49107-006: West Bengal Drinking Water Sector Improvement Project

Total Page:16

File Type:pdf, Size:1020Kb

49107-006: West Bengal Drinking Water Sector Improvement Project INITIAL ENVIRONMENTAL EXAMINATION UPDATED PROJECT NUMBER: 49107-006 NOVEMBER 2020 IND: WEST BENGAL DRINKING WATER SECTOR IMPROVEMENT PROJECT – BULK WATER SUPPLY FOR TWO BLOCKS IN BANKURA (Package DWW/BK/01) – PART A PREPARED BY PUBLIC HEALTH ENGINEERING DEPARTMENT, GOVERNMENT OF WEST BENGAL FOR THE ASIAN DEVELOPMENT BANK ABBREVIATIONS ADB - Asian Development Bank CBO - Community-Based Organization CPCB - Central Pollution Control Board CTE - Consent to Establish CTO - Consent to Operate DBO - Design, Build and Operate DDR - Due Diligence Report DMS - Detailed Measurement Survey DSC - District Steering Committee DSISC - Design, Supervision and Institutional Support Consultant EAC - Expert Appraisal Committee EHS - Environmental, Health and Safety EIA - Environmental Impact Assessment EMP - Environmental Management Plan ESSU - Environment and Social Safeguard Unit FGD - Focus Group Discussion GLR - Ground Level Reservoir GoWB - Government of West Bengal GRC - Grievance Redress Committee GRM - Grievance Redress Mechanism HIDCO - Housing and Infrastructure Development Corporation HSGO - Head, Safeguards and Gender Officer IBPS - Intermediate Booster Pumping Station IEE - Initial Environmental Examination IPP - Indigenous People Plan IWD - Irrigation and Waterways Department MOEFCC - Ministry of Environment, Forest and Climate Change NGO - Nongovernment Organization NOC - No Objection Certificate PHED - Public Health Engineering Department PIU - Project Implementation Unit PMC - Project Management Consultant PMU - Project Management Unit PPTA - Project Preparatory Technical Assistance PWSS - Piped Water Supply Scheme REA - Rapid Environmental Assessment RFCTLARRA - Right to Fair Compensation and Transparency in Land ROW - Right Acquisition,-of-Way Rehabilitation and Resettlement Act SIA - Social Impact Assessment SPS - Safeguard Policy Statement SGC - Safeguard and Gender Cell TOR - Terms of Reference WBDWSIP - West Bengal Drinking Water Sector Improvement Project P a g e | 1 WBPCB - West Bengal Pollution Control Board WHO - World Health Organization WTP - Water Treatment Plant WEIGHTS AND MEASURES m3/h : cubic meter per hour dBA : decibel C : degree Celsius Ha : hectare Km : kilometre Lpcd : liter per capita per day M : meter Mbgl : meters below ground level Mgd : million gallons per day MLD : million liters per day mm : millimetre km2 : square kilometer CURRENCY EQUIVALENTS (as of 11 July 2018) Currency Unit – Indian rupee (₹) ₹1.00 – $0.014 $1.00 = ₹68.691 NOTE In this report, "$" refers to United States dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. P a g e | 2 TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 5 I. INTRODUCTION ............................................................................................................. 10 A. Background .................................................................................................... 10 B. Purpose of the Initial Environmental Examination Report .......................... 12 C. Report Structure ............................................................................................ 13 II. DESCRIPTION OF THE PROJECT ................................................................................ 14 A. Project Area .................................................................................................... 14 B. Existing Water Supply Situation ................................................................... 15 C. Proposed Project ........................................................................................... 16 D. Work Completed and Undergoing ................................................................ 19 III. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ............................................. 28 A. ADB Policy ..................................................................................................... 28 B. National Environmental Laws ....................................................................... 30 C. Other Permission from Statutory Authorities .............................................. 33 IV. DESCRIPTION OF THE ENVIRONMENT ....................................................................... 