The Manila LRT System

Total Page:16

File Type:pdf, Size:1020Kb

The Manila LRT System Feature New Urban Transit Systems The Manila LRT System Evangeline M. Razon The Philippines Light Rail Transit Author- ity (LRTA) was established on 12 July 1980 by Executive Order No. 603 to construct, operate and/or lease LRT systems in the Philippines. Its mission is to create a fully integrated mass rail transit network to al- leviate Metro Manila’s serious congestion. The Meralco Transit Organization (METRO), then a wholly-owned subsid- iary of Meralco (but now a wholly-owned subsidiary of LRTA), was organized and contracted on 31 July 1980 to manage and operate the system on a day-to-day basis under a 10-Year Management and Oper- ating Agreement. Measuring approximately 15 km, and presently the only operational LRT system in the country, LRT Line 1 (Fig. 1) is a fully elevated, double-track system carried on a concrete superstructure stretching along LRT Line 1 running in front of Manila City Hall (LRTA) the Taft-Rizal corridor of Metro Manila. It has three terminals and 15 stations and The LRT uses a dual-fare system; passen- which granted a BFr300-million soft and initially operated with 32 trains, each con- gers boarding in the Token Zone (any of interest-free loan with a 30-year repay- sisting of two articulated cars, carrying the first 14 stations southbound from the ment period. A Belgian Consortium con- about 450,000 passengers daily. To date, North Terminal or northbound from the sisting of ACEC, BN, TEI and TC* provided a total of 1.4 billion passengers have been South Terminal) pay 10 pesos while those an additional loan of 700 million pesos. transported since commercial operation boarding in the Peso Zone (remaining four The consortium provided the cars, signal- started in December 1984. The trains run stations) pay 1 peso. ling, power, telecommunications, training at a 2- to 3-minute headway from 05:30 The LRT Line 1 was financed through an and technical assistance. The actual cost until 21:30. Each train has a capacity of Economic and Technical Cooperation of the project at 1986 was 3.4 billion pe- 748 passengers (162 seated and 586 Agreement between the Philippines and sos broken down as follows: standing), and an operating speed of 50– Belgium. Initial assistance for building the 55 km/h (60 km/h max.). LRT came from the Belgian government, LRT Line 1 entering Pedro Gil Station (LRTA) LRT Line 2 under construction (LRTA) 38 Japan Railway & Transport Review 16 • June 1998 Copyright © 1998 EJRCF. All rights reserved. Local Loans 0.438 billion pesos Foreign Loans 1.814 billion pesos Figure 1 Metro Manila LRT Line 1 and Future Lines under Construction Sub-total 2.252 billion pesos or in Planning Government Equity 1.124 billion pesos Qurino Ave. Total 3.376 billion pesos To Clark Bristol Dona Carmen Regalado The elevated concrete superstructure was Batasan B LINE 5 designed and built to withstand a Richter Batasan A magnitude 8 earthquake. Special provi- Don Antonio LINE 4 sions were made to dissipate seismic en- Caloocan Zusuaragui Roosevelt ergy at the bridge supports (restraining Monumento North Ave. Tandang Sora bars, shear keys) and at the column bases Balintawak State Acctg. North Terminal (plastic hinges). Meralco supplies the Philcoa Del Monte Ave. 5th Ave. Quezon Ave. Quezon City hall 35-kV power for the system to nine sub- Quezon Ave. R. Papa Bir Agham Road Katipunan Timog Ave. Kamuning stations, which convert the supply to G. Araneta Ave. Examiner LINE 2 Abad Santos Anonas 750 V dc using two air-cooled silicon rec- Roosevelt Cubao Santolan Blumentritt Araneta E. Rodoriguez Sr. ave. Cubao tifiers. Communications with trains uses Banawe Boston Tayuman LINE 