LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Lincoln Training Center Diversified Landscape Co. Woods Maintenance Service, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News

FACILITY/LOCATION 36 MONTH BASE A. BUS DIVISIONS, TERMAINALS AND LAYOVER LOTS MONTHLY MONTHLY MONTHLY SAN FERNANDO $535.25 $444.00 $1,506.00 SAN GABRIEL VAL $540.50 $888.00 $1,506.00 DIVISION 1 $1,635.75 $1,110.00 $4,438.00 DIVISION 2 $420.79 $444.00 $1,163.00 DIVISION 3 $357.27 $333.00 $986.00 DIVISION 4 $325.95 $888.00 $889.00 DIVISION 5 $335.35 $1,332.00 $1,035.00 DIVISION 6 $219.36 $444.00 $617.00 DIVISION 7 $239.36 $444.00 $655.00 DIVISION 8 $375.98 $1,332.00 $1,026.00 DIVISION 9 $170.25 $888.00 $479.00 DIVISION 10 $646.50 $2,664.00 $1,751.00 DIVISION 12 $175.80 $666.00 $493.00 DIVISION 15 $1,300.00 $2,220.00 $3,558.00 TERMINAL 17 $197.25 $222.00 $547.00 DIVISION 18 $645.85 $1,554.00 $1,751.00 TERMINAL 19 $1,235.55 $222.00 $3,354.00 TERMINAL 26 $180.00 $222.00 $506.00 TERMINAL 27 $190.00 $222.00 $533.00 LOCATION 30 $2,479.59 $444.00 $6,735.00 LOCATION 31 $170.95 $222.00 $479.00 TERMINAL 37 $105.27 $222.00 $288.00 TERMINAL 38 $257.39 $222.00 $711.00 TERMINAL 39 $174.95 $222.00 $479.00 TERMINAL 40 $629.36 $222.00 $1,711.00 TERMINAL 42 $238.07 $222.00 $657.00 TERMINAL 44 $340.75 $222.00 $932.00 TERMINAL 45 $192.75 $222.00 $531.00 TERMINAL 47 $388.29 $222.00 $1,058.00 LOCATION 53 $335.36 $222.00 $889.00 LAYOVER LOT $270.40 $222.00 $751.00 BUS DIVISIONS MONTHLY SUBTOTAL $15,309.89 (A) $19,425.00 (A) $42,014.00 (A) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

B. BLUE LINE FACILITIES LOCATION 60 $310.75 $293.00 $889.00 IMPERIAL STATION $320.25 $293.00 $902.00 LOCATION 60 $325.98 $293.00 $916.00 $350.80 $222.00 $986.00 GRAND STATION $475.29 $222.00 $1,312.00 SAN PEDRO STATION $470.79 $444.00 $1,301.00 WASHINGTON STATION $369.98 $222.00 $1,012.00 $389.10 $222.00 $1,067.00 $375.25 $222.00 $1,040.00 FLORENCE STATION $320.65 $444.00 $902.00 103rd STREET STATION $630.12 $133.00 $1,737.00 $338.15 $444.00 $933.00 $912.26 $666.00 $2,478.00 $965.36 $888.00 $2,629.00 DIVISION 11 $642.36 $444.00 $1,751.00 $813.45 $222.00 $2,217.00 WILLOW STATION $646.32 $222.00 $1,767.00

Page 1 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Lincoln Training Center Diversified Landscape Co. Woods Maintenance Service, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News FLORENCE $330.00 $222.00 $916.00 FIRESTONE $340.35 $222.00 $932.00 103RD STREET $340.75 $222.00 $946.00 PIRU STATION $355.86 $222.00 $916.00 COMPTON $375.00 $222.00 $916.00 PACIFIC COAST HIGHWAY $335.39 $222.00 $916.00 9TH STREET $350.98 $444.00 $970.00 1ST STREET $372.75 $222.00 $1,026.00 WATTS URBAN PARK $1,000.00 $666.00 $3,367.00 LAKEWOOD STATION $45.95 $133.00 $121.00 LONG BEACH STATION $45.95 $222.00 $121.00 BLUE LINE MONTHLY SUBTOTAL $12,549.84 (B) $8,915.00 (B) $34,986.00 (B) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

