To Save This File Or to View It As a PDF File in Full

Total Page:16

File Type:pdf, Size:1020Kb

To Save This File Or to View It As a PDF File in Full WINTER 2014 Troy forced to condemn station land Volume 41, Number 1 BY LARRY SOBCZAK in early January,” City Manager the adjacent property owner and The city of Troy began con- Brian Kischnick said. “We will ending with the Michigan Su- demnation proceedings to gain follow the letter of the law over preme Court refusing to hear a ownership of the land occupied condemnation proceedings to case involving ownership of the by the recently completed $6.3 gain clear and continuous own- land on which the building and million Intermodal Transit Cen- ership of the property.” parking lot sit. Michigan Association of Railroad Passengers ter along Doyle Drive near Ma- The city found itself in this Developer Grand Sakwa ple Road and Coolidge Highway. position beginning with a long Properties gave the 2.3 acre par- www.marp.org “We initiated condemnation protracted legal dispute with (See CONDEMN, page 3) WHAT’S INSIDE… NSTB report on Niles derailment See Page 3 Take the train to the wild north See Page 4 Snow train cancelled See Page 5 Amtrak discusses food and beverages See Page 6 SANTA’S IRON SLEIGH. The Steam Railroading Institute’s Pere Marquette 1225 locomotive brought Santa and passengers to the village of Ashley on special excursions this holiday season. It’s the fi rst time this locomotive, which served as a physical model for the animated movie “The Polar Express,” has been on the rails in nearly fi ve years. (Photo by Rosemary Horvath) PAID 44870 U.S. POSTAGE U.S. PRESORT STD. PRESORT PERMIT NO. 10 PERMIT NO. SANDUSKEY, OH SANDUSKEY, 1225 steams again! Historic locomotive brought thousands to Ashley Breathing fi re and steam for Owosso (Pere Marquette 1225’s in Lima, Ohio in 1941. It was one of the fi rst times in nearly home) to make the hour-long taken out of service in 1951 and fi ve years, the historic Pere journey to the town named in became part of a static display Marquette 1225 locomotive honor of John M. Ashley, de- at Michigan State University in brought life back to the central scribed as promoter and builder 1957. A group of students be- Michigan village of Ashley this of the Ann Arbor Railroad. gan restoring the locomotive in past Christmas season. The steam locomotive has 1969. By 1988, the students had Costumed elves and hobos been out of service since 2009 evolved into the Steam Railroad- as well as locals greeted 19 when the Federal Railroad Ad- ing Institute and the locomotive trains carrying more than 500 ministration mandated a rebuild was ready to begin its second ca- passengers each trip to the tiny and inspection of its boiler. In reer as an excursion locomotive. town of 563 residents along the November the Steam Railroad- Around the time the 1225 Great Lakes Central Railroad, ing Institute completed the ar- began running under its own a line more familiar with haul- duous physical and fundraising power again in the mid-1980s, ing freight for small rural indus- tasks to return the locomotive to children’s author and illustra- tries. service. tor Chris Van Allsburg wrote an Sold-out passenger lists The 1225 is a 2-8-4 (Berk- award-winning book, “The Po- boarded on weekends through- shire) steam locomotive built for lar Express,” about the locomo- out the holiday season at the Pere Marquette Railway (PM) tive he used to climb on as child MI 48318-0076 ca, when his family attended home Ɵ Steam Railroading Institute in by Lima Locomotive Works MARP 180076 PO Box U (See 1225, page 3) Page 2 Th e Michigan Passenger Winter 2014 Michigan Association of Railroad Th e Michigan Passenger Passengers, Inc. is published four times annually by the Michigan Association of Railroad Passengers, Inc. OFFICERS Copyright © 2014 Michigan Association of Railroad Passengers, Inc. Chair All articles not originated by MARP are copyrighted by their Robert Tischbein respective originators. All rights reserved. Articles used in 586-726-9737 accordance with the Fair Use Clause of the United States [email protected] Constitution. Vice Chair The Michigan Passenger welcomes submissions on passenger rail Larry Krieg 734-347-2179 issues for publication. Material sent for publication should be sent [email protected] to our Editor at: [email protected]. Secretary Clippings from newspapers and magazines must include the Hugh Gurney publication’s name and date. Photos sent in by e-mail should be in 517-545-2979 JPEG format. [email protected] We reserve the right to edit all submissions.To subscribe to this Treasurer publication, join MARP by fi lling out the application below. All David Randall MARP members receive a copy of this publication sent to their 248-924-4078 home or business. [email protected] Michigan Passenger