Document Title: Revision Date: 7/6/15 Validus Page 1 of 3
RUSLE2 Worksheet
Landowner: County: State:
Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)
Conservation Practices: Enter estimated row or channel grade if practice is present
Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____
Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield
Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)
Conservation Practices: Enter estimated row or channel grade if practice is present
Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____
Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield
UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential
Document Title: Revision Date: 7/6/15 Validus Page 2 of 3
Rusle2 Continuation sheet
Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)
Conservation Practices: Enter estimated row or channel grade if practice is present
Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____
Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield
Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)
Conservation Practices: Enter estimated row or channel grade if practice is present
Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____
Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield
UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential
Document Title: Revision Date: 7/6/15 Validus Page 3 of 3
Instructions for Rusle2 Worksheet:
Please fill out the worksheet thoroughly. Complete one sheet for each client. Fields may be combined if they have the same crop rotation, tillage, yield, predominant soil, slope and slope length. If any of these items are significantly different enter the data as a different field. All soil disturbing operations and manure additions need to be included.
The four practices listed are the only ones that affect the Rusle2 calculation. Estimated row and channel (for terraces) grade are needed for soil loss. Conservation tillage, no-till, and residue levels are reflected in the tilla
UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential