APPENDIX H – LIST OF ENVIRONMENTAL LICENCE/PERMIT Construction Noise Permit (CNP) Register Date: 27 February 2003

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

Cancelled. 29 June EPD Local Control Office / Territory West; 7 CNP No. Construction Noise Permit (Percussive Piling). At Junction Mj7 North & EPD letter 1 2001 for six / Floor; Chinachem Tsuen Wan Plaza; 455- West – 3 August PP-TW0025-01 months 457 Road; Tsuen Wan. 2001 27 July EPD Local Control Office / Territory West; 7 CNP No. Construction Noise Permit (23.00-07.00hrs). LRT crossings at Junction 27 June 2 2001 @ / Floor; Chinachem Tsuen Wan Plaza; 455- Mj7 North – Tuen Mun 2001 GW-TW0251-01 07.00 hrs. 457 Castle Peak Road; Tsuen Wan. 14 August EPD Local Control Office / Territory West; 7 CNP No. Construction Noise Permit (23.00-07.00hrs). LRT OHL pole relocation at 14 July 3 2001 @ / Floor; Chinachem Tsuen Wan Plaza; 455- Junction 6 East – Pui To Road, Tuen Mun 2001 GW-TW0280-01 07.00 hrs. 457 Castle Peak Road; Tsuen Wan. 31 July EPD Local Control Office / Territory West; 7 CNP No. Construction Noise Permit (23.00-07.00hrs). Road marking for traffic 23 July 4 2001 @ / Floor; Chinachem Tsuen Wan Plaza; 455- diversion at Junction L, Tin Shui Wai Reserve Zone. 2001 GW-TW0290-01 07.00 hrs. 457 Castle Peak Road; Tsuen Wan. Application refused CNP Application Construction Noise Permit (23.00-07.00hrs). Driving sheet piles and EPD Local Control Office / Territory West; 7 5 excavating pipe jacking receiving pit at side of LR track at Mj7 north Pui EPD letter N/A / Floor; Chinachem Tsuen Wan Plaza; 455- 29 June 2001 To Road; Tuen Mun. 30 July 457 Castle Peak Road; Tsuen Wan. 2001 CNP No. Construction Noise Permit (23.00-07.00hrs). LRT Plant crossing for 8 7 October EPD Local Control Office / Territory West; 7 6 access to hand dug caissons at north east corner of Tuen Mun Town September 2001 @ / Floor; Chinachem Tsuen Wan Plaza; 455- GW-TW0317-01 Park; Pui To Road; Tuen Mun. 2001 05.00 hrs. 457 Castle Peak Road; Tsuen Wan. CNP Application Construction Noise Permit (07.00-19.00hrs Gen. Hol. Inc. Sunday). Bored 28 EPD Local Control Office / Territory West; 7 10 August 2001. 30 August 7 Piling construction for retaining west bank of Nullah near Police Station; February / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 Pui To Road; Tuen Mun. 2002 457 Castle Peak Road; Tsuen Wan. GW-TW0368-01

EA00770/R24/1 March 2003 Appendix H - Page 1 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Application refused 13 August 2001 Construction Noise Permit (23.00-07.00hrs). Temporary relocation of LR EPD Local Control Office / Territory West; 7 8 track to allow construction of viaducts at east side of Tuen Mun Town EPD phone N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

Park (Junction 6 South – Tuen Mun Heung Sze Wui Road). call 7 Sept. 457 Castle Peak Road; Tsuen Wan. TW20010818-001 2001 CNP Application Application refused 17 August 2001. Construction Noise Permit (19.00-23.00hrs). Temporary relocation of LR EPD Local Control Office / Territory West; 7 9 track to allow construction of viaducts at east side of Tuen Mun Town EPD phone N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

Park (Junction 6 South – Tuen Mun Heung Sze Wui Road). call 31 Aug 457 Castle Peak Road; Tsuen Wan. TW20010839-001 2001 CNP Application 29 29 EPD Local Control Office / Territory West; 7 28 August 2001 Construction Noise Permit (01.00-05.00hrs). LRT OHL pole relocation at 10 September November / Floor; Chinachem Tsuen Wan Plaza; 455- Junction 6 West – Pui To Road, Tuen Mun 2001 2001 457 Castle Peak Road; Tsuen Wan. GW-TW0407-01 CNP Application 10 September 2001 Construction Noise Permit (01.00-05.00hrs). LRT OHL pole relocation to 21 11 EPD Local Control Office / Territory West; 7 11 allow construction of viaducts at east side of Tuen Mun Town Park at September December / Floor; Chinachem Tsuen Wan Plaza; 455- Junction 6 South – Tuen Mun Heung Sze Wui Road. 2001 2001 457 Castle Peak Road; Tsuen Wan. GW-TW0432-01 CNP Application Construction Noise Permit (19.00-07.00hrs on weekdays & 24hrs on EPD Local Control Office / Territory West; 7 10 September 2001 1 October 9 April 12 general holidays and Sundays). Pipe Jacking for utility diversion at / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 2002 Junction Mj8 – Pui To Road, Tuen Mun industrial area. 457 Castle Peak Road; Tsuen Wan. GW-TW0431-01 CNP Application Construction Noise Permit (two 36hour periods – end October & mid 13 October 23 EPD Local Control Office / Territory West; 7 12 September 2001 November 2001). Temporary relocation of LR track to allow construction 2001 for 13 December / Floor; Chinachem Tsuen Wan Plaza; 455- of viaducts at east side of Tuen Mun Town Park (Junction 6 South – Tuen Start 14 2001 457 Castle Peak Road; Tsuen Wan. Mun Heung Sze Wui Road). October GW-TW0441-01 CNP Application 11 October Construction Noise Permit (19.00-07.00hrs on weekdays & 24hrs on EPD Local Control Office / Territory West; 7 20 September 2001 2001 for 5 January 14 general holidays and Sundays). Pipe Jacking for utility diversion at road / Floor; Chinachem Tsuen Wan Plaza; 455- Start 19 2002 junction East of Kin On Stop on Pui To Road, Tuen Mun industrial area. 457 Castle Peak Road; Tsuen Wan. October GW-TW0449-01

EA00770/R24/1 March 2003 Appendix H - Page 2 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application 26 October Construction Noise Permit (23.00-07.00hrs). Drilling and grouting to 29 EPD Local Control Office / Territory West; 7 28 September 2001 2001 for 15 provide grout curtain for hand dug caissons at junction of Pui To Road December / Floor; Chinachem Tsuen Wan Plaza; 455- Start 29 and Tuen Mun Heung Sze Wui Road in Tuen Mun. 2001 457 Castle Peak Road; Tsuen Wan. October GW-TW0467-01 CNP Application Application refused 29 September 2001 Construction Noise Permit (19.00-21.00hrs on weekdays & 07.00- EPD Local Control Office / Territory West; 7 16 21.00hrs on general holidays and Sundays). Construction of CLP EPD letter N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

Substation at location S3 on Tin Fuk Road in Tin Shui Wai Phase 4 area. 12 October 457 Castle Peak Road; Tsuen Wan. TW0470-01 2001