Editor & MARP Webmaster: REGIONAL CHAIRS Larry Sobczak, [email protected] Metro Detroit 586-781-6891 Robert Patterson 313-836-3736 [email protected] Contributors: Kay Chase East/Central Michigan Cathy Hart Rosemary Horvath 989-506-9539 Rosemary Horvath [email protected] Steve Sobel West Michigan Vacant Contact MARP if you are interested in this position. About MARP… [email protected] The Michigan Association of Railroad Passengers, Inc. (MARP) Northern Michigan was established in 1973 as a consumer advocacy group to improve Don Monteith intercity rail and bus service, improve local transit and encourage (231) 675-1608 the preservation of historic railroad stations. [email protected] MARP is not affi liated with Amtrak, the railroads, governments or AT-LARGE EXECUTIVES any political party. MARP is incorporated as a Michigan non-profi t organization and is exempt from federal income tax under the IRS John D. Langdon 616-218-9009 code, 501( c )(3) as a charitable educational organization. Dues and [email protected] donations to MARP may be tax-deductible in accordance with the IRS code. Jim Wallington 517-303-6038 MARP is an all-volunteer organization. Its membership consists of [email protected] passengers and citizens who want a viable, balanced transportation Kay M. Chase system in Michigan. We can all use the help we can get! 269-388-3777 [email protected] http://www.marp.org [email protected] Kathleen Newell http://www.facebook.com/pages/michigan-association-of-railroad-passengers 310-740-0421 [email protected] http://twitter.com/michrailpass JOIN MARP TODAY! It’s easy. Just fi ll out and return this form! Winter 2014 Th e Michigan Passenger Page 3 center was delayed. refused to hear the case in No- will be able to demonstrate other CONDEMN The Oakland County Circuit vember. parts of the law in court. (Continued from Court agreed with the city’s ar- In December, the city had “We are confi dent that it gument that the 2000 agreement the land appraised and offered will be found this meets a public page 1) was still in effect because the Grand Sakwa $550,000. need,” he said. center had full funding for con- The city has approximately In a separate issue, the city is cel to the city in 2000 with the struction and it was in the pro- stipulation that a transit center be $2 million in unused funds from negotiating with Amtrak and the cess of engineering and architec- the original Federal grant to Michigan Department of Trans- built within 10 years. The dona- tural designs. tion was part of an agreement be- build the center to tap into. portation (MDOT) over moving tween the city and Grand Sakwa In May 2013, the Michigan Kischnick said the city was the current Amtrak stop a few that allowed for the construction Court of Appeals had overturned forced to fi le for condemnation hundred yards south in Birming- of the adjacent shopping center the Circuit Court decision and of the property because Grand ham to the new transit center. and condominium complex. it said that Grand Sakwa owned Sawka had not responded to its Kischnick said that nego- the property. By that time, the Grand Sakwa fi led a lawsuit offer. tiations with Amtrak and MDOT transit center was more than half are ongoing and could be infl u- in Oakland County Circuit Court way completed. He said that the appraisal and to regain the property in 2012 the waiting period followed con- enced by the timing of condem- after construction of the transit The city appealed to the demnation laws and that the city nation proceedings. Michigan Supreme Court which Jumper wires blamed for Niles Amtrak derailment BY LARRY SOBCZAK remote sensors had detected a the track. The NTSB said the use of The National Transportation problem with the equipment. On board the train were 165 the jumper wire was inconsis- Safety Board (NTSB) has deter- The result was eastbound passengers and 4 crewmembers. tent with Amtrak procedures for mined that the probable cause of Amtrak train 350, The Wolver- Emergency responders reported using jumper wires to override the derailment of an Amtrak train ine, entered the Niles Yard from that 13 people were injured; 8 signal and train control safety- on Oct. 21, 2012 in Niles was the main track at Control Point of those were transported to area critical circuits. from the improper use of jumper (CP) 190 while traveling 61 hospitals. None of the injuries The NTSB said inadequate wires on a signal system. mph. The train derailed about were reported to be life-threat- oversight by Amtrak manage- The jumper wires which 291 feet after diverging from the ening. ment to ensure that proper jumper were attached by a signal super- main track and traveled 1,148 Amtrak estimated the dam- wire safeguards were employed visor caused the signals to show additional feet before coming to age at $400,000.
