Chapter-1: Introduction
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Gandaki Province
2020 PROVINCIAL PROFILES GANDAKI PROVINCE Surveillance, Point of Entry Risk Communication and and Rapid Response Community Engagement Operations Support Laboratory Capacity and Logistics Infection Prevention and Control & Partner Clinical Management Coordination Government of Nepal Ministry of Health and Population Contents Surveillance, Point of Entry 3 and Rapid Response Laboratory Capacity 11 Infection Prevention and 19 Control & Clinical Management Risk Communication and Community Engagement 25 Operations Support 29 and Logistics Partner Coordination 35 PROVINCIAL PROFILES: BAGMATI PROVINCE 3 1 SURVEILLANCE, POINT OF ENTRY AND RAPID RESPONSE 4 PROVINCIAL PROFILES: GANDAKI PROVINCE SURVEILLANCE, POINT OF ENTRY AND RAPID RESPONSE COVID-19: How things stand in Nepal’s provinces and the epidemiological significance 1 of the coronavirus disease 1.1 BACKGROUND incidence/prevalence of the cases, both as aggregate reported numbers The provincial epidemiological profile and population denominations. In is meant to provide a snapshot of the addition, some insights over evolving COVID-19 situation in Nepal. The major patterns—such as changes in age at parameters in this profile narrative are risk and proportion of females in total depicted in accompanying graphics, cases—were also captured, as were which consist of panels of posters the trends of Test Positivity Rates and that highlight the case burden, trend, distribution of symptom production, as geographic distribution and person- well as cases with comorbidity. related risk factors. 1.4 MAJOR Information 1.2 METHODOLOGY OBSERVATIONS AND was The major data sets for the COVID-19 TRENDS supplemented situation updates have been Nepal had very few cases of by active CICT obtained from laboratories that laboratory-confirmed COVID-19 till teams and conduct PCR tests. -
Environmental Impact Assessment (Draft) NEP: SASEC Roads
Environmental Impact Assessment (Draft) June 2016 NEP: SASEC Roads Improvement Project Prepared by Department of Roads, Ministry of Physical Infrastructure and Transport, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 27 May 2016) Currency unit – Nepalese rupee (NPR) NPR1.00 = $ 0.00931 $1.00 = 107.432 ABBREVIATIONS ADB - Asian Development Bank BOQ - Bill of Quantities BZMC - buffer zone management committee CNP - Chitwan National Park CFUGs -- Community Forest User Groups CSC - Construction Supervision Consultants DOR - Department of Roads DBST - double bituminous surface treatment EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMOP - Environmental Monitoring Plan EPA - Environment Protection Act GHG - greenhouse gas emission GRM - grievance redress mechanism GRC - grievance redress committee IUCN - International Union for Conservation of Nature GoN - Government of Nepal MHC - Mid-Hill East-West Corridor MOEST - Ministry of Environment, Science and Technology MOPIT - Ministry of Physical Infastructure and Transport NPWCA - National Parks and Wildlife Conservation Act NGO - Non-governmental organization PIP - Priority Investment Plan REA) Rapid Environmental Assessment ROW - right-of-way SWRP - Sector Wide Road Program SPS - Safeguard Policy Statement TNM - Traffic Noise Model TYIP - Three Year Interim Plan WWF - World Wildlife Fund This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -
Saath-Saath Project
