World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. 5834a-NEP Public Disclosure Authorized STAFF APPRAISAL REPORT NEPAL RASUIWA-NUWAKOTRURAL DEVELOPMENT PROJECT - PHASE II (RASNUDEV) Public Disclosure Authorized June 20, 1986 Public Disclosure Authorized South Asia Projects Department General AgricultureDivision II This document has sk restricted distribution gandmay be used by recipients only in the performance of their official duties. Its contents mnaynot otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Currency Unit = Nepalese Rupees (NRs) US$ 1.00 = NRs 18.0 NRs 1.00 = USS 0.056 (approx.) NRs 1 M = USS 55,555 WEICHTS AND MEASURES Metric System Fiscal year July 16 - July 15 ABBREVIATIONS AND ACRONYMS AA - Agricultural Assistant AADO - Assistant Agricultural Development Officer ADBN - Agricultural Development Bank, Nepal ADB - Asian Development Bank (Manila) ADO - Agricultural Development Officer AHW - Animal Health L4orker AIC - Agricultural Input Corporation APROSC - Agricultural Projects Services Center ARU - Adaptive Research Unit ASC - Agricultural Service Center ATU - Appropriate Technology Unit CDO - Chief District Officer DADO - District Agricultural Development Office DAP - District Annual Plan DDG - Deputy Director General DFO - District Forest Officer DC - Director General DIHM - Department of Irrigation, Hydrology & Metereology DLAH - Department of Livestock Development & Animal Health DOA - Department of Agriculture DP - District Panchayat DTO - District Technical Office FAO/CP - Food and Agricultural Organization/CooperaiveProgram HMG/N - His Majesty's Goverment of Nepal IAAS - Institute of Agricultural & Animal Science ICP - Integrated Cereals Project IDA - International Development Association IPDD - Integrated Panchayat Development Design IRDB - Integrated Rural Development Board IRDP - Integrated Rural Development Project JT - Junior Technican JTA - Junior Technical Assistant FOR OMCIAL USE ONLY LDO - Local Deveopment Officer LHF - Leasehold Forest MOA - Ministry of Agriculture MPLD - Ministry of Panchayat & Local Development NPC - National Planning Commission PC - Project Coordinator PCO - Project Cordinator's Office PDO - Panchayat Development Officer PF - Panchayat Forests P0 - Production Officer PPF - Panchayat Protected Forests RDI - Rural Development Project I RTC - Regional Training Centre, Trishuli SFDP - Small Farmers Development Programme SMS - Subject Matter Specialists SPO - Sub-Project Office (SFDP) TA - Technical Assistance T&V - Training & Visit System (of Extension) UG - Users Group UNDP - United Nations Development Programme VP - Village Panchayat VSO - Voluntary Services Organization IVS - International Voluntary Services WUG - Water User Group I Thi document has a restrkced distribution and may be used by recipientsonly in the performance of their oficil duties. Its contents may not otherwise be disclosedwithout World Bankauthori2tion. NEPAL RASUWA-NUWAKOTRURAL DEVELOPMENT PROJECT - PHASE II (RASNUDEVII) Credit and Projezt Summary Borrower: His Majesty's Government of Nepal (HMG/N) Executing Agency: Ministry of Panchayat and Local Development (MPLD) Amount: SDR 16.6 Million (US$19.1 M equivalent) Terms: Standard Project The proposed project is the second phase of the IDA Description: financed Rural Development Project (Credit 617-NEP) covering the Rasuwa & Nuwakot districts in the Central DevelopmentRegion of Nepal, which was completed in June 1984. The proposed project would aim: (a) to consolidate the investmentsmade during the earlier phase of develop- ment by making all physical facilities fully operational, and by improving the qualities and coverage of agricul- tural support services and the services of the institu- tions responsible for rural infrastructure