MEEUP Methodology Report

Total Page:16

File Type:pdf, Size:1020Kb

MEEUP Methodology Report Methodology Study Eco-design of Energy-using Products Final Report MEEUP Methodology Report Contractor: Client: VHK European Commission Van Holsteijn en Kemna BV DG ENTR, Unit ENTR/G/3, René Kemna contact: Michaïl Papadoyannakis Martijn van Elburg William Li in collaboration with DG TREN, Unit D1, contact: Rob van Holsteijn André Brisaer Rue de la Loi 200 Delftech Park 1100 Brussels Elektronicaweg 14 Belgium 2628 XG Delft Netherlands DISCLAIMER & IMPORTANT NOTE The authors accept no liability for any material or immaterial direct or indirect damage resulting from the use of this report or its content. Note: This report contains the results of research by the authors and is not to be perceived as the opinion of the European Commission. VHK, Delft, 28.11.2005 MEEuP Methodology Report, Final | 28.11.2005 | VHK for European Commission 1 CONTENTS page Summary.............................................................................................................................................7 1 INTRODUCTION ....................................................................................................................11 1.1 Aim....................................................................................................................................................... 11 1.2 Article 15.............................................................................................................................................. 11 1.3 Structuring............................................................................................................................................ 16 1.4 Reporting.............................................................................................................................................. 19 2 SCOPE: DOMAIN OF ECO-DESIGNER.............................................................................21 2.1 Products................................................................................................................................................ 21 2.2 Product development............................................................................................................................ 22 2.3 Energy-using Products ......................................................................................................................... 24 2.4 EuP Industry......................................................................................................................................... 25 2.5 Integrated Product Policy..................................................................................................................... 27 2.6 Indicators for Designers ....................................................................................................................... 28 3 ENVIRONMENTAL IMPACT: METHODOLOGY...........................................................30 3.1 Introduction.......................................................................................................................................... 30 3.1.1 Assignment.............................................................................................................................. 30 3.1.2 Directive.................................................................................................................................. 30 3.1.3 Existing legislation.................................................................................................................. 31 3.1.4 International Treaties............................................................................................................... 31 3.1.5 EU Air and Water Quality Framework Directives .................................................................. 31 3.1.6 Non Regulated Substances ...................................................................................................... 32 3.2 Parameters Required ............................................................................................................................ 33 3.3 Energy .................................................................................................................................................. 34 3.3.1 Introduction ............................................................................................................................. 34 3.3.2 Accounting Unit and Auxiliary Parameters............................................................................. 34 3.3.3 Process vs. I/O Analysis.......................................................................................................... 35 3.3.4 System boundaries................................................................................................................... 36 3.3.5 Multi-product processes and multi-process products .............................................................. 37 3.3.6 Recycling................................................................................................................................. 38 3.3.7 Product Life & Number of Users ............................................................................................ 43 3.3.8 Functional unit......................................................................................................................... 45 3.4 Water.................................................................................................................................................... 46 3.5 Waste.................................................................................................................................................... 46 3.6 Global Warming Potential [Kyoto] ...................................................................................................... 48 3.7 Ozone Depletion Potential [ Montreal ] ............................................................................................... 51 3.8 Acidification [ Gothenburg ] ................................................................................................................ 53 3.9 Volatile Organic Compounds VOCs.................................................................................................... 57 3.10 Persistent Organic Pollutants [ Stockholm ]......................................................................................... 58 3.11 Heavy Metals To Air [Århus] .............................................................................................................. 59 3.12 Particulate Matter ................................................................................................................................. 63 3.13 Water emissions ................................................................................................................................... 64 3.14 Other..................................................................................................................................................... 68 3.14.1 Hazardous Substances ............................................................................................................. 68 3.14.2 Land-use.................................................................................................................................. 71 3.14.3 Product specific emissions ......................................................................................................71 3.15 Summary and Normalisation Options .................................................................................................. 71 4 ENVIRONMENTAL ANALYSIS: DATA RETRIEVAL....................................................73 4.1 Introduction.......................................................................................................................................... 73 MEEuP Methodology Report, Final | 28.11.2005 | VHK for European Commission 2 4.2 Data Required....................................................................................................................................... 73 4.3 Data Sources Available ........................................................................................................................ 75 4.3.1 Full LCA ................................................................................................................................. 75 4.3.2 Simplified LCA ....................................................................................................................... 77 4.3.3 Legislation............................................................................................................................... 79 4.3.4 Industry associations ............................................................................................................... 81 4.3.5 Other sources........................................................................................................................... 82 4.3.6 Physical product analysis ........................................................................................................ 83 4.3.7 Stakeholder experts ................................................................................................................. 83 4.4 Data Retrieval Use Phase ..................................................................................................................... 83 4.4.1 Harmonised Test Standards..................................................................................................... 83 4.4.2 Use Phase: Consumer Behaviour ...........................................................................................
