National Developments – Response Form
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Dalmarnock Power Station, Riverside
Case Studies DALMARNOCK POWER STATION, RIVERSIDE, GLASGOW Description: Land Reclamation and Remediation Form of Contract: NEC3 Option A Duration: 60 weeks Contract Value: £3,400,000 Client: Clyde Gateway Clients Representative: Grontmij This reclamation contract was on the site of the once colossal Dalmarnock Power Station, located in the East End of Glasgow. The power station was closed in 1977 and subsequently demolished to ground level with the demolished structures used to backfill the substantial underground voids (basements, tunnels etc). Our scope of work involved major land reclamation, remediation of contaminated soils, bulk earthworks and drainage to provide development platforms on the 9ha site. The site is located in a sensitive area bounded by residential properties, the River Clyde and a railway line which required close liaison with all stakeholders for the duration of the project. Dalmarnock Road Drainage Crib wall Borrow Pit Dalmarnock Road Tunnel SUDS Pond Power Station Building Footprint Railway Line Perimeter Wall River Clyde Walkway River Clyde By far the largest element of the reclamation works involved the controlled demolition of the old power station foundations. Over 60,000m3 of reinforced concrete (R.C.) was broken out, at depths up to 5m. Careful consideration was given to neighbouring properties during this stage of the work. To reassure residents during this stage of the contract, we undertook numerous structural surveys of properties prior to demolition and established vibrographs at strategic locations to monitor vibration during demolition. All concrete was processed to provide engineered fill for the required development platform. www.ihbrown.com Case Studies The removal of the substantial perimeter wall included a section which ran parallel with the River Clyde Walkway. -
Fiv Crativ Workspac Studios
FIV CR ATIV WORKSPAC EastWorks is a cutting edge new development that will completely transform the disused Purifier Shed in Dalmarnock, Glasgow into high quality, contemporary office / studio accommodation. The former Purifier Shed is one of just STUDIOS five historic buildings to remain in the area and the regeneration plan seeks to safeguard the Victorian listed façade and revitalise the location. The existing roof structure and columns will be exposed and celebrated. A new steel structure will be installed to support mezzanine levels and open flexible floor space with expanses of curtain wall glazing. The listed façade at the rear will boast original features such as decorative sandstone arches around the windows. The final product will deliver the refurbishment of interesting and innovative spaces, which will comprise 5 standalone units / studios / offices. The building was originally known as the Dalmarnock Purifier Shed developed in the late 1800s. It was opened I for various uses and finally closed in the 1950’s. Since then the building has lain vacant until recently when it was I D ST. supported by the Glasgow 2018 European Championships > 1843 for young people to use the area for an Art Festival. DORA STREET / GLASGOW W ll WORTH IT WelLBEING Provision - Dedicated modern accessible shower facilities, high quality changing areas, drying rooms with benches and hooks, lockers, WCs including accessible toilet located at both ground and mezzanine levels with high quality finishes - Service tails for future tea point/kitchen installation - 26 car spaces including 3 accessible spaces - Electric car charging points - Ample cycle parking provided - External bench seating and soft landscaping for relaxation areas Open plan office areas with Mezzanine levels in each unit. -
City Centre – Carmyle/Newton Farmserving
64 164 364 City Centre – Carmyle/Newton Farm Serving: Tollcross Auchenshuggle Parkhead Bridgeton Newton Farm Bus times from 18 January 2016 Hello and welcome Thanks for choosing to travel with First. We operate an extensive network of services throughout Greater Glasgow that are designed to make your journey as easy as possible. Inside this guide you can discover: • The times we operate this service Pages 6-15 and 18-19 • The route and destinations served Pages 4-5 and 16-17 • Details of best value tickets • Contact details for enquiries and customer services Back Page We hope you enjoy travelling with First. What’s Changed? Service 364 - minor timetable changes before 0930. The 24 hour clock For example: This is used throughout 9.00am is shown as this guide to avoid 0900 confusion between am 2.15pm is shown as and pm time. 1415 10.25pm is shown as 2225 Save money with First First has a wide range of tickets to suit your travelling needs. As well as singles and returns, we have a range of money saving tickets that give unlimited travel at value for money prices. Single – We operate a single flat fare structure in Glasgow, and a simpler four fare structure elsewhere in the network. Buy on the bus from your driver. Return – Valid for travel off-peak making them ideal for customers who know they will only make two trips that day. Buy on the bus from your driver. FirstDay – Unlimited travel in the area of your choice making FirstDay the ideal ticket if you are making more than two trips in a day. -
