Melamchi Municipality, Nepal Situation Analysis for Green Municipal Development
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Code Under Name Girls Boys Total Girls Boys Total 010290001
P|D|LL|S G8 G10 Code Under Name Girls Boys Total Girls Boys Total 010290001 Maiwakhola Gaunpalika Patidanda Ma Vi 15 22 37 25 17 42 010360002 Meringden Gaunpalika Singha Devi Adharbhut Vidyalaya 8 2 10 0 0 0 010370001 Mikwakhola Gaunpalika Sanwa Ma V 27 26 53 50 19 69 010160009 Phaktanglung Rural Municipality Saraswati Chyaribook Ma V 28 10 38 33 22 55 010060001 Phungling Nagarpalika Siddhakali Ma V 11 14 25 23 8 31 010320004 Phungling Nagarpalika Bhanu Jana Ma V 88 77 165 120 130 250 010320012 Phungling Nagarpalika Birendra Ma V 19 18 37 18 30 48 010020003 Sidingba Gaunpalika Angepa Adharbhut Vidyalaya 5 6 11 0 0 0 030410009 Deumai Nagarpalika Janta Adharbhut Vidyalaya 19 13 32 0 0 0 030100003 Phakphokthum Gaunpalika Janaki Ma V 13 5 18 23 9 32 030230002 Phakphokthum Gaunpalika Singhadevi Adharbhut Vidyalaya 7 7 14 0 0 0 030230004 Phakphokthum Gaunpalika Jalpa Ma V 17 25 42 25 23 48 030330008 Phakphokthum Gaunpalika Khambang Ma V 5 4 9 1 2 3 030030001 Ilam Municipality Amar Secondary School 26 14 40 62 48 110 030030005 Ilam Municipality Barbote Basic School 9 9 18 0 0 0 030030011 Ilam Municipality Shree Saptamai Gurukul Sanskrit Vidyashram Secondary School 0 17 17 1 12 13 030130001 Ilam Municipality Purna Smarak Secondary School 16 15 31 22 20 42 030150001 Ilam Municipality Adarsha Secondary School 50 60 110 57 41 98 030460003 Ilam Municipality Bal Kanya Ma V 30 20 50 23 17 40 030460006 Ilam Municipality Maheshwor Adharbhut Vidyalaya 12 15 27 0 0 0 030070014 Mai Nagarpalika Kankai Ma V 50 44 94 99 67 166 030190004 Maijogmai Gaunpalika -
Nepal: Rural Reconstruction and Rehabilitation Sector Development Program
Environmental Assessment Document Initial Environmental Examination Grant Number: 0093 NEP February 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Program Sildhunga-Jethal-Tauthali-Tekanpur Road Subproject, Sindhupalchowk District Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Government of Nepal Ministry of Local Development Department of Local Infrastructure Development and Agricultural Roads Rural Reconstruction and Rehabilitation Sector Development Program [ADBGrant 0093NEP] Initial Environmental Examination (IEE) Report of Sildhunga-Jethal-Tauthali-Tekanpur Road Subproject, Sindhupalchowk District Submitted to: Ministry of Local Development Government of Nepal Proponent: Office of District Development Committee/ District Technical Office Chautara, Sindhupalchowk Prepared by: Frisa-Iteco Joint Venture (in association with SKAT) District Implementation Support Team (DIST) Chautara, Sindhupalchowk, Nepal Telephone No.: 011-620338 Fax No.: 011-620087 February, 2010 TABLE OF CONTENTS Abbreviations ………………………………………………………………………….....i Name and Address of Proponent………………………………………………..……...ii Executive Summary in Nepali………………………………………………………….iii Executive summary in English………………………………………………….…… viii Salient Features of the sub-Project………………………………………..………….xiii 1. Introduction ………………………………………………………………………………… 1 1.1. Background………………………………………………………………...........1 -
139 4 - 10 April 2003 16 Pages Rs 25
www.nepalitimes.com #139 4 - 10 April 2003 16 pages Rs 25 Maoists, police and soldiers are rushing home MIN BAJRACHARYA ‘‘‘ to meet families while the Peace bridge peace lasts. in KALIKOT MANJUSHREE○○○○○○○○○○○○○○○○○○○○ THAPA athletes have joined a regional few weeks into the ceasefire, volleyball competition. A driver who and Dailekh bazar is trans- weekly plies the Nepalganj-Dailekh ’’’ Out in the open A formed. “Nobody dared to road says hundreds of people who had The Maoist negotiating team hasn’t had a move about like this before,” marvels a fled during the state of emergency are moment to spare as it made its high-profile young man, eyeing the bustle. “The returning. “The Maoists, the police comeback in Kathmandu this week. Maoists didn’t dare come here, and the and the army are rushing back to meet Baburam Bhattarai and Ram Bahadur their families while the