World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
HEALTH s·ECTOR REFORM PROJECT PHASE 2 IBRD Loan 4760RO EIB Loan 22943 RO Project Management Unit APL2 Bank approval Date of the Procurement Plan : Original: April7, 2005 Revision 3: May 19, 2010 Revision 4: March 15, 2011 Date of GPN : March 31, 2005 Period covered by this Procurement Plan: January, 2007 ·December 31, 2013 Revision 7: April 27, 2012 Revision 8: June 11,2012 Procurement Procedures for Community Participation in Procurement: Nona UPDATED PROCUREMENT PLAN : December 18, 2012 w ESTIMATED/ ACTUAL DATES a: Q Bids :I 0 t:c :c Eval1111tlon Public Disclosure Authorized Iii Report/ :IE Bank TORI REI/ Technlcel& ~ IFBI BDIITQ I Bid Opening/ l'i1 No. of Review ITOIBD Rllllflclal Contract Contract Ref No. CONTRACT DESCRIPTION ffi REI Issue Propoeala COMMENTS ... LOTS Prlod Prepare& Eval1111tlon Signing Date Completion 0 i!i Date submlsalon > a: Post Submlsalon Report & Date a: :I Date 0 0 Award 0 lil a: Recommend ...oC ... aU on 0 Component A • Mellmlty IUid Child lte.llh Cere MCH1 Procurement of equlpmen_J for component mother and child G 15 ICB Prior 12-Mar-ol 25-Jun-ol MCH1.1 Hlah Lavel Neonatology Incubator (Package I) G 6-Dec·07 Dec-08 Completed MCH1.2 Hloh Lavel Neonatology Eaulcrnent Package II) G 14-Dec·07 Dec-08 Completed MCH1.3 Hlah Lavel Neonatoloov Eauicrnent Peckaae Ill G 21·Jan·08 Jan-09 ComPleted MCH1.4 Basic Neonatology Equipment (Peckage IV) G 14-Dec-07 Jun-09 Compleled MCH1.5 Other Neonatology Equipment (PeckaQe V) G 14-Dec-07 Jun-09 COmpleled MCHt.6 Standard Neonatology ICU Equipment PeckaQe V1 G 14-Dec.07 Dec·08 COmpleted MCH1.7 General Anesthesia and ICU Equipment Package Vl!) G 1·Mar·08 Mar·09 Completed MCH1.8 Gynecology • Surgery (Package VIII) G 29-Feb-08 May-09 Completed MCH1.9 Sterilization (Package IX G 28·Mar·08 May-09 Completed MCH1.10 Ultrasound system (Packaae X G 28·Mar·08 Mar-09 Completed Public Disclosure Authorized MCH .1.11 lmaalstic E;_QI.Iipment (Packaae XI G 29-Feb-08 Feb-09 Completed MCH1.12 Laborat01Y Eauiprnent (Peckaae XII G Re ·bid IC88 MCH1.13 Fetal Diagnostic Equipment (Package XIII) G 6·May-o8 May-o9 Completed MCHt.14 Neonatal Parenteral Nulrition Equipment PeckaQe XIV) G 14-Dec.07 Dec-oe Completed MCH 1.15 Monitors • Package XV) G Re·Bid ICB7 MCH2 TA lor design and development of an operational manual on the maternal & neonatal cs 1 OCBS Prior 15-Feb-08 24-Apr·OB 04-Aug·08 17-Apr-09 2-Sep-09 Apr-10 Completed referral system MCH3 Designs for civil works (Initially expertlee) for 22 units selected under criterill cs 4 LCS Prior established by PSC and TWO (1at pilaR) MCH3.1 Design lor Moldova region (Proiect Bucuresti) including