development and maintenance; (b) to further improve the agricultural production base and the socio-economic infrastructure (roads, bridges, drinking water); (c) to expand forestry plantation and soil conservation programs; and (d) to promote developmentof effective local level planning and implementationof rural development projects. The project would be implemented over an eight year period and at full development would benefit some 20,000 farm families and generate incremental annual production of 22,000 Mt of foodgrains, 0.8 M litres of milk, 0.6 M3 of fuelwood, and some 250 tons of tropical and sub-tropical fruits, apart from additional sustained employment equivalent to about 5000 manyears annually. Unquantified benefits would also accrue from the development of rural infrastructure,forestry and soil conservation works, and human resource and institutionaldevelopment. The project does not face any unusual technical or engineering risks. It would be implemented under a more stable administrativeenvironment as a result of HEG/N's commitment to the implementationof new administrative arrangements for decentralized rural development planning and implementation. Nevertheless, organizati4)nal,staffing and local funding problems could conceivably affec. timely implementation. These risks, however, would be partly offset by the strong implementationsupport, technical assistance, and staff development provided under the project, and by the fact that the project is focussed on selected activities for which experience was gained under the first phase development program. Estimated Cost: 1/ (US$ Million) Local Foreign Total Extension, Training and Research, Farms and ATU 2.1 0.6 2.7 I rigatio0 2.4 1.2 3.6 Agricultural Cre-1it 0.6 0.0 0.6 Agricultural Inputs 0.2 1.0 1.2 Livestock Development 0.7 0.2 0.9 Rural Infrastructure 1.5 0.9 2.4 Forestry 1.7 0.1 1.8 SoiL Conservation 0.5 0.2 0.7 ImpLementation Support & Institutional DeveLopment 1.5 0.7 2.2 Technical Assistance, Overseas training and studies 0.2 1.6 1.8 Total Base Costs 11.4 6.5 17.9 Physical Contingencies 0.5 0.4 0.9 Price Contingencies 2.9 1.8 4.7 Total Project Costs 14.8 8.7 23.5 Financing Plan: US$ Milli^n IDA UNDP HMGIN Total Local Costs 11.0 0.5 3.3 14.8 Foreign Costs 8.1 .6 - 8.7 TOTAL 19.1 1.1 3.3 1/ 23.5 Z 81.0 5.0 14.0 100.0 Estimated Disbursements: 21 (US$ Million) FY87 FY88 FY89 FY90 FY91 FY92 FY93 FY94 Annual 1.0 1.8 2.0 2.5 3.0 3.7 3.5 1.7 Cumulative 1.0 2.8 4.8 7.3 10.3 14.0 17.4 19.1 Z 5.0 15.0 25.0 38.0 54.0 73.0 91.0 100.0 Economic Rate of Return: 21Z 31 1/ Including taxes and duties of US$0.2 h (approximately). 2/ According to IDA Fiscal Year. Credit closing date 12/31/93. 3/ With 85Z of project costs (excluding price contingencies) included as economic costs. -ii-' Table of Contents (continuation) Page No. VII. PRODUCTION. YIELDS. FARM INCOME AND COST RECOVERY............ 45 Sources of Increased Production 45 Farm Budget Analysisn.. .... ............ * ** 48 Marketing and Prices. .......... 49 VIII. BENEFITS, ECONOMIC RATE OF RETURN AND RISKS.................. 50 Overall Benefitsn e f i ts............ 50 Economic Analysis. 51 Project Risks and Sensitivity Analysis . .52 IX. CONDITIONALITIESAND ASSURANCES. 54 List of Tables in Text 3.01 - Major Cropping Systemsy s ...t e .... ms......... 14 3.02 - Yield and Production of Major Crops . .14 5.01 - Stmmary of Project Costs .. 32 5.02 - Proposed Financing Plan . .33 5.03 - Procurement Arrangements .. 35 7.01 - Present and Projected Yields per ha . .46 7.02 - Overall Incremental Crop Production. 47 7.03 - Per Ha and Total Incremental Production of Forestry Produce. 48 7.04 - Farm Budget for a Typical 0.8 ha Farm . .49 8.01 - Economic Analysis and Sensitivity Tests .. 54 List of Table in Annexes Annex 1, Table 1 - Land use in Project Area Table 2 - Land use by PhysiographicRegion & Land Type Table 3 - Present Cropping Pattern & Land Use in Nuwakot District Table 4 - Present Cropping Pattern & Land Use in Rasuwa District Table 5 - Present Cropped Area. Yield & Production in the Project Area Annex 2. Table 1 - Phasing of Crop Development Program Table 2 - Training Programs for Extension Staff & Farmers Table 3 - On-farm Adaptive Research Table 4 - Appropriate Technology Unit Table 5 - Technical Assistance, Overseas Training & Studies NEPAL RASUWA-NUWAKOTRURAL DEVELOPMENT PROJECT - PHASE II (RASNUDEVII) STAFF APPRAISAL REPORT Table of Contents Page No. I. INTRODUCTION........... .....................................1 II. SECTORBACKGROUND. 1 The Agricultural Settin. 1 Agricultural and Rural Development Strategy. 5 IDA Sector Lending Strategy. 7 Review of Implentationof IDA Assisted Rural Development Projects. 8 Implication for Future Projects. 9 Rationale for a Second Phase of the RD I Project.10 III. THE PROJECT AREA.11 General.11 Present Land Use and Crop Production.12 IV. THE PROJECT.15 Ceneral.15 Summary of Project Components.16 Detailed Features.17 AgriculturalDevelopment .17 Forestry, Soil Conservation and Watershed Management.... 25 Rural InfrastructureDevelopment .28 InstitutionalDevelopment and ImplementationSupport.... 30 Technical Assistance, Overseas Training and Studies. 30 V. PROJECT COSTS, FINANCING, PROCURMENT, DISBURSEMENT, FISCAL IMPACT AND COST RECOVERY.31 Project Costs and Financing.31 Procurement.34 Disbursements.37 Fiscal Impact and Cost Recovery.38 VI. PROJECT ORGANIZATION& IMPLEMENTATION.40 Broad Framework.40 The Project Coordinator'sOffice .40 Reorganizationof the DTO.42 Village Panchayats and Users' Groups.42 Trained Manpower and Project Staffing.42 Staff Development.44 Monitoring and Reporting.44 Status of Preparation. 45 -ii i- Annex 3, Table 1 - Summary of Project Costs (by categories of expenditure) Table 2 - Summary
Recommended publications
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • NPL LOG Nuwakotdistrict Eleva
    Nepal - Nuwakot District - Elevation map 3400 44 3800 3600 3600 00 hote Dhokche 4600 Tenchet B Garta 2200 2000 er 2800 3400 v 1800 Koshii 2800 00 1600 Chhapchet R Karang 14 3800 Nesing Thulo 2400 2600 Tenchet 3000 Bharkhu 2400 Yamchet Garsyong 2600 5000 00 32 Sano RUSSIA 2200 Mangche 2800 1200 Haku Gumba ± Ungul Chyamthali 2800 Kichet 5200 KAZAKHSTAN MONGOLIA nkhu Khola Lakcho Mugu A 32 Iba 3000 00 Thulo Hakubesi CHINA 3600 Haku Kokhim 2600 Richet 3400 2400 1800 Dhunche 5400 5000 Tingchet 3200 p INDIA Chandanbari 5000 Tajimarang 3000 Kalmrang 2800 2200 Dimsa Chandane Chopche 46 Paticho 00 ola Deurali Chamtang 3800 h Bhimali 5200 1000 Laurebina 48 2200 00 Jersyat ng K lu Yungang Kandrang i Gomma Karumaryang Ma Tiru hola 5000 20 Gigang Trisuli K 00 Sangyung Chogegaun Nagung Thali 24 00 Sole 4400 Rigaun Lumrang 5000 2000 Khloa 4000 1600 Nyam N Gogane Ankhu ya 1800 CHINA Sokthali Purung DHADING Kyun m Khola Karumaryang Bokejhunda 4200 1400 Singang Rupchet 1200 Agthali 1200 800 2600 Dhunche Barre Thade Kathmandu 1400 Mailung Singang 1000 1000 Dobhan Kuri Apha Koda 1600 l Bhoteni Kh 3000 Siruchet ola 1800 RASUWA Bhalche BANGLADESH Darkha Birchet 3200 INDIA 1200 Gomchet 1000 800 Khalchettol Archaletol Khadku Grang 3400 4600 Khorsyattol Chipleti Khasra Mammai Katunje Mere Choreje 28 Raute ola Kharen Boldogang 00 LEGEND Diyong Kh Palep 800 Bachcha Doklang 2800 Gorkang Diyale 3000 Pachet o International Airport Kapre 1000 Khanyubas Pati Bremrang Maur Singbandi Salme o Khaniyabas Pachet Pati Jenjen Aranchet Ramche 2200 Regional Airport Bradi Gorom
    [Show full text]
  • DAMS & DEVELOPMENT: Emerging Trendsinnepal's Hydropower Terrain