C. RED LINE FACILITIES DIVISION 20 $345.36 $888.00 $983.00 CIVIC CENTER STATION $475.79 $444.00 $1,328.00 $359.36 $222.00 $1,013.00 WILSHIRE/NORMANDY STATION $500.00 $444.00 $1,368.00 VERMONT/BEVERLY STATION $395.36 $222.00 $1,110.00 VERMONT/SANTA MONICA STATION $520.19 $666.00 $1,438.00 VERMONT/SUNSET STATION $370.98 $222.00 $1,026.00 UNIVERSITY CITY STATION $819.39 $1,554.00 $2,258.00 $825.66 $1,110.00 $2,258.00 WESTLAKE STATION $650.96 $1,110.00 $1,848.00 RED LINE MONTHLY SUBTOTAL $5,263.05 (C) $6,882.00 (C) $14,630.00 (C) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY D. GREEN LINE PARK-AND-RIDE LOTS AND FACILITIES $501.39 $222.00 $1,436.00 NASH $65.50 $888.00 $188.00 DIVISION 22 $398.46 $888.00 $1,110.00 MARINE STATION $631.36 $222.00 $1,737.00 DOUGLAS STATION $342.36 $222.00 $945.00 MARIPOSA STATION $375.41 $222.00 $1,067.00 AVIATION STATION $1,125.31 $666.00 $3,394.00 117TH STREET $50.00 $666.00 $132.00 NEW HAMPSHIRE $50.00 $666.00 $143.00 BELLHAVEN $50.00 $888.00 $145.00 LONG BEACH STATION $332.69 $888.00 $932.00 FERNWOOD A $52.30 $888.00 $151.00 FERNWOOD B $52.30 $666.00 $132.00 FLORENCE $75.62 $888.00 $223.00 LOCATION 66, LIGHT RAIL $330.46 $888.00 $916.00 DEL NORTE STATION $335.76 $222.00 $959.00 IMPERIAL STATION $330.98 $444.00 $932.00 IMPERIAL $80.79 $444.00 $234.00 PARAMOUNT STATION $337.38 $222.00 $946.00 LEAHY AVE. STATION $150.00 $222.00 $520.00 GREEN LINE PART-AND-RIDE LOT & FAC. MONTHLY SUBTOTAL $5,668.07 (D) $11,322.00 (D) $16,242.00 (D)

Page 2 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Lincoln Training Center Diversified Landscape Co. Woods Maintenance Service, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News FACILITY/LOCATION MONTHLY MONTHLY MONTHLY E. EXPO LINE PHASE 1 (FROM East to West) 23rd Street Station $1,050.35 $666.00 $1,094.00 Jefferson/USC Station $1,750.05 $444.00 $1,076.00 Expo Park/USC Station $700.12 $888.00 $1,101.00 Expo/Vermont Station $1,050.00 $444.00 $1,181.00 Expo/Western Station $2,195.75 $222.00 $1,108.00 Expo/ $1,750.32 $222.00 $1,191.00 Farmdale Station $1,398.95 $222.00 $1,093.00 Expo/La Brea Station $2,150.25 $222.00 $1,007.00 La Cienega/Jefferson Station $1,200.00 $888.00 $1,373.00 $1,798.36 $444.00 $1,542.00 TPSS #1 (Flower/18th — in Caltrans Property) $355.00 $444.00 $489.00 TPSS #2 (Flower/37th) $355.00 $666.00 $534.00 TPSS #3 (Exposition/Halldale) $355.00 $222.00 $513.00 TPSS #4 (Rodeo/Cimarron) $355.00 $222.00 $491.00 TPSS #5 (Exposition PI/9th Ave) $355.00 $444.00 $434.00 TPSS #6 (Exposition/Farmdale) $355.00 $222.00 $496.00 TPSS #7 (Jefferson/La Cienega) $355.00 $222.00 $522.00 TPSS #8 (Washington/National) $355.00 $288.00 $524.00 La Cienega Parking Structure $550.00 $22.00 $974.00 EXPO LINE PHASE 1 MONTHLY SUBTOTAL $18,434.15 (E) $7,414.00 (E) $16,743.00 (E) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY F. GOLD LINE FACILITIES POMONA / ATLANTIC $320.76 $603.00 $1,101.00 ATLANTIC $180.36 $444.00 $555.00 EAST LOS ANGELES / CIVIC CENTER $315.15 $888.00 $1,087.00 ARIZONA / 3RD ST $175.36 $444.00 $550.00 MARAVILLA $339.75 $222.00 $1,337.00 INDIANA $210.78 $222.00 $541.00 INDIANA $420.86 $222.00 $1,315.00 SOTO TPSS $179.36 $222.00 $532.00 SOTO $332.47 $888.00 $1,286.00 MARIACHI PLAZA $325.36 $444.00 $1,569.00 PICO TPSS $225.10 $444.00 $531.00 PICO / ALISO $332.10 $657.00 $1,501.00 Little Tokyo / Arts District $331.86 $444.00 $1,438.00 CHINA TOWN $650.79 $666.00 $1,607.00 BAKER STREET $315.20 $444.00 $784.00 DIVISION 21 $320.21 $888.00 $797.00 MIDWAY YARD $340.29 $444.00 $834.00 LINCOLN HEIGHTS/CYPRESS PARK $618.26 $222.00 $1,488.00 HERITAGE SQUARE/ARROYO $649.36 $222.00 $1,505.00 HERITAGE SQUARE/ARROYO $329.25 $222.00 $811.00 SOUTHWEST MUSEUM $338.35 $222.00 $797.00 AVENUE 50 $200.00 $888.00 $495.00 HIGHLAND PARK $359.45 $444.00 $869.00 MONTEREY $200.00 $444.00 $495.00 MISSION AVENUE $629.98 $666.00 $1,511.00 GLENARM $200.00 $222.00 $452.00 FILLMORE $215.00 $222.00 $584.00 DEL MAR $336.80 $222.00 $800.00 MEMORIAL PARK $338.81 $444.00 $810.00 WALNUT AVENUE $200.00 $222.00 $499.00