Saath-Saath Project Saath-Saath Project THIRD ANNUAL REPORT August 2013 – July 2014 September 2014 0 Submitted by Saath-Saath Project Gopal Bhawan, Anamika Galli Baluwatar – 4, Kathmandu Nepal T: +977-1-4437173 F: +977-1-4417475 E: [email protected] FHI 360 Nepal USAID Cooperative Agreement # AID-367-A-11-00005 USAID/Nepal Country Assistance Objective Intermediate Result 1 & 4 1 Table of Contents List of Acronyms .................................................................................................................................................i Executive Summary ............................................................................................................................................ 1 I. Introduction ........................................................................................................................................... 4 II. Program Management ........................................................................................................................... 6 III. Technical Program Elements (Program by Outputs) .............................................................................. 6 Outcome 1: Decreased HIV prevalence among selected MARPs ...................................................................... 6 Outcome 2: Increased use of Family Planning (FP) services among MARPs ................................................... 9 Outcome 3: Increased GON capacity to plan, commission and use SI ............................................................ 14 Outcome -
Bharatpur – Bardghat 220 Kv T/L Project SIA Report
Bharatpur – Bardghat 220 kV T/L Project SIA Report CHAPTER-1: INTRODUCTION 1.1 Background Nepal Electricity Authority (NEA) is constructing a 220 kV transmission line from Bharatpur to Bardaghat in Nepal to strengthen the power transmission network of Integrated Nepal Power System (INPS), thereby increasing the capacity of power flow from the west where the major generating stations exist or planned to the east where the demand is high. The line particularly enhances the existing Bharatpur-Bardghat sector which is of single circuit configuration only and has been constructed with limited capacity in early seventies when the power system was in nascent stage. This will also help enhance the power exchange with India. The proposed alignment passes through Bharatpur Municipality of Chitwan district and 14 VDCs of Nawalparasi district. The estimated length of the transmission line is 73.5 Km. Right of Way (RoW) of the transmission line is 30m (15m on each side of centerline) and each tower will require an average area of 12.5mx12.5 m. A total of 0.673 ha private land will be acquired by the project for the placement of 43 towers. The SIA has been prepared in compliance with GoN legislation, The World Bank policies, guidelines and best practices. The Bank policies emphasize the need to avoid or minimize involuntary resettlement on development projects. This SIA of Bharatpur- Bardghat 220 kV Transmission Line Project has been prepared based on the review of available literatures, collection of the secondary VDC level data, findings of household survey of affected households and inventory of affected private and public assets. -
BIODIVERSITY, PEOPLE and CLIMATE CHANGE Final Technical Report of the Hariyo Ban Program, First Phase
BIODIVERSITY, PEOPLE AND CLIMATE CHANGE Final Technical Report of the Hariyo Ban Program, First Phase Volume Two Detailed Annexes HARIYO BAN PROGRAM This final technical report for Hariyo Ban Program Phase One is submitted to the United States Agency for International Development Nepal Mission by World Wildlife Fund Nepal in partnership with CARE, the Federation of Community Forest Users Nepal and the National Trust for Nature Conservation, under Cooperative Agreement Number AID-367-A-11-00003. © WWF Nepal 2017 All rights reserved Citation Please cite this report as: WWF Nepal. 2017. Biodiversity, People and Climate Change: Final Technical Report of the Hariyo Ban Program, First Phase. WWF Nepal, Hariyo Ban Program, Kathmandu, Nepal. Cover photo credit © Karine Aigner/WWF-US Disclaimer: This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of WWF and do not necessarily reflect the views of USAID or the United States Government. 7 April, 2017 Table of Contents ANNEX 5: HARIYO BAN PROGRAM WORKING AREAS ......................................................................... 1 ANNEX 6: COMMUNITY BASED ANTI-POACHING UNITS FORMED/REFORMED ................................. 4 ANNEX 7: SUPPORT FOR INTEGRATED SUB-WATERSHED MANAGEMENT PLANS ........................... 11 ANNEX 8: CHARACTERISTICS OF PAYMENTS FOR ECOSYSTEM SERVICES SCHEMES PILOTED ......... 12 ANNEX 9: COMMUNITY ADAPTATION PLANS OF ACTION PREPARED ............................................. -
