Enhancement Delivery Plan Update

Total Page:16

File Type:pdf, Size:1020Kb

Enhancement Delivery Plan Update Enhancements Delivery Plan September 2018 Contents Introduction 3 Cross route projects 4 East West Rail 14 Electric Spine 20 Anglia 25 Midland Mainline Programme 31 Kent 43 Transpennine Route Upgrade 50 LNE 57 LNW 61 Sussex 71 Great Western Capacity Programme and Electrification 76 Wales 110 Wessex Capacity Improvement Programme 112 Funds 125 Cash Funded Projects 144 Investment Framework Projects 151 Scotland 159 Scottish Funds 176 2 The Enhancements Delivery Plan sets out the outputs, scope and Each project entry includes a milestones table setting out the programme milestones for projects and ring fenced funds that Network Rail is for the project’s delivery. Each milestone is assigned a status; the committed to deliver in CP5. It is used both by the regulator, to hold us statuses used have the following definitions: to account, and by our customers and funders, to give them visibility of our plans. Network Rail publishes an updated version of the EDP every ‐ Regulated Output – a regulated milestone for which we are held to quarter. account by the Office of Rail and Road (ORR). For a project that is in GRIP stages 1 to 3 this is the GRIP 3 completion milestone. Otherwise In January 2016 an update to the Enhancements Delivery Plan it is the entry into service milestone when the infrastructure is available covering England and Wales was published in draft to support the for use; Hendy review of Network Rail’s enhancements programme for CP5. ‐ Indicator – this is used for a milestone with a confirmed date which is The review confirmed that Network Rail will continue to deliver a very not a Regulated Output. It is used for GRIP 4 / GRIP 5 milestones significant enhancement programme during the period to 2019. Most of for projects which have completed GRIP 3; the originally planned projects will still be delivered in CP5 with ‐ Complete – a past milestone completed on time; significant benefits for passengers and freight users. We will work with ‐ Revised – a milestone that has been changed not due to NR caused our industry partners to deliver the planned benefits to the end user as slippage; soon as they can be achieved, so the benefits of other industry ‐ Indicative – a milestone which gives our best view of the likely date changes such as new franchises are delivered. but which may be subject to re-planning and to which Network Rail has The Department for Transport has formally accepted the re-planning of not committed. This is used for all milestones subsequent to GRIP 3 the enhancements portfolio for CP5 which was proposed in the Hendy (including GRIP 6) when GRIP 3 has not been completed. review. Further updates to the Enhancements Delivery Plan have been Until a project completes its development at the end of GRIP 3 there is agreed between Network Rail and the Department through a formal likely to be some uncertainty around scope and timescales. Therefore change control process. projects which have not yet completed GRIP 3 are unlikely to be supported by a delivery programme and future milestones may be shown as “TBC”, as well as having an “indicative” status. Most projects have an Output delivered milestone with its status shown as ‘not applicable’. This milestone is the point at which the customer benefit of a project is delivered. This often relies on other industry partners to provide the rolling stock or introduce a new timetable to contribute to the outputs. This edition of the EDP updates the completion status of all milestones up until the end of August 2018. Updates to milestones due in September 2018 will be made in the December 2018 EDP update. 3 Crossrail Details submitted to CRL in March 2012. The joint sponsors for the Crossrail project (DfT and TfL) accepted CRL’s recommendation of that OTP, and CRL confirmed this Project reference code: CR001 acceptance on 29 April 2012. HLOS driver: Committed projects These works support the full introduction of the Crossrail services in 2019, through a Operating route: Anglia, Kent and Western series of Key Dates obligations and Key Output obligations set out in the Network Rail Last updated: September 2018 Client Requirements (NRCR) Scope of works CP5 output driver The scope of works Network Rail is responsible for, and that make up the ONW, is set The Crossrail project will deliver a new integrated railway route through central London out in the Network Rail Client Requirements and is as follows: from Reading and Heathrow in the west to Shenfield and Abbey Wood in the east. Track The joint sponsors of the Crossrail project, the Department for Transport (DfT) and Layout changes and turnback capability at Maidenhead, Slough, West Transport for London (TfL), have set-up a company called Crossrail Limited (CRL) to Drayton, West Ealing, Hayes and Harlington, Ilford, Chadwell Heath, Gidea act as the delivery agent. Network Rail is one of CRL’s delivery partners. Park and Shenfield Two new tracks from Plumstead to Abbey Wood to support the Crossrail train The Crossrail project benefits are as follows: service New Crossrail train services will provide direct links from Reading and Remodelling at the interfaces between the Crossrail Central Tunnel section Heathrow to Paddington in the west to Shenfield and Abbey Wood in the and the existing Network Rail infrastructure at Pudding Mill Lane, Plumstead, east. With up to 24 Crossrail trains an hour running through the central Royal Oak and on the approaches to Paddington section in each direction (at peak times) a total of 10% will be added to Remodelling at Old Oak Common depot to facilitate the Crossrail rolling stock London’s rail-based transport capacity; and depot 28 existing surface stations will be upgraded with many of these stations also Track lowering beneath a number of bridges between Stockley and receiving platform extensions. Maidenhead Network Rail’s obligation Structures The responsibility for the design and construction of the works outside of the central A major new elevated junction at Stockley and a new dive-under at Acton tunnel section - known as the ‘On Network Works’ (ONW) - was transferred to Network Reconstruction of a number of bridges between Stockley and Maidenhead Rail when Royal Assent was granted to the Crossrail project in July 2008. and between Plumstead and Abbey Wood New bay platforms at Maidenhead, West Ealing and Shenfield The Protocol, which was established between Network Rail, Crossrail Limited (CRL) and the Department for Transport (DfT) on 27 November 2009 and subsequently amended in version 7.0 on 9 May 2012, details in full Network Rail’s obligation to Signalling deliver the ONW. It authorised the completion of design development for the ONW to Re-signalling of the Great Western Main Line between Paddington and the end of GRIP 4 and provided a process for agreeing an Overall Target Price (OTP) Reading for GRIP 5 to 8, to be Regulatory Asset Base (RAB) funded. Modification to the signalling of the Great Eastern Main Line between Stratford and Shenfield On 01 December 2011 Network Rail submitted its Key Date 1A (KD1A) submission to Design and provision of a new control centre facility at Romford CRL. This was followed by an amended Overall Target Price (OTP) which was Development of Enhanced TPWS 4 Electrification Interfaces and assumptions All four tracks of the Great Western Main Line will be electrified between Stockley and Maidenhead and new OLE structures will be fitted to the listed There are multiple interfaces within Network Rail with: Maidenhead Railway Bridge Intercity Express Programme (IEP), Great Western Electrification (GWEP), Telecoms ERTMS, FTN and GSM-R which have key interfaces to support delivery Station and lineside telecoms systems will be provided in order to meet outputs including the installation of Series 1 equipment, ETCS and SCADA, Crossrail requirements and installation of OLE between Maidenhead and Reading; Stations HS2 especially the design and construction interface at Old Oak Common; A new station will be constructed at Abbey Wood. Stations at Ealing Routes (Western, Anglia, Kent) including delivery outputs for Access for All at Broadway, Ilford, Romford, Slough and Maidenhead will be refurbished Burnham station; New modular station buildings at Acton Main Line, West Ealing, Southall and Enhancements, including Romford Control Centre which will house CRL staff; Hayes and Harlington CP4 & CP5 renewals; key amongst these will be the Great Eastern rewiring Platforms will be lengthened and step-free access will be provided at a which supports the Programmes delivery outputs on Anglia route; number of stations Maintenance, including Western asset resilience work which will affect delivery outputs for a resilient Crossrail timetable; Other works (not part of the ONW) cash funded by CRL Tunnel spoil removal; and Advanced works and asset protection works at Paddington Station, Ilford Outside party works. Depot and the tunnel interfaces at Royal Oak, Plumstead and Pudding Mill Lane The following key assumptions have been identified: Resignalling of Heathrow Spur The systems installed by CRL in the Central Tunnel Section will be compatible with the surface railway infrastructure; Separately funded The delivery and integration of the whole Crossrail system, management of Upgrade of the traction power supply system interfaces and achievement of the required Public Performance Measure (PPM) remains the responsibility of CRL; and Interfacing projects are funded and delivered on time by other parties. 5 Activities and milestones (NR)
Recommended publications
  • Our Counties Connected a Rail Prospectus for East Anglia Our Counties Connected a Rail Prospectus for East Anglia
