A CITY OF OPPORTUNITIES MAYOR BORYS FILATOV:

“Our goal is to relieve businessmen, investors, and ordinary citizens of the obligation of communicating with state functionaries. By reducing contact between the public and civil servants, we reduce corruption and make life easier for everyone”.

Mayor Filatov personally welcomes investors to the city and will help ease their market entry at all stages of their business activity in the city of Dnipro.

3

CONTENTS

1. Message from the Mayor 3 7. Investment projects 33 7.1. Industrial Park 34 2. Contents 5 7.2. IT park offices and residential area 36 3. Dnipro in and the World 6 7.3. Expocenters 37 7.4. "Space Lift" Science and 4. Dnipro City History 7 Technology Park 38 7.5. "Academia" Science and Technology Park 39 5. Dnipro Today 15 7.6. Float-glass factory 5.1. Dnipro at a Glance 16 40 7.7. Modernization of the transport 5.2. Economy 17 system 41 5.3. Education 18 7.8. New highways 42 5.4. Culture & Tourism 20 7.9. Ropeway 43 7.10. Dnipro International Airport 44 6. City development strategy 27 7.11. Business Aviation Terminal 45 6.1. City Development Strategy 28 7.12. Air Cargo Terminal and Hub 46 6.2. New industrial parks and zones 7.13. Thermodernization of Municipal of economic development 29 Buildings 47 6.3. IT Cluster 30 7.14. Integrated 31 6.4. Theme parks Thermo-Modernization of 6.5. Energy saving 32 Muncipal Buildings 48 6.6. Development of transport 32 7.15. Waste-to-Energy Processing 6.7. Ecology and waste 32 Complex 49 7.16. Agropark 50 7.17. Fruit And Vegetable Storage and Sorting Facility 51 7.18. Leisure Centre "Golf Resor" 52 7.19. Logistics Center "Green Market" 53 7.20. Polymer Materials Sheets Production 54 7.21. Production of Polimer Coatings on Galvanized Steel or Aluminum Sheets 55 7.22. Production of Bio Fuel Pellets 56 7.23. Production of Tanks from Polymer Materials 57 7.24. Atmospheric Air monitoring system 58 7.25. "Staryy Kodak" tourist and recreation park 59 7.26. "Stara Samar" tourist and recreation park 59 7.27. The Museum of History of the City of Dnipro 60

5 DNIPRO ON THE MAP THE WORLD

DNIPRO IN UKRAINE

Kyiv 480 km 220 km 200 km

Vinnitsa 570 km

Kropivnitsky 270 km

Krivy Rig 145 km 350 km

Zaporizhzhia 80 km

Odessa 520 km 330 km

6 DNIPRO CITY HISTORY HISTORY THE CITY AROSE ON THE BASIS OF THE SYSTEM OF COSSACK SETTLEMENTS IN 1524

STARA SAMAR

NOVYY KODAK STARYY KODAK

Reconstructions by Alexander Kharlan

STRONG TRANSIT TRADE WITH HANSA LEAGUE, HOLLAND, OTTOMAN EMPIRE AND IN XVI-XVIII CENTURIES

COINS COMMODITY SEALS

8 HISTORY AT THE END OF XVIII CENTURY PLANNED TO CREATE HERE ITS THIRD SOUTHERN CAPITAL AND FORPOST

THE SAVIOUR'S TRANSFIGURATION CATHEDRAL HISTORY

FIRST PLAN OF EKATERINOSLAV CITY

IN THE XIX CENTURY EKATERINOSLAV CITY USED TO BE THE CENTRE OF PROVINCE OF RUSSIAN EMPIRE WITH NO INDUSTRY

GOVERNOR'S HOUSE

9 HISTORY THE RAMPANT TAKE-OFF OF THE CITY STARTS FROM THE END OF XIX CENTURY. ALEXANDER PAUL DISCOVERED IRON ORE AND BUILT THE RAILWAY

ALEXANDER PAUL

10 HISTORY IRON FEVER: EXPERIENCING QUICK GROWTH DUE TO GERMAN, FRENCH AND BELGIAN INVESTMENTS, IRON AND STEEL BECAME THE MAIN INDUSTRY OF THE CITY HISTORY

BELGIAN TRAM

FACTORIES OF THE TIMES OF "IRON FEVER"

11 HISTORY DURING THE SECOND WORLD WAR, FIERCE FIGHTING WAS TAKING PLACE IN THE CITY

HOTEL "UKRAINE" 1941 2017

AMUR BRIDGE 1941 2017

12 HISTORY FROM 1950TH THE CITY BECAME THE CENTRE OF ROCKET-BUILDING INDUSTRY OF THE

MAIN OFFICE BUILDING YUZHMASH FACTORY

ROCKET "SATAN" HISTORY

AFTER UKRAINE BECAME INDEPENDENT, "YUZHMASH" COMPANY STARTED DEVELOPING SPACE ROCKETS, INCLUDING JOINT PROJECT WITH USA "SEA LOUNCH"

13 HISTORY IN 2014 DNIPRO CITY OPPOSED RUSSIAN SUPPORTED HYBRID WAR. PRO-UKRAINIAN POSITION OF THE INHABITANTS AND THE HIGHEST NUMBER OF VOLUNTEER SOLDIERS IN UKRAINE STOPPED RUSSIAN AGRESSION

THE MEETING TO SUPPORT INDEPENDENCE OF UKRAINE, 19TH OF FEBRUARY 2014

REGIMENT DNIPRO-1 ON THE POSITION OF "REPUBLIC BRIDGE"

14 DNIPRO TODAY DNIPRO AT A GLANCE

DNIPRO KEY FACTS DNIPRO INNOVATIVE

Distance to – 465 km AEROSPACE: Area – 405 km2 Serial production, the most environmentally friendly rocket carriers in the world Population – 1002 thousand Telecommunication and remote sensing satellites Universities - 10 Participation in projects of ANTARES RN, Alcántara Age - 35% of population is from 20 to 40 High-end devices and systems 9 business centers 900 m2 of retail space per 1000 inhabitants IT OUTSOURCING: 7000 EMPLOYED, TOP-3 IT COMPANIES IN UKRAINE 10,2% of the GNP OF UKRAINE 16% of total EXPORTS OF UKRAINE DNIPRO TOURISTIC 1100 large and medium-sized companies 67 hotels 240 of them are industrial 20 shopping and entertainment complexes 25% of the region's total industrial products 460 cafes, 22 nightclubs DNIPRO INDUSTRIAL SPORT STEEL INDUSTRY: 12 large and medium-sized enterprises The main arena of Ukraine in canoeing and kayaking ENGINEERING: aviation, mine hydraulics, special electric 862 m cableway for water skiing and wakeboarding drives Dnipro soccer arena CHEMICAL AND PROCESSING INDUSTRY: rare gases production, battery production LIGHT INDUSTRY: high quality sewing, food industry FOOD INDUSTRY: sunflower oil