CNP Application 12 November Construction Noise Permit (00.30-05.30hrs). LRT crossing - Emergency 15 EPD Local Control Office / Territory West; 7 16 October 2001 2001 for 17 Vehicle Access & construction plant access to Tuen Mun Town Park East December / Floor; Chinachem Tsuen Wan Plaza; 455- start 15 of San Fat Stop at Junction 6 West – Pui To Road, Tuen Mun 2001 457 Castle Peak Road; Tsuen Wan. November GW-TW0501-01 2001 CNP Application Application refused EPD Local Control Office / Territory West; 7 18 October 2001 Construction Noise Permit (19.00-21.00hrs). Concreting to bored piles at 18 EPD letter N/A / Floor; Chinachem Tsuen Wan Plaza; 455- Junction L; Tin Shui Road in Tin Shui Wai Reserve Zone. 29 October 457 Castle Peak Road; Tsuen Wan. TW0505-01 2001

CNP Application 19 November Construction Noise Permit (Weekdays 01.00-05.00hrs). LRT OHL pole 23 EPD Local Control Office / Territory West; 7 29 October 2001 2001 for 19 foundation construction and installation of OHL poles at Junction B; February / Floor; Chinachem Tsuen Wan Plaza; 455- start 26 Junction of Ping Ha Road and Tin Yiu Road in Tin Shui Wai Phase 4. 2002 457 Castle Peak Road; Tsuen Wan. November GW-TW0522-01 2001

CNP Application 30 Construction Noise Permit (Weekdays 19.00-07.00hrs). Installation of November 28 EPD Local Control Office / Territory West; 7 3 November 2001 Falsework above road and roundabout to enable construction of new LRT 2001 for 20 February / Floor; Chinachem Tsuen Wan Plaza; 455- viaduct at Junction L; junction of Tin Shui Road and Tin Wah Road in Tin start 01 2002 457 Castle Peak Road; Tsuen Wan. Shui Wai Reserve Zone. January GW-TW0532-01 2002

EA00770/R24/1 March 2003 Appendix H - Page 3 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application 06 Construction Noise Permit (Weekdays 01.00-05.00hrs). Light Rail December EPD Local Control Office / Territory West; 7 10 November 2001 permanent way alterations to facilitate Phase 4 extension of LRT system 2001 for 09 March 21 / Floor; Chinachem Tsuen Wan Plaza; 455- at Junction B (junction of Ping Ha Road and Tin Yiu Road) in Tin Shui start 09 2002 457 Castle Peak Road; Tsuen Wan. Wai. December GW-TW0566-01 2001 CNP Application Re- Construction Noise Permit (Weekdays 23.00-07.00hrs). Removal of submitted EPD Local Control Office / Territory West; 7 12 November 2001 existing footbridge and installation of temporary footbridge across LR 22 in two parts N/A / Floor; Chinachem Tsuen Wan Plaza; 455- tracks and Heung Sze Wui Road to facilitate construction of the LRT (18/12/01 & 457 Castle Peak Road; Tsuen Wan. viaducts at Tuen Mun town centre. TW0565-01 ?) CNP Application Application 12 November 2001 Construction Noise Permit (Weekdays 19.00-07.00hrs). Load-out of withdrawn EPD Local Control Office / Territory West; 7 23 prefabricated footbridge units at Hoi Wah Road (S1), Tuen Mun (for 6/12/01 at N/A / Floor; Chinachem Tsuen Wan Plaza; 455- installation across LR tracks and Heung Sze Wui Road). EPD 457 Castle Peak Road; Tsuen Wan. TW0564-01 request. CNP Application Construction Noise Permit (Weekdays 23.00-07.00hrs). Removal of part 21 Dec. 01 22 EPD Local Control Office / Territory West; 7 18 December 2001 of existing footbridge and installation of new temporary footbridge across 24 for start February / Floor; Chinachem Tsuen Wan Plaza; 455- LR tracks and Heung Sze Wui Road to facilitate construction of the LRT 2002 457 Castle Peak Road; Tsuen Wan. viaducts north of Tuen Mun Town Centre Stop. 21 Dec. 01 GW-TW0625-01 CNP Application Construction Noise Permit (07.00-21.00hrs Gen. Hol. Inc. Sunday & 11 Jan. 02 EPD Local Control Office / Territory West; 7 21 December 2001 weekdays 19.00-23.00hrs). Bored Piling construction for new retaining 15 July 25 for start / Floor; Chinachem Tsuen Wan Plaza; 455- wall along west bank of Nullah (near Police Station), Pui To Road; Tuen 2002 457 Castle Peak Road; Tsuen Wan. Mun. 16 Jan. 02 GW-TW0629-01

CNP Application Withdrawn 27 December 2001 Construction Noise Permit (weekdays 23.00-07.00hrs). Water main at EPD EPD Local Control Office / Territory West; 7 26 diversion across of Pui To Rd at Mj7, Tuen Mun (HK Police require road request N/A / Floor; Chinachem Tsuen Wan Plaza; 455- closure at night to minimise traffic disruption). 457 Castle Peak Road; Tsuen Wan. GW-TW0634-01 28 Jan 02

EA00770/R24/1 March 2003 Appendix H - Page 4 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application 14 Jan. 02 31 December 2001 Construction Noise Permit (weekdays 01.00-05.00 hrs.). Temporary 28 EPD Local Control Office / Territory West; 7 27 relocation of LR OHL to allow construction of viaducts at J6 east (west of for start February / Floor; Chinachem Tsuen Wan Plaza; 455-

Pui To Road Stop Tuen Mun. 28 Jan. 02 2002 457 Castle Peak Road; Tsuen Wan. GW-TW0639-01 CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Temporary 14 Jan. 02 EPD Local Control Office / Territory West; 7 31 December 2001 30 April 28 relocation of LR track to allow construction of viaducts at J6 east (west of for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Pui To Road Stop) Tuen Mun. 20 Mar. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0638-01 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Water main 28 Jan. 02 EPD Local Control Office / Territory West; 7 21 January 2002 20 March 29 diversion across of Pui To Rd at Mj7, Tuen Mun (HK Police require road for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 closure at night to minimise traffic disruption). RE-APPLICATION 29 Jan. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0023-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Temporary 11 Feb. 02 EPD Local Control Office / Territory West; 7 22 January 2002 17 May 30 relocation of LR track to allow construction of viaducts at J6 east (west of for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Pui To Road Stop) Tuen Mun. RE-APPLICATION. 18 Feb 02 457 Castle Peak Road; Tsuen Wan. GW-TW0027-01 CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Cut-out and 11 Feb. 02 EPD Local Control Office / Territory West; 7 23 January 2002 24 March 31 replace worn LR track (2 x 6mtrs) on Heung Sze Wui Road at J6 south for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 (north of Tuen Mun Town Centre Stop). 24 Feb 02 457 Castle Peak Road; Tsuen Wan. GW-TW0028-02 CNP Application Construction Noise Permit (Weekdays 23.00-07.00hrs). Removal of part 19 Feb. 02 of existing footbridge and installation of new temporary footbridge across for start EPD Local Control Office / Territory West; 7 31 January 2002 15 March 32 LR tracks and Heung Sze Wui Road north of Tuen Mun Town Centre 23 Feb 02 / Floor; Chinachem Tsuen Wan Plaza; 455- Stop. 2002 Withdrawn 457 Castle Peak Road; Tsuen Wan. GW-TW0042-02 PERMIT RENEWAL. 27 Feb 02

EA00770/R24/1 March 2003 Appendix H - Page 5 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (Weekdays 01.00-05.00hrs). Light Rail permanent way alterations to facilitate Phase 4 extension of LRT system 16 Mar. 02 EPD Local Control Office / Territory West; 7 18 February 2002 31 July 33 at Junction B (junction of Ping Ha Road and Tin Yiu Road) in Tin Shui for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Wai. 2 Apr. 02 457 Castle Peak Road; Tsuen Wan. TW0067-02 PERMIT RENEWAL. CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Lifting steel 13 Mar. 02 EPD Local Control Office / Territory West; 7 18 February 2002 reinforcement bars over the LRT tracks and power lines into the hand dug 15 June 34 for start / Floor; Chinachem Tsuen Wan Plaza; 455- caissons at the junction of Heung Sze Wui Road and Pui To Road in Tuen 2002 457 Castle Peak Road; Tsuen Wan. Mun. 15 Mar 02 GW-TW0066-02 CNP Application Construction Noise Permit (Weekdays 23.00-07.00hrs). Removal of (during meeting) 27 Feb. 02 EPD Local Control Office / Territory West; 7 existing footbridge and installation of new temporary footbridge across LR 16 March 35 25 February 2002 for start / Floor; Chinachem Tsuen Wan Plaza; 455- tracks and Heung Sze Wui Road north of Tuen Mun Town Centre Stop. 2002 457 Castle Peak Road; Tsuen Wan. REPLACEMENT FOR PERMIT No. GW-TW0042-02. 27 Feb 02 GW-TW0075-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00 hrs.). Temporary 13 Mar. 02 EPD Local Control Office / Territory West; 7 01 March 2002 15 May 36 relocation of LR OHL to allow construction of viaducts at J6 east (west of for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Pui To Road Stop Tuen Mun. PERMIT RENEWAL 15 Mar 02 457 Castle Peak Road; Tsuen Wan. GW-TW0081-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs). To construct a 27 Mar. 02 EPD Local Control Office / Territory West; 7 07 March 2002 31 May 37 crossing over the Light Rail permanent way for construction plant access for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 at existing Tin Shui Wai Terminus (Stop 500). 2 Apr 02 457 Castle Peak Road; Tsuen Wan. GW-TW0089-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Water main 17 Apr. 02 EPD Local Control Office / Territory West; 7 27 March 2002 18 June 38 diversion across of Pui To Rd at Mj7, Tuen Mun (HK Police require road for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 closure at night to minimise traffic disruption). PERMIT RENEWAL 19 Apr 02 457 Castle Peak Road; Tsuen Wan. TW0116-02

EA00770/R24/1 March 2003 Appendix H - Page 6 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Footbridge 24 Apr. 02 EPD Local Control Office / Territory West; 7 9 April 2002 18 June 39 erection / partial removal at Junction L, TSW (HK Police require road for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 closure at night to minimise traffic disruption). 18 May 02 457 Castle Peak Road; Tsuen Wan. GW-TW0122-02 CNP Application Construction Noise Permit (Weekdays 01.00-05.00hrs). Light Rail 29 Apr. 02 EPD Local Control Office / Territory West; 7 15 April 2002 10 Sept. 40 permanent way alterations to facilitate grade separation viaduct for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 construction of LRT system at junction Mj7 on Pui To Road, Tuen Mun. 10 May 02 457 Castle Peak Road; Tsuen Wan. TW0141-02 CNP Application Construction Noise Permit (Weekdays 23.00-07.00hrs). Construction of 17 May 02 EPD Local Control Office / Territory West; 7 29 April 2002 30 Sept. 41 platform No. 6 at existing Tin Shui Wai Terminus – Stop 500, TSW – for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Phase 4. 1 June 02 457 Castle Peak Road; Tsuen Wan. TW0151-02 CNP Application Construction Noise Permit (Weekdays 19.00-23.00hrs & General holidays 22 May 02 EPD Local Control Office / Territory West; 7 30 April 2002 14 Nov. 42 07.00-19.00hrs). Utility diversions at Ng Lau Road, (LT1) to for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 facilitate grade separation viaduct construction work. 22 May 02 457 Castle Peak Road; Tsuen Wan. GW-TW0154-02 CNP Application Construction Noise Permit (07.00 to 19.00hrs on General holiday incl. 31 May 02 EPD Local Control Office / Territory West; 7 16 May 2002 Sundays & weekdays 19.00-23.00hrs). Foundation works to facilitate LRT 14 Dec. 43 for start / Floor; Chinachem Tsuen Wan Plaza; 455- grade separation viaduct construction at junction Mj7 West on Pui To 2002 457 Castle Peak Road; Tsuen Wan. Road, Tuen Mun. 15 June 02 GW-TW0171-02 CNP Application Construction Noise Permit (any day 23.00-07.00hrs). Footbridge erection / 3 Jun 02 for EPD Local Control Office / Territory West; 7 17 May 2002 18 July 44 partial removal at Junction L, TSW (HK Police require road closure at start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 night to reduce traffic disruption). PERMIT RENEWAL (GW-TW0122-02). 18 June 02 457 Castle Peak Road; Tsuen Wan. GW-TW0175-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00hrs). Erection of 14 Jun 02 EPD Local Control Office / Territory West; 7 18 May 2002 temporary working platforms over LRT at support columns to facilitate 30 Sept. 45 for start / Floor; Chinachem Tsuen Wan Plaza; 455- installation of viaduct beams at J6 West area (San Fat Stop to Heung Sze 2002 457 Castle Peak Road; Tsuen Wan. Wui Road) on Pui To Road, Tuen Mun. 1 July 02 GW-TW0176-02

EA00770/R24/1 March 2003 Appendix H - Page 7 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Lifting steel 3 June 02 EPD Local Control Office / Territory West; 7 21 May 2002 reinforcement bars over the LRT tracks and power lines into the hand dug 15 Aug 46 for start / Floor; Chinachem Tsuen Wan Plaza; 455- caissons at the junction of Heung Sze Wui Road and Pui To Road in Tuen 2002 457 Castle Peak Road; Tsuen Wan. Mun. PERMIT RENEWAL (GW-TW0066-02). 15 June 02 GW-TW0177-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). De-stressing of 12 June 02 EPD Local Control Office / Territory West; 7 22 May 2002 30 Sept. 47 temporary LRT track at J6 South area, north of Tuen Mun Town Centre for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 Stop, Heung Sze Wui Road, Tuen Mun. 24 June 02 457 Castle Peak Road; Tsuen Wan. GW-TW0178-02 CNP Application Construction Noise Permit (weekdays 19.00-07.00hrs). Temporary re- 17 June 02 EPD Local Control Office / Territory West; 7 30 May 2002 alignment of Pui To Road at Mj7 East to provide space for piling 15 July 48 for start / Floor; Chinachem Tsuen Wan Plaza; 455- operations in the centre reservation, Tuen Mun area. (Police road 2002 457 Castle Peak Road; Tsuen Wan. closure). 17 June 02 GW-TW0188-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Water main 21 June 02 EPD Local Control Office / Territory West; 7 10 June 2002 diversion across of Pui To Rd at Mj7, Tuen Mun (HK Police require road 18 Aug. 49 for start / Floor; Chinachem Tsuen Wan Plaza; 455- closure at night to minimise traffic disruption). PERMIT RENEWAL (GW- 2002 457 Castle Peak Road; Tsuen Wan. TW0116-02). 26 June 02 GW-TW0202-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Water main 21 June 02 EPD Local Control Office / Territory West; 7 10 June 2002 diversion across of Pui To Rd at Mj7, Tuen Mun (HK Police require road 18 Aug. 50 for start / Floor; Chinachem Tsuen Wan Plaza; 455- closure at night to minimise traffic disruption). PERMIT RENEWAL (GW- Permit No. 2002 457 Castle Peak Road; Tsuen Wan. TW0116-02). 26 June 02 GW-TW0202-02 CNP Application Construction Noise Permit [weekdays 19.00-23.00hrs & 07.00-21.00hrs general holiday (including Sunday)]. Deck construction along west bank of 27 June 02 10 June 2001 14 Jan. EPD Local Control Office / Territory West; 7 51 Nullah (near Police Station & Kin Fung Circuit) off Pui To Road; Tuen for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. Mun. 2003 15 Jul. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0201-02 PERMIT RENEWAL (GW-TW0629-01). CNP Application Construction Noise Permit (Weekdays 19.00-21.00hrs & General holidays Refused EPD Local Control Office / Territory West; 7 14 June 2002 07.00-19.00hrs). Sewer diversion and site investigation at Tsing Lun see 52 N/A / Floor; Chinachem Tsuen Wan Plaza; 455- Road, Lam Tei (LT1) to facilitate grade separation viaduct construction Refused EPD letter 457 Castle Peak Road; Tsuen Wan. work. Ref: TW0208-02 9 Jul. 02