    Recognising Entitlements and Sharing Benefits: Emerging TrendsinNepal’s Hydropower Terrain Dialogue on DAMS & DEVELOPMENT:NEPAL Copyright: © 2005 IUCN-The World Conservation Union Nepal and Nepal Water Conservation Foundation Published in support of the Dams and Development Strategic Priorities Series for the National Steering Committee on Dams and Development by IUCN Nepal and Nepal Water Conservation Foundation The role of German Technical Cooperation (GTZ) in supporting the Dams and Development Strategic Priorities Series is gratefully acknowledged. The material in this publication may be reproduced in whole or in part and in any form for educational or non-profit uses, without prior written permission from the copyright holder, provided acknowledgement of the source is made. IUCN Nepal would appreciate receiving a copy of any publication which uses this publication as a source. DISCLAIMER No use of this publication may be made for resale or other commercial purposes without prior written permission of IUCN Nepal and NWCF. This Dams and Development Strategic Citation: Dixit, Ajay & Basnet, Shreshna (2005). Recognising Entitle- Priorities Series summaries the find- ments and Sharing Benefits: Emerging Trends in Nepal's Hydropower Terrain ings and serves as a platform for con- IUCN Nepal + 38 pp. tinuing the dialogue on the issues of water resources development and dams Technical Advice: Bhawani P. Kharel and Deependra Joshi in Nepal. This report can assist in the ISBN: 99933-860-9 evolution of the policy process, but it is not the policy document of any of the Printed by: Quality Printers Kathmandu, Nepal organizations involved in the specific priorities series consultative processes. ii Foreword t is five years since the report of the World Commission Priorities.
    [Show full text]
  • Rasuwa (As of 10 May 2017) HRRP
    District Profile - Rasuwa (as of 10 May 2017) HRRP This district profile outlines the current activities by partner organisations (POs) in post-earthquake recovery and reconstruction. It is based on 4W and secondary data collected from POs on their recent activities pertaining to housing sector. Further, it captures a wide range of planned, ongoing and completed activities within the HRRP framework. For additional information, please refer to the HRRP dashboard. FACTS AND FIGURES Population: 43,3001 18 VDCs Damage Status - Private Structures Type of housing walls Rasuwa National Mud-bonded bricks/stone 87% 41% Cement-bonded bricks/stone 10% 29% Damage Grade (3-5) 12,024 Other 3% 30% Damage Grade (1-2) 620 % of households who own 90% 85% Total 12,6442 their housing unit (Census 2011)1 NEWS & UPDATES 1. Out of 1,406 Grievances listed 1,287 were addressed as eligible for Rasuwa District. NRA Rasuwa already circulated details to all respective rural municipality and ward level offices. 2. Batash Foundation has completed 151 houses to its beneficiaries at Yarsa VDC ward 5. Formalhandover program has not been scheduled yet. 3. 37 HHs from Thulogoun VDCs of Rasuwa district have received third tranche of govern- ment subsid with financial and technical support from Nepal Red Cross society /Build Change. HRRP Rasuwa HRRP © PARTNERS SUMMARY AND HIGHLIGHTS3 Partner Organisation Implementing Partner(s) ACF LACCOS 838 25 DEPROCS SHORT TRAINING GIZ GOAL VOCATIONAL TRAINING 300 901 GOAL UON (Targets Achieved) HELVETAS GMTI,CMES Reached Remaining KF LDF LUMANTI 72 Demonstration Constructions in 10 VDCs LWF MANEKOR,BATAS NAF NRCS OM-N 8 VDCs with Household WASH Assistance PPY SAHAS SP OM-N 9,682 beneficiaries enrolled, 86% 15 partners 4 This table indicates the partner organisations and 9,456 beneficiaries received the 1st Tranche, 84% their respective implementing partner(s) KEY CONTACTS DAO OFFICE DDC OFFICE NRA District Office DUDBC OFFICE Mr.
