For Official Use Only FOR OFFICIAL USE ONLY The Philippines Agno and Allied Rivers Urgent Rehabilitation Project External Evaluator: Junko Saikawa (KRI International Corporation) Field Survey: November 2007 1. Project Profile and Japan’s ODA Loan Baguio Project site Manila Cebu City Philippines Davao Map of project area Bugallon short-cut channel 1.1 Background The Agno River runs through the western part of the central Luzon region and flows into the Lingayen Gulf in the hinterland of the vast alluvial plain of Pangasinan. The square area of the river basin ranks second on Luzon Island and fifth nationwide. In this basin, flooding due to typhoons occurred repeatedly, frequently resulting in damage to houses and farmland, etc. In addition, due to the earthquake in July 1990 and the volcanic ash and lahars from the eruption of Mount Pinatubo in June 1991, the riverbed rose, resulting in damage to the flood control facilities as well. 1.2 Objective The objective of this project is to reduce flood damage by rehabilitating existing flood control facilities for which urgent measures are necessary on the lower reaches of the Agno River and the upper reaches of the Sinocalan River, thereby contributing to the stability of people’s livelihoods and the development of the regional economy. 1.3 Borrower/Executing Agency Government of the Republic of the Philippines / Department of Public Works and Highways (DPWH) 1 FOR OFFICIAL USE ONLY 1.4 Outline of Loan Agreement Loan Amount / Loan Disbursed Amount 8,312 million yen / 8,280 million yen Exchange of Notes / Loan Agreement July 1995 / August 1995 Terms and Conditions -Interest Rate 2.5%/year (consultant 2.1%/year) -Repayment Period (Grace Period) 30 years (10 years) -Procurement General untied Final Disbursement Date June 2005 Main Contractors Toyo Construction Company Ltd., Philippine National Construction Corporation (Philippines) Consulting Services Nippon Koei Co., Ltd., CTI Engineering Co. Ltd., Basic Technology & Management Corporation (Philippines), PKII Engineers (Philippines) Feasibility Study (F/S), etc. M/P and F/S: 1989–1991 JICA E/S (D/D): 1988 E/S loan (PH-P88) 2. Evaluation Result (overall evaluation: B) 2.1 Relevance (rating: a) This project was consistent with the national plan, etc., both at the time of appraisal and at the time of ex-post evaluation, and so the relevance of the project implementation was and remains extremely high. 2.1.1 Relevance of the plan at the time of appraisal In the project region, flooding due to typhoons occurred repeatedly, frequently resulting in damage to houses and farmland, etc. In the water resource sector of the Medium-Term Philippine Development Plan (1993–1998) at the time of the appraisal, one of the objectives was to place priority on flood control projects in the 12 major river basins, in order to improve agricultural productivity and minimize loss of human life and property. Flood control and management of the major rivers is the responsibility of DPWH, and a comprehensive water resource development programs has been underway since the 1960s for seven rivers including the Agno River. 2.1.2 Relevance of plan at the time of ex-post evaluation In the environmental and natural resource sector of the Medium-Term Philippine Development Plan (2004–2010) at the time of the evaluation, one of the objectives was to mitigate the occurrence of natural disasters in order to prevent the loss of human life and property. Development of suitable flood control and drainage facilities, including 2 FOR OFFICIAL USE ONLY rehabilitation and improvement of existing facilities, across the entire area affected by flood damage was mandated as a countermeasure. Furthermore, in the DPWH’s current Medium-Term Development Plan (2005–2010), continuation of the comprehensive plan for priority major river basins and development of suitable flood control and drainage facilities in regions affected by flood damage are mandated as strategy. Figure 1: Project Area Province line Road River Levee Project area 2.2 Efficiency (rating: b) In this project, the project cost was basically as planned, but the project period exceeded the plan by 48%. Therefore, the efficiency of the project was evaluated as moderate. 2.2.1 Outputs A comparison of the planned output and the actual output is shown on Table 1. The main changes in the plan and the reasons for them are as follow. Agno River ・ As the result of a detailed design review,1 the total dredging amount increased because it became necessary to dredge for bank protection works and there was the addition of construction of a channel to supply water for fish farming. 1 As a result of the detailed design review, it was ascertained that there was more actual sediment than the assumed amount, and conversely, the flow could be secured without dredging after all. 3 FOR OFFICIAL USE ONLY ・ The total length of bank protection sites increased due to design changes because of alterations in the topography of the riverbed and river banks and due to additional sites requiring repair because of flood damage in August 1999. ・ As the result of an elevation study, it was ascertained that the sites for levee raising (3,000 m) in the original plan exceeded the designed flood level. 