STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Hazardous Annsville 1 nw materials Fixed wastewater Protection around wastewater treatment plant A, C, E, F 10 10 20 10 10 10 30 0 5 5 Site Severe Storm, Study and implement long term drainage solutions in the hamlet of AUG1 s Bridge/Culvert A, F 10 10 20 5 5 10 20 0 10 10 Flooding Knoxboro Severe Storm, Culvert upgrade/replacement on the Sconondoa Creek Bridge on AUG2 s Bridge/Culvert A, C, F 10 10 20 10 10 10 30 0 5 5 Flooding Knoxboro Road

Ava 1 nw Utility Failure Equipment Purchase emergency supplies for the Town's emergency shelter A, E 10 10 20 10 10 10 30 0 10 10

Severe Storm, Barneveld1 nc Stormwater Storm Water System Improvement Project A, C, E, 10 10 20 10 10 10 30 0 10 10 Flooding

Hazardous Barneveld2 nc materials Fixed wastewater Address the failing septic systems in the Village. E, F 10 10 20 5 10 10 25 0 10 10 Si Severe Storm, Boonville T1 ne Road/Streets Address flooding on Edmonds Road A, F 5 5 10 10 5 10 25 10 10 20 Flooding

Boonville T2 ne Dam Failure dam Address the instability at the Hawkinsville Dam on the Black River A, E, F 5 10 15 10 5 10 10 10 5 0

Boonville T3 ne Landslide landslide Address the unstable slopes along NY 46 to mitigate potential landslides A, C, E, F 5 10 15 10 5 10 25 10 10 20

Severe Storm, The NYSDOT will be taking on an implementation project to upgrade the Boonville V1 ne Stormwater A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding storm sewer system at Post and Ford Street. The Village's wastewater treatment plant is prone to flooding and is being Boonville V2 ne Flooding wastewater A, C, E, F 10 10 20 10 10 10 30 0 5 5 upgraded with state funding. The Village is reviewing codes regarding occupancy levels in apartment Boonville V3 ne Fire Zoning/Codes B, F 10 10 20 10 10 10 30 10 10 20 buildings following the devastating fire in 2013. Severe Storm, BW Town1 s Stormwater Install Stormwater Detention practices to mitigate flooding. A, C, F 10 10 20 5 10 10 25 10 10 20 Flooding

Address instability and flood potential in the ditch behind Fitch Farm on Severe Storm, BW Town2 s Flooding Gulf Road. This project would benefit the residents of the Fitch mobile A, B, C, D, F 5 10 15 10 10 10 30 0 10 10 Flooding home park.

Severe Storm, BW Town3 s Bridge/Culvert Right size the culvert on Donley Road. A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding Severe Storm, Flood Mitigation including streambank reinforcement and detention BW V1 s Stormwater A, B, C, D, E, F 10 10 20 10 10 10 30 5 10 15 Flooding basin construction

BW V2 s Flooding Stormwater Udate the Village's Stormwater Study completed by local PE. A, B, C, F 10 10 20 10 5 10 25 5 5 10

CamT&V1 nw Fire Equipment Replace and upgrade pumper truck A, C, E, F 10 10 20 5 10 10 25 5 10 15 STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Fire/Explosion/ Cam T&V2 nw Training Attend Fire Training Courses A, B, C, D, F 10 10 20 5 10 0 15 0 5 5 Spills/Accidents Fire/Explosion/ Cam T&V3 nw Equipment Need new Scott Air Packs A, E, F 10 10 20 5 10 10 25 5 10 15 Spills/Accidents Severe Storm, Cam1 nw Stream Mad River Streambank stabilization at sewer line A, C, E, F, 10 10 20 10 10 10 30 5 10 15 Flooding Complete addition to the firehouse which will also be a community Clay1 s Fire/Explosion Emergency Shelter A, E, F 10 10 20 10 10 5 25 5 10 15 shelter. Severe Storm, Retrofit the Clayville Dam to stabilize the structure and produce Clay2 s Dam A, E, F 10 10 20 10 10 5 25 0 0 0 Flooding hydropower. Severe Storm, Clinton 1 sc Flooding, Water sewer Address flooding at the wastewater treatment plant. A, E, F 5 10 15 10 10 10 30 5 10 15 S l Water Supply Clinton 2 sc Water Supply Install Generator at Water Supply Plant #2 A,E,F 10 10 20 10 10 5 25 5 10 15 Contamination Severe Storm, Address streambank erosion, debris removal and stabilization in local Clinton 3 sc Stream A,F 10 10 20 10 10 5 25 10 10 20 Flooding streams especially Sherman Brook Severe Storm, Clinton 4 sc Stream Stream Management in the St. Mary's Brook A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding Severe Storm, Clinton 5 sc Stormwater Implement stormwater management where needed in the Village F 5 10 15 10 10 5 25 5 5 10 Flooding

Purchase or manufacture a stream table to display stream processes to DEC Flooding Stream educate the public and municipal officials about the impacts from A, C, E, F, 10 10 20 10 10 10 30 5 10 15 dredging and over-widening of natural channels. Severe Storm, DF1 nc Flooding Stabilize Cheesefactory Road after washout damages from storms. A, B, E, F 10 10 20 10 10 10 30 5 10 15 Flooding

Severe Storm, DF2 nc Road/Streets Address long term, repetitive stormwater flooding on Beaton Drive B, C, F 5 10 15 10 10 10 30 5 10 15 Flooding

Severe Storm, Address severe repetitive flooding at the DF3 nc Flooding A, C, E, F, 10 10 20 5 10 10 25 5 10 15 Flooding Campgrounds.

Water Supply Obtain funding to build an indoor storage facility for the Town's salt and DF4 nc salt storage A, F 10 10 20 10 10 10 30 5 10 15 Contamination sand piles to prevent contamination of soils nearby. Severe Storm, Flo1 nw Bridge/Culvert Clean debris from culverts and bridges to prevent washouts and flooding E, F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Flo2 nw Road/Streets Trim trees along roads A, D, F, 5 10 15 10 10 5 25 10 10 20 Storms/Tornados

Floyd 1 nc Utility Failure Shelter Est. emergency shelter, @ Gwf Elementary School B, D, F 10 10 20 10 10 10 30 5 10 15

Floyd 2 nc Utility Failure Backup Power Establish backup power at the Town Hall to create a shelter opportunity. A, E, F 10 10 20 10 10 10 30 5 10 15 STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Severe Storm, Floyd 3 nc Bridge/Culvert W. Boak Rd. Culvert Rep. A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, Floyd 4 nc Bridge/Culvert Right size the culvert on Wynn Rd A, D, E, F 10 10 20 10 10 10 30 10 10 20 Flooding

Floyd 5 nc Utility Failure Backup Power Establish backup power at the Highway Garage A, D, E, F 10 10 20 10 10 10 30 5 10 15

Forestport 1 ne Landslide Erosion repair Address areas on roadsides where landslide potential exists. F 10 10 20 5 10 10 25 10 10 20

HP1 nc Blight Trees Re-establish Trees where ash trees were lost A, E, F 10 10 20 10 10 10 30 0 10 10

HP2 nc All Communication Install new cell tower for improved communication during emergencies A,B,C 10 10 20 10 10 10 30 0 10 10

Severe Storm, Comprehensive stormwater management in the St. Mary's Brook Kirk 1 sc Stormwater A, B, C, E, F 10 10 20 10 10 10 30 5 10 15 Flooding watershed Severe Storm, Kirk 2 sc Stream streambank stabilization A, B, C, E, F 10 10 20 10 5 10 25 5 10 15 Flooding Severe Storm, Kirk 3 sc Bridge/Culvert Replace and upgrade bridge on Norton Ave over the Oriskany E 10 10 20 10 10 10 30 5 10 15 Flooding Severe Storm, Kirk 4 sc Stream Identify and remove woody debris from the main channel of the Oriskany A, C, E, 10 10 20 10 0 5 15 10 5 15 Flooding Investigate flood mitigation projects in the town to address severe Severe Storm, repetitive losses. Consider the use of practices such as property Kirk 5 sc Flooding A, B, C, E, F 10 10 20 10 10 5 25 5 10 15 Flooding acquisition, stormwater detention, green infrastructure and right-sizing infrastructure based on current watershed calculations. Severe Storm, Kirk 6 sc Bridge/Culvert Replace bridge on Grant Street A, E 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, Lee1 nw Stream Stream Repair, Pillmore Drive A, C, E, 10 10 20 10 10 10 30 5 10 15 Flooding

Lee2 nw Landslide Road/Streets Belcher Road Bank Repair A, E, F 10 10 20 10 10 10 30 5 10 15

Lee3 nw Landslide Road/Streets River Road Bank Repair A, E, F 10 10 20 10 10 10 30 5 10 15

Lee4 nw Fire Dry Fire Hydrant Find location for dry fire hydrant A, D, F, 10 10 20 10 10 10 30 10 10 20

Address storm water management issues in coordination with other Severe Marcy 1 nc Stormwater governmental agencies, including adjacent municipalities, Oneida A, B, C, D, F 10 10 20 10 10 10 30 5 10 15 Storm/Flooding County, FEMA, EPA, the Army Corps of Engineers, and the NYSDEC.

