This Document Present S EMS, LLC S Standard Operating (SOP) for the Form a Procedure For s1

This Document Present S EMS, LLC S Standard Operating (SOP) for the Form a Procedure For s1

<p> Document Title: Revision Date: 7/6/15 Validus Page 1 of 3</p><p>RUSLE2 Worksheet</p><p>Landowner: County: State:</p><p>Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)</p><p>Conservation Practices: Enter estimated row or channel grade if practice is present</p><p>Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____</p><p>Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield</p><p>Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)</p><p>Conservation Practices: Enter estimated row or channel grade if practice is present</p><p>Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____</p><p>Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield</p><p>UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential </p><p>Document Title: Revision Date: 7/6/15 Validus Page 2 of 3</p><p>Rusle2 Continuation sheet</p><p>Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)</p><p>Conservation Practices: Enter estimated row or channel grade if practice is present</p><p>Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____</p><p>Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield</p><p>Field(s) Predominant Slope Steepness Slope Length Soil Map Unit (%)</p><p>Conservation Practices: Enter estimated row or channel grade if practice is present</p><p>Terraces _____ Contouring _____ Stripcropping _____ Contour buffer strips _____</p><p>Crop Rotation (include all tillage practices with approximate dates): Date Operation Crop Crop Yield</p><p>UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential </p><p>Document Title: Revision Date: 7/6/15 Validus Page 3 of 3</p><p>Instructions for Rusle2 Worksheet:</p><p>Please fill out the worksheet thoroughly. Complete one sheet for each client. Fields may be combined if they have the same crop rotation, tillage, yield, predominant soil, slope and slope length. If any of these items are significantly different enter the data as a different field. All soil disturbing operations and manure additions need to be included.</p><p>The four practices listed are the only ones that affect the Rusle2 calculation. Estimated row and channel (for terraces) grade are needed for soil loss. Conservation tillage, no-till, and residue levels are reflected in the tilla</p><p>UNCONTROLLED DOCUMENT IF PRINTED – Considered obsolete 2 business days from 5/21/2018 Copyright 2009, Validus Verification Services, LLC. All rights reserved. Business Confidential </p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us