peace lasts.” Thapa have been giving back-to-back security forces wouldn’t go to the interviews to media, meeting political villages alone. Now they’re all talking Further afield in Dullu, the scene is leaders and diplomats and reiterating their to one another.” even more festive. Many village men three-point demand for a roundtable A few Maoists are openly attending are stoned on the occasion of Holi, in conference, constituent assembly and an passing-out ceremonies in local schools. flagrant defiance of Maoist puritanism. interim government. A rally in Tundikhel In nearby Chupra village, Maoist “We welcome the talks,” says Maoist on Thursday, two months after the ceasefire agreement, was attended by about 15- area secretary, ‘Rebel’, talking to us at a 20,000 supporters, mainly from outside the hotel close to where a man, high on Valley. -
Study on Kodari Scheme of Rikaze-Kathmandu Railway
2017 2nd International Conference on Sustainable Energy and Environment Protection (ICSEEP 2017) ISBN: 978-1-60595-464-6 Study on Kodari Scheme of Rikaze-Kathmandu Railway Location Yaoping ZHANG1,a 1Institute of Vacuum Tube Transport, Xijing University, Xi’an 710123, China a [email protected] Keywords: Rikaze, Kathmandu, Railway location, Rack rail, Linear motor, Himalaya tunnel Abstract: Building Rikaze-Kathmandu Railway will change the broken road situation of Lasa-Rikaze Railway, activate the potential of Qingzang Railway, have Tibet as well as Lasa and Rikaze become the node of south Asia channel of “One Belt and One Road”, strengthen commercial trade and bilateral relations between China and Nepal. It is the shortest route for Rikaze-Kathmandu railway to go through Zhangmu port. By primary analysis, the feasible route should extend from the current Rikaze railway station, going through Qumei county, entering into the current G318 highway belt, then going through Jiding, Liuxiang and Resa, arriving Lazi. The route extends from Lazi, then goes through Jiacuola mountain by tunnel with 45km length, going through Jiacuo county and arriving Dingri. After Dingri, the route extends to west along with Pengqu river valley, going through Zhaguo, then arriving Gangga. Extending to southwest from Gangga, the route goes under Labujikang peak by a 42km tunnel, then arriving Yalai, then Nielamu and Zhangmu. The nature gradient between Nielamu and Zhangmu is 110‰, line mileage 20km, thus the rack rail technology or the linear motor driving should be considered for train to climb the steep slope more than 110‰. Another possible scheme is to build an 88km tunnel with a 28‰ gradient between Gangga and Zhangmu for going under Himalaya, so as to avoid the 110‰ steep slope between Nielamu-Zhangmu. -
NATIONAL WOMEN COMMISSION January 2018 Published By: National Women Commission Bhadrakali Plaza, Kathmandu, Nepal
FINAL REPORT For Baseline Study of Integrated Platform for Gender Based Violence Prevention and Response (Sambodhan) Project GOVERNMENT OF NEPAL NATIONAL WOMEN COMMISSION January 2018 Published by: National Women Commission Bhadrakali Plaza, Kathmandu, Nepal (This study was conducted by an external research team and not directly implemented by the Government of Nepal; therefore, the matters contained in this report are not official version of the government) Published: January 2018 Fieldwork and Initial Analysis: Technical and Financial Support Contents Contents ........................................................................................................................................... i List of Figures .................................................................................................................................. iv List of Tables ................................................................................................................................... vi Abbreviations and Acronyms ........................................................................................................ viii Executive Summary ......................................................................................................................... 1 CHAPTER I: INTRODUCTION ............................................................................................................ 4 1.1 Background and Context ....................................................................................................... 4 1.2 -
