Gable End Raking Verge Overhang Options

Total Page:16

File Type:pdf, Size:1020Kb

Gable End Raking Verge Overhang Options 01/2017 GABLE END RAKING VERGE OVERHANG OPTIONS Covers raking verge using standard purlin overhang options. Covers up to 750mm overhang using standard verge outriggers. Covers up to 1200mm overhang using verge outrigger/purlin combination. OVERHANG OPTIONS • All gable end loading parameters are based on the design considerations used in NZS 3604:2011 and cover heavy roof weight, extra high wind load and snow load Sg of up to 1.0kPa. • All live load considerations as per AS/NZS 1170. • All timber to be minimum grade SG8 as defined in NZS 3604:2011. CANTILEVER PURLIN OPTION antilever Purlin or atten to extend over at least length 3 rafter/truss supports TABLE 1 PURLIN SIZE & ORIENTATION MAX. CANTILEVER LENGTH (mm) PURLIN CENTRES (mm) 45x45 200 400 70x45 300 900 90x45 450 900 CANTILEVER OUTRIGGER OPTION (Note: Maximum sidewall overhang of 750mm) (See details on next pages) TABLE 2 OUTRIGGER SIZE & ORIENTATION MAX. CANTILEVER LENGTH (mm) OUTRIGGER CENTRES (mm) 750 600 70x45 600 900 750 900 90x45 600 1200 750 400 LENGTH 750mm 90x45 MAX. CANTILEVER 600 600 CANTILEVER OUTRIGGER/PURLIN COMBINATION OPTION (Note: Maximum sidewall overhang of 1200mm) (See details on next pages) TABLE 3 OUTRIGGER SIZE & ORIENTATION MAX. CANTILEVER LENGTH (mm) OUTRIGGER CENTRES (mm) 45x45 Purlin 1200 450 90x45 Outrigger 70x45 Purlin 1200 700 90x45 Outrigger 90x45 Purlin LENGTH 1200mm 1200 900 MAX. CANTILEVER 90x45 Outrigger CONSTRUCTION DETAILS FOR CANTILEVER OUTRIGGER OPTION (SPANS & CENTRES AS PER TABLE 2) antilever length antilever length max 750mm wang to support Purlin outline max 750mm l rafter wangpurlin sto support Purlin outline min 90x45l rafter purlins min 90x45 3/ 90mm nails 3/ 90mm(tpial nails) MO 200 (tpial) MO 200 Standard full nailed with 30 x Standard full nailed with 30 x trusses/rafters 315mm or ire og trusses/rafters op dropop ondrop gale on gale end end 315mm or ire og same depth as outrigger fixing plus 2/ 90mm same depth as outrigger fixing plus 2/ 90mm Outrigger sewsew driven driven nails nails Outrigger op droppedop dropped galegale end truss/rafteend truss/rafter r MinimumMinimum 900mm 900mm spaingspaing CROSS SECTION op droppedop dropped gale galeMOMO 200 200fullfull nailed nailed with with 30 x30 315mm x 315mm StandarStandard d end truss/rafteend truss/rafter r or ireor ireog ogfixing fixing plus plus 2/ 90mm 2/ 90mmsewsew driven driven nails nails purlinpurlins s OutriggerOutrigger numer 4 numer 4 Outrigger Outrigger Standard sie and Standard sie andentres as trusses/rafters trusses/rafters entresale as 2 ale 2 wang towang support purlin. ix first fl rafter at to supportSame depthpurlin as. ix firsteah fl rafteroutrigger at Sameoutrigger depth as eah outriggerwith 3/ 90mm nails up to outrigger with 3/outrigger 90mm nails numer up to4 ix outer P0 to outriggerfl rafter numer to first 4 ixfl rafterouter with P0outrigger to fl rafter90mm to first nails fl rafter 150mm with rs outrigger 90mmstaggered nails 150mm rs staggeredOutrigger alwas loated Outriggerover alwas outside loated wall top plate over outside wall top plate 3/ 90mm nails plus 3/ 90mm1/ MO nails plus Multigrip 1/ MOfull nailed