Download 6.39 MB
Total Page:16
File Type:pdf, Size:1020Kb
Compensation Plan for Temporary Damages Project Number: 49214-002 July 2017 IND: Solar Transmission Sector Project (Transmission System for Ultra-Mega Solar Power Park at Pavagada, Tumkur District, Karnataka- Phase-II, Part A&B) Prepared by Power Grid Corporation of India Ltd. for the Asian Development Bank. This Compensation Plan for Temporary Damages is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. COMPENSATION PLAN FOR TEMPORARY DAMAGES (CPTD) FOR TRANSMISSION SYSTEM FOR ULTRA-MEGA SOLAR POWER PARK AT PAVAGADA, TUMKUR DISTRICT, KARNATAKA-PHASE-II, PART – A& B ENVIRONMENT AND SOCIAL MANAGEMENT POWER GRID CORPORATION OF INDIA LTD. (A GOVERNMENT OF INDIA ENTERPRISE) July, 2017 TABLE OF CONTENTS SECTION PARTICULARS PAGE EXECUTIVE SUMMARY I-VI I INTRODUCTION AND PROJECT DESCRIPTION 1-7 1.1 Project Background 1 1.2 The Project 1 1.3 Project Components 2 1.4 Objective of CPTD 2 1.5 Scope and Limitation of CPTD 5 1.6 Measures to Minimize Impact 5 1.7 Route Selection and Study of Alternatives 6 II SOCIO-ECONOMIC INFORMATION AND PROFILE 8-25 2.1 General 8 2.2 Karnataka 8 2.3 Andhra Pradesh 20 III LEGAL& REGULATORY FRAMEWORK 26-31 3.1 Overview 26 3.2 Statutory Requirements 26 3.3 ADB‟s Safeguard Policy Statement (SPS), 2009 29 3.4 POWERGRID‟s ESPP, 2009 29 3.5 Basic Principles for the Project 30 3.6 Cut-off Date 31 IV PROJECT IMPACTS 32-40 4.1 General 32 4.2 Impact Due to construction of Substation & Bay Extension 34 4.3 Temporary Impacts Caused due to Tr. Lines (Right of Way) 35 4.4 Details of Affected Persons 38 4.5 Other Damages 39 4.6 Impact on Indigenous Peoples 39 4.7 Summary of Impacts 40 V ENTITLEMENTS, ASSISTANCE AND BENEFITS 41-46 5.1 Entitlements 41 5.2 Entitlement Matrix 41 5.3 Procedure of Tree/crop compensation 42 5.4 Compensation for Structure 44 VI INFORMATION DISCLOSURE, CONSULTATION AND 47-50 PARTICIPATION 6.1 Consultations 47 6.2 Plan for further Consultation 49 6.3 Information Disclosure 50 VII INSTITUTIONAL ARRANGEMENTS 51-53 7.1 General 51 7.2 Various Level 51 7.3 Arrangement for CPTD Implementation 52 7.4 Staff Training on Environment and Social Issues 53 VIII GRIEVANCE REDRESS MECHANISM 54-55 IX BUDGET 56-58 9.1 Compensation for Crops & Trees 56 9.2 Compensation for Land for Tower Base and RoW Corridor 57 SECTION PARTICULARS PAGE 9.3 Summary of Budget 57 X IMPLEMENTATION SCHEDULE 59 XI MONITORING AND REPORTING 60 LIST OF TABLES TABLE PARTICULAR PAGE Table 1.1 Salient Features of the Project 1 Table 2.1 Land Use Pattern in Karnataka 8 Table 2.2 District wise Mineral distribution of Karnataka under Project area 11 Table 2.3 Details on Total population of Karnataka and its Project district 16 Table 2.4 Details on Male & Female Population 17 Table 2.5 Details on SC/STPopulation 17 Table 2.6 Details on Literate & Illiterate Population 18 Table 2.7 Details on Total Population Literate 18 Table 2.8 Details on Households 19 Table 2.9 Details on Population Work 19 Table 2.10 Land Use Pattern in Andhra Pradesh 20 Table 2.11 Details on Total Population of Andhra Pradesh and its Project 23 district Table 2.12 Details on Male & Female Population 24 Table 2.13 Details on SC/ST Population 24 Table 2.14 Details on Literate & Illiterate Population 24 Table 2.15 Details on Total Population Literate 25 Table 2.16 Details on Households 25 Table 2.17 Details on Population Work 25 Table 4.1 Details of Substation Bay Extension 34 Table 4.2 Type and Use of Land within Corridor of ROW (in km/ha.) 35 Table 4.3 Estimation of Land area for Crop Damage due to Overhead 36 Lines Table 4.4 Loss of Crop Area estimated for Tower footing 37 Table 4.5 Total Loss of Crop Area (Corridor RoW and Towers) 37 Table 4.6 Loss of Trees 38 Table 4.7 Loss of Other Assets 38 Table 4.8 Number of Affected Persons 38 Table 4.9 Summary Impacts 40 Table 5.1 Entitlement Matrix 41 Table 6.1 Details of Consultation 48 Table 6.2 Plan for Future Consultations 49 Table 7.1 Agencies Responsible for CPTD Implementation 53 Table 9.1 Cost of Compensation for Crops & Trees Corridor 56 Table 9.2 Cost of Land Compensation for Tower Base & RoW 57 Table 9.3 Summary of Budget 58 Table 10.1 Tentative Implementation Schedule 59 LIST OF FIGURES FIGURE PARTICULAR PAGE Figure-1.1 Schematic of proposed transmission system under Part-A of 3 Phase-II Figure-1.1a Schematic of proposed transmission system under Part-Bof 4 Phase-II Figure-4.1 Typical Plan of Transmission Line Tower Footing 33 Figure-5.1 Tree/Crop Compensation Process 46 Figure-8.1 Flow Chart of Grievance Redress Mechanism 55 Figure-11.1 Organization Support Structure Safeguard Monitoring 60 LIST OF ANNEXURES ANNEXURE PARTICULAR Annexure-1 Comparative details of Three Alternatives Annexure-2 MoP Guidelines on RoW Compensation Annexure-3 State Govt. notification on RoW Compensation Annexure-4 Action Plan for Safeguards Annexure-5 Sample proforma for Compensation Annexure-6 Details of Public Consultation LIST OF ABBREVIATIONS AP Affected Person AHH Agricultural Households ADB Asian Development Bank CEA Central Electricity Authority CGWB Central Ground Water Board CP Compensation Plan CPTD Compensation Plan for Temporary Damages CAO Construction Area Office CSR Corporate Social Responsibility CSS Country Safeguard System DPSP Directive Principles of State Policy DC District Collector D/c Double Circuit EA Executing Agency ESMD Environment and Social Management Department E&S Environmental & Social ESMC Environmental & Social Management Cell ESMT Environmental & Social Management Team ESPP Environmental and Social Policy & Procedures EMP Environmental Management Plan GIS Geographical Information System GOI Government of India GRC Grievance Redress Committee GRM Grievance Redress Mechanism Ha Hectare INRs Indian National Rupees IP Indigenous People ISTS Inter State Transmission Scheme IR Involuntary Resettlement kV Kilo volt Km Kilometer KSPDCL Karnataka Solar Power Development Corporation Ltd. LA Land Acquisition LAA Land Acquisition Act MCM Million Cubic Meter MVA Mega Volt Ampere MW Mega Watt MM Mille Meters MoEF&CC Ministry of Environment, Forests and Climate Change MoP Ministry of Power M&E Monitoring and Evaluation NoC No Objection Certificate O&M Operation and Maintenance PAP Project Affected Person PESA Panchayats (Extension to Scheduled Areas) Act, 1996 PTCC Power and Telecommunication Coordination Committee POWERGRID Power Grid Corporation of India Limited Pvt. Private RHQ Regional Head Quarter R&R Resettlement and Rehabilitation RP Resettlement Plan RoW Right of Way SPS Safeguard Policy Statement of ADB, 2009 SCs Scheduled Castes STs Scheduled Tribes Sq. km Square kilometers SCM Standing Committee Meeting SRPC Southern Region Power Committee SEBs State Electricity Boards SH State Highway TL Transmission Line RFCTLARRA The Right to Fair Compensation and Transparency in Land, Acquisition, Rehabilitation and Resettlement Act, 2013 UMSPP Ultra Mega Solar Power Parks USD United States Dollar GLOSSARY Block An administrative sub-division within a district. Panchayat Elected Village Council/ the third tier of decentralized governance Sarpanch Elected head of the Gram Panchayat Tehsil A revenue sub-division, within a district Zila/District It is the first administrative division at the State level. EXECUTIVE SUMMARY i. The Compensation Plan for Temporary Damages (CPTD) has been prepared for proposed transmission lines(2 nos.) associated with Transmission system for ultra-mega solar power park at Pavagada, Tumkur district, Karnataka covered under Phase-II Part-A & Part-B project, funded by Asian Development Bank (ADB). The Executing Agency (EA) is Power Grid Corporation of India Limited (PGCIL/POWERGRID) who will also be responsible for implementing the project. The Project is categorized as „B‟ for Involuntary Resettlement (IR) and "C" for Indigenous Peoples impact, as per the ADB safeguard category. CPTD is based on POWERGRID‟s Environmental and Social Policy & Procedures, 2009 (ESPP) and the Action Plan for Safeguards for the use of Country Safeguard System (CSS) under the ADB Safeguard Policy Statement 2009 (SPS). The CPTD is guided by The Electricity Act 2003, The Indian Telegraph Act, 1885, Ministry of Power(MoP) guideline of Oct.‟ 2015 on RoW Compensation, ESPP and the Action Plan for Safeguards. ii. The project components under the proposed ADB financing include construction of 359 km of 400kV line including 13.50 km Multicircuitline along with extension/augmentation of associated substationsat Tumkur(Pavagada), Tumkur (Vasantnarsapur) & Devanahally (KPTCL)located in the Karnataka and Andhra Pradesh States. The CPTD has been prepared based on the preliminary route survey/ investigation. The impacts are temporary in nature in terms of temporary impacts of land and loss of crops. Additionally, loss of tress is also foreseen along with small structures associated with agricultural use. No physical displacement is foreseen. Temporary impacts are mostly foreseen during the project implementation/construction. Therefore, the CPTD remains as a draft, as final survey is not done yet and actual temporary impacts shall be known only during implementation which will be based on the detailed design and final survey once the construction contractor is mobilized for implementation.