Regularly monitor the need for fire, police, and emergency medical Fire/Explosion/ Marcy 2 nc Emergency Services service upgrades to ensure the provision of quality and cost effective D, F 10 10 20 10 10 10 30 10 10 20 Spills/Accidents services into the future. STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Severe Storm, Marshall1 s Bridge/Culvert culvert replacement Route 12B in the Hamlet of Deansboro A, C, E, F 10 10 20 10 10 10 30 0 5 5 Flooding Severe Storm, Marshall2 s Stream Streamwork on Big Creek ACEF 10 10 20 10 10 10 30 0 0 0 Flooding Severe Storm, Marshall3 s stormwater Remediate Stormwater Runoff issues in the Earl Manor subdivision A, E, F 10 10 10 5 10 10 25 5 10 15 Flooding Severe Winter Marshall4 s Road/Streets Reduce drifting on roads during winter: A, F 10 2 12 5 10 10 25 0 0 0 Storm Transportation Marshall5 s Road/Streets Correct the sharp bend on Rt. 315 where accidents are frequent. F 10 10 20 10 10 10 30 0 5 5 Accident Severe Storm, NH V1 sc Dam Remove silt from dam on Route 8 near 840 cloverleaf F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, NH1 sc Stormwater Grange Hill Road Drainage improvement A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, NH2 sc Stormwater Roberts Road drainage basin A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding Emergency Power Install a generator at the Town Highway facility to provide un-interrupted NH3 sc Utility Failure A, E, F 10 10 20 10 10 10 30 5 10 15 supply service and an emergency shelter to town residents displaced in a di Severe Storm, Watershed Address watershed management issues throughout the Mud Creek NH4 sc A, B, C, E, F 10 10 20 10 10 10 30 5 10 15 Flooding Management watershed.

Severe Storm, Infrastructure Address stabilization and capacity issues at priority locations in the NH5 sc E 10 10 20 10 10 10 30 5 10 15 Flooding upgrades Town; right size culverts and control erosion;

Severe Storm, NH6 sc Stormwater Address flooding at senior housing facility. A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding

Consider stormwater management options to prevent further severe repetitive losses incurred in the Village. One possibility that was Severe Storm, NYM1 sc Dam discussed involved retrofitting the dam on the Sauquoit upstream of the E 5 10 15 5 5 0 10 5 10 15 Flooding Village in the Town of Paris. However, as this would negatively affect the residents of Paris, the proposal is not likely to move forward.

Oneida Castle Complete conversion from Firehouse to Village Hall and make accessible w Utility Failure Building A, D, E, F 10 10 20 10 10 10 30 5 10 15 2 as a disaster shelter. Oneida Castle Hazardous w sewer Connect residents to sewer line from Oneida F 10 10 20 5 10 10 25 5 5 10 1 materials Fixed Si Install additional communications towers to augment the County's 911 OC1 County All critical infrastructure D 10 10 20 10 10 5 25 5 10 15 system response. Work with local partners including Cornell Cooperative Extension, USDA Blight/Infestation agencies and the SWCD to complete an Agricultural Vulnerability Study OC2 County /Food agricultural B, C, F 10 10 20 10 10 10 30 10 10 20 in order to mitigate hazards such as ice storms, drought, infestation, Shortage/Drought blight and utility failures. STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Fire/Explosion/ OC3 County critical infrastructure Improve monitoring of communications tower system D 10 10 20 10 10 10 30 10 10 20 Spills/Accidents Fire/Explosion/ OC4 county critical infrastructure Upgrade land mobile radios (LMR) D 10 10 20 10 10 10 30 10 10 20 Spills/Accidents

Improve outreach for disaster preparedness especially among vulnerable populations. Work to develop a reliable system that can be implemented OC5 County All public education D 5 10 15 5 10 10 25 5 10 15 County-wide to identify those who need special assistance during an emergency.

Obtain funding to ensure that seniors in rural areas are able to receive hot Meals on Wheels and a personal visit for an informal wellness check. OC6 County All Vulnerable Populations ACEF 10 10 20 10 10 10 30 0 0 0 These wellness checks have saved many lives of isolated seniors who are disabled and living in rural areas.

Initiate a 211 System in the County to assist with human services related questions. This system is available in nearly every other County OC7 County All Vulnerable Populations B 10 10 20 5 10 10 25 5 5 10 state-wide and would be beneficial to the County's residents. http://www.211ny.com/index.html.

Severe Storms Municipalities and Upgrade equipment including the purchase of an excavator to expedite OC8 County DPW F 10 10 20 10 10 10 30 10 10 20 and Flooding critical infrastructure cleanout of bridges and culverts that become blocked in a storm event.

OC9 County DOH Epidemic Education "B'Ready Family" Flu Commercials B, F 10 10 20 10 10 10 30 10 10 20

OC10 County DOH All Education "B'Ready Family" Disaster Preparedness Commercials B,F 10 10 20 10 10 10 30 10 10 20

Translation of Medical/Preparedness Materials on Hardcopy for OC11 County DOH All Education B,D 5 10 15 10 10 10 30 5 10 15 languages in the County

OC12 County DOH All Education Sponsor a Mass Fatality Workshop B,D,F 10 10 20 10 10 10 30 0 5 5

OC13 County DOH All Education Food Safety, Mold Abatement and Mosquito Control Commercials A,B,F 10 10 20 10 10 10 30 10 10 20

OC14 County DOH All Education Extreme Temperature PSAs (Hot and Cold) B 10 10 20 10 10 10 30 10 10 20 STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Updating and Distribution of Oneida County Disaster Preparedness OC15 County DOH All Education B 10 10 20 10 10 10 30 10 10 20 Guide (All Hazards Guide)

Planned Community Engagement and Outreach Disaster Preparedness OC16 County DOH All Education Presentations in 2014 to Individuals with Functional Needs (Physical, B 10 10 20 10 10 10 30 10 5 15 Sensory, and Cultural and Language Barriers)

Address flooding at critical facilities including wastewater treatment County Water Severe Storms plants that are frequently inundated by the and the OC17 Pollution and Flooding E 10 10 20 5 10 10 25 10 5 15 and Flooding pumping station where frequent backups occur due to Control flooding in the Sauquoit.

Work with appropriate local partners to provide education and outreach about the new floodzone maps and their affect on residents throughout Severe Storms OC18 HOOAD Education the County. Try to foster an understanding of appropriate building B 10 10 20 10 10 10 30 10 10 20 and Flooding practices in floodzones as well as the types of assistance one can expect should flooding occur.

Blight, Infestation, Education of Ag Work with producers to plant a diversity of crops to combat disease and OC19 CCE C 10 10 20 10 10 10 30 10 10 20 Drought community droughty conditions.

Orisk1 sc Fire Dry Fire Hydrant Install dry fire hydrants in the Village A, E, F 10 10 10 5 10 10 25 5 10 15

Severe Storm, Address persistent flooding by right-sizing infrastructure throughout the Orisk2 sc Stormwater A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding Village but especially on Utica Street near the school.

Severe Storm, OFalls 1 s Flooding Install Stormwater Detention at the Oriskany Falls Fire Department D, E 10 10 20 10 10 10 30 10 10 20 Flooding

Severe Storm, Stormwater Infrastructure Retrofits on Willow Brook Lane, Church Road, Paris 1 s Stormwater A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding Gridley Blvd, Butler Road, and Oneida Street to prevent future flooding.