Page 3 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Lincoln Training Center Diversified Landscape Co. Woods Maintenance Service, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News CRAIG AVENUE $200.00 $222.00 $523.00 TITLEY AVENUE $200.00 $293.00 $499.00 SIERRA MADRE VILLA $340.07 $222.00 $834.00 GOLD LINE FACILITIES MONTHLY SUBTOTAL $10,671.09 (F) $13,985.00 (F) $30,337.00 (F) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

G. GOLD LINE ROW MAINTENANCE LOC's (LP SHEET #'S) 102 $37.16 $140.00 $108.00 105 $38.00 $140.00 $114.00 308 $40.35 $140.00 $108.00 403 $38.00 $140.00 $108.00 404 $38.00 $140.00 $111.00 405 $70.50 $140.00 $216.00 503 $40.36 $140.00 $114.00 504 $70.45 $140.00 $222.00 505 $74.15 $140.00 $213.00 506 $75.10 $140.00 $222.00 507 $47.75 $140.00 $144.00 508 $38.00 $140.00 $108.00 509 $70.35 $140.00 $213.00 509 $45.00 $140.00 $141.00 606 $47.00 $140.00 $141.00 607 $40.76 $140.00 $115.00 608 $38.38 $140.00 $111.00 609 $39.45 $140.00 $120.00 610 $35.24 $140.00 $108.00 611 $45.60 $140.00 $123.00 612 $47.19 $140.00 $141.00 613 $50.15 $140.00 $150.00 703 $75.36 $140.00 $158.00 703 $78.35 $140.00 $172.00 704 $43.76 $140.00 $132.00 705 $45.31 $140.00 $141.00 706 $39.91 $140.00 $120.00 707 $39.37 $140.00 $120.00 708 $40.00 $140.00 $114.00 709 $40.38 $140.00 $123.00 709 $39.91 $140.00 $120.00 710 $50.00 $140.00 $153.00 711 $35.00 $140.00 $108.00 715 $37.00 $140.00 $114.00 715 $40.79 $140.00 $120.00 717 $38.26 $140.00 $120.00 904 $38.15 $140.00 $114.00 905 $40.12 $140.00 $128.00

Page 4 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Lincoln Training Center Diversified Landscape Co. Woods Maintenance Service, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News GOLD LINE ROW MAINTENANCE LOC's MONTHLY SUBTOTAL $1,788.61 (G) $5,320.00 (G) $5,208.00 (G) (A) (C=AXB) (A) (C=AXB) (A) (C=AXB) SUBTOTAL (B) ANNUAL SUBTOTAL (B) ANNUAL SUBTOTAL (B) ANNUAL THREE YEAR BASE SUBTOTALS (Monthly) 12 MON BASE SUBTOTAL (Monthly) 12 MON BASE SUBTOTAL (Monthly) 12 MON BASE SUBTOTAL A. BUS DIVISION, TERMINALS AND LAYOVERS $15,309.89 12 $183,718.68 $19,425.00 12 $233,100.00 $42,014.00 12 $504,168.00 B. BLUE LINE FACILITIES $12,549.84 12 $150,598.08 $8,915.00 12 $106,980.00 $34,986.00 12 $419,832.00 C. RED LINE FACILITIES $5,263.05 12 $63,156.60 $6,882.00 12 $82,584.00 $14,630.00 12 $175,560.00 D. GREEN LINE PARK-AND-RIDE FACILITIES $5,668.07 12 $68,016.84 $11,322.00 12 $135,864.00 $16,242.00 12 $194,904.00 E. EXPO LINE PHASE 1 FACILITIES $18,434.15 12 $221,209.80 $7,414.00 12 $88,968.00 $16,743.00 12 $200,916.00 F. GOLD LINE FACILITIES $10,671.09 12 $128,053.08 $13,985.00 12 $167,820.00 $30,337.00 12 $364,044.00 G. GOLD LINE ROW MAINTENANCE LOCATIONS $1,788.61 12 $21,463.32 $5,320.00 12 $63,840.00 $5,208.00 12 $62,496.00 TOTAL ANNUAL COST (A-G) $836,216.40 $879,156.00 $1,921,920.00 TOTAL THREE YEAR BASE CONTRACT (D)=(CX3) $2,508,649.20 $2,637,468.00 $5,765,760.00