16 ECONOMY DNIPRO TODAY

POWERFUL INDUSTRIAL POTENTIAL TWIN CITIES AGREEMENTS

Іndustrial enterprises produce 4,5% of all industrial Vilnius Lithuania products of Ukraine Herzliya Israel The basis of the cityʼs industry is the metallurgy (12 large Dalian China and middle enterprises). The metallurgical complex Xian China produces 6,9% of the total production volume of the ferrous metallurgy of Ukraine Zilina Slovakia Kutaisi Georgia The cityʼs machine-building and metal-processing industries produce 10,5% of the national production Zugdidi Georgia volume of the machine-building complex Durham Canada 7 enterprises of the cityʼs chemical industry produce 7,5% Saloniki Greece of the total production volume of chemical and Tashkent Uzbekistan petrochemical industry of Ukraine Szczecin Poland The cityʼs light, food and processing industries produce Szolnok Hungary foodstuffs in volume of 5,6% of the total production of Bern Switzerland Ukraine The cityʼs building complex is on the second place in CONSULATES Ukraine: 150 building organizations, 56 design companies, 540 small-scale building companies Consulate General of Germany Honorary Consulate of the Republic of Lithuania Honorary Consulate of the Republic of Austria Honorary Consulate of Czech Republic

FOREIGN TRADE

The city has foreign economic activity almost with 130 countries of the world. The volume of export-import operations is over 7% of the external turnover of Ukraine

The volume of export in 2016 is 1,3 USD billion The volume of import in 2016 is 1,9 USD billion 17 EDUCATION

Dnipro is a major educational centre in Ukraine and is home to two of Ukraine's top-ten universities.

10 UNIVERSITIES

181 EDUCATIONAL INSTITUTIONS AMONG THEM SCHOOLS, GYMNASIUMS AND BOARDING SCHOOLS

203 PRESCHOOL EDUCATIONAL ESTABLISHMENTS

NUMEROUS OUTOFSCHOOL INSTITUTIONS SUCH AS YOUTH CLUBS AND CENTERS

18 HIGHER EDUCATION DNIPRO TODAY

HIGHER EDUCATION

One of Dnipro cityʼs points of pride is its higher education. It has a long and rich history. Its students, graduates and academics have long been known and appreciated worldwide, especially in the following areas: space programme, creation of energy-saving and environmentally friendly technologies in mining, metallurgy, chemical industry, construction, agriculture. Currently, there are 87 thousand students in all higher education establishments of Dnipro.

THE MOST RENOWNED UNIVERSITIES OF DNIPRO:

NATIONAL MINING UNIVERSITY OF UKRAINE NATIONAL UNIVERSITY OF RAILWAY TRANSPORT ALFRED NOBEL UNIVERSITY OLES HONCHAR NATIONAL UNIVERSITY NATIONAL METALLURGICAL ACADEMY OF UKRAINE

In 2017 Ukraineʼs Higher Education system was ranked as the top in Eastern Europe by Universitas 21, ahead of Czech Republic, Poland, Slovenia, and Slovakia. The research group sited high Education spending as a proportion of GDP compared to other nations as a likely cause of Ukraine having the best post secondary system in East Europe. 19 CULTURE & TOURISM DNIPRO IS RENOWNED FOR RICH AND ACTIVE CULTURAL LIFE HAVING 8 THEATERS, 4 MUSEUMS, 3 CONCERT HALLS, 86 LIBRARIES, 9 MOVIE HALLS, 16 CLUBS, 67 HOTELS

One-man show "The Scream" Dnipro Theater Opera and Ballet Dnipro House of Organ and Chamber Music

Dnipro Philharmonic named after Theatre of Ukrainian Drama named after Dnipro Theater of Drama and Musical L. Kogan Comedy

Art Center «Kvartira» Picture Gallery «TELEGA» Art Gallery ”Artsvit”

Black Lizard Gallery-book store Art center «I Gallery» Art Museum

20 Dnipro National Historical Museum named after Dnipro Museum of D. Yavornitsky D. Yavornitsky DNIPRO TODAY

Museum centre of O. Blavatska and her family Dnipro Planetarium

The museum “Literary Dnipro” Museum “Jewish Memory and Holocaust in Ukraine”

Technical museum RetroAuto The museum of ukrainian painting Dnipro region Antiterrorist operation museum

21 TOP DNIPRO TOURIST ATTRACTIONS

Dnipro is a place of considerable touristic charm. Located on the banks of the Dnipro River in a region rich in natural beauty and steeped in Ukrainian Cossack tradition, todayʼs Dnipro offers a range of recreation and leisure activities that make it a fun city break destination.

This chic boulevard is a relatively new and fresh arrival to the Dnipro downtown architectural ensemble. It is one of the cityʼs most popular eating out and retail focuses. The district includes a range of fountains and other funky design elements such as overhead decorations. In the long and sultry summer months, it plays host to a series of terraces and streetside cafes that attract Dniproʼs beautiful people. EKATERINOSLAVSKIY BOULEVARD 22 TOP ATTRACTIONS MONASTERY ISLAND This downtown natural treasure is a wonderful place for family strolls and romantic interludes all year round. Connected to the city via a pedestrian bridge, it forms part of Dniproʼs largest park complex – Shevchenko Park. Monastery Island is home to one of Ukraineʼs largest Shevchenko monuments and boasts some of the cityʼs best beaches. Weekenders can also enjoy a zoo, pony riding club, and various cafes. The island abounds in greenery and is a great place to chill out if you are looking to get away from the big city bustle without travelling out of town.

GRAND HOTEL "UKRAINE" Known to many as "" or "The House of Khrennikov", this local landmark is a classic example of Ukrainian modernist architecture. Built in 1912 by prominent businessman Vladimir Khrennikov, this four-story building DNIPRO TODAY has won plaudits as the architectural embodiment of Ukrainian national traditions. Ukrainian ethnographer and historian Dmytro Yavornytsky played a key role in the development of the architectural plans behind the building and helped to add elements of authenticity. With its tower topped by wrought iron spikes, tiled roof and white walls, the building is reminiscent of architectural styles common during the era of the Zaporizhia Sich and the heyday of the Ukrainian . The buildingʼs ornate and detailed decorations include the Coat of Arms of the Zaporizhia Army – a Cossack with a musket and a sword. This monument to Ukrainian architectural heritage miraculously survived the destruction of WWII and serves today as one of the cityʼs top hotels.

UKRAINEʼS EXTREME WATERSPORTS CAPITAL Dnipro is home to Ukraineʼs largest aquatic sports complex, the Sentosa Cable Park. The park is popular for wakeboarding and water skiing. It has already gained a reputation beyond Ukraine as a venue for international competitions. Sentosa Cable Park boasts state-of-the-art facilities and offers a dose of adrenaline close to the city center. This is an extremely popular hangout during the summer season and is a great place to improve your waterski skills with the help of qualified instructors.

23 TOP ATTRACTIONS SAMAR DNIPRO FEST This festival offers a window into Ukrainian history and incorporates authentic elements from across a range of different eras including everything from the Middle Ages to the present day. The festivities are diverse and dynamic, with arts and crafts alongside literature and period performances. There is also an accent on contemporary Ukrainian music, giving the event a traditional festival feel. The Samar Dnipro Fest is hosted at a cultural heritage site that occupies an important place in national folklore – Stara Samar Fortress, which dates back to the Ukrainian Cossack period.

