East-West Interconnector Connecting Ireland and Britain

Total Page:16

File Type:pdf, Size:1020Kb

East-West Interconnector Connecting Ireland and Britain East-West Interconnector Connecting Ireland and Britain United Kindom Woodland Liverpool Dublin Deeside Ireland The 500 MW East-West Interconnector HVDC Light® trans- Data mission system will connect the grids of Ireland and Wales. Connection point Irish grid: Woodland This is the first HVDC Light project to use ±200 kV cables sea cable landing: Rush North Beach, Co. Dublin and the link is about 260 km long. Connection point British grid: Deeside sea cable landing: Barkby Beach, North Wales Ireland has plans to expand the wind power generation and the Operator: Eirgrid, Ireland link will facilitate addition of renewables and give the possibility Commercial operation: 2012 to export excess energy to the UK market and vice versa. The Transmission technology: HVDC Light® by ABB new link will also enchance security of supply in the Irish grid Transmission capacity: 500 MW and allow Ireland and Britain access to more competition. DC voltage: ± 200 kV AC voltage: 400 kV Additional customer benefits, due to the choice of the HVDC Cable route length: 261 km Light technology, are “black start”, a way of restoring power - 186 km with parallel submarine cables after a blackout without the aid of external energy sources, and - 75 km with parallel land cables active AC voltage support. Featured submarine cable - Extruded polymer insulated cable - Conductor 1650 mm2 copper - Steel armoring - Diameter 117 mm - Weight 39 kg/m Featured land cable - Extruded polymer insulated cable - Conductor 2210 mm2 aluminum - Diameter 107 mm - Weight 12 kg/m HVDC Light® converter stations: Convert alternate current (AC) to direct current (DC) and on the other side DC to AC. A proven extruded cable technology is used that simplifies HVDC Light® systems (Voltage Source Converters and the installation on land and on sea allowing very short time for extruded polymeric DC cable), have now been implemented in cable jointing. The oil-free HVDC Light® cables minimize the 23 converter stations. More than 2,000 km of extruded poly- environmental impact on sea and on land. meric DC cables have been installed. HVDC Light® can also be supplied with overhead lines. ABB has been in the forefront of HVDC technology since 1954 and has an unparalleled history of supplying HVDC transmission www.abb.com/hvdc schemes to the benefit of its customers. Today ABB has installed close to 60,000 MW in over 70 projects all over the world. POW-0069 rev.3 Project In service Power MW DC voltage kV Station location Transmission Application Customer Hällsjön 1997 3 ± 10 Hällsjön, 10 kV 10 km Pilot system VB Elnät, Sweden Sweden Grängesberg, 10 kV (overhead) Gotland 1999 50 ± 80 Näs, 77 kV 70 km Wind, GEAB, Sweden Bäcks, 77 kV Undergrounding Sweden Directlink 2000 3 x 60 ± 80 Terranora, 110 kV 65 km Undergrounding TransEnergy, USA Australia Mullumbimby, 132 kV North Power, Australia Tjæreborg 2000 7,2 ± 9 Enge, 10,5 kV 4,4 km Wind, Eltra, Denmark Denmark Tjaereborg, 10,5 kV Undergrounding Eagle Pass 2000 36 ±15,9 Eagle Pass, 138 kV NA Grid reliability AEP, USA USA (both sides) (back-to-back) Cross Sound 2002 330 ±150 New Haven, 345 kV 40 km