Management Team (Regional Or Program Level) PDO Project Development Objective POM Program Operational Manual RETF Recipient Executed Trust Fund

Total Page:16

File Type:pdf, Size:1020Kb

Management Team (Regional Or Program Level) PDO Project Development Objective POM Program Operational Manual RETF Recipient Executed Trust Fund Document of The World Bank Public Disclosure Authorized Report No: ICR00003374 IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-13973 TF-14063) ON A TRUST FUND GRANT Public Disclosure Authorized IN THE AMOUNT OF EUROS 9.00 MILLION (US$ 11.21 MILLION EQUIVALENT) TO INTERNATIONAL UNION FOR THE CONSERVATION OF NATURE (IUCN) AND WORLDWIDE FUND FOR NATURE (WWF) FOR THE Public Disclosure Authorized EUROPEAN NEIGHBORHOOD AND PARTNERSHIP INSTRUMENT EAST COUNTRIES FOREST LAW ENFORCEMENT AND GOVERNANCE II PROGRAM June 28, 2017 Public Disclosure Authorized Environment and Natural Resources Global Practice Europe and Central Asia Region CURRENCY EQUIVALENTS (Exchange Rate Effective Date 06/28/2017) Currency Unit = Euro Euro 1.00 = US$ 1.136 US$ 1.00 = Euro 0.880 FISCAL YEAR July 1 – June 30 ABBREVIATIONS AND ACRONYMS ADA Austrian Development Agency BETF Bank executed trust fund CWP Country Work Plan EC European Commission ECA Europe and Central Asia EIRR Economic Internal Rate of Return ENPI European Neighborhood and Partnership Instrument ENPI-FLEG (I European Neighborhood and Partnership Instrument Forest Law and II) Enforcement and Governance (Phase I and II) EU European Union EUTR European Union Timber Regulation FLEG I, II Forest Law Enforcement and Governance (phase I and II) FLEGT Forest Law Enforcement, Governance and Trade GDP Gross Domestic Product FLERMONECA Forest and Biodiversity Governance Including Environmental Monitoring FLR Forest Landscape Restoration ICR Implementation completion and results report ICT Information and Communication Technology IO Implementing Organization IUCN International Union for the Conservation of Nature ISR Implementation Status and Results (report) IUFR Interim Unaudited Financial Report INC Intergovernmental Negotiating Committee INGO International non-governmental organization M&E Monitoring and Evaluation MOU Memorandum of Understanding MTR Mid-term Review NPAC National Program Advisory Committee OC Operational Committee ORAF Operational Risk Assessment Framework PAD Project Appraisal Document PCT Program Coordination Team (participating country level) PMT Program Management Team (regional or Program level) PDO Project Development Objective POM Program Operational Manual RETF Recipient executed trust fund i RWP Regional Work Plan SC Steering Committee SFM Sustainable Forest Management SESAF Strategic Environmental and Social Assessment Framework SPD St. Petersburg Declaration TA(L) Technical Assistance (loan) VPA Voluntary Partnership Agreement WWF Worldwide Fund for Nature Senior Global Practice Director: Karin Kemper Practice Manager: Valerie Hickey Project Team Leader: Tuukka Castrén ICR Team Leader: Tuukka Castrén ICR Primary Author: Nils Junge ii COUNTRY Armenia, Azerbaijan, Belarus, Georgia, Moldova, Russian Federation and Ukraine Project Name ENPI EAST COUNTRIES FLEG II PROGRAM CONTENTS Data Sheet A. Basic Information B. Key Dates C. Ratings Summary D. Sector and Theme Codes E. World Bank Staff F. Results Framework Analysis G. Ratings of Project Performance in ISRs H. Restructuring I. Disbursement Graph 1. Project Context, Development Objectives and Design ........................................................... 1 2. Key Factors Affecting Implementation and Outcomes ........................................................... 6 3. Assessment of Outcomes ...................................................................................................... 15 4. Assessment of Risk to Development Outcome ..................................................................... 25 5. Assessment of World Bank and Borrower Performance ...................................................... 27 6. Lessons Learned .................................................................................................................... 30 7. Comments on Issues Raised by Borrower/Implementing Agencies/Partners ....................... 31 Annex 1. Project Costs and Financing ...................................................................................... 32 Annex 2. Outputs by Component .............................................................................................. 33 Annex 3. Economic and Financial Analysis ............................................................................. 86 Annex 4. Grant Preparation and Implementation Support/Supervision Processes ................... 87 Annex 5. Beneficiary Survey Results ....................................................................................... 89 Annex 6. Stakeholder Workshop Report and Results ............................................................... 95 Annex 7. Summary of Granteer's ICR and/or Comments on Draft ICR ................................. 