36 A. Methodology Used for Baseline Study ......................................................... 36 B. Physical Resources ....................................................................................... 36 C. Ecological Resources .................................................................................... 50 D. Economic Development ................................................................................ 53 E. Socio Cultural Resources ............................................................................. 60 F. History, Culture and Tourism ........................................................................ 61 G. Subproject Site Environmental Features ..................................................... 64 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES .................. 67 A. Pre-Construction Impacts – Design and Location ....................................... 67 B. Construction Impacts .................................................................................... 71 C. Operation and Maintenance Impacts ............................................................ 81 VI. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ........................................ 84 A. Overview ......................................................................................................... 84 B. Public Consultation ....................................................................................... 84 C. Information Disclosure .................................................................................. 85 VII. GRIEVANCE REDRESS MECHANISM ............................................................................. 86 A. Project Specific Grievance Redress Mechanism ......................................... 86 VIII. ENVIRONMENTAL MANAGEMENT PLAN ....................................................................... 90 A. Environmental Management Plan ................................................................. 90 B. Implementation Arrangements ................................................................... 113 C. Capacity Building and Training .................................................................. 116 D. Monitoring and Reporting ........................................................................... 117 E. Environmental Management Plan Implementation Cost ........................... 117 IX. CONCLUSION AND RECOMMENDATIONS ................................................................... 119 P a g e | 3 APPENDIX Appendix 1: Rapid Environmental Assessment Checklist ................................................. 122 Appendix 2: National Ambient Air Quality Standards ......................................................... 126 Appendix 3: Vehicle Exhaust Emission Norms .................................................................. 128 Appendix 4: National Ambient Air Quality Standards in Respect of Noise ........................ 129 Appendix 5: Extract from Construction and Demolition Management Rules, 2016 .......... 130 Appendix 6: Department of Environment’s Direction Under Air Act, 1981 For Control of Air Pollution From Construction Activities In West Bengal ............................................... 136 Appendix 7: Salient Features of Major Labor Laws Applicable to Establishments Engaged in Construction of Civil Works ............................................................................................. 138 Appendix 8: Drinking Water Standards ............................................................................... 140 Appendix 9: Guidelines for Safety during Monsoon/Heavy Rainfall ................................. 143 Appendix 10: Photo Illustration of Recent Activity at Site ................................................. 145 Appendix 11: Summary of Public Consultation .................................................................. 146 Appendix 12: Photograph of Public Consultation............................................................... 154 Appendix 13: Sample Site Inspection Format Filled Up .................................................... 159 Appendix 14: GRC Notification and Committee ................................................................. 161 Appendix 15: Sample Grievance Registration Form .......................................................... 172 Appendix 16: Permission letter of water abstraction from IWD ......................................... 174 Appendix 17: Intake substation and WTP land details ....................................................... 176 Appendix 18: CTE from WBPCB .......................................................................................... 185 Appendix 19: Approved SEMP ............................................................................................. 188 Appendix
