Cable Tray for Telecommunications Part 1

Total Page:16

File Type:pdf, Size:1020Kb

Cable Tray for Telecommunications Part 1 SECTION 270528 — CABLE TRAY FOR TELECOMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to the work of this Section. 1.2 SUMMARY A. Provide all materials and labor for the installation of a cable tray system for communications infrastructure. This section includes requirements for providing a cable tray system for communications circuits. These requirements are in addition to any that may exist in Section 27 – “Cable Tray.” B. Related Sections 1. Division 7 Section — "Firestopping" 2. Division 10 Section — "Cutting and Patching" 3. Division 27 Section — "Basic Electrical Materials and Methods" 4. Division 27 Section — "Raceway and Boxes for Communications Circuits" 5. Division 27 Section — "Inside Plant Communications Circuits" 6. Division 27 Section — "Outside Plant Communications Circuits" 7. Division 27 Section – “Telecommunications Room Requirements” 8. Division 27 Section – “Backbone Cabling Requirements” 9. Division 27 Section – “Horizontal Cabling Requirements” 1.3 REFERENCES A. The applicable portions of the following specifications, standards, codes and regulations shall be incorporated by reference into these specifications. 1. General: a. National Electrical Code (NEC) b. National Electrical Safety Code (NESC) c. Washington Industrial Safety and Health Act (WISHA) d. Occupational Safety and Health Act (OSHA) e. ASTM A123 – Specification for Zinc (Hot Galvanized) Coatings on Products Fabricated from Rolled, Pressed, and Forged Steel Shapes, Plates, Bars, and Strip. f. ASTM A653 – Specification for Steel Sheet, Zinc-Coated (Galvanized) by the Hot Dip Process, Structural (Physical) Quality. g. ASTM A1011 – Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High- Strength Low Alloy and High-Strength Low-Alloy with Improved Formability. h. ASTM A1008 – Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low Alloy and High-Strength Low-Alloy with Improved Formability. i. ASTM B633 – Specification for Electrodeposited Coatings of Zinc on Iron and Steel j. NEMA VE 1 – Metallic Cable Tray Systems k. NEMA VE 2 – Cable Tray Installation Guidelines 2. Communications: a. TIA/EIA - 568: Commercial Building Telecommunications Cabling Standard b. TIA/EIA - 569: Commercial Building Standard for Telecommunication Pathways and Spaces c. TIA/EIA - 606: The Administration Standard for the Telecommunications Infrastructure of Commercial Buildings d. TIA/EIA - 607: Commercial Building Grounding and Bonding Requirements for Telecommunications e. ISO/IEC IS 11801: Generic Cabling for Customer Premises f. BICSI: BICSI Telecommunications Cabling Installation Manual g. BICSI: BICSI Telecommunications Distribution Methods Manual (TDMM) 1.4 DEFINITIONS A. “EMT shall mean Electrical Metallic Tubing. B. “RMC” shall mean Rigid Metal Conduit. C. “Raceway” shall mean any enclosed channel for routing wire, cable or busbars. D. “TMGB” shall mean Telecommunications Main Grounding Busbar. There is typically one TMGB per building, located in the main telecommunications room. This busbar is directly bonded to the electrical service ground. E. “TGB” shall mean Telecommunications Grounding Busbar. There is typically one TGB per telecommunications room. The TGB is connected both to the TMGB and to building structural steel or other permanent metallic systems. F. “TBB” shall mean Telecommunications Bonding Backbone. The TBB is a conductor used to connect TMGBs to the TGBs. G. “Pullbox” shall mean a metallic box with a removable cover, used to facilitate pulling cable through conduit runs longer than 100’ or in which there are more than 180 degrees of bends. Pullboxes shall have no more than one conduit entering and one conduit exiting the box. H. “Junction box” shall mean a pullbox wherein a conduit run transitions from a feeder conduit to multiple distribution conduits. 1.5 SYSTEM DESCRIPTION A. Furnish, install, and place into satisfactory and successful operation all materials, devices, and necessary appurtenances to provide a complete, permanent Cable Tray infrastructure for communications circuits as hereinafter specified and/or shown on the Contract Documents. The Cable Tray system shall support an ANSI/TIA/EIA and lSO/IEC compliant communications Structured Cabling System (SCS) as specified in Inside Plant Communications Circuits. B. The work shall include materials, equipment and apparatus not specifically mentioned herein or noted on the plans but which are necessary to make a complete working ANSI/TIA/EIA and ISO/IEC compliant Cable Tray system. 