100 Annex 8. Comments of Cofinanciers and Other Partners/Stakeholders ................................. 104 Annex 9. List of Supporting Documents................................................................................. 104 Annex 10. Best Practice Models ............................................................................................. 105 iii A. Basic Information Europe and Central ENPI East Countries Country: Project Name: Asia FLEG II Program Project ID: P131138 L/C/TF Number(s): TF-13973,TF-14063 ICR Date: 06/28/2017 ICR Type: Core ICR Lending Instrument: TAL Grantee: IUCN & WWF Original Total USD 11.21M Disbursed Amount: USD 10.9M Commitment: Revised Amount: USD 11.21M Environmental Category: B: Partial assessment Implementing Agencies: Worldwide Fund for Nature International (WWF) International Union for Conservation of Nature (IUCN) Cofinanciers and Other External Partners: B. Key Dates Revised / Actual Process Date Process Original Date Date(s) Concept Review: 06/21/2012 Effectiveness: 06/28/2013 07/01/2013 Appraisal: 08/13/2012 Restructuring(s): 8/25/2014 Approval: 01/10/2013 Mid-term Review: 07/15/2015 Closing: 12/31/2016 12/31/2016 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Moderately Satisfactory Risk to Development Outcome: Substantial World Bank Performance: Moderately Satisfactory Grantee Performance: Moderately Satisfactory C.2 Detailed Ratings of World Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Moderately Satisfactory Government: Satisfactory Implementing Quality of Supervision: Moderately Satisfactory Moderately Satisfactory Agency/Agencies: Overall World Bank Overall Borrower Moderately Satisfactory Moderately Satisfactory Performance: Performance: iv C.3 Quality at Entry and Implementation Performance Indicators Implementation QAG Assessments Indicators Rating Performance (if any) Potential Problem Project Quality at Entry No None at any time (Yes/No): (QEA): Problem Project at any Quality of No None time (Yes/No): Supervision (QSA): DO rating before Moderately Closing/Inactive status: Satisfactory D. Sector and Theme Codes Original Actual Major Sector/Sector Agriculture, Fishing and Forestry Forestry 52 52 Public Administration Public administration - Agriculture, fishing and 40 40 forestry Information and Communications Technologies Telecommunications 8 8 Major Theme/Theme/Sub Theme Environment and Natural Resource Management Climate change 21 21 Mitigation 21 21 Environmental policies and institutions 21 21 Renewable Natural Resources Asset Management 21 21 Biodiversity 21 21 Finance Finance for Development 11 11 Agriculture Finance 11 11 Human Development and Gender Gender 16 16 Urban and Rural Development Rural Development 11 11 Rural Markets 11 11 v E. World Bank Staff Positions At ICR At Approval Vice President: Cyril Muller Philippe H. Le Houerou Mariam J. Sherman (strategy and Gerard A. Byam (operational Country Director: operations) services and quality) Practice Manager Valerie Hickey Kulsum Ahmed Project Team Leader: Tuukka Castrén Andrew Mitchell ICR Team Leader: Tuukka Castrén ICR Primary Author: Nils Junge F. Results Framework Analysis Project Development Objectives (from Project Appraisal Document) The objective of the Project is to support the seven Participating Countries to strengthen forest governance through improving implementation of relevant international processes; enhancing their forest policy, legislation and institutional arrangements; and developing, testing and evaluating sustainable forest management models at the local level on a pilot basis for future replication. This is the PDO from the Grant Agreement. The PDO in the PAD is worded slightly different: “The Program will support the participating countries [to] strengthen forest governance through improving implementation of relevant international processes, enhancing their forest policy, legislation and institutional arrangements, and developing, testing and evaluating sustainable forest management models at the local level on a pilot basis for future replication” Revised Project Development Objectives (as approved by original approving authority) The Project Development Objectives were not revised. F. Results Framework Analysis (a) PDO Indicator(s) Original Target Formally Actual Value Values (from Revised Achieved at Indicator Baseline Value approval Target Completion or documents) Values Target Years Best practice models on sustainable forest management and improved Indicator 1: forest governance developed and demonstrated 0 29 34 Date achieved March 26, 2013 Dec 31, 2016 Dec 31, 2016 Target achieved (117%). Comments (incl. % This indicator relates to the dimension of testing forest management models achievement) in the PDO and was added during the August 2014 restructuring, replacing
Recommended publications
  • Supply Base Report for State Forestry Institution “Begoml Forestry Enterprise”