2 Instead, construction for levee raising was conducted in three locations (total of 540 m). Moreover, a setback dike3 was installed to protect the levee at Guelew where it was damaged during the wet season in 1998. ・ The right-bank levee was paved to ensure all-weather access to deal with levee sites which are damaged. Sinocalan River ・ Embankments were planned, but because land acquisition was necessary and since the river meanders, the bank protection works were switched to riverbank locations near residential areas and existing roads. Tarlac River ・ The implementation of TRIIW (Tarlac River Interim Improvement Works) was added as a condition when the Region III Local Development Council approved the Agno River Flood Control Project (II). ・ It became necessary to repair levee sites (Colibanban, Maleyep) which were damaged by the typhoon in August 2004. Consulting Services ・ Accompanying the addition of components to the civil works, the following were added: detailed design and construction supervision and monitoring of TRIIW; necessary studies, design, and construction supervision and monitoring of the Domalandan Bridge area construction; and TOR for flood analysis, etc. Table 1: Comparison of Output Planned at Time of Appraisal and Actual Output Plan Actual 1) Civil Works a) Agno River i) Dredging: 8,626,690 m3 i) Dredging: 11,494,521 m3 (35.51 km) Low channels Low channels: 6,616,000 m3 (21.08 km) Short-cut channels in 3 locations Short-cut channels in 3 locations: 4,805,600 m3 ii) Bank protection works (7.2 km) Low-water embankments: total Water supply channel for fish farming: 72,921 9,100 m m3(7.23 km) iii) Levees ii) Bank protection works Raising of existing levees: 3,000 m Low-water embankments: total 13,730 m 2 The water level of the flood for which the project is designed (a 10-year flood in this case). 3 This refers to a levee built a certain distance from the main levee in the event that the strength of the main levee is insufficient to protect important areas. In the case of Guelew, rocks, stones, and sand were built up immediately beside the existing levee. 4 FOR OFFICIAL USE ONLY (left bank) iii) Levees iv) Bridges Raising of existing levees: 540 m (left bank) Bugallon Bridge: extension 393 m; Construction of setback dike on right bank width: 9.3 m (Guelew) iv) Bridges Bugallon Bridge: extension 393 m; width: 7.3 m v) Coffering: 6 locations, total 1,366 m vi) Sluice and drainage ditch vii) Paving of right-bank levee: 31.6 km (Lingayen–Wawa) b) Sinocalan High-water embankments in 6 Low-water embankments in 7 locations, total River locations, total 1,500 m 1,280 m c) Tarlac River i) TRIIW (interim improvement works) (right-bank embankment/raising): 4,974 m ii) Repair work on right-bank levee (Colibanban, Maleyep): 1,650 m 2) Consulting Services Foreign 172 MM, Local 138 MM Foreign 244 MM, Local 333 MM Detailed design review; bidding Detailed design review; bidding assistance; assistance; construction monitoring construction monitoring and supervision; project and supervision completion activities (PCR, preparation of O&M manual); detailed design and construction monitoring and supervision of TRIIW; necessary studies, design, and construction monitoring and supervision of construction around the Domalandan Bridge; study of the existing Urbiztondo Bridge and initial design of new bridge; flood analysis; preparation of detailed diagrams, quantity specifications, and construction monitoring/supervision assistance for the repair of the right-bank levee on the Tarlac River Figure 2: Raising the left-bank levee Figure 3: TRIIW current works of the Agno River 2.2.2 Project period The planned project period was from August 1995 to March 2002 (80 months), but the actual project period was from August 1995 to May 2005 (118 months), or 148% of the planned period. The main reason for the extension was the addition of components including repairs of places damaged by typhoons during construction (repair of the 5 FOR OFFICIAL USE ONLY Guelew levee, bank protection in the area of the Domalandan Bridge, paving of the levee on the right bank of the Agno River, construction of a channel to supply water to a fish farm, TRIIW, and repairs to the right-bank levee on the Tarlac River). The civil works were planned to be conducted from September 1997 to March 2002 (54 months), but in fact were conducted from April 1998 to May 2005 (86 months), an extension of 32 months. The construction for the originally planned components was also delayed due to design changes necessitated by changes in the condition of the riverbed and diversion of construction equipment for use in the additional components.