Paris 2 s Landslide Road/Streets Latus Road Bank Stabilization A, E, F 10 10 20 10 10 10 30 5 10 15 STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Paris 3 s Dam Failure Dam Paris Dam Rehabilitation E 10 2 12 10 10 10 30 10 10 20

Paris 4 s Landslide Road/Streets Mudslide stabilization on Route 8 F 10 5 15 0 10 10 20 5 10 15

Paris 5 s Dam Failure Dam Rehabiliation of Dam on Latus Road E 10 10 20 5 10 10 25 5 5 10

Paris 6 s Landslide Road/Streets Rebuild Kehoe Rd E 10 10 20 5 5 5 15 5 5 10

Paris 6a s Landslide Road/Streets Dead-Ending Kehoe Road F 10 10 20 10 10 10 30 10 10 20

The electric line that comes from the White Falls water treatment facility was exposed by erosion in the June storm events. The line is located Severe Storm, Paris 7 s Erosion repair within a ditch. If that line is entirely washed out, the town would not D, E, F 10 10 20 10 10 10 30 10 10 20 water supply have water. Therefore, this is a high priority mitigation strategy for the Town to pursue. Matching county funds may be sought for this project.

Transportation Make necessary improvements to the transportation routes to ensure Pros1 nc Road/Streets D 10 10 20 10 10 10 30 5 5 10 Accident that they are passable in an emergency.

Pros2 nc All Alarm Improve security at the water treatment facility. D 10 10 20 10 10 10 30 10 10 20

Severe Storm, Identify and right-size culverts that are aging or undersized on local Remsen T1 ne Bridge/Culvert A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding roads especially Buck Road.

Severe Prune or eliminate dead and dying trees that are overhanging the RemVill 1 ne Storm/Flooding/I Stream A, C, E, 10 10 20 10 5 5 20 10 10 20 Cincinnati Creek to prevent blockage. ce Jams

Severe Storm, RemVill 2 ne Stream Streambank stabilization on the Cinn. Creek ACEF 10 10 20 10 10 10 30 0 0 0 Flooding

Severe Storm, RemVill 3 ne Stormwater Implement large scale stormwater management project A, C, E, F 10 10 20 10 10 10 30 5 10 15 Flooding

Install communication tower in west Rome for for better reception of Rome 1 w Communication Communications D.E 10 10 20 10 10 10 30 0 5 5 emergency vehicles and public operations. Infiltration and Identify and address infiltration and inflow into sanitary sewer collection Rome 2 w Environmental A,B,C,D,F 10 10 20 10 10 10 30 5 5 10 Inflow system STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Emergency Rome 3 w Public Safety Consolidation of police operations and evidence storage A,D 5 10 15 10 10 5 25 0 0 0 Services Stormwater Rome 4 w Stormwater Address localized stormwater management problems in south Rome A,B,C,D,F 10 10 20 10 10 5 25 0 5 5 Management Address regional approach to the supply of public water to surrounding Rome 5 w Water Supply Public Utility C 10 10 20 10 10 10 30 0 5 5 areas in need. Address regional approach to the provision of public sanitary sewer Rome 6 w Sanitary Sewer Public Utility C 10 10 20 10 10 10 30 0 5 5 service to surrounding areas in need.

Sang 1 s Water Supply salt storage Install covered salt storage at the Town barn A, C 10 10 20 10 10 10 30 10 10 20

Severe Storm, Sherrill1 w Stormwater Stormwater system repairs f 10 10 20 5 10 10 25 10 10 20 Flooding

Sherrill2 w Dam Failure Dam Stabilize eroding dam in the City damaged by the June storm events. A, B, C, D, F 10 10 20 10 10 10 30 5 10 15

Severe Storm and Work with local landowners and partnering agencies to identify and Sherrill3 w Flooding and Ice Stream A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 remove debris jams in the Sconondoa and Taylor Creeks. Jam

Severe Storm, SQ CRK1 sc Bridge/Culvert ESD Project #1: CSX Bridge f 5 5 10 5 5 5 15 0 5 5 Flooding Severe Storm, SQ CRK10 sc Stream Oneida Street Streambank Restoration e 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, SQ CRK11 sc Stormwater Detention Basin Preswyck Glen f 10 5 15 5 10 10 25 0 0 0 Flooding

SQ CRK12 sc Ice Jam Bridge/Culvert Commercial Drive Ice Piers e 10 10 20 5 10 10 25 0 10 10

Severe Storm, SQ CRK13 sc Stormwater Sangertown Mall Stormwater Detention areas e 10 10 20 10 10 5 25 0 5 5 Flooding Severe Storm, SQ CRK14 sc Stormwater Washington Mills Route 8 Diversion A, D 10 10 20 10 10 10 30 10 10 20 Flooding Severe Storm, SQ CRK15 sc Stormwater Bioswales/Detention Area A, E, F 10 10 20 10 10 10 30 10 10 20 Flooding

Severe Storm, SQ CRK16 sc Stormwater Parkway School Retention Structure A, F 10 10 20 10 10 10 30 10 10 20 Flooding

Severe Storm, SQ CRK17 sc wetlands Mud Creek And Middle Settlement Road Wetlands Enhancement A, F 10 10 20 10 10 10 30 10 10 20 Flooding

Severe Storm, SQ CRK18 sc Stormwater Whitestown Stormwater Management Plan A, F 10 10 20 10 10 10 30 5 5 10 Flooding STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Severe Storm, SQ CRK19 sc Stream Mud Creek Realignment A, D, F, 10 10 20 10 5 5 20 10 5 10 Flooding

Severe Storm, SQ CRK2 sc Stream ESD Project #2 - Paris Bank stabilization B, D 10 10 20 10 10 5 25 5 5 10 Flooding

Severe Storm, SQ CRK20 sc Stream Deflector Structures D 10 10 20 10 10 5 25 10 0 10 Flooding

SQ CRK21 sc Flooding model Hydraulic Modelling C, F 10 10 20 10 10 10 30 10 10 20

Severe Storm, SQ CRK22 sc Stream Stream Gauges A, C, E, 10 10 20 10 10 10 30 5 5 10 Flooding

SQ CRK23 sc Flooding mapping Base Mapping B, C, F 10 10 20 10 10 10 30 10 10 20

Severe Storm, SQ CRK24 sc Stream Bleachery Ave Retaining Wall A, D, E, F 10 10 20 10 10 10 30 5 10 15 Flooding

Severe Storm, SQ CRK25 sc Stream Elm Street Retaining Wall A, D, E, F 10 10 20 5 10 10 25 5 10 15 Flooding

Severe Storm, SQ CRK26 sc Stormwater Devereaux Creek Detention Pond A, D, E, F 10 10 20 10 10 10 30 5 10 15 Flooding

Severe Storm, SQ CRK27 sc Stream Dunham Park Bank Stabilization A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding

Severe Storm, SQ CRK28 sc Stormwater Storm Sewer Realignment in Whitesboro A, E, F 10 10 20 5 10 10 25 5 10 15 Flooding

Feasibility study for micro-hydro generation at the Homogenous Metals SQ CRK29 sc Utility Failure Dam 0 0 0 Plant: SEE CLAYVILLE2

Severe Storm, SQ CRK3 sc Dam Paris Dam Reconstruction: SEE PARIS 3 0 0 0 Flooding

Severe Storm, SQ CRK4 sc Stream Hand Place Armoring A, E, F 10 10 20 10 10 10 30 5 10 15 Flooding STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Severe Storm, SQ CRK5 sc Dam NY Mills Berm Flooding A,C, F 10 10 20 10 10 10 30 10 10 20

Severe Storm, SQ CRK6 sc Stream Washington Mills Park Bank Stabilization Flooding A,F 10 10 20 10 10 10 30 5 10 15

Severe Storm, SQ CRK7 sc Stream Flow model at CSX bridge Flooding A,B,D 10 10 20 10 10 10 30 10 10 20

Severe Storm, SQ CRK8 sc Stream ESD Project #4 - Palmers Creek Flooding D 10 10 20 10 10 10 30 5 5 10 Severe Storm, SQ CRK9 sc Stream Palmers Creek Phase 2 to Kellogg Road Flooding D,E,F 10 10 20 10 10 10 30 5 5 10 Severe Storm, ST1 ne Bridge/Culvert Lewis Road Culvert Replacement A,D,E,F 10 10 20 10 10 5 25 10 10 20 Flooding Address the flooding at the Town hall as it is the Town's emergency ST2 ne Flooding Shelter D 10 10 20 5 10 10 25 5 10 20 shelter.

Investigate options for beach replenishment when ice damage has Sylv B1 nw Ice Jam Ice A

Initiate Public Education for both flood damage prevention and flood Sylv B2 nw Flooding Education D,E,F 10 10 20 10 10 10 30 5 5 10 evacuation

Urge a decrease in the speed limit and the improvement of sight lines Transportation T1 nc Road/Streets near the entrance to the Pop Warner football complex along NYS Route A,D,E,F 10 10 20 10 10 10 30 5 10 10 Accident 365 west of the Village of Holland Patent. Transportation Urge the creation of a “safe crossing” for the walking/biking trail across T2 nc Road/Streets A,C,E,F 10 10 20 10 10 10 30 0 10 10 Accident NYS Route 365 between the Village of Barneveld and the Town Park.

Severe Advocate for the replacement of the NYS Route 12 bridge over Cincinnati T3 nc Road/Streets A,B,C,E,F 10 10 20 10 10 10 30 10 5 15 Storm/Flooding Creek.

Water Supply Review the wellhead protection provisions of the zoning law to ensure T4 nc Water Supply A,B,D,E 10 10 20 10 10 10 30 0 10 10 Contamination continued effectiveness in preventing groundwater contamination.

Water Supply Monitor groundwater and surface water contamination town‐wide, T5 nc Water Supply A,B,C, D,F 10 10 20 10 10 10 30 5 10 15 Contamination especially in high density, unsewered areas. STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Adopt “Crime Prevention Through Environmental Design” (CPTED) for UT 1 sc Civil Unrest Zoning/Codes F 10 10 10 10 10 10 10 the City, detailing action plans for each neighborhood. 20 30 20

Adopt policies and regulations that foster healthy living as outlined by UT 2 sc Epidemic Education F 10 10 10 10 10 10 10 the Centers for Disease Control’s Healthy Communities Program. 20 30 20 Establish a new Community Park at the Kemble Street property study to UT 3 sc all Emergency Svcs understand how emergency services, particularly fire and EMS, could be D, F 10 10 5 10 10 5 10 shared with neighboring communities. 20 25 15

Develop a long range plan for the construction of new, strategically UT 4 sc all Emergency Svcs D 10 10 10 10 10 10 10 located public safety buildings. 20 30 20 Continue to search for funding to construct a new emergency services UT 5 sc all Emergeny Svs facility to house modern equipment, a centralized mechanic shop and D 10 10 10 10 10 10 10 centralized purchasing for emergency services. 20 30 20

UT 6 sc all Education Establish a city-wide public safety plan. D 10 10 10 10 10 10 10 20 30 20 UT7 sc Landslide Road/Streets Parkway Headwalls A,B,C,D,E,F 10 10 20 10 10 10 30 10 10 20 Severe Storm, Stormwater Detention in the Calvary Cemetery in New Hartford to UT8 sc Stormwater B,D,F 10 10 10 10 10 10 10 Flooding alleviate flooding on Genesee Street and Roosevelt Drive 20 30 20 UT9 sc Severe Storm, Stormwater Streambank Protection Various Locations in North Utica A,F 10 10 20 10 10 10 30 10 10 20 UT10 sc Severe Storm, Stormwater Re-establishment of Original Alignment of Starch Factory Creek near A,F 10 10 20 10 10 10 30 10 10 20 UT11 sc Severe Storm, Stormwater Hallecks ravine Flood Warning System A,F 10 10 20 10 10 10 30 10 10 20 Severe Storm, Acquire the Dickson Trailer Park Property to prevent future flooding Vern1 w Property Acquisition D 10 10 20 10 10 10 30 10 10 20 Flooding damages to vulnerable and low income residents.

Severe Storm, Assess streambank erosion and document debris jams in the Sconondoa Vern2a w Stream e, f 5 5 10 10 10 5 25 10 10 20 Flooding Creek

Severe Storm, Repair streambank erosion and remove debris jams on Sconondoa Creek Vern2b w Stream D, E, F 10 10 20 10 10 10 30 5 10 15 Flooding where feasible.

Severe Storm, Repair and/or upgrade the culvert on Skinner Road on the tributary to Vern3 w Bridge/Culvert A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding Deans Creek.

Severe Storm, Identify and remove where possible large deposits of woody debris from Vern Vill1 w Stream A, B, C, D, F 10 10 20 10 5 5 20 10 10 20 Flooding the Sconondoa Creek.

Severe Storm, Verona 1 w Bridge/Culvert Right size the Hartman Road culvert to prevent future flooding damages. A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Hazardous Verona 2 w materials Fixed sewer Implement the Sewer Extension Project F 10 10 20 5 10 10 25 5 5 10 Site

Verona 3 w Fire Dry Fire Hydrant Install dry fire hydrant at New London site A, D, F, 10 10 20 10 10 10 30 10 10 20

Repair closed bridge over the Fish Creek as there is no evacuation route Vienna 1 nw Severe Storm Bridge/Culvert D, E, F 10 10 20 5 10 10 25 5 5 10 currently. Identify the possibility for converting the soon to be abandoned school Vienna 2 nw Utility Failure Shelter A, E, F 10 10 20 10 10 10 30 5 10 15 into the community's disaster shelter.

Vienna 3 nw Flooding Erosion repair Repair the washout on Cove Road A, B, C, D, F 10 10 20 10 5 10 25 5 10 15

Severe Storm, WV1 s Stream Stabilize streambank on Big Creek upstream of the WWTP. A, B, C, D, F 10 10 20 10 5 5 20 10 10 20 Flooding

The Village will be installing an emergency backup generator at the WV2 s Utility Failure Backup Power A, E, F 10 10 20 10 10 10 30 5 10 15 Village Hall in order to create shelter space for disaster events.

Upgrade the culvert on Bacon Street adjacent to the Bus Garage to Severe Storm, WV3 s Bridge/Culvert alleviate flooding; partnership among Waterville, Sangerfield and A, F 10 10 20 5 10 10 25 0 0 0 Flooding Marshall.

Severe Storm, Western 1 ne Bridge/Culvert Right size the culvert on Tannery Road A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding

Western 2 ne Landslide Road/Streets Erosion damage on Dixon Drive A, E, F 10 10 20 10 10 10 30 5 10 15

Water Supply Western 3 ne salt storage Finish Salt Storage facility A, C 10 10 20 10 10 10 30 10 10 20 Contamination

Severe Storm, Westmo1 w Bridge/Culvert Bridge improvements on Station Hill Road A, B, C, D, F 10 10 20 10 5 10 25 5 10 15 Flooding

Severe Storm, Address stormwater runoff concerns on West Street affecting multiple WB1 sc Stormwater A, D, E, F 10 10 20 5 10 10 25 5 10 15 Flooding residents.

Severe Storm, Explore options for property acquisition of the Gardner Street residences WB2 sc Property Acquisition D 10 10 20 10 10 10 30 10 10 20 Flooding that are severely repetitively damaged by Sauquoit Creek flooding.

Work with the Sauquoit Creek Basin Commission to implement priority Severe Storm, WB3 sc Stream management projects in the Sauquoit Creek Watershed: SEE SQ CRK Mitigation 0 0 0 Flooding Strategies STAPLEE Categories Social Technical Administrative

How many Can Can Is there Long benefit Social Technically Secondary existing Maintenance Admin STAPLEE Category Subsets Community Term Tech Score from Score Feasible Impacts staff handle / Ops be Total Acceptance? Solution project? work? done locally?