Grid reliability TransEnergie US, USA Shoreham, 138 kV USA Murraylink 2002 220 ±150 Berri, 132 kV 180 km Undergrounding TransEnergie US, Australia Red Cliffs, 220 kV USA Troll A 2005 2 x 41 ± 60 Troll A, 56 kV 67 km Offshore Statoil, Norway Norway Kollsnes, 132 kV Estlink 2006 350 ±150 Espoo, 400 kV 105 km Grid reliability, Nordic Energy Link AS, Estonia-Finland Harku, 330 kV Undergrounding Estonia Valhall 2011 78 150 Lista, 300 kV 292 km Offshore BP, Norway Norway Valhall, 11 kV BorWin1 2009 400 ±150 Diele, 380 kV 200 km Offshore wind TenneT Offshore GmbH Germany BorWin Alpha, 170 kV Germany Caprivi Link 2010 300 350 Zambezi, 330 kV 950 km Grid reliability NamPower, Namibia Gerus, 400 kV (overhead) Namibia East-West 2012 500 ± 200 Woodland, 400 kV 256 km Grid interconnection EirGrid, Interconnector Deeside, 400 kV Ireland Irland-UK DolWin1 2013 800 ± 320 Dörpen West, 380 kV 165 km Offshore wind TenneT Offshore GmbH Germany DolWin alpha, 155 kV Germany NordBalt 2015 700 ± 300 Klaipeda, 330 kV 450 km Grid interconnection SvK, Sweden Sweden Nybro, 400 kV LITGRID turtas, Lithuania Lithuania Skagerrak 4 2014 700 500 Kristiansand and 244 km Grid interconnection Statnett, Norway Norway Tjele, 400 kV Energinet.dk, Denmark Denmark DolWin2 2015 900 ±320 Dörpen-West 380kV 135 km Grid interconnection TenneT Offshore GmbH, Germany DolWin beta 155 kV Germany ABB AB Grid Systems - HVDC SE-771 80 Ludvika, Sweden Tel: +46 240 78 20 00 Fax: +46 240 61 11 59 www.abb.com/hvdc.
Recommended publications
  • Eirgrid Plc Annual Report 2014
    EirGrid plc Annual Report 2014 www.eirgrid.com Our Mission Contents To provide quality, efficient, Chairperson’s Report 2 independent transmission and Chief Executive’s Review 6 market services for the benefit Financial Review 10 Operational Highlights of everyone across the island 14 Grid25 Initiatives 22 of Ireland. Europe 28 Corporate Social Responsibility 32 The Board 34 Organisational Structure 40 Executive Team 42 Financial Statements 47 Image Bibliography 113 EirGrid - It’s Your Grid Working with you for our energy future Ireland needs a safe, secure electricity network, to power our homes, schools, hospitals, farms and businesses. EirGrid Group is the organisation entrusted with the responsibility of managing the electricity grid in Ireland and Northern Ireland. As the designated Transmission System Operator and Market Operator, we operate the grid throughout the island of Ireland. We also own and operate the 260km East West Interconnector that runs between Ireland and Great Britain. We are a commercially run semi-state company, which operates in the interest of all people on the island. Our role is to deliver the electricity from where it is generated to where it is needed. We manage the network as safely and efficiently as possible, ensuring there is enough capacity to meet demand at any given time, 365 days of the year. EirGrid also operates the independent all-island electricity market, facilitating the buying of wholesale electricity by the suppliers who sell to the end user. We don’t participate in the wholesale or retail market, as we neither buy nor sell electricity. A quality electricity network is essential for everyone on the island of Ireland and one which we are proud to manage on your behalf.