RELIGIOUSLY DIVERSE DNIPRO Throughout its history, Dnipro has always been home to a wide variety of different religious communities. This cosmopolitan heritage is reflected in the presence of numerous houses of worship that continue to coexist and function in the city. For example, visitors will find a range of different Ukrainian Orthodox, Catholic, and Protestant churches to explore. The cityʼs diverse religious traditions have helped to create a culture of tolerance while providing a welcoming environment for people of all faiths.

DNIPROʼS ICONIC STONE WOMEN The Dnipro History Museum is home to one of the worldʼs largest collections of ancient steppe sculptures. A number of fascinating female statues stand outside the museum, offering an echo of a long-forgotten era when nomadic peoples dominated the surrounding region. Known to locals as Dniproʼs “Stone Women”, these iconic figures serve as a reminder of the many different cultures to leave their mark on Ukraine over the centuries. Similar stone statues dot the landscape throughout todayʼs Ukraine, with many looking out across the countryʼs seemingly endless southern steppe lands. Female figures tend to dominate this genre of stone sculpture, hinting at ancient associations with fertility.

24 TOP ATTRACTIONS ROCKET PARK IN A ROCKET CITY

Dniproʼs status as the capital of the Soviet Unionʼs rocket program earned it the twentieth century nickname "Rocket City". You can catch a flavor of this locally produced ballistic brilliance by visiting Dniproʼs dedicated Rocket Park complex, which boasts a number of giant exhibits guaranteed to thrill fans of Cold War relics. The park serves as a reminder that Dnipro remains the capital of Ukraineʼs space industry and a significant player in the international rocket and missile industry. It is also home to the Alexander Makarov Aerospace Museum – Ukraineʼs only museum dedicated to rocket and space technologies. DNIPRO TODAY

SENSATIONAL SUMMER SAILING

Who needs the seaside when you have one of the worldʼs biggest and most beautiful rivers running right through the middle of town? The Dnipro River serves as a giant playground for the entire city and is an endless source of entertainment. Sailing is a popular pastime and visitors in the spring and summer months will see dozens of pleasure boats cruising up and down the river.

25

CITY DEVELOPMENT STRATEGY CITY DEVELOPMENT STRATEGY

DNIPRO VISION OBJECTIVES

NEW JOBS Create 100K new jobs

ADVANCED Create technological and science parks with 20K INDUSTRIES employees

Attract USD 10 billion over INVESTMENTS the next 10 years

Achieve cleaner environment LIVEABILITY Advance urban agriculture Improve recreation industry Create the new image of BRAND the city as a cosmopolitan, spacious, and innovative place

Increase population in the MEGAPOLIS city and region by 15%

28 NEW INDUSTRIAL PARKS & ZONES OF ECONOMIC DEVELOPMENT

TH 19 CENTURY INDUSTRIAL PLANTS INDUSTRY 4.0 TECHNOLOGIES 20TH CENTURY TECHNOLOGIES STRATEGY

Industry 4.0 29 IT CLUSTER

DNIPRO IT COMMUNITY KEY FACTS & IT CLUSTER MISSION: VALUE PROPOSITION Create a balanced IT ecosystem in the region for IT business development 7000 IT LABOR POOL 7 UNIVERSITIES WITH IT CLUSTER GOALS: 1000 IT GRADUATES/YEAR Regional IT industry representatives consolidation for IT 170+ COMPANIES IN THE IT SECTOR industry promotion IT business development and support of related activities Creation of attractive investment climate in Dnipro and LOCATION VALUE PROPOSITION Ukraine in general Strong math, science & engineering education Support the development of socially important industries – Scalable & mature IT market education, law, infrastructure, promotion High level of competences, commitment, communication skills, cultural proximity to European countries is very suitable for R&D tasks Low operating costs

IT CLUSTER ADVANTAGES Excellent location in terms of number of innovation and R&D centers, product companies and startups 8+ years in the local IT market for 20+ IT companies KEY IT SERVICE PARTNERS Very affordable senior management talents which are full professional Almost 80% of teams use agile development methodologies 40%+ of IT specialists are senior software engineers Average years of experience for Senior level close to Western Europe standards

30 STRATEGY 31 EXTREME PARK ONE OF THE MAIN PILLARS OF DNIPRO CITY DEVELOPMENT STRATEGY IS DEVELOPMENT CITY STRATEGY OF DNIPRO PILLARS THE MAIN ONE OF A MULTITUDE OF THE CREATION THEY WILL INCREASE PARKS. OF THEME CITYʼS COMFORT POTENTIAL CITY OF OUR RECREATIONAL USING HUGE TOURISTS OF LIVING AND ATTRACT LOCAL AND INBOUND THEME PARKS THEME STARA SAMAR TOURIST & RECREATION PARK SPACE PARK WATER SPORTS PARK ENTERTAINMENT PARK ENTERTAINMENT ENERGY SAVING

In the Monitoring, based on the indicators recommended by the International Energy Agency, the estimated energy efficiency level in Ukraine in 2017 was 60% of the EU level. Two thirds of the energy saving potential falls on the industry and the residential sector According to the Action Plan for sustainable energy development in the city of Dnipro for the period from 2015 to 2025, Dnipro undertakes to increase energy efficiency and increase the use of alternative and renewable sources of energy

The "Covenant of Mayors" obliges Dnipro to reduce its CO2 emissions by at least 30% by 2030 by implementing energy-saving technologies and renewable energy sources. Therefore, huge investment possibilities are open to companies investing in enegy efficiency projects in the industry and real estate

DEVELOPMENT OF TRANSPORT

CITY TRANSPORT DEVELOPMENT KEY STRATEGEIC POINTS: development of transport infrastructure by means construction of passenger terminals, rolling stock upgrade; priority development of environmentally friendly modes of transport (tram, trolleybus, metro, etc.); improving the investment climate by creation of favorable conditions for attractiveness of the transport industry; Improvement of payment system in urban transport.