1.6 SUBMITTAL INFORMATION A. Product Data Submittals: Provide submittal information for review before materials are delivered to the job site. Provide product data submittals for all products at the same time. 1. Submit a letter stating that the materials will be provided as specified, and specifically listing any items that will not be provided as specified. The letter shall also state that the Contractor has reviewed the specified items and agrees that they are applicable to this project in all respects. 2. For those items noted as allowing “or equal,” and which are not being provided as specifically named, submit standard manufacturer's cut sheets or other descriptive information, along with a written description detailing the reason for the substitution. 3. Provide standard manufacturer’s cut sheets and the operating and maintenance (O&M) instructions at the time of submittal review for each device in the system, regardless of whether it is submitted as specified or as an approved equal. These instructions shall detail how to install and service the equipment and shall include information necessary for rough-in and preparation of the building facilities to receive the materials. B. Closeout Submittals: Provide submittal information for review as follows: 1. O&M Manual for Communications - At the completion of the project, submit O&M information from product data submittals (above), updated to reflect any changes during the course of construction, to the Designer in the telecommunications-specific O&M Manual for Communications binder labeled with the project name and description. 2. Records - Maintain at the job site a minimum of one set of Record Drawings, Specification, and Addenda. Record Drawings shall consist of redline markups of drawings, specifications and spreadsheets. a. Document changes to the system from that originally shown on the Contract Documents and clearly identify system component labels and identifiers on Record Drawings. b. Keep Record Drawings at the job site and make available to the Owner and Designer at any time. c. Keep Record Drawings current throughout the course of construction. (“Current” is defined as not more than one week behind actual construction). d. Show identifiers for major infrastructure components on Record Drawings. 1.7 SEQUENCING 1.8 CONTRACTOR WARRANTY: A. Provide a Contractor-endorsed two-year service warranty against defects in materials and workmanship. 1. Provide labor attributable to the fulfillment of this warranty at no cost to the Owner. 2. The Contractor Warranty period shall commence upon Owner acceptance of the work. PART 2 - PRODUCTS 2.1 GENERAL A. Materials shall consist of tray sections, tray fittings, connectors, supports, expansion joints, blind end plates, barrier strips, radius drops, bonding conductors and other incidentals and accessories as required. Provide all incidental and/or miscellaneous hardware not explicitly specified or shown on the Contract Documents that is required for a fully operational and warranted system. B. Unless specifically stated as “Or equal”, equivalent items are not acceptable. Provide items as specified. C. Physically verify existing site conditions prior to purchase and delivery of the materials. D. Cable tray components shall be manufactured by a single manufacturer. Components shall not be intermixed between different manufacturers. 1. The cable tray manufacturer shall be one of the following: a. GS Metals b. Cablofil 2. Substitution is not acceptable unless the cable tray manufacturer has been pre-approved prior to bidding. Contractors, in order to obtain approval for cable tray manufacturer substitution, shall submit their request for substitution to the Engineer at least two weeks prior to the bid date. Approval or denial of a substitution request will be based upon the sole judgment of the Engineer. E. For a given manufacturer, all components shall be part of a single cable tray product line – components shall not be intermixed between a manufacturer’s cable tray product lines. 