Type: Choose: (A) Property Protection; (B)Public Education; Positive = Hazard Yes = 10, Yes = >2; Yes = 10; Yes = 10; Yes = 10; Yes = 10; Mitigation (C)Natural Resource 10; Neutral Region Addressed by Key Word Description Neutral = 5; Neutral = Neutral = 5; Neutral = Neutral = 5; Neutral = 5; Project Code Protection; = 5; Strategy No = 0 1; No = 0 No = 0 5; No = 0 No = 0 No = 0 (D)Emergency Negative = 0 Services; (E)Structural; (F)Preventative

Severe storm, WT1 sc Stream Stream management on the Sauquoit Creek A, B, C, D, F 10 10 20 10 5 5 20 10 10 20 flooding Severe Storm, Address flooding at the Sauquoit Creek pumping station located in the Yorkville1 sc Critical facilities E 10 10 20 5 10 10 25 10 5 15 Flooding Village of Yorkville. CC1 all Climate Change Control sprawl to reduce housing and transportation costs B, F 5 10 15 10 10 10 30 10 10 20

CC2 all Climate Change Invest in public transit systems to serve more people and minimize E 5 10 15 5 10 10 25 5 10 15 pollution

CC3 all Climate Change Build stores, schools, and workplaces near neighborhoods to reduce E 5 10 15 0 10 10 20 5 10 15 vehicle miles traveled Attract businesses to neighborhoods to create jobs, and keep dollars CC4 all Climate Change B 5 10 15 10 10 10 30 10 10 20 local

CC5 all Climate Change B, F 5 10 15 10 10 10 30 10 10 20 Make walking and bicycling easy to foster healthy lifestyles CC6 all Climate Change Reuse developed land to improve economic potential C 5 10 15 10 10 10 30 10 10 20

CC7 all Climate Change Adopt clean technologies to grow our 21st century economy B, F 5 10 15 5 10 10 25 5 10 15

CC8 all Climate Change Conserve resources to strengthen the natural environment B, F 5 10 15 10 10 10 30 10 10 20

CC9 all Climate Change B, F 5 10 15 5 10 10 25 5 10 15 Reduce greenhouse gases to improve and protect our environment.

Establish a committee to make Oneida County a Climate Smart CC10 ALL Climate Change B 10 10 20 10 10 10 30 5 10 15 Community Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Annsville 1 10 10 20 10 10 5 10 35 5 5 5 10 25 10 5 15 78.94736842 state

AUG1 10 10 20 10 10 10 10 40 5 5 5 5 20 10 5 15 76.31578947 Trenton

AUG2 10 10 20 10 10 10 10 40 5 5 5 5 20 10 10 20 81.57894737 Contractor

Ava 1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 Contractor

Town/Village, Barneveld1 10 10 20 10 10 5 10 35 5 10 5 10 30 10 5 15 84.21052632 Contractor, State

Barneveld2 10 10 20 10 10 10 10 40 5 5 5 5 20 5 10 15 78.94736842 Town/Contractor

Boonville T1 5 10 15 10 10 5 5 30 5 5 5 5 20 10 0 10 68.42105263 Town

Boonville T2 5 0 5 10 10 5 10 35 5 5 5 5 20 10 0 10 50 Town

Boonville T3 5 0 5 10 10 5 10 35 5 5 5 5 20 5 5 10 68.42105263 Town

Boonville V1 10 10 20 10 10 10 10 40 10 5 5 10 30 10 10 20 92.10526316 State

Boonville V2 10 10 20 10 10 5 10 35 5 5 5 10 25 10 5 15 78.94736842 state

Boonville V3 10 10 20 10 10 10 10 40 10 10 5 10 35 10 10 20 97.36842105 Village

BW Town1 10 10 20 10 10 10 10 40 10 10 10 10 40 10 10 20 97.36842105 Village

BW Town2 10 10 20 10 5 10 5 30 5 5 5 5 20 10 10 20 76.31578947 Private

BW Town3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

BW V1 0 5 5 10 0 0 0 10 5 10 10 10 35 10 5 15 68.42105263 City; Contractor

BW V2 10 10 20 10 10 10 10 40 10 10 5 10 35 10 10 20 89.47368421 Village/Town

Municipal, CamT&V1 10 10 20 10 5 10 10 35 10 5 5 5 25 10 5 15 81.57894737 contractor Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Cam T&V2 5 10 15 10 0 0 0 10 0 5 5 5 15 5 0 5 44.73684211 Local

Cam T&V3 10 10 20 10 10 5 10 35 5 5 5 5 20 10 10 20 81.57894737 Local

Cam1 10 10 20 10 10 10 10 40 5 10 10 10 35 10 10 20 94.73684211 Local

Municipal, Clay1 10 10 20 10 10 5 5 30 5 5 5 10 25 10 10 20 81.57894737 contractor

Clay2 5 5 10 10 0 10 10 30 5 10 5 5 25 10 0 10 63.15789474 State?

Clinton 1 5 5 10 10 10 10 5 35 5 5 5 10 25 5 5 10 73.68421053 Town/Private

Clinton 2 10 5 15 10 10 5 10 35 10 5 5 5 25 5 5 10 76.31578947 Contractor

Clinton 3 10 10 20 10 10 10 10 40 5 10 5 10 30 10 10 20 92.10526316 Town

Clinton 4 10 5 15 10 10 10 5 35 5 10 5 10 30 10 5 15 84.21052632 Town

Clinton 5 10 10 20 10 10 10 10 40 10 5 5 10 30 10 10 20 84.21052632 Village/Town

DEC 10 10 20 10 10 10 10 40 5 10 10 10 35 10 10 20 94.73684211 Local

Village/Contractor DF1 10 10 20 10 10 10 10 40 5 10 5 10 30 5 5 10 86.84210526 /Town

DF2 5 10 15 10 10 10 5 35 5 10 5 10 30 5 0 5 76.31578947 DEC, SWCD

DF3 10 10 20 10 10 10 10 40 5 10 5 10 30 10 10 20 89.47368421 Local

DF4 10 10 20 10 5 10 10 35 5 10 10 10 35 10 0 10 86.84210526 Local

Flo1 10 10 20 10 10 5 5 30 5 5 5 5 20 10 10 20 84.21052632 Town

Flo2 10 5 15 10 10 10 10 40 10 5 5 5 25 10 10 20 84.21052632 Town

Floyd 1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 86.84210526 Town

Town/Contractor/ Floyd 2 5 5 10 10 10 10 10 40 10 10 10 10 40 10 10 20 92.10526316 Private Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Floyd 3 10 10 20 10 10 10 10 40 5 10 5 10 30 10 5 15 92.10526316 Town/Contractor

Floyd 4 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Town

Floyd 5 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 86.84210526 Town

Forestport 1 10 10 20 10 10 10 10 40 10 5 5 10 30 10 10 20 92.10526316 Town

HP1 10 10 20 10 10 10 10 40 10 10 5 10 35 10 10 20 87.5 Contractor

HP2 10 10 20 10 10 10 10 40 0 10 10 10 30 10 0 10 84.2 Contractor

Kirk 1 10 10 20 10 10 10 5 35 5 10 5 5 25 10 5 15 84.21052632 Town/Contractor

Kirk 2 10 10 20 10 10 10 5 35 5 10 5 10 30 10 5 15 84.21052632 Town/Contractor

Kirk 3 10 10 20 10 10 10 5 35 5 10 5 10 30 5 5 10 84.21052632 Town/Contractor

Kirk 4 10 10 20 10 10 5 5 30 5 10 5 10 30 10 5 15 76.31578947 Town/Contractor

Kirk 5 10 10 20 10 10 5 5 30 5 10 5 10 30 10 5 15 81.57894737 Town/Contractor

Kirk 6 10 10 20 10 10 10 10 40 5 5 5 10 25 10 5 15 89.47368421 Town/Contractor

Lee1 10 10 20 10 10 10 10 40 5 10 5 10 30 5 5 10 86.84210526 Town/Contractor

Lee2 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor

Lee3 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor

Lee4 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 92.10526316 Town/Contractor

Marcy 1 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 92.10526316 Town and others

Marcy 2 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 Town and others Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Marshall1 10 10 20 10 10 5 10 35 5 10 10 10 35 10 5 15 84.21052632 state

Marshall2 10 10 20 10 10 5 5 30 5 10 10 10 35 10 0 10 76.31578947 Town

Marshall3 10 5 15 10 10 5 5 30 5 5 5 10 25 5 5 10 68.42105263 Town/Private?