    Our Counties Connected A rail prospectus for East Anglia Our Counties Connected A rail prospectus for East Anglia Contents Foreword 3 Looking Ahead 5 Priorities in Detail • Great Eastern Main Line 6 • West Anglia Main Line 6 • Great Northern Route 7 • Essex Thameside 8 • Branch Lines 8 • Freight 9 A five county alliance • Norfolk 10 • Suffolk 11 • Essex 11 • Cambridgeshire 12 • Hertfordshire 13 • Connecting East Anglia 14 Our counties connected 15 Foreword Our vision is to release the industry, entrepreneurship and talent investment in rail connectivity and the introduction of the Essex of our region through a modern, customer-focused and efficient Thameside service has transformed ‘the misery line’ into the most railway system. reliable in the country, where passenger numbers have increased by 26% between 2005 and 2011. With focussed infrastructure We have the skills and enterprise to be an Eastern Economic and rolling stock investment to develop a high-quality service, Powerhouse. Our growing economy is built on the successes of East Anglia can deliver so much more. innovative and dynamic businesses, education institutions that are world-leading and internationally connected airports and We want to create a rail network that sets the standard for container ports. what others can achieve elsewhere. We want to attract new businesses, draw in millions of visitors and make the case for The railways are integral to our region’s economy - carrying more investment. To do this we need a modern, customer- almost 160 million passengers during 2012-2013, an increase focused and efficient railway system. This prospectus sets out of 4% on the previous year.
    [Show full text]
  • Rf LTW Chiltern Response
    campaigning by the Railway Development Society Limited Development of Train Services for Chiltern Routes Response from Railfuture 1. Introduction Railfuture is pleased to respond to the London TravelWatch document regarding the Development of Train Services for Chiltern Routes. Our comments will be brief and to the point. Railfuture is the campaigning name of the Railway Development Society Limited, a (not for profit) Limited Company organised in England as twelve regional branches plus two national branches in Scotland and Wales. This coordinated response has been compiled by Railfuture London & South East, and has been agreed with Railfuture Thames Valley for those sections of line in their area (Amersham to Aylesbury and West Ruislip to Bicester North). 2. General Comments Railfuture welcomes the initiative from LTW to suggest ways of raising standards of service on Chiltern Railways services in London and South East. We note the work that has gone into gathering the detail on network capacity and existing services. Chiltern is unique for a number of reasons: its close working relationship and shared infrastructure with London Underground (LU) on the Aylesbury Line; the close proximity of other LU and London Bus services to many Chiltern ‘metro’ stations on the High Wycombe line; the close mix of short and medium distance commuter traffic and the poor interchange facilities at Marylebone. It is equally unique for the impressive increase in patronage generated by reliable modern rolling stock and infrastructure; the benefits of a long-term franchise agreement and an imaginative customer oriented professional management team. It is also inhibited by many of the factors that make it unique! These range from the poor interchange facilities at Marylebone, to a lack of infrastructure between Wembley and West Ruislip.
    [Show full text]
  • Solent to the Midlands Multimodal Freight Strategy – Phase 1
    OFFICIAL SOLENT TO THE MIDLANDS MULTIMODAL FREIGHT STRATEGY – PHASE 1 JUNE 2021 OFFICIAL TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................................................................................... 4 1. INTRODUCTION TO THE STUDY .......................................................................................................................................................... 9 2. STRATEGIC AND POLICY CONTEXT ................................................................................................................................................... 11 3. THE IMPORTANCE OF THE SOLENT TO THE MIDLANDS ROUTE ........................................................................................................ 28 4. THE ROAD ROUTE ............................................................................................................................................................................. 35 5. THE RAIL ROUTE ............................................................................................................................................................................... 40 6. KEY SECTORS .................................................................................................................................................................................... 50 7. FREIGHT BETWEEN THE SOLENT AND THE MIDLANDS ....................................................................................................................