    [Show full text]
  • Study to Determine the Special Needs of Women in the Micro-Enterprise Development Sector
    STUDY TO DETERMINE THE SPECIAL NEEDS OF WOMEN IN THE MICRO-ENTERPRISE DEVELOPMENT SECTOR Study commissioned by: Micro-Enterprise Development Programme (MEDEP) 2000 TABLE OF CONTENTS EXECUTIVE SUMMARY....................................................................................................................................5 1. INTRODUCTION .............................................................................................................................................8 2. RATIONALE OF THE STUDY ......................................................................................................................9 3. OBJECTIVE OF THE STUDY .......................................................................................................................9 4. METHODOLOGY ............................................................................................................................................9 5. LIMITATIONS ................................................................................................................................................11 6. DISTRICT PROFILE .....................................................................................................................................11 7. SOCIO-ECONOMIC BACKGROUND OF WOMEN COVERED BY THE STUDY .............................13 8. MAJOR FINDINGS .......................................................................................................................................15 8.1 SOCIAL – ECONOMIC ISSUES ...........................................................................................................15
    [Show full text]
  • Access of Disadvantaged Children to Education
    Access of Disadvantaged Children to Education Tribhuvan University Research Centre for Educational Innovation and Development Balkhu, Kathmandu, Nepal 2005 Access of Disadvantaged Children to Education i Research Team Narendra Prasad Phuyal – Researcher Prof. Dr. Mana Prasad Wagle – Resource Person Dr. Shreeram Prasad Lamichhane - Resource Person Renu Thapa - Associate Researcher Ganesh Silwal – Research Assistant Chandra Mani Bhandari – Research Assistant Language Editor Veda Nath Regmi Design & Layout Gautam Manandhar Chandra Mani Bhandari Secretarial Support Suresh Shakya Bhakta Bahadur Shrestha Formative Research Project, CERID Project Coordinator: Dr. Kishor Shrestha Project Advisors: Prof. Hridaya R. Bajracharya Associate Researcher: Mr. Rom Prasad Bhattarai Dr. Shreeram P. Lamichhane ii FRP Report 1 Acknowledgement Effective mechanisms to generate awareness in the disadvantaged groups for the education of their children are major challenge for EFA. Poverty of households is a great hindrance to the access to education of the disadvantaged children. The scholarship and school welcome programs are the main interventions to support schooling of the poor and disadvantaged families’ children. The study focuses on the issues and challenges underlined by the EFA Core Document for the education of disadvantaged children. The study also intends to determine the measures for improvement in enrolment and retention of disadvantaged children of Nepal. The research team expresses its sincere gratitude to Mr. Dankert Vedeler, Assistant Director General, Ministry of Education and Research, Norway and to Dr. Kristin Tornes, Technical Advisor, Norway for entrusting the team this study. We also express our gratitude to Dr. Hridaya Ratna Bajracharya, Executive Director, CERID; to Dr. Kishore Shrestha, Coordinator, Formative Research Project, CERID and Mana Prasad Wagle Faculty of Education, Tribhuvan Univerity for their moral as well as technical support to the study.
    [Show full text]
  • Integrated Development Planning of Bidur (2017-2035) Integrated Development Planning of Bidur (2017-2035)
    INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) 2035 BIDUR WLSP WPDI Foreword INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) Background / Working process 001 / 002 I. Background China put forwards the "Belt and Road Initiative" to join hands with the countries along the belt and road to develop together. In this context, invited by United Nations Human Settlements Programme (UN-HABITAT), Wuhan Land Use and Urban Spatial Planning Research Center (WLSP) and Wuhan Planning & Design Institute (WPDI) formed a joint design team to prepare the Integrated Development Planning of Bidur (2017-2035) of Nepal, a country along the belt and road. Nepal is one of the less developed countries in the world. It has frequently changing political situation and lacks of complete urban planning system. The earthquake in Nepal in 2015 destroyed Zhangmu Port at the border between China and Nepal and led to rise of Gyirong Port in the north of Bidur. Therefore, as a bridge connecting Gyirong and Kathmandu, the capital of Nepal, Bidur will usher brand new development opportunities. The work goal this time is to complete the planning of three parts: integrated development strategy (2017-2035), spatial layout (2017-2035) and five-year action plan (2017-2022), and try to establish urban planning system of Nepal. II. Working process 1. On July 21, 2016, WLSP and UN-HABITAT signed memorandum of understanding with a term of three years in Beijing, constituting a firmer and more stable basis for cooperation between both parties. UN-HABITAT invited WLSP to take part in the post-disaster reconstruction in international regions and promote the post-disaster reconstruction and economic recovery of the disaster-stricken areas, which is an important part of the cooperation.