Marshall4 10 5 15 10 0 10 10 30 5 10 10 5 30 1:01 0 0.042361111 58.96966374 state

Marshall5 10 10 20 10 0 10 10 30 10 5 5 5 25 5 5 10 73.68421053 state

NH V1 10 10 20 10 10 10 10 40 5 5 5 5 20 10 10 20 89.47368421 Village and others

NH1 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Town

NH2 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Town

Town/Contractor/ NH3 5 5 10 10 10 10 10 40 10 10 10 10 40 10 10 20 92.10526316 Private

NH4 10 10 20 10 10 10 5 35 5 10 5 5 25 10 5 15 84.21052632 Town/Contractor

NH5 10 10 20 10 10 10 5 35 5 10 5 10 30 5 5 10 84.21052632 Town/Contractor

NH6 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Town

NYM1 5 10 15 5 5 5 0 15 0 0 0 0 0 5 0 5 39.47368421 Village

Oneida Castle 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 86.84210526 Town 2 Oneida Castle 10 10 20 10 5 10 5 30 5 10 5 10 30 5 5 10 76.31578947 Village and others 1

OC1 10 10 20 10 10 10 5 35 5 5 5 5 20 10 5 15 78.94736842 County

Local agencies and OC2 10 10 20 10 10 10 10 40 10 5 10 10 35 10 5 15 94.73684211 farmers Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

OC3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

OC4 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

County and OC5 10 10 20 10 10 10 10 40 5 5 5 5 20 10 5 15 78.94736842 municipalities

OC6 10 10 20 10 10 5 5 30 5 10 10 10 35 10 0 10 76.31578947 Town

OC7 5 10 15 10 10 10 10 40 10 5 5 5 25 5 0 5 73.68421053 United Way

OC8 10 10 20 10 10 10 10 40 10 5 5 5 25 5 0 5 84.21052632 County

OC9 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

OC10 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

OC11 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 84.21052632 County

OC12 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 81.57894737 County

OC13 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

OC14 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

OC15 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 County

OC16 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 86.84210526 County

Municipalities and OC17 10 10 20 10 5 5 10 30 5 10 5 10 30 10 5 15 81.57894737 County

HOOAD and OC18 10 10 20 10 10 10 10 40 10 5 5 10 30 10 10 20 94.73684211 partnering agencies

CCE and OC19 10 10 20 10 10 10 10 40 10 10 10 10 40 10 5 15 97.36842105 cooperating agencies

Orisk1 10 5 15 10 10 5 5 30 5 5 5 10 25 5 5 10 68.42105263 Town/Private?

Orisk2 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

OFalls 1 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 92.10526316 Village?

Paris 1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

Paris 2 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Paris 3 5 5 10 10 10 10 5 25 0 10 5 10 25 5 0 5 66.84210526 Town

Paris 4 5 0 5 10 5 5 5 15 5 5 5 10 25 0 0 0 50 Town

Paris 5 5 5 10 10 10 5 5 20 0 10 10 10 30 5 0 5 63.15789474 Town

Paris 6 10 10 20 10 10 5 10 35 10 5 5 5 25 5 10 15 73.68421053 Town

Paris 6a 10 10 20 10 10 5 10 35 10 5 5 5 25 10 10 20 89.47368421 Town

Town and Paris 7 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 contractors

Pros1 10 10 20 10 10 10 10 40 5 5 5 5 20 5 5 10 78.94736842 Village

Pros2 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 89.47368421 Village

Remsen T1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

RemVill 1 10 10 20 10 5 10 5 30 10 10 5 10 35 10 5 15 84.21052632 Village, Contractor

RemVill 2 10 10 20 10 10 5 5 30 5 10 10 10 35 10 0 10 76.31578947 Town

Village/Contractor RemVill 3 10 10 20 10 10 10 10 40 5 10 10 10 35 10 5 15 92.10526316 /Town

Rome 1 10 10 20 5 10 10 10 35 10 5 5 5 25 5 5 10 76.31578947 Local

Rome 2 10 10 20 10 10 10 10 40 10 5 5 5 25 5 5 10 81.57894737 Local Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Rome 3 10 10 20 5 10 10 10 35 5 5 5 5 20 10 10 20 71.05263158 Local

Rome 4 10 10 20 10 10 10 10 40 10 5 5 5 25 5 0 5 73.68421053 State

Rome 5 10 10 20 10 10 10 10 40 10 5 5 5 25 5 0 5 76.31578947 Local

Rome 6 10 10 20 10 10 10 10 40 10 5 5 5 25 5 0 5 76.31578947 Local

Sang 1 10 10 20 10 10 10 10 40 10 10 5 10 35 5 5 10 92.10526316 Town/Contractor

town/Village/City; Sherrill1 5 5 10 10 10 5 5 30 10 10 5 10 35 5 5 10 78.94736842 Contractor; State; Federal; Private Sherrill2 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 89.47368421 City; Contractor

Sherrill3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

SQ CRK1 5 0 5 10 5 0 0 15 0 5 5 5 15 5 0 5 36.84210526 Town/Contractor

SQ CRK10 5 5 10 10 5 5 5 25 0 10 10 5 25 5 0 5 71.05263158 Town/Contractor

State/Town/Privat SQ CRK11 5 0 5 10 0 5 5 20 0 10 5 10 25 5 0 5 50 e Town/Private/Cont SQ CRK12 5 5 10 10 5 5 5 25 0 10 10 10 30 5 0 5 65.78947368 ractor

SQ CRK13 10 10 20 10 10 0 0 20 10 5 5 10 30 5 5 10 68.42105263 contractor

SQ CRK14 5 5 10 10 10 5 10 35 10 10 5 5 30 10 5 15 84.21052632 town

SQ CRK15 10 10 20 10 10 10 10 40 10 10 5 10 35 10 10 20 97.36842105 state

SQ CRK16 10 5 15 10 10 10 10 40 10 5 5 10 30 10 10 20 92.10526316 state

SQ CRK17 10 10 20 5 10 0 5 20 5 5 5 5 20 5 10 15 76.31578947 Town

SQ CRK18 10 10 20 5 10 0 0 15 5 5 5 5 20 10 5 15 68.42105263 Town and Private Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

SQ CRK19 10 5 15 5 10 0 5 20 10 5 5 5 25 10 0 10 63.15789474 Town and village

SQ CRK2 10 10 20 5 5 10 10 30 10 5 5 5 25 10 5 15 76.31578947 Town and village

SQ CRK20 10 10 20 10 10 0 10 30 10 5 5 5 25 10 5 15 76.31578947 Town and village

SQ CRK21 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Sauq. Creek Basin

SQ CRK22 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 89.47368421 Sauq. Creek Basin

SQ CRK23 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 94.73684211 Sauq. Creek Basin

Fire Dept and SQ CRK24 10 10 20 10 10 10 10 40 5 5 5 10 25 10 0 10 84.21052632 Grant

Fire Dept and SQ CRK25 5 10 15 5 5 10 10 30 0 5 5 10 20 10 0 10 71.05263158 Grant

Fire Dept and SQ CRK26 10 10 20 10 10 10 10 40 5 5 5 10 25 5 10 15 86.84210526 Grant

SQ CRK27 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor

SQ CRK28 10 10 20 10 10 10 10 40 10 10 5 10 35 10 5 15 89.47368421 Village and others

SQ CRK29 0 0 10 10 0 5.263157895

SQ CRK3 0 0 10 10 0 5.263157895

SQ CRK4 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

SQ CRK5 Town Highway 10 10 20 10 10 5 10 35 5 10 10 10 35 10 5 15 92.10526316 Dept

SQ CRK6 10 10 20 10 5 5 10 30 5 10 5 10 30 10 5 15 84.21052632 Village

SQ CRK7 10 5 15 10 10 5 10 35 10 10 10 10 40 0:00 5 15 92.10526316 Village

SQ CRK8 10 10 20 10 10 10 10 40 5 0 0 0 5 10 5 15 73.68421053 Town/Cont

SQ CRK9 10 10 20 10 10 10 10 40 10 5 0 0 15 10 5 15 78.94736842 Town/Cont

ST1 5 5 10 10 10 5 5 30 5 5 5 10 25 10 5 15 76.31578947 Town/Cont

ST2 10 10 10 5 10 10 10 5 5 5 10 25 10 5 15 60.52631579 Town

Sylv B1 5 5 10 10 10 5 5 30 5 5 5 10 25 10 5 15 76.31578947 Town/Cont

Sylv B2 10 10 20 10 10 10 10 40 10 5 0 0 15 10 5 15 78.94736842 Town/Cont

T1 10 10 20 10 10 10 10 40 10 5 5 5 15 10 5 15 78.94736842 state/contractor

T2 10 10 20 10 0 10 5 25 5 5 5 10 25 5 5 10 73.68421053 Contractor

T3 10 10 20 10 0 10 5 25 5 5 10 10 30 5 5 10 78.94736842 Contractor

T4 10 10 20 10 10 10 10 40 10 5 5 5 25 10 5 15 84.21052632 state/contractor

T5 10 10 20 10 10 10 10 40 5 10 10 10 35 10 5 15 92.10526316 state/contractor Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