with Multigrip 30 x 315mm nails Max overhang 750mm MO full nailed with MO Strap Nail eah side30 x 315mm nails P0 Max overhang 750mm MO MO ntermediate lo Strap Nail90x45 eah a side lo fixed to truss/ P0 to support purlin where rafter overhang and fl rafter with ntermediatepurlin/atten lo reuired within 90x45 a lo fixed to truss/ 1/ MO P0 fixed with to supportoverhang purlin setion where rafter overhang and fl rafter with 4/ 14g srews per flange eah end purlin/attenix eah end reuired with 3/ within90mm nails 1/ MO P0 fixed with LAYOUT overhang setion 4/ 14g srews per flange eah end ix eah end with 3/ 90mm nails CONSTRUCTION DETAILS FOR OUTRIGGER/PURLIN COMBINATION (SPANS & CENTRES AS PER TABLE 3) MO 200 MOoth sides full 200 nailed with antilever length 760mm oth 30 x sides 315mm full plus nailed with Purlin diretl over outrigger. antilever length 760mm to max 1200mm 302/ x90mm 315mm sew plus Purlinix with diretl 90mm over nails outrigger 50mm. rs to max 1200mm 2/driven 90mm nails sew ixMO with 90mm nailsoist anger 50mm 47x90 rs driven nails MOfull nailed with oist 30 angerx 315mm 47x90 full nailed with 30 x 315mm 90x45 outrigger op dropped gale 90x45 outrigger opend dropped truss/rafte galr e oule standard end truss/rafter oule standard l rafter to e at least truss/rafter truss/rafter lsame rafter sie to as e outrigger at least or speial design or speial design sameominations sie as outrigger ominationsie minimum 140x45 Note: eiling oists as per NS 3604:2011 ie minimum 140x45 Note: eiling oists as per NS 3604:2011 Minimum dimension 15 timesMinimum the antileverdimension length 15 times the antilever length CROSS SECTION op dropped gale end MO 200 oth sides full nailed with oule standard rafter/truss optruss dropped or rafte rgale end MO30 x 315mm plus200 2/ 90mmoth sides sew full driven nailed nails with ouleor speial standard design rafter/truss truss or rafter 30 x 315mm plus 2/ 90mm sew driven nails or speial design Min 2/ 90mm nails Minto rafter/truss 2/ 90mm plus MOnails to rafter/truss oist anger plus MO47x90 full oist naile angerd 47x90 full nailed Purlin numer 4 with 30 x 315mm Purlin numer 4 with 30 x 315mm Max overhangMax 1200mm overhang 1200mm ix purlins to ixoutrigger purlins with to outrigger90mm nails with 90mm 50mm nails rs 50mm rs Outrigger lined Outrigger lined up diretl elow eah up diretl elow eah purlin See ale 3 for purlin See ale 3 for sie and orientation sie and orientation irst outrigger omination Paer irst outrigger omination Paer to e diretl over end wall 1000mm rs to e diretl over end wall 1000mm rs 3/ 90mm nails plus MO P0 fixed with 3/ 90mm nails plus MO P0 fixed with 1/ MO 4/ 14g srews per flange to a 1/ MO 4/ 14g srews per flange to a 90x45 dwang Multigrip full nailed lo and truss rafters 90x45 dwang Multigrip full nailed lo and truss rafters with 30 x 315mm 90x4590x45 a a lo lo with 30 x 315mm andand fl fl rafte rafterr MO Strap Nail ixix first first fl fl rafter rafter at at eah eah purlin/outrigger purlin/outrigger with with 4/ 4/ 90mm 90mm nails nails up up to to purlin purlin MO Strap Nail numer 4 ix outer fl rafter to first fl rafter with 90mm nails 150mm eaheah sideside numer 4 ix outer fl rafter to first fl rafter with 90mm nails 150mm rsrs staggered staggered LAYOUT.