    Supply Base Report for State Forestry Institution “Begoml Forestry Enterprise” Focusing on sustainable sourcing solutions Version 1.1 February 2016 For further information on the SBP Framework and to view the full set of documentation see www.sustainablebiomasspartnership.org Document history: Version 1.0: published 26 March 2015 Version 1.1: published 22 February 2016 © Copyright TheSustainableBiomassPartnershipLimited2015 Page ii Focusing on sustainable sourcing solutions Contents 1 Overview .................................................................................................................................................. 1 2 Description of the Supply Base ............................................................................................................ 2 2.1 General description ................................................................................................................................. 2 2.2 Actions taken to promote certification amongst feedstock supplier ........................................................ 5 2.3 Final harvest sampling programme ......................................................................................................... 5 2.4 Flow diagram of feedstock inputs showing feedstock type ..................................................................... 5 2.5 Quantification of the Supply Base ........................................................................................................... 6 Supply Base .....................................................................................................................................................
    [Show full text]
  • Assessment of Forest Pests and Diseases in Protected Areas of Georgia Final Report
    Assessment of Forest Pests and Diseases in Protected Areas of Georgia Final report Dr. Iryna Matsiakh Tbilisi 2014 This publication has been produced with the assistance of the European Union. The content, findings, interpretations, and conclusions of this publication are the sole responsibility of the FLEG II (ENPI East) Programme Team (www.enpi-fleg.org) and can in no way be taken to reflect the views of the European Union. The views expressed do not necessarily reflect those of the Implementing Organizations. CONTENTS LIST OF TABLES AND FIGURES ............................................................................................................................. 3 ABBREVIATIONS AND ACRONYMS ...................................................................................................................... 6 EXECUTIVE SUMMARY .............................................................................................................................................. 7 Background information ...................................................................................................................................... 7 Literature review ...................................................................................................................................................... 7 Methodology ................................................................................................................................................................. 8 Results and Discussion ..........................................................................................................................................
    [Show full text]
  • Social and Economic Space Compression in Border Areas: the Case of the Northwestern Federal District Romanova, E.; Vinogradova, O.; Frizina, I
    www.ssoar.info Social and economic space compression in border areas: the case of the Northwestern Federal District Romanova, E.; Vinogradova, O.; Frizina, I. Veröffentlichungsversion / Published Version Zeitschriftenartikel / journal article Empfohlene Zitierung / Suggested Citation: Romanova, E., Vinogradova, O., & Frizina, I. (2015). Social and economic space compression in border areas: the case of the Northwestern Federal District. Baltic Region, 3, 28-46. https://doi.org/10.5922/2079-8555-2015-3-3 Nutzungsbedingungen: Terms of use: Dieser Text wird unter einer Free Digital Peer Publishing Licence This document is made available under a Free Digital Peer zur Verfügung gestellt. Nähere Auskünfte zu den DiPP-Lizenzen Publishing Licence. For more Information see: finden Sie hier: http://www.dipp.nrw.de/lizenzen/dppl/service/dppl/ http://www.dipp.nrw.de/lizenzen/dppl/service/dppl/ Diese Version ist zitierbar unter / This version is citable under: https://nbn-resolving.org/urn:nbn:de:0168-ssoar-51391-6 Economic and geographical development of the Russian Northwest ECONOMIC AND GEOGRAPHICAL DEVELOPMENT OF THE RUSSIAN NORTHWEST The so-called “compression” of social SOCIAL AND ECONOMIC and economic space has been the subject of SPACE COMPRESSION quite a few studies in the past decades. There are two principle types of compres- IN BORDER AREAS: sion: communicative, that is, associated THE CASE with the development of transport and in- OF THE NORTHWESTERN formation systems, and physical, mani- FEDERAL DISTRICT fested in the rapid decrease of the number of new territories to explore. While physi- cal and communicative compression are in- terrelated, they have different spatial ex- * pressions depending on geographical con- E.