ECOLOGY AND WASTE COMPREHENSIVE PROGRAM OF ECOLOGICAL SAFETY AND INTRODUCTION OF SUSTAINABLE ECOLOGICAL LOW CARBON DEVELOPMENT OF THE CITY OF DNIPRO FOR 2016-2020 HAS SEVERAL PRIORITES: Introduction of technologies of utilization of industrial wastes with the purpose of maximum level of the involvement of waste in the technological processes of production

improvement of the system of collection, transportation, utilization and processing of solid domestic wastes

development of the environmental monitoring system

improvement of technological processes of production, introduction of the best available technologies for minimization of technogenic influence on the environment

32 INVESTMENT PROJECTS INDUSTRIAL PARK

PROJECT DESCRIPTION

INDUSTRIAL PARK COMPONENTS

Road/transport and engineering infrastructure, office premises, pre-school facilities, vocational school Industrial production sites Regional multi-purpose exhibition center R&D, experimental production, business incubator COMMERCIAL SITES FOR: office premises for IT community apartments for IT-cluster and industrial park employees

INDUSTRIAL PARK LOCATION:

City center distance - 4,6 km International airport PROJECT PARAMETERS DNK, class 4С, distance - 21,2 km River port TOTAL INVESTMENTS REQUIRED – USD 158 MLN Navigation: Mar-Dec Throughput: 5,7 mln tons INDUSTRIAL PARK 61,4 ha 3 cargo terminals 16 piers Draught – up to 4 m INDUSTRIAL ZONE 50,4 ha distance - 3,8 km Railway station RESIDENTIAL COMPLEX 5,45 ha "Nizhnodniprovsk – Junction Station" Customs terminal, cargo processing terminals for 3 t, 5 t PUBLIС COMPLEX 5,5 ha 20 and 40-feet containers (distance - 3,1 km) 34 PREFERENCES FOR RESIDENTS OF FROM THE OPERATOR COMPANY THE INDUSTRIAL PARK Land plots at the territory of the industrial park ready for design and construction works FROM THE STATE Individual approach to land plot selection According to the Law of Ukraine "On Industrial Parks": Up-to-date topographic and geodesic information Zero-Interest loans Special purpose grants for the development of the Geological research industrial park "Turn-key" design and construction services Preferences in the Law of Ukraine "On amendments to Legal assistance the Tax Code": Centralized connection to municipal engineering real-estate tax exemption networks land tax exemption land rent payment exemption PR services exemption from profit tax (to be enacted) Security extension of import VAT payment (to be enacted) Maintenance and logistic Preferences stated in the Law of Ukraine "On amendments to Customs Code": Internal transport import duties exemptions Food courts, auxiliary services, recreational areas preferences on import duties

IT-PARK: FROM THE CITY 1. Office premises Roads and transport infrastructure 2. Apartments for lT-park and industrial park Engineering networks employees Vocational school 3. Pre-school facilities Land plots ready for rent INDUSTRIAL ZONE: Land plots ready for connection to engineering networks 4. Industrial production sites Exemption from shared funding of the development of 5. Exhibition center municipal infrastructure in case of construction within the 6. Business incubator, R&D, Experimental production industrial park (10-15% of the estimated cost of the facility) ADDITIONAL SERVICES: Preferential local taxes 7. Hotel Other preferences from the city 8. Park, green areas Public transportation, regional station, cableway station 9. Trade and catering facilities (planned) 10. Medical complex Synergy effect from close allied production sites location 11. Sports complex

AREA 61,4 ha 614000 m2 PROJECTS

35 IT PARK OFFICES & RESIDENTIAL AREA

PROJECT DESCRIPTION

IT-park offices, and residential area buildings are planned to be build on the territory of the industrial park. This area will accommodate IT-park, Business incubator and Industrial area specialists, as well as the visitors of the exhibition hall.

PROJECT PARAMETERS:

General area of office accommodation - 50 000 m2 Effective area of office accommodation - 40 000 m2 Total area of residential accommodation – 25 000 m2 Capital expenditure – USD 52,5 mln (including design works) Payback period – 10 years

36 EXPOCENTERS

PROJECT DESCRIPTION It is planned to build a regional exhibition center on the territory of the industrial park at Slobozhansky Highway. The territory of the exhibition complex is 4.2 hectares.

INDUSTRIAL EXHIBITION: I stage: 6 000 m2 II stage: 8 000 m2 Parking space: 15 000 m2 PROJECT COST - USD 14 MILLION

PROJECT DESCRIPTION

THE TERRITORY OF THE EXHIBITION COMPLEX IS 16 PROJECTS HECTARES EXHIBITION AREA 50 000 M2

According to the decisions of the Project Master Plan, Part of the Quay is transferred from the industrial lands to the territory of residential and public use. Reconstruction of Railway Square provides creation of transitions and concourses from the station to the embankment. The attraction of this place is its proximity to the city center, transport links and location on the banks of the Dnipro River. PROJECT COST - USD 80 MILLION 37 "SPACE LIFT" S&T PARK

PROJECT PARAMETERS:

STAGE 1: INNOVATION AND BUSINESS PARK Apartments 25 000 m2 all-together, incl: for S&T Park 10 000 m2 for IT - cluster 15 000 m2 Innovation & business, R&D zone 35 000 m2 all-together, incl. 10 000 m2 already existing buildings (to be renovated), 25 000 m2 new buildings: for S&T Park 10 000 m2 for IT- cluster 15 000 m2

PROJECT DESCRIPTION STAGE 2: STAGE 1 INCLUDING UNIVERSITIES Includes major universities of Dnipro city: SCIENCE AND TECHNOLOGY PARK Dnipro State University, Dnipro Polytechnika, Transport institute Science and technology park is the part of innovation and business ecosystem in Dnipro. STAGE 3: SERENDIPITY POLIS OF DNIPRO Science and technology park is a strategically planned, Creative industry and business industrial zone: purpose built work environment designed to locate in close InnoCampus (Marketing & Advertisement innovations) physical proximity university, government and private 10 additional business & industrial park research bodies involved in a particular field of endeavour. STAGE 4: UKRAINE - SERENDIPITY STATE There the knowledge can be shared, innovation promoted All-Ukrainian application and research outcomes progressed to viable commercial products. PROJECT COST: Stage 1: USD 750 000

MOVABLE PRE-INCUBATOR Multi-functional Mobile pre-incubator allows for the incubator's team to be closer to innovators, startups for more accessible and faster incubation.

38 "ACADEMIA" SCIENCE & TECHNOLOGY PARK

PROJECT DESCRIPTION FORMS OF COOPERATION Investor's share participation Description of the project: the creation of science and technology park in Dnipro City Location of the project: Dnipro National University, PROJECT INITIATOR Dnipro National University of Railway Transport Dnipro Development Agency www.dda.dp.ua [email protected] PROJECT PARAMETRS Soborna Squar Total cost of the project: USD 20 mln 3 km Project duration: 3 years Payback period: 6 years

Gagarin ave PROJECT PRODUCT 1500 new jobs 300 residents in the technological park 20 new innovative companies annually USD 20 mln / year annual increase in innovative products Kazakova str PROJECTS 1000 annual increase in new jobs Involvement of international investments into the region

PROJECT ADVANTAGES

Assistance from the municipal authorities ENGINEERING INFRASTRUCTURE Dnipro is the center of space, IT and agrarian branches of Ukraine Distance from the 2 km - Route H08 Synergy of Science, Business and Municipal Authority nearest routes Very attractive campus area with sports facility and the Water, gas, electricity In su cient quantity park 39 FLOAT GLASS FACTORY

PROJECT DESCRIPTION FORMS OF COOPERATION Description of the project: construction and Credit, project finance, foreign direct investment commissioning of a plant for the production of sheet float glass Location of the project: the site for the future facility may PROJECT INITIATOR be allocated at the territory of industrial park of the city of Dnipro or on other available locations Dnipro Development Agency Resources of the initiator (municipalities) for the project: Land plot of 40 hectares Description and economic feasibility of the project for the construction and commissioning of a float glass plant CHARACTERISTICS OF PRODUCTION PLOT PROJECT PARAMETRS Area 40 ha Total cost of the project: USD 150 - 300 mln (depends on the chosen technology) Purpose of land plot Industrial land Term of the project: 1,5-2 years – the period of design and construction Kind of ownership Municipal land Payback period: 6-7 years