South Lanarkshire Core Paths Plan Adopted November 2012
South Lanarkshire Core Paths Plan Adopted November 2012 Core Paths list Core paths list South Lanarkshire UN/5783/1 Core Paths Plan November 2012 Rutherglen - Cambuslang Area Rutherglen - Cambuslang Area Map 16 Path CodeNorth Name Lanarkshire - Location Length (m) Path Code Name - Location LengthLarkhall-Law (m) CR/4/1 Rutherglen Bridge - Rutherglen Rd 360 CR/27/4 Mill Street 137 CR/5/1 Rutherglen Rd - Quay Rd 83 CR/29/1 Mill Street - Rutherglen Cemetery 274Key CR/5/2 Rutherglen Rd 313 CR/30/1 Mill Street - Rodger Drive Core233 Path CR/5/3 Glasgow Rd 99 CR/31/1 Kingsburn Grove-High Crosshill Aspirational530 Core Path Wider Network CR/5/4 Glasgow Rd / Camp Rd 543 CR/32/1 Cityford Burn - Kings Park Ave 182 HM/2280/1 Cross Boundary Link CR/9/1 Dalmarnock Br - Dalmarnock Junction 844 CR/33/1 Kingsheath Ave 460 HM/2470/1 Core Water Path CR/9/2 Dalmarnock Bridge 51 CR/34/1 Bankhead Road Water122 Access/Egress HM/2438/1 CR/13/1 Bridge Street path - Cambuslang footbridge 56 CR/35/1 Cityford Burn Aspirational164 Crossing CR/14/1 Clyde Walkway-NCR75 440 CR/36/1 Cityford Burn SLC276 Boundary Neighbour Boundary CR/15/1 Clyde Walkway - NCR 75 1026 CR/37/1 Landemer Drive 147 North Lanarkshire HM/2471/2 CR/15/2 NCR 75 865 CR/38/1 Landemer Drive Core Path93 Numbering CR/97 Land CR/15/3 Clyde Walkway - NCR 75 127 CR/39/1 Path back of Landemer Drive 63 UN/5775/1 Water CR/16/1 Clydeford Road 149 CR/40/1 Path back of Landemer Drive CL/5780/1 304 W1 Water Access/Egress Code CR/17/1 Clyde Walkway by Carmyle 221 CR/41/1 King's Park Avenue CL/3008/2 43 HM/2439/1 -
To Let 3-5 Cambuslang Way (May Sell) Gateway Office Park, Cambuslang, Glasgow, G32 8Nd Suites from 5,058 Sq Ft – 10,149 Sq Ft (469.9 Sq M – 942.86 Sq M)
TO LET 3-5 CAMBUSLANG WAY (MAY SELL) GATEWAY OFFICE PARK, CAMBUSLANG, GLASGOW, G32 8ND SUITES FROM 5,058 SQ FT – 10,149 SQ FT (469.9 SQ M – 942.86 SQ M) Clowes Developments (Scotland) Ltd cwc-group.co.uk Industrial & Distribution / Office / Retail / Mixed Use / Residential / Leisure Clowes Developments (Scotland) Ltd 9 Coates Crescent, Edinburgh, EH3 7AL t / 0131 225 7265 f / 0131 225 7266 e / [email protected] cwc-group.co.uk Industrial & Distribution / Office / Retail / Mixed Use / Residential / Leisure Modern two storey office pavilion providing flexible open plan office floor space with the benefit of a high quality existing fit out capable of accommodating a wide range of sizes. Specification • Raised access floor • Gas fired central heating Ground Floor • Suspended ceiling with modern lighting • A range of open plan and cellular offices • Boardrooms with comfort cooling • Shower facilities • Staff kitchen facilities installed • Passenger lift • Excellent private car parking – 36 spaces • Cycle racks • EPC C • Equality Act compliant access First Floor Accommodation Floor Size (sq ft) Size (sq m) Ground 5058 469.90 First 5091 472.97 TOTAL 10,149 942.86 Location 3-5 Cambuslang Way is a detached office building within a prominent office park accessed from J2A of the M74 then onto Fullerton Road briefly joining Cambuslang Road and then into Cambuslang Way. Superbly sited for both Scotland’s motorway network and access into Glasgow city centre 4 miles away this location has proved popular with a wide range of local and corporate occupiers. Cambuslang and Carmyle Railway Stations together with various local bus routes are a few minutes away. -
Clyde and Loch Lomond Local Plan District
Flood Risk Management (Scotland) Act 2009: Clyde and Loch Lomond Local Plan District Local Flood Risk Management Plan June 2016 Published by: Glasgow City Council Delivering sustainable flood risk management is important for Scotland’s continued economic success and well-being. It is essential that we avoid and reduce the risk of flooding, and prepare and protect ourselves and our communities. This is first local flood risk management plan for the Clyde and Loch Lomond Local Plan District, describing the actions which will make a real difference to managing the risk of flooding and recovering from any future flood events. The task now for us – local authorities, Scottish Water, the Scottish Environment Protection Agency (SEPA), the Scottish Government and all other responsible authorities and public bodies – is to turn our plan into action. Pagei Foreword Theimpactsoffloodingexperiencedbyindividuals,communitiesandbusinessescanbedevastating andlonglasting.Itisvitalthatwecontinuetoreducetheriskofanysuchfutureeventsandimprove Scotland’sabilitytomanageandrecoverfromanyeventswhichdooccur. ThepublicationofthisPlanisanimportantmilestoneinimplementingtheFloodRiskManagement (Scotland)Act2009andimprovinghowwecopewithandmanagefloodsintheClydeandLoch LomondLocalPlanDistrict.ThePlantranslatesthislegislationintoactionstoreducethedamageand distresscausedbyfloodingoverthefirstplanningcyclefrom2016to2022.ThisPlanshouldberead inconjunctionwiththeFloodRiskManagementStrategythatwaspublishedfortheClydeandLoch LomondareabytheScottishEnvironmentProtectionAgencyinDecember2015. -