1. The cable tray product one shall be one of the following: a. For GS Metals: Flextray Series b. For Cablofil, Inc.: EZ Tray CF54/xxx Series 2.2 MATERIALS AND FINISH A. General: Except as otherwise indicated, provide metal cable runways of types, classes and sizes indicated with splice connectors, bolts, nuts and washers for connecting units. B. Welded Wire (Basket Tray): Cable tray shall be constructed of welded wire mesh (high strength steel wires) with a continuous safety edge wire lip. Cable tray shall be complete will all tray supports, materials, and incidental and miscellaneous hardware required for a complete cable tray system. 1. Finish: Carbon steel with electro-plated zinc galvanized finish. 2. Width: Widths shall be as shown on the Contract Documents. Where cable tray width is not shown on the Contract Documents, it shall
Recommended publications
  • Best Practice Guide to Cable Ladder and Cable Tray Systems
    Best Practice Guide to Cable Ladder and Cable Tray Systems Channel Support Systems and other Associated Supports November 2012 BEAMA Best Practice Guide to Cable Ladder and Cable Tray Systems Including Channel Support Systems and other Associated Supports Companies involved in the preparation of this Guide Contents INTRODUCTION 5 DEFINITIONS AND ABBREVIATIONS 6 1. Packing Handling and Storage 8 1.1 General Packing and Handling 8 1.2 Loading and offloading recommendations 9 1.3 Storage 11 2A. Installation of the system 12 2.1 Common tools for Installation 12 2.2 Structural characteristics 12 2.3 Support Systems 18 2.4 Straight cable ladder and cable tray lengths 29 2.5 Coupler types (refer to manufacturer’s literature) 32 2.6 Fixings 36 2.7 Fittings 36 2.8 Accessories 39 2.9 Site modification 39 2.10 Earth protection and EMC 40 2B. Installation of Cable 41 2.11 Preparation 41 2.12 Wiring Regulations 41 2.13 Power Cables 41 2.14 Data Cables 46 2.15 Expansion 46 2.16 Electro Mechanical Effects 46 3. Environment 48 3.1 Selecting the right material and finish 48 3.2 Finishes 56 3.3 Non-Metallic systems 61 3.4 Loadings 63 3.5 Temperature 65 4. Health & Safety 67 5. Maintenance 68 5.1 Inspection 68 5.2 Removal of cables 68 5.3 On site repairs 68 6. Sustainability 69 6.1 Sustainable development 69 6.2 REACH regulations 69 6.3 The management of WEEE and RoHS 69 6.4 Environmental footprint 70 7. Applicable Standards 71 Companies involved in the preparation of this Guide 72 FIGURES Figure 1: Methods of removal 9 Figure 2: Loaded beams 13 Figure
    [Show full text]
  • Guidance Notes on Recommended Specifications of Junction Box and Cable Tray for Offshore Application
    Guidance Notes on Recommended Specifications of Junction Box and Cable Tray for Offshore Application GUIDANCE NOTES ON RECOMMENDED SPECIFICATIONS OF JUNCTION BOX AND CABLE TRAY FOR OFFSHORE APPLICATION FEBRUARY 2018 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2018 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword These Guidance Notes provide ABS recommendations for the design and construction of cable trays and junction boxes. These Guidance Notes are applicable to fixed and floating offshore structures as well as drilling units. These Guidance Notes provide recommendations and best practices for standard specifications of certain electrical and instrumentation components thus improving cost efficiency (i.e., design man-hours, operation and maintenance costs), and increasing predictability of operation without compromising quality and safety in offshore structures and units. The recommendations in these Guidance Notes are based on industrial experiences, project experience, shipyard practices, manufacturer’s data sheets, national regulations, international standards, and ABS Rules. These Guidance Notes become effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this version of these Guidance Notes is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to [email protected]. Terms of Use The information presented herein is intended solely to assist the reader in the methodologies and/or techniques discussed. These Guidance Notes do not and cannot replace the analysis and/or advice of a qualified professional.