amendment cs LCS 26-8e!HJ7 Oct-13 Contract on-going MCH3.2 Design lor Dobrogea regiOn (Prolecl Bucuresti) InCluding amendment cs LCS 26-:Sep-07 Oct·13 Contract on-going MCH3.3 Design lor center of Moldova (SeJVcom) cs LCS 2-0ct·07 Oct-13 Contract on-going_ MCH3.4 Design lor Ardeal region (Se!Vcom ) Including amendment cs LCS 2·0ct·07 Oct-13 Contract on-going_ MCH4 TA on devetODina the quality assurance svstem lor MCH seJVices cs 1 OCBS Prior 15-Feb-08 24-Ailr·OB 07·Aua·08 15-Ailr·09 2·Sep.09 Jun·10 Com Dieted MCH5.1 Technical expertise lor Nord region cs 1 LCS Prior 26-Sep-()7 Feb-08 Completed MCH5.2 Technical expertise lor South region cs 1 LCS Prior 26-Sep-07 Feb-08 Completed MCH6 Design for civil works 3 unlla - pilaR 2 cs 3 sss Prior MCH6.1 Design OG Plolesti hospital cs sss 2·Jun-o9 SeP-13 Contract on:going_ MCH6.2 IDeslan lor Matemllv • Countv Emeraencv HosDital Bacau cs sss 21·Ailr·09 Oct·13 Contract on·aoina MCH6.3 IDeskin tor Clnical HosDital ··er. Panait Saltu" cs sss 25-Mar-o9 Dec·10 Com Dieted MCH7·8 Training management seJVice provider cs 1 OCBS Prior 01·Apr·08 11·Apr·08 22-Sep-08 27·Apr·09 2·Sep.()9 Dec-10 Completed Public Disclosure Authorized MCH9 Civil works MCH9/W/1 SBARCEA 01>-Gyn County Hospital Brasov cw 1 NCB Prior 17-May-09 2·Jun·09 29-Jui·09 1-Jun-10 9-Aug-10 Nov-13 Contract on-going MCH9/WI2 "CUZA VODA" 01>-Gyn Clinical Hospllallasl CW 1 NCB Prior 17·May·09 23-Jun·09 13-Aug-09 17-Mar-10 15-Apr-10 Mar-13 Contract on-going MCH9/W/3 BRAILA Qb.Gyn Hospital CW 1 NCB Prior 17·May·09 18·Jun·09 17·Aug·09 15-Jun-10 5-Jul·11 Jul-13 Contract on-going MCH9/W/4 SIBIU County Clinical Hospital cw 1 NCB Prior 17·May·09 25-Jun-o9 18-Aug-09 1-Jun-10 9-Ju~ 1 0 Jul-13 Contract on-going MCH9/WI5 CLW County CUnlcal Hospital cw 1 NCB Prior 17·May-o9 16-Jun-09 14-Aug-o9 1-Jun-10 1()-Sep-10 Jan-13 Contract on-going MCH9/W16 BISTRITA County Hospital (MCH9/Wf6.BN CW 1 NCB Post 30-Jul-09 31 ·AUQ-o9 23-0ct· 09 15-Sep.11 23-Ju~12 Aug-13 Contract on-going MIERCUREA CIUC County Hospital (MCH9/W/6-MG>_ cw NCB Post 15-Aug-11 17·AUQ-11 B·Sep-11 22·Sep-11 Cancelled MCH9/W" BOTOSANI 01>-Gyn Hospital (MCH9/W"·Bl) cw 2 NCB Prior 30-Jul-09 3-Sep-09 19-0ct·09 12·Aug·11 18·NOV·11 Mar-13 Contract on-going RADAUTI Municipal Hospital (MCH9/W"·RD CW NCB Prior 30-Jul-09 3-Sep-09 19-0ct·09 13-Jul·11 4-Aug-11 Jan·13 Contract on-going MCH9/W18 "SF lOAN CEL NOU" Suceava County Hospital MCH9/WI8·SV) CW 2 NCB Post 15-Aug-11 17·AUQ·11 6-Sep-11 22-Sep-11 17·NOV·11 Jan·13 Contract on-going PIATRA NEAMT County Hospital (MCH9/W/6-PN CW NCB Post 15-AUQ·11 17·Aug·11 B·Sep-11 22-Sep-11 17·Nov·11 Jan-13 Contract on-going MCH9/WI9 BACAU County Hospital cw 1 NCB Post 25-May-11 