CHECKLIST of CURRENT AIP SUPPLEMENTS (Updated Upto 31St December 2017)
Total Page:16
File Type:pdf, Size:1020Kb
AIP SUPPLEMENT INDIA TEL: 91-11-24632950 AERONAUTICAL INFORMATION SERVICE 01/2018 Extn: 2219/2233 AIRPORTS AUTHORITY OF INDIA AFS: VIDDYXAX RAJIV GANDHI BHAVAN FAX: 91-11-24615508 SAFDARJUNG AIRPORT Email: [email protected] 01 JAN 2018 NEW DELHI – 110003 File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance and necessary action. sd/- S. RAHEJA OFFICIATING CHAIRMAN AIRPORTS AUTHORITY OF INDIA CHECKLIST OF CURRENT AIP SUPPLEMENTS (Updated upto 31st December 2017) AIPS No. SUBJECT 1989 33/1989 IAL Procedures - Kota Aerodrome 1990 02/1990 NDB IAL Procedure - Rourkela Aerodrome 1991 19/1991 RWY dimensions/declared distances of Kolhapur Aerodrome 1999 09/1999 Transition of World Geodatic System – 1984 30/1999 Requirements for holders of Flight Crew Licenses issued by contracting states 2002 13/2002 NDB IAL Procedure – Kolhapur Aerodrome 2003 21/2003 Aerodrome Elevation 2007 Implementation of air traffic flow management procedures over Bay of Bengal, South Asia and 25/2007 Pakistan through Kabul FIR 2008 33/2008 RNAV SIDs and STARs – Ahmedabad Airport 34/2008 RNAV SIDs and STARs – Mumbai Airport 35/2008 VOR Procedure Runway 27 – Fursatganj Airport Airports Authority of India AIP Supplement 01/2018 Page 1 of 14 36/2008 VOR Procedure Runway 09 – Fursatganj Airport 37/2008 ILS Procedure Runway 27 – Fursatganj Airport 40/2008 Establishment, Operation of a Central Reporting Agency for Data link services 46/2008 NDB Circling Procedure Runway 04/22 – Gondia Airport (CAT A/B/C) 47/2008 VOR Procedure Runway 04 – Gondia Airport (CAT A/B/C) 48/2008 VOR Procedure Runway 22 – Gondia Airport (CAT A/B/C) 2009 29/2009 RNAV SIDs & STARs – Chennai International Airport 2010 09/2010 Helicopter Routing – CSI Airport, Mumbai/Juhu 14/2010 RNAV-1 (GNSS or DME/DME/IRU) SIDS and STARs – RGI Airport, Shamshabad 2011 09/2011 NON-RNAV Standard Instrument Departure Procedure – Cochin International Airport 61/2011 RNAV-1 (GNSS) SIDs and STARs – Thiruvananthapuram Airport 67/2011 NON-RNAV SIDs – RWY 27 , Cochin International Airport 68/2011 RNP-1 STARs & RNAV (GNSS) Approach RWY 27 – Cochin International Airport 2012 10/2012 Transponder Operating Procedures on Ground 11/2012 ENR 1.10 Flight Planning 12/2012 VOR Runway 27 (CAT A/B/C), DME Required – Jalgaon Airport 13/2012 VOR Runway 09 (CAT A/B), DME Required – Jalgaon Airport 14/2012 Aerodrome data – Jalgaon Airport Commissioning of Cargo Stands 104, 105 & 106 Commissioning of Taxiway L2 15/2012 Indira Gandhi International Airport, New Delhi 17/2012 ILS Runway 26 (DME Required) (CAT A/B/C) – Tirupati Airport Establishment of New RNP 10 Connector Routes V30 & V31 to Provide Connectivity to 18/2012 Tiruchirrappali from ATS Routes N563 and M300 Establishment of New RNAV 5 ATS Routes Q1, Q2, Q3, Q4, Q5, Q6 and Q7 Connecting Delhi 19/2012 to Mumbai/Ahmedabad/Udaipur/Vadodara 22/2012 Aerodrome Data – Mangalore Airport 23/2012 Establishment of Control Zone Daman 24/2012 ILS Runway 26 (DME Required) – Vijayawada Airport Implementation of Data Link Services i Departure Clearance (DCL) 27/2012 ii Data Link – Automatic Terminal Information Service (D-ATIS) iii Data Link – Meteorological Information for Aircraft in Flight (D-VOLMET) 28/2012 ILS Procedure RWY 19, (DME Required), Khajuraho Airport Airports Authority of India AIP Supplement 01/2018 Page 2 of 14 29/2012 ILS Procedure Runway 25, Chennai Airport 31/2012 VOR Procedure Runway 25, Chennai Airport 32/2012 VOR Procedure Runway 07, Chennai Airport 35/2012 Aerodrome Obstacle Charts – Type A, Mangalore Airport Runway Capacity Enhancement Measures - Rajiv Gandhi International Airport, Shamshabad 36/2012 (Hyderabad) 38/2012 Changes to the ICAO Model Flight Plan Form 39/2012 Establishment of Danger Area VAD 223 – (LPR Khamaria Jabalpur) 40/2012 Re-alignment of ATS Route W45 42/2012 Establishment of New ATS Route W137 44/2012 ILS Procedure Runway 19R (DME Required), Kolkata Airport 2013 03/2013 ILS (Z) DME Procedure Runway 27 (DME Required) – Mumbai Airport 04/2013 ILS (Y) DME Procedure Runway 27 (DME Required) – Mumbai Airport 05/2013 Commissioning of Aircraft Stands – Bangalore International Airport, Bangalore 06/2013 Establishment of ATS Routes W138 & W140 Establishment of RNAV 5 ATS Routes 07/2013 Q8 [RNAV 5] Between Chennai and Mumbai & Q9 [RNAV 5] Between Mumbai and Chennai 09/2013 Aerodrome Data – Rajahmundry Airport 11/2013 VOR Procedure Runway 12 (DME Required) – CAT A/B – Ludhiana Airport 12/2013 VOR Procedure Runway 30 (DME Required) – CAT A/B – Ludhiana Airport 13/2013 Establishment of ATS Route L875 14/2013 Establishment of ATS Route L756 15/2013 Aerodrome Data – Ranchi Airport 16/2013 Re-alignment of ATS Routes W113 [East Bound] and W113 [West Bound] 17/2013 Establishment of Connector ATS Route T1 18/2013 Helicopter Operations in Arunachal Pradesh Re-commissioning of Apron & Revised Aerodrome Data 19/2013 Rajiv Gandhi International Airport Shamshabad (Hyderabad) Establishment of RNAV 5 ATS Routes 20/2013 Q10 [RNAV5] Between Chennai and Kolkata & Q11 [RNAV 5] Between Kolkata and Chennai Delhi Airport Collaborative Decision Making (DA-CDM) 21/2013 Indira Gandhi International Airport, New Delhi Establishment of RNAV 5 ATS Routes 23/2013 Q12 [RNAV 5] Between Thiruvananthapuram & Mumbai Q13 [RNAV 5] Between Mumbai & Thiruvananthapuram 24/2013 Establishment of Aerodrome Traffic Zone (ATZ) Thanjavur Airports Authority of India AIP Supplement 01/2018 Page 3 of 14 27/2013 Aerodrome Data – Shimla Airport 28/2013 Establishment of ATS Route W139 Establishment of User Preferred Route (UPR) Geographic Zone in Chennai FIR and Mumbai 29/2013 FIR Commissioning of Aircraft Stands 01 to 03 & Re-alignment of Stands 04 to 09 30/2013 Bangalore International Airport, Bangalore 31/2013 ILS CAT-I Procedure Runway 27 (DME Required) – Lucknow Airport 33/2013 VOR Procedure Runway 27 (DME Required) – Lucknow Airport 34/2013 VOR Procedure Runway 09 (DME Required) – Lucknow Airport 36/2013 Establishment of Connector ATS Routes V33, V34 and V35 37/2013 RNAV-1 (GNSS) SIDs & STARs – Guwahati Airport 38/2013 Re-Alignment of Restricted Area- NAL 39/2013 Aeronautical Charts – Sri Guru Ram Dass Jee international Airport Amritsar 40/2013 Aerodrome Data – Pantnagar Airport 43/2013 Aerodrome Obstacle Chart – Type A Vadodara Airport 44/2013 Aerodrome Obstacle Chart – Type A – Guwahati International Airport 45/2013 ATC Surveillance Minimum Altitude Chart – Cochin International Airport, Cochin 46/2013 Aeronautical Charts – Dehradun Airport 47/2013 Aeronautical Charts – Sri Guru Ram Dass Jee International Airport, Amritsar Implementation of Indian Satellite Based Augmentation System GPS Aided GEO Augmented 48/2013 Navigation (GAGAN) System 49/2013 Longitudinal Separation Minima on Domestic ATS Routes. 