    [Show full text]
  • System Operation Stakeholders Committee
    System Operation Stakeholders Committee Materials for meeting 16th September 2020 1.1 Review of the Agenda Time Agenda Topics Documents Lead 1. Opening Uros Gabrijel 13:30-13:35 1.1 Review of the agenda Agenda 13:35-13:45 1.2 Review and approval of minutes from previous meeting Minutes 13:45-13:55 1.3 Review of actions Slides Ana Cigaran 13:55-14:15 2. Update on the implementation actions at pan-EU level Slides Ana Cigaran 3. System Operation Guideline Slides 14:15-14:30 3.1 Cost Benefit Analysis for FCR providers by Limited Energy Reservoirs: Luca Ortolano Status update 3.2 Information on Exchange\Sharing of reserves 14:30-15:00 Mohamed El Jafoufi 15:00-15:15 4. CGM Program Implementation Update Derek Lawler 15:15-15:45 5. NC ER Implementation update Slides Rafal Kuczynski 5.1 Update on TCM Status according to Art. 4. 6. Information on Low frequency Pump disconnection & energy storage units Rafal Kuczynski\Walter Sattinger 15:45-16:00 6.1 Why low frequency pump disconnection is triggered at different frequencies across Europe? 6.2 Outlook on the plans for the energy storage units 16:00-16:15 16:15-16:30 7. AOB – Next meeting 9th December Uros Gabrijel 2 1.3 Review of actions Ana Cigaran 3 1.3 Review of actions (I) ACTION ANSWER STATUS 1. Note for future SO GL active library to include pre- Preparation for SO GL Active Library Open qualification process aFRR, mFRR, RR. is in good progress both for the Digital and content part.
    [Show full text]
  • Minutes SDAC Joint Steering Committee Meeting 30/01/2020,11:00 – 17:00 CET, Brussels Airport
    Minutes SDAC Joint Steering Committee Meeting 30/01/2020,11:00 – 17:00 CET, Brussels Airport Present parties 50Hertz Cropex EPEX Spot Litgrid PSE Terna Admie EirGrid (TSO) ESO MAVIR REE TGE Amprion Eirgrid (SEMO PX) EXAA Nasdaq REN Transelectrica APG ElecLink Fingrid Nemo Link RTE Transnet BW AST Elering GME NGIC SEPS TTG BritNed ELES HEnEx OKTE SONI (SEMO PX) TTN BSP Elia HOPS OMIE SONI (TSO) ČEPS EMCO Nord Pool HUPX OPCOM Statnett Creos Energinet IBEX OTE Svk Attending in person Attending by phone Proxy arranged Not present Present chairs, TF leaders, PMOs, observers BMTF leader JSC Secretary MRC OPSCOM PMO MSD PMO PCR chair & PMO TSO co-chair EC MEPSO MSD NEMO co-leader NEMO co-chair Procedures TF leader Entso-e MRC OPSCOM leader MSD TSO co-leader OST Swissgrid Attending in person Attending by phone Not present Meeting agenda # Topic For 1 Welcome, practicalities 1.1 Confirm quorum Inf 1.2 Adoption of the agenda Dec 1.3 Approval of minutes of past meetings/calls (incl. part for publication) Dec 1.4 Review open action points Inf 1.5 Participation in SDAC JSCs – overview 2019 meetings Dis 2 Decisions required 2.1 Way forward Central Settlement Entity (without JAO present) Dec 2.2 NRA access to Simulation Facility & cost sharing Dec 2.3 Mandate for co-chairs to take actions after a decoupling event Dec LUNCH 3 TF status reports and decisions requested 3.1 BMTF Dec 3.2 MRC OPSCOM Dec 3.3 Procedures TF 3.4 MSD Dec 3.5 MNA Implementation Coordination Group Inf 3.6 Legal TF Inf 3.7 Communication TF Inf 3.8 Feedback from 29/01 Internal Coordination Team (ICT) strategy meeting Inf 4 Important points for SDAC from ENTSO-E/ NC/ NRAs/ ACER/ EC 4.1 NEMOs status report Inf 4.2 Feedback from 10/12 TCG and 18/12 MESC meetings Inf 4.3 Update on Algorithm Methodology 5 Any other business 5.1 Baltic Cable – status update on TSO certification Inf 5.2 CCP default Dis 5.3 Next meetings Inf 1 List of decisions # Topic Decision 1.2 Adoption of the The meeting agenda is approved.