EA00770/R24/1 March 2003 Appendix H - Page 8 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (any day 23.00-07.00hrs). Footbridge erection / 10 July 02 EPD Local Control Office / Territory West; 7 18 June 2002 18 Aug. 53 partial removal at Junction L, TSW (HK Police require road closure at for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 night to reduce traffic disruption). PERMIT RENEWAL (GW-TW0175-02). 19 July 02 457 Castle Peak Road; Tsuen Wan. GW-TW0211-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 16 July 02 EPD Local Control Office / Territory West; 7 24 June 2002 19 Aug. 54 beams & pre-cast Planks over LRT at J6 West work area on Pui To Road, for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun. 5 Aug. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0215-02 CNP Application Construction Noise Permit (Weekdays 19.00-23.00hrs and 01.00-05.30 02 July 02 EPD Local Control Office / Territory West; 7 24 June 2002 hrs). Temporary relocation of the Light Rail permanent way to facilitate 31 Oct. 55 for start / Floor; Chinachem Tsuen Wan Plaza; 455- viaduct construction between and junction Mj7 on Pui To 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. Road, Tuen Mun. 03 July 02 GW-TW0216-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00hrs). Erection of 19 July 02 EPD Local Control Office / Territory West; 7 25 June 2002 temporary working platforms over LRT at support columns to facilitate 15 Oct. 56 for start / Floor; Chinachem Tsuen Wan Plaza; 455- installation of viaduct beams at J6 South area (North of Town Centre Stop 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. to Pui To Road) on Heung Sze Wui Road, Tuen Mun. 15 Aug. 02 GW-TW0222-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00hrs). Erection of 19 July.02 EPD Local Control Office / Territory West; 7 25 June 2002 temporary working platforms over LRT at support columns to facilitate 30 Oct. 57 for start / Floor; Chinachem Tsuen Wan Plaza; 455- installation of viaduct beams at J6 East area (Pui To Stop to Heung Sze 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. Wui Road) on Pui To Road, Tuen Mun. 30 Aug. 02 GW-TW0221-02 CNP Application Construction Noise Permit (Weekdays 01.00-05.00hrs). Light Rail permanent way alterations to facilitate Phase 4 extension of LRT system 16 July 02 EPD Local Control Office / Territory West; 7 25 June 2002 31 Jan. 58 at Junction B (junction of Ping Ha Road and Tin Yiu Road) in Tin Shui for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. Wai. 2003 1 Aug. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0223-02 PERMIT RENEWAL (GW-TW0067-02). CNP Application Construction Noise Permit for Percussive Piling (08.00 to 09.00 hrs and 23 July 02 EPD Local Control Office / Territory West; 7 27 June 2002 12.30 to 14.00 hrs and 15.30 to 18.00 hrs). Sheet Piling with drop 23 Dec. 59 for start / Floor; Chinachem Tsuen Wan Plaza; 455- hammer for sewer diversion at Tsing Lun Road, Lam Tei (LT1) north Tuen 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. Mun. 24 Jul. 02 PP-TW0027-02

EA00770/R24/1 March 2003 Appendix H - Page 9 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct Withdrawn 3 July 2002 beams & pre-cast planks over LRT at J6 West work area on Pui To Road, EPD Local Control Office / Territory West; 7 60 for start N/A / Floor; Chinachem Tsuen Wan Plaza; 455- i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun. 3 Aug. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0234-02 PERMIT RENEWAL (GW-TW0215-02). CNP Application Construction Noise Permit (weekdays 19.00-07.00hrs). Temporary re- alignment of Pui To Road at Mj7 East to provide space for piling 19 July 02 EPD Local Control Office / Territory West; 7 3 July 2002 21 Aug. 61 operations in the centre reservation, Tuen Mun area. (Police road for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. closure). 2002 22 July 02 457 Castle Peak Road; Tsuen Wan. GW-TW0233-02 PERMIT RENEWAL (GW-TW0188-02). CNP Application Withdrawn 6 July 2002 Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct EPD Local Control Office / Territory West; 7 62 beams & pre-cast planks over LRT at J6 South work area on Heung Sze for start N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

Wui Road, i.e. between Town Centre Stop and Pui To Road, Tuen Mun. 10 Aug. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0239-02 CNP Application Withdrawn 6 July 2002 Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct EPD Local Control Office / Territory West; 7 63 beams & pre-cast planks over LRT at J6 East work area on Pui To Road, for start N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

i.e. between Pui To Stop and Heung Sze Wui Road, Tuen Mun. 30 Aug. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0238-02 CNP Application Construction Noise Permit (Weekdays 019.00-23.00hrs and 01.00 to EPD Local Control Office / Territory West; 7 16 July 2002 05.30 hrs). Light Rail permanent way alterations to facilitate Phase 4 15 Oct. 64 for start / Floor; Chinachem Tsuen Wan Plaza; 455- extension of LRT system at Junction Q (south end of Stop 500) in Tin 2002 457 Castle Peak Road; Tsuen Wan. Shui Wai. 15 Aug. 02 Ref: TW0254-02 CNP Application Construction Noise Permit (any day 23.00-07.00hrs). Southern footbridge EPD Local Control Office / Territory West; 7 24 July 2002 18 Sept. 65 erection at Junction L, TSW (HK Police require road closure at night to for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 reduce traffic disruption). PERMIT RENEWAL (GW-TW0211-02). 18 Aug. 02 457 Castle Peak Road; Tsuen Wan. TW0266-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct EPD Local Control Office / Territory West; 7 26 July 2002 beams & pre-cast Planks over LRT at J6 West work area on Pui To Road, 30 Sept. 66 for start / Floor; Chinachem Tsuen Wan Plaza; 455- i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun ( Five 2002 457 Castle Peak Road; Tsuen Wan. Week Trial Period). PERMIT RENEWAL (GW-TW0215-02). 26 Aug. 02 Ref: TW0269-02