    [Show full text]
  • Result Sheet
    Sun and Wind ELRII-473 outputs and results Energy and robotics Outputs hobby-group Local heating and electricity supply systems are modernised in 5 public buildings in Estonia and Pskov Region, Russia Obinitsa village center and Rõuge municipality house energy systems was renoveted with ground heat pumps integrated with solar PV panels Street lighting systems installed in Rõuge (Estonia) and in Tyamsha (Russia) Lightening system installed in Rõuge, Estonia Trainings and capacity building seminars for energy experts and municipality employees organised. Networking of energy experts and local authorities and public representatives is established Secondary school in Boroussy village, Russia equipped with solar panels, which provide hot water for the school 1 Energy Class modernised in Rõuge School by New biomass boilers in Gavry (Pytalovo), Russia installing the smart board and purchasing new equipment for energy measuring. Also weekly energetics-robotics hobby group was regularly attended by students in Rõuge Energy day on Energy Saving Technologies and Renewable Energy Systems (RES) with participation of Russian and Estonian students was held A number of showcases of using solar and wind Solar Panel installed in Boroussy village, Russia power, biofuel and ground heat as possible energy resources were demonstrared Various seminars and study tours on renewable energy and energy efficiency were organised for a wide range of participants RESULTS Increase of knowledge and awareness of local authorities and the community, especially youth on
    [Show full text]
  • The Childrens' Names That Appear on This List Were Taken from Pages of Testimony Submitted to Yad Vashem
    The childrens' names that appear on this list were taken from Pages of Testimony submitted to Yad Vashem Family name First name Father's name Age Place of residence Place of death Date of death ABOULAFIA ODETTE MARCO 8 FRANCE AUSCHWITZ 1944 ABOULAFIA ROSE MARCO 12 FRANCE AUSCHWITZ 1944 ABRAMOV YEVDO ABRAM 1 USSR YEVPATORIYA, KRYM, RUSSIA (USSR) 1942 ABRAMOVICH LIOVA NAKHMAN 4 USSR KHMELNIK, VINNITSA, UKRAINE (USSR) 1943 ABRAMOVICH PESL ELIA 8 USSR KHMELNIK, VINNITSA, UKRAINE (USSR) 1943 ABRAMOVICH PESL NAKHMAN 7 USSR KHMELNIK, VINNITSA, UKRAINE (USSR) 1943 ABRAMOVITCH BORIS RUVIM 17 LITHUANIA KUNDA, ESTONIA 1944 ABRAMOWICZ SIMON RAFAEL 10 POLAND AUSCHWITZ 1942 ABRAMZON EMA BORIS 10 USSR ROSONY, VITEBSK, BELORUSSIA (USSR) 12/01/42 ABRAMZON LIUDMILA BORIS 7 USSR ROSONY, VITEBSK, BELORUSSIA (USSR) 12/01/42 ABRAMZON MARIA BORIS 4 USSR ROSONY, VITEBSK, BELORUSSIA (USSR) 12/01/42 ABUKOVSKI SHEINDEL ISRAEL 8 POLAND LODZ, POLAND 1945 ADELSON BENTZION SHIMON 11 POLAND PONARY, WILNO, POLAND 1942 Yad Vashem - Hall of Names 1/79 The childrens' names that appear on this list were taken from Pages of Testimony submitted to Yad Vashem Family name First name Father's name Age Place of residence Place of death Date of death ADLER ADEL DEZSO 6 HUNGARY AUSCHWITZ 1944 ADLER ENDRE GYULA 11 HUNGARY AUSCHWITZ 1944 ADLER JENO DEZSO 4 HUNGARY AUSCHWITZ 1944 ADLER LASZLO KAROLY 12 HUNGARY AUSCHWITZ 1944 ADLER MARIANNE MANO 10 HUNGARY AUSCHWITZ 1944 ADLER OTTO KAROLY 6 HUNGARY AUSCHWITZ 1944 ADLER WOLF ANSHEL 17 POLAND AUSCHWITZ 1943 AHARONOVIZ YTZKHAK KHAYIM 12
    [Show full text]
  • Development Project Ideas Goris, Tegh, Gorhayk, Meghri, Vayk