    [Show full text]
  • Fire Protection Guide for Electrical Installations
    Fire protection guide for electrical installations Building Connections Table of contents In the second edition of this fire protection guide, we have again compiled lots of useful information. The in- terconnections of fire protection between different types of technical building equipment are now ex- plained in even more detail. Perhaps you will find some new information in this edition which can help you in the planning and implementation of fire protec- tion systems. BSS Brandschutzleitfaden für die Elektroinstallation / en / 2019/03/22 08:28:10 08:28:10 (LLExport_04692) / 2019/03/22 08:28:13 2 Table of contents Fire protection guide for electrical installations Table of contents 1 General introduction 7 1.1 Construction law 12 1.2 The four pillars of fire protection 18 1.3 Construction products 26 1.4 Fire protection concepts 32 2 Maintenance of the fire sections – protection aim 1 36 2.1 Components closing rooms – firewalls 36 2.2 Requirements for cable penetrations - insulation 36 2.3 Proofs of usability 39 2.4 Construction types of cable and combination insulation 42 2.5 Applications and special applications 52 2.6 Selection aid and OBO Construct BSS 60 2.7 Building in old buildings 62 2.8 Cable bandages 65 3 Protection of escape routes – protection aim 2 75 3.1 What is an escape and rescue route? 75 3.2 Installations in lightweight partitions 78 3.3 Installation in false ceilings 80 3.4 Installations in underfloor systems 91 3.5 Shielding with plate material 93 3.6 Cable routing in fire protection ducts 94 4 Maintaining the electrical
    [Show full text]
  • Industrial MI Wiring Cable
    Industrial MI Wiring Cable Installation Manual for Alloy 825 Sheath Cable Wiring Systems Important Safeguards and Warnings WARNING: FIRE AND SHOCK HAZARD. nVent PYROTENAX mineral insulated (MI) industrial wiring cables must be installed in accordance with the requirements of national and local codes and standards, the installation instructions in this manual, and the customer’s specification. Read these important safeguards and carefully follow the installation instructions. • Ensure the cable has been stored properly and is in good condition prior to commencing installation. • Always use safe working practices when installing cables, observing OSHA and other national safety rules. • Store cables indoors in a clean, dry, covered area, if possible. • During the time that the cables are exposed and during cable pulling activities, protect cables from nearby or overhead work to prevent damage to the cable sheath. • Do not pull cables around corners that have sharp edges, such as corners in cable trays, or other obstructions. • Prevent damage to cables by removing any abrasions or sharp edges from surface of support system. • Damage to cables or components can cause sustained electrical arcing or fire. Do not energize cables that have been damaged. Damaged cable or terminations may need to be repaired or replaced. Damaged cable should be repaired by a qualified person. • When installing cables which may be exposed to hydrocarbon flash fires, use only steel or stainless steel in the support system. ii | nVent.com Table of Contents General Information
    [Show full text]
  • Cable Tray SHIB.FINAL.Pmd
    U.S. Department of Labor Occupational Safety and Health Administration Directorate of Technical Support & Emergency Management Office of Technical Programs and Coordination Activities Safely Installing, Maintaining and Inspecting Cable Trays Safety and Health Information Bulletin SHIB 01-16-2008 Purpose This Safety and Health Information Bulletin (SHIB) is not a standard or regulation, and it creates no new The purpose of this Safety and Health Information legal obligations. The Bulletin is advisory in nature, Bulletin is to: informational in content, and is intended to assist • Review the proper methods for safely employers in providing a safe and healthful installing, maintaining and inspecting electrical workplace. The Occupational Safety and Health Act cable trays; requires employers to comply with safety and health • Provide information regarding the hazards of standards promulgated by OSHA or by a state with overloaded cable trays; an OSHA-approved state plan. In addition, pursuant • Identify specific Occupational Safety and to Section 5(a)(1), the General Duty Clause of the Health Administration (OSHA) regulatory Act, employers must provide their employees with a requirements and National Electrical Code® workplace free from recognized hazards likely to (NEC) guidance that address the proper cause death or serious physical harm. Employers can installation and maintenance of cable trays; be cited for violating the General Duty Clause if there • Recognize electrical cable tray misuse that is a recognized hazard and they do not take can lead to electric shock and arc-flash/blast reasonable steps to prevent or abate the hazard. events and fires caused by overheating. However, failure to implement any recommendations in this SHIB is not, in itself, a violation of the General OSHA Regulations and Industry Consensus Duty Clause.
