Government of Uttar Pradesh
Total Page:16
File Type:pdf, Size:1020Kb
GOVERNMENT OF UTTAR PRADESH UPSLRPIII. PROJECT INVITATIONS FOR BIDS(IFB) REHABILITATION OF DRAINS NATIONAL COMPETITIVE BIDDING (e-Tendering) Advertisement No. 05/EE/ID-2/Unnao/e-Tender/2014-15 Date: 16 , March, 2015 IFB Number : 05/2014-15 The Government of India has received a credit from the International Development Association equivalent to US Dollar 197 million towards the cost of U.P. Sodic Land Reclamation III Project and it intends to apply a part of the proceeds of this credit to payments under the above Contract :- 1. The Executive Engineer Irrigation Division-2 Unnao (U.P) invites bids open for all from eligible bidders through e-Tendering process for Rehabilitation of drains as per Table no. 1
Notice No. 05/EE/2014-15 Table No. 1 Details for porposed rehabiliation of drain Package Name of division Name of Name of Drain Bid Cost of Period of Bid document fee Demand No. related to work District Security Document Completion Draft/Bid Security in form of FDR (Rs.in (In Rupees) shall be made in favour of Lacs) 1 2 3 4 5 6 7 8 01/W-2 Executive Engineer Barabanki Jamuwasi Drain 0.34 2300.00 03 Month Executive Engineer, Irrigation I.D-2.Unnao Division-2,Unnao
02/W-2 Barabanki Julia Bararas Drain 0.32 2300.00 03 Months -Do-
03/W-2 Barabanki Pind Drain 0.76 2300.00 3 Months -Do- 04/W-2 Lucknow Dona Drain 0.75 2300.00 3 Months -Do- 05/W-2 Unnao Bayari Drain 0.36 2300.00 3 Months -Do-
2. All bidders must fulfill the required qualifications as specified in bidding document.
3. Interested eligible bidders may see and download the bid document form the website http://etender.up.nic.in w.e.f. 24.03.2015 5:00 PM to 18.04.2015 5:00 PM and document cost as mentioned above in column no. 6 of Table -1 will have to be paid in the form of DD drawn on any schedule bank as per given details in column no. 8 of Table-1. Which will necessarily be deposited in the office of Executive Engineer Irrigation Division-2 Unnao (U.P) before last date of submission (18.04.2015 5:00 pm) and scanned copy of draft will be delivered with e-Tender. 4. All bidders who wish to participate in the e-Procurement, must be having digital signature /registration from U.P. Electronics Corporation Limited, 10 Ashok Marg, Lucknow. 5. Bid documents must be accompanied with earnest money of the amount specified, for the work as per in the column no. 5 of Table -1. Earnest money will have to be paid in the form as specified in the bidding document and shall be valid for 90 days beyond the validity of the bid. Earnest money will necessarily be deposited in the Office of Executive Engineer Irrigation Division-2 Unnao (U.P) before 18.04.2015 upto 5:00 PM and scanned copy of the same will be delivered with e-Tender. 