Global Initiative on Out-Of-School Children
ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children NEPAL COUNTRY STUDY JULY 2016 Government of Nepal Ministry of Education, Singh Darbar Kathmandu, Nepal Telephone: +977 1 4200381 www.moe.gov.np United Nations Educational, Scientific and Cultural Organization (UNESCO), Institute for Statistics P.O. Box 6128, Succursale Centre-Ville Montreal Quebec H3C 3J7 Canada Telephone: +1 514 343 6880 Email: [email protected] www.uis.unesco.org United Nations Children´s Fund Nepal Country Office United Nations House Harihar Bhawan, Pulchowk Lalitpur, Nepal Telephone: +977 1 5523200 www.unicef.org.np All rights reserved © United Nations Children’s Fund (UNICEF) 2016 Cover photo: © UNICEF Nepal/2016/ NShrestha Suggested citation: Ministry of Education, United Nations Children’s Fund (UNICEF) and United Nations Educational, Scientific and Cultural Organization (UNESCO), Global Initiative on Out of School Children – Nepal Country Study, July 2016, UNICEF, Kathmandu, Nepal, 2016. ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children © UNICEF Nepal/2016/NShrestha NEPAL COUNTRY STUDY JULY 2016 Tel.: Government of Nepal MINISTRY OF EDUCATION Singha Durbar Ref. No.: Kathmandu, Nepal Foreword Nepal has made significant progress in achieving good results in school enrolment by having more children in school over the past decade, in spite of the unstable situation in the country. However, there are still many challenges related to equity when the net enrolment data are disaggregated at the district and school level, which are crucial and cannot be generalized. As per Flash Monitoring Report 2014- 15, the net enrolment rate for girls is high in primary school at 93.6%, it is 59.5% in lower secondary school, 42.5% in secondary school and only 8.1% in higher secondary school, which show that fewer girls complete the full cycle of education. -
Environmental Impact Assessment NEP: SASEC Roads Improvement
Environmental Impact Assessment August 2016 NEP: SASEC Roads Improvement Project Prepared by Department of Roads, Ministry of Physical Infrastructure and Transport, Government of Nepal for the Asian Development Bank. This is an updated version of the draft originally posted in June 2016 available on http://www.adb.org/projects/48337-002/documents. CURRENCY EQUIVALENTS (as of 27 May 2016) Currency unit – Nepalese rupee (NPR) NPR1.00 = $ 0.00931 $1.00 = 107.432 ABBREVIATIONS ADB - Asian Development Bank BOQ - Bill of Quantities BZMC - buffer zone management committee CNP - Chitwan National Park CFUGs -- Community Forest User Groups CSC - Construction Supervision Consultants DOR - Department of Roads DBST - double bituminous surface treatment EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMOP - Environmental Monitoring Plan EPA - Environment Protection Act GHG - greenhouse gas emission GRM - grievance redress mechanism GRC - grievance redress committee IUCN - International Union for Conservation of Nature GoN - Government of Nepal MHC - Mid-Hill East-West Corridor MOEST - Ministry of Environment, Science and Technology MOPIT - Ministry of Physical Infastructure and Transport NPWCA - National Parks and Wildlife Conservation Act NGO - Non-governmental organization PIP - Priority Investment Plan REA) Rapid Environmental Assessment ROW - right-of-way SWRP - Sector Wide Road Program SPS - Safeguard Policy Statement TNM - Traffic Noise Model TYIP - Three Year Interim Plan WWF - World Wildlife Fund This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -
Mcpms Result of Lbs for FY 2065-66