    Ministry of Territorial Administration and Development of the Republic of Armenia DEVELOPMENT PROJECT IDEAS GORIS, TEGH, GORHAYK, MEGHRI, VAYK, JERMUK, ZARITAP, URTSADZOR, NOYEMBERYAN, KOGHB, AYRUM, SARAPAT, AMASIA, ASHOTSK, ARPI Expert Team Varazdat Karapetyan Artyom Grigoryan Artak Dadoyan Gagik Muradyan GIZ Coordinator Armen Keshishyan September 2016 List of Acronyms MTAD Ministry of Territorial Administration and Development ATDF Armenian Territorial Development Fund GIZ German Technical Cooperation LoGoPro GIZ Local Government Programme LSG Local Self-government (bodies) (FY)MDP Five-year Municipal Development Plan PACA Participatory Assessment of Competitive Advantages RDF «Regional Development Foundation» Company LED Local economic development 2 Contents List of Acronyms ........................................................................................................................ 2 Contents ..................................................................................................................................... 3 Structure of the Report .............................................................................................................. 5 Preamble ..................................................................................................................................... 7 Introduction ................................................................................................................................ 9 Approaches to Project Implementation ..................................................................................
    [Show full text]
  • ZRBG – Ghetto-Liste (Stand: 01.08.2014) Sofern Eine Beschäftigung I
    ZRBG – Ghetto-Liste (Stand: 01.08.2014) Sofern eine Beschäftigung i. S. d. ZRBG schon vor dem angegebenen Eröffnungszeitpunkt glaubhaft gemacht ist, kann für die folgenden Gebiete auf den Beginn der Ghettoisierung nach Verordnungslage abgestellt werden: - Generalgouvernement (ohne Galizien): 01.01.1940 - Galizien: 06.09.1941 - Bialystok: 02.08.1941 - Reichskommissariat Ostland (Weißrussland/Weißruthenien): 02.08.1941 - Reichskommissariat Ukraine (Wolhynien/Shitomir): 05.09.1941 Eine Vorlage an die Untergruppe ZRBG ist in diesen Fällen nicht erforderlich. Datum der Nr. Ort: Gebiet: Eröffnung: Liquidierung: Deportationen: Bemerkungen: Quelle: Ergänzung Abaujszanto, 5613 Ungarn, Encyclopedia of Jewish Life, Braham: Abaújszántó [Hun] 16.04.1944 13.07.1944 Kassa, Auschwitz 27.04.2010 (5010) Operationszone I Enciklopédiája (Szántó) Reichskommissariat Aboltsy [Bel] Ostland (1941-1944), (Oboltsy [Rus], 5614 Generalbezirk 14.08.1941 04.06.1942 Encyclopedia of Jewish Life, 2001 24.03.2009 Oboltzi [Yid], Weißruthenien, heute Obolce [Pol]) Gebiet Vitebsk Abony [Hun] (Abon, Ungarn, 5443 Nagyabony, 16.04.1944 13.07.1944 Encyclopedia of Jewish Life 2001 11.11.2009 Operationszone IV Szolnokabony) Ungarn, Szeged, 3500 Ada 16.04.1944 13.07.1944 Braham: Enciklopédiája 09.11.2009 Operationszone IV Auschwitz Generalgouvernement, 3501 Adamow Distrikt Lublin (1939- 01.01.1940 20.12.1942 Kossoy, Encyclopedia of Jewish Life 09.11.2009 1944) Reichskommissariat Aizpute 3502 Ostland (1941-1944), 02.08.1941 27.10.1941 USHMM 02.2008 09.11.2009 (Hosenpoth) Generalbezirk
    [Show full text]
  • 1.1 Forests and Forest Use in Russia
    Dependency of Russian Villages on Forest Resources National Analytical Report, Russia October 2014 This publication has been produced with the assistance of the European Union. The content, findings, interpretations, and conclusions of this publication are the sole responsibility of the FLEG II (ENPI East) Programme Team (www.enpi-fleg.org) and can in no way be taken to reflect the views of the European Union. The views expressed do not necessarily reflect those of the Implementing Organizations. Table of contents 1. Introduction ................................................................................................................................................................ 