Recommended publications
  • Financial Year
    GITANJALI GEMS LIMITED Statement Showing Unpaid / Unclaimed Dividend as on Annual General Meeting held on September 28, 2012 for the financial year 2011‐12 First Name Last Name Address Country State District PINCode Folio Number Investment Type Amount Proposed Date of Securities Due(in of transfer to Rs.) IEPF (DD‐MON‐ YYYY) JYOTSANA OPP SOMESHWAR PART 3 NEAR GULAB TOWER THALTEJ AHMEDABAD INDIA GUJARAT AHMEDABAD 380054 GGL0038799 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 MANISH BRAHMBHAT 16 MADHUVAN BUNGLOW UTKHANTHESWAR MAHADEV RD AT DEGHAM DIST GANDHINAGAR DEHGAM INDIA GUJARAT GANDHI NAGAR 382305 GGL0124586 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 BHARAT PATEL A‐8 SHIV PARK SOC NR RAMROY NAGAR N H NO 8 AHMEDABAD INDIA GUJARAT GANDHI NAGAR 382415 GGL0041816 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 SHARMISTA GANDHI 13 SURYADARSHAN SOC KARELIBAUG VADODARA INDIA GUJARAT VADODARA 390228 GGL0048293 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 C MALPANI SURAT SURAT INDIA GUJARAT SURAT 395002 GGL0049550 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 SONAL SHETH C/O CENTURION BANK CENTRAL BOMBAY INFOTECH PARK GR FLR 101 K KHADEVE MARG MAHALAXMI MUMBAI INDIA MAHARASHTRA MUMBAI 400011 GGL0057531 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 CHIRAG SHAH C/O CENTURION BNK CENTRAL BOMY INFOTECH PARK GR FLR 101 KHADVE MAWRG MAHALAXMI MUMBAI INDIA MAHARASHTRA MUMBAI 400011 GGL0057921 Amount for unclaimed and unpaid dividend 105.00 08‐OCT‐2019 NUPUR C/O
    [Show full text]
  • State City Hospital Name Address Pin Code Phone K.M
    STATE CITY HOSPITAL NAME ADDRESS PIN CODE PHONE K.M. Memorial Hospital And Research Center, Bye Pass Jharkhand ​Bokaro NEPHROPLUS DIALYSIS CENTER - BOKARO 827013 9234342627 Road, Bokaro, National Highway23, Chas D.No.29-14-45, Sri Guru Residency, Prakasam Road, Andhra Pradesh Achanta AMARAVATI EYE HOSPITAL 520002 0866-2437111 Suryaraopet, Pushpa Hotel Centre, Vijayawada Telangana Adilabad SRI SAI MATERNITY & GENERAL HOSPITAL Near Railway Gate, Gunj Road, Bhoktapur 504002 08732-230777 Uttar Pradesh Agra AMIT JAGGI MEMORIAL HOSPITAL Sector-1, Vibhav Nagar 282001 0562-2330600 Uttar Pradesh Agra UPADHYAY HOSPITAL Shaheed Nagar Crossing 282001 0562-2230344 Uttar Pradesh Agra RAVI HOSPITAL No.1/55, Delhi Gate 282002 0562-2521511 Uttar Pradesh Agra PUSHPANJALI HOSPTIAL & RESEARCH CENTRE Pushpanjali Palace, Delhi Gate 282002 0562-2527566 Uttar Pradesh Agra VOHRA NURSING HOME #4, Laxman Nagar, Kheria Road 282001 0562-2303221 Ashoka Plaza, 1St & 2Nd Floor, Jawahar Nagar, Nh – 2, Uttar Pradesh Agra CENTRE FOR SIGHT (AGRA) 282002 011-26513723 Bypass Road, Near Omax Srk Mall Uttar Pradesh Agra IIMT HOSPITAL & RESEARCH CENTRE Ganesh Nagar Lawyers Colony, Bye Pass Road 282005 9927818000 Uttar Pradesh Agra JEEVAN JYOTHI HOSPITAL & RESEARCH CENTER Sector-1, Awas Vikas, Bodla 282007 0562-2275030 Uttar Pradesh Agra DR.KAMLESH TANDON HOSPITALS & TEST TUBE BABY CENTRE 4/48, Lajpat Kunj, Agra 282002 0562-2525369 Uttar Pradesh Agra JAVITRI DEVI MEMORIAL HOSPITAL 51/10-J /19, West Arjun Nagar 282001 0562-2400069 Pushpanjali Hospital, 2Nd Floor, Pushpanjali Palace,
    [Show full text]
  • Final Report
    FINAL REPORT EXTENT OF DECENTRALIZATION OF LOCAL PLANNING AND FINANCES IN WEST BENGAL To PLANNING COMMISSION SER DIVISION Government of India NEW DELHI BY Gramin Vikas Sewa Sanstha, Purba Udayrajpur, Tutepara- 24 Pg (N) West Bengal -700 129 ACKNOWLEDGEMENT At the out set we appreciate the thoughtfulness and the concern of the Adviser SER division Planning Commission Govt. of India, New Delhi for appreciating the proposed research project “EXTENT OF DECENTRALIZATION OF LOCAL PLANNING AND FINANCES IN WEST BENGAL” The cooperation and assistance provided by various functionaries like State Panchayat and Rural Development, District Zila Parishad, District magistrate office and member of Panchayat office are