    [Show full text]
  • CHITWAN-ANNAPURNA LANDSCAPE: a RAPID ASSESSMENT Published in August 2013 by WWF Nepal
    Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Published in August 2013 by WWF Nepal Any reproduction of this publication in full or in part must mention the title and credit the above-mentioned publisher as the copyright owner. Citation: WWF Nepal 2013. Chitwan Annapurna Landscape (CHAL): A Rapid Assessment, Nepal, August 2013 Cover photo: © Neyret & Benastar / WWF-Canon Gerald S. Cubitt / WWF-Canon Simon de TREY-WHITE / WWF-UK James W. Thorsell / WWF-Canon Michel Gunther / WWF-Canon WWF Nepal, Hariyo Ban Program / Pallavi Dhakal Disclaimer This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of Kathmandu Forestry College (KAFCOL) and do not necessarily reflect the views of WWF, USAID or the United States Government. © WWF Nepal. All rights reserved. WWF Nepal, PO Box: 7660 Baluwatar, Kathmandu, Nepal T: +977 1 4434820, F: +977 1 4438458 [email protected] www.wwfnepal.org/hariyobanprogram Hariyo Ban Program CHITWAN-ANNAPURNA LANDSCAPE: A RAPID ASSESSMENT Foreword With its diverse topographical, geographical and climatic variation, Nepal is rich in biodiversity and ecosystem services. It boasts a large diversity of flora and fauna at genetic, species and ecosystem levels. Nepal has several critical sites and wetlands including the fragile Churia ecosystem. These critical sites and biodiversity are subjected to various anthropogenic and climatic threats. Several bilateral partners and donors are working in partnership with the Government of Nepal to conserve Nepal’s rich natural heritage. USAID funded Hariyo Ban Program, implemented by a consortium of four partners with WWF Nepal leading alongside CARE Nepal, FECOFUN and NTNC, is working towards reducing the adverse impacts of climate change, threats to biodiversity and improving livelihoods of the people in Nepal.
    [Show full text]
  • Road Connectivity Sector I Project
    Resettlement Planning Document Resettlement Plan for Galchhi–Trishuli–Syaphrubesi Subproject Document Stage: Final Project Number: 37266 November 2008 Nepal: Road Connectivity Sector I Project Prepared by Ministry of Physical Planning and Works, Department of Roads. The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Resettlement Plan November 2008 Galchhi - Trishuli - Syaphrubesi Road TABLE OF CONTENTS Executive Summary.............................................................................................................. 1 Description of the Project........................................................................................................ 1 Project Area and Impacts........................................................................................................1 Resettlement Principles and Policy Frameworks.................................................................... 3 Stakeholders Participation and Disclosure of RP ................................................................... 4 Implementation Framework and Budget ................................................................................. 4 Monitoring & Evaluation .......................................................................................................... 5 1. THE PROJECT BACKGROUND ..........................................................................................................6
    [Show full text]
  • EDUCATION MANAGEMENT INFORMATION SYSTEM / Report on Higher Education 2013/14 A.D
    EDUCATION MANAGEMENT INFORMATION SYSTEM / Report on Higher Education 2013/14 A.D. (2070/71 B.S.) EDUCATION MANAGEMENT INFORMATION REPORT ON HIGHER EDUCATION 2013/14 A.D. SYSTEM (2070/71 B.S.), NEPAL EDUCATION MANAGEMENT INFORMATION SYSTEM / Report on Higher Education 2013/14 A.D. (2070/71 B.S.) Published in 2015 by: UNIVERSITY GRANTS COMMISION Sanothimi, Bhaktapur, Nepal Post Box : 10796 Telephone : (977-1) 6638548, 6638549, 6638550 Fax: 977-1-6638552 E-mail: [email protected] Website : www.ugcnepal.edu.np Design & Print at: Jaya Laligurans Investment & Trading Company Pvt. Ltd. Lalitpur-3, Hariharbhawan, 01-5524211 EDUCATION MANAGEMENT INFORMATION SYSTEM / Report on Higher Education 2013/14 A.D. (2070/71 B.S.) FOREWORD GC has been developing Higher Education Management Information System (H-EMIS) as a core aspect of strengthening higher education system capacity since the implementation of the Second Higher Education Project (SHEP, 2007-2014) supported by the World Bank. The EMIS development Ustrategy includes preparation of framework of systemic and program indicators, development of modality and tools for data collection, data analysis and report publication. The overall aim is to create data based system environment thereby contributing to development of data culture that ensures data based planning, monitoring and operational as well as management decisions. Publishing EMIS Report regularly from 2007/08 on annual basis is one of the major parts of HEMIS development. This report is the seventh publication in this line. As the country prepared to implement national higher education policy framework, the scope and importance of EMIS has expanded tremendously. There has been an increasing realization for the need of a comprehensive and coordinated framework of HEMIS extending from UGC to the universities and to their campuses and departments.