OPTION YEAR 1 ANNUAL COST $836,216.40 $879,156.00 $1,921,920.00 EXCALATION % 5% 10% 4.5% ESCALATION COST $41,810.82 $87,915.60 $86,486.40 (F) TOTAL OPTION YEAR 1 (escalation cost + annual) $878,027.22 $967,071.60 $2,008,406.40

OPTION YEAR 2 OPTION YEAR 2 COST (F) $878,027.22 $967,071.60 $2,008,406.40 EXCALATION % 5% 5% 4.5% ESCALATION COST $43,901.36 $48,353.58 $90,378.29 (H) TOTAL OPTION YEAR 1 (escalation cost + annual) $921,928.58 $1,015,425.18 $2,098,784.69 Estimated Fully Burdened Estimated Fully Burdened Estimated Fully Burdened 1. GENERAL Hours Hourly Rate Subtotal Hours Hourly Rate Subtotal Hours Hourly Rate Subtotal Year 1 through 5 2,000$ 20.50 $41,000.00 2,000$ 37.50 $75,000.00 2,000$ 24.50 $49,000.00 Est. Number of Est. Number of Est. Number of 2. PLANT REPLACEMENT Plants Cost Per Plant Subtotal Plants Cost Per Plant Subtotal Plants Cost Per Plant Subtotal A. Replace plants years 1 through 5, including soil mitigation(activated charcoal or imported backfill) 1. - 15 gal 500$ 87.00 $43,500.00 500$ 64.80 $32,400.00 500$ 94.00 $47,000.00 2. - 5 gal 750$ 19.05 $14,287.50 750$ 18.40 $13,800.00 750$ 19.00 $14,250.00 3. - 1 gal 1,000$ 5.30 $5,300.00 1,000$ 6.60 $6,600.00 1,000$ 12.00 $12,000.00 Replace Plants with Soil Mitigation TOTAL $63,087.50 $52,800.00 $73,250.00 B. Replace plants years 1 through 5, without soil mitigation 1. - 15 gal 500$ 84.50 $42,250.00 500$ 62.70 $31,350.00 500$ 90.00 $45,000.00 2. - 5 gal 750$ 17.55 $13,162.50 750$ 17.50 $13,125.00 750$ 17.00 $12,750.00 3. - 1 gal 1,000$ 4.55 $4,550.00 1,000$ 6.30 $6,300.00 1,000$ 10.00 $10,000.00 TOTAL $59,962.50 $50,775.00 $67,750.00 General Total $41,000.00 $75,000.00 $49,000.00 Replace plants, incl. Soil Mitigation $63,087.50 $52,800.00 $73,250.00 Replace plants, w/out Soil Mitigation $59,962.50 $50,775.00 $67,750.00 TOTAL AS NEEDED SERVICES $164,050.00 $178,575.00 $190,000.00 THREE YEAR BASE $2,508,649.20 $2,637,468.00 $5,765,760.00 FIRST YEAR OPTION $878,027.22 $967,071.60 $2,008,406.40 2ND YEAR OPTION $921,928.58 $1,015,425.18 $2,098,784.69 AS NEEDED PRICING $164,050.00 $178,575.00 $190,000.00 FIVE YEAR GRAND TOTAL $4,472,655.00 $4,798,539.78 $10,062,951.09

Page 5 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Conejo Crest Landscape Marina Landscape Inc. Complete Landscape Care, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News