3 1.1 Forests and forest use in Russia ............................................................................................................. 3 1.2 Rationale ............................................................................................................................................................. 4 2. Methodology .............................................................................................................................................................. 4 2.1 Study area........................................................................................................................................................... 4 2.2 Method of sampling ........................................................................................................................................ 5 2.3 Number of households .................................................................................................................................
    [Show full text]
  • Study of Legal Framework Acting in the Republic of Armenia Regulating the Activities of Cooperatives
    Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives YEREVAN 2014 Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives Necessity and importance of cooperatives................................................. 3 a. Legal acts regulating the activities of cooperatives acting in the Republic of Armenia (Law, Decision of the Government, Normative Act, etc.)................................................................................................. 18 List of the legal acts regulating the activities of cooperative acting in the Republic of Armenia............................................................................... 35 b. Analysis of strengths and weaknesses of legal acts focusing on legal acts related to agricultural cooperatives............................... 36 c. Study and analysis of draft legal acts on cooperatives currently circulated within the RA Government (focusing on agricultural cooperatives); expected outcomes of adoption (approval) of draft legal acts............................................................ 42 2 Study of legal framework acting in the Republic of Armenia regulating the activities of Cooperatives. Necessity and importance of Cooperatives Cooperatives have existed for over two hundred years. Acting in all spheres of economic activity, cooperatives are more durable than investment tended companies. Cooperative model has permanently adapted to the changing conditions, and the innovative new ways of cooperation
    [Show full text]
  • Pskov Regional Centre for Medical Prevention
    PSKOV REGIONAL CENTRE FOR MEDICAL PREVENTION IMPLEMENTATION OF THE NORDIC COUNCIL OF MINISTERS’ COOPERATION WITH NORTHWEST RUSSIA IN HEALTH PROMOTION AND DISEASE PREVENTION: MOBILIZING RESOURCES FOR BETTER RESPONSE TO HIV AND ASSOCIATED INFECTIONS: ACTIVITIES IN PSKOV REGION NORDIC COUNCIL OF MINISTERS’ COOPERATION WITH NORTHWEST RUSSIA The National Institute for Health and Welfare (THL) is the administrator of the Programme Eligible NW Russian regions: St. Petersburg, Arkhangelsk Region, Kaliningrad Region, Leningrad Region, Murmansk Region, Pskov Region, and Republic of Karelia ONE OF THE TWO OBJECTIVES OF THE PROGRAMME: STRENGTHENING INNOVATIVE PREVENTION WORK AMONG YOUNG PEOPLE AND SUPPORT TO VOLUNTEERISM Pursuant to order of the Pskov Regional Committee of Healthcare and Pharmacy “Approval of the local action plan for the implementation of the cooperation programme” (05.07.2017 № 550), it was decided to: Train volunteers to do HIV prevention among young people based on the peer-to-peer approach OUR PARTNERS IN PSKOV REGION: Pskov State University Pskov Polytechnic, Volunteer Team “INDIGO” Pskov Medical College, Volunteer Team “Kind Hearts” STAFF OF THE CENTRE FOR MEDICAL PREVENTION VOLUNTEER CAMP “HIV PREVENTION AMONG YOUNG PEOPLE” (11-13 SEPTEMBER 2017), 33 PEOPLE The camp participants received certificates and started a regional volunteer school (2017/2018) https://vk.com/club51940174 SKILLS PRACTICING “HIV PREVENTION AMONG YOUNG PEOPLE” 70 classes, 1,400 people covered Pskov Polytechnic 42 classes held, coverage - 772 people Pskov