PROJECT PRODUCT The product is sheet float glass for windows ENGINEERING INFRASTRUCTURE

PROJECT ADVANTAGES Distance from the Access road - 100 m nearest roads Distance from the railway - Assistance from the authorities in obtaining technical 100 m specifications, permits, licenses, certificates for construction and operation of the plant. Water supply: distance - 50 m, Gas – none. Directed to 100% of import substitution. Water, gas, electricity The power line substations: Sites for production placement prepared. on site, 10kV 40 PROJECTS 41 The project envisages the construction of line a trolleybus The project USD 1,2 mln Approximate cost of the project is of line a trolleybus of envisages: construction project The The estimated cost of the project is USD 9,2 mln machines financed by the of 50 trolleybus Purchase CONSTRUCTION OF THE TROLLEYBUS CONSTRUCTION OF THE TROLLEYBUS DISTRICT LINE IN THE SONYACHNY CONSTRUCTION OF THE TROLLEYBUS LINE IN THE RESIDENTIAL AREA OF PRIDNIPROVSK PURCHASE AND LEASING OF TROLLEYBUS VEHICLES of 3,8 km, the modernization of one traction substation and substation traction modernization of one km, the of 3,8 center the construction of one dispatching substations and two 19 km, traction of construction three traction stations, modernization of two dispatching substations and Development, for Reconstruction Bank European Belarusian of 13 amounting to USD 12,3 mln and leasing trolley buses manufactured by OJSC "Belkommunmash" MODERNIZATION OF TRANSPORT MODERNIZATION SYSTEM The project envisages construction of a trolleybus line of line trolleybus of a construction envisages project The The cost of the project is USD 1 mln First stage – completion of construction of the existing of the of construction stage – completion First subway line and depot new stations Second stage - construction of three (Teatralna, Central, Historical Museum) defence of (civil stage - construction additional sites Third existing both on the located sites) and dual-purpose construction (second under and at the site subway area launch complex) for is scheduled - 5 years, completion Construction period 2021 for agreements facilities is financed by credit The project of Ukraine and the Ministry of Finance the between Development and Bank for Reconstruction European co-financed by the European Investment Bank, totaling EUR 224 mln 2,8 km, construction of one dispatching center, of one dispatching km, construction 2,8 modernization of of substation, installation one traction 62 contact sysyem masts THE PROJECT CONSISTS OF THE CONSTRUCTION OF THE PROJECT CONSISTS THREE STAGES: CONSTRUCTION OF THE TROLLEYBUS LINE IN THE SOKIL RESIDENTIAL AREA COMPLETION OF "DNIPRO METRO LINE" COMPLETION OF "DNIPRO NEW HIGHWAYS

FROM KAYDATSKIY SHLYAH STREET TO CONSTRUCTION OF A ROAD CROSSING "KYIV – LUGANSK – IZVARINO" HIGHWAY AT THE INTERSECTION OF HIGHWAY AND BEREZINSKA STREET IN PROJECT DESCRIPTION THE CITY OF DNIPRO To solve the problem of transit cargo transport along the central streets of Dnipro, improve traffic flow conditions, develop transport infrastructure and improve the ecological PROJECT DESCRIPTION condition of the city, is planned the construction of a main road Construction of a traffic junction at two levels (a tunnel overpass on the Donetsk highway under Berezynska Street) will enable the transit transport, in particular the cargo, to PROJECT PARAMETRS cross Berezynska street at high speed, that avoid delays at the intersection, congestion and traffic jams at the THE TOTAL ESTIMATED COST OF THE PROJECT IS intersection of the Donetsk highway and adjacent streets and USD 120,8 MLN, including: improve environmental load. construction works – USD 94,0 mln equipment – USD 0,3 mln other expenses – USD 26,5 mln

PROJECT PARAMETRS

THE TOTAL ESTIMATED COST OF THE PROJECT IS USD 11,7 MLN INCLUDING:

construction works – USD 9,15 mln equipment – USD 0,14 mln Project implementation period – 68 months other expenses – USD 2,39 mln

Duration of construction - 23 months 42

PROJECTS 43

Donetsk

Dnipro River River Dnipro Kharkiv 5 4 3 _Heroes of Maidan Square_ _Sagaydak Park_ _Industrial Park Kalynova_ _Basil Sukhomlynsky 2 3 m 1 2 5 / 2 Power lines substations - 10kV 7200 3000 p/hour State, municipal, Concession-based public-private partnership 1 ROPEWAY

Dnipro River The current station Construction site Projected site Electricity and city Electricity electric network Number of stations, including engines Total length Max passenger traffic on branches Ownership ENGINEERING INFRASTRUCTURE CHARACTERISTICS OF THE ROPEWAY CHARACTERISTICS OF THE ROPEWAY POSSIBLE ROUTE ROPEWAY POSSIBLE ROUTE METRO

in Construction of the first two

Levoberezhnii district, Central District 13-15 years (depending on technical ROPEWAY (5 stations), with a capacity of 3000 people / hour people of 3000 a capacity (5 stations), with Total project cost: USD 100 mln (Phase 1 – USD 40,3 mln) Project of duration: 2 years – the period design and Payback period: Project description: Project Location: Initiator's Resources (municipalities) for the project: PPP, loan, project finance, foreign direct investment, the finance, foreign PPP, loan, direct project Assistance from the authorities in obtaining technical Assistance from the authorities and assistance of support licenses, permits, specifications, relevant departments of the city CO2 by 10%, unloading lots of traffic towards the Reducing new bridge by 30% Connecting remote districts and the city center Ropeway solutions) construction branches of the ropeway in Dnipro of of and feasibility project the ropeway the Description Dnipro city PROJECT PARAMETRS PROJECT DESCRIPTION FORMS OF COOPERATION Dnipro with collaboration in determined investor Development Agency and 7,2 km long PROJECT ADVANTAGES PROJECT PRODUCT DNIPRO INTERNATIONAL AIRPORT

PROJECT DESCRIPTION AIRPORT Dnipro International Airport serves Dnipro City and the AERODROME INFRASTRUCTURE: region with the population of 7 mln people Construction of a new runway (3260x60 m) Located: 5 km southeast of Dnipro City Repair of the existing runway (2850x44 m) and existing Type: civil taxiways, reconstruction of the apron, light-signal and Passenger turnover (year): 450 thousand radio navigation systems Airlines Austrian Airlines, Dniproavia, Windrose Airlines, The new runway will be longer and wider than the existing International Airlines of Ukraine, Air Baltic, Georgian one, located parallel to the existing strip 150 meters from it Airlines, Lufthansa (towards the passenger terminals). Reconstruction and repair of the apron, taxiways – will be implemented with increasing coverage and increasing their bearing capacity. The apron will be significantly expanded, its area will increase by 75%, additional parking will be built for medium and long-haul aircraft, the total number of aircraft stops will increase.

