CHAPTER 5 Highways Department Maintenance of Public Roads
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
(T&TC) Southern District Council (SDC) Date Time Venue
Minutes of the 23rd Meeting of the Traffic and Transport Committee (T&TC) Southern District Council (SDC) Date : 4 April 2011 Time : 2:30 p.m. Venue : SDC Conference Room Present: Mr LEUNG Ho-kwan, MH (Chairman) Mr CHAN Fu-ming (Vice-Chairman) Ms MAR Yuet-har, BBS, MH (Chairlady of SDC) Mr CHU Ching-hong, JP (Vice-Chairman of SDC) Mr AU Lap-sing Mr CHAI Man-hon Ir CHAN Lee-shing, William, JP Mrs CHAN LEE Pui-ying Ms CHEUNG Sik-yung Mr CHEUNG Siu-keung Mr FUNG Se-goun, Fergus Mr FUNG Wai-kwong Mr LAM Kai-fai, MH Ms LAM Yuk-chun, MH Mr MAK Chi-yan Mrs MAK TSE How-ling, Ada Mr TSUI Yuen-wa Mr WONG Che-ngai Mr WONG Ling-sun, Vincent Mr Paul ZIMMERMAN Dr YANG Mo, PhD Mr CHEUNG Hon-fan Mr CHOW Seung-man Mr PANG Siu-kei Mr PUK Kwan-kin Dr TANG Chi-wai, Sydney TTC2011/mins23 1 Absent with Apologies: Dr MUI Heung-fu, Dennis Secretary: Miss LI Mei-yee, Ivy Executive Officer II (District Council)3, Home Affairs Department In Attendance: Mr WONG Yin-fun, Alex, JP District Officer (Southern), Home Affairs Department Miss LEUNG Tsz-ying, Almaz Assistant District Officer (Southern), Home Affairs Department Mr YAU Kung-yuen, Corwin Acting Senior Transport Officer/Southern, Transport Department Mr LEE Chen-sing, Sidney Engineer/Southern & Peak 1, Transport Department Mr LIU Po-wa, Paul Engineer 10 (HK Island Division 2), Civil Engineering and Development Department Mr MA Wing-tak, Peter Senior District Engineer/HES, Highways Department Ms AU Siu-ping District Operations Officer (Western), Hong Kong Police Force Mr LAU Wing-fu Officer-in-charge, District -
Ian Bramley Msc, C.Eng, MICE, MCIOB, MHKIE Senior Consultant
August 2020 Ian Bramley MSc, C.Eng, MICE, MCIOB, MHKIE Senior Consultant KEY EXPERIENCE Ian is a contracts management and claims specialist with over 40 years of experience in the design, contract, project and construction management of major civil engineering and building projects including bridges, highways, foundations, structures and infrastructures. A UK-qualified chartered civil engineer and chartered builder, he has a strong understanding of the technical and contractual issues involved in complex civil engineering claims, especially those relating to design and design intent. Having formerly occupied roles as project director and manager on active projects with values up to US$5bn, Ian now focusses on the successful resolution of disputes on civil engineering and building projects worldwide. CAREER SUMMARY 2017 to present – Senior Consultant, Contract Dispute Consultants HK Ltd., Hong Kong Ian is responsible for researching and drafting technical and engineering claims for various clients. His current assignments include: - Claim strategy advice to a design builder on a major PPP light rail scheme in North America; - Advising a contractor and drafting claims related to the construction of an access shaft and spoil disposal on a large urban road tunnel project in Hong Kong; - Providing contractual advice to a main contractor involved in the construction of the basement of a major cultural development, drafting claims and supporting the management team in negotiations and mediation proceedings with the client; and - Drafting a delay -
For Discussion on 6 November 2015 Legislative Council Panel On
CB(4)119/15-16(03) For discussion on 6 November 2015 Legislative Council Panel on Transport “Universal Accessibility” Programme PURPOSE This paper reports on the latest progress of the “Universal Accessibility” (UA) Programme, and consults Members on the proposal of the Government to seek approval from the Finance Committee (FC) of the Legislative Council for an allocation of $770.90 million in 2016-17 for the block allocation Subhead 6101TX – “Universal Accessibility Programme” under Capital Works Reserve Fund (CWRF) Head 706 – “Highways”. BACKGROUND 2. The Government has been installing barrier-free access facilities at public walkways1 for years. In response to public requests, the Government launched in August 2012 a new policy to expand the programme to retrofit barrier-free access facilities at public walkways, striving to create a “universally accessible” environment in the community to facilitate the access to public walkways by the public. Under the new policy – (a) from now on, when considering retrofitting of barrier-free access facilities to existing or newly constructed public walkways, the Government will treat lifts and ramps equally (unless the site conditions dictate one form over another). This is a change from the past practice which gave priority to ramps; and (b) as long as site conditions permit, we will consider installing lifts at walkways where there is already a standard ramp installed. After a lift has been installed, we will evaluate whether to keep the ramp or demolish it for more spacious pavement or to make way for roadside greening. 3. With the support of the Panel on Transport and the Panel on Development, the Government obtained approval from the FC in January 2013 to create a new block allocation Subhead 6101TX – “Universal Accessibility 1 i.e. -
Better Safe Than Worry
VSLnews MONITORING OF STRUCTURES BETTER SAFE THAN WORRY SPECIAL REPORT Match-cast segmental bridge piers ABERDEEN CHANNEL BRIDGE Full-scope construction VSLnews ISSUE ONE • 2013 Anticipating structural behaviour VSL has built its reputation by providing services of high added-value Daniel Rigout, through the technical expertise of its strong worldwide network, backed Chairman and up by a dynamic R&D effort. From the earliest project phases until the end Chief Executive Officer of a structure’s life, VSL’s experts provide consultancy and engineering services that produce cost-effective, durable and sustainable solutions for our clients. The life of any structure is divided into three key phases: planning, construction and maintenance. VSL’s engineers are of invaluable support to designers carrying out feasibility studies at the planning stage, and, if relevant, can propose alternative solutions to achieve what is best for the project. How to build the structure becomes the critical issue once the design is optimised and here VSL’s teams take up the challenge to ensure fast-track and safe construction. Monitoring of structural behaviour may be required either during construction or later, when the structure is in service, in order to forecast maintenance works and allocate the corresponding budgets. In each case, our experts respond to the requirements by providing a monitoring system that is adapted to the needs and economic constraints. Once the inspection plan has been established, VSL can also handle any corresponding strengthening and repair works required. True turnkey and full-scope projects covering all phases of a structure’s life are at the heart of our business. -
MTR Corporation Limited Report on SCL Contract 1112 – Review of the EWL Slab Construction
15 June 2018 MTR Corporation Limited Report on SCL Contract 1112 – Review of the EWL Slab Construction 1. Executive Summary On 29 May, we received an enquiry from the media asking a number of questions about the steel fixing works for the East West Line platform slab of the extended Hung Hom Station being constructed as part of the Shatin to Central Link (“SCL”) project. On 31 May, the Railway Development Office of the Highways Department of Government wrote to us expressing their concern on the alleged non-compliant steel fixing works found at the joints between diaphragm walls and the platform slab at Hung Hom Station under Contract 1112 and requesting us to prepare a Report into this matter, of which this Executive Summary forms part. SCL is a strategic railway project which connects existing railway lines to form an East West Corridor (“EWL”) (Tai Wai to Hung Hom Section) and a North South Corridor (Hung Hom to Admiralty Section) with six interchange stations. In 2012, Government appointed MTR Corporation Limited (“MTRCL”) to project manage the construction and commissioning of the SCL project under an Entrustment Agreement dated 29 May 2012 (“EA3”). MTRCL therefore has the role and responsibilities of a project manager working on behalf of Government in carrying out the entrustment activities. The responsibilities for the actual construction of the project rest with the contractors appointed to build various parts of the project in accordance with the specifications and terms of their respective construction contracts. The contractor appointed for the construction contract relevant to the EWL platform slab works (Contract 1112) is Leighton Contractors (Asia) Limited (“Leighton”). -