Recommended publications
  • The Ferrophiliac Column April, 1992 Conducted by Just A. Ferronut
    The Ferrophiliac Column April, 1992 Conducted by Just A. Ferronut I thought winter had got to me the other day when I was Railway Commission of that City. The Pere Marquette asked by a couple of fans whether I was asleep when I put the continued to operate the line on a month to month basis while material on the Pere Marquette together for the February the City was upgrading it and electrifying it. This Column. The question was if perhaps I had got the figures in arrangement continued until the rehabilitated line was the date of the timetable reversed? A check of the timetable officially opened on July 1, 1915. from Bill Reddy confirmed that the 1942 date shown in Meanwhile, back in the 1890s the Lake Erie and February is correct and that there was in fact a mixed train Detroit River Railway Company wanted to extend eastward each way, six days a week between Chatham and Blenheim. to the Niagara Peninsula and the markets of Buffalo and New These trains connected with similar mixed trains that York State. A few cooler heads were starting to realise that operated on Subdivision No. 1 between Blenheim and railways couldn’t just keep building bridge routes across Walkerville (Windsor). This trip – less than 50 miles via southern Ontario and expect them all to make money. Canadian National, Canadian Pacific or Highway # 401 – Therefore the Lake Erie and Detroit River Railway Company took six or six and half hours via the good old Pere like the Wabash settled for running rights on an existing Marquette mixed in 1942.
    [Show full text]
  • History of the Pere Marquette Railway
    History of the Pere Marquette Railway Local History at the St. Thomas Public Library 1900: The Pere Marquette Railroad (PM) is formed by merging three small railroads in the United States: Chicago & West Michigan; Flint & Pere Marquette; and the Detroit, Grand Rapids & Western Railways. The PM is named after Père Jacques Marquette, the French Jesuit missionary who founded Michigan’s first European settlement, Sault St. Marie. 1901: Car ferry Pere Marquette 17 is placed in Lake Michigan service. The PM used car ferries on Lake Michigan to avoid the terminal and interchange delays in the area. Later, they were used on Lake Erie, the Detroit River, and in Port Huron. Car Ferry Pere Marquette 17 1902: Car ferry (first) Pere Marquette 18 is placed into Lake Michigan service. January 1903: PM acquires the Lake Erie & Detroit River Railway (LE&DRR), with main lines running from Walkerville, Windsor to St. Thomas, Ontario, as well as from Sarnia to Chatham and Erieau. This begins the Pere Marquette’s presence in Canada. 1904: The Pere Marquette secures running rights from Buffalo, New York and Niagara Falls, New York over the Canadian Southern railway lines to reach St. Thomas, where the PM’s main Canadian facilities will be located. 1905: Shop facilities are constructed in St. Thomas. December 1905: The first receivership begins, meaning that the company is controlled by others in order to make the best decision based on its finances, whether that is stabilizing or selling the company. The Pere Marquette has struggled financially for much of its operating life, and will continue to do so.