Rivers and Streams Play an Important Part in the Recreation 6 Paisley Fulfil Conditions Under the Water Framework Directive and Is Being and Amenity Value of an Area
Current Status - UK and Local A wide variety of riverine habitats occurs in the LBAP Partnership area, ranging from fast flowing upland The River Calder feeds Castle Semple Loch with smaller contributions streams to slow flowing deep sections of river. In this area the main rivers are the White Cart Water, Black coming from the overflows of the Kilbirnie and Barr Lochs. Barr Loch Cart Water, Gryfe and Calder. They are relatively small rivers with the longest being the White Cart Water, was once a meadow with the Dubbs Water draining Kilbirnie Loch into which is 35km in length from its source south of Eaglesham to where it joins the Clyde Estuary at Renfrew. Castle Semple Loch. To preserve some of the marshy habitat in the There are also a number of tributaries that feed these rivers such as the Levern Water, Kittoch Water, Earn area, the Dubbs Water, which drains from Kilbirnie Loch, is channelled Water, Green Water, Dargavel Burn and Locher Water and some smaller watercourses such as the Spango around the outside of the Barr Loch. There is an opportunity to manage Burn. There is also a series of burns flowing down from the Clyde Muirshiel plateau. Land use in the area the area as seasonally flooded wetland (3 Lochs Project). To alleviate varies greatly - there is forest, moorland, agriculture, towns, villages, industrial areas, motorways and parks flooding in the vicinity of Calder Bridge, Lochwinnoch, excavation has amongst others, and each type of land use presents different problems and challenges for biodiversity and recently been carried out. -
Housing & Development Vacant and Derelict Land Report
60-site sample extract from 2017 vacant and derelict land register Period when site Site Size Local Authority Site Name (If Supplied) Address (If Supplied) East North Site Type Location of Site Owner 1 Owner 2 became Vacant Previous Use of Site Development Potential Datazone (Ha.) or Derelict Stirling BORROWMEADOW BORROWMEADOW FARM, STIRLING 281500 694200 33.8 Derelict Within the countryside Public: Local Authority Not applicable 1981-1985 Community & Health Developable - Medium Term S01013066 North Ayrshire NIL LOCHSHORE NORTH, GLENGARNOCK 232046 653688 29.71 Derelict Within a settlement of < 2,000 Public: Scottish Enterprise Not applicable 1986-1990 Manufacturing Developable - Short Term S01011334 ClackmannanshireKILBAGIE COUNTRYSIDE, KILBAGIE 292740 689958 19.26 Derelict Within the countryside Private: Other Private Not applicable 2015 Manufacturing Developable - Undetermined S01007448 East Renfrewshire ARMITAGE SHANKS Shanks Ind Est, Barrhead 250336 659938 14.67 Derelict Within a settlement of 2,000+ Private: Other Private Not applicable 1991-1995 Manufacturing Developable - Short Term S01008307 East Lothian SITE AT EAST FORTUNE HOSPITAL, EAST FORTUNE, EAST LOTHIAN 355262 679352 13.87 Derelict Within the countryside Private: Other Private Not applicable 1996-2000 Community & Health Developable - Medium Term S01008262 North Ayrshire NACCO PORTLAND ROAD, IRVINE 231431 637571 12.58 Derelict Within a settlement of 2,000+ Unknown Private Not applicable 2008 Manufacturing Developable - Short Term S01011178 Glasgow City NIL S OF 6 VAILA PL. -
PPF 2017 MASTER.Pmd
WEST DUNBARTONSHIRE Planning and Perfomance Framework Planning and Building Standards Service July 2017 Planning Performance Framework Foreword This is the sixth reporting year of the an exciting opportunity for the service to be Dumbarton waterfront is also progressing Planning Performance Framework which in the heart of Council services and to work with three out of the four sites having outlines our performance and showcases in a modern purpose built Council office submitted detailed applications for our achievements and improvements in with A listed façade. The new Council development. 2016-17. It also outlines our service office is due to be opened on January Progress of these key development sites improvements for 2017-18. 2018. It will be good to occupy a building has put increased pressure on the service which our service has had a major influence Last year’s Planning Performance as we try to support the development of on its design. Framework was peer reviewed by Glasgow these sites with the same resources as City Council who are part of our Solace As this is the sixth Planning Performance before. The Service has been successful Benchmarking Group. This exercise was Framework I took the opportunity to revisit this year in securing the funding for a part- very useful with good feedback being our first Planning Performance Framework time Planning Compliance Officer and the received. This has helped to shape the back in September 2012. It was good to Strategic Lead of Regeneration has agreed format and content of this year’s Planning see how much progress has been made in to fund a Lead Planning Officer post for 2 Performance Framework. -