Government of Nepal Ministry of Local Development Secretariat of Local Body Fiscal Commission (LBFC) Minimum Conditions(MCs) and Performance Measurements (PMs) assessment result of all LBs for the FY 2065-66 and its effects in capital grant allocation for the FY 2067-68 1.DDCs Name of DDCs receiving 30 % more formula based capital grant S.N. Name PMs score Rewards to staffs ( Rs,000) 1 Palpa 90 150 2 Dhankuta 85 150 3 Udayapur 81 150 Name of DDCs receiving 25 % more formula based capital grant S.N Name PMs score Rewards to staffs ( Rs,000) 1 Gulmi 79 125 2 Syangja 79 125 3 Kaski 77 125 4 Salyan 76 125 5 Humla 75 125 6 Makwanpur 75 125 7 Baglung 74 125 8 Jhapa 74 125 9 Morang 73 125 10 Taplejung 71 125 11 Jumla 70 125 12 Ramechap 69 125 13 Dolakha 68 125 14 Khotang 68 125 15 Myagdi 68 125 16 Sindhupalchok 68 125 17 Bardia 67 125 18 Kavrepalanchok 67 125 19 Nawalparasi 67 125 20 Pyuthan 67 125 21 Banke 66 125 22 Chitwan 66 125 23 Tanahun 66 125 Name of DDCs receiving 20 % more formula based capital grant S.N Name PMs score Rewards to staffs ( Rs,000) 1 Terhathum 65 100 2 Arghakhanchi 64 100 3 Kailali 64 100 4 Kathmandu 64 100 5 Parbat 64 100 6 Bhaktapur 63 100 7 Dadeldhura 63 100 8 Jajarkot 63 100 9 Panchthar 63 100 10 Parsa 63 100 11 Baitadi 62 100 12 Dailekh 62 100 13 Darchula 62 100 14 Dang 61 100 15 Lalitpur 61 100 16 Surkhet 61 100 17 Gorkha 60 100 18 Illam 60 100 19 Rukum 60 100 20 Bara 58 100 21 Dhading 58 100 22 Doti 57 100 23 Sindhuli 57 100 24 Dolpa 55 100 25 Mugu 54 100 26 Okhaldhunga 53 100 27 Rautahat 53 100 28 Achham 52 100 -
Cfot Axfb"/ K/Lof/ /Fd Axfb"
खुला प्रलतयोलगतात्मक परीक्षाको वीकृ त नामावली वबज्ञापन नं. : २०७७/७८/२४ (गण्डकी तह : ४ पदः सहायक प्रदेश) रोल नं. उ륍मेदवारको नाम उ륍मेदवारको नाम ललंग सम्륍मललत हुन चाहेको समूह थायी म्ि쥍ला थायी न. पा. / गा.वव.स बािेको नाम बाबुको नाम 1 AAITA BAHADUR PARIYAR cfOt axfb"/ k/Lof/ Male ख쥍ु ला, दललत Kaski Salyan /fd axfb"/ bd} ;"qm /fh bd} 2 AARAI LAMICHHANE cf/tL nfld%fg] Female ख쥍ु ला, महिला Parvat Thulipokhari t]hgf/fo)f nfdL%fg] #d{nfn nfdL%fg] 3 AASHIKA BAGALE BHANDARI cflzsf aufn] e)*f/L Female ख쥍ु ला, महिला Syangja Waling e"jfgL z+s/ aufn] e'k/fh aufn] 4 AASHISH GURUNG cflzif u"?ङ Male ख쥍ु ला Kaski Dangsing OGb| axfb/ u"?ङ kmndfg u"?ङ 5 AASTHA LAMSHAL आस्था ल륍साल Female ख쥍ु ला, महिला Tanahu Gajarkot सोमनाथ ल륍साल प셂ु षोत्तम ल륍साल 6 ABIRAL ADHIKARI clj/n Male ख쥍ु ला Tanahu Vyas Municipality eLd axfb"/ clwsf/L hLt axfb"/ clwsf/L 7 AJIT G.C clht lh=;L Male ख쥍ु ला Kaski Hemja led lh=;L cDa/ af= lh=;L 8 AJITA DHAKAL PARAJULI clhtf (sfn k/fh"nL Female ख쥍ु ला, महिला Kaski Pokhara g]q k|;fb zdf{ v]d/fh zdf{ 9 ALISHA BOHARA Pln;f af]x/f Female ख쥍ु ला Sindhupalchowk Tekanpur ;tn l;+x af]x/f ltns axfb"/ af]x/f 10 AMBIKA PRASAD ADHIKARI अम्륍िका प्रसाद अम्िकारी Male ख쥍ु ला Parvat Kushma म्िष्णु प्रसाद अम्िकारी कृ ष्ण प्रसाद अम्िकारी 11 AMBIKA SUBEDI अम्륍िका सवु ेदी Female ख쥍ु ला, महिला Kaski Hansapur पनु राम सवु ेदी ररषी मोहन सवु ेदी 12 AMIR KATEL cld/ s^]n Male ख쥍ु ला Solukhumbu Nechabatasa k|;fb s^]n ?b| k|;fb s^]n 13 AMRIT RAJ DHAKAL cd[t /fh (sfn Male ख쥍ु ला Tanahu Thaprek x/L k|;fb (sfn an/fd (sfn 14 AMRITA BHATTARAI cd[tf e^\^/fO{ Female ख쥍ु ला, -
Environmental Impact Assessment
Environmental Impact Assessment August 2016 NEP: SASEC Roads Improvement Project Prepared by Department of Roads, Ministry of Physical Infrastructure and Transport, Government of Nepal for the Asian Development Bank. This is an updated version of the draft originally posted in June 2016 available on http://www.adb.org/projects/48337-002/documents. CURRENCY EQUIVALENTS (as of 27 May 2016) Currency unit – Nepalese rupee (NPR) NPR1.00 = $ 0.00931 $1.00 = 107.432 ABBREVIATIONS ADB - Asian Development Bank BOQ - Bill of Quantities BZMC - buffer zone management committee CNP - Chitwan National Park CFUGs -- Community Forest User Groups CSC - Construction Supervision Consultants DOR - Department of Roads DBST - double bituminous surface treatment EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMOP - Environmental Monitoring Plan EPA - Environment Protection Act GHG - greenhouse gas emission GRM - grievance redress mechanism GRC - grievance redress committee IUCN - International Union for Conservation of Nature GoN - Government of Nepal MHC - Mid-Hill East-West Corridor MOEST - Ministry of Environment, Science and Technology MOPIT - Ministry of Physical Infastructure and Transport NPWCA - National Parks and Wildlife Conservation Act NGO - Non-governmental organization PIP - Priority Investment Plan REA) Rapid Environmental Assessment ROW - right-of-way SWRP - Sector Wide Road Program SPS - Safeguard Policy Statement TNM - Traffic Noise Model TYIP - Three Year Interim Plan WWF - World Wildlife Fund This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. -