    [Show full text]
  • 3. the Electrical Cabinet
    V1.0- 9.01.2015 Page 1 of 68 Preface, Our long experience enables us to offer our customers integrated high-tech devices, from in- house development, manufactured in recognised industrial conditions and reaching the top quality for installers and end users. With standalone and modular concepts we are able to offer maximum flexibility for field applications. These innovative products are developed and manufactured to the highest level achieving an excellent level of quality. The following guide lines which include real world examples as illustrations aim to benefit planners, installers and commissioning engineers, the theme is to provide an approach to diagnostics and troubleshooting of devices housed within and around a technical cabinet. Modern devices are based on advanced electronics technologies, with this the accuracy is higher and the measurement faster than in previous generations. This greater precision and accuracy requires an environment with the same attention to detail. In the field more often these devices are mounted together with Frequency Converters (FC), Power switched mode power supply elements, commonly used for better and more accurate pumps management and ventilation systems, however due to the way these devices function they can affect other devices by propagating Electromagnetic distortion waves or electromagnetic interference (EMI) which disturbs many electronic systems, irrespective of the colour of the box or the label or mark stamped on the bottom. This booklet is the fruit of the collected experience over recent years from many staff. It is the result of knowledge exchanged and transferred, applied and implemented, we hope it will bring support for field engineers, planners, programmers, project managers, technicians and all people getting in touch with this area.
    [Show full text]
  • Technical Information Handbook Wire and Cable
    Technical Information Handbook Wire and Cable Fifth Edition Copyright © 2018 Trademarks and Reference Information The following registered trademarks appear in this handbook: Information in this handbook has been drawn from many Alumel® is a registered trademark of Concept Alloys, LLC publications of the leading wire and cable companies in the industry and authoritative sources in their latest available Chromel® is a registered trademark of Concept Alloys, LLC editions. Some of these include: Copperweld® is a registered trademark of Copperweld Steel Company CSA® is a registered trademark of the Canadian Standards Association • American Society for Testing and Materials (ASTM) CCW® is a registered trademark of General Cable Corporation • Canadian Standards Association (CSA) ® DataTwist is a registered trademark of Belden • Institute of Electrical and Electronics Engineers (IEEE) Duofoil® is a registered trademark of Belden Flamarrest® is a registered trademark of Belden • Insulated Cable Engineers Association (ICEA) Halar® is a registered trademark of Solvay Solexis • International Electrotechnical Commission (IEC) Hypalon® is a registered trademark of E. I. DuPont de Nemours & Company • National Electrical Manufacturers Association (NEMA) Hypot® is a registered trademark of Associated Research, Inc. • National Fire Protection Association (NFPA) IBM® is a registered trademark of International Business Machines Corporation Kapton® is a registered trademark of E. I. DuPont de Nemours & Company • Naval Ship Engineering Center (NAVSEC) Kevlar® is a registered trademark of E. I. DuPont de Nemours & Company • Telecommunications Industry Association (TIA) ® K FIBER is a registered trademark of General Cable Corporation • Underwriters Laboratories (UL). Kynar® is a registered trademark of Arkema, Inc. Loc-Trac® is a registered trademark of Alpha Wire Note: National Electrical Code (NEC) is a registered trademark of the National Fire Protection Association, Quincy, MA.