Recommended publications
  • Draft Final Report – Dagupan Environmental Monitoring and Modelling of Aquaculture in Risk Areas of the Philippines (EMMA)
    9296 Tromsø, Norway Tel. +47 77 75 03 00 BFAR-NIFTDC Faks +47 77 75 03 01 Bonuan-Binloc Dagupan City, Philippines Rapporttittel /Report title Draft Final Report – Dagupan Environmental Monitoring and Modelling of Aquaculture in risk areas of the Philippines (EMMA) Forfatter(e) / Author(s) Akvaplan-niva rapport nr / report no: Patrick White APN-2415.03 Guttorm N. Christensen Dato / Date: Rune Palerud 00/00/00 Tarzan Legovic Westly Rosario Antall sider / No. of pages Nelson Lopez 46 + 0 Regie Regpala Distribusjon / Distribution Suncana Gecek Jocelyn Hernandez Begrenset/Restricted Oppdragsgiver / Client Oppdragsg. ref. / Client ref. Sammendrag / Summary Draft final report of work undertaken during the course of the Project Emneord: Key words: Philippines Aquaculture Environmental survey Training Participatory workshops Prosjektleder / Project manager Kvalitetskontroll / Quality control Patrick White Anton Giæver © 2007 Akvaplan-niva The client has permission to copy the complete report, without omissions. It is not allowed to copy, or use in other ways, parts of the report (texts, figures, conclusion, etc.) without written consent from Akvaplan-niva AS Final report – Dagupan: Environmental Monitoring and Modelling of Aguaculture in risk areas of the Philippines (EMMA) Table of contents 1 Introduction.............................................................................................................................3 2 Summary of survey results......................................................................................................4
    [Show full text]
  • DENR-BMB Atlas of Luzon Wetlands 17Sept14.Indd
    Philippine Copyright © 2014 Biodiversity Management Bureau Department of Environment and Natural Resources This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the Copyright holder provided acknowledgement of the source is made. BMB - DENR Ninoy Aquino Parks and Wildlife Center Compound Quezon Avenue, Diliman, Quezon City Philippines 1101 Telefax (+632) 925-8950 [email protected] http://www.bmb.gov.ph ISBN 978-621-95016-2-0 Printed and bound in the Philippines First Printing: September 2014 Project Heads : Marlynn M. Mendoza and Joy M. Navarro GIS Mapping : Rej Winlove M. Bungabong Project Assistant : Patricia May Labitoria Design and Layout : Jerome Bonto Project Support : Ramsar Regional Center-East Asia Inland wetlands boundaries and their geographic locations are subject to actual ground verification and survey/ delineation. Administrative/political boundaries are approximate. If there are other wetland areas you know and are not reflected in this Atlas, please feel free to contact us. Recommended citation: Biodiversity Management Bureau-Department of Environment and Natural Resources. 2014. Atlas of Inland Wetlands in Mainland Luzon, Philippines. Quezon City. Published by: Biodiversity Management Bureau - Department of Environment and Natural Resources Candaba Swamp, Candaba, Pampanga Guiaya Argean Rej Winlove M. Bungabong M. Winlove Rej Dumacaa River, Tayabas, Quezon Jerome P. Bonto P. Jerome Laguna Lake, Laguna Zoisane Geam G. Lumbres G. Geam Zoisane
    [Show full text]
  • Flood Risk Assessment of Major River Basins in the Philippines