4-Jun-11 11·Jul-11 25-Aug-11 4-0ct-11 Feb-13 Contract on-going MCH9/W/10 CRAIOVA Emergency County Clinical Hospital cw 1 NCB Prior 15-Jun-11 25-Jul-11 25-Aug-11 25-Sep-11 4-Nov· 11 Mar·13 Contracl on-going MCH9/W/11 PLOIESTI Qb.Gyn Hospital_ CW 2 NCB Post 1·Aua· 12 27·Aua· 12 27·Seo-12 15-Nov-12 28·NOV·12 Oct-13 Contract on-going_ "SF lOAN" Children's Emeroencv Clinical Hospital Galati CW NCB Post 1·Au0· 12 27·AU0·12 27-SeP-12 15-Nov·12 26-Nov·12 Apr-13 Contract on-going_ MCH9/W/12 GIURGIU County Hospital MCH9/W/12·GRJ CW 3 NCB Post 1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 16·NOV·11 Mar-13 Contract on-going_ Emeroencv University Clinical Hosollal Bucharest (MCH9/W/12 ·SUUS CW NCB Post 1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 28·Feb-12 Aug-13 Contract on-going_ SF PANTEUMON EmergenCY Clinical Hose. Such. MCH9/W/12·SFPB cw NCB Post 1·JUI·11 4-Jul-11 4-Aua· 11 5-SeP-11 14-Fet>-12 Jul· 13 Contract on-going_ MCH9/W/13 ONESTI MuniciDal HosDital cw 1 NCB Post 31-Jul-11 18·Jan·12 5-Mar· 12 25-Ailr-12 23-Ju~12 Jun-13 Contract on·aoina MCH9/W/14 ORAOEA Cauntv Ctinical HosDital cw 1 NCB Post 15-Aua-11 15-Mar· 12 17·Ailr·12 17·Mav·12 23-Jul-12 SeP.13 Contract on-aolna MCH9/W/15 TG MURES Emeraencv Countv Clinical HosDital cw 1 NCB Post 22·Jun·12 2..Ju~12 13-Aua-12 13-Seo-12 12.Qct·12 Oct·13 Contract on-QOing 2% axes 0.10 and 0.70% Public Disclosure Authorized MCH10 TA lor civH works site suD&JVision includina amendment no.1 cs 1 OCBS Prior 11·Mar-09 23-Mar·09 24-Jun-10 8-Nov·10 30-Jun-11 Dec-13 Contract on oolna MCH11 TA • MCH Health Worldorce Planning and Management Reform cs 1 OCBS Prior 14-Mar·OB 05-May-08 29-Sep-08 20-Ailr·09 Cancelled MCH12 Procurement of eaulpment for comPOnent mother and child - Phaae II G 7 ICB Prior MCH12.1 LOT I : Neonatal EauiD!11ent G 26·Jan·11 22·Jun·11 Corn eted MCH12.2 LOT II : Gynecology • Surgery G 18·Feb-11 18·Jul· 11 Com eted MCH12.3 LOT Ill: Vacuum EauiiJment G 15-Jul-09 1()-Sep-09 20-Mav· 10 14-Ailr·11 20-Jul-11 17·Dec· 11 Com; ted MCH12.4 LOT IV : Screening EQuipment lor new born G 19-Jul-11 16-Dec·11 Com!: ted MCH12.5 LOT V : Gynecology eauil)menl G 20-Jan-11 20-Jun-11 Com eted Re- bid ICB 15 MCH12.6 LOT VI : Surglcallnstrumenta1or Gynecology (rebid ICB 15) G 1 ICB Prior 11-Jun-12 27·Jun·12 1·Aug·12 13-Sep-12 11·Jan· 13 15-Mar-13 (contract sianinal LOT Vll : Eq lor Treatment and final elimination of hazardous biomedical and health -care MCH12.7 G 15-Nov-10 13-May-11 Completed waste MCH13 TA • Elaboration of Bidding documents lor Civil worl<s cs 1 co Prior 18·Aug·08 01·NOV.08 01·Dec·08 19·Mar·09 Feb-13 Contract on-going is Evaluation Iii"' Report/ :::E Bank TORIREU Technlcello f ...