    [Show full text]
  • Consultation Technical Report
    Making Meaningful Connections Consultation Technical Report East West Rail Consultation: 31 March – 9 June 2021 This document contains the full Consultation Technical Report, without the Appendices. To access the Appendices, please visit www.eastwestrail.co.uk 01. Introduction 18 - 26 07. Project Section B: Bletchley and the Marston Vale Line 100 - 229 1.1. Chapter Summary 18 7.1. Chapter Summary 101 1.2. East West Rail 19 7.2. Introduction 104 1.3. The Project 19 7.3. Service Concepts 109 1.4. Consultation 23 7.4. Bletchley Station 141 1.5. Technical Report 26 7.5. Fenny Stratford Additional Track 144 02. The Case for East West Rail 27 - 31 7.6. Level Crossings on the Marston Vale Line 146 2.1. Chapter Summary 27 7.7. Marston Vale Line Infrastructure Upgrade 228 2.2. The overall case for East West Rail 28 08. Project Section C: Bedford 230 - 299 2.3. Benefits of railways over road improvements 31 8.1. Chapter Summary 230 03. Project Objectives 32 - 42 8.2. Introduction 234 3.1. Chapter Summary 32 8.3. Bedford St Johns 238 3.2. Introduction 33 8.4. Bedford Station 250 3.3. Safety 34 8.5. North Bedford 268 3.4. Environment 34 8.6. Conclusion 297 3.5. EWR Services 34 09. Project Section D: Clapham Green to The Eversdens 300 - 371 3.6. Connectivity 36 9.1. Chapter Summary 301 3.7. Customer Experience and Stations 37 9.2. Introduction 303 3.8. Powering EWR Services 38 9.3. Option Development 306 3.9.
    [Show full text]
  • London Guide Welcome to London
    Visitor information Welcome to London Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Tube and central London bus maps inside #LondonIsOpen Welcome to London Paying for your travel Public transport is the best way to get There are different ways to pay for your around London and discover all that the travel. For most people, pay as you go - city has to offer. This guide will help you paying for the trips you make - with a plan how to get around the Capital on contactless payment card, an Oyster card or public transport. a Visitor Oyster card, is the best option as it If you have just arrived at an airport and are offers value, flexibility and convenience. looking for ways to get to central London, go to page 11 in this guide. Getting around London London’s transport system is iconic. With its world famous Underground (Tube) and iconic red buses, travelling around the Capital is an experience in itself. But London is much more than just the Tube or the bus; our vast network of transport services includes: Contactless payment cards If your credit, debit, charge card or wearable device has the contactless symbol above you can use it for pay as you go travel on London’s public transport. Android Pay and Apple Pay are also accepted. Benefits of contactless • It’s quick and easy – there’s no need to queue to buy a ticket • It offers great value – pay as you go with contactless is better value than buying a single ticket and you can benefit from both Night Tube daily and weekly capping (see page 5) • 14 million people have used contactless Night Tube services run on the to travel in London – including customers Jubilee, Victoria and most of from over 90 countries the Central and Northern lines all night on Fridays and Saturdays.
    [Show full text]
  • Annex G – Forming & Delivering a Strategy
    Swindon and Wiltshire Rail Study 09/05/2019 Reference number 107523 ANNEX G – FORMING & DELIVERING A STRATEGY SWINDON AND WILTSHIRE RAIL STUDY ANNEX G – FORMING & DELIVERING A STRATEGY IDENTIFICATION TABLE Client/Project owner Swindon and Wiltshire Local Enterprise Partnership Project Swindon and Wiltshire Rail Study Study Annex G – Forming & Delivering a Strategy Type of document Report Date 09/05/2019 File name Framework N/A Reference number 107523 Number of pages 33 APPROVAL Version Name Position Date Modifications Author J Jackson Associate 12/03/2019 Checked A Sykes Associate 13/03/2019 1 by Approved D Bishop Director 15/03/2019 by Author J Jackson Associate 09/05/2019 Checked A Sykes Associate 09/05/2019 2 by Approved A Sykes Associate 09/05/2019 by TABLE OF CONTENTS 1. INTRODUCTION 6 2. IDENTIFYING THE COMPONENTS OF THE STRATEGY 7 3. NETWORK-WIDE INITIATIVES 8 4. GREAT WESTERN MAINLINE 11 RECOMMENDATIONS 11 PHASE 0: 1 TPH WESTBURY – SWINDON 12 PHASE 1: 1 TPH SOUTHAMPTON CENTRAL – SWINDON 13 PHASE 2 & 2A: GREAT WESTERN CONNECT 14 PHASE 3: EXTENSION OF GREAT WESTERN CONNECT 16 DELIVERY OF GREAT WESTERN CONNECT 16 THE SOUTH COTSWOLDS LINE 17 5. BERKS & HANTS ROUTE 18 EXTENSION OF LONDON – BEDWYN SERVICES 18 DEVIZES PARKWAY 19 EXTENSION OF LONDON – WESTBURY SERVICES TO BRISTOL (PEAK ONLY) 19 ENHANCEMENT OF PADDINGTON – EXETER SERVICES TO HOURLY 19 DELIVERING AND ENHANCED BERKS & HANTS SERVICE 19 6. WEST OF ENGLAND LINE 21 SALISBURY – LONDON JOURNEY TIME REDUCTIONS 21 PORTON STATION 22 WILTON STATION 23 ANDOVER – LUDGERSHALL LINE 23 7. TRANS WILTS CORRIDOR 24 ASHTON PARK STATION 25 THE IMPACT OF METRO WEST 25 8.