2. Project Description
Consultancy Agreement No. NEX/2301 South Island Line (East) Environmental Impact Assessment 2. Project Description 2.1 Project Background The South Island Line (SIL) was originally proposed as part of the Second Railway Development Study (RDS-2) completed in May 2000 as an extension to the existing railway network to serve the Southern District of Hong Kong. In June 2002, MTRCL submitted a preliminary proposal for a medium-capacity SIL, which involved a monorail system looping from University Station of the planned West Island Line (WIL) to the southern part of Hong Kong Island and back to Wanchai Station of the existing Island Line (ISL). The study identified that SIL would not be commercially viable without Government’s funding support. Subsequently, MTRCL further developed the proposed SIL as part of a Feasibility Study (FS) entitled “West Island Line and South Island Line Feasibility Study” which was completed in March 2004. After an evaluation of various alternative options, the FS recommended the implementation of the proposed SIL(E) from South Horizons to Admiralty, via intermediate stations at Lei Tung, Wong Chuk Hang and Ocean Park, for serving the Southern District and provision of a necessary depot at Wong Chuk Hang to support the operation of SIL, amongst other recommendations related to WIL. The FS also evaluated the feasibility of providing additional intermediate stations at Happy Valley and Wanchai. In February 2005, MTRCL submitted a project proposal to the Government for phased implementation of the SIL and WIL. In December 2007, the Executive Council gave the green light for MTRCL to proceed with preliminary planning and design of the SIL(E), which will be a medium capacity railway line running from Admiralty to South Horizons, with three intermediate stations at Ocean Park, Wong Chuk Hang and Lei Tung. -
List of Abbreviations
LIST OF ABBREVIATIONS AAHK Airport Authority Hong Kong AAIA Air Accident Investigation Authority AFCD Agriculture, Fisheries and Conservation Department AMS Auxiliary Medical Service ASC Aviation Security Committee ASD Architectural Services Department BD Buildings Department CAD Civil Aviation Department CAS Civil Aid Service CCCs Command and Control Centres CEDD Civil Engineering and Development Department CEO Chief Executive’s Office / Civil Engineering Office CESC Chief Executive Security Committee CEU Casualty Enquiry Unit CIC Combined Information Centre CS Chief Secretary for Administration DECC District Emergency Co-ordination Centre DEVB Development Bureau DH Department of Health DO District Officer DSD Drainage Services Department EDB Education Bureau EMSC Emergency Monitoring and Support Centre EMSD Electrical and Mechanical Services Department EPD Environmental Protection Department EROOHK Emergency Response Operations Outside the HKSAR ESU Emergency Support Unit ETCC Emergency Transport Coordination Centre FCC Food Control Committee FCP Forward Control Point FEHD Food and Environmental Hygiene Department FSCC Fire Services Communication Centre FSD Fire Services Department GEO Geotechnical Engineering Office GFS Government Flying Service GL Government Laboratory GLD Government Logistics Department HA Hospital Authority HAD Home Affairs Department HD Housing Department HyD Highways Department HKO Hong Kong Observatory HKPF Hong Kong Police Force HKSAR Hong Kong Special Administrative Region HQCCC Police Headquarters Command -
Examination of Estimates of Expenditure 2016-17 Reply Serial No