    [Show full text]
  • Great Lakes Maritime Institute
    JANUARY - FEBRUARY, 1978 Volume XXVII; Number 1 GREAT LAKES MARITIME INSTITUTE DOSSIN GREAT LAKES MUSEUM Belle Isle, Detroit, Michigan 48207 JAN/FEB, 1978 Page 2 MEMBERSHIP NOTES Welcome to 1978! A brand new year, a brand new slate, and a brand new outlook. It is going to be difficult to keep up with the pace set in 1977, but the continued success of the Institute demands that we not just meet, but surpass last year. At the close of the year our member­ ship had grown to approaching 1,50C. pretty good for an organization that had 97 members in 1959...but this year we’ll shoot for 1,600. It’ll take a lot of work, and you’ll have to help, but you always have, so we should make it. Telescope production last year produced a total of 244 pages, and in addition to that we produced the FITZGERALD book with 60 pages. For the uninitiated, this means your Editor typed, then Varityped 608 pages. This much production takes a lot of time, but we are going to do something about it, and we’ll have an announcement to make perhaps as early as the next issue. Not only will what we have planned result in far less work to getting Telescope out, but it will produce a far better product. Yes, 1977 was a good year...but 1978 looks better. MEETING NOTICES Regular membership meetings are scheduled for January 27, March 31, and May 19 (early to avoid Memorial Day weekend). All meetings will be at the Dossin Museum at 8:00 PM.
    [Show full text]
  • Amtrak Saved from Bankruptcy Marpasks for GAO Trains Regain a Future in an 11Th-Hour Move, the U.S
    ' ~§§§(fO~§[fil [Fd§~~ [M]§OD1J8 ·'(l\11ehig~n Ohio • Indiana Issue 128 November 1997 Amtrak saved from bankruptcy MARPasks for GAO Trains regain a future In an 11th-hour move, the U.S. Congress has saved Am­ investigation trak from an almost -certain bankruptcy by passing the Am­ trak reform and reauthorization bill. The measure passed In a letter to U.S. Senator Spen­ both the Senate and House of Representatives without any cer Abraham (R-Michigan), objection. With the clock ticking down to a holiday re­ MARP has asked for a General Ac­ cess, Republicans and Democrats negotiated an agreement counting Office (GAO) investiga­ that drew support from interest groups that were at odds tion and assessment of the effec­ only days earlier. tiveness ofAmtrak's management. Amtrak's access to $2.3 billion in capital investment The request was prompted by the funds, included in the Taxpayer Relief Act of 1997, was fall schedules for the Chicago-De­ tied to passage of the reform bill. The capital funds are troit corridor, which went into ef­ needed to retire old debt and to upgrade aging facilities fect Oct. 26. and rolling stock. Without these, Amtrak was facing the The new schedules are the long­ prospect having to go back to unsympathetic creditors in est in Amtrak's history, and, at six December, which probably would have forced Amtrak to hours (Chicago-Detroit), are even file for bankruptcy. longer than they were in the days of Penn Central. After over $100 mil­ It is quite likely that, if Amtrak had filed for bankruptcy, ., a large portion of the national system would have been lion of track and signal work by the -' linnirl<=>tf>rl to n<=>v off rrPrlitor<:: Tn<:tP<=>rl A rntr<=>k h!'l<:: <::nrl- State of Michigan and Amtrak over - x-~-~..,...----~~~I~-.:t D.l.-.;;;; ~I~ ~··e- prospect having to go_back to unsympathetic creditors in est in Amtrak's history, and, at six December, which probably would have forced Amtrak to hours (Chicago-Detroit), are even file for bankruptcy.
    [Show full text]
  • Section 707 FY21-25 Rail Strategic Plan
    Michigan Department of Transportation Rail Strategic Plan – FY2021-2025 2020 PA166, Section 707 February 26, 2021 Section 707. (1) Before March 1 of each year, the department will provide to the legislature, the state budget office, and the house and senate fiscal agencies its rail strategic plan. The strategic plan shall include, but is not limited to, a rolling 5-year rail plan and summary of the department’s obligations for programs funded under the appropriation in part 1 for rail operations and infrastructure. (2) The rolling 5-year rail plan shall include, but is not limited to, all the following: (a) A listing by county of all rail infrastructure projects on rail lines within the state utilizing state funds, and the estimated cost of each project. (b) The actual or projected state expenditures for operation of passenger rail service. (c) The actual or projected state expenditures for maintenance of passenger service rail lines. (3) The period of the rolling 5-year rail plan includes the current fiscal year and the 4 fiscal years immediately following the current fiscal year. (4) The summary of the department’s obligations for programs funded under the appropriation in part 1 for rail operations and infrastructure shall include a breakdown of the appropriation by program, year-to-year obligations under each program itemized by project, and an estimate of future obligations under each program itemized by project for the remainder of the fiscal year. The Michigan Department of Transportation’s Office of Rail is pleased to present its Rail Strategic Plan for Fiscal Years 2021 through 2025.