    [Show full text]
  • Midland Main Line Upgrade Programme Economic Case Department for Transport
    Midland Main Line Upgrade Programme Economic Case Department for Transport 30 August 2017 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to Midland Main Line Upgrade Programme Business Case. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 108 pages including the cover. Document history Job number: 5159267 Document ref: v4.0 Revision Purpose description Originated Checked Reviewed Authorised Date Interim draft for client Rev 1.0 - 18/08/2017 comment Revised draft for client Rev 2.0 18/08/2017 comment Revised draft addressing Rev 3.0 - 22/08/2017 client comment Rev 4.0 Final 30/08/2017 Client signoff Client Department for Transport Project Midland Main Line Upgrade Programme Document title Midland Main Line Upgrade Programme: KO1 Final Business Case Job no. 5159267 Copy no. Document reference Atkins Midland Main Line Upgrade Programme | Version 4.0 | 30 August 2017 | 5159267 2 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Table of contents Chapter Pages Executive Summary 7 1. Introduction 12 1.1. Background 12 1.2. Report Structure 13 2. Scope of the Appraisal 14 2.1. Introduction 14 2.2. Scenario Development 14 3. Timetable Development 18 3.1. Overview 18 4. Demand & Revenue Forecasting 26 4.1. Introduction 26 4.2. Forecasting methodology 26 4.3. Appraisal of Benefits 29 4.4.
    [Show full text]
  • Eccleston Place, London, England
    A ULI Advisory Services Panel Report Eccleston Place, London, England 13-18 May 2012 1 A ULI Advisory Services Panel Report About ULI ULI – the Urban Land Institute – is a non-profit research We are a think tank, providing advice and best practices in and education organisation supported by its members. a neutral setting – valuable for practical learning, involving Founded in Chicago in 1936, the Institute now has over public officials and engaging urban leaders who may not 30,000 members in 95 countries worldwide, representing have a real estate background. By engaging experts from the entire spectrum of land use and real estate development various disciplines we can arrive at advanced answers to disciplines and working in private enterprise and public problems which would be difficult to achieve independently. service. In Europe, we have around 2,000 members supported by a regional office in London and a small ULI shares knowledge through discussion forums, research, team based in Frankfurt. publications and electronic media. All these activities are aimed at providing information that is practical, down to ULI brings together leaders with a common commitment to earth and useful so that on-the-ground changes can be improving professional standards, seeking the best use of made. By building and sustaining a diverse network of land and following excellent practices. local experts, we are able to address the challenges facing Europe’s cities. Copyright ©2012 by ULI – the Urban Land Institute. ULI Europe, all rights reserved. No part of this report may be reproduced in any form or by any means, electronic or mechanical, including photocopying or recording, or by any information storage and retrieval system, without written permission of the publisher.