Examination of Estimates of Expenditure 2016-17 Reply Serial No. THB(T)023 CONTROLLING OFFICER’S REPLY (Question Serial No. 1523) Head: (60) Highways Department Subhead (No. & title): (-) Not Specified Programme: (3) Railway Development Controlling Officer: Director of Highways (K K LAU) Director of Bureau: Secretary for Transport and Housing Question: It is noted that the Railway Development Office (RDO) of the Highways Department (HyD) is responsible for the tasks under this programme. Will the Government inform this Committee of the main duties, operational expenditure, staff establishment and full year salary expenditure for the RDO of the HyD in the 2016-17 estimates? Asked by: Hon Albert CHAN Wai-yip (Member Question No. 25) Reply: In 2016-17, the major duties of the RDO are to – (a) co-ordinate actions with bodies and departments concerned to speed up land resumption and to resolve interface problems to facilitate implementation of the railway projects; (b) oversee the progress of the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link, the South Island Line (East), the Kwun Tong Line Extension and the Shatin to Central Link to ensure their timely completion; (c) continue to take forward the railway schemes recommended under the Railway Development Strategy 2014; (d) scrutinise submissions including project estimates by the MTR Corporation Limited on the implementation of railway projects; (e) co-ordinate with the Mainland authorities on cross-boundary infrastructure developments; and (f) continue to undertake route protection of the recommended railway projects and other longer term proposals. The HyD deploys in-house staff resources (with a projected staff establishment of 134 as at 31 March 2017), with the assistance of consultants on some specialised tasks, to monitor the Session 14 THB(T) - Pa ge 40 implementation of the railway projects. -
Pennsylvania State Archives Sampling of Record Groups and Manuscript Groups
Pennsylvania State Archives Sampling of Record Groups and Manuscript Groups Please note: Listed below are records that may be useful to search in regards to postwar development during the 1940s to 1960s. There may be more information located at the Pennsylvania State Archives in other Record or Manuscript groups that are not cited on this list. RG – 10 Records of the Office of the Governor – Office of Policy and Planning State Planning Board Minutes and Agendas 1934‐1978 (10 cartons) For example from the 1954 minutes: “Study of Local Government Costs and Planning Standards, Southeastern PA Regional Planning Commission.” “Proposed Board Action on Housing & Redevelopment Program” Secretary of Administration Joint State Government Commission Records 1940‐41 Buildings Department, General Plan, Highways Department, Utilities Department State Government Survey committee Records 1951‐1953 Agriculture, Education, Highways, Public Utilities, Recreation RG – 11 Records of the Department of Health Bureau of Sanitary Engineering Sanitary Project Plans and Profiles ca. 1905‐1968 Water Supply and Sewage Report and Permit Books, 1905‐1959 “A record of water supply and sewage reports and permits issued by the Sanitary Water Board to municipalities and private companies. Most reports and permits are for sewerage and waterworks and the reports provide information on effluents from local industries, regional population growth, river systems and comprehensive sewage treatment plans.” Secretary of Health General Correspondence 1930‐1976 (18 cartons) County Departments of Health, Deputy Secretary for Environmental Protection Legal Opinions, 1920‐1965 Bureau of Sanitation 1920‐1956 Housing 1938‐1939 Vital Statistics 1927‐1965 Deputy Secretary for Environmental Protection Meeting File 1963, 1966‐1970 Testimonies and speeches. -
MTR Corporation Limited South Island Line (East)
MTR Corporation Limited South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Final Monitoring Report South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Final Monitoring Report (Issue 1) Date of Submission Name Prepared by: Ida YU (Qualified Ecologist) Certified by: (Environmental Team Leader) Dr Michael LEVEN Date: 22 February 2019 Job Ref.: 11/503/210F MTRC-SIL South Island Line (East) Monitoring on the Implementation of Ecological Planting & Landscape Plan during 3-year Post-Planting Care and Maintenance Period (January 2016 – December 2018) Job Ref.: 11/503/210F MTRC-SIL Final Monitoring Report(Issue 1) CONTENTS 1 INTRODUCTION ................................................................................................................................. 