3 a semi-duplex or duplex UHF radio sys- Quezon Ave. Gilmore J. Ruiz Bambang Lerma Santolan tem. Relay-type trackside signals with fail- Pureza Araneta D. Jose safe technology are used throughout the Old Bilibid Aurora Ave. Recto 9 de Febrero Ortigas line. Legarda Kalentong Carriedo An important link with the LRT Line 1 run- EDSA Central Station Arroceros Shaw Blvd. ning north-south will be Line 2 running U.N. Ave. east-west. This project is still in progress Pedro Gil LINE 1 Boni Ave. and involves construction of a 13.8-km, Pres. Quirino Guadalupe Fort Bonifacio almost completely elevated 8-m high line Vito Cruz Buendia Ayala (higher than the existing LRT 1) along Gil Puyat Marcos Highway, Aurora Boulevard, Libertad Magallanes Ramon Magsaysay Boulevard, Legarda EDSA Taft South Terminal Baclaran Naia and Recto Avenue corridors. The total Airport Road estimated cost of the Line 2 project is 25.7 Naia Road billion pesos financed by Yen Credit Pack- J.P. Rizal Kabihasnan ages (YCP) from the Overseas Economic St. Joseph LINE 6 I Cooperation Fund (OECF) in Tokyo. Naga Alabang Zapote Road Notes Zapote Terminal * ACEC: Ateliers de Constructions Electriques de (LRTA) Charleroi BN: Constructions Ferroviaires et Metalliques, formerly Brugeoise et Nivelles TEI: Tractionnel Engineering International TC: Transurb Consult Evangeline M. Razon Ms Razon is Officer-in-Charge of the Light Rail Transit Authority of the Philippines. She has a Bach- elors degree in Engineering and has held various posts in planning, administration and management, etc., at LRTA. Copyright © 1998 EJRCF. All rights reserved. Japan Railway & Transport Review 16 • June 1998 39.
Recommended publications
  • BUS Bus Time Schedule & Line Route
    BUS bus time schedule & line map BUS Baclaran SM Fairview via Lagro View In Website Mode The BUS bus line (Baclaran SM Fairview via Lagro) has 2 routes. For regular weekdays, their operation hours are: (1) Maria, 9583 →Sm Public Transport Terminal, Regalado Highway, Quezon City: 12:00 AM - 11:00 PM (2) Quirino Highway / Maligaya Intersection, Caloocan City →Naia Rd, Parañaque City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest BUS bus station near you and ƒnd out when is the next BUS bus arriving. Direction: Maria, 9583 →Sm Public Transport BUS bus Time Schedule Terminal, Regalado Highway, Quezon City Maria, 9583 →Sm Public Transport Terminal, 114 stops Regalado Highway, Quezon City Route Timetable: VIEW LINE SCHEDULE Sunday 12:00 AM - 10:00 PM Monday 12:00 AM - 11:00 PM Maria, 9583 Tuesday 12:00 AM - 11:00 PM Terminal 1 Arrivals Area Rd, Ninoy Aquino International Airport, Parañaque City, Manila Wednesday 12:00 AM - 11:00 PM Thursday 12:00 AM - 11:00 PM Ninoy Aquino Ave, Lungsod Ng Pasay, Manila Friday 12:00 AM - 11:00 PM Naia Rd / Imelda Ave Intersection, Parañaque City, Manila Saturday 12:00 AM - 10:00 PM Ninoy Aquino Avenue, Philippines Naia Rd, Parañaque City, Manila NAIA Road, Philippines BUS bus Info Naia Rd, Parañaque City, Manila Direction: Maria, 9583 →Sm Public Transport NAIA Expressway, Philippines Terminal, Regalado Highway, Quezon City Stops: 114 Naia Rd / Quirino Ave Intersection, Parañaque Trip Duration: 171 min City, Manila Line Summary: Maria, 9583, Terminal 1 Arrivals Area Quirino Avenue, Philippines Rd, Ninoy Aquino International Airport, Parañaque City, Manila, Ninoy Aquino Ave, Lungsod Ng Pasay, Roxas Blvd, Parañaque City, Manila Manila, Naia Rd / Imelda Ave Intersection, Coastal Jeepney Terminal Road, Philippines Parañaque City, Manila, Naia Rd, Parañaque City, Manila, Naia Rd, Parañaque City, Manila, Naia Rd / Roxas Boulevard, 161 Quirino Ave Intersection, Parañaque City, Manila, Roxas Blvd, Parañaque City, Manila, Roxas Roxas Blvd / C.