EA00770/R24/1 March 2003 Appendix H - Page 10 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (07.00 to 19.00hrs on General holiday incl. EPD Local Control Office / Territory West; 7 17 August 2002 14 Jan. 67 Sundays & weekdays 19.00-23.00hrs). Foundation works to facilitate LRT for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2003 viaduct construction at junction Mj7 North on Pui To Road, Tuen Mun. 15 Sept. 02 457 Castle Peak Road; Tsuen Wan. TW0290-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 26 Aug. 02 EPD Local Control Office / Territory West; 7 17 August 2002 20 Dec. 68 beams & pre-cast planks over LRT at J6 South work area on Heung Sze for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 Wui Road, i.e. between Town Centre Stop and Pui To Road, Tuen Mun. 16 Sept. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0291-02 CNP Application Construction Noise Permit (weekdays 01.00-05.00 hrs.). Lifting steel 4 Sept. EPD Local Control Office / Territory West; 7 23 Aug. 2002 reinforcement bars over the LRT tracks and power lines into the hand dug for start 02for 69 / Floor; Chinachem Tsuen Wan Plaza; 455- caissons at the junction of Heung Sze Wui Road and Pui To Road in Tuen start15 15 Sept. 02 457 Castle Peak Road; Tsuen Wan. Mun. PERMIT RENEWAL (GW-TW0177-02). Sept. 02 Ref: TW0300-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 4 Sept. 02 EPD Local Control Office / Territory West; 7 30 August 2002 31 Jan. 70 beams & pre-cast planks over LRT at J6 East work area on Pui To Road, for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2003 i.e. between Pui To Stop and Heung Sze Wui Road, Tuen Mun. 2 Oct. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0305-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 9 Sept. 02 EPD Local Control Office / Territory West; 7 31 August 2002 beams & pre-cast Planks over LRT at J6 West work area on Pui To Road, 30 Nov. 71 for start / Floor; Chinachem Tsuen Wan Plaza; 455- i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun. PERMIT 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. RENEWAL (GW-TW0269-02). 2 Oct. 02 GW-TW0307-02 CNP Application Construction Noise Permit (Weekdays 19.00-24.00hrs and 01.00 to 05.30 24 Sept.02 EPD Local Control Office / Territory West; 7 2 September 2002 29 Nov. 72 hrs). Light Rail permanent way alterations to facilitate the Reserve Zone for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 extension of LRT system at Junction I on Tin Shui Road in Tin Shui Wai. 30 Sept. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0308-02 CNP Application Construction Noise Permit (Weekdays 19.00-24.00hrs and 01.00 to 05.30 24 Sept. 02 EPD Local Control Office / Territory West; 7 2 September 2002 hrs). Light Rail permanent way alterations to facilitate the Reserve Zone 29 Nov. 73 for start / Floor; Chinachem Tsuen Wan Plaza; 455- extension of LRT system at Junction J (north end of Stop 500) on Tin 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. Shing Road in Tin Shui Wai. 30 Sept. 02 GW-TW0309-02

EA00770/R24/1 March 2003 Appendix H - Page 11 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Construction of 19 Sept.02 EPD Local Control Office / Territory West; 7 2 September 2002 15 Nov. 74 platform No. 6 at the existing TSW Terminus – Stop 500, Tin Shui Wai – for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 Phase 4. PERMIT RENEWAL (GW-TW0151-02). 1 Oct. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0312-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00hrs). Southern 18 Sept. 02 EPD Local Control Office / Territory West; 7 5 September 2002 18 Oct. 75 footbridge erection at Junction L, TSW (HK Police require road closure at for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2002 night to reduce traffic disruption). PERMIT RENEWAL (GW-TW0266-02). 19 Sept. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0317-02 CNP Application Construction Noise Permit (Friday 27/09/02 from 21.00 to 05.00hrs). Light 27 Sept.02 EPD Local Control Office / Territory West; 7 18 September 2002 Rail permanent way alterations at Junction B to facilitate Phase 4 for one 28 Sept. 76 / Floor; Chinachem Tsuen Wan Plaza; 455- extension of LRT system (at junction of Ping Ha Road and Tin Yiu Road) night 2002 Permit No. 457 Castle Peak Road; Tsuen Wan. in Tin Shui Wai. PERMIT RENEWAL (GW-TW0223-02). GW-TW0337-02 27 Sept. 02 CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Light Rail 12 Oct. 02 EPD Local Control Office / Territory West; 7 19 September 2002 permanent way paved track installation at Junction G (junction of Tin 09 Jan. 77 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Shing Road & Tin Wu Road) to facilitate Phase 4 extension of LRT 2003 457 Castle Peak Road; Tsuen Wan. system in Tin Shui Wai. 17 Oct. 02 Ref: TW0343-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Light Rail 12 Oct. 02 EPD Local Control Office / Territory West; 7 19 September 2002 permanent way paved track installation at Junction A17 (junction of Tin 09 Jan. 78 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Shing Road & Tin Cheung Road) to facilitate Phase 4 extension of LRT 2003 457 Castle Peak Road; Tsuen Wan. system in Tin Shui Wai. 17 Oct. 02 Ref: TW0344-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Light Rail 16 Oct. 02 EPD Local Control Office / Territory West; 7 23 September 2002 permanent way paved track installation at Junction Q (junction of Tin 15 Dec. 79 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Shing Road & Tin Yan Road) to facilitate Phase 4 extension of LRT 2002 457 Castle Peak Road; Tsuen Wan. system in Tin Shui Wai. 16 Oct. 02 Ref: TW0350-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Light Rail 16 Oct. 02 EPD Local Control Office / Territory West; 7 23 September 2002 permanent way paved track installation at Junction A4 (junction of Tin 15 Dec. 80 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Shing Road & Tin Yau Court main entrance) to facilitate Phase 4 2002 457 Castle Peak Road; Tsuen Wan. extension of LRT system in Tin Shui Wai. 16 Oct. 02 Ref: TW0351-02

EA00770/R24/1 March 2003 Appendix H - Page 12 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (Weekdays 019.00-23.00hrs and 01.00 to 16 Oct. 02 EPD Local Control Office / Territory West; 7 24 September 2002 05.30 hrs). Light Rail permanent way alterations to facilitate Phase 4 15 Jan. 81 for start / Floor; Chinachem Tsuen Wan Plaza; 455- extension of LRT system at south end of Stop 500 (by junction Q) in Tin 2003 457 Castle Peak Road; Tsuen Wan. Shui Wai. PERMIT RENEWAL (GW-TW0254-02). 16 Oct. 02 Ref: TW0357-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 11 Oct. 02 EPD Local Control Office / Territory West; 7 24 September 2002 19 Dec. 82 beams & pre-cast planks over LRT and main road at J6 Delta work area for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 at the junction of Pui To Road and Heung Sze Wui Road, Tuen Mun. 20 Oct. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0352-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Cable 22 Oct. 02 EPD Local Control Office / Territory West; 7 30 September 2002 31 Jan. 83 installation along existing LRT reserve between Yuen Long Terminus, for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2003 JunctionB Tin Shui Wai and Ho Tin Stop Tuen Mun. 28 Oct. 02 457 Castle Peak Road; Tsuen Wan. GW-TW0363-02 CNP Application 4 Nov. 02 26 October 2002 Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 31 EPD Local Control Office / Territory West; 7 84 pre-cast parapets over LRT and main road at J6 work area between San for start January / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. Fat Stop, Pui To Stop & Town Centre Stop, Tuen Mun. 18 Nov. 02 2003 457 Castle Peak Road; Tsuen Wan. GW-TW0390-02 CNP Application Withdrawn 28 October 2002 Construction Noise Permit (weekdays 24.00-06.00hrs). Excavation of EPD Local Control Office / Territory West; 7 85 caisson in close proximity to LRT and main road at J6 work area at the for start N/A / Floor; Chinachem Tsuen Wan Plaza; 455-