Recommended publications
  • IBM Thinkpad Selectadock III User's Guide
    IBM ThinkPad SelectaDock III User's Guide IBM ThinkPad IBM SelectaDock III User's Guide Note Before using this information and the product it supports, be sure to read the general information in Appendix C. First Edition (September 1997) The following paragraph does not apply to the United Kingdom or any country where such provisions are inconsistent with local law: INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICATION “AS IS” WITHOUT ANY WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE LIMITED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Some states do not allow disclaimer or express or implied warranties in certain transactions; therefore, this statement may not apply to you. This publication could include technical inaccuracies or typographical errors. Changes are periodically made to the information herein; these changes will be incorporated in new editions of the publication. IBM may make improvements or changes in the products or the programs described in this publication at any time. Requests for technical information about IBM products should be made to your IBM Authorized Dealer or your IBM Marketing Representative. Some parts of this manual are taken or adopted from the Adaptec EZ-SCSI documentation with permission from Adaptec, Inc. IBM Corporation has rights and responsibility for this manual. Copyright International Business Machines Corporation 1997. All rights reserved. Portions of this manual are Copyright 1993, 1997. Adaptec, Inc. All rights reserved. Note to U.S. Government Users — Documentation related to restricted rights — Use, duplication or disclosure is subject to restrictions set forth in GSA ADP Schedule Contract with IBM Corp.
    [Show full text]
  • IBM Thinkpad 770 User's Guide Supplement Title: C79DKMST Creationdate: 08/19/97 17:47:41
    Title: C79DKMST CreationDate: 08/19/97 17:47:41 IBM ThinkPad 770 User's Guide Supplement Title: C79DKMST CreationDate: 08/19/97 17:47:41 Title: C79DKMST CreationDate: 08/19/97 17:47:41 IBM IBM ThinkPad 770 User's Guide Supplement Title: C79DKMST CreationDate: 08/19/97 17:47:41 First Edition (September 1997) The following paragraph does not apply to the United Kingdom or any country where such provisions are inconsistent with local law: INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICATION “AS IS” WITHOUT ANY WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE LIMITED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Some states do not allow disclaimers or express or implied warranties in certain transactions; therefore, this statement may not apply to you. This publication could include technical inaccuracies or typographical errors. Changes are periodically made to the information herein; these changes will be incorporated in new editions of the publication. IBM may make improvements or changes in the products or the programs described in this publication at any time. Requests for technical information about IBM products should be made to your IBM authorized dealer or your IBM marketing representative. Copyright International Business Machines Corporation 1997. All rights reserved. Note to U.S. Government Users – Documentation related to restricted rights – Use, duplication, or disclosure is subject to restrictions set forth in GSA ADP Schedule Contract with IBM Corp. Title: C79DKMST CreationDate: 08/19/97 17:47:41 Contents The following sections supplement the information contained in the User's Guide.
