CHECKLIST of CURRENT AIP SUPPLEMENTS (Updated Upto 31St December 2017)

CHECKLIST of CURRENT AIP SUPPLEMENTS (Updated Upto 31St December 2017)

AIP SUPPLEMENT INDIA TEL: 91-11-24632950 AERONAUTICAL INFORMATION SERVICE 01/2018 Extn: 2219/2233 AIRPORTS AUTHORITY OF INDIA AFS: VIDDYXAX RAJIV GANDHI BHAVAN FAX: 91-11-24615508 SAFDARJUNG AIRPORT Email: [email protected] 01 JAN 2018 NEW DELHI – 110003 File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance and necessary action. sd/- S. RAHEJA OFFICIATING CHAIRMAN AIRPORTS AUTHORITY OF INDIA CHECKLIST OF CURRENT AIP SUPPLEMENTS (Updated upto 31st December 2017) AIPS No. SUBJECT 1989 33/1989 IAL Procedures - Kota Aerodrome 1990 02/1990 NDB IAL Procedure - Rourkela Aerodrome 1991 19/1991 RWY dimensions/declared distances of Kolhapur Aerodrome 1999 09/1999 Transition of World Geodatic System – 1984 30/1999 Requirements for holders of Flight Crew Licenses issued by contracting states 2002 13/2002 NDB IAL Procedure – Kolhapur Aerodrome 2003 21/2003 Aerodrome Elevation 2007 Implementation of air traffic flow management procedures over Bay of Bengal, South Asia and 25/2007 Pakistan through Kabul FIR 2008 33/2008 RNAV SIDs and STARs – Ahmedabad Airport 34/2008 RNAV SIDs and STARs – Mumbai Airport 35/2008 VOR Procedure Runway 27 – Fursatganj Airport Airports Authority of India AIP Supplement 01/2018 Page 1 of 14 36/2008 VOR Procedure Runway 09 – Fursatganj Airport 37/2008 ILS Procedure Runway 27 – Fursatganj Airport 40/2008 Establishment, Operation of a Central Reporting Agency for Data link services 46/2008 NDB Circling Procedure Runway 04/22 – Gondia Airport (CAT A/B/C) 47/2008 VOR Procedure Runway 04 – Gondia Airport (CAT A/B/C) 48/2008 VOR Procedure Runway 22 – Gondia Airport (CAT A/B/C) 2009 29/2009 RNAV SIDs & STARs – Chennai International Airport 2010 09/2010 Helicopter Routing – CSI Airport, Mumbai/Juhu 14/2010 RNAV-1 (GNSS or DME/DME/IRU) SIDS and STARs – RGI Airport, Shamshabad 2011 09/2011 NON-RNAV Standard Instrument Departure Procedure – Cochin International Airport 61/2011 RNAV-1 (GNSS) SIDs and STARs – Thiruvananthapuram Airport 67/2011 NON-RNAV SIDs – RWY 27 , Cochin International Airport 68/2011 RNP-1 STARs & RNAV (GNSS) Approach RWY 27 – Cochin International Airport 2012 10/2012 Transponder Operating Procedures on Ground 11/2012 ENR 1.10 Flight Planning 12/2012 VOR Runway 27 (CAT A/B/C), DME Required – Jalgaon Airport 13/2012 VOR Runway 09 (CAT A/B), DME Required – Jalgaon Airport 14/2012 Aerodrome data – Jalgaon Airport Commissioning of Cargo Stands 104, 105 & 106 Commissioning of Taxiway L2 15/2012 Indira Gandhi International Airport, New Delhi 17/2012 ILS Runway 26 (DME Required) (CAT A/B/C) – Tirupati Airport Establishment of New RNP 10 Connector Routes V30 & V31 to Provide Connectivity to 18/2012 Tiruchirrappali from ATS Routes N563 and M300 Establishment of New RNAV 5 ATS Routes Q1, Q2, Q3, Q4, Q5, Q6 and Q7 Connecting Delhi 19/2012 to Mumbai/Ahmedabad/Udaipur/Vadodara 22/2012 Aerodrome Data – Mangalore Airport 23/2012 Establishment of Control Zone Daman 24/2012 ILS Runway 26 (DME Required) – Vijayawada Airport Implementation of Data Link Services i Departure Clearance (DCL) 27/2012 ii Data Link – Automatic Terminal Information Service (D-ATIS) iii Data Link – Meteorological Information for Aircraft in Flight (D-VOLMET) 28/2012 ILS Procedure RWY 19, (DME Required), Khajuraho Airport Airports Authority of India AIP Supplement 01/2018 Page 2 of 14 29/2012 ILS Procedure Runway 25, Chennai Airport 31/2012 VOR Procedure Runway 25, Chennai Airport 32/2012 VOR Procedure Runway 07, Chennai Airport 35/2012 Aerodrome Obstacle Charts – Type A, Mangalore Airport Runway Capacity Enhancement Measures - Rajiv Gandhi International Airport, Shamshabad 36/2012 (Hyderabad) 38/2012 Changes to the ICAO Model Flight Plan Form 39/2012 Establishment of Danger Area VAD 223 – (LPR Khamaria Jabalpur) 40/2012 Re-alignment of ATS Route W45 42/2012 Establishment of New ATS Route W137 44/2012 ILS Procedure Runway 19R (DME Required), Kolkata Airport 2013 03/2013 ILS (Z) DME Procedure Runway 27 (DME Required) – Mumbai Airport 04/2013 ILS (Y) DME Procedure Runway 27 (DME Required) – Mumbai Airport 05/2013 Commissioning of Aircraft Stands – Bangalore International Airport, Bangalore 06/2013 Establishment of ATS Routes W138 & W140 Establishment of RNAV 5 ATS Routes 07/2013 Q8 [RNAV 5] Between Chennai and Mumbai & Q9 [RNAV 5] Between Mumbai and Chennai 09/2013 Aerodrome Data – Rajahmundry Airport 11/2013 VOR Procedure Runway 12 (DME Required) – CAT A/B – Ludhiana Airport 12/2013 VOR Procedure Runway 30 (DME Required) – CAT A/B – Ludhiana Airport 13/2013 Establishment of ATS Route L875 14/2013 Establishment of ATS Route L756 15/2013 Aerodrome Data – Ranchi Airport 16/2013 Re-alignment of ATS Routes W113 [East Bound] and W113 [West Bound] 17/2013 Establishment of Connector ATS Route T1 18/2013 Helicopter Operations in Arunachal Pradesh Re-commissioning of Apron & Revised Aerodrome Data 19/2013 Rajiv Gandhi International Airport Shamshabad (Hyderabad) Establishment of RNAV 5 ATS Routes 20/2013 Q10 [RNAV5] Between Chennai and Kolkata & Q11 [RNAV 5] Between Kolkata and Chennai Delhi Airport Collaborative Decision Making (DA-CDM) 21/2013 Indira Gandhi International Airport, New Delhi Establishment of RNAV 5 ATS Routes 23/2013 Q12 [RNAV 5] Between Thiruvananthapuram & Mumbai Q13 [RNAV 5] Between Mumbai & Thiruvananthapuram 24/2013 Establishment of Aerodrome Traffic Zone (ATZ) Thanjavur Airports Authority of India AIP Supplement 01/2018 Page 3 of 14 27/2013 Aerodrome Data – Shimla Airport 28/2013 Establishment of ATS Route W139 Establishment of User Preferred Route (UPR) Geographic Zone in Chennai FIR and Mumbai 29/2013 FIR Commissioning of Aircraft Stands 01 to 03 & Re-alignment of Stands 04 to 09 30/2013 Bangalore International Airport, Bangalore 31/2013 ILS CAT-I Procedure Runway 27 (DME Required) – Lucknow Airport 33/2013 VOR Procedure Runway 27 (DME Required) – Lucknow Airport 34/2013 VOR Procedure Runway 09 (DME Required) – Lucknow Airport 36/2013 Establishment of Connector ATS Routes V33, V34 and V35 37/2013 RNAV-1 (GNSS) SIDs & STARs – Guwahati Airport 38/2013 Re-Alignment of Restricted Area- NAL 39/2013 Aeronautical Charts – Sri Guru Ram Dass Jee international Airport Amritsar 40/2013 Aerodrome Data – Pantnagar Airport 43/2013 Aerodrome Obstacle Chart – Type A Vadodara Airport 44/2013 Aerodrome Obstacle Chart – Type A – Guwahati International Airport 45/2013 ATC Surveillance Minimum Altitude Chart – Cochin International Airport, Cochin 46/2013 Aeronautical Charts – Dehradun Airport 47/2013 Aeronautical Charts – Sri Guru Ram Dass Jee International Airport, Amritsar Implementation of Indian Satellite Based Augmentation System GPS Aided GEO Augmented 48/2013 Navigation (GAGAN) System 49/2013 Longitudinal Separation Minima on Domestic ATS Routes. 