FACILITY/LOCATION 36 MONTH BASE A. BUS DIVISIONS, TERMAINALS AND LAYOVER LOTS MONTHLY MONTHLY MONTHLY SAN FERNANDO $1,263.25 $1,319.13 $1,500.00 SAN GABRIEL VAL $1,263.25 $1,319.13 $1,500.00 DIVISION 1 $3,732.34 $3,897.44 $1,500.00 DIVISION 2 $976.14 $1,019.33 $1,500.00 DIVISION 3 $826.84 $863.43 $1,500.00 DIVISION 4 $746.46 $779.49 $1,500.00 DIVISION 5 $780.92 $815.46 $1,500.00 DIVISION 6 $516.77 $539.65 $1,500.00 DIVISION 7 $551.24 $575.62 $1,500.00 DIVISION 8 $861.31 $899.41 $1,500.00 DIVISION 9 $401.94 $419.72 $1,500.00 DIVISION 10 $1,469.95 $1,534.99 $1,500.00 DIVISION 12 $413.42 $431.72 $1,500.00 DIVISION 15 $2,985.84 $3,117.95 $1,500.00 TERMINAL 17 $459.37 $479.68 $500.00 DIVISION 18 $1,469.95 $1,534.99 $1,000.00 TERMINAL 19 $2,813.59 $2,938.07 $1,500.00 TERMINAL 26 $424.90 $443.71 $500.00 TERMINAL 27 $447.89 $467.69 $500.00 LOCATION 30 $5,650.16 $5,900.12 $1,000.00 LOCATION 31 $401.94 $419.72 $1,000.00 TERMINAL 37 $241.16 $251.83 $500.00 TERMINAL 38 $597.16 $623.59 $500.00 TERMINAL 39 $401.94 $419.72 $500.00 TERMINAL 40 $1,435.51 $1,499.01 $500.00 TERMINAL 42 $551.24 $575.62 $500.00 TERMINAL 44 $780.92 $815.46 $500.00 TERMINAL 45 $444.63 $464.29 $500.00 TERMINAL 47 $888.09 $927.39 $500.00 LOCATION 53 $746.46 $779.49 $2,000.00 LAYOVER LOT $631.61 $659.57 $2,000.00 BUS DIVISIONS MONTHLY SUBTOTAL $35,176.19 (A) $36,732.42 (A) $35,000.00 (A) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

B. BLUE LINE FACILITIES LOCATION 60 $746.46 $779.49 $2,500.00 IMPERIAL STATION $757.94 $791.48 $1,250.00 LOCATION 60 $769.44 $803.47 $750.00 PICO STATION $826.84 $863.43 $1,250.00 GRAND STATION $902.47 $1,151.24 $1,250.00 SAN PEDRO STATION $890.99 $1,139.25 $1,000.00 WASHINGTON STATION $848.72 $886.23 $1,750.00 VERNON STATION $894.64 $934.23 $1,750.00 SLAUSON STATION $872.79 $911.40 $1,500.00 FLORENCE STATION $757.94 $791.48 $1,250.00 103rd STREET STATION $1,258.45 $1,523.00 $1,500.00 COMPTON STATION $780.92 $815.46 $1,000.00 ARTESIA STATION $2,079.36 $2,171.37 $2,250.00 DEL AMO STATION $2,204.95 $2,302.49 $2,250.00 DIVISION 11 $1,469.95 $1,534.99 $1,500.00 WARDLOW STATION $1,860.41 $1,942.72 $1,250.00 WILLOW STATION $1,481.45 $1,546.98 $1,250.00

Page 6 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Conejo Crest Landscape Marina Landscape Inc. Complete Landscape Care, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News FLORENCE $769.44 $803.47 $500.00 FIRESTONE $780.92 $815.46 $500.00 103RD STREET $792.40 $827.46 $500.00 PIRU STATION $300.00 $779.49 $500.00 COMPTON $525.33 $791.48 $500.00 PACIFIC COAST HIGHWAY $769.44 $803.47 $500.00 9TH STREET $814.26 $850.28 $500.00 1ST STREET $860.20 $898.25 $500.00 WATTS URBAN PARK $2,825.00 $2,950.06 $1,750.00 LAKEWOOD STATION $100.71 $105.16 $750.00 LONG BEACH STATION $700.71 $105.16 $750.00 BLUE LINE MONTHLY SUBTOTAL $28,642.13 (B) $30,618.45 (B) $32,500.00 (B) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