    [Show full text]
  • Modeling Electricity Trade in Southern Africa 1999 ~ 2000
    June 10, 1999 Proposal for funding under the USAID co-operative agreement on Equity And Growth through Economic Research/Trade Regimes and Growth (EAGER/TRADE) MODELING ELECTRICITY TRADE IN SOUTHERN AFRICA 1999 ~ 2000 June 1999 Purdue University Principal and Co-Investigators: William A. Masters F.T. Sparrow Brian H. Bowen ii Contents Summary ......................................................................................................................... 3 Accomplishments to Date and Introduction........................................................................ 4 1) Accomplishments during the Second Year ....................................................... 4 2) Background for the Proposed Year Three Study............................................. 10 3) Summary of the Three Areas of Proposed Work during Year Three.............. 12 I. Area One: Modeling Refinement ............................................................................ 13 a) Incorporate the changes in the model structure suggested at the February 1999 SAPP meeting ............................................. 13 b) Further testing of the model to insure all modules are functioning properly................................................................ 13 c) Update the data sets that drive the model........................................................ 13 d) Create a ÒWindowsÓ interface version of the model....................................... 13 II. Area Two: Model Dissemination ...........................................................................
    [Show full text]
  • Linux Hardware Compatibility HOWTO
    Linux Hardware Compatibility HOWTO Steven Pritchard Southern Illinois Linux Users Group [email protected] 3.1.5 Copyright © 2001−2002 by Steven Pritchard Copyright © 1997−1999 by Patrick Reijnen 2002−03−28 This document attempts to list most of the hardware known to be either supported or unsupported under Linux. Linux Hardware Compatibility HOWTO Table of Contents 1. Introduction.....................................................................................................................................................1 1.1. Notes on binary−only drivers...........................................................................................................1 1.2. Notes on commercial drivers............................................................................................................1 1.3. System architectures.........................................................................................................................1 1.4. Related sources of information.........................................................................................................2 1.5. Known problems with this document...............................................................................................2 1.6. New versions of this document.........................................................................................................2 1.7. Feedback and corrections..................................................................................................................3 1.8. Acknowledgments.............................................................................................................................3
    [Show full text]
  • Linux Hardware Compatibility HOWTO Linux Hardware Compatibility HOWTO
    Linux Hardware Compatibility HOWTO Linux Hardware Compatibility HOWTO Table of Contents Linux Hardware Compatibility HOWTO........................................................................................................1 Patrick Reijnen, <[email protected] (remove both "antispam.")