    International Journal of GEOMATE, Dec., 2019 Vol.17, Issue 64, pp. 201- 208 ISSN: 2186-2982 (P), 2186-2990 (O), Japan, DOI: https://doi.org/10.21660/2019.64.17155 Geotechnique, Construction Materials and Environment FLOOD RISK ASSESSMENT OF MAJOR RIVER BASINS IN THE PHILIPPINES Christian Dominick Q. Alfonso1, Marloe B. Sundo*2, Richelle G. Zafra2, Perlie P. Velasco2, Jedidiah Joel C. Aguirre2 and Marish S. Madlangbayan2 1University of the Philippines Los Baños Foundation, Inc., Philippines; 2University of the Philippines Los Baños, Philippines *Corresponding Author, Received: 00 Oct. 2019, Revised: 00 Nov. 2019, Accepted: 00 Dec. 2019 ABSTRACT: Disaster risk management is vital in strengthening the resilience to and reduction of losses brought by natural disasters. In Philippines where typhoons frequently occur, flood risk maps are essential for the protection of communities and ecosystems in watersheds. This study created flood inundation maps with climate change considerations under 2020 A1B1 and 2050 A1B1 scenarios for four major river basins in the Philippines: the Agno, Cagayan, Mindanao, and Buayan-Malungon River Basins. From these maps, the most vulnerable areas for each basin are identified using GIS mapping software. Sixteen inundation risk maps were generated, four for each river basin, in terms of built-up areas, roads, bridges, and dams. Results showed that the northern part of Cagayan River Basin and the central parts of the Agno and Mindanao River Basins are the most flood-prone areas, while the Buayan-Malungon River Basin will have no significant inundation problems. Suitable adaptation and mitigation options were provided for each river basin. Keywords: Disaster risk reduction, Climate change adaption, Inundation, Risk Mapping 1.
    [Show full text]
  • Pdf | 262.1 Kb
    Region III – A total of 405 families or 1,621 persons in 15 brgys in four (4) municipalities and two (2) cities in the Provinces Pampanga and Zambales have been affected by Typhoon “EMONG” Landslide Occured: Olongapo City – Landslide incidents occurred in four (4) Sitios of Bgry Kalaklan, namely: #92 Brgy Kalaklan, #205 Lower Kalaklan, 14-C Upper Kalaklan and #35 Ati-atihan, Hilltop, Kalaklan Casualty: Dead – 1; Injured – 2; Missing – 1 - One (1) reported dead due to heart attack Jeremy Ambalisa in Guinipanng, Brgy Poblacion, Sta. Cruz, Zambales - Two (2) were injured, namely: Willjo Balaran, 3 y/o of Lower Kalaklan and Perla Balaran 49 y/o of the same brgy - One (1) missing namely, Asley Dualo Mosallina in Bagong Silang, Balanga City Actions Taken: • Olongapo City CDCC Rescue Team advised the residents to evacuate immediately to safer grounds • All school buildings in Olongapo City are being prepared as evacuation centers. Olongapo National High School as the main evacuation center. • Olongapo City Engineering Team conducted clearing operations • Kalaklan BDCC was advised to secure and monitor the area for possible landslide due to heavy rains Stranded Passengers: • 500 to 600 stranded passengers at the Port of Batangas bound for the island provinces of Romblon, Palawan and Masbate • 205 stranded passengers in Calapan Port, Oriental Mindoro due to cancellation of trips Reported Flooded Areas Region II – Bambang, Bagabag & Solano, all of Nueva Vizcaya Status of Lifelines: Power Region I • Pangasinan – Power interruption reported in the
    [Show full text]
  • List of Figures Figure 1 Overlay of Wqmas, 19 Priority River Basins