    [Show full text]
  • NORTH-SOUTH 400Kv INTERCONNECTION DEVELOPMENT
    NORTH-SOUTH 400kV INTERCONNECTION DEVELOPMENT OUTLINE AND UPDATE OF EIRGRID’S CONSIDERATION OF THE TRANSMISSION TECHNOLOGY OPTIONS AS PRESENTED TO THE INDEPENDENT EXPERT GROUP DECEMBER 2017 A European Project of Common Interest EXECUTIVE SUMMARY The Minister for Communications, Climate Action and Environment has appointed an independent expert group (IEG) to examine the technical feasibility and cost of undergrounding the North-South Interconnector, taking into account the most recent developments in technology and experience gained from existing projects abroad. This report sets out EirGrid’s position on these matters. EirGrid is proposing that the proposed interconnector be implemented by means of a single circuit 400 kV overhead line. The proposed overhead line will be approximately 137 km in length (103 km in Ireland and 34 km in Northern Ireland) and will form a second high capacity tie-line between the networks of Ireland and Northern Ireland. Planning approval for the part of the proposal located in Ireland has been received from An Bord Pleanála. This report replicates and updates the evaluation of the technology options that was submitted to An Bord Pleanála by EirGrid during the planning process. EirGrid’s evaluation of the technology options was carried out in the knowledge that the proposed second North South Interconnector will be of the highest strategic importance for the island of Ireland, with a power carrying capacity equivalent to 23% of the island’s peak demand. It will form an internal reinforcement of the single ‘all-island’ network and will operate like any other transmission circuit in the meshed network. HVDC technology was considered as an option.
    [Show full text]
  • The Benefits of Investing in Electricity Transmission a Case Study of Northern Europe
    The Benefits of Investing in Electricity Transmission A Case Study of Northern Europe Jonas Teusch Arno Behrens Christian Egenhofer January 2012 Abstract Electricity trading can bring down the costs of the EU’s transition to a competitive low-carbon economy, in particular by facilitating the integration of renewable energy from variable sources. Yet insufficient grid infrastructure and regulatory obstacles prevent the trading potential from being fully realised in northern Europe. While many interconnector projects are under development, various barriers are precluding the grid rollout from taking place on time. The European Commission’s energy infrastructure package is an important step forward to overcome these barriers. But the scale and urgency of the infrastructure challenge call for significant further progress. This study was funded by Dong Energy, Fortum, Statkraft and Vattenfall. The authors would like to extend special thanks to officials and representatives from the European Commission, ENTSO-E, ACER, BNetzA, the Swedish Markets Inspectorate and EWEA for their valuable assistance and support. The preliminary results of this study were discussed at a stakeholder workshop held at CEPS on 28 September 2011; the main results were debated by a high-level panel on 28 November 2011. Unless otherwise indicated, the views expressed are attributable only to the authors in a personal capacity and not to any institution with which they are associated. ISBN 978-94-6138-161-3 Available for free downloading from the CEPS website (http://www.ceps.eu)
    [Show full text]
  • Future System Inertia 2
    REPORT Future System Inertia 2 PARTICIPANTS Erik Ørum Energinet.dk Liisa Haarla Fingrid Mikko Kuivaniemi Fingrid Minna Laasonen Fingrid Anders Jerkø Statnett Inge Stenkløv Statnett Fredrik Wik Svenska kraftnät Katherine Elkington Svenska kraftnät Robert Eriksson Svenska kraftnät Niklas Modig Svenska kraftnät Pieter Schavemaker E-Bridge Consulting B.V. (PM) ENTSO-E AISBL • Avenue Cortenbergh 100 • 1000 Brussels • Belgium • Tel +32 2 741 09 50 • Fax +32 2 741 09 51 • [email protected] • www.entsoe.eu European Network of Transmission System Operators for Electricity Contents FUTURE SYSTEM INERTIA 2 ........................................................................................................1 1. EXECUTIVE SUMMARY ..........................................................................................................7 1.1 INTRODUCTION AND SCOPE ................................................................................................................................. 7 1.2 RESULTS AND CONCLUSIONS ................................................................................................................................ 7 1.3 NEXT STEPS ..................................................................................................................................................... 9 2. INTRODUCTION ................................................................................................................. 11 2.1 SCOPE FOR THE PROJECT ..................................................................................................................................