    [Show full text]
  • Resettlement Plan PHI: EDSA Greenways Project (Balintawak
    Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of
    [Show full text]
  • List of Participating Petron Service Stations September 6
    LIST OF PARTICIPATING PETRON SERVICE STATIONS SEPTEMBER 6 - 21, 2021 REGION CITY / MUNICIPALITY ADDRESS METRO MANILA CALOOCAN CITY 245 SUSANO ROAD, DEPARO KALOOKAN CITY METRO MANILA CALOOCAN CITY ZABARTE ROAD, BRGY. CAMARIN, NORTH CALOOCAN, KALOOKAN CITY METRO MANILA CALOOCAN CITY 146RIZAL AVENUE EXT. GRACE PARK CALOOCAN CITY METRO MANILA CALOOCAN CITY 510 A. MABINI ST., KALOOKAN CITY METRO MANILA CALOOCAN CITY C-3 ROAD, DAGAT-DAGATAN CALOOCAN CITY METRO MANILA CALOOCAN CITY BLK 46 CONGRESSIONAL ROAD EXT., BAG CALOOCAN CITY METRO MANILA CALOOCAN CITY B. SERRANO ST. COR 11TH AVE CALOOCAN CITY METRO MANILA CALOOCAN CITY GEN. SAN MIGUEL ST., SANGANDAAN, CALOOCAN CITY METRO MANILA LAS PINAS ALABANG ZAPOTE ROAD LAS PINAS, METRO MANILA METRO MANILA LAS PINAS LOT 2A DAANG HARI CORNER DAANG REYN LAS PINAS METRO MANILA LAS PINAS NAGA ROAD LAS PINAS CITY, METRO MANILA METRO MANILA LAS PINAS BLK 14 LOT 1 VERSAILLES SUBD DAANG LAS PIбAS CITY METRO MANILA LAS PINAS CRM AVENUE, BF ALMANZA, LAS PIбAS METRO MANILA METRO MANILA LAS PINAS LOT 1 & 2 J. AGUILAR AVENUE TALON TRES, LAS PINAS METRO MANILA LAS PINAS ALABANG ZAPOTE RD., PAMPLONA LAS PINAS METRO MANILA LAS PINAS 269 REAL ST. PAMPLONA LAS PINAS METRO MANILA LAS PINAS 109 MARCOS ALVAREZ AVE. TALON LAS PINAS METRO MANILA LAS PINAS 469 REAL ST., ZAPOTE LAS PINAS METRO MANILA MAKATI CITY 46 GIL PUYAT AVE. NEAR COR. DIAN MAKATI CITY METRO MANILA MAKATI CITY G PUYAT COR P TAMO AVE, MAKATI CITY METRO MANILA MAKATI CITY LOT 18 BLOCK 76 SEN. GIL PUYAT AVE. PALANAN, MAKATI CITY METRO MANILA MAKATI CITY PETRON DASMARINAS STATION EDSA, MAKATI CITY METRO MANILA MAKATI CITY 363 SEN.