    List of Figures Figure 1 Overlay of WQMAs, 19 priority river basins, and KBAs Figure 2 Ambient water quality management program sites of DENR–EMB Region 5 Figure 3 Location of existing mining tenements, with reference to protected areas and key biodiversity areas Figure 4 Location of illegal logging hotspots and their overlap with protected areas and Key Biodiversity Areas Figure 5 Wildlife crime hotspots in the Philippines Figure 6 Hotspot areas of illegal fishing in 2016 List of Tables Table 1 Number of invasive species documented in six protected areas that were pilot sites for the prevention, control, and management of IAS Table 2 Classification and usage of freshwater water bodies Table 3 Classification and usage of marine water bodies Table 4 Results of the water quality monitoring of the 19 priority rivers as of 2016.* * Values in bold mean that the river complies with DAO No. 34 Table 5 18 priority river basins, their rivers, and classifications Table 6 Number of illegal logging hotspots List of Footnotes 1 DENR-Biodiversity Management Bureau. 2016. The National Invasive Species Management Strategy and Action Plan 2016-2026 (Philippines. Quezon City: Department of Environment and Natural Resources- Biodiversity Management Bureau, pp. i-xix, 1-95. 2 DENR-Biodiversity Management Bureau. Protected Area Management Master Plan (draft). 3 FORIS Project (UNEP/GEF Project on Removing Barriers to Invasive Species Management in Production and Protection Forests in Southeast Asia). Powerpoint. 4 DENR-Biodiversity Management Bureau. 2016. The National Invasive Species Management Strategy and Action Plan 2016-2026 (Philippines. Quezon City: Department of Environment and Natural Resources- Biodiversity Management Bureau, pp.
    [Show full text]
  • Pdf | 222.27 Kb
    Mindoro; 27 Passenger Bus – Batangas Port; 21 Vessels from Ports of Batangas (15), Romblon (1), Calapan (3), and Roxas (2); 11 M/Tankers from Bataan port Reported Flooded Areas Region II – Bambang, Bagabag & Solano, all of Nueva Vizcaya Status of Lifelines: Power Region I • Pangasinan – Power interruption reported in the following municipalities: CENPELCO - of Labrador, Bugallon, Lingayen, Binmaley, San Carlos City, Malasiqui, Sual, Aguilar, Mangatarem, Urbiztondo, Mangaldan, Sison, San Fabian and San Jacinto and part of Pozorubio PANELCO 1 – Agno, Alaminos, Anda, Bani, Bolinao, Burgos, Dasol, Infanta and Mabini Transmission Lines – Kadampat-BPPC 230KV line (Labrador, Pangasinan) Subtransmission Lines - 53LR4 (Bani, Sual, Labrador) – energized as of 10:23PM - 55LR4 (Labrador-San Carlos) - energized as of 9:05PM - 57LR4 (Dagupan City/Calasiao) - energized as of 10:05PM - 57SM4 Northern Cement Corp. Sison – energized as of 8:37PM • La Union – LUELCO - Power failure is likewise being experienced in Rosario, Sto. Tomas, Pugo, Tubao, Agoo, Aringay, Caba, Naguillan, Burgos, Bagulin and Bauang Transmission Lines - Baung-BPPC 230KV line (Payocpoc, La Union) - 51BJ4 Holcim-Bacnotan – energized as of 1:11AM - 52BJ4 Bacnotan, San Juan, Balaoan, Santol, Luna, Bangar, Sudipen - energized as of 1:11AM Region II • Cagayan Electric Cooperative 2 restored its power supply as of 6:00 PM 07 May 2009 • Communication lines, water and health facilities are in operational status Region III - Zambales - ZAMECO 1 – Botolan still no power NCR • Transient power interruptions experienced in some areas in Makati city, Pasay, Malate, Manila, Parañaque, Las Piñas and Brgy Paltok in Quezon City. Power has been restored as of 7:00 PM II.