    [Show full text]
  • CABLE TRAY MANUAL Based on the 2005 National Electrical Code® Table of Contents Page No
    CT05MAN 2 0 0 5 CABLE TRAY MANUAL Based on the 2005 National Electrical Code® Table of Contents Page No. Introduction ...................................................................................................................... 2 Why Cable Tray? Safety .................................................................................................................... 3 Dependability ........................................................................................................... 4 Space Savings .......................................................................................................... 4 Cost Savings ......................................................................................................... 5-8 An In-depth Look at the 2005 NEC®, Section 392 Types of Cable Trays (NEC® 392.1 Scope)............................................................ 9-11 EMI/RFI Cable Tray ......................................................................................... 10-11 Cable Tray Materials ............................................................................................... 12 Types of Cables Allowed in Cable Tray [392.3 (A)]..................................................... 12 MI - Mineral Insulated Metal Sheathed Cable [Article 332] ............................... 12 MC - Metal Clad Cable [Article 330] .............................................................. 13 TC - Power and Control Tray Cable [Article 336] ........................................... 13 ITC - Instrumentation Tray
    [Show full text]
  • Interpreting the NEC for Structured Cabling
    Interpreting the NEC for Structured Cabling Tim Kuhlman, PE, RCDD, CDT TEECOM Safety Moment Schedule • 9 a.m. to 10:15 a.m. • 1:30 p.m. to 2:45 p.m. • 10:15 a.m. – 15 • 2:45 p.m. – 15 minute minute break break • 10:30 a.m. to 12 p.m. • 3 p.m. to 4:15 p.m. • 12 p.m. to 1:30 p.m. - • 4:15 p.m. - Q&A and Lunch wrap up • 4:30 p.m. – The End Purpose of This Course • Detail Review of the National Electrical Code as it Applies to Telecom Design – Overview of the NEC Structure – 725 Power Limited Requirements – Interpreting Technique – Classification of Cables – Understanding Article 800 – Article 725 Defined – Article 725 & 800 Similarities Purpose of This Course – Abandoned Cable – Cable Tray – Plenum Spaces – Bonding of Conduit Sleeves – Securing & Supporting Conductors – Unlisted Cables Entering a Building – Separation from Other Conductors – Circuit Protection – Article 645 Information Technology Equipment – Fiber Optic Cables – Raceway Purpose of This Course • Not Covered in This Seminar – Audio Cables – Radio – Health Care Specific Requirements – Residential • Intended Audience – Targeting Commercial and Industrial Environments True or False Panel of Experts or • I would like 5 volunteers that consider themselves experts in the National Electrical Code. • Throughout the seminar we will be asking for our Panels of Experts opinion on whether a statement made by the Presenter is True or False. True or False Sample question for our Panel of Experts: True or False: Cable trays, when used in electrical installations, are limited to supporting wires and cables.
    [Show full text]
  • UFGS 26 20 00 Interior Distribution System
    ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-26 20 00 (August 2019) Change 2 - 05/21 ------------------------------------ Preparing Activity: NAVFAC Superseding UFGS-26 20 00 (February 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated July 2021 ************************************************************************** SECTION TABLE OF CONTENTS DIVISION 26 - ELECTRICAL SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM 08/19, CHG 2: 05/21 PART 1 GENERAL 1.1 REFERENCES 1.2 DEFINITIONS 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE 1.4.1 Fuses 1.4.2 Regulatory Requirements 1.4.3 Standard Products 1.4.3.1 Alternative Qualifications 1.4.3.2 Material and Equipment Manufacturing Date 1.5 MAINTENANCE 1.5.1 Electrical Systems 1.6 WARRANTY 1.7 SEISMIC REQUIREMENTS PART 2 PRODUCTS 2.1 MATERIALS AND EQUIPMENT 2.2 CONDUIT AND FITTINGS 