Modular OVerview Modular

• Founded in 1989 as furniture workshop and rapidly grown into a high-quality international furniture manufacturer for the hospitality industry. T I F R A L U D O M • Since 2012, began producing fully-furnished steel-framed volumetric building systems, operating 3 industrial production facilities (cages, furniture and modules fit out).

• Acquired In December 2018 by PIMCO, one of the world’s largest global investment management firms, in partnership with the Polish investment group, Griffin Real Estate. - T U O • Since 2019 on an accelerated journey to become global leader in offsite construction.

17 February 2020 ©© PolcomPolcomModularModular 2 17 February 2020 © Polcom Modular 3 17 February 2020 © Polcom Modular 4 17 February 2020 © Polcom Modular 5 17 February 2020 © Polcom Modular 6 17 February 2020 © Polcom Modular 7 17 February 2020 © Polcom Modular 8 Modular portfolio

CitizenM Schiphol POD Brooklyn CitizenM Bowery Alt Hotel Alt Hotel, Calgary CitizenM Barbados Indigo, St. Tomas CitizenM Netherlands New York New York, USA St. John’s, Canada Canada Seattle, USA Caribbean USVI Washington DC, USA

2015 2016 2017 2018 2019 2020

CitizenM Tower Hill CitizenM Shoreditch Courtyard by Courtyard Courtyard Express Indigo, Liverpool, CitizenM Victoria London London, UK Marriott, Edinburgh Luton Airport, UK Inverness, UK Liverpool, UK UK London, UK Cambridge

UK USA Caribbean Other

17 February 2020 © Polcom Modular 9 Projects citizenM London Tower, A Unesco World Heritage Site

17 February 2020 © Polcom Modular 11 Projects citizenM Bowery, New York, The First Modular Hotel on Manhattan

17 February 2020 © Polcom Modular 12 Projects citizenM London, Amsterdam, New York, Seattle, Washington DC

London Amsterdam London

Seattle London Washington DC New York 17 February 2020 © Polcom Modular 13 Projects Marriott Courtyard Luton, Edinburgh & Inverness, UK

Edinburgh

London Luton InvernessEdinburgh

17 February 2020 © Polcom Modular 14 Projects Alt St. Johns & Calgary, Canada

St. Johns

Calgary

17 February 2020 © Polcom Modular 15 Projects Indigo St. Thomas, USVI & Barbados, Caribbean

St. Thomas

Barbados 17 February 2020 © Polcom Modular 16 Why Modular?

17 February 2020 © Polcom Modular 18 Construction technology has not changed much for 3000 years

17 February 2020 © Polcom Modular 19 Construction productivity and labour supply are falling

Skilled Construction Work Falls Among All Ages

Carpenters, electricians and roofers share of workers, by age

24 and under 25 to 34 35 to 44 45 and up

3.0

2.5

2.0

1.5

1.0

0.5 90 95 00 05 10 15

Sources: BLS, Moody’s Analytics

17 February 2020 © Polcom Modular 20 Our mission: To make construction an industrial process

17 February 2020 © Polcom Modular 21 Construction vs Manufacturing

Costs Value

Value Costs

Traditional Construction Modular Construction

17 February 2020 © Polcom Modular 22 Benefits of modular technology

Time to market Value creation Cost Optimization Projects can be completed up Enhance the product and Lower costs of interest and to 50% faster than traditional optimize costs at the same site setup, plus an earlier construction. time. revenue stream.

17 February 2020 © Polcom Modular 23 Benefits of modular technology

Time Certainty Sustainability Weight Projects can be completed Construction waste in the Modular construction is 30- quickly and are far less modular building process is 40% lighter than in-situ dependent on the organization around 2%. concrete structures. of trades on-site.

17 February 2020 © Polcom Modular 24 Benefits of modular technology

Logistics Building Quality Design Freedom Modular construction results Well trained permanent Flexibility in dimensions and in up to 75% fewer vehicle manufacturing staff and façades. Modular buildings are movements around permanent quality control. indistinguishable from their a construction site. High consitency and very tight site-built counterparts. tolerances.

17 February 2020 © Polcom Modular 25 Vendor financing solution example

• Client pays 10% deposit upfront to hold a production slot. • Polcom will take payment for the modules after acceptance in the port (the next 70%). • 10% After installation onto the building • 5% At completion of the building • 5% Retention • The bridge financing is for 6-8 months • The client will pay an additional % (the cost of capital to Polcom) for the financed 70% added to the contract price • Client warranty required

17 February 2020 © Polcom Modular 43 Modular vs Traditional

Construction time Reduced up to 50%

Quality assurance Consistent quality due to manufacturing process

On-site labour Reduced up to 70%

Weight 30-40% lighter than in-situ concrete

Waste Up to 90% less waste on site

Traffic Up to 75% fewer movements, reducing transport related emissions, noise and congestion

Schedule High certainty on schedule due to high level of preparation and QC

Pre construction Full building design required and little room for changes

Execution MC needs to fully understand the modular process and requirements

17 February 2020 ©© PolcomPolcomModularModular 49