junction of Pui To Road and Heung Sze Wui Road, Tuen Mun. 18 Nov. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0392-02 CNP Application Construction Noise Permit (Weekdays 19.00-24.00hrs and 01.00 to 05.30 18 Nov. 02 29 EPD Local Control Office / Territory West; 7 5 November 2002 hrs). Light Rail permanent way alterations to extend the LRT system into 86 for start January / Floor; Chinachem Tsuen Wan Plaza; 455- the Reserve Zone at Junction I on Tin Shui Road in Tin Shui Wai. Permit No. 2003 457 Castle Peak Road; Tsuen Wan. PERMIT RENEWAL (GW-TW0308-02). 30 Nov. 02 GW-TW0396-02 CNP Application Construction Noise Permit (Weekdays 19.00-24.00hrs and 01.00 to 05.30 18 Nov. 02 29 EPD Local Control Office / Territory West; 7 5 November 2002 hrs). Light Rail permanent way alterations to extend the LRT system into 87 for start January / Floor; Chinachem Tsuen Wan Plaza; 455- the Reserve Zone at Junction J (north of Stop 500) on Tin Shing Rd in Tin Permit No. 2003 457 Castle Peak Road; Tsuen Wan. Shui Wai. PERMIT RENEWAL (GW-TW0309-02). 30 Nov. 02 GW-TW0395-02

EA00770/R24/1 March 2003 Appendix H - Page 13 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (07.00 to 19.00hrs on General holiday incl. 21 Nov. 02 14 EPD Local Control Office / Territory West; 7 13 November 2002 Sundays & weekdays 19.00-23.00hrs). Foundation works to facilitate LRT 88 for start February / Floor; Chinachem Tsuen Wan Plaza; 455- grade separation viaduct construction at junction Mj7 West on Pui To Permit No. 2003 457 Castle Peak Road; Tsuen Wan. Road, Tuen Mun. PERMIT RENEWAL (GW-TW0171-02). 15 Dec. 02 GW-TW0403-02 CNP Application 21 Nov. 02 13 November 2002 Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Erection of 24 EPD Local Control Office / Territory West; 7 89 Portal Frame to facilitate installation of viaduct at Mj7 junction on Pui To for start December / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. Road, Tuen Mun. 27 Nov. 02 2002 457 Castle Peak Road; Tsuen Wan. GW-TW0404-02 CNP Application Construction Noise Permit (Weekdays 19.00 - 05.30 hrs). Construction 04 Dec. 02 EPD Local Control Office / Territory West; 7 13 November 2002 03 April 90 and installation of OHL masts & equipment for Light Rail interim diversion for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2003 at Tsing Lun Road, Lam Tei (LT1). 3 Dec. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0405-02 CNP Application Construction Noise Permit (Weekdays 19.00 - 05.30 hrs). Temporary 09 Dec.02 EPD Local Control Office / Territory West; 7 14 November 2002 31 March 91 diversion of the Light Rail permanent way to facilitate construction of the for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2003 new LRT viaduct at Tsing Lun Road, Lam Tei (LT1). 9 Dec. 02 457 Castle Peak Road; Tsuen Wan. Ref: TW0408-02 CNP Application 09 Dec. 02 14 November 2002 Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Light Rail 15 EPD Local Control Office / Territory West; 7 92 permanent way temporary paved track installation for interim diversion at for start February / Floor; Chinachem Tsuen Wan Plaza; 455-

Tsing Lun Road, Lam Tei (LT1). 16 Dec. 02 2003 457 Castle Peak Road; Tsuen Wan. Ref: TW0409-02 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of 11 Dec. 02 EPD Local Control Office / Territory West; 7 25 November 2002 working platforms, viaduct beams & pre-cast Planks over existing LRT 15 March 93 for start / Floor; Chinachem Tsuen Wan Plaza; 455- track at Mj7 West Industrial area on Pui To Road from the Police Station 2003 457 Castle Peak Road; Tsuen Wan. to Kin Tai Street, Tuen Mun. 16 Dec. 02 Ref: TW0419-02 CNP Application 17 Dec. 02 Construction Noise Permit (weekdays 19.00 to 07.00 hrs) Excavation of 31 EPD Local Control Office / Territory West; 7 25 November 2002 for 1 day 94 third caisson to support the new LRT viaduct at the junction of Heung Sze January / Floor; Chinachem Tsuen Wan Plaza; 455- trial from Wui Road and Pui To Road, Tuen Mun. 2003 457 Castle Peak Road; Tsuen Wan. Ref: TW0421-02 17 Dec. 02

EA00770/R24/1 March 2003 Appendix H - Page 14 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 23.00-06.00hrs). Erection of viaduct 04 Dec. 02 14 EPD Local Control Office / Territory West; 7 25 November 2002 beams & pre-cast Planks over LRT at J6 West work area on Pui To Road, 95 for start January / Floor; Chinachem Tsuen Wan Plaza; 455- i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun. PERMIT 2003 457 Castle Peak Road; Tsuen Wan. RENEWAL (GW-TW0307-02). 5 Dec. 02 Ref: TW0420-02 CNP Application Construction Noise Permit (weekdays 23.00-06.00hrs). Erection of 11 Dec. 02 EPD Local Control Office / Territory West; 7 28 November 2002 working platforms, viaduct beams & pre-cast Planks alongside LRT track 22 March 96 for start / Floor; Chinachem Tsuen Wan Plaza; 455- at Mj7 North Industrial area from Pui To Road to Kin Fung Circuit, Tuen 2003 457 Castle Peak Road; Tsuen Wan. Mun. 23 Dec. 02 Ref: TW0423-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 06.00 hrs). Erection of 06 Dec. 02 EPD Local Control Office / Territory West; 7 28 November 2002 01 March 97 viaduct beams & pre-cast planks over the existing LRT track at Mj7 for start / Floor; Chinachem Tsuen Wan Plaza; 455- 2003 junction on Pui To Road, Tuen Mun. 2 Jan. 03 457 Castle Peak Road; Tsuen Wan. Ref: TW0424-02 CNP Application Construction Noise Permit (Weekdays 23.00 - 05.30 hrs). Concreting of 20 Dec. 02 22 EPD Local Control Office / Territory West; 7 05 December 2002 OHL masts & back stays for Light Rail interim diversion to facilitate 98 for start February / Floor; Chinachem Tsuen Wan Plaza; 455- construction of the grade separation viaduct at Tsing Lun Road, Lam Tei Permit No. 2003 457 Castle Peak Road; Tsuen Wan. (LT1). 23 Dec. 02 GW-TW0434-02 CNP Application Construction Noise Permit (weekdays 23.00-07.00 hrs). To construct a 14 Jan.03 EPD Local Control Office / Territory West; 7 16 December 2002 30 April 99 crossing over the Light Rail permanent way for construction plant access for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. 2003 at Ng Lau Road, near Lam Tei Interchange (LT1 work site). 3 Feb. 03 457 Castle Peak Road; Tsuen Wan. GW-TW0445-02 CNP Application Construction Noise Permit {Any day (incl. Sunday) 01.00 to 06.00 hrs & 23 Dec. 02 18 December 2002 weekdays 19.00 to 23.00 & general holidays (incl. Sunday) 07.00 to 23.00 22 EPD Local Control Office / Territory West; 7 100 hours}. Excavation of third caisson to support the new LRT viaduct at the for start February / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. junction of Heung Sze Wui Road and Pui To Road, Tuen Mun. Permit 23 Dec. 02 2003 457 Castle Peak Road; Tsuen Wan. GW-TW0450-02 Renewal (GW-TW0421-02). CNP Application Construction Noise Permit (Weekdays 019.hrs to 05.30 hrs). Light Rail 29 Jan. 03 EPD Local Control Office / Territory West; 7 11 January 2003 permanent way alterations to facilitate Phase 4 extension of LRT system 29 April 101 for start / Floor; Chinachem Tsuen Wan Plaza; 455- at south end of Stop 500 (by junction Q) in Tin Shui Wai. Permit Renewal 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. (GW-TW0357-02). 30 Jan. 03 GW-TW0018-03

