Proposed Project Location – Key Map 0 0 82 30’ 820 15’ 820 20’ 82 25’

Total Page:16

File Type:pdf, Size:1020Kb

Proposed Project Location – Key Map 0 0 82 30’ 820 15’ 820 20’ 82 25’ F1 - 26 Proposed LNG FSRU Terminal Annexure - 1 Proposed Project Location – Key Map 0 0 82 30’ 0 0 82 25’ 82 15’ 82 20’ 0 17 05’ F1 Proposed Widening and - Deepening of entry channel 27 Proposed Subsea pipeline 170 Proposed Onshore Island Jetty Facility 00’ Proposed 600 mɸ Turning Circle Annexure - 0 16 2 55’ Preliminary Layout of Proposed Project F1 - 28 (A) Identified location for Offshore Facility (Island Jetty & FSRU) Annexure - 3 (B) Identified location for Onshore Facility (landfall Point) Project Site Photographs APPENDEX I (Revised as per MoEF Notification S.O.3067(E) dt. 01.12.2009) (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the Project/s Development of offshore LNG FSRU Facility at Kakinada Deep Water Port 2. S.No. in the schedule 7(e) 3. Proposed The project will be designed for 6.5 Million Ton capacity/area/length/tonnage to be Per Annum (MTPA) LNG throughput (Equivalent handled/command area/lease to Approx. 26.9 MMSCMD Natural Gas flow area/number of wells to be drilled rate) 4. New/Expansion/Modernization Expansion 5. Existing Capacity/Area etc. The existing Kakinada Deep Water Port handled 10.8 Million Metric ton Multiple Cargo during 2010-’11 6. Category of Project i.e., 'A' or 'B' ‘A’ 7. Does it attract the general Not applicable, since proposed project falls in ‘A’ condition? If yes, category Please specify. 8. Does it attract the specific -No- condition? If yes, Please specify. 9. Location Kakinada Deep Water Port, Kakinada, East Godavari District, Andhra Pradesh (Annexure- 1). Geographic location: Latitude – 160 59.141’ – 170 00.275’ N Longitude - 82016.763’ - 820 17.976’ E Plot/Survey/Khasra No. Within the existing Kakinada Deep Water Port limits Village Kakinada Tehsil Kakinada District East Godavari State Andhra Pradesh 10. Nearest Railway station/Airport Railway Station: Kakinada Port / Kakinada Town along with distance in kms Air Port: Rajahmundry (Approx. 70 Km) 11. Nearest town/city, district Head Nearest City : Kakinada (Population – 0.312 quarters along with the distance in million) kms Kakinada is District Head Quarters for East Godavari District 12. Village Panchayats, Zilla Parishad, The proposed project is planned within existing Municipal Corporation, Local Body Kakinada Deep Water Port limits. Present (Complete Postal addresses with custodian of proposed project site: telephone no.s to be given) General Manager – Operations Kakinada Seaports Limited 1st Floor, Operations Building Kakinada Deep Water Port F1-1 Sr. Item Details No. Beach Road, Kakinada – 533 007 Andhra Pradesh Phones : 0884-2349619, 2368246 Fax : 0884-2354170, 2354171 13. Name of the applicant Managing Director Andhra Pradesh Gas Distribution Corporation Limited (APGDC) 14. Registered 2nd Floor, Parisrama Bhavan, 5-9-59/B, Fatheh Address Maidan Road, Hyderabad - 500 004, Andhra Pradesh 15. Address for correspondence: Name S.Narayanan Designation Managing Director Owner/Partner/CEO) Address 2nd Floor, Parisrama Bhavan, 5-9-59/B, Fatheh Maidan Road, Hyderabad - 500 004, Andhra Pradesh Pin Code 500 004 E-mail [email protected] [email protected] Telephone No. 040-67304949/ 67304930 / 09866248025 Fax. No. 040- 67304951 16. Details of alternative Sites As the immediate and main objective of proposed examined, if any project is to provide Natural Gas to the existing location of these sites should be Combined Cycle Power Plant (CCPP’s) apart shown on a toposheet. from city gas supply in Andhra Pradesh to overcome the existing electricity/energy crisis, the existing sea ports along A.P. coast (Visakhapatnam Port, Gangavaram Port etc.) have been studied by IPA & IIT, Chennai and recommended Kakinada Deep Water Port as comparatively better option (The details are provided in Appendix-B of