1 2 SUMMARY OF INSPECTION FINDINGS .............................................................................................. 1 3 DISCUSSION ..................................................................................................................................... 11 4 CONCLUSION ................................................................................................................................... 15 5 REFERENCES ................................................................................................................................... -
FDS Track Records
Government Projects (Prime Contractor) Supplier Name: FDS Solutions Limtied Last update on: 20 Jul 2020 Project Owner Project Title Awarded in Contract Value (Bureau / Department Name) Environmental Protection System Maintenance and Support for the Environmental Database Model for Enforcement and May 2017 HK$775,770.00 Department Monitoring (ENDMEM) System System Maintenance and Support (SM&S) for Centralised Organ Donation Register (CODR) Department of Health Jun 2017 HK$396,206.00 for the Department of Health Electrical and Mechanical Combined System Development Services for the Online Booking System for Type Approval and Dec 2017 HK$1,999,330.00 Services Department Pre-registration Vehicle Inspection for the Transport Department Combined System Development Services for the Enhancement of Members and Cadet Corps Auxiliary Medical Service Jan 2018 HK$925,585.00 Management System (AMACS) of the Auxiliary Medical Service (AMS) Civil Engineering and Combined System Development Services of the Slope Registration Online System Feb 2018 HK$1,492,234.00 Development Department Combined System Development Services for Ferry Terminal Pass Management System for the Marine Department Feb 2018 HK$1,713,988.00 Marine Department System Implementation and System Integration of the Redevelopment of Electronic Hong Kong Police Force Configuration Management and Support System (ECON2) for the Hong Kong Police Force Mar 2018 HK$1,073,498.00 (HKPF) Important: Project reference(s) described in this document are for reference only and should not be construed -
EVS Customer Notice
*C201702176a02* 發佈日: 2017年10月3日 張貼至: 2017年10月8日 C201702176a02_ODII 路線 Routes 930, 930X 「香港單車節2017」特別交通安排 Special Traffic Arrangements for“Hong Kong Cyclothon 2017” 為配合於「香港單車節 2017」改道措施,上述路線將有以下特別改路安 排,詳情如下: In order to facilitate the traffic diversion plan for “Hong Kong Cyclothon 2017”, the captioned routes will be temporarily diverted. Details are as follows: 日期及時間 2017年10月8日(星期日)頭班車起至道路解封止 Date & Time First departure on 8 October 2017 (Sunday) until roads reopened 往香港島 To Hong Kong Island 改道路線 改經葵涌道、荔枝角道、西九龍走廊、欣翔道、海泓道、 Route 西九龍公路返回原有路線 Diversion Divert via Kwai Chung Road, Lai Chi Kok Road, West Kowloon Corridor, Yan Cheung Road, Hoi Wang Road and resume normal routeing at West Kowloon Highway 沿途巴士站不受影響,惟因改道和交通擠塞,車程將延長而班次或作調 整,請預留額外乘車時間,不便之處,敬請原諒。 Bus stops will not be affected. Due to diversion and traffic congestion, journey may be lengthened and frequency may be adjusted. Please allow extra time for journey. We apologize for any inconvenience caused. 營運貳部 啟 Operations Department Two LSK/ycc *C201702177a02* 發佈日: 2017年10月3日 張貼至: 2017年10月8日 C201702177a02_ODII 路線 Routes 962B, 962X, 967, 969, N962, N969 「香港單車節2017」特別交通安排 Special Traffic Arrangements for“Hong Kong Cyclothon 2017” 為配合於「香港單車節 2017」改道措施,上述路線將有以下特別改路安排,詳情如下: In order to facilitate the traffic diversion plan for “Hong Kong Cyclothon 2017”, the captioned routes will be temporarily diverted. Details are as follows: 日期及時間 2017年10月8日(星期日)頭班車起至道路解封止 Date & Time First departure on 8 October 2017 (Sunday) until roads reopened 往香港島 To Hong Kong Island 改道路線 改經屯門公路、荃灣路、葵涌道、荔枝角道、西九龍走廊、欣翔道、 Route 海泓道、西九龍公路返回原有路線 Diversion Divert via Tuen Mun Road, Tsuen Wan Road, Kwai Chung Road, Lai Chi Kok Road, West Kowloon Corridor, Yan Cheung Road, Hoi Wang Road and resume normal routeing at West Kowloon Highway 沿途巴士站不受影響,惟因改道和交通擠塞,車程將延長而班次或作調整,請預留 額外乘車時間,不便之處,敬請原諒。 Bus stops will not be affected.