EA00770/R24/1 March 2003 Appendix H - Page 15 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (Weekdays 19.00 hrs to 05.30 hrs). Light Rail 29 Jan. 03 EPD Local Control Office / Territory West; 7 11 January 2003 permanent way alterations to extend the LRT system into the Reserve 29 April 102 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Zone at junction of Tin Wing Road and Tin Shui Road (Junction I) in Tin 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. Shui Wai. Permit Renewal (GW-TW0396-02). 30 Jan. 03 GW-TW0016-03 CNP Application Construction Noise Permit (Weekdays 19.00 hrs to 05.30 hrs). Light Rail 29 Jan. 03 EPD Local Control Office / Territory West; 7 11 January 2003 permanent way alterations to extend the LRT system into the Reserve 29 April 103 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Zone at Junction J (north of Stop 500) on Tin Shing Rd in Tin Shui Wai. 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. Permit Renewal (GW-TW0395-02). 30 Jan. 03 GW-TW0017-03 CNP Application Construction Noise Permit (Weekdays 01.00-05.00hrs). Light Rail permanent way alterations to facilitate Phase 4 extension of LRT system 27 Jan. 03 EPD Local Control Office / Territory West; 7 14 January 2003 03 August 104 at Junction B (junction of Ping Ha Road and Tin Yiu Road) in Tin Shui for start / Floor; Chinachem Tsuen Wan Plaza; 455- Permit No. Wai. 2003 04 Feb. 03 457 Castle Peak Road; Tsuen Wan. GW-TW0031-03 Permit Renewal (GW-TW0223-02). CNP Application Construction Noise Permit (Weekdays 23.00 - 07.00 hrs). Cable 23 Jan. 03 EPD Local Control Office / Territory West; 7 14 January 2003 installation along existing LRT reserve from Yuen Long Terminus to 31 March 105 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Junction B Tin Shui Wai and Ho Tin Stop Tuen Mun. PERMIT RENEWAL 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. (GW-TW0363-02) 04 Feb. 03 GW-TW0032-03 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 29 Jan. 03 EPD Local Control Office / Territory West; 7 17 January 2003 pre-cast parapets over LRT and main road at J6 work area between San 31 March 106 for start / Floor; Chinachem Tsuen Wan Plaza; 455- Fat Stop, Pui To Stop & Town Centre Stop, Tuen Mun. PERMIT 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. RENEWAL (GW-TW0390-02) 10 Feb. 03 GW-TW0039-03 CNP Application Construction Noise Permit (weekdays 19.00-23.00hrs & 07.00 to 19.00hrs 06 Feb. 03 EPD Local Control Office / Territory West; 7 18 January 2003 on General holiday incl. Sundays). Foundation works to facilitate LRT 15 April 107 for start / Floor; Chinachem Tsuen Wan Plaza; 455- viaduct construction at junction Mj7 North on Pui To Road, Tuen Mun. 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. PERMIT RENEWAL (GW-TW0290-02) 10 Feb. 03 GW-TW0037-03 CNP Application Construction Noise Permit (weekdays 19.00-23.00hrs & 07.00 to 19.00hrs 07 Feb. 03 EPD Local Control Office / Territory West; 7 18 January 2003 on General holiday incl. Sundays). Foundation works to facilitate LRT 15 March 108 for start / Floor; Chinachem Tsuen Wan Plaza; 455- grade separation viaduct construction at junction Mj7 West on Pui To 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. Road, Tuen Mun. PERMIT RENEWAL (GW-TW0403-02). 15 Feb. 03 GW-TW0038-03

EA00770/R24/1 March 2003 Appendix H - Page 16 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of viaduct 06 Feb. 03 EPD Local Control Office / Territory West; 7 20 January 2003 beams & pre-cast planks over LRT and main road at J6 Delta work area 31 March 109 for start / Floor; Chinachem Tsuen Wan Plaza; 455- at the junction of Pui To Road and Heung Sze Wui Road, Tuen Mun. 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. PERMIT RENEWAL (GW-TW0352-02). 20 Feb. 03 GW-TW0041-03 CNP Application Construction Noise Permit (weekdays 23.00-06.00hrs). Erection of viaduct 12 Feb. 03 EPD Local Control Office / Territory West; 7 20 January 2003 beams & pre-cast Planks over LRT at J6 West work area on Pui To Road, 31 March 110 for start / Floor; Chinachem Tsuen Wan Plaza; 455- i.e. between San Fat Stop and Heung Sze Wui Road, Tuen Mun. PERMIT 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. RENEWAL (GW-TW0420-02). 13 Feb. 03 GW-TW0042-03 CNP Application Construction Noise Permit (Weekdays 23.00 - 05.30 hrs). Concreting of 12 Feb. 03 EPD Local Control Office / Territory West; 7 24 January 2003 OHL masts & back stays for Light Rail interim diversion to facilitate 30 April 111 for start / Floor; Chinachem Tsuen Wan Plaza; 455- construction of the grade separation viaduct at Tsing Lun Road, Lam Tei 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. (LT1). PERMIT RENEWAL (GW-TW0434-02). 23 Feb. 03 GW-TW0044-03 CNP Application Construction Noise Permit (Weekdays 23.00 - 06.00 hrs). Erection of 10 Feb. 03 EPD Local Control Office / Territory West; 7 27 January 2003 viaduct beams & pre-cast planks over the existing LRT track at Mj7 01 June 112 for start / Floor; Chinachem Tsuen Wan Plaza; 455- junction on Pui To Road, Tuen Mun. PERMIT RENEWAL (GW-TW0424- 2003 Permit No. 457 Castle Peak Road; Tsuen Wan. 02). 2 Mar. 03 GW-TW0045-03 CNP Application Construction Noise Permit (weekdays 24.00-06.00hrs). Erection of EPD Local Control Office / Territory West; 7 14 February 2003 working platforms, viaduct beams & pre-cast Planks over existing LRT 113 for start / Floor; Chinachem Tsuen Wan Plaza; 455- track at Mj7 West Industrial area on Pui To Road from the Police Station 457 Castle Peak Road; Tsuen Wan. to Kin Tai Street, Tuen Mun. PERMIT RENEWAL (GW-TW0419-02). 16 Mar. 03 Ref: TW0053-03 CNP Application

14 February 2003 Construction Noise Permit (weekdays 22.00-05.00hrs). OHL alterations & EPD Local Control Office / Territory West; 7 114 new connections in the vicinity of junction Q to provide traction power to for start / Floor; Chinachem Tsuen Wan Plaza; 455-

the LRT Phase 4 extension in Tin Shui Wai. 17 Mar. 03 457 Castle Peak Road; Tsuen Wan. Ref: TW0054-03 CNP Application Construction Noise Permit (weekdays 23.00-06.00hrs). Erection of EPD Local Control Office / Territory West; 7 20 February 2003 working platforms, viaduct beams & pre-cast Planks alongside LRT track 115 for start / Floor; Chinachem Tsuen Wan Plaza; 455- at Mj7 North Industrial area from Pui To Road to Kin Fung Circuit, Tuen 457 Castle Peak Road; Tsuen Wan. Mun. PERMIT RENEWAL (GW-TW0423-02). 23 Mar. 03 Ref: TW0062-03