gratefully acknowledged. We are also grateful to the leaders and functionaries of NGOs, CBOs and Civil Society organisations working in the target districts. We are indebted to the Adviser SER, Planning Commission and the Deputy Adviser State planning for the guidance, we are thankful to Mr. S. Mukherjee Deputy Secretary SER Planning Commission. Mr. B S. Rather Senior Research Officer, and Satish Sharma Assistant. Dr. M.N. Chakraborty and Dr. Manoj Roy Choudhary helped us in the compilation and analysis of data and report preparation. I gratefully acknowledge their assistance. I extend my heartfelt thanks to the Team Leaders and their teammates, who conducted the study sincerely. Last but not the least, the cooperation and assistance of the respondents in providing required information is gratefully acknowledged. (Subrata Kumar Kundu) Study
    [Show full text]
  • Journal of History
    Vol-I. ' ",', " .1996-97 • /1 'I;:'" " : ",. I ; \ '> VIDYASAGAR UNIVERSITY Journal of History S.C.Mukllopadhyay Editor-in-Chief ~artment of History Vidyasagar University Midnapore-721102 West Bengal : India --------------~ ------------ ---.........------­ I I j:;;..blished in June,1997 ©Vidyasagar University Copyright in articles rests with respective authors Edi10rial Board ::::.C.Mukhopadhyay Editor-in-Chief K.K.Chaudhuri Managing Editor G.C.Roy Member Sham ita Sarkar Member Arabinda Samanta Member Advisory Board • Prof.Sumit Sarkar (Delhi University) 1 Prof. Zahiruddin Malik (Aligarh Muslim University) .. <'Jut". Premanshu Bandyopadhyay (Calcutta University) . hof. Basudeb Chatterjee (Netaji institute for Asian Studies) "hof. Bhaskar Chatterjee (Burdwan University) Prof. B.K. Roy (L.N. Mithila University, Darbhanga) r Prof. K.S. Behera (Utkal University) } Prof. AF. Salauddin Ahmed (Dacca University) Prof. Mahammad Shafi (Rajshahi University) Price Rs. 25. 00 Published by Dr. K.K. Das, Registrar, Vidyasagar University, Midnapore· 721102, W. Bengal, India, and Printed by N. B. Laser Writer, p. 51 Saratpalli, Midnapore. (ii) ..., -~- ._----~~------ ---------------------------- \ \ i ~ditorial (v) Our contributors (vi) 1-KK.Chaudhuri, 'Itlhasa' in Early India :Towards an Understanding in Concepts 1 2.Bhaskar Chatterjee, Early Maritime History of the Kalingas 10 3.Animesh Kanti Pal, In Search of Ancient Tamralipta 16 4.Mahammad Shafi, Lost Fortune of Dacca in the 18th. Century 21 5.Sudipta Mukherjee (Chakraborty), Insurrection of Barabhum
    [Show full text]
  • 49107-006: West Bengal Drinking Water Sector Improvement Project
    Land Acquisition, Involuntary Resettlement and Indigenous People Due Diligence Report Document Stage: Updated Draft Project Number: 49107-006 January 2020 IND: West Bengal Drinking Water Sector Improvement Project – Construction of IBPS-cum- GLSR at Raghunathpur, IBPS at Gobindapur, Including Transmission Mains, Overhead Reservoirs, Water Supply Distribution Network and Metering Works in Indpur Block (PART A) Package No. WW/BK/02A Prepared by Public Health Engineering Department, Government of West Bengal for the Asian Development Bank. This land acquisition, involuntary resettlement and indigenous people due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 24 September 2018) Currency unit = Indian rupee (`) INR 1.00 = $0.0138 $1.00 = ` 72.239 ABBREVIATIONS ADB - Asian Development Bank BPS - booster pumping stations DMS - detailed measurement survey FGD - focus group discussions GRC - grievance redressal committee GRM - grievance redress committee NGO - non-governmental organization PHED - public health
    [Show full text]
  • 07Day Bankura & Purulia Singdha Srijon Tours Private Limited
    07DAY BANKURA & PURULIA SINGDHA SRIJON TOURS PRIVATE LIMITED Respected Sir / Madam, Greetings from SINGDHA SRIJON TOURS PVT. LTD. !!! You are invited to joining for hotel booking first time to SINGDHA SRIJON TOURS PRIVATE LIMITED. BUDGET TOUR PACKAGES: Briharinath Hill 2 NIGH AND Mukutmonipur 1 NIGHT, Bishnupur 1 NIGHT, 1ST DAY:- Adra / Raniganj / Asansol / Durgapur to Barhanti 4TH DAY:- Purulia to Susunia / Biharinath / Raghunathpur 5TH DAY:- Mukutmanipur Sightseeing 2ND DAY:- Barhanti / Biharinath / Raghunathpur to 6TH DAY:- Bishnupurlocal Sightseeing Baghmundi 7TH DAY:- Drop 3RD DAY:- Baghmundi to Purulia RATE 6 NIGHT 7 DAYS (B) RATE 6 NIGHT 7 DAYS (A) 2 PAX RS 50000 PER PAX 25000 2 PAX RS 00000 PER PAX 00000 4 PAX RS 