    [Show full text]
  • Minutes SDAC Joint Steering Committee Meeting 04/06/2020,13:30 – 17:00 CET, Conference Call
    Minutes SDAC Joint Steering Committee Meeting 04/06/2020,13:30 – 17:00 CET, conference call Present parties 50Hertz Cropex EPEX Spot Litgrid PSE Terna Admie EirGrid (TSO) ESO MAVIR REE TGE Amprion Eirgrid (SEMO PX) EXAA Nasdaq REN Transelectrica APG ElecLink Fingrid Nemo Link RTE Transnet BW AST Elering GME NGIC SEPS TTG BritNed ELES HEnEx OKTE SONI (SEMO PX) TTN BSP Elia HOPS OMIE SONI (TSO) ČEPS EMCO Nord Pool HUPX OPCOM Statnett Creos Energinet IBEX OTE Svk Attending by phone Not present Present chairs, TF leaders, PMOs, observers BMTF leader/PMO Entso-e MRC OPSCOM leader MSD TSO co-leader OST Swissgrid EC JSC Secretary MRC OPSCOM PMO MSD PMO PCR chair & PMO TSO co-chair EMS MEPSO MSD NEMO co-leader NEMO co-chair Procedures TF leader Attending by phone Not present Meeting agenda # Topic For 1 Welcome, practicalities 1.1 Confirm quorum Inf 1.2 Adoption of the agenda Dec 1.3 Approval of minutes of past meetings/calls (incl. part for publication) Dec 1.4 Review open action points Inf 2 Strategy/governance – decisions required 2.1 Way forward Central Settlement Entity Inf 3 Important points to highlight and decisions requested by TFs 3.1 Status extension projects and communication towards EC Dec 3.2 MRC OPSCOM Dec 3.3 MSD Dec 3.4 Procedures TF Inf 3.5 BMTF Dec 3.6 JSC members questions to reports in back-up section Dis 4 Important points for SDAC from ENTSO-E/ NC/ NRAs/ ACER/ EC 4.1 Preparations for next TCG and MESC Inf 4.2 EC consultation on first light amendment of some relevant regulations incl.
    [Show full text]
  • Minutes SDAC Joint Steering Committee Meeting 28/10/2020,11:00 – 17:00 CET, Conference Call
    Minutes SDAC Joint Steering Committee Meeting 28/10/2020,11:00 – 17:00 CET, conference call Present parties 50Hertz Cropex EPEX Spot Litgrid PSE Terna Admie EirGrid (TSO) ESO MAVIR REE TGE Amprion Eirgrid (SEMO PX) EXAA Nasdaq REN Transelectrica APG ElecLink Fingrid Nemo Link RTE Transnet BW AST Elering GME NGIC/NGIFA2 SEPS TTG BritNed ELES HEnEx OKTE SONI (SEMO PX) TTN BSP Elia HOPS OMIE SONI (TSO) ČEPS EMCO Nord Pool HUPX OPCOM Statnett Creos Energinet IBEX OTE Svk Attending by phone Not present Present chairs, TF leaders, PMOs, observers BMTF leader/PMO Entso-e MRC OPSCOM leader MSD TSO co-leader OST Swissgrid EC JSC Secretary MRC OPSCOM PMO MSD PMO PCR chair & PMO TSO co-chair EMS MEPSO MSD NEMO co-leader NEMO co-chair Procedures TF leader Attending by phone Not present Meeting agenda # Topic For 1 Welcome, practicalities 1.1 Confirm quorum Inf 1.2 Adoption of the agenda Dec 1.3 Approval of minutes of past meetings/calls (incl. part for publication) Dec 1.4 Review open action points Inf 2 Strategy/governance 2.1 Exit plan for GB parties Dec 2.2 DAOA: clarification re. approval of updated operational procedures Dec 2.3 15 min MTU implementation project Dec 2.4 Assessment on synergies between