Asset List for Publication Inc Summary.Xlsx

Total Page:16

File Type:pdf, Size:1020Kb

Asset List for Publication Inc Summary.Xlsx Assets Under Construction Category Asset Reference Asset Name Net Book Value (as at 31/03/2014) Assets Under Construction TB014 Advance Signage - Assets Under Construction 03625-04-04 Bishops CE 04 22,899.67 Assets Under Construction TB016 Bridge Access Works lb 22,934.75 Assets Under Construction TB022 Bridge Half Joint Replacement lb 986.09 Assets Under Construction TB020 Bridge Handstrands lb 6,804.38 Assets Under Construction TB017 Bridge Protective Coating 101,702.42 Assets Under Construction 17227 Bugle to Minorca Lane Footpath - Assets Under Construction 09346-05-05 Connon Bridge 05 - Assets Under Construction 17221 Cornwall Archive Centre 153,157.77 Assets Under Construction 16615 Eco Town 3,250,363.34 Assets Under Construction TB013 Electronic Toll System - Assets Under Construction 16209 Falmouth HWRC - Assets Under Construction 16209-01-01 Falmouth Recycling Centre (HW) 01 - Assets Under Construction 16731-01-01 Fire Headquarters 01 343,220.17 Assets Under Construction 13808-01-01 Firestation 01 53,756.35 Assets Under Construction TB018 Footpath 24 - Assets Under Construction 01116-02-02 Gooseberry Bush 02 - Assets Under Construction TB019 Illuminated Road Studs - Assets Under Construction 02432-06-06 Indian Queens CP 06 20,281.88 Assets Under Construction 17092 Land at Church View Farm, Tuckingmill 135,000.00 Assets Under Construction 17176 Land at Church View Road, Camborne 126,000.00 Assets Under Construction 16216 Launceston HWRC - Assets Under Construction 16216-01-01 Launceston HWRC - Assets Under Construction 16207-01-01 Loee Sites and Premises 01 - Assets Under Construction 16207 Looe Sites and Premises - Assets Under Construction NPP5250/001 MOUNT EDGCUMBE - BARROW CENTRE 2,519.86 Assets Under Construction NPP5249/001 MOUNT EDGCUMBE - PHASE 1 TRANSFORMATION PROJECT 938.50 Assets Under Construction 16201 Penzance Recycling Centre LI TERMINATION 2012-2013 - Assets Under Construction 16201-01-01 Penzance Recyling Centre 01 - Assets Under Construction TB021 Plaza Canopy Access Works lb 10,774.54 Assets Under Construction 18069 Plots 2 & 3 Beacon Technology Park Bodmin 1,384,557.44 Assets Under Construction 18068 Redruth Brewery, Chapel Street, Redruth 155,000.00 Assets Under Construction 16546-03-03 Redruth HWRC (United Mines) 03 - Assets Under Construction 16726 Rostowrack Farm 15,023,540.41 Assets Under Construction 16208 Saltash Sites and Premises - Assets Under Construction 16208-01-01 Saltash Sites and Premises 01 - Assets Under Construction 16202 Scorrier Refuse Transfer Station - Assets Under Construction 16202-01-01 Scorrier Refuse Transfer Station 01 - Assets Under Construction 18071 South Carluddon Farmhouse - Assets Under Construction 18071-01-01 South Carluddon Farmhouse 01 - Assets Under Construction 16210 St Austell Recycling Centre (Highways) - Assets Under Construction 16210-01-01 St. Austell Recycling Centre (HW) 01 - Assets Under Construction TB015 Storage Building Devonport - Assets Under Construction 02221-03-03 Treleigh 03 - Assets Under Construction 17179 Truro Park & Ride (East) - Assets Under Construction 16670-01-01 Waste PFI 01 - Assets Under Construction 18111 Waste PFI CERC 43,064,075.58 Assets Under Construction 16619 Western United Mines 1,154,081.69 65,032,594.84 Page 1 of 1.