    [Show full text]
  • Proj Profile November 12 2
    November 12, 2009 DPWH recent COMPLETED AND ON -GOING MAJOR FLOOD CONTROL PROJECTS Laoag River Basin Flood Control & Sabo Project, JBIC (2008) Agno & Allied Urgent Rehabilitation Projects , Phase I (Completed) Agno River Flood Control Project , Phase II-A & Phase II-B, JBIC, (2009) Restoration/Rehabilitation of Waterways in the Pinatubo Pilot Areas (2006) Mount Pinatubo Hazard Urgent Mitigation Project , Phase II, JBIC KAMANAVA Area Flood Control & Drainage System Improvement , JBIC, (2007) Metro Manil a Flood Control Project West Mangahan Floodway, JBIC, (2008) Iloilo Flood Control Project Phase II, JBIC, (2009) Lower Agusan Development Project Stage I, Phase II, JBIC, (2007) 1 PROJECT PROFILE Laoag River Basin Flood Control and Sabo Project Agno River Flood Control Project, Phase II (ARFCPII) KAMANAVA Area Flood Control and Drainage System Improvement Project (PH-212) PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT Phase II (PMRCIP II) ILOILO FLOOD CONTROL PROJECT (PHASE II) THE PROJECT FOR FLOOD MITIGATION IN ORMOC CITY REHABILITATION/ENHANCEMENT OF ORMOC CITY FLOOD CONTROL STRUCTURES PINATUBO HAZARD URGENT MITIGATION PROJECT, PHASE I (Mudflow/Flood Control Works in Sacobia-Bamban River Basin) PINATUBO HAZARD URGENT MITIGATION PROJECT, PHASE II (Lahar and Flood Control in the Pasig-Potrero River Basin) PINATUBO HAZARD URGENT MITIGATION PROJECT, PHASE III WIDENING OF GAPAN-SAN FERNANDO-OLONGAPO (GSO) ROAD AND EMERGENCY DREDGING OF PORAC-GUAMIN RIVER BASIC STUDY ON NON-STRUCTURAL DISASTER PREVENTION MEASURES IN CAMIGUIN Metro Manila Flood Control Project - West Mangahan Floodway 2 I. PROJECT TITLE : Laoag River Basin Flood Control and Sabo Project II. LOCATION : Province of Ilocos Norte, Region I III. BACKGROUND Laoag river Basin has potential for greater economic development given its brisk economic activities, vast agricultural lands, broad-based human resources and favorable geographic location.
    [Show full text]
  • River Improvement Projects Started in Philippines.Pptx
    River Improvement Projects Started in Philippines Toyo Construc:on Co., Ltd. (President: Kyoji Takezawa) received orders for two projects in the Republic of the Philippines from the Department of Public Works and Highways in that country as part of the Pasig-Marikina River Channel Improvement Project (Phase III). Toyo will carry out improvements in the Pasig River sec:on in a joint project with Shimizu Corp. and in the lower Marikina River as the sole contractor. The two projects were started in June and July 2014, respec:vely. The total value of the order is approximately \12.5 billion (Toyo share: approx. \9.3 billion; Pasig River sec:on JV: total approx. \6.5 million, Marikina River sec:on: \6.0 billion). The order is a con:nuaon from the Pasig-Marikina River Channel Improvement Project (Phase II). Among the loan assistance (yen loans) programs of Japan’s Official Development Assistance (ODA), these projects are being implemented under Special Terms for Economic Partnership (STEP). Flood damage caused by the Pasig-Marikina River system, which flows through a region where urbanizaon is par:cularly advanced, including Metro Manila, has a serious economic and social impact on the region. The aims of these projects are to mi:gate the flood damage caused by the rivers while also improving the riverside environment. The projects will make an especially important social contribu:on, even among infrastructure projects, and are expected to contribute to the stable economic development of the region. Phase III, which is the object of the order, includes embankment construc:on and improvement from the Delpan Bridge at the river’s mouth on Manila Bay to the Napindan River flood control gate in the Pasig River sec:on (16.4 km) and dredging, dike construc:on, and embankment improvement from the Napindan River flood control gate upstream to the lower Mangahan Floodway in the Lower Marikina River sec:on (5.4 km).