attached PFR) based on techno economic considerations 17. Interlinked Projects -Nil- 18. Whether separate -No- application of interlinked Project has been submitted 19. If yes, date of submission N.A. 20. If no , reason N.A. 21. Whether the proposal involves approval / clearance under : (a)The Forest (Conservation) Act, - No- 1980 (b)The Wildlife (Protection) Act, 1972 - No- (c) The CRZ Notifications, 1991 - Yes- If yes, details of the same and their A separate application will be submitted to F1-2 Sr. Item Details No. status to be given. APCZMA after completion of CRZ study / demarcation by MoEF authorized agency 22. Whether there is any Government -No- Order/Policy relevant/relating to the site? 23. Forest land involved No forest land is involved (hectares) 24. Whether there is any litigation pending against the project and/or - Nil - land in which project propose to be set up? (a) Name of the Court (b) Case No. Not Applicable (c ) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S.No. Information/Checklist Yes/ quantities /rates, wherever possible) with confirmation No source of information data 1.1 Permanent or temporary change Yes The proposed project (offshore LNG FSRU, in land use, land cover or associated pipeline and landfall facilities) is topography including increase in planned within the existing port area intensity of land use (with (Annexure-2). The landuse as well as respect to local land use plan) offshore facilities (Island jetty & FSRU) for proposed project will be in compliance with the local designated land use plan within port area (Annexure-3). However, the proposed 2Ha (5 Acre) land for landfall facilities is at present undeveloped vacant area (Annexure-3). The development of control room with Natural Gas metering facility in this area (within port limits) will lead to increase in intensity of land use. 1.2 Clearance of existing land, Yes The 2 Ha land identified for Natural Gas vegetation and buildings? pipeline landfall facilities is within existing port limits and at present it is vacant undeveloped coastal land (Annexure-3). It requires development in the form of site grading, approach road, control room construction etc. 1.3 Creation of new land uses? Yes As per the requirement for proposed F1-3 Details thereof (with approximate S.No. Information/Checklist Yes/ quantities /rates, wherever possible) with confirmation No source of information data onshore landfall facilities consisting of control room, metering, greenbelt etc.. The detailed plot plan / proposed land use details shall be included in EIA report. 1.4 Pre-construction investigations No To be undertaken after obtaining statutory e.g. bore holes, soil testing? clearances. However, the borehole data 1.5 Construction works? No available with M/s KSPL for harbour area will be utilized for assessing dredging and piling requirements. 1.6 Demolition works? No Not Required 1.7 Temporary sites used for No The major part of construction activity construction works or housing of (Island Jetty) will be in coastal sea water construction workers? (harbour area), which requires skilled workforce, limited in number and their required facilities will be arranged by the contractor. 1.8 Above ground buildings, Yes Insignificant; limited to control room and structures or earthworks office building as part of onshore landfall including linear structures, cut facilities (2 Ha land including gas metering and fill or excavations facilities). 