Recommended publications
  • STATISTICS for MISSION: Church Groups and Outreach/Community Engagement Activities 2013 District: 12 Cornwall District Circuit: 1 Camborne-Redruth
    STATISTICS FOR MISSION: Church Groups and Outreach/Community Engagement Activities 2013 District: 12 Cornwall District Circuit: 1 Camborne-Redruth FX of Led by Years Shared Local Lay Volun- Employ- Pres- Deacon Group Type Group Name (Nos) Running Frequency Initiative Location Church Worship Preacher Officer teer ee byter Circuit Summary 52 2 0 2 3 42 3 1 0 Barripper Church Groups Creative Arts PBK Ladies Group 12 Monthly Ecumenical Church l Premises Community Outreach Activities/Engagement Projects Family Support Foodbank 3 Weekly or More Ecumenical Church Premises Beacon Church Groups Youth/Children - Other () Stay & Play 2 Weekly or More - Church l l Premises Youth/Children - Other () Holiday Club 3 Quarterly - Church l l Premises Mother and Baby/Toddler Praise & Play 2 Monthly - Church l l l Premises Arts & Crafts Flower Club 4 Monthly - Church l Premises Fellowship Group Fellowship 3 Monthly - Church l Premises Fellowship Group Ladies Fellowship 51 Fortnightly - Church l Premises Other () Soup & Sweet 3 Monthly - Church l Premises Other () Homebake 25 Monthly - Church l Premises Community Outreach Activities/Engagement Projects Playgroups/nurseries/pre- Toy Library 3 Weekly or More Ecumenical Church schools Premises Family Support Foodbank 3 Weekly or More Ecumenical Church l Premises Adult fellowship/social Camborne/Redruth 3 Fortnightly Local Authority Communit groups Disabled Club y Space Brea Church Groups - STATISTICS FOR MISSION: Church Groups and Outreach/Community Engagement Activities 2013 District: 12 Cornwall District Circuit:
    [Show full text]
  • Environment Agency Plan
    environment agency plan FAL AND ST AUSTELL STREAMS SECOND ANNUAL REVIEW JULY 2000 Fal &t St Austell Streams 2"" Annual Review Further copies of this Annual Review can be obtained from: Team Leader, LEAPs Environment Agency Sir John Moore House Victoria Square Bodmin PL31 1EB Tel: 01208 78301 Fax: 01208 78321 E n v i r o n m e n t A g e n c y Information Services Unit Please return or renew this item by the due date Due Date 21 ' N > C \) - 06 Environment Agency Copyright Waiver This report is Intended to be used widely and may be quoted, copied or reproduced In any way, provided that the extracts are not quoted out of context and that due acknowledgement Is given to the Environment Agency. Note: This Is not a legally or scientifically binding document. ENVIRONMENT AGENCY n i i i i i i i i 108444 Fal & St Austell Streams 2* Annual Review Our Vision Our vision is of this area being managed in a sustainable way, that balances the needs of all users with the needs of the environment. We look forward to a future where a healthy economy leads to: Biodiversity and the physical habitat for wildlife being enhanced People's enjoyment and appreciation of the environment continuing to grow Pressures from human wants being satisfied sustainably Foreword This is the second annual review of the Fal and St.Austell Streams Action Plan, which was published in December 1997. It describes the progress that has been made since. In addition to our own actions in the plan area we welcome opportunities to work in partnership with other groups.
    [Show full text]
  • Barn and Derelict Cottage at Connon Farm, St Pinnock, Liskeard, Cornwall PL14 4ND £125,000 Freehold
    www.kivells.com Barn and derelict Cottage at Connon Farm, St Pinnock, Liskeard, Cornwall PL14 4ND £125,000 Freehold A detached barn constructed of stone and concrete block along with a derelict cottage in a rural location. The extent of land surrounding the property is subject to negotiation. The property is offered for sale for commercial purposes only. Situated to the south west of the market town of Liskeard and within easy commuting distance to the city of Plymouth. Please contact us to view this property tel: 01579 345543 or email: [email protected] SITUATION This property is situated in a truly rural location near Connon BOUNDARIES Farm. The property is such that the market town of Liskeard is The Purchaser(s) will be responsible for all boundaries to the within easy driving distance, as is the south Cornish coast and property. more particular the fishing and holiday resort of Looe. Liskeard is regarded as the administrative centre of South East TENURE Cornwall offering all facilities which one would associate of a The property is offered freehold and with vacant possession town of this size including primary and comprehensive education, upon completion of the purchase. leisure centre, good shopping centre and mainline railway station with branch line to Looe. Looe again offers all facilities which one would associate with a town of this size. LOCAL AUTHORITY Cornwall Council, Luxstowe House, Liskeard, Cornwall PL34 The nearby small village of Dobwalls offers limited facilities 3DZ. Tel: 0300 1234 100. including primary education and Bodmin Moor is within relatively easy driving distance to the north.