    [Show full text]
  • Water Quality Assessment of Agno River Tributaries in Eastern Pangasinan for Irrigation Purposes
    Journal of Natural and Allied Sciences Vol. II No.1, pp. 10-15, December 2018 Water Quality Assessment of Agno River Tributaries in Eastern Pangasinan for Irrigation Purposes Jerves M. Geron1, Jerina A. Garcia2, Cecilia M. Cruz3, Freddie Rick L. Ramos4 Pangasinann State University - Sta. Maria Campus [email protected], [email protected], [email protected], [email protected] Abstract – This study was conducted to assess Agno River tributaries for irrigation purposes. Water discharge, coordinates and water samples for laboratory test, were gathered simultaneously. Results and findings revealed that water quality indicators and the water discharge at the study sites are all safe to use for irrigation. The pH of the water samples tested is within the normal range from 6.0 to 9.0. Amounts of sodium are within the optimum range of 0-50 ppm. Detected amounts of sulfate are too low to exceed the optimum amount of 400 ppm. Chloride contents of the water samples were below the normal range of 350 ppm. Boron contents are below the normal range of 0.75 mg/l. It was then observed that there was dumping of garbage along the banks of Agno River which may cause water quality deterioration in the future. It is recommended that the Clean Water Act and Solid Waste Management must be strictly implemented along the river. Water quality analysis in Agno River and proper monitoring is necessary to determine the changes or any detrimental ills that may affect the irrigation water and to develop solutions for water resource problems that may affect plant growth.
    [Show full text]
  • Summary Report
    SUMMARY REPORT RESULT OF THE MGB GEOHAZARD ASSESSMENT COVERING THE EIGHTEEN (18) MUNICIPALITIES/CITY IN THE PROVINCE OF TARLAC In line with the Presidential Directive and NDCC resolutions following the February 17 Southern Leyte landslide incident, and the need to fast track the geohazard mapping program along the eastern seaboard of the Philippines, geologists from the Mines and Geosciences Bureau-Regional Office III (MGB-R3) conducted a geohazard assessment of the barangays in the municipalities/city n the province of Tarlac. Each barangay was classified according to their susceptibility to landslide and/or flooding. For landslide susceptibility, the rating parameters are as follows: High • Presence of active and/ or recent landslides • Presence of numerous and large tension cracks along slope adjacent to the community and that would directly affect the community • Areas with drainages that are prone to landslides damming • Steep/Unstable slopes consisting of loose materials Moderate • Areas with indicative and/or old landslides • Presence of small tension cracks along slope and are located away from the community • Moderate slopes 1 Low • Low to gently sloping • No presence of tension cracks Each barangay was rated into low, moderate or high for flooding susceptibility with the rating parameters as follows: Low • 0 – 0.5 meter depth of floodwaters Moderate • 0.51 – 1 meter depth of floodwaters High • > 1 meter depth of floodwaters With regards to landslide susceptibility, the barangays assessed include areas that are located on and/or near slopes and riverbanks and have the potential for landslide occurrence. The rating of each barangay presented herein particularly refers to the barangay proper since majority of the population is located there.