1.9 Underground works including Yes As per the requirement for RCC pilings of mining or tunneling? proposed island jetty (one plat form and six mooring dolphins), for laying sub-sea pipeline (Natural Gas) & related cables, for laying buried pipeline (Natural Gas) on coast/land part. 1.10 Reclamation works? No Not Applicable 1.11 Dredging? Yes Based on IPA site selection report, capital dredging for proposed project is estimated to be: Widening and deepening of approach channel: approx 10 million m3 Turning Circle: approx 2 million m3 Berth Pockets: approx 5 million m3 TOTAL capital dredging: approx 17 million m3. Out of this, the ship approach channel and turning circle (12 million m3) will become common facility for Kakinada Deep Water Port. 1.12 Offshore structures? Yes An island jetty with a RCC top will be built offshore (lee side of existing break waters in harbour area) to accommodate LNG FRSU and a carrier ship F1-4 Details thereof (with approximate S.No. Information/Checklist Yes/ quantities /rates, wherever possible) with confirmation No source of information data 1.13 Production and manufacturing No There will be no manufacturing processes processes? for proposed project except regasification of LNG and supply at high pressure, in Natural Gas form, through pipeline to main NG supply network 1.14 Facilities for storage of goods or Yes Proposed Facilities: materials? Temporary warehouse during construction phase One FSRU with a design capacity of max. 175,000 m3 LNG storage Terminal warehouses for maintenance purpose 1.15 Facilities for treatment or Yes The proposed FSRU as well as LNG carrier disposal of solid waste or liquid ships will have onboard treatment of waste effluents? (sewage, oily water etc.) to international standards The proposed offshore FSRU will utilize sea water for regasification of LNG. The outlet temperature of sea water after regasification will be maintained at 5-70C less than ambient sea water temperature The solid/hazardous waste will be managed as per HWM Rules 2008/2010 (Amendment) through
Recommended publications
  • Invitation for Bids for the Work of " Restoration And
    BIDDING DOCUMENTS FOR PROCUREMENT OF WORKS IFB No. 01/AP/VMRDA/APDRP/Visakhapatnam/2019-20 Name of Work: Restoration & Redevelopment of 380 Acres Kailasagiri Hill Top park at Visakhapatnam. STEP Activity No. IN-PIU-VMRDA-103847-CW-RFB Project: Andhra Pradesh Disaster Recovery Project. Bid Inviting Authority: Metropolitan Commissioner, VMRDA, Udyog Bhavan, Siripuram Jn.,Visakhapatnam-530003. Country : India Metropolitan Commissioner, VMRDA, 9th Floor, Udyog Bhavan, SiripuramJn.,Visakhapatnam-530003. Telephone:- 0891-2754133/34, 2755155, 9866076925, 7702333584 Email :- [email protected], [email protected], 2 INVITATION FOR BID (IFB) 3 GOVERNMENT OF ANDHARA PRADESH ANDHRA PRADESH DISASTER RECOVERY PROJECT IFB NO: 01/ AP/VMRDA/APDRP/Visakhapatnam/2019-20 NATIONAL COMPETITIVE BIDDING (Two-Envelope Bidding Process with e-Procurement) (FOR ITEM RATE/ADMEASUREMENT CONTRACTS IN CIVIL WORKS) NAME OF WORK : RESTORATION & RE-DEVELOPMENT OF 380 ACRES KAILASAGIRI HILL TOP PARK AT VISAKHAPATNAM DATE OF ISSUE OF IFB : 30-09-2019 AVAILIBILTY OF BIDDING : FROM DATE : 03-10-2019 TIME11.00 HOURS DOCUMENT ON-LINE : TO DATE : 02-11-2019 TIME 15.00 HOURS TIME AND DATE OF : DATE :16-10-2019 TIME: 11.30 HOURS PREBID CONFERENCE LAST DATE AND TIME FOR : DATE :02-11-2019 TIME: 15.30 HOURS RECEIPT OF BIDS ON-LINE LAST DATE FOR SUBMITTING HARD : DATE :02-11-2019 TIME: 15.30 HOURS COPIES BY THE BIDDERS TIME AND DATE OF DATE :02-11-2019 TIME: 16.00 HOURS OPENING OF PART 1 OF : BIDS ONLINE [TECHNICAL QUALIFICATION PART] TIME AND DATE OF OPENING OF PART 2 OF BIDS ONLINE
    [Show full text]
  • The Visakhapatnam Chemical Disaster Arpita Pattnaik & Ketaki Vatsa
    I S S N : 2 5 8 2 - 2 9 4 2 LEX FORTI L E G A L J O U R N A L V O L - I I S S U E - V J U N E 2 0 2 0 I S S N : 2 5 8 2 - 2 9 4 2 DISCLAIMER N O P A R T O F T H I S P U B L I C A T I O N M A Y B E R E P R O D U C E D O R C O P I E D I N A N Y F O R M B Y A N Y M E A N S W I T H O U T P R I O R W R I T T E N P E R M I S S I O N O F E D I T O R - I N - C H I E F O F L E X F O R T I L E G A L J O U R N A L . T H E E D I T O R I A L T E A M O F L E X F O R T I L E G A L J O U R N A L H O L D S T H E C O P Y R I G H T T O A L L A R T I C L E S C O N T R I B U T E D T O T H I S P U B L I C A T I O N .