MISP) of Reproductive Health Services for Internally Displaced Persons in Kathmandu and Sindhupalchowk Districts, Nepal
Women’s Refugee Commission Research. Rethink. Resolve. Evaluation of the Minimum Initial Services Package (MISP) of Reproductive Health Services for Internally Displaced Persons in Kathmandu and Sindhupalchowk Districts, Nepal Literature Review Focus Group Discussions Key Informant Interviews Health Facility Assessments May 2016 Research. Rethink. Resolve. The Women’s Refugee Commission improves the lives and protects the rights of women, children, and youth displaced by conflict and crisis. We research their needs, identify solutions, and advocate for programs and policies to strengthen their resilience and drive change in humanitarian practice. Acknowledgments This evaluation could not have been undertaken without the support of the Family Health Division (FHD), Department of Health Services (DoHS) Nepal the United Nations Population Fund Nepal (UNFPA), International Planned Parenthood Foun- dation (IPPF), and the Family Planning Association of Nepal (FPAN). We greatly appreciate the time taken by Dr. Shilu Aryal, FHD and Dr. Shilu Adhikari UNFPA in particular for supporting the Internal Review Board submission to the Nepal Research Council; hosting the Nepal RH sub-cluster MISP evaluation debriefing and support throughout the evaluation. We also deeply appreciate the time of Mr. Hari Kari UNFPA for scheduling and accompanying the evaluation team on key informant interviews; Dr. Nirmal Rimal, UNFPA for scheduling health facility assessments, and the overall support of UNFPA Country Director, Ms. Giulia Vallese. We also thank the IPPF for supporting administration and logistics for the evaluation including Ms. Nimisha Goswami and Mr. Rajrattan Lokhande, and at FPAN Mr. Subhash Shreshtha and Mr. Prabin Khadka. Thanks to Research Input and Development Action (RIDA) for conducting the focus group discussions; and FPAN for coordinating, scheduling, logistics, and overseeing recruitment of participants. -
Japanese Contributions to Reconstruction and Recovery in Sindhupalchowk
Seminar on Sustainable Recovery: Experience Sharing between Nepal and Japan Japanese Contributions to Reconstruction and Recovery in Sindhupalchowk 17 January 2019 JICA Nepal Our Support for EQ Recovery Based on the Build Back Better (BBB) concept, a wide range of support has been provided since immediately after the earthquake in April 2015. • Housing Reconstruction • School Reconstruction • Rebuilding Local Public Infrastructure & Facilities • Livelihood Recovery in the Affected Communities • Hazard Maps • District-Level Recovery Planning • Rehabilitation of Cultural Heritage • Earthquake Risk Assessment for Kathmandu Valley 2 As of January 2019 3 1. Hazard Maps Enlargement of Hazard Map (Tatopani) Source: JICA Project Team Enlargement of Hazard Map (Barhabise) 2. District Rehabilitation and Recovery Plan Consultative Process for RRP Formulation ・Preliminary Workshop: Jun.24, 2016 Contents:Explanation of PDDP and RRP, viewpoint of reconstruction ・Cluster Workshop: Aug. 1-10, 2016 Contents: Issue setting in 8 regions in the district ・Vision Workshop :Sep. 25-26, 2016 Contents:District reconstruction vision setting ・Sectoral Committee :Nov. 16-17, 2016 Contents: Action list for 5 sectors of PDDP ・Planning Workshop: Nov.22-24,2016 Contents:PDDP Action list elaboration, introduction of the example of reconstruction ・Sectoral Committee :Feb. 8-9, 2017 Contents:RRP Action list elaboration ・Final Presentation: Feb.10, 2017 Contents:Introduction of Draft RRP, introduction of overview of PDDP - Approval of RRP: March 8, 2017 by Board meeting -
Food Insecurity and Undernutrition in Nepal
SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014. -
Gender Equality and Social Inclusion Diagnostic of Selected Sectors in Nepal