>..1 1.Introduction...........................................................................................................................................1 2.Computers/Motherboards/BIOS...........................................................................................................1 3.Laptops..................................................................................................................................................1 4.CPU/FPU..............................................................................................................................................1 5.Memory.................................................................................................................................................1 6.Video cards...........................................................................................................................................2 7.Controllers (hard drive).........................................................................................................................2 8.Controllers (hard drive RAID)..............................................................................................................2 9.Controllers (SCSI)................................................................................................................................2
    [Show full text]
  • USB Busport™ Mobile User Manual
    USB BusPort™ Mobile MODEL F5U022 User Manual P73280 Table of Contents Overview Belkin BusPort™ Mobile Features . 4 System Requirements . 4 Package Contents . 4 Checking CardBus Host Controller on a PC . 5 Installation for notebook PCs using Windows® 98 (First Edition) . 6 Installation for notebook PCs using Windows® 98 (Second Edition) . 10 Using Your BusPort™ Mobile on a notebook PC Initializing USB Devices . 14 Troubleshooting on a notebook PC . 15 Installation using Macintosh® PowerBook® . 16 Troubleshooting on a Mac® . 17 Compatibility List . 18 2 Overview The Belkin USB BusPort™ Mobile is the perfect solution for notebook PC or Macintosh® PowerBook® users without USB ports. Installation is fast and easy – just slide it in your CardBus PC Card Type II slot. The BusPort™ Mobile is completely Plug-and-Play, and is compatible with Windows® 98 and Macintosh® OS 8.6 or higher. You can instantly connect USB printers, modems, keyboards, mice, joysticks, and hundreds of other USB devices. The BusPort™ Mobile provides two additional USB ports. When used with USB hubs such as the Belkin BusStation™ or 4 Port Hub, you can daisy-chain up to 127 USB devices to your notebook or PowerBook®. And because it is a Belkin product, you are assured that it is fully compliant with current USB specifications, meets the standard of USB OHCI specifications and comes with an unbeatable Lifetime Warranty. 3 Features • Adds USB capabilities to your notebook PC or Macintosh® PowerBook® quickly and easily • Instantly connect ANY USB device such as USB printers,
    [Show full text]
  • VOC) Due to the Use of Decorative Paints and Varnishes for Professional and Non-Professional Use
    Chemiewinkel EC DG Environment Tender E1/ETU/980084 DECOPAINT Study on the Potential for Reducing Emissions of Volatile Organic Compounds (VOC) Due To The Use Of Decorative Paints and Varnishes for Professional and Non-professional Use FINAL REPORT Contributors Chemiewinkel (1) Enterprise Ireland(2) WIMM(3) (Health,Safety and the Environment) (Coatings Technology) (Economics) J. C. van Broekhuizen. P J Thornton. M. van der Veen. J Terwoert. J. Colreavy. S. Walhain. M. Le Feber. J. Mulvihill. I. McStravick. D.Black. J. Murphy. H. McAuliffe. June, 2000 (1)University of Amsterdam,Chemiewinkel - Consultancy and Research Centre on Chemistry, Work and Environment P.O. Box 20242, NL-1000 HE Amsterdam, Tel. 00 31 20 525 5607, Fax. 00 31 20 525 5615 (2)Enterprise Ireland, Coatings Research Group, Glasnevin, Dublin 9, Ireland, Tel. 00 353 1 837 0101, Fax. 00 353 1 808 2046. (3)Institute for Environmental Management (WIMM), Roetersstraat 11, NL-1018 WB Amsterdam, Tel. 00 31 20 525 4077, Fax. 00 31 20 525 5092 Foreword Prior to undertaking this mission, the Study Team was aware that it would be a daunting task. This it has turned out to be in good measure, and more. Over the past fourteen months we have consulted, surveyed, visited, measured, considered and debated to such an extent it seemed that meeting our deadline would be impossible. Up to the last moment we were still dealing with written and electronic communications, and requests for further meetings. To those who could not be accommodated we offer our sincere apologies, and trust that their views are nevertheless reflected in our report.