    [Show full text]
  • District Disaster Management Action Plan 2017
    PUDUCHERY DISTRICT DISASTER MANAGEMENT ACTION PLAN 2017 STATE LEVEL EMERGENCY OPERATION CENTER (SLEOC) TOLL FREE NUMBER 1077 / 1070 Off: 2253407 / Fax: 2253408 VSAT - HUB PHONE NO : 81627 e-Mail SLEOC : [email protected] / [email protected] District Collector : [email protected] Collectorate e-Mail : [email protected] NATIONAL DISASTER MANAGEMENT AUTHORITY (NDMA) HELPLINE NUMBER 011-1078 Control Room: 011-26701728 Fax: 011-26701729 E-mail: [email protected] Postal Address: NDMA Bhawan, A-1, Safdarjung Enclave, New Delhi – 110029 Telephone : 011-26701700 Contents 1 CHAPTER..............................................................................................................................1 INTRODUCTION ...........................................................................................................................1 1.1 Objectives of this Action Plan......................................................................................1 2 CHAPTER..............................................................................................................................3 2.1 LOCATION....................................................................................................................3 2.2 CLIMATE ......................................................................................................................3 2.3 TOPOGRAPHY..............................................................................................................3 2.3.1 Puducherry Region ..............................................................................................3
    [Show full text]
  • Baseline St1udy Training in Sea Safety Development
    BASELINE ST1UDY FOR TRAINING IN SEA SAFETY DEVELOPMENT PROGRAMME IN EAST GODAVARI DISTRICT, ANDHRA. PRADESH NINA FOR FOOD AND AGRICULTURE ORGANISATION OF TFIE UNITED NATIONS AND DEPARTMENT OF FISHERIES, GOVTOF ANDHRAPRADESH BY ACTION FOR FOOD PRODUCTION (AFPRO) FIELD UNIT VI, HYDERABAD 1998 TRAINING IN SEA SAFETY DEVELOPIVIENT PROGRAMME IN EAST GODA VARI DISTRICT, ANDHRA PRADESH INDIA TCP/IND/6712 BASELINE STUDY November, 1997January, 1998 BY ACTION FOR FOOD PRODUCTION (AFPRO) FIELD UNIT VI, HYDERABAD 12-13-483/39, Street No.1, Tarnaka Secunderabad - 500 017 DEPARTMENT OF FISHERIES, GOVT.OF ANDHRAPRADESH FOOD AND AGRICULTURE ORGANISATION OF THE UNITED NATIONS The designations employed and the presentations of the material in this document do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. ACKNOWLEDGMENTS Action for Food Production (AFPRO) Field Unit VI is grateful to the Food and Agriculture Organisation of the United Nations (FAO) and the Department of Fisheries Andhra Pradesh for giving the opportunityfor conducting the Baseline Study - Training in Sea Safety Development Programme in East Godavari District, Andhra Pradesh. Action for Food Production (AFPRO) Field Unit VI wish to thank the following for all the assistance and cooperation extended during the study. The Fisherfolk and Sarpanches of Balusitippa, Bhairavapalem and other villages (Mansanitippa, Komaragiri, Joggampetta, Gadimoga, Peddavalsula). Mr.O. Bhavani Shankar,Additional Director and Conunisioner ofFisheries in Charge, Hyderabad. Mr.Ch.Krishna Murthy, Joint Director of Fisheries, Hyderabad.
    [Show full text]
  • Current Affairs May 2020
    Current Affairs – May 2020 Current Affairs ─ May 2020 This is a guide to provide you a precise summary and a huge collection of Multiple Choice Questions (MCQs) covering national and international current affairs for the month of May 2020. This guide will help you in preparing for Indian competitive examinations like Bank PO, Banking, Railway, IAS, PCS, UPSC, CAT, GATE, CDS, NDA, MCA, MBA, Engineering, IBPS, Clerical Gradeand Officer Grade, etc. Audience Aspirants who are preparing for different competitive exams like Bank PO, Banking, Railway, IAS, PCS, UPSC, CAT, GATE, CDS, NDA, MCA, MBA, Engineering, IBPS, Clerical Grade, Officer Grade, etc. Even though you are not preparing for any exams but are willing to have news encapsulated in a roll, which you can walk through within 30 minutes, then we have put all the major points for the whole month in a precise and interesting way. Copyright and Disclaimer Copyright 2020 by Tutorials Point (I) Pvt. Ltd. All the content and graphics published in this e-book are the property of Tutorials Point (I) Pvt. Ltd. The user of this e-book is prohibited to reuse, retain, copy, distribute or republish any contents or a part of contents of this e-book in any manner without written consent of the publisher. We strive to update the contents of our website and tutorials as timely and as precisely as possible, however, the contents may contain inaccuracies or errors. Tutorials Point (I) Pvt. Ltd. provides no guarantee regarding the accuracy, timeliness or completeness of our website or its contents including this tutorial.