C. RED LINE FACILITIES DIVISION 20 $825.74 $862.23 $500.00 CIVIC CENTER STATION $1,113.89 $1,163.23 $500.00 PERSHING SQUARE STATION $848.72 $886.22 $500.00 WILSHIRE/NORMANDY STATION $1,148.40 $1,199.21 $500.00 VERMONT/BEVERLY STATION $930.74 $971.92 $1,000.00 VERMONT/SANTA MONICA STATION $1,205.82 $1,259.17 $500.00 VERMONT/SUNSET STATION $861.37 $899.41 $1,000.00 UNIVERSITY CITY STATION $1,894.87 $1,978.70 $1,000.00 NORTH HOLLYWOOD STATION $1,894.87 $1,978.70 $500.00 WESTLAKE STATION $1,550.34 $1,618.94 $1,000.00 RED LINE MONTHLY SUBTOTAL $12,274.76 (C) $12,817.73 (C) $7,000.00 (C) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY D. GREEN LINE PARK-AND-RIDE LOTS AND FACILITIES EL SEGUNDO STATION $1,210.34 $1,259.17 $2,000.00 NASH $157.91 $164.89 $500.00 DIVISION 22 $930.22 $971.36 $2,000.00 MARINE STATION $1,458.47 $1,523.00 $2,000.00 DOUGLAS STATION $792.40 $827.46 $2,000.00 MARIPOSA STATION $895.75 $935.38 $1,750.00 AVIATION STATION $2,848.05 $2,974.04 $2,000.00 117TH STREET $111.31 $116.23 $250.00 NEW HAMPSHIRE $119.26 $124.53 $500.00 BELLHAVEN $121.90 $127.30 $2,500.00 LONG BEACH STATION $780.92 $815.46 $2,500.00 FERNWOOD A $127.22 $132.84 $250.00 FERNWOOD B $111.31 $116.23 $250.00 FLORENCE $187.05 $195.56 $750.00 LOCATION 66, LIGHT RAIL $769.44 $803.47 $750.00 DEL NORTE STATION $803.88 $839.45 $1,000.00 IMPERIAL STATION $780.92 $815.46 $1,000.00 IMPERIAL $197.66 $206.17 $250.00 PARAMOUNT STATION $792.40 $827.46 $1,000.00 LEAHY AVE. STATION $436.38 $455.70 $500.00 GREEN LINE PART-AND-RIDE LOT & FAC. MONTHLY SUBTOTAL $13,632.79 (D) $14,231.16 (D) $23,750.00 (D)

Page 7 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Conejo Crest Landscape Marina Landscape Inc. Complete Landscape Care, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News FACILITY/LOCATION MONTHLY MONTHLY MONTHLY E. EXPO LINE PHASE 1 (FROM East to West) 23rd Street Station $2,524.51 $276.45 $2,000.00 Jefferson/USC Station $4,207.89 $4,394.05 $2,000.00 Expo Park/USC Station $1,683.16 $1,757.62 $2,000.00 Expo/Vermont Station $2,524.74 $2,636.43 $2,500.00 Expo/Western Station $5,049.47 $5,272.86 $2,500.00 Expo/Crenshaw Station $4,207.89 $4,394.05 $2,500.00 Farmdale Station $3,366.32 $3,515.24 $2,500.00 Expo/La Brea Station $5,049.47 $5,272.86 $2,000.00 La Cienega/Jefferson Station $2,945.53 $3,075.84 $2,000.00 Culver City Station $4,207.89 $4,394.05 $2,500.00 TPSS #1 (Flower/18th — in Caltrans Property) $841.58 $878.81 $500.00 TPSS #2 (Flower/37th) $841.58 $878.81 $500.00 TPSS #3 (Exposition/Halldale) $841.35 $878.57 $500.00 TPSS #4 (Rodeo/Cimarron) $841.35 $878.57 $500.00 TPSS #5 (Exposition PI/9th Ave) $841.35 $878.57 $500.00 TPSS #6 (Exposition/Farmdale) $841.35 $878.57 $500.00 TPSS #7 (Jefferson/La Cienega) $841.35 $878.57 $500.00 TPSS #8 (Washington/National) $841.35 $878.57 $500.00 La Cienega Parking Structure $1,262.61 $1,318.22 $2,000.00 EXPO LINE PHASE 1 MONTHLY SUBTOTAL $43,760.74 (E) $43,336.71 (E) $28,500.00 (E) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY F. GOLD LINE FACILITIES POMONA / ATLANTIC $757.94 $791.48 $500.00 ATLANTIC $436.38 $455.70 $500.00 EAST LOS ANGELES / CIVIC CENTER $746.46 $779.49 $500.00 ARIZONA / 3RD ST $424.90 $443.71 $500.00 MARAVILLA $792.40 $827.46 $500.00 INDIANA $1,022.09 $507.39 $500.00 INDIANA $485.90 $1,067.30 $500.00 SOTO TPSS $436.38 $455.70 $500.00 SOTO $769.44 $803.47 $500.00 MARIACHI PLAZA $780.92 $815.46 $500.00 PICO TPSS $528.28 $551.64 $750.00 PICO / ALISO $780.92 $815.46 $750.00 Little Tokyo / Arts District $769.44 $803.47 $1,000.00 CHINA TOWN $1,550.34 $1,618.97 $1,500.00 BAKER STREET $757.94 $791.48 $500.00 DIVISION 21 $769.44 $803.47 $750.00 MIDWAY YARD $803.88 $839.45 $500.00 LINCOLN HEIGHTS/CYPRESS PARK $1,435.51 $1,499.01 $1,250.00 HERITAGE SQUARE/ARROYO $1,504.41 $1,570.97 $1,250.00 HERITAGE SQUARE/ARROYO $780.92 $815.46 $500.00 SOUTHWEST MUSEUM $769.44 $803.47 $1,250.00 AVENUE 50 $476.52 $497.59 $500.00 HIGHLAND PARK $838.35 $875.42 $1,000.00 MONTEREY $476.52 $497.59 $500.00 MISSION AVENUE $1,458.47 $1,523.00 $1,000.00 GLENARM $436.38 $455.70 $500.00 FILLMORE $562.72 $587.61 $1,000.00 DEL MAR $769.44 $803.47 $1,000.00 MEMORIAL PARK $780.92 $815.46 $1,000.00 WALNUT AVENUE $481.22 $502.51 $500.00