regions and SDAC Inf 3 Important points to highlight and decisions requested by TFs 3.1 BMTF Dec 3.2 MRC OPSCOM – PART 1 Dec Lunch break 3.3 Confirm quorum Inf 3.4 MRC OPSCOM – PART 2 Inf 3.5 Interim Coupling Project Inf 3.6 MSD (20 min) Inf 3.7 Intraday auctions (IDA) Inf 3.8 CCP default – status reporting Inf 3.9 JSC members questions to reports in back-up section Dis 4 Important points for SDAC from ENTSO-E/ NC/ NRAs/ ACER/ EC 4.1 Joint SDAC & SIDC governance: “lean” implementation proposal Dis 4.2 Feedback from 22/09 TCG and 23/09 MESC Inf 5 Any other business 5.1 SDAC communication plan Inf 5.2 Qualified electronic signature – status investigation outcome Inf 5.3 Next meetings Inf 1 List of decisions # Topic Decision 1.2 Adoption of the The meeting agenda is approved.
    [Show full text]
  • The Role of Innovative Grid-Impacting Technologies Towards the Development of the Future Pan-European System: the Gridtech Project
    21, rue d’Artois, F-75008 PARIS C1-213 CIGRE 2014 http : //www.cigre.org The role of innovative grid-impacting technologies towards the development of the future pan-European system: the GridTech project A. L’Abbate 1, R. Calisti, A. Zani (RSE SpA, Italy) H. Auer 2, G. Koerbler, G. Lettner (EEG TU Wien, Austria) P. Frias, L. Olmos, C. Fernandes (IIT UP Comillas, Spain) T. Maidonis (WIP GmbH, Germany) S. Vitiello, G. Fulli (EC - JRC, The Netherlands) G. Schauer (Verbund, Austria) S. Sulakov 3, A. Andreev, M. Ivanov (ESO EAD, Bulgaria) A. Mansoldo (EirGrid plc, Ireland) C. Vergine, P. Tisti, O. D’Addese, A. Sallati (Terna Rete Italia SpA, Italy) K. Jansen, R. van Houtert, J. Bos (TenneT TSO BV, The Netherlands) B. Heyder (EnBW AG, Germany) L. Radulov (BSERC, Bulgaria) J. Wolpert (TransnetBW GmbH, Germany) SUMMARY For the achievement of the European Union’s ambitious renewable energy targets for 2020 and beyond, extensive electricity system planning and investments are necessary. This covers electricity generation capacity, transmission networks, and supporting technologies and measures that will ensure clean, secure and efficient energy supply. Within this framework, the European project GridTech mainly aims at conducting a fully integrated assessment of new grid-impacting technologies and their implementation into the European electricity system. This will allow comparing different technological options towards the exploitation of the full potential of future electricity production from renewable energy sources (RES), with the lowest possible total electricity system cost. Within the 2020, 2030 and 2050 time horizons, the goal is to assess where, when, and to which extent innovative technologies could effectively contribute to the further development of the European transmission grid, fostering the integration of an ever-increasing penetration of RES generation and boosting the creation of a pan-European electricity market, while maintaining secure, competitive and sustainable electricity supply.