    [Show full text]
  • SFG 2021 - Level 3 | Test 1 – Solutions | Forumias
    Page 1 of 47 SFG 2021 - Level 3 | Test 1 – Solutions | ForumIAS Q.1) With reference to the Secular character of the Constitution of India, which one of the following statements is incorrect? a) All citizens are equally entitled to liberty of belief, faith and worship. b) All minorities have the right to establish and administer educational institutions of their choice. c) All people are equally required to pay taxes for the promotion of their religion. d) The State shall not deny any person equality before the law or equal protection of the laws. Ans) c Exp) Option c is correct. The Constitution of India stands for a secular state. Hence, it does not uphold any particular religion as the official religion of the Indian State. The following provisions of the Constitution reveal the secular character of the Indian State: 1) The term ‘secular’ was added to the Preamble of the Indian Constitution by the 42nd Constitutional Amendment Act of 1976. 2) The Preamble secures to all citizens of India liberty of belief, faith and worship. Hence, option a is correct. 3) The State shall not deny to any person equality before the law or equal protection of the laws (Article 14). Hence, option d is correct. 4) The State shall not discriminate against any citizen on the ground of religion (Article 15). 5) Equality of opportunity for all citizens in matters of public employment (Article 16). 6) All persons are equally entitled to freedom of conscience and the right to freely profess, practice and propagate any religion (Article 25).
    [Show full text]
  • Market Assessment of Solar Water Heating Systems in Five Potential States/Ncr Region
    MARKET ASSESSMENT OF SOLAR WATER HEATING SYSTEMS IN FIVE POTENTIAL STATES/NCR REGION Final Report Submitted to Project Management Unit UNDP/GEF Assisted Global Solar Water Heating Project Ministry of New and Renewable Energy Government of India 10 February, 2011 Submitted by: Greentech Knowledge Solutions (P) Ltd. New Delhi -110078 (India) Website: www.greentechsolution.co.in Final Report: Market Assessment of Solar Water Heating Systems in Five Potential States / NCR Region PROJECT TEAM Core Team Dr Sameer Maithel, Greentech Knowledge Solutions (GKS), New Delhi Mr Shailesh Modi, Fourth Vision Consultants (FVC), Ahmedabad Mr Minhaj Ameen, EvalueS, Auroville Mr Prashant Bhanware, GKS, New Delhi Mr Rahul Rai, GKS, New Delhi Regional Teams North Dr Sameer Maithel, Mr Prashant Bhanware, Mr Gaurav Malhotara & Mr Rahul Rai, GKS, New Delhi Mr Richard Sequeira, Solenge India, Gurgaon South Mr Minhaj Ameen, Mr Arijit Mitra, Mr Erik Conesa, EvalueS, Auroville West Mr Shailesh Modi, Mr Vimal Suthar, Mr Mihir Vyas, Mr Vipin Thakur, Prof. Mahesh Shelar, Mr Haresh Patel, FVC, Ahmedabad Greentech Knowledge Solutions ii Final Report: Market Assessment of Solar Water Heating Systems in Five Potential States / NCR Region ACKNOWLEDGEMNETS The project team would like to sincerely thank Dr Bibek Bandyopadhyay, Advisor and Head, MNRE and Mr Ajit Gupta, National Project Manager, UNDP/GEF Global Solar Water Heating Project for their guidance during the entire duration of the project. Periodic review meetings organized by the Project Management Unit helped immensely in shaping the study. We are also grateful to the members of the Project Executive Committee as well as participants of the stakeholders‟ consultation workshop for their suggestions and inputs.