2014 03/2014 List of Aerodromes Equipped for Night Operations. 04/2014 Aerodrome Data – Raipur Airport (VARP). 05/2014 Aeronautical Charts – Kangra Airport (VIGG). 06/2014 Aerodrome Data – Salem Airport (VOSM). 07/2014 Aerodrome Data – Tuticorin Airport (VOTK). 08/2014 Aerodrome Data – Thiruvananthapuram Airport (VOTV). Commissioning of Three Aircraft Stands (801, 802 & 803), Pushback Procedure and Aerodrome 09/2014 Chart & Parking Docking Charts Indira Gandhi International Airport, New Delhi (VIDP) 11/2014 Re-alignment of Restricted Airspace VIR149 (Bhatinda). 12/2014 Realignment of Delhi TMA. Realignment of ATS Routes W30 [WEST BOUND], W30 [EAST BOUND] 13/2014 W31 [WEST BOUND], W31 [EAST BOUND], A466 and A589. 14/2014 Establishment of Connector ATS Route V36 and V37. 16/2014 Aeronautical Charts – Raipur Airport (VARP) Airports Authority of India AIP Supplement 01/2018 Page 4 of 14 17/2014 Aeronautical Charts – Vijayawada Airport (VOBZ) 18/2014 Automatic Dependent Surveillance-Broadcast (ADS-B) Out Based ATS Surveillance Services 19/2014 Aerodrome Data – Surat Airport (VASU) 21/2014 Aeronautical Charts – Birsa Munda Airport, Ranchi (VERC) 22/2014 VOR Procedure Runway 09 (CAT A/B) (DME Required) – Porbandar Airport (VAPR) 23/2014 VOR Procedure Runway 27 (CAT A/B) (DME Required) – Porbandar Airport (VAPR) 25/2014 Establishment of Connector ATS Route V38 and V39 27/2014 Aeronautical Charts – Ahmedabad International Airport (VAAH) 30/2014 Restructuring of Mumbai Flight Information Region 31/2014 Restructuring of Delhi Flight Information Region 32/2014 Restructuring of Kolkata Flight Information Region 33/2014 Establishment of Oceanic Airspace in Kolkata FIR 34/2014 Restructuring of Nagpur Control Area 36/2014 Establishment of Lower Area Control Centre Varanasi (LBN) 40/2014 Establishment of Lower Area Control Centre Guwahati (LGT) 41/2014 Establishment of Upper Area Control Centre Guwahati (UGT) 42/2014 Establishment of Lower Area Control Centre Agartala (LAT) 44/2014 Aeronautical Charts – Surat Airport (VASU) 45/2014 Aeronautical Charts – Tiruchirappalli International Airport (VOTR) Radio Communication Failure Procedures 47/2014 Indira Gandhi International Airport, New Delhi (VIDP) Implementation of 30 NM Longitudinal Separation Between RNP4 Approved Aircraft on 48/2014 RNP10 Routes 50/2014 Hot Spot Locations – Indira Gandhi International Airport, New Delhi (VIDP) 51/2014 Establishment of ATS Route W141 and W142 52/2014 ATC Surveillance Minimum Altitude Chart-Chaudhary Charan Singh Airport, Lucknow (VILK) 53/2014 ILS (Z) Procedure RWY 02 – Guwahati Airport (VEGT) 54/2014 ILS (Y) Procedure RWY 02 – Guwahati Airport (VEGT) 55/2014 ILS (X) Procedure RWY 02 – Guwahati Airport (VEGT) 56/2014 VOR Procedure RWY 02 – Guwahati Airport (VEGT) 57/2014 VOR Procedure RWY 20 – Guwahati