§ 117.161 33 CFR Ch. I (7–1–14 Edition)

open on signal if at least 12 hours no- phone at (707) 648–4313 for drawspan op- tice is given to the San Joaquin Coun- eration. When the drawbridge operator ty Department of Public Works at is not present, mariners may contact Stockton. the City of Vallejo via the same tele- phone number to schedule drawspan § 117.161 Honker Cut. operation. The draw of the San Joaquin County (b) The draw of the Northwestern Pa- (Eightmile Road) bridge, mile 0.3 be- cific railroad bridge, mile 10.6 at Braz- tween Empire Tract and King Island at os, shall be maintained in the fully Stockton, shall open on signal if at open position, except for the crossing least 12 hours notice is given to the of trains or for maintenance. When the San Joaquin County Department of draw is closed and visibility at the Public Works at Stockton. drawtender’s station is less than one mile, up or down the channel, the § 117.163 Islais Creek (Channel). drawtender shall sound two prolonged blasts every minute. When the draw is (a) The draw of the Illinois Street opened, the drawtender shall sound drawbridge, mile 0.3 at , three short blasts. shall open on signal if at least 72 hours advance notice is given to the Port of [CGD 82–025, 49 FR 17452, Apr. 24, 1984, as San Francisco. amended by CGD 12–85–02, 50 FR 20758, May (b) The draw of the 3rd Street draw- 20, 1985; USCG–1999–5832, 64 FR 34712, June 29, bridge, mile 0.4 at San Francisco, shall 1999; CGD11–03–006, 69 FR 21958, Apr. 23, 2004; CGD 11–05–025, 70 FR 20467, Apr. 20, 2005] open on signal if at least 72 hours ad- vance notice is given to the San Fran- § 117.171 Middle River. cisco Department of Public Works. (a) The draw of the San Joaquin [USCG–2008–0648, 73 FR 74019, Dec. 5, 2008] County (Bacon Island Road) highway bridge, mile 8.6 between Bacon Island § 117.165 Lindsey Slough. and Lower Jones Tract, shall open on The center drawspan of the Hastings signal from May 15 through September Farms Highway Bridge, mile 2.0 be- 15 from 9 a.m. to 5 p.m. From Sep- tween Egbert and Lower Hastings tember 16 through May 14, the draw Tracts, must be removed for the pas- shall open on signal from 9 a.m. to 5 sage of vessels if at least 72 hours no- p.m. from Thursday through Monday. tice is given to the Hastings Island At all other times, the draw shall open Land Company office at Rio Vista. on signal if at least 12 hours notice is given to the San Joaquin County De- [USCG–2001–10881, 71 FR 70309, Dec. 4, 2006] partment of Public Works at Stockton. § 117.167 Little Potato Slough. (b) The draw of the Burlington Northern Santa Fe railroad bridge, The draw of the California Depart- mile 9.8 near Middle River Station, ment of Transportation highway shall open on signal if at least 12 hours bridge, mile 0.1, at Terminus, shall notice is given to the Burlington open on signal if at least 4 hours notice Northern Santa Fe Railway Manager of is given to the drawtender at the Rio Structures at San Bernadino. Vista bridge across the Sacramento (c) The California Route 4 Bridge, River, mile 12.8. mile 15.1, between Victoria Island and [CGD11–95–02, 61 FR 17248, Apr. 19, 1996] Drexler Tract need not open for the passage of vessels. § 117.169 Strait and the . [CGD 82–025, 49 FR 17452, Apr. 24, 1984; 49 FR 37381, Sept. 24, 1984, as amended by CGD 12– (a) The draw of the Mare Island 85–01, 50 FR 26559, June 27, 1985; USCG–2000– Drawbridge, mile 2.8, at Vallejo shall 7223, 65 FR 40056, June 29, 2000] open on signal between the hours of 9 a.m. and 7 p.m. daily, and upon two § 117.173 Miner Slough. hours advance notice all other times. The draw of the California Depart- When the drawbridge operator is ment of Transportation highway present, mariners may contact the bridge, mile 5.5 between the northerly drawbridge via marine radio or tele- end of and Holland Tract,

562

VerDate Mar<15>2010 11:33 Sep 02, 2014 Jkt 232135 PO 00000 Frm 00572 Fmt 8010 Sfmt 8010 Q:\33\33V1.TXT 31