    [Show full text]
  • Global Environment Facility
    MONIQUE BARBUT GLOBAL ENVIRONMENT FACILITY Chif!f Uf!CutiVf! Officf!r and Chairperson VEST ! G IN OUR PlA ET 1818 HStreet, NW Washington, DC 20·03 USA Tel: 202.~73.3Z02 fax: 202.5U.32401J2~5 E-mail: mbarbutttTheGEf.org February 16, 2011 Dear Council Member, The UNDP as the Implementing Agency for the project entitled: India: IND-BD Mainstreaming Coastal and Marine Biodiversity Conservation into Production Sectors in the Godavari River Estuary in Andhra Pradesh State under the India: IND-BD: GEF Coastal and Marine Program (IGCMP), has submitted the attached proposed project document for CEO endorsement prior to final Agency approval of the project document in accordance with the UNDP procedures. The Secretariat has reviewed the project document. It is consistent with the project concept approved by the Council in June 2009 and the proposed project remains consistent with the Instrument, and GEF policies and procedures. The attached explanation prepared by the UNDP satisfactorily details how Council's comments and those of the STAP have been addressed. We have today posted the proposed project document on the GEF website at www.TheGEF.or£! for your information. We would welcome any comments you may wish to provide by March 19, 2011 before I endorse the project. You may send your comments to [email protected] . If you do not have access to the Web, you may request the local field office of UNDP or the World Bank to download the document for you. Alternatively, you may request a copy of the document from the Secretariat. If you make such a request, please confirm for us your current mailing address: Sincerely, Attachment: Project Doc ume nt Copy to : Countly Operational Focal Point.
    [Show full text]
  • (SCR) Status of Projects
    SOUTH CENTRAL RAILWAY STATUS OF TARGETED & NON TARGETED PROJECTS As on 01.10.20 NEW LINES Name of Project: MANOHARABAD - KOTHAPALLI, 151.36 Km (PH -11, New lines) S C Railway Name of Project: MANOHARABAD - KOTHAPALLI, 151.36 Km (PH -11, New lines) S C Rly SNAP SHOT OF FULL PROJECT Year of Inclusion 2006 - 07 Month & year of Final Sanction July, 2016 Project falling in (Railway) South Central Railway Project falling in (States) Telangana Executing Agency CAO ( C ) SCR ROR ( + %) (+) 0.16 % Length of Complete Project 151.36 km 1373.74 Cr Latest anticipated Cost of Project (Original sanc 1160.47 Cr. + 213.26 Cr MM ) Up to date Expenditure of full project 460.93 Cr. (Rly: 400.93 Cr + State: 60.00 Cr) Physical Progress of full Project (%) 25 % Financial Progress of full Project (%) 39 % Outlay 2020-21 (in Cr.) 79.00 Cr. Manoharabad-Gajwel(31.071 km) CRS authorisation Length of Project already Commissioned (km) received on 19.06.2020 and workman special run on 26.08.20. Mar, 25 (Subject to handing over of land & deposition Likely TDC of complete project (Month & Year) of 1/3rd share by Telangana Govt) Name of Project: MAHABUBNAGAR - MUNIRABAD, (PH - 11, New lines) S C Railway SCR portion: DEVARAKADRA - KRISHNA, 65.74 Km Name of Project: MAHABUBNAGAR - MUNIRABAD, (PH - 11, New lines) S C Railway SCR portion: DEVARAKADRA - KRISHNA, 65.74 Km SNAP SHOT OF FULL PROJECT Year of Inclusion 1997 - 98 Month & year of Final Sanction January, 2012 Project falling in (Railway) South Central Railway Telangana (SCR portion 65.74 km), Project falling in (States) Karnataka (SWR portion, 161.675km) Executing Agency CAO ( C ) SCR & CAO ( C ) SWR ROR ( + %) (+ ) 3.49 % Length of Complete Project 16+65,74 NL,81.74 (SCR portion) 243.50 Complete project (Overall: Rs 3421.35 Cr) Latest anticipated Cost of Project 907.71 Cr.