UT 1 10 10 10 10 10 10 10 5 5 5 10 5 89.47368421 City 20 40 25 15

UT 2 10 10 10 10 10 10 10 5 5 5 10 10 92.10526316 City 20 40 25 20

UT 3 10 10 10 10 10 10 10 5 5 5 10 0 81.57894737 City 20 40 25 10

UT 4 10 10 10 10 10 10 10 5 5 5 10 5 89.47368421 City 20 40 25 15

UT 5 10 10 10 10 10 10 10 5 5 5 10 5 89.47368421 City 20 40 25 15

UT 6 10 10 10 10 10 10 10 5 5 5 10 5 89.47368421 City 20 40 25 15 UT7 10 10 20 10 10 10 10 40 10 5 5 5 25 10 0 10 86.84210526 local/contractor

UT8 10 10 10 10 10 10 10 10 10 10 10 0 94.73684211 local/contractor 20 40 40 10 UT9 10 10 20 10 10 10 10 40 10 5 5 10 30 5 5 10 89.47368421 Contractor UT10 10 10 20 10 10 10 10 40 10 5 5 10 30 5 5 10 89.47368421 Contractor UT11 10 10 20 10 10 10 10 40 10 5 5 10 30 5 5 10 89.47368421 Contractor

Vern1 10 10 20 10 5 10 10 35 5 10 5 10 30 10 0 10 86.84210526 Town

Vern2a 5 5 10 5 10 10 10 35 5 5 5 10 25 10 5 15 73.68421053 Municipality

Vern2b 10 10 20 10 10 10 10 40 5 5 5 10 25 10 5 15 86.84210526 Village, SWCD

Vern3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

Municipal, Vern Vill1 10 10 20 5 5 10 5 25 5 5 5 0 15 5 0 5 65.78947368 contractor

Verona 1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Verona 2 10 10 20 10 5 10 5 30 5 10 5 10 30 5 5 10 76.31578947 Village and others

Verona 3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 92.10526316 Town/Contractor

Vienna 1 10 10 20 10 10 10 10 40 5 5 5 5 20 10 0 10 76.31578947 Town

Town/Contractor/ Vienna 2 5 5 10 10 10 10 10 40 10 10 10 10 40 10 10 20 92.10526316 Private

Vienna 3 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

Municipal, WV1 10 10 20 5 5 10 5 25 5 5 5 0 15 5 0 5 65.78947368 contractor

Town/Contractor/ WV2 5 5 10 10 10 10 10 40 10 10 10 10 40 10 10 20 92.10526316 Private

WV3 10 5 15 10 0 10 10 30 5 10 10 5 30 0:00 0 5 65.78947368 state

Western 1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

Western 2 10 10 20 10 10 10 10 40 10 5 5 10 30 10 5 15 89.47368421 Town/Contractor

Western 3 10 10 20 10 10 10 10 40 10 10 5 10 35 5 5 10 92.10526316 Town/Contractor

Westmo1 10 10 20 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 City; Contractor

WB1 10 10 20 10 10 10 10 40 10 10 5 10 35 10 0 10 86.84210526 Village

WB2 10 10 20 10 5 10 10 35 5 10 5 10 30 10 0 10 86.84210526 Town

WB3 0 0 0 0 0 Political Legal Environmental Economic

Who will do the project? Choose from below. Economic Total Score Complies with Existing Long Term Potential Effect on Air Effect on Political Local Political Legal Effect on Env. Outside funding Score % State/Local Local Liability Legal Permits needed and/or Land Benefit:Cost Ratio Support Champion Score Score Wildlife Score requirement Regs Authority Issues Challenges Water Resources

Yes = 10; Yes = 10; Yes = 0; Easy/None = 10; Positive = Easy/No need = 10; Yes = 10; Yes = 10; Yes = 0; Positive = 10; Positive = 10; 2:1 use Positive, Town/Village/City; Mitigation Neutral = Neutral = Neutral = Some = 5; 10; Neutral = Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; Neutral = 5; 1:1 use maybe, Contractor; State; Project Code 5; No = 5; No = 5; No = Difficult/Many = 5; Negative = Difficult/None avail = No = 0 No = 0 No = 10 Negative = 0 Negative = 0 1:2 use negative Federal; Private 0 0 10 0 0 0

Municipal, WT1 10 10 20 5 5 10 5 25 5 5 5 0 15 5 0 5 65.78947368 contractor Municipalities and Yorkville1 10 10 20 10 5 5 10 30 5 10 5 10 30 10 5 15 81.57894737 County CC1 5 10 15 10 10 10 10 40 10 5 10 5 30 10 10 20 89.47368421 County wide

CC2 5 10 15 10 10 10 10 40 5 10 10 10 35 5 0 5 78.94736842 County wide

CC3 5 10 15 10 10 10 10 40 5 10 5 10 30 5 0 5 73.68421053 County wide

CC4 5 10 15 10 10 10 10 40 10 5 5 10 30 10 10 20 89.47368421 County wide

CC5 10 10 20 10 10 10 10 40 10 10 10 10 40 10 10 20 97.36842105 County wide

CC6 5 10 15 10 10 10 10 40 10 10 10 10 40 10 10 20 94.73684211 County wide

CC7 5 10 15 10 10 10 10 40 10 10 10 10 40 5 5 10 84.21052632 County wide

CC8 5 10 15 10 10 10 10 40 10 10 10 10 40 10 5 15 92.10526316 County wide

CC9 5 10 15 10 10 10 10 40 10 10 10 10 40 10 5 15 86.84210526 County wide

CC10 5 10 15 10 10 10 10 40 10 5 5 5 25 10 10 20 86.84210526 County wide What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Annsville 1 1-5 years Grant Moderate no Y

AUG1 <1 CHIPS, local funds Moderate no Y Y

AUG2 <1 local funds High yes Y Y

Ava 1 <1 local funds High yes Y

Local Funds; Grant Barneveld1 <1 High no Y Funds;

Barneveld2 <1 Local Moderate yes Y

Boonville T1 1-5 years Local Low no Y

Boonville T2 5-10 years Local Very Low no Y

Boonville T3 5-10 years Local Low no Y

Boonville V1 1-2 years State Very High yes Y

Boonville V2 1-5 years Grant Moderate no Y

Boonville V3 1-5 years local Very High yes Y

BW Town1 1-5 years Local Very High yes Y Y

BW Town2 1-5 years Private Moderate yes Y Y

BW Town3 < 1 year Grant in hand High yes Y Y

BW V1 < 1 year FEMA possibly Low no Y Y

BW V2 1-5 years Local High yes Y Y

CamT&V1 <1 year Local/ grant maybe High no Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Cam T&V2 5-10 years Grant Very Low no Y

Cam T&V3 < 1 year Local High yes Y

Cam1 <1 year Local Very High yes Y Y

Clay1 < 1 year Local High yes Y

Clay2 <1 year Grant Low no Y

Clinton 1 1-5 years Grant/Loan, Private Moderate no Y

Clinton 2 1-5 years Local Funds Moderate no Y

Clinton 3 1-5 years local funds Very High yes Y Y

Grant and local Clinton 4 5 years High no Y Y funds

Clinton 5 1 year Local Funds High yes Y Y

DEC <1 year Local Very High yes Y

Grant and local DF1 1-5 years High no Y funds

DF2 1 year Grant? Moderate no Y

DF3 <1 year Local High yes Y

DF4 1-5 years Local High no Y

Flo1 < 1 year Local High yes Y

Flo2 < 1 year Local High yes Y

Local, possible Floyd 1 1-5 years High no Y grant

Floyd 2 1-5 years Grant Very HIgh yes Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Floyd 3 <1 year Local Very High no Y

Floyd 4 <1 year Local and grant Very High no Y

Floyd 5 1-5 years Local and grant High no Y

Forestport 1 <1 year Local Very High yes Y

HP1 < 1 year Grant High yes Y

HP2 1-5 Years ALL High no Y

Kirk 1 1-5 years Local and grant High no Y Y

Kirk 2 1-5 years Local and grant High no Y Y

Kirk 3 1-5 years Local and grant High no Y Y

Kirk 4 1-5 years Local and grant High no Y Y

Kirk 5 1-5 years Local and grant High no Y Y

Kirk 6 1-5 years Local and grant High no Y Y

Lee1 1-5 years Local and grant High no Y

Lee2 1-5 years Local and grant High no Y

Lee3 1-5 years Local and grant High no Y

Lee4 1-5 years Local and grant High yes Y

Marcy 1 1-5 years Local and grant Very High no Y

Marcy 2 1-5 years Local and grant Very High no Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Marshall1 1-5 years Grant high no Y Y