Recommended publications
  • BUILDING CONSTRUCTION NOTES.Pdf
    10/21/2014 BUILDING CONSTRUCTION RIO HONDO TRUCK ACADEMY Why do firefighters need to know about Building Construction???? We must understand Building Construction to help us understand the behavior of buildings under fire conditions. Having a fundamental knowledge of buildings is an essential component of the decisiondecision--makingmaking process in successful fireground operations. We have to realize that newer construction methods are not in harmony with fire suppression operations. According to NFPA 1001: Standard for FireFighter Professional Qualifications Firefighter 1 Level ––BasicBasic Construction of doors, windows, and walls and the operation of doors, windows, and locks ––IndicatorsIndicators of potential collapse or roof failure ––EffectsEffects of construction type and elapsed time under fire conditions on structural integrity 1 10/21/2014 NFPA 1001 Firefighter 2 Level ––DangerousDangerous building conditions created by fire and suppression activities ––IndicatorsIndicators of building collapse ––EffectsEffects of fire and suppression activities on wood, masonry, cast iron, steel, reinforced concrete, gypsum wallboard, glass and plaster on lath Money, Money, Money….. Everything comes down to MONEY, including building construction. As John Mittendorf says “ Although certain types of building construction are currently popular with architects, modern practices will be inevitably be replaced by newer, more efficient, more costcost--effectiveeffective methods ”” Considerations include: ––CostCost of Labor ––EquipmentEquipment
    [Show full text]
  • Traditional Gable Freestanding Carport
    TRADITIONAL GABLE FREESTANDING CARPORT STRATCO OUTBACK® ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback TRADITIONAL GABLE CARPORT BEFORE YOU START Carefully read these instructions. If you do not have all the necessary tools or information, contact Stratco for advice. Before starting lay out all components and check them against the delivery docket. The parts description identifies each key part, and the component location diagrams indicates their fastening position. PARTS DESCRIPTION RIDGE KNUCKLE FOOTING PLATE EAVES KNUCKLE FOOTING COLUMNS AND Slots inside the gable rafters to Slots inside column Slots inside gable rafter and KNUCKLE RAFTERS form connection at the ridge to form on concrete column to form connection at Slots inside Pre cut 120 outback footing connection. eaves. column to form beam make up an in ground rafters and columns footing connection PURLINS BARGE CAP RIDGE CAP HEADER FLASHING INFILL PANELS Purlins provide support for The barge cap covers This flashing covers the roof This flashing attaches the infill Sufficient number of sheets are cladding the area where the sheets at the gable ridge. panel to the infill frame. provided, from which the required deck finishes at portal infill panels can be cut. frame PANEL STRIPS HEX HEAD SELF DRILLING BOLTS AND RIVETS Panel strips attach to the SCREWS Bolt types vary depending infill panel where applicable Screw types vary depending upon upon the connection, ensure the connection, ensure correct the correct fixings are used screws are used 10 x 16 12 x 20 14 x 95 ADDITIONAL MATERIALS These items are available at request, they are not included in the basic kit price.