2014 03/2014 List of Aerodromes Equipped for Night Operations. 04/2014 Aerodrome Data – Raipur Airport (VARP). 05/2014 Aeronautical Charts – Kangra Airport (VIGG). 06/2014 Aerodrome Data – Salem Airport (VOSM). 07/2014 Aerodrome Data – Tuticorin Airport (VOTK). 08/2014 Aerodrome Data – Thiruvananthapuram Airport (VOTV). Commissioning of Three Aircraft Stands (801, 802 & 803), Pushback Procedure and Aerodrome 09/2014 Chart & Parking Docking Charts Indira Gandhi International Airport, New Delhi (VIDP) 11/2014 Re-alignment of Restricted Airspace VIR149 (Bhatinda). 12/2014 Realignment of Delhi TMA. Realignment of ATS Routes W30 [WEST BOUND], W30 [EAST BOUND] 13/2014 W31 [WEST BOUND], W31 [EAST BOUND], A466 and A589. 14/2014 Establishment of Connector ATS Route V36 and V37. 16/2014 Aeronautical Charts – Raipur Airport (VARP) Airports Authority of India AIP Supplement 01/2018 Page 4 of 14 17/2014 Aeronautical Charts – Vijayawada Airport (VOBZ) 18/2014 Automatic Dependent Surveillance-Broadcast (ADS-B) Out Based ATS Surveillance Services 19/2014 Aerodrome Data – Surat Airport (VASU) 21/2014 Aeronautical Charts – Birsa Munda Airport, Ranchi (VERC) 22/2014 VOR Procedure Runway 09 (CAT A/B) (DME Required) – Porbandar Airport (VAPR) 23/2014 VOR Procedure Runway 27 (CAT A/B) (DME Required) – Porbandar Airport (VAPR) 25/2014 Establishment of Connector ATS Route V38 and V39 27/2014 Aeronautical Charts – Ahmedabad International Airport (VAAH) 30/2014 Restructuring of Mumbai Flight Information Region 31/2014 Restructuring of Delhi Flight Information Region 32/2014 Restructuring of Kolkata Flight Information Region 33/2014 Establishment of Oceanic Airspace in Kolkata FIR 34/2014 Restructuring of Nagpur Control Area 36/2014 Establishment of Lower Area Control Centre Varanasi (LBN) 40/2014 Establishment of Lower Area Control Centre Guwahati (LGT) 41/2014 Establishment of Upper Area Control Centre Guwahati (UGT) 42/2014 Establishment of Lower Area Control Centre Agartala (LAT) 44/2014 Aeronautical Charts – Surat Airport (VASU) 45/2014 Aeronautical Charts – Tiruchirappalli International Airport (VOTR) Radio Communication Failure Procedures 47/2014 Indira Gandhi International Airport, New Delhi (VIDP) Implementation of 30 NM Longitudinal Separation Between RNP4 Approved Aircraft on 48/2014 RNP10 Routes 50/2014 Hot Spot Locations – Indira Gandhi International Airport, New Delhi (VIDP) 51/2014 Establishment of ATS Route W141 and W142 52/2014 ATC Surveillance Minimum Altitude Chart-Chaudhary Charan Singh Airport, Lucknow (VILK) 53/2014 ILS (Z) Procedure RWY 02 – Guwahati Airport (VEGT) 54/2014 ILS (Y) Procedure RWY 02 – Guwahati Airport (VEGT) 55/2014 ILS (X) Procedure RWY 02 – Guwahati Airport (VEGT) 56/2014 VOR Procedure RWY 02 – Guwahati Airport (VEGT) 57/2014 VOR Procedure RWY 20 – Guwahati

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us