    [Show full text]
  • The Elizabeth Line
    COMPLETING ELIZABETH LINE THE ELIZABETH LINE Trial Running Update TRIAL RUNNING Plumstead Sidings PROJECT UPDATE WHAT IS TRIAL RUNNING? Delivery of the Elizabeth line is now in its Throughout the Trial Running programme Crossrail will Trial Running marks the point at which the Railways and complex final stages. Crossrail and Transport steadily increase the numbers of trains running in the tunnels. Other Guided Transport Systems (Safety) Regulations 2006 This will then be further increased and will allow the railway (ROGS) apply for the first time in the Central Operating for London (TfL) are working to ensure the and the supporting systems to be operated as close as Section. Crossrail transitions from following the construction earliest possible opening for the Elizabeth line. possible to an operational timetable. regulations to following Rail regulations. The project is nearing the next important milestone and There is important work to be done but we will take the time Following a readiness review, we will sign over control of the expects to commence extensive commissioning of the railway needed to get it right. Our top priority is a safe railway which central operating section to TfL as infrastructure manager as in spring 2021. This is a crucial moment in the project with the London and the UK can rely on. we transition to ROGS and operate under the Railway Rule railway on track to open in the first half of 2022. Book. From that moment forward, TfL’s service and The progress we have seen over recent months highlights the infrastructure managers will be accountable for the safety, The next phase, Trial Running, involves integrated trials of clear path we have towards completing the Elizabeth line and operation and maintenance of the railway, and the Trial the railway to demonstrate that the Elizabeth line is safe and commencing passenger services in the first half of 2022.
    [Show full text]
  • Hampton Court to Berrylands / Oct 2015
    Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth.
    [Show full text]
  • Rail for All Report
    RAIL FOR ALL Delivering a modern, zero-carbon rail network in Scotland Green GroupofMSPs Policy Briefing SUMMARY Photo: Times, CC BY-SA 2.5 BY-SA Times, CC Photo: The Scottish Greens are proposing the Rail for All investment programme: a 20 year, £22bn investment in Scotland’s railways to build a modern, zero-carbon network that is affordable and accessible to all and that makes rail the natural choice for commuters, business and leisure travellers. This investment should be a central component of Scotland’s green recovery from Covid, creating thousands of jobs whilst delivering infrastructure that is essential to tackle the climate emergency, that supports our long-term economic prosperity, and that will be enjoyed by generations to come. CONTENTS CHAPTER PAGE 1 Creating the delivery infrastructure 4 i. Steamline decision-making processes and rebalance 4 them in favour of rail ii. Create one publicly-owned operator 4 iii. Make a strategic decision to deliver a modern, 5 zero-carbon rail network and align behind this iv. Establish a task force to plan and steer the expansion 5 and improvement of the rail network 2 Inter-city services 6 3 Regional services 9 4 Rural routes and rolling stock replacement 10 5 TramTrains for commuters and urban connectivity 12 6 New passenger stations 13 7 Reopening passenger services on freight lines 14 8 Shifting freight on to rail 15 9 Zero-carbon rail 16 10 Rail for All costs 17 11 A green recovery from Covid 18 This briefing is based on the report Rail for All – developing a vision for railway investment in Scotland by Deltix Transport Consulting that was prepared for John Finnie MSP.
    [Show full text]
  • Agenda Item 8: West Coast Main Line Released Capacity
    East West Rail Consortium 13th March 2019 Agenda Item 8: West Coast Main Line Released Capacity Recommendation: It is recommended that the meeting: a) Note the update on the West Coast Main Line Released Capacity study b) Endorse the strategic issues identified in paragraph 2.6 that have been identified by England’s Economic Heartland as needing to be considered by the study c) Note that England’s Economic Heartland has established a working group of representative interests, working on a ‘task and finish’ basis to support the EEH Business Unit d) Note the update on the Old Oak Common: Future Chiltern Capacity 1. Context 1.1. The East West Rail Consortium has previously identified the strategic importance of developing rail services along the Northampton – Milton Keynes – Aylesbury – High Wycombe – Old Oak Common axis. 1.2. The opportunity to realise this occurs through a combination of the opening of East West Rail and the opening of the first stage of HS2. 1.3. The Chiltern and East West Rail Route Strategy was published by Network Rail in 2017 and identified the potential and need to develop this north- south axis, partly in response to limitations elsewhere on the network and partly in response to the potential for further passenger growth as a result of planned growth set out in locally. 1.4. Realising the potential to develop services on this north-south axis has been a long-standing strategic priority for England’s Economic Heartland and was included within the submission to the 2018 Budget. 1.5. Over and above the on-going work being taken forward by the East West Rail Company to deliver East West Rail, there are two pieces of work underway that are pertinent to realising the opportunity to deliver services on the north-south axis: London North West South CMSP – Released Capacity WCML South Old Oak Common Station: Future Chiltern Capacity 2.
    [Show full text]