    [Show full text]
  • Dutch Gable Carport Recommended Instruction Manual
    DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL This document remains the property of FBHS (Aust) Pty Ltd September 2015 Table of Contents Introduction 2 Components 3 Step 1a – Marking out the Perimeter of the Carport with Footing only 4 Step 2a – Footing Set-Out for Concrete Block Pad Footing 5 Step 1b – Marking out the Perimeter of the Carport with Slab 6 Step 2b – Footing Set-Out for Concrete Slab 7 Step 3 – Preparation of Carport Posts 8 Step 4a – Post Sleeve on Base Plate Set-out on Footing only 9 Step 4b – Post Sleeve on Base Plate Set-out on Slab 10 Step 5 - Fitting of Intermediate Rafters with Apex Bracket 11 Step 6 - Fitting of End Rafters with Apex Bracket and Cross Beam Assembly 12 Step 7 - Fitting of Columns with Haunch Bracket 14 Step 8 - Fitting of Sidewall Eave Purlin (SW) to Post 15 Step 9 – Fixing of Cover Flashing to Sidewall Eave Purlin (SEP) 16 Step 10 - Gutter 16 Step 11 - Sidewall Frame Assembly 18 Step 12 - Other Sidewall Frame Assembly 18 Step 13- Standing First Sidewall Frame Assembly 18 Step 14 - Standing Second Sidewall Frame Assembly 19 Step 15- Fixing of Endwall Eave Purlin(EEP) to Sidewall Eave Purlin (SEP) on the Rear Endwall 19 Step 16- Installation of Rear Endwall Rafter 20 Step 17- Fixing of Dutch Cross Beam 21 Step 18 - Fixing of Rafter Frame Bracket to Cross Beam End Bracket 21 Step 19 - Fixing of Internal Hip Bracket 22 Step 20 - Fixing of Dutch Hip Rafter 23 Step 21- Fixing of Dutch Hip Rafter to the opposite corner 25 Step 22 - Fixing of Crown Rafter 26 Step 23 - Installation of Intermediate Rafters
    [Show full text]
  • Dutch Gable Freestanding Carport
    DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK® ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If you do not have all the necessary tools or information, contact Stratco for advice. Before starting lay out all components and check them against the delivery docket. The parts description identifies each key part, and the component location diagram indicates their fastening position. PARTS DESCRIPTION RIDGE KNUCKLE FOOTING PLATE EAVES KNUCKLE FOOTING COLUMNS AND Slots inside the gable rafters to Slots inside column Slots inside gable rafter and KNUCKLE RAFTERS form connection at the ridge to form on concrete column to form connection at Slots inside Pre cut 120 outback footing connection. eaves. column to form beam make up an in ground rafters and columns footing connection PURLINS HIP PLATE RIDGE CAP BARGE CAP INFILL PANELS Purlins provide support for Connects purlins to This flashing covers the roof The barge cap covers Sufficient number of sheets are cladding the hip rafter. sheets at the gable ridge. the area where the provided, from which the required deck finishes at portal dutch gable infill panels can be HIP FLASHING frame cut. Covers the roof sheet ends along the hip rafter. WEATHER STRIP HEX HEAD SELF DRILLING BOLTS AND RIVETS 68 mm PURLIN Weather strip supports infill SCREWS Bolt types vary depending BRACKET panel and covers the sheet Screw types vary depending upon upon the connection, ensure This bracket ends at the collar
    [Show full text]
  • Roof Truss – Fact Book
    Truss facts book An introduction to the history design and mechanics of prefabricated timber roof trusses. Table of contents Table of contents What is a truss?. .4 The evolution of trusses. 5 History.... .5 Today…. 6 The universal truss plate. 7 Engineered design. .7 Proven. 7 How it works. 7 Features. .7 Truss terms . 8 Truss numbering system. 10 Truss shapes. 11 Truss systems . .14 Gable end . 14 Hip. 15 Dutch hip. .16 Girder and saddle . 17 Special truss systems. 18 Cantilever. .19 Truss design. .20 Introduction. 20 Truss analysis . 20 Truss loading combination and load duration. .20 Load duration . 20 Design of truss members. .20 Webs. 20 Chords. .21 Modification factors used in design. 21 Standard and complex design. .21 Basic truss mechanics. 22 Introduction. 22 Tension. .22 Bending. 22 Truss action. .23 Deflection. .23 Design loads . 24 Live loads (from AS1170 Part 1) . 24 Top chord live loads. .24 Wind load. .25 Terrain categories . 26 Seismic loads . 26 Truss handling and erection. 27 Truss fact book | 3 What is a truss? What is a truss? A “truss” is formed when structural members are joined together in triangular configurations. The truss is one of the basic types of structural frames formed from structural members. A truss consists of a group of ties and struts designed and connected to form a structure that acts as a large span beam. The members usually form one or more triangles in a single plane and are arranged so the external loads are applied at the joints and therefore theoretically cause only axial tension or axial compression in the members.