    [Show full text]
  • Macrofungal Diversity in Mt. Makiling Forest Reserve, Laguna, Philippines: with Floristic Update on Roadside Samples in Makiling Botanic Gardens (MBG)
    BIODIVERSITAS ISSN: 1412-033X Volume 19, Number 4, July 2018 E-ISSN: 2085-4722 Pages: 1579-1585 DOI: 10.13057/biodiv/d190451 Short Communication: Macrofungal diversity in Mt. Makiling Forest Reserve, Laguna, Philippines: with floristic update on roadside samples in Makiling Botanic Gardens (MBG) ALMA E. NACUA1,2, HAZEL JOY M. PACIS2,3, JEFFREY R. MANALO2, CARIZA JANE M. SORIANO2, NIKKI ROSE N. TOSOC2, ROBERT PADIROGAO2, KEN JOSEPH E. CLEMENTE4,♥, CUSTER C. DEOCARIS5,6,7 1Urban Biodiversity Laboratory, Universidad de Manila. 659 A. Cecilia Muñoz, Ermita 1000, Manila, Philippines 2Graduate School, University of the East. 2219 Recto Avenue, Sampaloc 1008, Manila, Philippines 3Bureau of Plant Industry. 692 San Andres St., Malate 1004, Manila, Philippines 4University of Santo Tomas. España Blvd., Sampaloc 1015, Manila, Philippines. email: [email protected] 5De La Salle University. Taft Avenue, Malate, Manila, Philippines 6Technological Institute of the Philippines. 938 Aurora Blvd., Cubao, Quezon City, Philippines 7Polytechnic University of the Philippines. Anonas Street, Sta. Mesa, Manila 1008, Philippines Manuscript received: 11 May 2018. Revision accepted: 29 July 2018. Abstract. Nacua AE, Pacis HJM, Manalo JR, Soriano CJM, Tosoc NRN, Padirogao R, Clemente KJE, Deocaris CC. 2018. Macrofungal diversity in Mt. Makiling Forest Reserve, Laguna, Philippines: with floristic update on roadside samples in Makiling Botanic Gardens (MBG). Biodiversitas 19: 1579-1585. The Mt. Makiling Forest Reserve (MMFR) stands as a highly biodiverse habitat and the only intact natural forest near Metro Manila, the Philippines. It is one of the 18 key centers of plant biodiversity and 32 key ecotourism sites in the Philippines. In monitoring the implementation plans for protecting MMFR, the information pertaining to the mushroom biodiversity across decades is important.
    [Show full text]
  • Robinsons Land Corporation RLC
    The Exchange does not warrant and holds no responsibility for the veracity of the facts and representations contained in all corporate disclosures, including financial reports. All data contained herein are prepared and submitted by the disclosing party to the Exchange, and are disseminated solely for purposes of information. Any questions on the data contained herein should be addressed directly to the Corporate Information Officer of the disclosing party. Robinsons Land Corporation RLC PSE Disclosure Form 17-11 - List of Stockholders Reference: Section 17.11 of the Revised Disclosure Rules Type of Securities Common Preferred - Others - Record Date of Apr 24, 2019 Stockholders' Meeting Date of Stockholders' May 29, 2019 Meeting Type of Stockholders' Meeting Annual (Annual or Special) Other Relevant Information Please find attached the list of stockholders of Robinsons Land Corporation (RLC) as of April 24, 2019, the record date set by the Board of Directors of RLC to determine the stockholders entitled to notice and to vote at the annual meeting of the stockholders of RLC to be held on May 29, 2019. Filed on behalf by: Name Rosalinda Rivera Designation Corporate Secretary Robinsons Land Corporation April 24, 2019 SH # SH NAME SH ADDRESS NATIONALITY TOTAL NO. OF SHARES PERCENTAGE 0000230766 A & A SECURITIES, INC. 1906 PACIFIC BANK BLDG. AYALA AVENUE, MAKATI CITY FILIPINO 4,000.00 0.00007701 0000230768 A. ANGEL S. TANJANGCO 542 ARQUIZA ST.,ERMITA, MANILA FILIPINO 38,500.00 0.00074126 0000230770 ABOITIZ JEBS EN BULK TRANSPORT CORPORATION CEBU CITY, PHILIPPINES FILIPINO 400.00 0.00000770 0000230771 ABRAHAM T. CO C/O PBU, RCBC 333 SEN GIL PUYAT AVE 1200 MAKATI, METRO MANILA FILIPINO 1,000.00 0.00001925 0000230772 ACRIS CORPORATION 5/F BENPRES BUILDING,MERALCO AVENUE, PASIG CITY FILIPINO 8,900.00 0.00017136 0000230774 ADELINA A.