74000 PER PAX 18500 4 PAX RS 00000 PER PAX 00000 6 PAX RS 102000 PER PAX 17000 6 PAX RS 00000 PER PAX 00000 8 PAX RS 124000 PER PAX 15500 8 PAX RS 00000 PER PAX 00000 Extra person with bed Rs 12500, child with out bed Rs 8000 Note:- Bankura & Purulia hotel with map plan , id prove mandatory all person , if possible nathula pass , payment hotel as on rate . Car – max or sumo, bolero (set capasity 8 person) . Gst extra. PAYMENT ACCOUNT DETAILS 01. Account Holder Name:- Singdha Srijon Tours 02. Account Holder Name:- Singdha Srijon Tours Private Limited. Private Limited. Bank Name:- State Bank of India Bank Name:- ICICI Bank Branch:- Katabagan Branch:- R.N Tagar Road, Bohrampore A/c No:- 39053858287 A/c No:- 333105003231 Ifsc:- SBIN0007147 Ifsc:- ICIC0003331 Micro Code - 742002101 Micro Code - 742229002 COMPANY NAME (BILLING INVOICE) - SINGDHA SRIJON TOURS PRIVATE.
    [Show full text]
  • Office of the Executive Engineer' Kangsabati Mechanical Division' Khatra
    GOVERNMENT OF WEST BENGAL DI RECTORATE I RRIGATION & WATERWAYS Office of the Executive Engineer' Kangsabati Mechanical Division' Khatra. Bankura Dated: O}.O2-2O2O Memo No.78/10E-28 (For Budgetary PurPose) invited quotes at competiiive current m rrket prices is being Expression of interest for obtaining budgetary resourcefu| Division, Khatra , Bankura from reliabIe reputed by Executive Engineer, Kangsabati MechanicaI of estimated cost for "Renovation of Rail along agencies/manufacturer in connection with determination trolley movement' construction of shed with Girder, fixtures ,gate, electro-mechanical hoisting system, in arr respect at Mukutmanipur, P.O- Khatra, and painting arong with ail necessary civir work comprete Dist- Bankura ". lssue of EOI doguments:- web site www.wbiwd'sov'in as well as The Eol documents can be downloaded from the Departmental Mechanical Division, Khatra, Bankura can be seen from the office of the Executive Engineer, Kangsabati during office hours on all working days up to 25.02.2020 up to 3.00 P.M. Submission of EOI:- their proposal The intending agencies should submit their most competitive budgetary quote based on a sealed'envelope as per current market price in the prescribed BoQ Format(Annexed to this notice) in supers cribbing on the top "Renovation of Rail along with Girder, fixtures ,gate, electro-mechanical hoisting system, trolley movement, Construction of shed and painting along with all necessary civil work complete in all respect at Mukutmanipur , P.O- Khatra, Dist- Bankura ".The intending agencies / manufacturer should submit their EOI as per ltems to be framed by themselves based on their technical proposal. The quoted rate should be exclusive of all taxes and duties.
    [Show full text]
  • CPI(Maoist) Spokesperson Comrade Azad on 2009 Lok Sabha Elections
    MAOIST INFORMATION BULLETIN - 7 April 15, 2009 In this issue News from the battle field From the news papers Interview with CPI(Maoist) Spokesperson Comrade Azad on 2009 Lok Sabha elections Press statements Maoists Avenge Singaram Massacre News from Battle-field Maoist guerrillas wipe out 15 policemen in Maharashtra in a daring day-light ambush In one of the most daring attacks by Maoist guerrillas on the mercenary police forces in Maharashtra, 15 policemen including a sub-inspector were wiped out in the jungles of Markegaon village in Dhanora tehsil of Gadchiroli district, around 300 km from Nagpur, on the morning of February 1. After the successful ambush the Maoists retreated without any casualty. Markegaon is close to the Gyrapatti-Sawargaon road and around eight km from the Gyarapatti Katgul police outpost, which is along the Maharashtra-Chhattisgarh border. The police sub-inspector killed has been identified as Bhupendra Gudgekar of Amravati. A number of cops took bullet injuries. A sources in Gadchiroli police said, ‘’The police party was heading towards Markegaon, some 45 km from Dhanora, to investigate into the January 30 arson committed by the Maoists, when the rebels attacked them. The police party was ambushed in such a manner that all the members, including head PSI Gudgekar, were killed on spot.’’ The ambush took place at around 11.15 am. When a relief party reached the area to rescue the first team, it, too, was attacked, preventing immediate reinforcement. But by late in the afternoon on 1st, more than 3,000 police personnel were sent to Gadchiroli.