    [Show full text]
  • Chapter 3 Design Aids/Standard Forms
    AGRICULTURAL WASTE MANAGEMENT BUILDING DESIGN HANDBOOK 3 - 1 Chapter 3 Design Aids/Standard Forms Figure 3.1 The bin size required is dependent not only the volume of compost, but also on the size and type of mechanical equipment that will be used in the operation. General Effects of Bracing The size of a composting facility should be Lateral bracing (or knee bracing) is used to determined according to Chapter 10 of the increase rigidity in the post-to-rafter or post- Agricultural Waste Management Field to-truss connections. Analysis performed for Handbook (NRCS 1992). The actual bin the development of this handbook shows that size should be determined by the planner. bracing reduces the required member size of Once the bin size is known, the planner can the rafters, but infrequently affects post size use the member sizing charts on the for the shed-type composters, shown in following pages to select the appropriate Figure 3.2, page 3-5. Only the posts in the member sizes. 100 mph wind zone are reduced by bracing. (USDA-NRCS SOUTH CAROLINA 4/14/98) AGRICULTURAL WASTE MANAGEMENT BUILDING DESIGN HANDBOOK 3 - 2 The post sizes in the other zones remain the Frame Connection Details same for this building configuration. Details on how to connect the braces are included with the Construction Drawings in Figure 3.9 for composters (page 3-15) and Appendices. Figure 3.11 for stacking sheds (page 3-20) tabulate the correct number of fasteners for Analysis shows that the required post size each type of frame connection.
    [Show full text]
  • NOTICE to CONTRACTORS 11-005 Proper Roof Bracing Update Per IRC R802.5.1 (This Notice Replaces Notice 08-005) Effective: Immediately Distributed on March 11, 2011
    NOTICE TO CONTRACTORS 11-005 Proper Roof Bracing Update Per IRC R802.5.1 (This Notice replaces Notice 08-005) Effective: Immediately Distributed on March 11, 2011 This NOTICE TO CONTRACTORS contains important information for builders and contractors that do business in the City of Stillwater. Please circulate this to others in your organizations and to your sub-contractors as may be applicable. Issue: Proper Roof Bracing Clarification and Detail Applicable Code Section(s): R802.5.1 Purlins. Purlins are permitted to be installed to reduce the span of rafters as shown in Figure R802.5.1. Purlins shall be sized no less than the required size of the rafters that they support. Purlins shall be continuous and shall be supported by 2-inch by 4-inch (51 mm by 102 mm) braces installed to bearing walls at a slope not less than 45 degrees from the horizontal. The braces shall be spaced not more than 4 feet (1219 mm) on center for 2-inch by 4-inch (51 mm by 102 mm) or 6 feet (1829 mm) on center for 2-inch by 6-inch (51 mm by 152 mm) and the unbraced length of braces shall not exceed 8 feet (2438 mm). R802.3 Framing details. Rafters shall be framed to ridge board or to each other with a gusset plate as a tie. Ridge board shall be at least 1-inch (25.4 mm) nominal thickness and not less in depth than the cut end of the rafter. At all valleys and hips there shall be a valley or hip rafter not less than 2-inch (51mm) nominal thickness and not less in depth than the cut end of the rafter.