6. In case of any discrepancy between the downloaded bid document and that available with the concerned Executive Engineer/ Superintending Engineer, the bid document available in the office would be considered authentic. 7. Bids must be delivered by e-Tendering process only on the above web site by 18.04.2015 upto 5:00 PM. The Technical Bids will be opened on Date : 20.04.2015 12:30 PM at Office of Executive Engineer Irrigation Division-2 Unnao (U.P) . The financial bids shall be opened after Technical Bids Evaluation. Date and time of which will be intimated in due course of time. 8. A pre-bid meeting will be held on 08.04.2015 at 03:00 hours in office of the Executive Engineer Irrigation Division-2 Unnao (U.P), to clarify the issues on any matter by the bidders. 9. Bidders may offer bids for anyone or more Packages. 10. Contract for each Package will be concluded separately and Award of Contract would be issued separately. 11. Any bidder who is having criminal record or black listed by the State Govt. is not allowed to participate in the bidding process. 12. In case, the rate of work given by contractor are more than below 10% of The Schedule of Rate, performance security will be deducted @ 0.5% per 1 percent below the Schedule of Rate in extra ( as per G.O.) 13. Any of the package or complete bid can be cancelled/modified without assigning any reason thereof. Executive Engineer Irrigation Division-2 Unnao m0iz0ljdkj ;w0ih0,l0,y0vkj0ih0 r`rh; pj.k fufonk gsrq vkea=.k ¼vkbZ0,Q0ch0½ jk"Vªh; izfrLi/kkZRed fufonk ¼bZ&Vs.Mfjax½ foKkiu la0 % 05@bZ0bZ0@fl0[k02@mUuko@bZ&fufonk@2014&15 fn0 % 16 ] ekpZ] -2015 fcM vkeU=.k lwpuk % 05@2014&15
Hkkjr ljdkj us varjk"Vªh; fodkl la?k ls mÙkj izns'k Hkwfe lq/kkj fuxe ifj;kstuk&r`rh; gsrq ;w0,l0 Mkyj 197 fefy;u dk _.k izkIr fd;k gS rFkk mlds ,d Hkkx dks v/kksof.kZr dk;Z ds fuekZ.k gsrq fufonkvksa ds vUrxZr mi;qDr Hkqxrku dks djkus dk vk'k; j[krh gS %& 1- Vscqy ua0 1 eas nh xbZ Mªsuksa ds iquZjks)kj dk;ksaZ gsrq eqgjcUn fufonk;s leLr fufonknkrkvksa ls vf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko] }kjk bZ&fufonk;sa ds ek/;e ls vkeaf=r dh tkrh gSaA
fufonk lwpuk la0 05@bZ0bZ0@2014&15 Vscqy ua0&1 dk;Z rkfydk iSdst la[;k dk;Z ls lEcfU/kr [k.M dk tuin dk;Z dk uke fufonk nLrkost dk dk;Z iw.kZ fufonk izi= ds ewY; dk uke izfrHkwfr foØ; ewY; djus gsrq fMek.M Mªk¶V gsrq /kjksgj ¼:0 yk[k fu/kkZfjr @izfrHkwfr gsrq /kujkf'k esa½ vof/k /kjksgj /kujkf'k ¼ ftuds ¼:0 yk[k i{k esa ns; gksxk½ esa½ 1 2 3 4 5 6 7 8 01/W-2 vf/k'kklh vfHk;Urk] ckjkcad teqoklh 0.34 2300.00 3 ekg vf/k'kklh flapkbZ [k.M&2] h Msªu vfHk;Urk] mUuko flapkbZ [k.M&2] mUuko 02/W-2 ckjkcad tqfy;k cukjl 0.32 2300.00 3 ekg &rnSo& h Msªu 03/W-2 ckjkcad fiUM Msªu 0.76 2300.00 3 ekg rnSo h 04/W-2 y[kuÅ nksuk Msªu 0.75 2300.00 3 ekg rnSo 05/W-2 mUuko c;kjh Mªsu 0.36 