Marshall2 1-5 years Grant Moderate no Y Y

Marshall3 1-5 years Local, Private, Low no Y Y

Marshall4 5-10 years grant very low no Y

Marshall5 5-10 years grant very low no Y

NH V1 <1 year local High yes Y

NH1 <1 year Local and grant Very High no Y Y

NH2 <1 year Local and grant Very High no Y Y

NH3 1-5 years Grant Very HIgh yes Y

NH4 1-5 years Local and grant High no Y Y

NH5 1-5 years Local and grant High no Y Y

NH6 <1 year Local and grant Very High no Y Y

NYM1 5-10 years Grant Very Low, reassess no Y Y

Oneida Castle 1-5 years Local and grant High no Y 2 Oneida Castle 1-5 years Grant Moderate no Y 1

OC1 1-5 years Local and grant Moderate no Y

Local funds and OC2 1-5 years Very High no Y grants What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Local funds; grant if OC3 <1 year High no Y available

OC4 <1 year Local and grant High no Y

OC5 1-5 years Local and grant Moderate no Y

OC6 1-5 years Grant Moderate no Y

OC7 1-5 years Grant Moderate no Y

OC8 <1 year Grant High no Y Y

OC9 1-5 years High no Y

OC10 1-5 years High no Y

OC11 1-5 years High no Y

OC12 <1 year High no Y

OC13 1-5 years High no Y

OC14 1-5 years High no Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

OC15 1-5 years High no Y

OC16 <1 year High no Y

OC17 1-5 years Local and grant High no Y Y

Grant and local OC18 <1 year Very High yes Y Y funds

OC19 1-5 years Local and grant Very High no Y

Orisk1 1-5 years Local, Private, Low no Y

Orisk2 < 1 year Grant in hand High yes Y Y

OFalls 1 1 year Local? Very High no Y Y

Paris 1 < 1 year Grant in hand High yes Y Y

Paris 2 1-5 years Local and grant High no Y Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Paris 3 1-5 years Grants Low no Y Y

Paris 4 1-5 years Grant Very Low no Y

Paris 5 1-5 years Grant Low no Y

Paris 6 <1 year Local Moderate yes Y

Paris 6a <1 year Local High yes Y

Paris 7 <1 year Local and grant Very High no Y Y

Pros1 1-5 years Local and grant Moderate no Y

Local funds; grant if Pros2 <1 year High no Y available

Remsen T1 < 1 year Grant in hand High yes Y

Local funds and RemVill 1 <1 year high no Y grants

RemVill 2 1-5 years Grant Moderate no Y

RemVill 3 1 year Grant/Loan Very High no Y

Rome 1 1-2 Years Grant Moderate no Y

Rome 2 1-2 Years Grant High no Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Rome 3 3-5 Years Grant/ Local Moderate yes Y

Rome 4 3-5 Years Grant/ Local Moderate no Y

Rome 5 1-3 Years Grant/ Local Moderate no Y

Rome 6 1-3 Years Grant/ Local Moderate no Y

Sang 1 1-5 years Local and grant Very High no Y

Sherrill1 1-5 years Grant Moderate no Y

Sherrill2 < 1 year Grant in hand High yes Y Y

Sherrill3 < 1 year Grant in hand High yes Y

SQ CRK1 1-5 years Grant Reassess no Y Y

SQ CRK10 1-5 years Grant Moderate no Y Y

SQ CRK11 1-5 years State Very Low no Y Y

SQ CRK12 1-5 years Grant Low no Y

SQ CRK13 <1 Grant Moderate no Y Y

SQ CRK14 1-5 years Local funds/grant High no Y Y

SQ CRK15 5-10 years Grant Very High yes Y Y

SQ CRK16 1-5 years Local Very High yes Y Y

SQ CRK17 1-5 years Local Moderate yes Y

SQ CRK18 1-5 years Local funds Low no Y Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

SQ CRK19 1-5 years Local Funds Low no Y Y

SQ CRK2 1-5 years ? Moderate no Y Y

SQ CRK20 1-5 years Local Funds Moderate no Y Y

Grant and local SQ CRK21 1-5 years Very High no Y funds

Grant and local SQ CRK22 1-5 years Very High no Y Y funds

Grant and local SQ CRK23 1-5 years Very High no Y funds

SQ CRK24 <1 year Grant High no Y Y

SQ CRK25 <1 year Grant Moderate no Y Y

SQ CRK26 <1 year Grant High yes Y

SQ CRK27 1-5 years Local and grant High no Y Y

SQ CRK28 1-5 years Local and grant High no Y Y

SQ CRK29 no Y

SQ CRK3 no Y Y

SQ CRK4 1-5 years Local and grant High no Y Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

SQ CRK5 no Y Y <1 year Local Very High

SQ CRK6 no Y Y 1-5 years Grant Funds High

SQ CRK7 no Y Y 1-5 years Local Funds Very High

SQ CRK8 no Y Y 1-5years Local,Grant/ Very High

SQ CRK9 no Y Y 1-5years Local/Grant Very High

ST1 1-5years Local/Grant High no Y Y

ST2 1-5 years Local/Grant Low no Y Y

Sylv B1 1-5years Local/Grant High no Y

Sylv B2 1-5years Local/Grant Very High no Y

T1 1 year Grant/local High no Y

T2 1-5 Years Local Funds, Grant Moderate no Y

T3 1-5 Years Local Funds, Grant Moderate no Y

T4 1 year grant/local High no Y

T5 1 year grant/local Very High no Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

UT 1 1-5 years Local and grant High no Y

UT 2 1-5 years local Very High yes Y

UT 3 1-5 years Local and grant High no Y

UT 4 1-5 years Local and grant High no Y

UT 5 1-5 years Local and grant High no Y

UT 6 1-5 years Local and grant High no Y

UT7 1 year grant/local High no Y

UT8 1 year Grant/Loan Very High no Y Y

UT9 1-5 years Grant/Loan High no Y Y UT10 1-5 years Grant/Loan High no Y Y UT11 1-5 years Grant/Loan High no Y Y

Vern1 <1 year Grant High no Y Y

Grant and local Vern2a <1 year Moderate no Y Y funds

Vern2b <1 year Grant High no Y Y

Vern3 < 1 year Grant in hand High yes Y Y

Grant; Sauquoit Vern Vill1 1-5 years Moderate no Y Y Creek Coalition

Verona 1 < 1 year Grant in hand High yes Y Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Verona 2 1-5 years Grant Moderate no Y

Verona 3 1-5 years Local and grant High yes Y

Vienna 1 <1 year Local and grant Moderate no Y

Vienna 2 1-5 years Grant Very HIgh yes Y

Vienna 3 < 1 year Grant in hand High yes Y

WV1 1-5 years Grant; Moderate no Y Y

WV2 1-5 years Grant Very HIgh yes Y

WV3 5-10 years grant very low no Y Y

Western 1 < 1 year Grant in hand High yes Y

Western 2 1-5 years Local and grant High no Y

Western 3 1-5 years Local and grant Very High no Y

Westmo1 < 1 year Grant in hand High yes Y

WB1 1-5 years Grant High no Y Y

WB2 <1 year Grant High no Y Y

WB3 no Y Y What is the Who will pay for timeline? the project? Score Priority Choose from Choose from below below

90%-100% = Very High; 80-89% = < 1 year; Ready to implement, Ready to Project addresses Local Funds; Grant High; 70- Mitigation 1-5 years; no outside funds implement if funds damages related to Funds; Loans; 79% = Moderate; Project Code 5-10 years; needed? become available? 2013 storm events? Private 60-69% = Low; 10 years + Y or N Y or N Y or N 50-59% Very Low; <50% = reassess

Grant; Sauquoit WT1 1-5 years Moderate no Y Y Creek Coalition

Yorkville1 1-5 years Local and grant High no Y Y

CC1 1-5 years Local and grant High yes Y

CC2 1-5 years Local and grant Moderate no Y

CC3 1-5 years Local and grant Moderate no Y

CC4 1-5 years Local and grant High yes Y

CC5 1-5 years Local and grant Very High yes Y

CC6 1-5 years Local and grant Very High yes Y

CC7 1-5 years Local and grant High no Y

CC8 1-5 years Local and grant Very High no Y

CC9 1-5 years Local and grant High no Y

CC10 1-5 years Local and grant High yes Y