    [Show full text]
  • GRID25 13 Vision 19 Future Grid Requirements 21 the Grid Development Strategy 23 a Regional View
    A Strategy for the Development of Ireland’s Electricity Grid for a Sustainable and 25 Competitive Future www.eirgrid.com EirGrid is a state-owned company and is the independent electricity Transmission System Operator (TSO) in Ireland and the Market Operator (MO) of the wholesale electricity trading system. EirGrid's role is to deliver quality connection, transmission and market services to electricity generators, suppliers and customers utilising the high voltage electricity system. We are responsible for the Grid infrastructure required to support the development of Ireland's economy, as well as connecting the Irish Grid to the European Grid. EirGrid plays a key role in the operation of the Single Electricity Market (SEM) which services the island of Ireland. EIRGRID’S MISSION IS TO DEVELOP, MAINTAIN AND OPERATE A SAFE, SECURE, RELIABLE, ECONOMICAL AND EFFICIENT TRANSMISSION SYSTEM FOR IRELAND. Contents 3 Foreword by the Minister for Communications, Energy and Natural Resources, Eamon Ryan, T.D. 5 Introduction by Dermot Byrne, Chief Executive, EirGrid 6 Executive Summary 11 Introduction to GRID25 13 Vision 19 Future Grid Requirements 21 The Grid Development Strategy 23 A Regional View Appendices 44 Technical Options for Grid Development 47 Glossary 1 2 A Strategy for the Development of Ireland’s Electricity Grid FOREWORD BY THE MINISTER FOR COMMUNICATIONS, ENERGY AND NATURAL RESOURCES, EAMON RYAN, T.D. The last few years have seen extraordinary changes in global electricity markets, EirGrid is taking as climate change and energy security have moved to the top of policy imperatives on the challenge at home, in Europe and across the world.
    [Show full text]
  • LITGRID AB the Company's Financial Statements, Annual Report and Independent Auditor's Report for the Year Ended 31 Decembe
    LITGRID AB The Company’s financial statements, annual report and independent auditor’s report for the year ended 31 December 2020 CONFIRMATION OF RESPONSIBLE PERSONS 15 March 2021, Vilnius Following the Law on Securities of the Republic of Lithuania and the Rules on Information Disclosure approved by the Bank of Lithuania, we, Rokas Masiulis, Chief Executive Officer of LITGRID AB, Vytautas Tauras, Director of the Finance Department of LITGRID AB and Jurgita Kerpė, Head of the Accounting Division of LITGRID AB, hereby confirm that, to the best of our knowledge, the attached financial statements of LITGRID AB for the year 2020 prepared in accordance with the International Financial Reporting Standards adopted by the European Union give a true and fair view of the Company’s assets, liabilities, financial position, profit and cash flows; the annual report for the year 2020 presents a fair overview of the business development and performance, the Company’s financial position together with the description of its exposure to key risks and contingencies. Rokas Masiulis Chief Executive Officer Vytautas Tauras Director of the Finance Department Jurgita Kerpė Head of the Accounting Division CONTENTS Translation note: This version of the accompanying documents is a translation from the original, which was prepared in Lithuanian. All possible care has been taken to ensure that the translation is an accurate representation of the original. However, in all matters of interpretation of information, views or opinions, the original language version of the accompanying documents takes precedence over this translation. Independent auditor’s report 4 Annual report 10 The Company’s statement of financial position 101 The Company’s statement of comprehensive income 102 The Company’s statement of changes in equity 103 The Company’s statement of cash flows 104 Notes to the Company’s financial statements 105 The financial statements were approved on 15 March 2021.
    [Show full text]
  • Stakeholder Engagement Plan 2021 Table of Contents
    Stakeholder Engagement Plan 2021 Table of contents 1. Introduction ...........................................................................................................................1 2. Who we are and what we do ....................................................................................................2 Our role ...................................................................................................................................2 The context in which we work ..................................................................................................2 3. Our 2020-25 strategy .............................................................................................................3 4. Engage for better outcomes for all - an enhanced approach to engagement ............................4 Engage for better outcomes for all ...........................................................................................4 Why we engage .......................................................................................................................4 How we engage .......................................................................................................................4 What success looks like ...........................................................................................................5 Enhancing our stakeholder engagement ..................................................................................5 5. Our engagement principles ....................................................................................................8
    [Show full text]