Pinnacle Land Surveying Company

12/19/17

Pinnacle Land Surveying Company 121 County Road 5 Divide, CO.

Dear Applicant and/or Consultant:

Subject: Sanford Subdivision No. 4- Review 1-VR-17-016 (10595 Milam Road)

The purpose of this letter is to provide you with the review agency responses to the above named development application that have been received to-date by Planning and Community Development.

You are encouraged to directly contact those agencies that did provide review comments if the comments require additional action by the applicant/applicant’s representative. You are also encouraged to directly contact those agencies that did not provide review comments if such response is required by state statutes and the El Paso County Land Development Code.

EL PASO COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT

Planning

1. Please see red line of plat drawing. 2. Correct, upload, and prepare Mylar for recording.

Engineering Division See EDARP

Page 1 of 3 05/09/2018 A new access permit is required; this can be found at http://adm.elpasoco.com/Development%20Services/Documents/Land%20Use %20Forms%201/Driveway%20Application%20New%207-20-16.pdf

PIKES PEAK REGIONAL BUILDING DEPARTMENT

1. Standard final plat comments: enumerations/floodplain will review the mylar prior to plat for address placement, road naming, title block, & floodplain statement. $10.00 per lot & tract fee will be due at the time of the review of the mylar. If an address in not needed on a tract then no fee applies. Check should be made out to Pikes Peak Regional Building Department, paid directly to enumerations department. Addressing has already been established therefore, no addressing fee applies. A copy of the final recorded plat is required prior to plan submittal for residential. 2. There is not a Floodplain statement on the plat, which is not required since there is no floodplain on the area.

911 AUTHORITY –EL PASO/ TELLER COUNTY

No comment for 911 No new street names requested Thank you Justin

MOUNTAIN VIEW ELECTRIC ASSOCITATION INC

Mountain View Electric Association, Inc. (MVEA) has these comments about the following:

Project Name: 10595 Milam Road, Sanford Subdivision #4 Project Number: VR-17-016 Description: The property owners of Lot 2 and Lot 3 of Sanford Subdivision, Filing #3 are requesting approval for the redesign of these lots to form Sanford Subdivision, Filing #4. This redesign is for the relocation of the driveway across Lot 2 to access Lot 3. These lots are located in Section 24, Township 12 South, Range 66 West at 10595 and 10625 Milam Road.

This area is within MVEA certificated service area. MVEA will continue to serve this area according to our extension policy. There are existing facilities near this parcel of land. If there is any removal or relocation of facilities it will be at the expense of the applicant. Connection requiremen ts may include provisions for necessary line extensions and or other system improvements, and payment of all fees under MVEA line extension policy. Information concerning these requirements can be obtained by contacting the Engineering Department of MVEA.

Page 2 of 3 05/09/2018 MVEA requests the public utility easements of ten (10) foot all sides lot line along with twenty (20) foot exterior subdivision utility easements following the design as platted in the original Sanford Subdivision #3.

MVEA has no objection to the new design of Lot 2 and 3 to relocate the driveway for access to Lot 3.

If additional information is required, please contact our office at (719) 495-2283. Sincerely, Cathy Hansen-Lee Engineering Administrative Assistant

Comments received from any of the above non-responding agencies following the issuance of this letter will be forwarded to the applicant/applicant’s representative and will be added to the end of this letter for record keeping purposes.

If any review agency has an issue that needs resolution or requires a revision, you will need to provide the necessary documents, drawings, etc., to the Planning and Community Development Department in the form of a resubmittal. The Planning and Community Development Department will then forward the resubmitted items directly to the appropriate review agency. If you have any questions pertaining to specific agency comments please contact the appropriate agency directly.

When all the comments have been addressed and corrections made please upload the required documents as requested.

If you have any questions feel free to contact me at 520-6306.

Best Regards,

Kari Parsons El Paso County Planning and Community Development Department cc: Jeff Rice, Engineering File: VR-17-016