    [Show full text]
  • River Water Quality 1992 Classification by Determinand
    N f\A - S oo-Ha (jO$*\z'3'Z2 Environmental Protection Final Draft Report RIVER WATER QUALITY 1992 CLASSIFICATION BY DETERMINAND May 1993 Water Quality Technical Note FWS/93/005 Author: R J Broome Freshwater Scientist NRA CV.M. Davies National Rivers A h ority Environmental Protection Manager South West Region RIVER WATER QUALITY 1992 CLASSIFICATION BY DETERMINAND 1. INTRODUCTION River water quality is monitored in 34 catchments in the region. Samples are collected at a minimum frequency of once a month from 422 watercourses at 890 locations within the Regional Monitoring Network. Each sample is analysed for a range of chemical and physical determinands. These sample results are stored in the Water Quality Archive. A computerised system assigns a quality class to each monitoring location and associated upstream river reach. This report contains the results of the 1992 river water quality classifications for each determinand used in the classification process. 2. RIVER WATER QUALITY ASSESSMENT The assessment of river water quality is by comparison of current water quality against River Quality Objectives (RQO's) which have been set for many river lengths in the region. Individual determinands have been classified in accordance with the requirements of the National Water Council (NWC) river classification system which identifies river water quality as being one of five classes as shown in Table 1 below: TABLE 1 NATIONAL WATER COUNCIL - CLASSIFICATION SYSTEM CLASS DESCRIPTION 1A Good quality IB Lesser good quality 2 Fair quality 3 Poor quality 4 Bad quality The classification criteria used for attributing a quality class to each criteria are shown in Appendix 1.
    [Show full text]
  • SPECIAL CORRESPONDENCE. Omentum, Which Was Reduced by the Taxis Without Any Difficulty
    970 THE BRITISH MEDICAL _OURNAL. [Dec. 28, I878. into requisition in the treatment of many medical and surgical cases of disease. HOSPITAL AND DISPENSARY MANAGEMENT. The following case, related by the Gazette des Hc$pitaux, would seem TUNBRIDGE WELLS PROVIDENT DISPENSARY. to afford an illustration of the efficacy of intestinal insufflation of air THE first annual meeting of the Tunbridge Wells Provident Dis- or gas in certain forms of disease. A woman aged 58 had a left pensary was held on the 12th instant. The report, which was read femoral hernia for about twenty years, which was kept in a reduced and adopted, gave a satisfactory account of the progress of the institu- condition by a truss, which one day she neglected to wear, when the tion. There are at the present time more thaul 1,350 members on the hernia returned, and, notwithstanding the proper application of the books. During the year, their payments have amounted to £406, and taxis, purgative enemata, etc., it remained irreducible for five days; of this sum £268 have been divided among the medical officers. This and, urgent symptoms having set in, Dr. Guermonprez of Annappes, is a good beginning, and we trust the dispensary may go on growing in the patient's medical attendant, recollecting that cases of intestinal ob- popularity and prosperity year by year. It is remarkably well situated, struction had been overcome by the administration of lavements of as it occupies premises next door to the infirmary. The leading me- eau de Seltz or ordinary soda-water, resolved to try the remedy in this dical men of the town take a lively interest in its welfare, and several case.
    [Show full text]
  • Cornwall Energy Recovery Ltd
    CONNON BRIDGE Planning Supporting Statement To accompany a Planning application to include the following proposals:- - development of new waste reception facility [adjacent and to the north of the existing Waste Transfer Station (WTS) / Refuse Derived Fuel (RDF) Facility]; - retention and continued use of the above WTS / RDF facility; - demolition and then redevelopment of the Clinical Waste Facility in new location; - development of a turning head for on site traffic; - construction of a fire water tank and pump room and associated infrastructure All of the above proposed for a temporary period until 31st December 2036. Niall Kelly Cornwall Energy Recovery Ltd. December 2020 Cornwall Energy Recovery Cornwall Energy Recovery 05/03/2021 Connon Bridge – Planning Supporting Statement [2 of 44] Cornwall Energy Recovery Project quality assurance information sheet Connon Bridge Refuse Transfer Station Report status Final Report date November 2020 Prepared by Niall Kelly SUEZ recycling and recovery UK Planning Manager Reviewed by Corrina Scott Roy SUEZ recycling and recovery UK Head of Planning Cornwall Energy Recovery 1 INTRODUCTION ........................................................................................................................ ..1 2 THE APPLICANT ....................................................................................................................... 3 3 SITE DESCRIPTION .................................................................................................................. 4 4 THE PROPOSED DEVELOPMENT
    [Show full text]