NEW INTERNATIONAL PASSENGER TERMINAL

Construction of a new runway (3260x60 m) Repair of the existing runway (2850x44 m) and existing taxiways, reconstruction of the apron, light-signal and radio navigation systems PASSENGER TURNOVER (PER YEAR) The new facility, located to the south-west of the operating 3 MLN terminal, will significantly expand the airport's capabilities. It will be built in 2 levels with a division into the arrival and departure areas of passengers. The capacity of the new COST OF CONSTRUCTION AND terminal will be about 1000 people per hour. RECONSTRUCTION At the same time, the existing terminal will serve exclusively domestic flights in the future. The total throughput of two USD 165 MLN terminals will exceed 1500 passengers hourly. 44 PROJECTS 45 area: 20,9 ha service intended purpose of the use: air transport cadastral number: issued leaseholder: ATC "Yuzmashavia" electricity, water and gas supply: investments) available (it does not require additional for parking and of 20,9 ha, territorv an area with land plot of types of planes, all reception energy supply, existing transport, store), automobile (including buildings/premises cargo aircraft distance from the nearest transport corridor: 1 km distance to Dnipro: 5 krn Iuggage custom registration navigational support aircraft engineering servicing customs terminal take-off runway, highways and railway lines PROJECT TECHNICAL PARAMETERS LAND PLOT CHARACTERISTICS: ENGINEERING INFRASTRUCTURE: COMPANY RESOURCES: TRANSPORT INFRASTRUCTURE: TRANSPORTATION SERVICES: USD 1,8 mln 126% 5 years 18% USD 14,6 mln USD 7 mln Project cost: BUSINESS AVIATION TERMINAL AVIATION BUSINESS meeting/boarding a passenger with personal assistant meeting/boarding a passenger with by a separate of a passenger from / to a plane delivery transport tickets of air for registration procedure organization of the and Iuggage customs and security, passing of aviation individual passport control wi-fi, international calls, fax, printer luggage wrap visiting a bar with one person comfortable waiting rooms parking for passengers' cars The construction of modern business terminal for terminal of modern business construction The PROJECT PARAMETERS PROJECT GOALS Servicing, receipt of charter flight parking for private planes. Servicing, receipt of charter flight WILL SERVICE TERMINAL PASSENGER BUSINESS INCLUDE: PROJECT DESCRIPTION of territory to VlP passengers in the provision of services platform ATC "Yuzhmashavia" aviation in the acting international airport "Dnipro". EBlDA Profitability index - PI Payback Period - PP Internal Rate of Return - lRR Net Present Value - NPV AIR CARGO TERMINAL & HUB

PROJECT DESCRIPTION PROJECT GOALS Construction of the modern logistic terminal for cargo Reception and dispatch of cargo by regular flights from the handling on aviation and other transport in the territory of international Airport "Dnipropetrovsk" ATC "Yuzmashavia" in the lnternational Airport Handling of charter flights on the equipped parking stands "Dnipropetrovsk". Arrangement of cargo transits through the lnternational Airport anipropetrovskn Cargo storage PROJECT INITIATOR Customs broker services Aviation Transport Company "Yuzmashavia" Reception and sending of cargo by automobile transport SE "PA UMZ named after A.Makarov" www.yuzmashair.com.ua

PROJECT DURATION Building of terminal for cargo handling - 12 months

PROJECT PARAMETRS

Project cost: USD 2 mln

Net Present Value - NPV USD 0,6 mln

Internal Rate of Return - lRR 127%

Payback Period - PP 5 years

Profitability index - PI 18%

EBlDA USD 3,8 mln 46 THERMODERNIZATION OF MUNICIPAL BUILDINGS

PROJECT PARAMETRS

Cost of the project: EUR 10 000 000

Borrower - municipal ESCO company Term of credit - up to 10 years Grace period - 36 months. The European Bank for Reconstruction and Development loan - Euro 10 mln. Non-repayment grant of E5P agency - Euro 2,5 mln. One-time fee - 1,20% of the loan amount (120 thousand euros) Redemption fee - 0,5% pa Margin - 5,25% pa + EURIBOR PROJECT DESCRIPTION

Increase energy efficiency in municupal institutions by PROJECT READINESS STAGE: means of attracting extrabudgetary funds with the use of The second stage of the tender is held. An analysis of "performance-contracting" the mechanism. Reduction of tender offers and selection of the Contractor is conducted. energy consumption in budgetary institutions, budget allocations for energy costs and creation comfortable conditions for people. METHOD OF GUARANTEEING BORROWED RESOURCES: Dnipro City Council municipal guarantee (the volumes and conditions are agreed with the Ministry of Finance of Ukraine). The payback period of the project is 20 years. PROJECTS

47 INTEGRATED THERMO-MODERNIZATION OF MUNCIPAL BUILDINGS

PROJECT DESCRIPTION PROJECT PARAMETERS

Thermo-modernization of 150 municipal buildings ESTABLISHMENT OF THE SYSTEM OF ENERGY (schools, kindergartens, hospitals, administrative buildings) MONITORING: in order to reduce energy consumption, reduce CO2 emissions to the atmosphere, save budget funds Carrying out energy audit – USD 0,13 mln Development of design and estimate documentation – Project cost: USD 71,1 mln USD 2,83 mln (incl. municipal funds - USD 0,3 mln for energy monitoring, energy audit, energy management) Carrying out works on thermo-modernization – USD 67,92 mln Necessary investments: USD 70,8 mln Implementation of the energy management system is – USD 0,1 mln Annual energy consumption before thermo- modernization: 133 717 MWh Annual energy consumption after thermo-modernization: 93 602 MWh Reduced power consumption per year: 40 115 MWh Annual savings: USD 2,94 mln

Reduction of CO2 emissions: 8729 tons per year Financial resources: External investments, financial leasing, credit, grant Project readiness stage: Business plan Method of guaranteeing borrowed resources: municipal quarantee, insurance Payback period - 10 years

48 PROJECTS 49 The capacity of processing of solid waste - The capacity of processing of solid waste 225 000 t / year up to 70% Depth of processing of solid waste - Building area - 20 hectares Investments: USD 59 MUSD Operating profit: USD 11,5 MUSD per year The payback period is 10 years PROJECT PARAMETRS WASTE-TO-ENERGY PROCESSING WASTE-TO-ENERGY COMPLEX Resevoir of solid waste Sorting line Recycling of organic waste (AD), anaerobic reactor Heat and power plant Processing plastic into liquid fuel Chipper for construction waste Administrative buildings This project envisages the creation of a material and of envisages the creation a material This project The waste recycling facility within the framework of PPP within facility recycling waste The STRUCTURE OF THE WASTE RECYCLING COMPLEX technical base that will, in the long run, minimize the costs of in the long run, minimize that will, base technical from revenues of wastes and generate (recycling) utilization the products that will be formed during the processing. implementation is an integral property complex created by created complex property an integral is implementation of of the public-private the parties the joint activity the is of which purpose functional the partnership, to operations related of any technological implementation properties or biological chemical the change in the physical, them for of preparing purpose the with of waste safe processing, use, storage, environmentally transportation, utilization or disposal. PROJECT DESCRIPTION AGROPARK

PROJECT DESCRIPTION

Agricultural products cultivation with environmental protection using combined heat and power system (CHP), which supplies its electricity at premium prices to the energy market. CHP by-products (heat and CO2) serve as a nutrient environment for greenhouses. Agropark includes biomass processing unit (BML), which reduces the impact on the environment of domestic and industrial waste in the region.