    [Show full text]
  • 09-09 CRMHA Newsletter
    CENTRAL CROSSINGS MONTHLY NEWS- LETTER OF THE CENTRAL RAILWAY MODEL & HISTORICAL ASSOCIATION, INC. Volume 18, Number 9 September 2009 P. O. Box 128 SUMMER RAILFAN Central, SC 29630 EXTRAVAGANZA ISSUE ! WEBSITE: www.crmha.org MUSEUM & MEETING SITE 108 Werner Street Central, SC OFFICERS President / CEO: Jim Reece Vice President: Ron Keith Stationmaster & Webmaster Brian d’Entremont This month’s newsletter is PACKED with articles Paymaster from our officers, exciting Bob Folsom photos from our summer Shows Chairman: fan trips, the first of three Bruce Gathman Central Railway “history” articles, and Museum Curator: coming opportunities! Jim Selton Thanks to all who Editor & Publisher contributed to this Robert M. Seel, AIA awesome issue – our [email protected] biggest yet at 21 pages! Be sure to ask Bruce Gathman and Bob Folsom Next Meeting: about their trips, including Sept 3, 2009 Trainfestival 2009 in Owosso, Michigan. 7:15 PM Among the other TrainFestival attendees Museum layout were Pere Marquette 2-8-4 work sessions No. 1225 ( Bruce continue on Gathman’s photo above) Thursday and and Little River 4-6-2 No. Saturday 110 ( Bob Folsom’s photo, mornings! left). Z CENTRAL CROSSINGS, the CRM&HA Newsletter September 2009, Page 1 Program Schedule September 3, 2009 TBA APPROACHING HEADLIGHTS October 1, 2009 Herb Schmidt 3-D Cardstock Modeling Upcoming Events for the October 3, 2009 ANNUAL FALL PICNIC Central Railway Model & Historical Association See information at left For other shows and events, please see the list at the end of the newsletter. November 5, 2009 Open Still room for YOU! ANNUAL FALL December 3, 2009 Christmas Dinner Hosted by Bob Folsom PICNIC Saturday, October 3, 2009 January 7, 2010 Open Bruce Gathman’s House in Easley, SC Beat the New Year Rush and sign up now! 118 Richland Drive February 4, 2010 Open Hours will be: run live steam trains from 10 to 12, eat and socialize 12 to 2, then run more trains until 4 or so.
    [Show full text]
  • Railway History Chronology
    St. Thomas Railway History Chronology 1834 - The plan for the Great Western Railway (GWR) is conceived. An economic depression delays implementation for several years. 23 October 1847 - Sod-turning commences for the GWR. It becomes the largest system in Southwestern Ontario. 1850s - Surveying for railway lines is conducted in the St. Thomas area by different railroad companies. Among those reported in the St. Thomas Weekly Dispatch are routes to Simcoe and Amherstburg. 1854 - Citizens of St. Thomas are disappointed that the GWR decided to build through London from Windsor to Niagara Falls instead of St. Thomas. St. Thomas’s leading citizens had been campaigning for years for a railway. 1856 - The London and Port Stanley Railway (L&PS) is inaugurated. Though it was initially supported by St. Thomas, it turned out to be a financial disaster, as St. Thomas merchants lost customers to London. The city purchased shares in the company for $125,000.00 a piece and later sold them to the City of London, who owned the line, for $25,000.00 per share. 1868 - The Erie and Niagara Extension Railway is chartered and the following year it is renamed the Canada Southern Railway (CASO). Late 1860’s - William A. Thomson rallies support for the CASO run between Amherstburg and Fort Erie to connect to St. Thomas. He is successful. 1871 - The CASO Station is built in anticipation of the railroad’s arrival the following year. It still stands today. 1872- The GWR, afraid of losing traffic to the CASO, constructed a rival St. Thomas to Glencoe line, thereby affording St.
