<<

Flood Protection Scheme Community Engagement Dates of forthcoming community May 2021 engagement sessions and areas to be discussed at each event: The community engagement 15 June 2021, 1pm (Session 1) sessions will be held online using Overview of the entire flood protection Microsoft Teams, with recordings of scheme (approx. 60 mins) the sessions made available on the scheme website following the event. 15 June 2021, 5.30pm (Session 2) River Carron, Carron Works to If you want to book a place at any of (approx. 75 mins) the events please visit Online Events/ Sessions www.grangemouthfloodscheme.com. 16 June 2021, 5.30pm (Session 3) A joining link will be emailed to you 15 June to 24 June 2021 Grange Burn, Zetland Park, Abbots once you register. Road to Bo’ness Road and Park Road (approx. 75 mins) If you are unable to attend you can order a hardcopy briefing note and The next in a series of 17 June 2021, 5.30pm (Session 4) presentation by contacting us at the community engagement events Grange Burn, Grangeburn Road and address or number below. South Shore Road (approx. 75 mins) for the proposed Grangemouth Flood Protection Scheme will Contact 22 June 2021, 5.30pm (Session 5) begin in June 2021. Overview of the entire flood protection Council Flooding Team scheme (approx. 60 mins) These events will be held online (Repeat of event held on 15 June Abbotsford House Davids Loan due to current Covid-19 2021) Falkirk restrictions preventing large FK2 7YZ 23 June 2021, 5.30pm (Session 6) indoor gatherings. Flood Relief Channel, Rannoch Road Tel 01324 506070 (approx. 75 mins) The initial events will be followed by further sessions [email protected] 24 June 2021, 5.30pm (Session 7) later in the year. Details of Millhall Burn and Flood Relief www.grangemouthfloodscheme.com these further events will be Channel, Smiddy Brae and Reddoch @grangemouthfps Road (approx. 75 mins) notified separately.

Protecting the heart of our communities Protecting the heart of our communities The Grangemouth Flood Protection Scheme will provide around 27km of flood defences. These will be provided through a combination of walls, embankments, flood gates and flow control measures and by making greater use of the existing Flood Relief Channel. The map below identifies the locations where flood defences are proposed and the areas to be discussed at the initial community engagement groups. Further sessions will be organised for those areas not covered by the sessions taking place in June 2021.

Location of flood protection works and areas covered by each session. Sessions 1 and 5 will provide information on the whole scheme whereas the other sessions are focussed on individual areas.

M876 CULROSS

A88 M876

Port of Grangemouth Forth Estuary

STENHOUSEMUIR CARRONSHORE M9 Forth Valley A905 Royal Hospital Carron

LARBERT Langlees

B902 The Kelpies Mungal GRANGEMOUTH River Carron A904 Petrochemical Plant

Earlsgate Zetland A883 Park A9 A803 Kinneil Works Falkirk Grange Stadium Burn M9 Bowhouse A803 Falkirk Wheel A905 A905 FALKIRK Old River Avon Flood Relief Channel Union Canal A803

Tun nel POLMONT West Quarter Polmont Burn M9 Burn Union Canal Key: Location of Flood Defences B803

Protecting the heart of our communities Protecting the heart of our communities