TYPE OF PROJECT: Construction. Area under construction - 60 hectares The volume of solid waste - 350 000 t / year

PROJECT PARAMETRS

Project cost: USD 275 mln Own funds: Public-private partnership Necessary investments: USD 275 mln Brief description of operating income flows per project (per year): USD 117,4 mln Summary of capital and operational costs of the project (per year): USD 30,1 mln Method of attraction of resources: External investments Stage of project readiness: Business plan Guarantee: Insurance Payback period of the project: 10 years Net present value of the project (NPV): USD 404,8 mln

50 PROJECTS 51 Farming enterprise Vidrodzhennia. www.eko-sad.com Construction of the refrigerator with a controlled with Construction of the refrigerator The construction of The complex for storage of fruit and products and its sorting provides the vegetable for to entering opportunity to comply with requirements chain, the outlet namely: high annual product delivery, volumes, lot homogeneity products tonnes of the 40 is of sorting line capacity The is supposed the everyday shipment of shift. lt per production to the trade networks during 11 months markets of fruits to international to access planned is It The opportunity of and scale vegetables. project the extension is expected expansion: in the long term it of for space gardens up to 135 ha and small fruit acreage and for vegetables up to 40 ha PROJECT GOALS atmosphere - 11 months PROJECT INITIATOR PROJECT DURATION USD 1,1 mln 120% 5,3 years 16% USD 10,8 mln USD 5,5 mln USD 7,6 mln USD 2,1 mln Total project cost: FRUIT AND VEGETABLE STORAGE STORAGE VEGETABLE AND FRUIT FACILITY SORTING & Required investment capital: Initiator contribution to the project implementation: Initiator contribution to the project Market outlets: wholesale markets, trading networks of Market outlets: wholesale Construction of the refrigerator with a controlled a controlled with refrigerator Construction of the Total complex capacity will be 5 000 tonnes PROJECT PARAMETERS Ukraine. atmosphere, which is designed for high-quality storage of by sorting, followed fruits and packing, delivery vegetables, in the is expected implementation to consumers. Project Vidrodzhennia, which of farming enterprise space operating is placed near existing garden. PROJECT DESCRIPTION EBITDA Profitability index - PI Payback Period - PP Internal Rate of Return - lRR Net Present Value - NPV LEISURE CENTRE "GOLF RESORT"

PROJECT DESCRIPTION PROJECT GOALS Diversification of the entertainment industry of such cities Construction of a Leisure Centre on the land plot, which is as Dnipro, as well as Dnipro and free of buildings and located along the road. The possibility districts and promoting golf as a sport of designing and building a playing area in Petrykivka urban type settlement, taking into account a diverse local landscape Carrying out of professional competitions, sports, (forests, lakes, ravines). recreation, cultural and entertainment events

THE POSSIBILITY OF PLACING: PROJECT DURATION golf academy for children and adults Construction of a Leisure Centre «GOLF RESORT» - tennis courts 12 months cycle routes conference and business meeting room cottages, houses for living PROJECT INITIATOR hotels and restaurants Dnipropetrovsk Regional Investment Agency www.dia.dp.gov.ua

PROJECT PARAMETERS

Project cost: USD 8 mln (depends on the selected project)

Net present value NPV USD 2,1 mln

Profitability index Pl 126%

Internal rate of return IRR 18%

Payback period PP 5 years

EBIDA USD 16,8 mln 52 PROJECTS 53 5% - proprietary funds 95% - potential investor area: 97 ha lands intended purpose of the use: agricultural cadastral number: issued needs engineering and design water it is possible to connect to the gas, electricity, near the highways P 52 and T 0414 railwav station - 15 km distance to lnternational Airport "Dnipropetrovsk" - 60 km TECHNICAL PARAMETERS OF TECHNICAL PARAMETERS THE PROJECT LAND PLOT CHARACTERISTICS: ENGINEERING INFRASTRUCTURE: TRANSPORT INFRASTRUCTURE: MECHANISMS FOR COOPERATION USD 3,3 mln 142% 22% USD 19 mln 5 years USD 8 mln Project cost: LOGISTICS CENTER "GREEN MARKET" "GREEN CENTER LOGISTICS Reduction of production costs and turnover costs Reduction of production costs and turnover Create new modern warehouses and storage premises, modern warehouses new Create reduce product expenses and turnover expenses Receipt of additional funds to the local budgets Expand share of domestic products on the domestic on the products Expand share of domestic agricultural market ectiveness of distributive network of the economic eectiveness distributive lncrease by means of traffic flow optimization Reduced prices on agricultural products for the for products on agricultural prices Reduced population Expansion of export potential of the region Creation of for logistics center storage and transportation markets, Ukraine trade wholesale Sales markets/clients: PROJECT PARAMETERS PROJECT DESCRIPTION Payback period - PP EBlDA Internal Rate of Return - IRR Profitability index - PI Net Present Value - NPV of agricultural products "Green market" for collection, "Green products of agricultural of agricultural processing primarv storage, package, year, expansion of during the goods products, delivery export potential of the region. networks, foreign markets. PROJECT GOALS POLYMER MATERIALS SHEETS PRODUCTION

PROJECT DESCRIPTION PROJECT INITIATOR

Creation of a new enterprise for the production of polymer Ukrkhimzakhyst Ltd plastic sheets of polyethvlene, polypropylene and other polymer materials. PROJECT DURATION

Estimated implementation schedule - 8 years PROJECT PARAMETERS

Project cost: USD 4,3 mln INITIATOR'S RESOURCES FOR Net Present Value - NPV USD 2,3 mln THE PROJECT IMPLEMENTATION: machinery, office equipment - USD 30 K Internal Rate of Return - lRR 26% experience in relevant projects implementation and Payback Period - PP 5 years project solutions

