mageba – Project information

Don River Bridge, Rostov-on- ()

Project description mageba scope Highlights & facts Between 2007 and 2010, a network of mageba supplied a large number of bridges and overpasses was constructed in TENSA®MODULAR expansion joints for the mageba products: the city of Rostov-on-Don in southern Rus- construction of this bridge. For the first Type: TENSA®MODULAR sia. This included a steel/concrete com- phase, to construct the main river cross- expansion joints posite structure across the River Don. ing, joints of types LR3, LR4 and LR6 (with (LR2, LR3, LR4 and LR6) Installation: 2009 The project consisted of 2 phases. In the up to six movement gaps per joint) were first phase, in 2008, a multi-span bridge supplied for five bridge axes. For the sec- Structure: over the River Don was built. In the sec- ond phase, additional LR2 and LR3 joints City: Rostov-on-Don ond phase, in 2009, this was extended were supplied. Country: Russia with multi-span overpasses at both ends, Completed: 2009 resulting in a total length of 966 m. Length: 966 m The bridge was designed by the St. Designer: TransMost ­Petersburg engineering firm TransMost, Contractor: MostoTrest and constructed by the contrac- tor MostoTrest.

The bridge crosses the Don River in Rostov-on-Don, 6-gap (type LR6) and 4-gap (type LR4) A TENSA®MODULAR joint on site, ready for close to its estuary in the Sea of TENSA®MODULAR joints during transport to site installation

Russia

© 2014 Google

Switzerland www.mageba.ch

Version 2014.09 CH-EN ©mageba mageba sa - Solistrasse 68 - 8180 Bülach - Switzerland - T +41 44 872 40 50 - [email protected]