Mitigation Strategies
Total Page:16
File Type:pdf, Size:1020Kb
STAPLEE Categories Social Technical Administrative How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally? Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative Hazardous Annsville 1 nw materials Fixed wastewater Protection around wastewater treatment plant A, C, E, F 10 10 20 10 10 10 30 0 5 5 Site Severe Storm, Study and implement long term drainage solutions in the hamlet of AUG1 s Bridge/Culvert A, F 10 10 20 5 5 10 20 0 10 10 Flooding Knoxboro Severe Storm, Culvert upgrade/replacement on the Sconondoa Creek Bridge on AUG2 s Bridge/Culvert A, C, F 10 10 20 10 10 10 30 0 5 5 Flooding Knoxboro Road Ava 1 nw Utility Failure Equipment Purchase emergency supplies for the Town's emergency shelter A, E 10 10 20 10 10 10 30 0 10 10 Severe Storm, Barneveld1 nc Stormwater Storm Water System Improvement Project A, C, E, 10 10 20 10 10 10 30 0 10 10 Flooding Hazardous Barneveld2 nc materials Fixed wastewater Address the failing septic systems in the Village. E, F 10 10 20 5 10 10 25 0 10 10 Si Severe Storm, Boonville T1 ne Road/Streets Address flooding on Edmonds Road A, F 5 5 10 10 5 10 25 10 10 20 Flooding Boonville T2 ne Dam Failure dam Address the instability at the Hawkinsville Dam on the Black River A, E, F 5 10 15 10 5 10 10 10 5 0 Boonville T3 ne Landslide landslide Address the unstable slopes along NY 46 to mitigate potential landslides A, C, E, F 5 10 15 10 5 10 25 10 10 20 Severe Storm, The NYSDOT will be taking on an implementation project to upgrade the Boonville V1 ne Stormwater A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding storm sewer system at Post and Ford Street. The Village's wastewater treatment plant is prone to flooding and is being Boonville V2 ne Flooding wastewater A, C, E, F 10 10 20 10 10 10 30 0 5 5 upgraded with state funding. The Village is reviewing codes regarding occupancy levels in apartment Boonville V3 ne Fire Zoning/Codes B, F 10 10 20 10 10 10 30 10 10 20 buildings following the devastating fire in 2013. Severe Storm, BW Town1 s Stormwater Install Stormwater Detention practices to mitigate flooding. A, C, F 10 10 20 5 10 10 25 10 10 20 Flooding Address instability and flood potential in the ditch behind Fitch Farm on Severe Storm, BW Town2 s Flooding Gulf Road. This project would benefit the residents of the Fitch mobile A, B, C, D, F 5 10 15 10 10 10 30 0 10 10 Flooding home park. Severe Storm, BW Town3 s Bridge/Culvert Right size the culvert on Donley Road. A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding Severe Storm, Flood Mitigation including streambank reinforcement and detention BW V1 s Stormwater A, B, C, D, E, F 10 10 20 10 10 10 30 5 10 15 Flooding basin construction BW V2 s Flooding Stormwater Udate the Village's Stormwater Study completed by local PE. A, B, C, F 10 10 20 10 5 10 25 5 5 10 CamT&V1 nw Fire Equipment Replace and upgrade pumper truck A, C, E, F 10 10 20 5 10 10 25 5 10 15 STAPLEE Categories Social Technical Administrative How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally? Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative Fire/Explosion/ Cam T&V2 nw Training Attend Fire Training Courses A, B, C, D, F 10 10 20 5 10 0 15 0 5 5 Spills/Accidents Fire/Explosion/ Cam T&V3 nw Equipment Need new Scott Air Packs A, E, F 10 10 20 5 10 10 25 5 10 15 Spills/Accidents Severe Storm, Cam1 nw Stream Mad River Streambank stabilization at sewer line A, C, E, F, 10 10 20 10 10 10 30 5 10 15 Flooding Complete addition to the firehouse which will also be a community Clay1 s Fire/Explosion Emergency Shelter A, E, F 10 10 20 10 10 5 25 5 10 15 shelter. Severe Storm, Retrofit the Clayville Dam to stabilize the structure and produce Clay2 s Dam A, E, F 10 10 20 10 10 5 25 0 0 0 Flooding hydropower. Severe Storm, Clinton 1 sc Flooding, Water sewer Address flooding at the wastewater treatment plant. A, E, F 5 10 15 10 10 10 30 5 10 15 S l Water Supply Clinton 2 sc Water Supply Install Generator at Water Supply Plant #2 A,E,F 10 10 20 10 10 5 25 5 10 15 Contamination Severe Storm, Address streambank erosion, debris removal and stabilization in local Clinton 3 sc Stream A,F 10 10 20 10 10 5 25 10 10 20 Flooding streams especially Sherman Brook Severe Storm, Clinton 4 sc Stream Stream Management in the St. Mary's Brook A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding Severe Storm, Clinton 5 sc Stormwater Implement stormwater management where needed in the Village F 5 10 15 10 10 5 25 5 5 10 Flooding Purchase or manufacture a stream table to display stream processes to DEC Flooding Stream educate the public and municipal officials about the impacts from A, C, E, F, 10 10 20 10 10 10 30 5 10 15 dredging and over-widening of natural channels. Severe Storm, DF1 nc Flooding Stabilize Cheesefactory Road after washout damages from storms. A, B, E, F 10 10 20 10 10 10 30 5 10 15 Flooding Severe Storm, DF2 nc Road/Streets Address long term, repetitive stormwater flooding on Beaton Drive B, C, F 5 10 15 10 10 10 30 5 10 15 Flooding Severe Storm, Address severe repetitive flooding at the West Canada Creek DF3 nc Flooding A, C, E, F, 10 10 20 5 10 10 25 5 10 15 Flooding Campgrounds. Water Supply Obtain funding to build an indoor storage facility for the Town's salt and DF4 nc salt storage A, F 10 10 20 10 10 10 30 5 10 15 Contamination sand piles to prevent contamination of soils nearby. Severe Storm, Flo1 nw Bridge/Culvert Clean debris from culverts and bridges to prevent washouts and flooding E, F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Flo2 nw Road/Streets Trim trees along roads A, D, F, 5 10 15 10 10 5 25 10 10 20 Storms/Tornados Floyd 1 nc Utility Failure Shelter Est. emergency shelter, @ Gwf Elementary School B, D, F 10 10 20 10 10 10 30 5 10 15 Floyd 2 nc Utility Failure Backup Power Establish backup power at the Town Hall to create a shelter opportunity. A, E, F 10 10 20 10 10 10 30 5 10 15 STAPLEE Categories Social Technical Administrative How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally? Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative Severe Storm, Floyd 3 nc Bridge/Culvert W. Boak Rd. Culvert Rep. A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, Floyd 4 nc Bridge/Culvert Right size the culvert on Wynn Rd A, D, E, F 10 10 20 10 10 10 30 10 10 20 Flooding Floyd 5 nc Utility Failure Backup Power Establish backup power at the Highway Garage A, D, E, F 10 10 20 10 10 10 30 5 10 15 Forestport 1 ne Landslide Erosion repair Address areas on roadsides where landslide potential exists. F 10 10 20 5 10 10 25 10 10 20 HP1 nc Blight Trees Re-establish Trees where ash trees were lost A, E, F 10 10 20 10 10 10 30 0 10 10 HP2 nc All Communication Install new cell tower for improved communication during emergencies A,B,C 10 10 20 10 10 10 30 0 10 10 Severe Storm, Comprehensive stormwater management in the St.