Land Use and Land Cover Change in the Churia-Tarai Region, Nepal
Land use and Land cover change in the Churia-Tarai Region, Nepal Submitted to: Ministry of Forests and Soil Conservation Rastrapati Churia Conservation program (RCCP) Coordination Unit Babarmahal, Kathmandu by Motilal Ghimire, Ph.D Acknowledgements At the very outset, we express my heartfelt gratitude to Mr. Megh Bahadur Pandey, Joint Secretary/Coordinator, Ministry of Forests and Soil Conservation, Rastrapati Churia Conservation Programme (RCCP) Coordination Unit for granting us an opportunity to carry out this Project ―Land Use and Land Cover Change in the Churia-Tarai region‖. Also we sincerely extend out heartfelt thanks to Dr. Prem Paudel, for his initiative and sincere efforts in development of the project, arranging all logistic matters and giving valuable feedbacks at several stages of this Project. Our sincere gratitude goes to all staff of the RCCP for their cooperation and support in various ways to accomplish the Project. We also extend our heartfelt gratitude to Mr. Gokarna Jung Thapa, GIS officer, WWF, Nepal for providing us the satellite imageries as well printing maps and report for this Project. Last but not the least, we sincerely express our thanks to all the local people, who provided us information and various support during the field work. Authors Motilal Ghimire, Ph.D Laxmi Basnet Table of contents Chapter 1: Introduction ....................................................................................................... 4 1. Background ................................................................................................................ -
Buffer Zone 2013-2017
Management Plan for Chitwan National Park and It’s Buffer Zone 2013-2017 CHITWAN NATIONAL PARK AND IT’S BUFFER ZONE MANAGEMENT PLAN 2013-2017 Government of Nepal Ministry of Forests and Soil Conservation Department of National Parks and Wildlife Conservation Chitwan National Park Office Kasara, Chitwan - i - Management Plan for Chitwan National Park and It’s Buffer Zone 2013-2017 Management Plan for Chitwan National Park and It’s Buffer Zone 2013-2017 - ii - Management Plan for Chitwan National Park and It’s Buffer Zone 2013-2017 Management Plan for Chitwan National Park and It’s Buffer Zone 2013-2017 EXECUTIVE SUMMARY Chitwan National Park (CNP), a world heritage property, is the hotspot for the biodiversity conservation in Nepal. The park, which constitutes an important component of Terai Arc Landscape, is among the best managed parks in the world. It has Beeshazari Lake, a Ramsar enlisted site in its buffer zone (BZ). The park is home to second largest population of Greater One-horned Rhinoceros (Rhinoceros unicornis) in the world, a prime habitat for the viable source population of Royal Bengal Tiger (Panthera tigris) which is among few sites that holds more than 100 individuals and a refuge for the remnant population of critically endangered Gharial Crocodile (Gavialis gangeticus). Chitwan National Park at present faces several complex challenges which need to be addressed carefully for biodiversity conservation in general and ensure viable population of the species of conservation significance in particular. Poaching, human-wildlife conflict, habitat management, orphan animal management, sustainable eco-tourism and infrastructure development have been identified as the major issues of concern.