    [Show full text]
  • Builder's Guide to Trusses
    Table of Contents Roof Construction Techniques: Pro’s and Con’s . 2 Trusses: Special Benefits for Architects and Engineers . 4 Special Benefits for Contractors and Builders . 5 Special Benefits for the Owner. 5 How Does A Truss Work? . 6 Typical Framing Systems. 8 Gable Framing Variations . 11 Hip Set Framing Variations . 13 Additional Truss Framing Options Valley Sets . 15 Piggyback Trusses . 17 Typical Truss Configurations . 18 Typical Truss Shapes. 20 Typical Bearing / Heel Conditions Exterior Bearing Conditions. 21 Crushing at the Heel . 22 Trusses Sitting on Concrete Walls . 22 Top Chord Bearing. 23 Mid-Height Bearing . 23 Leg-Thru to the Bearing. 23 Tail Bearing Tray. 24 Interior Bearing Conditions . 24 Typical Heel Conditions. 25 Optional End Cosmetics Level Return. 25 Nailer . 25 Parapet. 26 Mansard . 26 Cantilever. 26 Stub . 26 Bracing Examples . 27 Erection of Trusses . 29 Temporary Bracing . 30 Checklist for Truss Bracing Design Estimates . 32 Floor Systems . 33 Typical Bearing / Heel Conditions for Floor Trusses Top Chord, Bottom Chord, and Mid-Height Bearing. 34 Interior Bearing Conditions . 35 Ribbon Boards, Strongbacks and Fire Cut Ends . 36 Steel Trusses . 37 Ask Charlie V. 38 Charlie’s Advice on Situations to Watch Out for in the Field. 41 Glossary of Terms. 42 Appendix - References. 48 1 Builders, Architects and Home Owners today have many choices about what to use in roof and floor systems Traditional Stick Framing – Carpenters take 2x6, Truss Systems – in two primary forms: 2x8, 2x10 and 2x12 sticks of lumber to the job • Metal Plate Connected Wood Trusses – site. They hand cut and fit this lumber together Engineered trusses are designed and into a roof or floor system.
    [Show full text]
  • Dutch Gable Carport
    Instruction Manual 19/9/01 Dutch Gable Carport Thank you for choosing this quality carport. We strongly recommend that you read these instructions thoroughly. The carport you are building may vary from a carport previously bought or those displayed as we are constantly upgrading designs and construction methods. Please take your time to and do not rush the erection of your new carport and you will ensure a finished product of which you may be justly proud. Due to the large range of sizes and styles available, it is impossible to prepare an instruction manual for each individual size and model. The following instructions relate to a 6m wide and 6m long carport. This manual is a guide only and should be used in conjunction with the components list and engineers plans as submitted to council. Frame Components Haunch Plates – Left hand and right hand: Galvanised “Boomerang” shaped plate to join columns to roof rafters. Haunch plate must always be installed on the smooth side of the rafters. LEFT SIDE RIGHT SIDE Apex Plates: For joining rafters to form apex to roof. AG&S Building Systems P/L/Hi-Tech Designs P/L 1 PO Box 252 CAMDEN NSW 2570 For any enquiries, contact your local distributor. Instruction Manual 19/9/01 C Purlins: “C” section purlin. Used as rafters, eave purlins, cross beams, apex cross beams, hip beams and awning beams. Smooth side of rafter and apex cross beam must face inside of carport Carport Flashing: Fitted to open side of eave purlins and cross bars. Columns: 75mm x 75mm square tube.
    [Show full text]
  • How to Build Safe Roofs with Corrugated Galvanized Iron (CGI) Sheeting
    How to build safe roofs with corrugated galvanized iron (CGI) sheeting ifrc-sru.org Shelter Research Unit Innovating shelter HOW TO BUILD SAFE ROOFS WITH COrrUGATED GALVANIZED IRON (CGI) SHEETING IMPORTANT NOTICE T he information provided in this manual and the calculations are based on up to date material specifications, field testing and current practice of calculating structures (using Eurocodes 1, 3 and 5) and must be treated as guidelines only and evaluated for suitability in the context of specific local conditions. Risk is inherent in construc- tion and especially after natural disaster caution must be exercised so as not to increase the threat to disaster affected persons. Users of this manual do so solely at their own risk. The International Federation of the Red Cross and Red Crescent societies – Shelter Research Unit (IFRC-SRU) nor any of it’s employees or technical consultants assume any liability for damages, loss or claims, of any nature, including the death or injury of persons or property damage, associated with the use of or reliance upon information contained in this manual. This publication has been made possible through the generous support of: Belgian Red Cross, Flemish and French speaking communities: Contents T ABLE OF CONTENTS Acknowledgements 11 Foreword 13 About this manual 14 Structure of the manual 15 For whom is this manual? 16 Technical terms used in this manual 17 Glossary of Terms (Alphabetical) 23 Acronyms 26 SECTION A Materials 29 A.1 Corrugated Roofing Materials 29 A.2 Corrugated Galvanized Iron or Steel (CGI) sheets 32 A.2.1. Dimensions and measurement for CGI sheets 33 A.2.2.