    [Show full text]
  • Linux Hardware Compatibility HOWTO
    Linux Hardware Compatibility HOWTO Steven Pritchard Southern Illinois Linux Users Group / K&S Pritchard Enterprises, Inc. <[email protected]> 3.2.4 Copyright © 2001−2007 Steven Pritchard Copyright © 1997−1999 Patrick Reijnen 2007−05−22 This document attempts to list most of the hardware known to be either supported or unsupported under Linux. Copyright This HOWTO is free documentation; you can redistribute it and/or modify it under the terms of the GNU General Public License as published by the Free software Foundation; either version 2 of the license, or (at your option) any later version. Linux Hardware Compatibility HOWTO Table of Contents 1. Introduction.....................................................................................................................................................1 1.1. Notes on binary−only drivers...........................................................................................................1 1.2. Notes on proprietary drivers.............................................................................................................1 1.3. System architectures.........................................................................................................................1 1.4. Related sources of information.........................................................................................................2 1.5. Known problems with this document...............................................................................................2 1.6. New versions of this document.........................................................................................................2
    [Show full text]
  • 40,00 PLN Brutto 32,52 PLN Netto
    SERVECOM.pl KOMPUTERY i MULTIMEDIA ul. Kopernika 2, 42-217 Częstochowa INFOLINIA +48 34 390 66 99 / 801 999 099 ładowarka / zasilacz movano 16v 3.36a (5.5x2.5) - ibm, itd 40,00 PLN brutto 32,52 PLN netto Producent: Movano Eurocom, 512TE, Kapok, AJP, ARM, Notebook Komputer, Gigatech, Producent urządzenia Formula, Epson, DTK, Acer, Digital, Clevo, Dynasty, IBM, 510, Panasonic, 512, Emachines, 512DX, Sager, 512T, California Access, 512T-64 Kabel_zasilajacy 2 pin Dostawa 2021-10-11 24 miesiące + 6 miesięcy* Gwarancja *dodatkowe 6 miesięcy po darmowej rejestracji produktu Wejscie AC 100-240V Wyjscie 16V 3.36A Średnica zewnętrzna 5.5 mm, średnica wewnętrzna 2.5 mm, długość 12 Wtyk mm Stan nowy Moc 54W Zabezpieczenie_przed przepięciem, przegrzaniem, zwarciem, przeciążeniem prądowym Certyfikat CE, RoHS W_zestawie kabel zasilający, zasilacz, instrukcja obsługi, karta gwarancyjna Wymiary 107.50 x 46.00 x 29.30 mm 02K6703, 02K6880, 02K6557, 02K6654, 02K6704, 02K7006, 02K6657, 02K6705, 02K7010, 02K6658, 02K6706, 02K7011, 02K6661, 02K6707, 02K6746, 02K7654, 02K6665, 02K6708, 02K6747, 08K8202, 02K6666, 02K6709, 02K6753, 08K8203, 02K6669, 02K6744, 01H6136, 08K8204, Zamiennik 02K6670, 02K6749, 02K5669, 08K8205, 02K6671, 02K6750, 02K6491, 08K8206, 02K6673, 02K6751, 02K6496, 08K8207, 02K6674, 02K6756, 02K6545, 08K8208, 02K6677, 02K6757, 02K6549, 02K6699, 02K6807, 02K6550, 02K6701, 02K6809, 02K6555, 02K6702, 02K6813, 02K6556 SERVECOM.pl Oferta ma charakter informacyjny pomimo dołożenia wszelkich starań z naszej strony nie gwarantujemy, że publikowane dane
    [Show full text]
  • Italy Radio Stations