2300.00 3 ekg rnSo 2- fufonknkrkvksa dks fufonk nLrkost+ks esa fufgr ;ksX;rkvksa dks iw.kZ djuk vko”;d gksxkA 3- ;ksX;] bPNqd fufonknkrkvksa }kjk fcM nLrkost fnukad % 24-03-2015 dks 5%00 cts vijkUg ls fnukad% 18-04-2015 dks vijkUg 5%00 cts rd osolkbV http://etender.up.nic.in ij ns[kk ,oa Mkmu yksM fd;k tk ldrk gSA mijksDr rkfyd&1 ds dkye la0 6 esa of.kZr fufonk izi= dh /kujkf”k dk fMek.M Mªk¶V [k.M ds vf/k”kklh vfHk;Urk ds uke fdlh Hkh jk’Vªh; cSad ls fuxZr Mªk¶V ds :i esa flapkbZ [k.M&2 mUuko ds dk;kZy; esa fufonk Mkyus dh vafre frfFk 18-04- 2015¼vijkUg 5%00 cts rd½ ls iwoZ tek djuk vfuok;Z gksxh ,oa Mªk¶V dh LdSsu dh gq;h izfr bZ&Vs.Vj ds lkFk viyksM djuh gksxhA 4- lHkh fufonknkrk tks bZ&izksD;ksjesV esa Hkkx ysuk pkgrs gSa] dks ;w0ih0 bysDVªfuDl dkjiksjs”ku] 10] v”kksd ekxZ] y[kuÅ ls fMftVy flXuspj@jftLVªs”ku izkIr djuk vko”;d gksxkA 5- mijksDr lkj.kh ds dkye la0 5 esa bafxr /kjksgj /kujkf”k] tks fd vf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko ds i{k esa ca/kd gksxh] dks fufonk izi= ds lkFk layXu djuk vfuok;Z gksxkA bafxr /kjksgj /kujkf”k dh oS/krk] fufonk dh oS/krk ls 90 fnol vf/kd gksuh pkfg;s] tksfd flapkbZ [k.M&2 mUuko ds dk;kZy; esa fufonk Mkyus dh vafre frfFk 18-04-2015 dks vijkUg 5%00 cts ls iwoZ tek djuk vfuok;Z gksxk rFkk mldh LdSsu dh x;h izfr bZ&Vs.Vj ds lkFk viyksM djkuk vfuok;Z gksxkA 6- osclkbM ls MkmuyksM dj izkIr fd;s x;s fufonk izi= vkf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko ds dk;kZy; esa miyC/k fufonk izi= esa ;fn fHkUurk gks rks dk;kZy; esa miyC/k fufonk izi= gh ekU; gksxasA 7- fufonk;sa izR;sd n”kk esa bZ&Vs.Mfjax izfØ;k ds vUrxZr gh mijksDr osclkbV ij fnukad 18&04&2015 lka; 5-00 cts rd gh viyksM dh tk ldsaxhA VsfDudy fcM fnukad % 20-04-2015 dks 12%30 cts vijkUg vf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko esa [kksyh tk;sxhA Qkbusf”k;y fcM~l] VsfDudy fcM~l ds ewY;kadu ds i”pkr~ [kksyh tk;sxhA ftldh frfFk ,oa le; rn~uqlkj VsfDudy fcM~l DokyhQkbZ djus okys fufonknkrkvksa dks esy }kjk lwfpr dh tk;sxhA 8- vf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko esa fnukad 08-04-2015 dks vijkUg~ esa 3-00 cts fufonk ls lEcfU/kr ,d izh&fcM cSBd vk;ksftr dh tk;sxh A 9- fufonknkrk fdlh ,d ;k ,d ls vf/kd iSdst ds fy, fufonk,a ns ldrs gSaA 10- izR;sd iSdst+ ds vuqcU/k vyx&vyx xfBr fd;s tk;sxsaA 11- vkijkf/kd fjdkMZ okys vFkok jkT; ljdkj ls CySd fyLVsM Bsdsnkj bZ&izksD;ksjes.V izfØ;k esa Hkkx ugha ys ldrs gSaA 12- ;fn fufonknkrk }kjk dk;Z dh nj foHkkxh; nj ls 10 izfr”kr ls vf/kd de izLrqr djrk gS rks fufonknkrk dks fu’ikfnr /kjksgj /kujkf”k 0-5 izfr”kr dh nj ls izR;sd 1 izfr”kr foHkkxh; nj ls vkxf.kr /kujkf”k vfrfjDr ns; gksxh ¼“kklukns”k ½A 13- fufonk esa fn;s x;s fdlh Hkh iSdst vFkok lEiw.kZ fufonk fcuk fdlh dkj.k crk;s fujLr@la”kksf/kr fd;s tk ldrs gSaA
vf/k”kklh vfHk;Urk flapkbZ [k.M&2 mUuko]