2.2.1 Rigid Metallic Conduit 2.2.1.1 Rigid, Threaded Zinc-Coated Steel Conduit 2.2.1.2 Rigid Aluminum Conduit 2.2.2 Rigid Nonmetallic Conduit 2.2.3 Intermediate Metal Conduit (IMC) 2.2.4 Electrical, Zinc-Coated Steel Metallic Tubing (EMT) 2.2.5 Plastic-Coated Rigid Steel and IMC Conduit 2.2.6 Flexible Metal Conduit 2.2.6.1 Liquid-Tight Flexible Metal Conduit, Steel 2.2.7 Fittings for Metal Conduit, EMT, and Flexible Metal Conduit 2.2.7.1 Fittings for Rigid Metal Conduit and IMC 2.2.7.2 Fittings for EMT 2.2.8 Fittings for Rigid Nonmetallic Conduit 2.2.9 Liquid-Tight Flexible Nonmetallic Conduit SECTION 26 20 00 Page 1 2.3 SURFACE
    [Show full text]
  • City Review Notes on 2011 National Electrical Code-Updated 4152013
    2011 National Electrical Code Significant Changes City Review 1. Article 100 Definitions. There are new definitions for service conductors overhead, service conductors underground, and uninterruptible power supply. 2. 110.14 Electrical Connections. Connectors and terminals for conductors more finely stranded than Class B and Class C stranding will need to be identified for specific class or classes. 3. 110.24 Available Fault Current. Requirement calls for a field applied marking indicating the maximum available short-circuit current being supplied at the line terminals of the service equipment. 4. 110.31(A) Electrical Vaults. The exception relaxes the construction fire rating from 3-hours to 1-hour if the vault is provided with an automatic fire-suppression system. 5. 210.5(C) Identification of Ungrounded Conductors. This requirement mandates identification of all ungrounded branch-circuit conductors where more than one nominal voltage system is employed on the premise. Also provides requirements for the identification and posting of the identification. 6. 210.8(B)(6)&(7) Ground-Fault Circuit Interrupter Protection for Personal. GFCI are now required to be readily accessible. New list item, indoor wet locations, requires GFCI protection for all 125-volt, single phase, 15 and 20 ampere receptacles installed in areas such as, car washes, food processing areas of facilities that make food products ,meat packing plants, locker rooms with associated showering facilities and all other indoor wet areas that are washed down daily. 7. 210.8(B)(8) Ground-Fault Circuit Interrupter Protection for Personal. All 125-volt, single phase, 125 and 20 ampere receptacles installed in garages, service bays and similar areas where electrical diagnostic equipment, hand tools, or portable lighting equipment are to be used are now required to be GFCI protected.
    [Show full text]
  • Electrical Legend Designation Symbols Power
    ELECTRICAL LEGEND FIRE ALARM POWER - SINGLE LINE DIAGRAM & RISER LIGHTING EMERGENCY NORMAL AFF ABOVE FINISHED FLOOR KVA KILOVOLT AMP FS TS SPRINKLER SYSTEM SWITCH: FLOW, TAMPER CIRCUIT BREAKER, WITH GROUND FAULT PROTECTION, DRAW OUT NA TRACK LIGHTING WITH , WITHOUT CURRENT LIMITER GFP A AMPERE (AMP) KVAR KILOVOLT AMPS REACTIVE F MANUAL FIRE ALARM STATION DOWNLIGHT: RECESSED: SQUARE, ROUND AL ALUMINUM LA LIGHTNING ARRESTOR WALL WASHER: RECESSED: SQUARE, ROUND I H P DETECTOR: IONIZATION, HEAT, PHOTOELECTRIC ARCH ARCHITECT / ARCHITECTURAL LTG LIGHTING DISTRIBUTION BOARD, WITH INTERNAL BUS ADJUSTABLE ACCENT: RECESSED: SQUARE, ROUND DETECTOR: BEAM ATS AUTOMATIC TRANSFER SWITCH LV LOW VOLTAGE P P DOWNLIGHT: SURFACE: SQUARE, ROUND AWG AMERICAN WIRE GAUGE MATV MASTER ANTENNA TELEVISION DUCT DETECTOR, TYPE AS NOTED PANEL WALL WASHER: RECESSED SQUARE, ROUND NAME PANELBOARD, TRANSFORMER CB CIRCUIT BREAKER MCA MINIMUM CIRCUIT AMPS T ADJUSTABLE ACCENT: SURFACE: SQUARE, ROUND F FIREMANS PHONE JACK C CONDUIT MCB MAIN CIRCUIT BREAKER D C MAGNETIC DOOR HOLDER, CLOSER ADJUSTABLE ACCENT: MULTILAMP CCTV CLOSED CIRCUIT TELEVISION MCC MOTOR CONTROL CENTER LINEAR: RECESSED CKT CIRCUIT MDP MAIN DISTRIBUTION PANEL T T SERVICE TRANSFOERMER, WITH VAULT WALL CEILING NOTIFICATION DEVICES LINEAR: RECESSED ASYMMETRIC CLG CEILING MECH MECHANICAL LINEAR: SURFACE CT CURRENT TRANSFORMER MH METAL HALIDE F F FIRE ALARM: VISUAL LINEAR: SURFACE ASYMMETRIC CU COPPER MLO MAIN LUGS ONLY G LINEAR: SUSPENDED DN DOWN MV MERCURY VAPOR FFF F FIRE ALARM: HORN; HORN W/VISUAL GENERATOR,
    [Show full text]