  • Cornwall Local Plan: Strategic Policies 2010-2030 Combined Document to Support Submission to the Secretary of State (January 2016)
    Cornwall Local Plan: Strategic Policies 2010-2030 Combined document to support submission to the Secretary of State (January 2016) 2 This is a version of the Cornwall Local Plan: Strategic Policies containing Further Significant Changes (January 2016) The original versions of the Proposed submission document (March 2014) and the Schedule of Focused Changes (September 2014). can be viewed by visiting www.cornwall.gov.uk/localplancornwall The document contains the amendments changed and consulted on during the further significant changes consultation and are expressed in the conventional form of strikethrough for deletions and underlining for additions of text. Cornwall Local Plan: Strategic Policies 2010-2030 Combined document to support submission to the Secretary of State (January 2016) Contents 72 Policy 18 Minerals – general principles 73 Policy 19 Minerals safeguarding 6 Introduction – Planning Future Cornwall 77 Policy 20 Strategic waste management principles 10 Vision and objectives 78 Policy 21 Managing the provision of waste 13 Spatial Strategy management facilities 36 General policies 79 Policy 22 Best use of land and existing buildings 106 Policy messages for places – Community Network Areas 80 Policy 22A Protection of the Countryside 206 Monitoring framework 85 Policy 23a European protected sites 218 Saved policies 88 Policy 23 Natural environment 224 Key diagram – policies map 97 Policy 24 Historic environment Schedule of policies 99 Policy 25 Green infrastructure 12 Policy 1 Presumption in favour of sustainable 101 Policy
    [Show full text]
  • Cornwall Local Plan: Strategic Policies
    Planning for Cornwall Cornwall’s future Local Plan Strategic Policies 2010 - 2030 Towl leel Kernow Policis Stratejek 2010 - 2030 www.cornwall.gov.uk Cornwall is the second largest local authority in the south west, covering an area of Crime in Cornwall is 3,559 sq km generally low with a coastline of 697km and it is a safe place in which to live and work Cornwall’s environmental assets are extremely valuable and are a 76% (as at 2014) of Cornwall’s key contributor to the economy and population and quality of life (414,466 people) are of working age (2011) Over of the population of Cornwall40% live in settlements of less than 3,000 people Median gross annual pay in Cornwall is £22,068 Agriculture and fishing compared to England at £26,165 (2011) account for a larger share of employment in Cornwall (3%) than Strengthening Cornwall’s economy the regional (2%) or national (1%) is an ongoing challenge - l (2010). economic output, low wages,ow low productivity and a lack of big companies are challenges Education and Skills - Over 69,900 Six universities and children colleges and young people are educated in make up the Combined University for state funded schools and academies Cornwall which attracted over 7,700 with a further 2,525 pupils on roll higher education students in 2009/10. across independent schools in Cornwall) To support the delivery of over 38,000 jobs over the plan period the target of 422,400 sq m of employment floorspace has been provided Planning for Cornwall Cornwall’s future Local Plan Strategic Policies 2010 - 2030 Adopted November 2016 Note: This document should be read in conjunction with the Policies maps and the Community Network Area Sections.
    [Show full text]
  • Display PDF in Separate
    environment agency plan TAMAR ANNUAL REVIEW 2000 December 2000 HOLSWORTHY LAUNCESTOI LISKEARD LOOE FOWEY PLYMOUTH FALMOUTH En v ir o n m e n t Ag e n c y Tamar Annual Review 2000 Further copies of this Annual Review can be obtained from: Team Leader, LEAPs Environment Agency Sir John Moore House Victoria Square Bodmin PL31 1EB Environment Agency Copyright Waiver This report is Intended to be used widely and may be quoted, copied or reproduced In any way; provided that the extracts are not quoted out of context and that due acknowledgement Is given to the Environment Agency. Note: This Is not a legally or scientifically binding document. ENVIRONMENT A G EN C Y 109199 Tamar Annual Review 2000 Our Vision Our vision is of this area being managed in a sustainable way, that balances the needs of all users with the needs of the environment. We look forward to a future where a healthy economy leads to: Biodiversity and the physical habitat for wildlife being enhanced People’s enjoyment and appreciation of the environment continuing to grow Pressures from human needs being satisfied sustainably Foreword This is the combined Annual Review of the Tamar Estuary and Freshwater Tamar Action Plans. It describes the progress that has been made since. In addition to our own actions in the plan area we welcome opportunities to work in partnership with other groups. Tamar Annual Review 2000 Contents 1. Introduction 2. Area Overview 3. Protection through Partnership 4. Actions 4.1 Quality of surface waters and groundwaters 4.1.1 Effects of effluent discharges
    [Show full text]
  • Connon Bridge Landfill Community Liaison Group Meeting Minutes