    [Show full text]
  • Geoarchaeosites for Geotourism: a Spatial Analysis for Rarh Bengal in India
    GeoJournal of Tourism and Geosites Year XII, vol. 25, no. 2, 2019, p.543-554 ISSN 2065-1198, E-ISSN 2065-0817 DOI 10.30892/gtg.25221-379 GEOARCHAEOSITES FOR GEOTOURISM: A SPATIAL ANALYSIS FOR RARH BENGAL IN INDIA Premangshu CHAKRABARTY* Visva-Bharati University, Faculty of Geography, Department of Geography, Santiniketan, Bolpur, West Bengal, India, e-mail: [email protected] Rahul MANDAL Visva-Bharati University, Department of Geography, Santiniketan, Bolpur, West Bengal, India, e-mail: [email protected] Citation: Chakrabarty, P., & Mandal, R. (2019). GEOARCHAEOSITES FOR GEOTOURISM: A SPATIAL ANALYSIS FOR RARH BENGAL IN INDIA. GeoJournal of Tourism and Geosites, 25(2), 543–554. https://doi.org/10.30892/gtg.25221-379 Abstract: Rarh Bengal in India is a well known lateritic landscape endowed with a number of geoarchaeological sites. Research gaps have been identified in the systematic mapping and location analysis on the nature of distributional pattern of such geoarchaeosites from the perspective of planning a number of geotourism circuits. With application of nearest neighbour analysis and GIS based digital cartography, this paper is an attempt to analyze space-time dimensions of geosites bearing the traces of past lives with special concentration on our predecessors. With the application of network analysis, shortest route planning is obtained for sustainable tourist movement. Key words: Location, cartography, nearest neighbour, network, sustainable * * * * * * INTRODUCTION Cemented deposits like pebble or cobble conglomerates in many places of Indian subcontinent bears the imprint of past lives of trees, animals and human being with their artifacts. Such fossils are useful for the classification and cataloguing of the entire roster of life with discernable evolution phases along with recognition of the divisions of geologic time (Dietz et al., 1987).
    [Show full text]
  • Market Survey Report Year : 2011-2012
    GOVERNMENT OF WEST BENGAL AGRICULTURAL MARKET DIRECTORY MARKET SURVEY REPORT YEAR : 2011-2012 DISTRICT : PURULIA THE DIRECTORATE OF AGRICULTURAL MARKETING P-16, INDIA EXCHANGE PLACE EXTN. CIT BUILDING, 4 T H F L O O R KOLKATA-700073 THE DIRECTORATE OF AGRICULTURAL MARKETING Government of West Bengal LIST OF MARKETS Purulia District Sl. No. Name of Markets Block/Municipality Page No. 1 Balarampur Hat Balarampur 1 2 Balarampur Market - do - 2 3 Berada Hat - do - 3 4 Choto Urma Hat - do - 4 5 Dabha Hat - do - 5 6 Malati Hat - do - 6 7 Bamundiha Hat Barabazar 7 8 Barabazar Hat - do - 8 9 Barabazar Market - do - 9 10 Sindri Hat - do - 10 11 Arsha Hat Arsha 11 12 Hatijuri Hat - do - 12 13 Kantadih Hat - do - 13 14 Senabana Hat - do - 14 15 Sirkabad Market - do - 15 16 Baghmundi Hat Baghmundi 16 17 Deuli Hat - do - 17 18 Kalimati Hat - do - 18 19 Suisa Market & Hat - do - 19 20 Bandhaghat Jhalda Municipality 20 21 Jhalda Cattle Market - do - 21 22 Jhalda Vegetable Market - do - 22 23 Rajar Hat - do - 23 24 Rajarhat Market - do - 24 25 Ilu Bazar Jhalda- I 25 26 Nowahatu Hat - do - 26 27 Rajar Hat - do - 27 28 Torang Hat - do - 28 29 Tulin Hat - do - 29 30 Begunkodar Hat Jhalda- I I 30 31 Begunkodar Market - do - 31 32 Kotshila Hat ( Janaganer ) - do - 32 33 Barotar Hat Joypur 33 34 Jaypur Market & Hat - do - 34 35 Kayalimohar Market - do - 35 36 Pundag Hat - do - 36 37 Ropo Hat - do - 37 38 Bandwan Bazar Bandwan 38 39 Bandwan Hat - do - 39 40 Chirudi Hat - do - 40 41 Dhadka Weekly Hat - do - 41 42 Doasinir Hat - do - 42 43 Kuchia Hat - do - 43 44 Kuilapal Hat - do - 44 45 Madhuban Hat - do - 45 46 Rajgram Hat - do - 46 47 Sirka Weekly Hat - do - 47 48 Bishpuria Hat Hura 48 49 Hura Market & Hat - do - 49 50 Keshargarh Market - do - 50 51 Ladhurka Hat - do - 51 52 Maguria Hat - do - 52 53 Bargoria Hat Manbazar- I 53 54 Bari Hat - do - 54 55 Bere Hat - do - 55 Sl.