    [Show full text]
  • No. Company Star
    Fair Trade Enforcement Bureau-DTI Business Licensing and Accreditation Division LIST OF ACCREDITED SERVICE AND REPAIR SHOPS As of November 30, 2019 No. Star- Expiry Company Classific Address City Contact Person Tel. No. E-mail Category Date ation 1 (FMEI) Fernando Medical Enterprises 1460-1462 E. Rodriguez Sr. Avenue, Quezon City Maria Victoria F. Gutierrez - Managing (02)727 1521; marivicgutierrez@f Medical/Dental 31-Dec-19 Inc. Immculate Concepcion, Quezon City Director (02)727 1532 ernandomedical.co m 2 08 Auto Services 1 Star 4 B. Serrano cor. William Shaw Street, Caloocan City Edson B. Cachuela - Proprietor (02)330 6907 Automotive (Excluding 31-Dec-19 Caloocan City Aircon Servicing) 3 1 Stop Battery Shop, Inc. 1 Star 214 Gen. Luis St., Novaliches, Quezon Quezon City Herminio DC. Castillo - President and (02)9360 2262 419 onestopbattery201 Automotive (Excluding 31-Dec-19 City General Manager 2859 [email protected] Aircon Servicing) 4 1-29 Car Aircon Service Center 1 Star B1 L1 Sheryll Mirra Street, Multinational Parañaque City Ma. Luz M. Reyes - Proprietress (02)821 1202 macuzreyes129@ Automotive (Including 31-Dec-19 Village, Parañaque City gmail.com Aircon Servicing) 5 1st Corinthean's Appliance Services 1 Star 515-B Quintas Street, CAA BF Int'l. Las Piñas City Felvicenso L. Arguelles - Owner (02)463 0229 vinzarguelles@yah Ref and Airconditioning 31-Dec-19 Village, Las Piñas City oo.com (Type A) 6 2539 Cycle Parts Enterprises 1 Star 2539 M-Roxas Street, Sta. Ana, Manila Manila Robert C. Quides - Owner (02)954 4704 iluvurobert@gmail. Automotive 31-Dec-19 com (Motorcycle/Small Engine Servicing) 7 3BMA Refrigeration & Airconditioning 1 Star 2 Don Pepe St., Sto.
    [Show full text]
  • JEEP Bus Time Schedule & Line Route
    JEEP bus time schedule & line map JEEP Aurora Blvd, Quezon City, Manila →Radial Road View In Website Mode 10 / Moriones Intersection, Manila The JEEP bus line (Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila) has 2 routes. For regular weekdays, their operation hours are: (1) Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila: 12:00 AM - 11:00 PM (2) Radial Road 10 / Moriones Intersection, Manila →Aurora Blvd, Quezon City, Manila: 12:00 AM - 11:00 PM Use the Moovit App to ƒnd the closest JEEP bus station near you and ƒnd out when is the next JEEP bus arriving. Direction: Aurora Blvd, Quezon City, JEEP bus Time Schedule Manila →Radial Road 10 / Moriones Intersection, Aurora Blvd, Quezon City, Manila →Radial Road 10 / Manila Moriones Intersection, Manila Route Timetable: 38 stops Sunday 12:00 AM - 10:00 PM VIEW LINE SCHEDULE Monday 12:00 AM - 11:00 PM Aurora Blvd, Quezon City, Manila Tuesday 12:00 AM - 11:00 PM General Romulo Ave / Aurora Blvd Intersection, Wednesday 12:00 AM - 11:00 PM Quezon City, Manila Thursday 12:00 AM - 11:00 PM Aurora Blvd / General Aguinaldo Ave Intersection, Friday 12:00 AM - 11:00 PM Quezon City, Manila Saturday 12:00 AM - 10:00 PM Aurora Blvd / Epifanio De Los Santos Avenue Intersection, Quezon City, Manila U-Turn Slot, Philippines Aurora Blvd / N Domingo Intersection, Quezon JEEP bus Info City, Manila Direction: Aurora Blvd, Quezon City, Manila →Radial Road 10 / Moriones Intersection, Manila Aurora Blvd / Betty Go-Belmonte Intersection, Stops: 38 Quezon City, Manila Trip Duration: 65 min 760 Aurora Boulevard, Philippines Line Summary: Aurora Blvd, Quezon City, Manila, General Romulo Ave / Aurora Blvd Intersection, Saint Paul University Of Quezon City, Aurora Quezon City, Manila, Aurora Blvd / General Aguinaldo Boulevard Cor.