    [Show full text]
  • Iasbaba's Daily Quiz
    IASbaba’s Daily Quiz January 23, 2018 Q.1) Global Talent Competitiveness Index – 2018 is released by 1. Adecco 2. Insead 3. Tata Communications Select the correct code: a) 1 and 2 b) 2 and 3 c) 1 and 3 d) All of the above Q.1) Solution (d) The 2018 study is released by Adecco, Insead and Tata Communications. India has moved up on a global index of talent competitiveness to the 81st position. It is released every year on the first day of the World Economic Forum (WEF) annual meeting. China has moved up to 43rd now, Russia to 53rd, South Africa to 63rd and Brazil to 73rd position. Source: https://www.ndtv.com/business/india-ranks-81st-on-global-talent- competitiveness-index-1803347 Q.2) National Regulatory Authority of India (NRAI) comprises of a) Pharmaco-vigilance Programme of India (PvPI) b) Central Drugs Standard Control Organisation (CDSCO) c) Both (a) and (b) d) Neither (a) nor (b) Q.2) Solution (c) The National Regulatory Authority of India (NRAI), the vaccine regulating authority of India, has been given the highest ratings by global health body World Health Organization for vaccine regulations. IASbaba’s Daily Quiz January 23, 2018 WHO carried out assessment of the NRA of India comprising the Central Drugs Standard Control Organisation (CDSCO), State Drug Regulatory Authorities, Pharmaco-vigilance Programme of India (PvPI) and Adverse Events Following Immunization (AEFI) structures at the Central and States level. National Regulatory Agencies (NRAs) are responsible for ensuring that pharmaceuticals and biological products, such as vaccines released for public distribution are evaluated properly and meet international standards of quality and safety.
    [Show full text]
  • Government of Andhra Pradesh
    GOVERNMENT OF ANDHRA PRADESH FINANCE ACCOUNTS 2011-2012 VOLUME-2 TABLE OF CONTENTS (Both volumes contain contents of each other) Subject Page(s) Volume 1 Table of Contents (i)-(iii) Certificate of the CAG (iv)-(v) Guide to Finance Accounts (Introduction) 1-5 1. Statement of Financial Position 6-7 2. Statement of Receipts and Disbursements 8-9 3. Statement of Receipts (Consolidated Fund) 10-13 4. Statement of Expenditure (Consolidated Fund)- 14-19 By Function and Nature Notes to Accounts 20-33 Appendix-I: 34-36 Cash Balances and Investment of Cash Balances Volume 2 Part I 5. Statement of Progressive Capital Expenditure 38-43 6. Statement of Borrowings and Other Liabilities 44-49 (i) Subject Page(s) 7. Statement of Loans and Advances given by the Government 50-52 8. Statement of Grants-in-Aid given by the Government 53-54 9. Statement of Guarantees given by the Government 55-61 10. Statement of Voted and Charged Expenditure 62 Part II 11. Detailed Statement of Revenue and Capital Receipts by minor 64-90 heads 12. Detailed Statement of Revenue Expenditure by minor heads 91-153 13. Detailed Statement of Capital Expenditure 154-232 14. Detailed Statement of Investments of the Government 233-261 15. Detailed Statement of Borrowings and Other Liabilities 262-278 16. Detailed Statement on Loans and Advances given by the 279-346 Government 17. Detailed Statement on Sources and Application of funds for 347-350 expenditure other than on Revenue Account 18. Detailed Statement on Contingency Fund and Other Public 351-370 Account transactions 19.
    [Show full text]
  • Handbook of Statistics 2014 Chittoor District Andhra Pradesh.Pdf
    HAND BOOK OF STATISTICS CHITTOOR DISTRICT 2014 ***** Compiled and Published by CHIEF PLANNING OFFICER CHITTOOR DISTRICT SIDDHARTH JAIN I.A.S., District Collector & Magistrate, Chittoor District. PREFACE I am happy to release the Twenty EighthEdition of Hand Book of Statistics of Chittoor District which incorporates Statistical Data of various departments for the Year 2014. The Statistical Data in respect of various departments and schemes being implemented in the district are compiled in a systematic and scientific manner reflects the progress during the year. The sector-wise progress is given in a nutshell under the chapter “DISTRICT AT A GLANCE” apart from Mandal-wise data. The publication reflects the latest data on various aspects of the District Economy. The information has been given Mandal-wise in a concise form to facilitate an over all assessment of the District Economy for the year. This compilation will serve as a useful reference book for the General public, Planners, Administrators, Research Scholars, Bankers and also special Agencies that are involved in the formulation and implementation of various developmental programmes in the district. I am thankful to all District Officers and the heads of other institutions for extending their helping hand by furnishing their respective Statistical data to theChief Planning Officer for publication of this Hand Book. I appreciate the efforts made by Sri. Ch. V.S.BhaskaraSarma, Chief Planning Officer, Chittoor, other Officers and Staff Members of the Chief Planning Office in bringing out this publication which projects the development of the District during the year 2014. Any suggestions aimed at improving the quality of data incorporated in this Hand Book are most welcome.
    [Show full text]