Profitability index - PI 156%

EBlDA USD 10,4 mln 54 PROJECTS 55 The equipment production, facility preparation and preparation production, facility The equipment installation will take about 12 months of volume planned the project of the year 3rd ln the production and sales will be 50 K tons The saturation of Ukrainian market with polymer coating polymer of Ukrainian market with saturation The no modern is Today there steel. sheet galvanized producer in this sphere in Ukraine different coating types, with trade and retail Wholesale of production roofing (metal and facade materials packaging flooring, siding), metal shingles, profiled production in small lots the to produce allow will The equipment and pattern color the both in of products range wide range and with various mechanical properties PROJECT GOALS Elvas trading house, Ltd www.elvas.com.ua PROJECT INITIATOR PROJECT DURATION USD 4,5 mln 35% 6 years 27% USD 16 mln REQUIRED INVESTMENTS LINE COST COST OF CONSTRUCTION OF WAREHOUSES AND PRODUCTION FACILITIES PART OF THE REQUIRED FLOATING CAPITAL PRODUCTION OF POLYMER COATINGS POLYMER OF PRODUCTION STEEL GALVANIZED ON SHEETS OR ALUMINUM USD 1,1 MLN USD 9 MLN USD 6,8 MLN USD 1,1 MLN The line of The line sheet. The on Polymer Coating galvanized steel year design capacity is 55 K tons of steel per a with polymer coating is The galvanized sheet steel for primary product production of facade and roofing materials including sandwich panels and metal shingles PROJECT PARAMETERS EBlDA Profitability index - PI Payback Period - PP Internal Rate of Return - lRR Net Present Value - NPV PROJECT DESCRIPTION PRODUCTION OF BIO FUEL PELLETS

PROJECT DESCRIPTION PROJECT INITIATOR "VelLCV" Ltd Creation of an enterprise for the production of bio fuel pellets with production capacity of 40 000 tons per year

PROJECT DURATION

Estimated implementation schedule: 1 year

INITIATOR'S RESOURCES FOR THE PROJECT IMPLEMENTATION:

USD 2,63 mln 6 ha land engineering infrastructure

PROJECT PARAMETERS

Required investment capital: USD 2,63 mln Project cost: USD 5,26 mln

Net Present Value - NPV USD 6 mln

Internal Rate of Return - lRR 112%

Payback Period - PP 5,7 years

Profitability index - PI 14%

EBlDA USD 6 mln 56 PROJECTS 57 Estimated implementation schedule - 5 years Machinery, office equipment - USD 30 thousd Machinery, office equipment - and implementation projects in the relevant Experience project solutions PROJECT DURATION INITIATOR'S RESOURCES FOR THE INITIATOR'S RESOURCES PROJECT IMPLEMENTATION: USD 10 mln 206% 5 years 150% USD 1,3 mln PRODUCTION OF TANKS FROM TANKS OF PRODUCTION MATERIALS POLYMERIC Project cost: USD 1,1 mln Ukrkhimzakhyst Ltd Creation of an enterprise for the design and construction for the of an enterprise Creation EBlDA Profitability index - PI Payback Period - PP Internal Rate of Return - lRR Net Present Value - NPV PROJECT PARAMETERS PROJECT INITIATOR of tanks from polymer materials (polypropylene, of tanks from materials polymer equipment as technological polyethylene, teflon, etc.), as well based on them. PROJECT DESCRIPTION ATMOSPHERIC AIR MONITORING SYSTEM

PROJECT DESCRIPTION PROJECT PARAMETERS

Acquisition and maintenance of mobile and stationary stations of automatic continuous monitoring of atmospheric Project cost: USD 1,91 mln air. City funds: USD 0,146 mln The main goal of the establishment of automatic continuous monitoring stations is the monitoring of Necessary investments: USD 1,76 mln environmental indicators of air pollution and informing the population about the quality of atmospheric air. Mobile environmental laboratories are designed to control Financial resources: External investments environmental pollution and damage to the environment at Stage of project readiness: Project proposal a given point of the territory. The modern environmental laboratory (laboratory of control) allows to assess the Way of guaranteeing borrowed resources: sanitary-hygienic pollution of the air (or air of the working Availability of pledged property zone), water, soil in the areas of industrial enterprises. It is used in carrying out of natural and instrumental surveys of sources of pollutant emissions into the atmosphere in order to develop standards for maximum allowable emissions, and simply for the purpose of state or departmental control. The proposed system will allow to make operational decisions in crisis environmental situations and inform the population about the probable negative impact of the ecological situation on different groups of the population. This is the first such project in Ukraine that will attract the attention of the whole society to environmental problems, increase awareness and investment attractiveness of the city.

58 PROJECTS 59 Project cost: USD 3 mln Project cost: USD 2 mln Stara Samar is a settlement that appeared in the first fourth the in that appeared Samar is a settlement Stara actively 2015 the government of has been Since the city Staryy Kodak is a fortress in the neighborhood of the city of the neighborhood the fortress in a is Staryy Kodak A part of Kodak was saved however. Itʼs about earthen PROJECT PARAMETRS PROJECT DESCRIPTION PROJECT DESCRIPTION PROJECT PROJECT PARAMETRS of the XVI century for maintenance of the trade ferry across ferry trade of the for maintenance XVI century of the fact and this trading for transit used was Samara. It river the and is confirmed by Polish, Hansa, Russian, Tatar Dutch, of A lot etc. seals, things product coins, Turkish already been accommodations, have an inn and a church remains of by archaeologists. The the powerful discovered in 1688 by hetman Ivan Mazepa here fortress, that was built years, in 1730 – and have been which was reconstructed saved to our time. this territory. Such events as festivals of developing The Day of here. The the City take place traditional culture, The territory. on this created be will park & cultural historic remains of accommodations, coins, and weapons have available this legacy found been here. In order to make all models and expose 3D is supposed to create to tourists, it information kiosks as in special as well them in the Internet on the territory of the fortress. of Dnipro that was built in 1635. This fortress appeared on the on the fortress appeared This 1635. in built that was of Dnipro was in Its value after it had European maps right been built. of the first rapid the before was constructed it fact that the way Dnipro and to control the strategic that it allowed river the Ukrainian lands. For to well-settled Sich from Zaporizhian of part it was destroyed by a granite time being the larger operation during Soviet Union time. quarry that was in point is to project and two bastions. The berms, ditch of view the external the fortress reconstruct by creation of a "complemented points of so-called model and access 3D Kodak convert construction. It will on remains of the reality" both interesting be will which object into an important tourist for the Ukrainian tourists and from for Poland, people of these nations have a as representatives Lithuania, France, direct relation to history of the fortress. STARA SAMAR STARA STARYY KODAK STARYY THE MUSEUM OF HISTORY OF THE CITY OF DNIPRO

Currently, the city of Dnipro does not have its own city PROJECT PARAMETERS history museum. Available expositions of the city in other museums often continue to show the city as a part of Russian Project cost (1st stage): USD 20 K history or Soviet Union history ignoring its Ukrainian basis Project cost (2nd stage): USD 1,5 mln and its powerful national minorities, which participated and still participate in creation of history of the city of Dnipro. That is why the Museum of History of the city of Dnipro will be important point for conducting of educational work with representatives of the city community, as well as a place to present the city to tourists. Conceptually, the Museum will differ from existing ones because it will bring a person living in the city and a person visiting the museum into focus. The exposition will tell about "a person in city space", "a person in society", "a person in productive activities" and will use interactivity and multimedia allowing a participant to feel empathy and to equate himself with inhabitants of the city of Dnipro from previous ages. The Museum of History of the city of Dnipro will be created in two stages. The first stage is to create mini-museum in the historical building under the name "The Governorʼs House" with parallel preparation of a large exposition. The second stage is to create the full-scale museum of the city of Dnipro.

60