Flood Risk Management (Scotland) Act 2009: Clyde and Loch Lomond
Flood Risk Management (Scotland) Act 2009: Clyde and Loch Lomond Local Plan District Local Flood Risk Management Plan June 2016 Published by: Glasgow City Council Delivering sustainable flood risk management is important for Scotland’s continued economic success and well-being. It is essential that we avoid and reduce the risk of flooding, and prepare and protect ourselves and our communities. This is first local flood risk management plan for the Clyde and Loch Lomond Local Plan District, describing the actions which will make a real difference to managing the risk of flooding and recovering from any future flood events. The task now for us – local authorities, Scottish Water, the Scottish Environment Protection Agency (SEPA), the Scottish Government and all other responsible authorities and public bodies – is to turn our plan into action. Pagei Foreword Theimpactsoffloodingexperiencedbyindividuals,communitiesandbusinessescanbedevastating andlonglasting.Itisvitalthatwecontinuetoreducetheriskofanysuchfutureeventsandimprove Scotland’sabilitytomanageandrecoverfromanyeventswhichdooccur. ThepublicationofthisPlanisanimportantmilestoneinimplementingtheFloodRiskManagement (Scotland)Act2009andimprovinghowwecopewithandmanagefloodsintheClydeandLoch LomondLocalPlanDistrict.ThePlantranslatesthislegislationintoactionstoreducethedamageand distresscausedbyfloodingoverthefirstplanningcyclefrom2016to2022.ThisPlanshouldberead inconjunctionwiththeFloodRiskManagementStrategythatwaspublishedfortheClydeandLoch LomondareabytheScottishEnvironmentProtectionAgencyinDecember2015. -
Clyde Gateway Green Network Strategy Final Report Prepared For
Clyde Gateway Green Network Strategy Final Report Prepared for the Clyde Gateway Partnership and the Green Network Partnership by Land Use Consultants July 2007 37 Otago Street Glasgow G12 8JJ Tel: 0141 334 9595 Fax: 0141 334 7789 [email protected] CONTENTS Executive Summary 1. Introduction ......................................................................................... 1 Clyde Gateway ............................................................................................................................................1 The Green Network ..................................................................................................................................1 The Clyde Gateway Green Network Strategy.....................................................................................3 2. Clyde Gateway Green Network Policy Context.............................. 5 Introduction..................................................................................................................................................5 Background to the Clyde Gateway Regeneration Initiative ..............................................................5 Regional Policy.............................................................................................................................................8 Local Policy.................................................................................................................................................10 Conclusions................................................................................................................................................17 -
Environment Baseline Report Scottish Sustainable Marine Environment Initiative
State of the Clyde Environment Baseline Report Scottish Sustainable Marine Environment Initiative SSMEI Clyde Pilot State of the Clyde Environment Baseline Report March 2009 D Ross K Thompson J E Donnelly Contents 1 INTRODUCTION............................................................................................................1 2 THE PHYSICAL ENVIRONMENT..............................................................................3 2.1 GEOLOGY....................................................................................................................3 2.2 THE SEALOCHS ...........................................................................................................6 2.3 THE ESTUARIES ..........................................................................................................9 2.4 THE INNER FIRTH......................................................................................................12 2.5 THE OUTER FIRTH ....................................................................................................14 2.6 COASTAL FLOODING .................................................................................................18 3 CLEAN AND SAFE SEAS............................................................................................19 3.1 THE CHEMICAL ENVIRONMENT ................................................................................19 3.1.1 Dissolved Oxygen.............................................................................................19 3.1.2 Nutrients...........................................................................................................22