    [Show full text]
  • Chapter Ii History Rise and Fall of the Bishnupur Raj
    CHAPTER II HISTORY RISE AND FALL OF THE BISHNUPUR RAJ The history of Bankura, so far as it is known, prior to the period of British rule, is identical with the history of the rise and fall of the Rajas of Bishnupur, said to be one of the oldest dynasties in Bengal. "The ancient Rajas of Bishnupur," writes Mr. R. C. Dutt, "trace back their history to a time when Hindus were still reigning in Delhi, and the name of Musalmans was not yet heard in India. Indeed, they could already count five centuries of rule over the western frontier tracts of Bengal before Bakhtiyar Khilji wrested that province from the Hindus. The Musalman conquest of Bengal, however, made no difference to the Bishnupur princes. Protected by rapid currents like the Damodar, by extensive tracts of scrub-wood and sal jungle, as well as by strong forts like that of Bishnupur, these jungle kings were little known to the Musalman rulers of the fertile portions of Bengal, and were never interfered with. For long centuries, therefore, the kings of Bishnupur were supreme within their extensive territories. At a later period of Musalman rule, and when the Mughal power extended and consolidated itself on all sides, a Mughal army sometimes made its appearance near Bishnupur with claims of tribute, and tribute was probably sometimes paid. Nevertheless, the Subahdars of Murshidabad never had that firm hold over the Rajas of Bishnupur which they had over the closer and more recent Rajaships of Burdwan and Birbhum. As the Burdwan Raj grew in power, the Bishnupur family fell into decay; Maharaja Kirti Chand of Burdwan attacked the Bishnupur Raj and added to his zamindari large slices of his neighbour's territories.
    [Show full text]
  • A Village in the Bishnupur Subdivision, Situated 7 Miles North-West of Bishnupur
    CHAPTER XIV GAZETTEER Ajodhya— A village in the Bishnupur subdivision, situated 7 miles north-west of Bishnupur. The village contains a charitable dispensary and the residence of one of the leading zamindars of the district. Ambikanagar— A village in the Bankura subdivision, situated on the south bank of the Kasai river, 10 miles south-west of Khatra, with which it is connected by an unmetalled road. This village has given its name to a pargana extending over 151 square miles, and was formerly the headquarters of an ancient family of zamindars, whose history has been given in the article on Dhalbhum. Bahulara— A village in the Bankura subdivision, situated on the south bank of the Dhalkisor river, 12 miles south-east of Bankura and 3 miles north of Onda. It contains a temple dedicated to Mahadeo Siddheswar, said to have been built by the Raja of Bishnupur, which Mr. Beglar has described as the finest brick temple in the district, and the finest though not the largest brick temple that he had seen in Bengal. He gives the following account of it in the Reports of the Archaeological Survey of India, Vol. VIII. "The temple is of brick, plastered; the ornamentation is carefully cut in the brick, and the plaster made to correspond to it. There are, however, ornaments on the plaster alone, but none inconsistent with the brick ornamentation below. I conclude, therefore, that the plaster formed a part of the original design. The mouldings of the basement are to a great extent gone, but from fragments here and there that exist, a close approximation can be made to what it was; some portions are, however, not recoverable.
    [Show full text]