    [Show full text]
  • Rasuwa - Operational Presence Map [As of 14 July 2015]
    NEPAL: Rasuwa - Operational Presence Map [as of 14 July 2015] Partners working in Rasuwa44 1-5 6-10 11-15 16-20 21-35 No. of implementing partners by cluster Shelter and NFI 17 Health 15 Protection 13 WASH 10 Education 3 Nutrition 1 IMPLEMENTING PARTNERS BY CLUSTER Education Health Nutrition 3 partners 15 partners 1 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Protection Shelter and NFI WASH 13 partners 17 partners 10 partners Nb of Nb of Nb of organisations organisations organisations 1 >=5 1 >=5 1 >=5 Want to find out the latest 3W products and other info on Nepal Earthquake response? visit the Humanitarian Response website at http:www.humanitarianresponse.info/en/op erations/nepal Note: Implementing partner represent the organization on the ground, in the affected district doing operational work, such as send feedback to distributing food, tents, water purification kits, etc. [email protected] Creation date: 23 July 2015 Glide number: EQ-2015-000048-NPL Sources: Cluster reporting The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations. Rasuwa District Number of organizations by VDC by Cluster Total VDC Name Education Health Nutrition Protection Shelter and NFI WASH organizations Bhorle 1 4 1 1 5 3 15 Briddim 1 2 1 4 3 10 Chilime 1 4 1 2 2 9 Danda Gaun 1 2 1 2 3 4 11 Dhunche 1 12 1 3 4 5 20 Gatlang 1 3 1 2 5 3 11 Goljung 1 3 1 4 3 2 11 Haku 1 3 1 3 3 3 14 Jibjibe (Nilkantha) 2 3 4 8 Laharepauwa 1
    [Show full text]
  • Nepal Electricity Authority Finance Directorate
    NEPAL ELECTRICITY AUTHORITY (A Government of Nepal Undertaking) FINANCE DIRECTORATE POWER SECTOR REFORM AND SUSTAINABLE HYDROPOWER DEVELOPMENT PROJECT Asset Verification and Valuation in Nepal Electricity Authority (AVNEA) REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) First Publication Date: April 24, 2019 Country: Nepal Name of Project: Power Sector Reform and Sustainable Hydropower Development Project Assignment Title: Asset Verification and Valuation in Nepal Electricity Authority Reference No.: PSRSHDP/CS/QCBS-01 1. The Government of Nepal (GoN) has received financing from the World Bank towards the cost for Power Sector Reform and Sustainable Hydropower Development Project (PSRSHDP) and intends to apply part of the proceeds for consulting services to carry out asset verification and valuation of Nepal Electricity Authority (NEA). 2. The consulting service (“the Services”) is for verification and valuation of assets in NEA. The principal activities are: Conduct physical verification segregating into various components of Property Plant & Equipment (PPE) and inventories under NEA’s ownership and control. Develop separate database/register for PPE and inventories respectively based on types of PPE & inventories. Conduct valuation as per NFRS based on the identified nature and condition of PPE/Inventories as agreeing with NEA on suitability of valuation method, useful lives and other aspects as applicable. Update database/ register of PPE/Inventories respectively based on valuation. Recommend appropriate adjustments including write-offs and disclosure requirement with justifications based on verification and valuation. Recommend adjustments required for outstanding inter-unit balances on PPE/ Inventories based on verification and valuation. Develop standard operating procedures/manuals for PPE and inventories respectively in consultation with NEA based on NEA’s nature of business and Nepal Financial Reporting Standards.
    [Show full text]