Page 8 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Conejo Crest Landscape Marina Landscape Inc. Complete Landscape Care, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News CRAIG AVENUE $504.18 $526.45 $500.00 TITLEY AVENUE $481.22 $431.72 $500.00 SIERRA MADRE VILLA $803.88 $839.45 $500.00 GOLD LINE FACILITIES MONTHLY SUBTOTAL $25,173.15 (F) $26,215.98 (F) $23,500.00 (F) FACILITY/LOCATION MONTHLY MONTHLY MONTHLY

G. GOLD LINE ROW MAINTENANCE LOC's (LP SHEET #'S) 102 $92.75 $96.86 $850.00 105 $98.06 $102.39 $850.00 308 $92.75 $96.86 $850.00 403 $92.75 $96.86 $850.00 404 $95.42 $99.63 $850.00 405 $174.90 $182.65 $850.00 503 $98.06 $102.39 $850.00 504 $177.57 $185.42 $850.00 505 $172.26 $179.88 $850.00 506 $180.21 $188.18 $850.00 507 $119.26 $124.53 $850.00 508 $92.75 $96.86 $850.00 509 $172.26 $179.88 $850.00 509 $119.26 $124.53 $850.00 606 $119.26 $124.53 $850.00 607 $98.06 $102.39 $850.00 608 $95.42 $99.63 $850.00 609 $100.71 $105.16 $850.00 610 $92.75 $96.86 $850.00 611 $103.35 $107.93 $850.00 612 $116.62 $121.77 $850.00 613 $124.55 $130.07 $850.00 703 $182.86 $190.95 $850.00 703 $190.81 $199.25 $850.00 704 $111.31 $116.23 $850.00 705 $116.62 $121.77 $850.00 706 $100.71 $105.16 $850.00 707 $100.71 $105.16 $850.00 708 $98.06 $102.39 $850.00 709 $103.35 $107.93 $850.00 709 $100.71 $105.16 $850.00 710 $127.22 $132.84 $850.00 711 $92.75 $96.86 $850.00 715 $98.06 $102.39 $850.00 715 $100.71 $105.16 $850.00 717 $100.71 $105.16 $850.00 904 $98.06 $102.39 $850.00 905 $113.90 $119.00 $850.00

Page 9 of 10 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP33673069 Landscape and Irrigation Maintenance Services