    [Show full text]
  • Preparatory Survey on Promotion of TOD for Urban Railway in the Republic of the Philippines Final Report Final Report
    the Republic of Philippines Preparatory Survey on Promotion of TOD for Urban Railway in Department of Transportation and Communications (DOTC) Philippine National Railways (PNR) Preparatory Survey on Promotion of TOD for Urban Railway in the Republic of the Philippines Final Report Final Report March 2015 March 2015 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) ALMEC Corporation Oriental Consultants Global Co., Ltd. 1R CR(3) 15-011 TABLE OF CONTENTS EXECUTIVE SUMMARY MAIN TEXT 1. INTRODUCTION .......................................................................................................... 1-1 1.1 Background and Rationale of the Study ....................................................................... 1-1 1.2 Objectives, Study Area and Counterpart Agencies ...................................................... 1-3 1.3 Study Implementation ................................................................................................... 1-4 2 CONCEPT OF TOD AND INTEGRATED DEVELOPMENT ......................................... 2-1 2.1 Consept and Objectives of TOD ................................................................................... 2-1 2.2 Approach to Implementation of TOD for NSCR ............................................................ 2-2 2.3 Good Practices of TOD ................................................................................................. 2-7 2.4 Regional Characteristics and Issues of the Project Area ............................................. 2-13 2.5 Corridor Characteristics and
    [Show full text]
  • Study on Medium Capacity Transit System Project in Metro Manila, the Republic of the Philippines
    Study on Economic Partnership Projects in Developing Countries in FY2014 Study on Medium Capacity Transit System Project in Metro Manila, The Republic of The Philippines Final Report February 2015 Prepared for: Ministry of Economy, Trade and Industry Ernst & Young ShinNihon LLC Japan External Trade Organization Prepared by: TOSTEMS, Inc. Oriental Consultants Global Co., Ltd. Mitsubishi Heavy Industries, Ltd. Japan Transportation Planning Association Reproduction Prohibited Preface This report shows the result of “Study on Economic Partnership Projects in Developing Countries in FY2014” prepared by the study group of TOSTEMS, Inc., Oriental Consultants Global Co., Ltd., Mitsubishi Heavy Industries, Ltd. and Japan Transportation Planning Association for Ministry of Economy, Trade and Industry. This study “Study on Medium Capacity Transit System Project in Metro Manila, The Republic of The Philippines” was conducted to examine the feasibility of the project which construct the medium capacity transit system to approximately 18km route from Sta. Mesa area through Mandaluyong City, Ortigas CBD and reach to Taytay City with project cost of 150 billion Yen. The project aim to reduce traffic congestion, strengthen the east-west axis by installing track-guided transport system and form the railway network with connecting existing and planning lines. We hope this study will contribute to the project implementation, and will become helpful for the relevant parties. February 2015 TOSTEMS, Inc. Oriental Consultants Global Co., Ltd. Mitsubishi Heavy
    [Show full text]
  • STATUS of PPP PROJECTS (SOLICITED) (As of October 9, 2018)
    STATUS OF PPP PROJECTS (SOLICITED) (as of October 9, 2018) I. AWARDED PROJECTS Notice of Award (NOA) has been successfully issued to the winning private proponent(s).1 Completed and Operational Projects Projects with completed construction and are operational PROJECT IMPLEMENTING PROJECTS COST REMARKS AGENCY PRIVATE SECTOR PARTNER (in PHP billion) 1 Daang Hari-SLEX Link Road 2.23 Department of Public Ayala Corporation The project involves construction of a new 4-kilometer 4-lane toll road, from the junction of (Muntinlupa-Cavite Expressway) Works and Highways Daang Reyna and DaangHari in Las Piñas/Bacoor, Cavite to SLEX through the Susana 2 Heights Interchange in Muntinlupa, traversing the New Bilibid Prison (NBP) Reservation. Project Operational since July 24, 2015 BTO | 30 years 2 PPP for School Infrastructure Project 9.89 Department of Contract Package A - Bright The project involves the design, financing and construction of about 9,296 one-storey and two- 3 Education Future Educational Facilities Inc. storey classrooms, including furniture and fixtures, in various sites in Region I, III, and IV-A. (PSIP) Phase I * Contract Package B and C – BLT | 10 Years 9,296 classrooms completed and delivered on December 4, 2015 Citicore - Megawide Consortium Inc. 3 Automatic Fare Collection System 1.72 Department of AF Payments, Inc. (AFPI) The project involves the decommissioning of the old-magnetic-based ticketing system and (AFCS) Project* Transportation replacing the same with contactless-based smart card technology on LRT Line 1 and 2 and MRT Line 3, with the introduction of a centralized back office that will perform apportionment BTO (Level 1-3) of revenues.