    [Show full text]
  • ON TRACK the E-Bulletin of the Michigan Association of Railroad Passengers [email protected]
    ON TRACK The E-Bulletin of the Michigan Association of Railroad Passengers www.marp.org [email protected] Issue # 96 January 2020 The Michigan Association of Railroad Midwest States Celebrate Progress Passengers, Inc. (MARP) is a 501 (c)(3) non- profit corporation established in 1973 to Plan for the Future improve passenger train service, travel conditions for passengers, and to work for the The annual meeting of the Midwest Interstate Passenger Rail Commission preservation of historic rail stations. (MIPRC) took place October 21-23, 2019, in Washington, D.C. Combining Monthly meetings are held at locations around the fall meeting—which usually takes place somewhere in the Midwest— the state. Check the website for dates and with the Commissioner’s annual visit to the Hill was undertaken as a way venues. The public is invited to attend. “to amplify the region’s voice as Congress begins discussing renewal of the law that sets federal policy and authorizes spending on surface MARP EXECUTIVE COMMITTEE transportation”—the Fixing America’s Surface Transportation [FAST] Act of 2018-2020 2015 which expires in 2020. Adam Tauno Williams Chair Open Vice-Chair In addition to a dozen Commissioners, the meeting was attended by a Steve Vagnozzi Treasurer number of Partners and sponsors, as well as members of Minnesota and Open Secretary Wisconsin passenger rail advocacy groups. Thanks to a generous donation Dwight Phillips Gov’t/Public Affairs Coordinator from a member, MARP enjoyed a visual presence on printed meeting Jeanie Merckel Membership Coordinator materials as a sponsoring organization. Kay Chase Communications Coordinator Chuck Merckel Meetings Coordinator Laura Kliewer, MIPRC Director, opened the proceedings with a brief review Robert Patterson Detroit/Metro Region Chair of the year’s activities.
    [Show full text]
  • Table of Contents
    TABLE OF CONTENTS PAGE ABOUT US (i) FACTS ABOUT DVDs / POSTAGE RATES (ii) LOOKING AFTER YOUR DVDs (iii) Greg Scholl 1 Pentrex (Incl.Pentrex Movies) 9 ‘Big E’ 32 General 36 Electric 39 Interurban 40 Diesel 41 Steam 63 Modelling (Incl. Allen Keller) 78 Railway Productions 80 Valhalla Video Productions 83 Series 87 Steam Media 92 Channel 5 Productions 94 Video 125 97 United Kindgom ~ General 101 European 103 New Zealand 106 Merchandising Items (CDs / Atlases) 110 WORLD TRANSPORT DVD CATALOGUE 112 EXTRA BOARD (Payment Details / Producer Codes) 113 ABOUT US PAYMENT METHODS & SHIPPING CHARGES You can pay for your order via VISA or MASTER CARD, Cheque or Australian Money Order. Please make Cheques and Australian Money Orders payable to Train Pictures. International orders please pay by Credit Card only. By submitting this order you are agreeing to all the terms and conditions of trading with Train Pictures. Terms and conditions are available on the Train Pictures website or via post upon request. We will not take responsibility for any lost or damaged shipments using Standard or International P&H. We highly recommend Registered or Express Post services. If your in any doubt about calculating the P&H shipping charges please drop us a line via phone or send an email. We would love to hear from you. Standard P&H shipping via Australia Post is $3.30/1, $5.50/2, $6.60/3, $7.70/4 & $8.80 for 5-12 items. Registered P&H is available please add $2.50 to your standard P&H postal charge.