    [Show full text]
  • P P P P P P P P
    Department of Science and Technology PHILIPPINE ATMOSPHERIC, GEOPHYSICAL AND ASTRONOMICAL SERVICES ADMINISTRATION (PAGASA) Agno River Basin Flood Forecasting and Warning Center (ARBFFWC) Tumana, Rosales, Pangasinan Tel/Fax No. (075)-582-35-28 FLOOD BULLETIN NO. 1 – AGNO RIVER BASIN and ALLIED RIVERS EXPECTED FLOOD P =POSSIBLE O =OCCUR ISSUED AT: 4:00 AM, 15 SEPTEMBER 2018 VALID UNTIL THE NEXT ISSUANCE AT 4:00 PM TODAY UNLESS THERE IS AN INTERVENING INTERMEDIATE BULLETIN. SITUATION: T =THREATENING F =PERSIST AVE RAGE BASIN RAINFALL AS OF 3:00 AM TODAY : PAST 24-HRS OBSERVED RAINFALL =42.5 MM FORECAST 24-HR = MODERATE TO HEAVY RAINS BASIN EXPECTED RESPONSE: RIVER/ SWAMP WATER LEVEL FLOOD SITUATION PARTICULAR LOW-LYING WATER LEVEL STATION (WL) MESSAGE AREAS TREND AT STATION MINOR FLOODING DUE TO STA. MARIA STATION/ STILL BELOW 2.25 M. ACCUMULATION OF ASINGAN, STA. MARIA, UPPER AGNO RIVER ALERT WATER LEVEL TO RAINWATER ROSALES, RISE VERY SLOWLY VILLASIS CARMEN STATION/ STILL BELOW 1.28 M. FLOODING IS POSSIBLE PARTS OF ROSALES & AGNO RIVER ALERT WATER LEVEL TO VILLASIS, STO. TOMAS, RISE SLOWLY ALCALA, BAUTISTA SAN VICENTE STATION/LOWER SLOW RISE TO REACH 2.75 FLOODING IS POSSIBLE BAYAMBANG,URBIZTONDO, AGNO RIVER M. ALERT WATER LEVEL MANGATAREM, AGUILAR, LINGAYEN FLOODING IS POSSIBLE DUE P MapandanMapandan BinalonanBinalonan TIBAG STATION/ STILL BELOW 4.2 M. ALERT TO ACCUMULATION OF TARLAC CITY, GERONA, TARLAC RIVER WATER LEVEL RAINWATER AND P Sta. MariaSanta Maria PANIQUI, MONCADA ,SAN P (TRIBUTARY) OVERFLOWING OF ITS Bugallon P P PPP MANUEL, CAMILING TRIBUTARIES Carmen NOW AT 0.83 M. GRADUAL BINALONAN, PORTIONS OF Carmen Agno Sub-Center BINALONAN RISE TO REACH 2.46 M.
    [Show full text]
  • The Study on Flood Control Project Implementation System for Principal Rivers in the Philippines
    NO. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Japan International THE REPUBLIC OF THE Cooperation Agency PHILIPPINES THE STUDY ON FLOOD CONTROL PROJECT IMPLEMENTATION SYSTEM FOR PRINCIPAL RIVERS IN THE PHILIPPINES Under THE PROJECT FOR ENHANCEMENT OF CAPABILITIES IN FLOOD CONTROL AND SABO ENGINEERING OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MAIN REPORT SEPTEMBER 2004 GE JR 04-034 LOCATION MAP TABLE OF CONTENTS LOCATION MAP TABLE OF CONTENTS ..................................................................................... i LIST OF TABLES ................................................................................................ iv LIST OF FIGURES .............................................................................................. v LIST OF ABBRIVIATIONS ................................................................................ vi CHAPTER 1. INTRODUCTION ................................................................ 1 1.1 Background .................................................................................................. 1 1.2 Study Objectives .......................................................................................... 2 1.3 Study Area .................................................................................................... 2 CHAPTER 2. FLOODS IN THE PHILIPPINES ...................................... 3 2.1 Natural and Socio-economic Conditions ..................................................... 3 2.1.1 Natural Condition .........................................................................
    [Show full text]