    [Show full text]
  • 1St Semester CY 2018 & Annual CY 2017
    Highlights Of Accomplishment Report 1st Semester CY 2018 & Annual CY 2017 Prepared by: Corporate Planning and Management Staff Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1 TRAFFIC ENFORCEMENT Income from Traffic Fines Traffic Direction & Control; Metro Manila Traffic Ticketing System Commonwealth Ave./ Macapagal Ave. Speed Limit Enforement Bus Management and Dispatch System South West Integrated Provincial Transport System (SWIPTS) Bicycle-Sharing Scheme Anti-Jaywalking Operations Anti-Illegal Parking Operations Enforcement of the Yellow Lane and Closed-Door Policy Anti-Colorum and Out-of-Line Operations Operation of the TVR Redemption Facility Personnel Inspection and Monitoring Road Emergency Operations (Emergency Response and Roadside Clearing) Towing and Impounding Unified Vehicular Volume Reduction Program (UVVRP) No-Contact Apprehension Policy TRAFFIC ENGINEERING Design and Construction of Pedestrian Footbridges Traffic Survey Roadside Operation Metro Manila Accident Reporting and Analysis System (MMARAS) Application of Thermoplastic and Traffic Cold Paint Pavement Markings Upgrading of Traffic Signal System Traffic Signal Operation and Maintenance Fabrication and Manufacturing/ Maintenance of Traffic Road Signs/ Facilities TRAFFIC EDUCATION OTHER TRAFFIC IMPROVEMENT-RELATED SPECIAL PROJECTS/ MEASURES Alignment of 3 TDO Units Regulating Provincial Buses along EDSA Establish Truck Lanes along C-2 Amendment to Coverage of the “No Physical Contact Apprehension Policy” Amendments to “Light Truck”
    [Show full text]
  • A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform Gilberto M
    Philippine Institute for Development Studies Surian sa mga Pag-aaral Pangkaunlaran ng Pilipinas A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform Gilberto M. Llanto DISCUSSION PAPER SERIES NO. 2008-25 The PIDS Discussion Paper Series constitutes studies that are preliminary and subject to further revisions. They are be- ing circulated in a limited number of cop- ies only for purposes of soliciting com- ments and suggestions for further refine- ments. The studies under the Series are unedited and unreviewed. The views and opinions expressed are those of the author(s) and do not neces- sarily reflect those of the Institute. Not for quotation without permission from the author(s) and the Institute. September 2008 For comments, suggestions or further inquiries please contact: The Research Information Staff, Philippine Institute for Development Studies 5th Floor, NEDA sa Makati Building, 106 Amorsolo Street, Legaspi Village, Makati City, Philippines Tel Nos: (63-2) 8942584 and 8935705; Fax No: (63-2) 8939589; E-mail: [email protected] Or visit our website at http://www.pids.gov.ph A Review of Build-Operate-Transfer for Infrastructure Development: Some Lessons for Policy Reform1 Gilberto M. Llanto2 Philippine Institute for Development Studies Summary The Philippines has used the BOT law, as amended to motivate private sector provision of infrastructure. Using examples from selected BOT projects in the country, the paper pointed out key issues constraining the successful implementation of the BOT approach to infrastructure provision. It also indicated several factors that were instrumental in forging an effective public- private partnership in BOT projects.
    [Show full text]