    [Show full text]
  • Saturday, August 5‒Steam Railroading Institute
    SATURDAY, AUGUST 5‒STEAM RAILROADING INSTITUTE–Owosso, MI The Steam Railroading Institute in Owosso, MI, is dedicated to educating the public about steam-era railroad technology. This technology made engineering history and it contributed to world history in the winning of World War II. Pere Marquette # 1225 was delivered from the builder just before America’s entrance into the war in December, 1941. Within two months, production of civilian automobiles stopped when factories in the Midwest focused on filling massive orders for tanks, Jeeps, and other equipment for the war effort. Mighty locomotives, such as PM #1225, were dispatched daily as a supply line that ran from Detroit factories to battlefields in Europe and the Pacific. From war hero to Hollywood icon! The majestic Pere Marquette #1225 locomotive is most famous as the prototype for the locomotive image and sounds that brought the 2004 Warner Bros Christmas Classic, THE POLAR EXPRESS to life! The Pere Marquette Railway’s 1200 series locomotives were the largest steam engines ever used in Michigan. Across the country, steam engines began disappearing before 1951. After #1225’s retirement, the locomotive was donated to Michigan State University in 1957 by the C&O Railroad with the help of Forest Akers, Dodge Motors, Vice President and MSU Trustee, who saw it as a real piece of machinery for engineering students to study, and it became part of the MSU Museum Collection. Displayed as an icon of the steam-era, the locomotive was moved to Owosso in 1982, and restoration of the locomotive continued until 1985, when it moved under its own power for the first time in 34 years.
    [Show full text]
  • (HSIPR) Program
    Track 1a – FD/Construction and/or Track 4 OMB No. 2130-0583 Project Name: Date of Submission: Version Number: High-Speed Intercity Passenger Rail (HSIPR) Program Application Form Track 1a–Final Design (FD)/Construction & Track 4–FY 2009 Appropriations Projects Welcome to the Track 1a Final Design (FD)/Construction and Track 4 Application for the Federal Railroad Administration’s High-Speed Intercity Passenger Rail (HSIPR) Program. Applicants for Track 1a FD/Construction and/or Track 4 are required to submit this Application Form and Supporting Materials (forms and documents) as outlined in Section G of this application and in the HSIPR Guidance. We appreciate your interest in the program and look forward to reviewing your application. If you have questions about the HSIPR program or this application, please contact us at [email protected]. Instructions: Please complete the HSIPR Application electronically. See Section G for a complete list of the required application materials. In the space provided at the top of each section, please indicate the project name, date of submission (mm/dd/yy) and the application version number. The distinct Track 1a and/or Track 4 project name should be less than 40 characters and follow the following format: State abbreviation-route or corridor name-project title (e.g., HI-Fast Corridor-Track Work IV). For each question, enter the appropriate information in the designated gray box. If a question is not applicable to your FD/Construction Project, please indicate “N/A.” Narrative questions should be answered concisely within the limitations indicated. Applicants must upload this completed application and all other application materials to www.GrantSolutions.gov by August 24, 2009 at 11:59pm EDT.
    [Show full text]
  • Ada Final Rule: Rail System Accessibility July 2011
    Regulatory Impact Assessment and Regulatory Flexibility Act Analysis ADA FINAL RULE: RAIL SYSTEM ACCESSIBILITY JULY 2011 Prepared by: Economic Analysis Division John A. Volpe National Transportation Systems Center Research and Innovative Technology Administration Department of Transportation Introduction Overview This document evaluates the benefits, costs, and other impacts of a DOT rulemaking related to the accessibility of commuter rail transportation and intercity passenger rail service. In keeping with Executive Order 12866, Executive Order 13563, and DOT policy, the analysis has been prepared with the goal of “assessing the costs and benefits of regulatory alternatives,” allowing policymakers to make regulatory decisions in light of the “best reasonably obtainable scientific, technical, economic, and other information” (E.O. 12866). Benefits and costs of the rule are presented in the sections below. Based on the information gathered for this analysis, the overall benefits and costs of the rule are relatively modest, since many aspects of rail service accessibility are already required by existing regulations. Compliance costs are estimated at about $1.8 million in construction costs, plus some minor increases in operational costs for certain commuter rail systems that use mini-high platforms. Benefits of the rule are mainly in the form of serving passengers with disabilities in a more integrated setting. General Benefit-Cost Principles The basic framework for regulatory evaluation is an examination of the future world with the regulation in place, versus a baseline of the future world in the absence of the regulation. The analysis ordinarily takes a “societal” perspective in which all benefits and costs are included regardless of to whom they accrue.
    [Show full text]