GENDER EQUALITY AND SOCIAL INCLUSION DIAGNOSTIC OF SELECTED SECTORS IN NEPAL OCTOBER 2020 ASIAN DEVELOPMENT BANK GENDER EQUALITY AND SOCIAL INCLUSION DIAGNOSTIC OF SELECTED SECTORS IN NEPAL OCTOBER 2020 ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2020 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 8632 4444; Fax +63 2 8636 2444 www.adb.org Some rights reserved. Published in 2020. ISBN 978-92-9262-424-8 (print); 978-92-9262-425-5 (electronic); 978-92-9262-426-2 (ebook) Publication Stock No. TCS200291-2 DOI: http://dx.doi.org/10.22617/TCS200291-2 The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) https://creativecommons.org/licenses/by/3.0/igo/. -
The Project on Rehabilitation and Recovery from Nepal Earthquake
Japan International Cooperation Agency (JICA) The Project on Rehabilitation and Recovery from Nepal Earthquake Inception Report (Draft) July 2015 ORIENTAL CONSULTANTS GLOBAL CO., LTD. Pacific Consultants Co., Ltd. MOHRI, ARCHITECT & ASSOCIATES, INC CTI Engineering International Co., Ltd. PASCO CORPORATION Location Map of Project Area Nepal Kathmandu Valley Kathmandu District Kathmandu Bhaktapur District Kirtipur Bhaktapu r Madhyapur Thimi Lalitpur Kathmandu Valley district line City line Lalitpur District Village line Table of contents Location Map of Study page 1. Overview of the Project ................................................................................................................................................... 1 1.1 Background of the Project ........................................................................................................................................ 1 1.2 Purpose and Scope of the Project ............................................................................................................................. 1 1.3 Outputs of the Project ............................................................................................................................................... 2 1.4 Project counterpart organizations ............................................................................................................................. 3 1.5 Target area of the Project ......................................................................................................................................... -
Japan International Cooperation Agency (JICA)
Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts. -
Nepal Earthquake District Profile - Sindhupalchok OSOCC Assessment Cell 08.05.2015
Nepal Earthquake District Profile - Sindhupalchok OSOCC Assessment Cell 08.05.2015 This report is produced by the OSOCC Assessment Cell based on secondary data from multiplce sources, including the Government of Nepal, UNDAC, United Nations Agencies, non-governmental organisation and media sources. I. Situation Overview Sindhupalchok is one of the worst-affected districts as a result of the earthquake that took place on the 25th April. While the initial epicentre of the earthquake was in Gorkha district, the highest magnitude (6.7) aftershock took place in Sindupolchok district 17km south of Kadari (USGS 2015). As of 7 May, 3057 people were dead and 860 are injured. 3000 people remain unaccounted for. Many VDCs have still not been reached due to remoteness and accessibility both in terms of roads and telecommunications (GoN 8 May). According to district authorities 63,885 houses are severely and 2,751 houses are moderately damaged. Based on government reporting on damaged houses as of 6th May an estimated 109,000 people (Ministry of Home Affairs 7th May) are affected (40% of district population as per the 2011 Census). Around 90,000 people have been identified as in need of assistance based on reporting at the VDC level. This figure is however unconfirmed and represents merely a preliminary estimate based on a combination of reports from a range of sources providing information on needs at the VDC level1 (pls. see below map for an illustration of aggregated number of reported people in need). 1 . Sources include Humanitarian agencies sit-reps, assessment reports, government data, social and news media.