    Radio Stations The list is not fully disclosed to avoid any unlawful manipulation and respect the work of industry professionals Italy Digital Delivery ✔ Radio Monitoring ✔ 100% Mix******* (Rome) Canale 1******* (Venice) FM Itali******* (Siracusa) Malvisi ******* (Busseto) R101 70******* (Milan) 105 2K &******* (Milan) Centro M******* (Ancona) Free Tim******* (Milan) Max Radi******* (Corciano) R101 80******* (Milan) 105 Clas******* (Milan) Centro S******* (Ladispoli) Frequenz******* (Bari) Max Radi******* (Corciano) R101 90******* (Milan) 105 Danc******* (Milan) Centro S******* (Rome) Funky Co******* (Turin) MEP Radi******* (Rieti) R101 Gra******* (Milan) 105 FM******* (Milan) Ciccio R******* (Brindisi) Gamma Ra******* (Ponsacco) Modena 9******* (Carpi) R101 Hip******* (Milan) 105 Hip ******* (Milan) Circuito******* (Cavarzere) Gammagio******* (Gioiosa Jonica) Modena R******* (Modena) R101 Leg******* (Milan) 105 Hits******* (Milan) Club Gen******* (Rome) Gammagio******* (Gioiosa Jonica) Mondorad******* (Rome) R101 Mad******* (Milan) 105 InDa******* (Milan) Cluster ******* (Rho) Golden H******* (Rome) MultiRad******* (Tolentino) R101 New******* (Milan) 105 Miam******* (Milan) Colors R******* (Rome) Golden R******* (Rome) MW Radio******* (Monza) R101 Spe******* (Milan) 105 Musi******* (Milan) Containe******* (Vicenza) HRN Hit ******* (Ravenna) NBC - Re******* (Bolzano) R101 Urb******* (Milan) 105 Rap ******* (Milan) Contatto******* (Carrara) Idea Rad******* (Civitavecchia) New Radi******* (Maddaloni) R101 You******* (Milan) 105 Stor*******
    [Show full text]
  • GSA Schedule for Website 1-09-03.XLS
    GSA Schedule GS-35F-5946H Manufacturer Category Mfg. Part Number Description List Price Sell-Price ADAPTEC CABLE 562800 External, Low-Density 50-pin to Low-Density 50-pin, Fast SCSI-2 cable (3 feet). $22.00 $17.47 For use with AHA-1510 product and external peripherals with a low-density 50-pin connector. ADAPTEC CABLE 563000 SCSI Cable 1100 Internal, standard 50-pin Fast SCSI-2 cable with 5 positions (5 $12.00 $9.28 feet or 1.5 meters). For use with AHA-15xx, 16xx, 27xx, 2910, 2920, 2940, 2940 Ultra, 2940UW, 3940 Ultra or AVA-1505A or AAA-131 and 133 products. ADAPTEC CABLE 915800 68 Pin Solution $52.00 $39.86 Internal, 68-pin Fast Wide and Wide Ultra SCSI cable with 5 positions (1.1 meters). For use with all Wide and Ultra Wide SCSI Host Adapters. ADAPTEC CABLE 973000 Internal, standard 50-pin Fast SCSI-2 cable with 5 positions and terminator (1.3 $35.00 $27.30 meters). For use with AHA-15xx, 16xx, 27xx, 2910, 2920, 2940, 2940 Ultra, 2940UW, 3940 Ultra or AVA-1505A or AAA-131 and 133 products. ADAPTEC CABLE 973100 Internal, 68-pin Fast Wide and Wide Ultra SCSI cable with 5 positions and $69.00 $53.51 terminator (1.3 meters). For use with AHA-274xW, 2940UW, and 3940AUW products. ADAPTEC CABLE 986300 Internal converter to change a 68-pin connector on an internal ribbon cable to a $30.00 $25.06 50-pin connector (1 inch). For use with AHA-2940UW, 3940UW, and 3940UW/MAC products.
    [Show full text]
  • MODELING ELECTRICITY TRADE in SOUTHERN AFRICA Second Year Final Report to the Southern African Power Pool
    March 23, 1999 USAID Co-operative Agreement on Equity and Growth through Economic Research Trade Regimes and Growth (EAGER/Trade) MODELING ELECTRICITY TRADE IN SOUTHERN AFRICA Second Year Final Report to the Southern African Power Pool F.T. Sparrow, William A. Masters, Zuwei Yu, Brian H. Bowen PURDUE UNIVERSITY Peter B. Robinson, Zimconsult David Madzikanda SAPP-PSC Jean-Louis Pabot SAPP-GPWG Arnot Hepburn Eskom, South Africa B.R.F. Moore BPC, Botswana M. Badirwang BPC, Botswana Fatima Arthur EDM, Mozambique Bongani Mashwama SEB, Swaziland Roland Lwiindi ZESCO, Zambia Edward Tsikirayi, ZESA, Zimbabwe K.R. Abdulla TANESCO, Tanzania Jose A. Salguerio Energy Sector, TAU, SADC Swaziland SAPP Management Meeting February 23-25, 1999 2 ACKNOWLEDGEMENTS Each of the members of Purdue UniversityÕs State Utility Forecasting Group and graduate staff have made significant contributions during the second year of SAPP modeling. These include Doug Gotham, David G. Nderitu, Frank Smardo, James Wang, Kevin Stamber, Basak Aluca, and Pedro Gonzales-Orbago. The administrative assistance from Chandra Allen and Barbara Beaver has been a great help throughout. Thanks is given to each one for contributing so much. Colleagues from the Southern African Power Pool (SAPP) and researchers at Purdue University highly value the funding and support of the USAID/EAGER in making the Purdue/SAPP joint research project all possible. CONTENTS Page Acknowledgements.............................................................................................................
    [Show full text]