    [Show full text]
  • BR IFIC N° 2654 Index/Indice
    BR IFIC N° 2654 Index/Indice International Frequency Information Circular (Terrestrial Services) ITU - Radiocommunication Bureau Circular Internacional de Información sobre Frecuencias (Servicios Terrenales) UIT - Oficina de Radiocomunicaciones Circulaire Internationale d'Information sur les Fréquences (Services de Terre) UIT - Bureau des Radiocommunications Part 1 / Partie 1 / Parte 1 Date/Fecha 06.10.2009 Description of Columns Description des colonnes Descripción de columnas No. Sequential number Numéro séquenciel Número sequencial BR Id. BR identification number Numéro d'identification du BR Número de identificación de la BR Adm Notifying Administration Administration notificatrice Administración notificante 1A [MHz] Assigned frequency [MHz] Fréquence assignée [MHz] Frecuencia asignada [MHz] Name of the location of Nom de l'emplacement de Nombre del emplazamiento de 4A/5A transmitting / receiving station la station d'émission / réception estación transmisora / receptora 4B/5B Geographical area Zone géographique Zona geográfica 4C/5C Geographical coordinates Coordonnées géographiques Coordenadas geográficas 6A Class of station Classe de station Clase de estación Purpose of the notification: Objet de la notification: Propósito de la notificación: Intent ADD-addition MOD-modify ADD-ajouter MOD-modifier ADD-añadir MOD-modificar SUP-suppress W/D-withdraw SUP-supprimer W/D-retirer SUP-suprimir W/D-retirar No. BR Id Adm 1A [MHz] 4A/5A 4B/5B 4C/5C 6A Part Intent 1 109078651 ARG 7233.0000 PICHANAL ARG 64W13'34'' 23S19'09'' FX 1 ADD 2 109078654
    [Show full text]
  • Armenian Tourist Attraction
    Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... rediscover armenia guide armenia > tourism > rediscover armenia guide about cilicia | feedback | chat | © REDISCOVERING ARMENIA An Archaeological/Touristic Gazetteer and Map Set for the Historical Monuments of Armenia Brady Kiesling July 1999 Yerevan This document is for the benefit of all persons interested in Armenia; no restriction is placed on duplication for personal or professional use. The author would appreciate acknowledgment of the source of any substantial quotations from this work. 1 von 71 13.01.2009 23:05 Armenian Tourist Attractions: Rediscover Armenia Guide http://mapy.mk.cvut.cz/data/Armenie-Armenia/all/Rediscover%20Arme... REDISCOVERING ARMENIA Author’s Preface Sources and Methods Armenian Terms Useful for Getting Lost With Note on Monasteries (Vank) Bibliography EXPLORING ARAGATSOTN MARZ South from Ashtarak (Maps A, D) The South Slopes of Aragats (Map A) Climbing Mt. Aragats (Map A) North and West Around Aragats (Maps A, B) West/South from Talin (Map B) North from Ashtarak (Map A) EXPLORING ARARAT MARZ West of Yerevan (Maps C, D) South from Yerevan (Map C) To Ancient Dvin (Map C) Khor Virap and Artaxiasata (Map C Vedi and Eastward (Map C, inset) East from Yeraskh (Map C inset) St. Karapet Monastery* (Map C inset) EXPLORING ARMAVIR MARZ Echmiatsin and Environs (Map D) The Northeast Corner (Map D) Metsamor and Environs (Map D) Sardarapat and Ancient Armavir (Map D) Southwestern Armavir (advance permission
    [Show full text]