Bids Out: 02/14/13 Total 15 Bids Opened: 03/21/13 Total 6 Conejo Crest Landscape Marina Landscape Inc. Complete Landscape Care, Inc. Advertisement Date(s): 02/14/13 Newspaper: LA Daily News GOLD LINE ROW MAINTENANCE LOC's MONTHLY SUBTOTAL $4,465.53 (G) $4,663.06 (G) $32,300.00 (G) (A) (C=AXB) (A) (C=AXB) (A) (C=AXB) SUBTOTAL (B) ANNUAL SUBTOTAL (B) ANNUAL SUBTOTAL (B) ANNUAL THREE YEAR BASE SUBTOTALS (Monthly) 12 MON BASE SUBTOTAL (Monthly) 12 MON BASE SUBTOTAL (Monthly) 12 MON BASE SUBTOTAL A. BUS DIVISION, TERMINALS AND LAYOVERS $35,176.19 12 $422,114.28 $36,732.42 12 $440,789.04 $35,000.00 12 $420,000.00 B. BLUE LINE FACILITIES $28,642.13 12 $343,705.56 $30,618.45 12 $367,421.40 $32,500.00 12 $390,000.00 C. RED LINE FACILITIES $12,274.76 12 $147,297.12 $12,817.73 12 $153,812.76 $7,000.00 12 $84,000.00 D. GREEN LINE PARK-AND-RIDE FACILITIES $13,632.79 12 $163,593.48 $14,231.16 12 $170,773.92 $23,750.00 12 $285,000.00 E. EXPO LINE PHASE 1 FACILITIES $43,760.74 12 $525,128.88 $43,336.71 12 $520,040.52 $28,500.00 12 $342,000.00 F. GOLD LINE FACILITIES $25,173.15 12 $302,077.80 $26,215.98 12 $314,591.76 $23,500.00 12 $282,000.00 G. GOLD LINE ROW MAINTENANCE LOCATIONS $4,465.53 12 $53,586.36 $4,663.06 12 $55,956.72 $32,300.00 12 $387,600.00 TOTAL ANNUAL COST (A-G) $1,957,503.48 $2,023,386.12 $2,190,600.00 TOTAL THREE YEAR BASE CONTRACT (D)=(CX3) $5,872,510.44 $6,070,158.36 $6,571,800.00

OPTION YEAR 1 ANNUAL COST $1,957,503.48 $2,023,386.12 $2,190,600.00 EXCALATION % 3% 2% 5% ESCALATION COST $58,725.10 $40,467.72 $109,530.00 (F) TOTAL OPTION YEAR 1 (escalation cost + annual) $2,016,228.58 $2,063,853.84 $2,300,130.00

OPTION YEAR 2 OPTION YEAR 2 COST (F) $2,016,228.58 $2,063,853.84 $2,300,130.00 EXCALATION % 3% 2% 5% ESCALATION COST $60,486.86 $41,277.08 $115,006.50 (H) TOTAL OPTION YEAR 1 (escalation cost + annual) $2,076,715.44 $2,105,130.92 $2,415,136.50 Estimated Fully Burdened Estimated Fully Burdened Estimated Fully Burdened 1. GENERAL Hours Hourly Rate Subtotal Hours Hourly Rate Subtotal Hours Hourly Rate Subtotal Year 1 through 5 2,000$ 23.50 $47,000.00 2,000$ 23.73 $47,460.00 2,000$ 27.50 $55,000.00 Est. Number of Est. Number of Est. Number of 2. PLANT REPLACEMENT Plants Cost Per Plant Subtotal Plants Cost Per Plant Subtotal Plants Cost Per Plant Subtotal A. Replace plants years 1 through 5, including soil mitigation(activated charcoal or imported backfill) 1. - 15 gal 500$ 90.00 $45,000.00 500$ 75.00 $37,500.00 500$ 95.00 $47,500.00 2. - 5 gal 750$ 40.00 $30,000.00 750$ 19.50 $14,625.00 750$ 25.00 $18,750.00 3. - 1 gal 1,000$ 13.00 $13,000.00 1,000$ 7.00 $7,000.00 1,000$ 10.00 $10,000.00 Replace Plants with Soil Mitigation TOTAL $88,000.00 $59,125.00 $76,250.00 B. Replace plants years 1 through 5, without soil mitigation 1. - 15 gal 500$ 88.00 $44,000.00 500$ 75.00 $37,500.00 500$ 95.00 $47,500.00 2. - 5 gal 750$ 39.00 $29,250.00 750$ 19.50 $14,625.00 750$ 25.00 $18,750.00 3. - 1 gal 1,000$ 12.00 $12,000.00 1,000$ 7.00 $7,000.00 1,000$ 10.00 $10,000.00 TOTAL $85,250.00 $59,125.00 $76,250.00 General Total $47,000.00 $47,460.00 $55,000.00 Replace plants, incl. Soil Mitigation $88,000.00 $59,125.00 $76,250.00 Replace plants, w/out Soil Mitigation $85,250.00 $59,125.00 $76,250.00 TOTAL AS NEEDED SERVICES $220,250.00 $165,710.00 $207,500.00 THREE YEAR BASE $5,872,510.44 $6,070,158.36 $6,571,800.00 FIRST YEAR OPTION $2,016,228.58 $2,063,853.84 $2,300,130.00 2ND YEAR OPTION $2,076,715.44 $2,105,130.92 $2,415,136.50 AS NEEDED PRICING $220,250.00 $165,710.00 $207,500.00 FIVE YEAR GRAND TOTAL $10,185,704.46 $10,404,853.12 $11,494,566.50

Page 10 of 10