    [Show full text]
  • Stramit Purlins, Girts and Bridging Detailing and Installation Guide
    STRAMIT ® PURLINS , GIRTS & BRIDGING DETAILING & INSTALLATION detailing & installation guide PGB – DI STRAMI T® PURLINS, GIRTS & BRIDGING DETAILING & INSTALLATION Guide to detailing and installation of Strami t ® Purlins, Girts & Bridging and their accessories. IMPORTANT NOTICE AND DISCLAIMER The information contained within this brochure is intended for general use and information only. Before application in a particular situation, Stramit recommends that you obtain appropriate independent qualified expert advice confirming the suitability of product(s) and information in question for the application proposed. While Stramit accepts its legal obligations, be aware however that to the extent permitted by law, Stramit disclaims all liability (including liability for negligence) for all loss and damage resulting from the direct or indirect use, or reliance on, the information provided in this brochure. CONTENTS INTRODUCTION Selection and Specification This Detailing and Installation Guide is complementary Materials 2 to the Stramit® Purlins, Girts & Bridging – Product Adverse Conditions 2 Technical Manual (incorporating design capacity tables). Compatibility 2 The Guide contains details on all Stramit® Purlins, Specification 2 Girts, Bridging and relevant accessories. Information is Structural Adequacy 2 provided to enable detailed purlin design including a wide range of practical component assemblies to cover Design Data - Stramit® Purlin Accessories Sizes 3 almost all applications. Hole Punching 4 Stramit offers a wide range of standard C and Z purlins Bridging Hole Location 5 from 100 to 350 deep in several thicknesses. Downturn Laps 5 lips are also available for both C and Z sections from Expansion Joints 6 150 to 350, including lappable Zs. Special sizes from 100 Detailing of Purlins 6 to 400 are also possible.
    [Show full text]
  • Behavior of Statically Determinate and Indeterminate Rafters
    Bulletin No. 2018-12 First Release: August 2018 Revised: Prepared by: Dick Schmidt & Joe Miller Title: Behavior of Statically Determinate and Indeterminate Rafters Introduction Selection of a rafter system for roof framing can depend on a variety of considerations, including span requirements, opportunities to provide rafter support, load magnitudes and distributions, roof pitch and aesthetics. Each method for supporting a pair of rafters has its own set of advantages and disadvantages affecting member size as well as building performance. The objective of this bulletin, which is based upon prior published work (see Ref. [1]), is to present structural analysis equations and a comparison of various rafter systems for pitched roofs such that the implications of a specific choice are clear to the designer. Seven different rafter systems are considered: four of which are statically determinate, and three of which are indeterminate to the first degree (with a single redundant). The seven options are illustrated in Figure 1. In the figure, the symbol represents a hinged support location that is capable of resisting both vertical and horizontal displacement of the rafter at that location. The symbol represents a roller support capable of resisting only vertical displacement; horizontal displacement is not restrained in this case. The discussion is limited to uniform gravity load that is symmetric about the ridgeline. Unbalanced and nonuniform gravity loads require alternative analysis. For each system, the structural analysis results include expressions for reactions, axial force, shear force, and bending moment. We have combined these results with additional practical information to provide designers with the resources to make an appropriate selection.
    [Show full text]