    CONNON BRIDGE LANDFILL SITE COMMUNITY FORUM MEETING MINUTES Meetings Tuesday 12 January 2016 2 Tuesday 15 March 2016 9 Tuesday 31 May 2016 18 Tuesday 26 July 2016 26 Tuesday 29 November 2016 34 Meeting minutes Subject Connon Bridge Liaison Group Date 12/01/2016 Location Connon Bridge Recorder Janine Sargent Present Name Initials Company Title Mike Dobson (Chair) MD SUEZ Communications Manager SW Ian Mitchell IM SUEZ Landfill Senior Site Manager Katherine Alexander KA SUEZ Assistant Landfill Site Manager William Tedder WT SUEZ Gas Support Manager Mike Beckett MB Cornwall Council Waste Manager Carol Spear CS St Pinnock Parish Council Chair of St Pinnock PC Mary Rees MR Environment Agency PPC Officer (Devon & C’wall) Paul Jordan PJ Braddock Parish Meeting Janet Haley JH Local resident Henry Haley HH Local resident Doug Mills DM Local resident Jenny Mills JM Local resident John Emerson JE Local resident Mick Butfield MB Cornwall Council Planning Department 28/11/2016 [1 of 7] Ref Note Action 1.0 Welcome and apologies 1.1 Apologies were received from Benedicte Bay, Stuart Higgins and Councillor Bernie Ellis. MD said that he had been extremely sad to hear that Suzanne Hardingham-Reeday, a long standing member of the group, had passed away just before Christmas. Thoughts were with her family and friends at this sad time. 2.0 Review Previous Minutes 2.1 Re. 2.2 DM said that he would have described the noise as ‘loud’ rather than ‘abrupt’. With that adjustment the draft minutes from 3 November 2015 were approved. 3.0 SUEZ Operational Update This incorporated agenda items of Testing and results of water samples, along with Gas wells and capping works update).
    [Show full text]
  • Author: Title: Year
    This work is made freely available under open access. AUTHOR: TITLE: YEAR: OpenAIR citation: This work was submitted to- and approved by Robert Gordon University in partial fulfilment of the following degree: _______________________________________________________________________________________________ OpenAIR takedown statement: Section 6 of the “Repository policy for OpenAIR @ RGU” (available from http://www.rgu.ac.uk/staff-and-current- students/library/library-policies/repository-policies) provides guidance on the criteria under which RGU will consider withdrawing material from OpenAIR. If you believe that this item is subject to any of these criteria, or for any other reason should not be held on OpenAIR, then please contact [email protected] with the details of the item and the nature of your complaint. This thesis is distributed under a CC ____________ license. ____________________________________________________ FACTORS IMPACTING ON TECHNOLOGY ACCEPTANCE FOR THE MICRO/SME ELECTRONICS RETAILER NEIL G. CONNON PhD 2007 Factors impacting on technology acceptance for the micro/SME electronics retailer Abstract Factors impacting on technology acceptance for the micro/SME electronics retailer The UK micro/SME (known here as SME) retail sector is very important to the economic well being of the country. Its ability to generate jobs as well as income makes it a key part of the drive towards economic growth, and as such it is supported by government through a variety of initiatives. One initiative in 2003 aimed to energise and invigorate practitioners into using internet based technologies more fully in their business practices. This supported the widely held belief that the internet can and does enhance and improve business efficiency.
    [Show full text]
  • Seaton, Looe and Fowey Catchment Management Plan Consultation Report
    EA-S'oU fh \K/£c>t LEAPs £ 0 x ^ 1 SEATON, LOOE AND FOWEY CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT “ ■€ National Rivers Authority South Western Region NRA Copyright Waiver This report is intended to be used widely and may be quoted, copied or reproduced in any way, provided that the extracts are not quoted out of context and that due acknowledgement is given to the National Rivers Authority. Published December 1994 Foreword The Seaton, Looe and Fowey is the first group of catchments for which the NRA’s Cornwall Area is preparing a Catchment Management Plan (CMP). The preparation of this plan is part of a national programme to prepare CMP’s for all catchments in England and Wales over the next 5 years. An important part of the Catchment Management Plan process is public consultation which is designed to allow those who live in, or use, the catchment to have an input into the development of NRA plans and work programmes. The Consultation Report includes relevant information about the catchment and lists the issues identified by the NRA which need to be addressed. Following the public consultation period the NRA will produce a Final Plan which will set out targets for action by the NRA and others over the coming years. We intend to set up Steering Groups comprising representatives of organisations and interests in the catchment to monitor progress. The Seaton, Looe and Fowey catchments are essentially high quality environments and the NRA’s vision is one of maintaining and reinforcing current high standards and ensuring that the character of the water related environments is maintained.
    [Show full text]