EA00770/R24/1 March 2003 Appendix H - Page 17 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM ISSUE EXPIRY PERMIT No. PERMIT DESCRIPTION ISSUING OFFICE No. DATE DATE

CNP Application Construction Noise Permit (Weekdays 19.00 - 05.30 hrs). Temporary EPD Local Control Office / Territory West; 7 26 February 2003 diversion of the Light Rail permanent way to facilitate construction of the 116 for start / Floor; Chinachem Tsuen Wan Plaza; 455- new LRT grade separation viaduct at Tsing Lun Road, Lam Tei (LT1). 457 Castle Peak Road; Tsuen Wan. PERMIT RENEWAL (GW-TW0408-02). 01 Apr. 03 Ref: TW0???-03 CNP Application

26 February 2003 Construction Noise Permit (weekdays 22.00-05.00hrs). OHL alterations & EPD Local Control Office / Territory West; 7 117 new connections in the vicinity of junction B to provide traction power to for start / Floor; Chinachem Tsuen Wan Plaza; 455-

the LRT Phase 4 extension in Tin Shui Wai. 01 Apr. 03 457 Castle Peak Road; Tsuen Wan. Ref: TW0???-03 CNP Application

26 February 2003 Construction Noise Permit (weekdays 22.00-05.00hrs). OHL alterations & EPD Local Control Office / Territory West; 7 118 new connections in the vicinity of junction J to provide traction power to for start / Floor; Chinachem Tsuen Wan Plaza; 455-

the LRT Reserve Zone extension in Tin Shui Wai. 01 Apr. 03 457 Castle Peak Road; Tsuen Wan. Ref: TW0???-03

EA00770/R24/1 March 2003 Appendix H - Page 18 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

Environmental Licence/Permit Register Date: 29th October 2002

ITEM PERMIT / LICENCE OR ISSUE EXPIRY PERMIT / REGISTRATION DESCRIPTION ISSUING OFFICE No. REGISTRATION No. DATE DATE

Permit No. Environmental Permit to Construct and Operate a Designated Project 4 October EPD; 28 / Floor; Southorn Centre; 130, 01 EP-041/2000/A N/A – Tin Shui Wai Phase 4 Rail Extension. 2002 Hennessy Road, Wan Chai. (KCRC) Permit No. Environmental Permit to Construct and Operate a Designated Project – Light Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone 4 October EPD; 28 / Floor; Southorn Centre; 130, 02 EP-042/2000/D N/A and Grade Separation of the LRT with Pui To Road and Tsing Lun 2002 Hennessy Road, Wan Chai. (KCRC) Road in Tuen Mun. Permit No. Further Environmental Permit to Construct a Designated Project – Light Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone and 23 March EPD; 28 / Floor; Southorn Centre; 130, 03 FEP-041/2001 N/A Grade Separation of the LRT with Pui To Road and Tsing Lun Road 2001 Hennessy Road, Wan Chai. (LCAL) in Tuen Mun. Permit No. Further Environmental Permit to Construct a Designated Project – Tin 23 March EPD; 28 / Floor; Southorn Centre; 130, 04 FEP-042/2001 N/A Shui Wai Phase 4 Rail Extension. 2001 Hennessy Road, Wan Chai. (LCAL) Form NA Submission Notification under Section 3(1) of the Air Pollution Control EPD Local Control Office / Territory West; 7 3rd May 05 Under APCO – EPD Ref: (Construction Dust) Regulations that construction works are N/A / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 No. TW20010406-001 commencing at the Tuen Mun site areas (Jn 6 , Mj7 & Mj8). 457 Castle Peak Road; Tsuen Wan. Notification under Section 3(1) of the Air Pollution Control Form NA Submission rd EPD Local Control Office / Territory West; 7 (Construction Dust) Regulations that construction works are 3 May 06 Under APCO – EPD Ref: N/A / Floor; Chinachem Tsuen Wan Plaza; 455- commencing at the Tin Shui Wai site areas (Phase 4 & Reserve 2001 No. TW20010407-001 457 Castle Peak Road; Tsuen Wan. Zone). Registration as Chemical Waste Producer under the Waste Disposal EPD Local Control Office / Territory West; 7 Registration No. 14 June 07 (Chemical Waste) (General) Regulation for Pui To Road, Tuen Mun N/A / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 5211-424-L2174-14 work areas. 457 Castle Peak Road; Tsuen Wan. Registration as Chemical Waste Producer under the Waste Disposal EPD Local Control Office / Territory West; 7 Registration No. 29 June 08 (Chemical Waste) (General) Regulation for Tin Shui Wai – Phase 4 & N/A / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 5298-515-L2174-16 Reserve Zone work areas. 457 Castle Peak Road; Tsuen Wan.

EA00770/R24/1 March 2003 Appendix H - Page 19 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

ITEM PERMIT / LICENCE OR ISSUE EXPIRY PERMIT / REGISTRATION DESCRIPTION ISSUING OFFICE No. REGISTRATION No. DATE DATE

Discharge Licence for the North Western Water Control Zone under EPD Local Control Office / Territory West; 7 Licence No. 29 June 30 June 09 Section 20 of the Water Pollution Control Ordinance. Applicable in / Floor; Chinachem Tsuen Wan Plaza; 455- 2001 2006 W7M17 - 1 the Tuen Mun work areas. 457 Castle Peak Road; Tsuen Wan.

Licence No. Discharge Licence for the Deep Bay Water Control Zone under EPD Local Control Office / Territory West; 7 10 Section 20 of the Water Pollution Control Ordinance. Applicable in 5 July 2001 31 July 2006 / Floor; Chinachem Tsuen Wan Plaza; 455- 1T279 / 1 the Tin Shui Wai – Phase 4 & Reserve Zone work areas. 457 Castle Peak Road; Tsuen Wan. Fire Services Department; Licensing & Licence No. Dangerous Goods Licence for the storage of Acetylene (18 cylinders 19 Sept. 11 Certification Command; NT North & West; x 48 litres – water capacity). Category 2 Class 3 Dangerous Goods. 2001 18628 Yuen Long Fire Station. Fire Services Department; Licensing & Licence No. Dangerous Goods Licence for the storage of Oxygen (18 cylinders x 19 Sept. 12 Certification Command; NT North & West; 47 litres – water capacity). Category 2 Class 1 Dangerous Goods. 2001 18629 Yuen Long Fire Station. Form NA Submission Notification under Section 3(1) of the Air Pollution Control EPD Local Control Office / Territory West; 7 11th April 13 Under APCO – EPD Ref: (Construction Dust) Regulations that construction works are N/A / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 No. TW20020416-001 commencing at the Lam Tei, Tuen Mun site (LT1). 457 Castle Peak Road; Tsuen Wan.

Discharge Licence for the North Western Water Control Zone under nd st EPD Local Control Office / Territory West; 7 Licence No. 22 May 31 May 14 Section 20 of the Water Pollution Control Ordinance. Applicable in / Floor; Chinachem Tsuen Wan Plaza; 455- 2002 2007 W7BI12-1 the Tuen Mun, Lam Tei (LT1) work area. 457 Castle Peak Road; Tsuen Wan.

EA00770/R24/1 March 2003 Appendix H - Page 20 of 18 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX I – EQUIPMENT CALIBRATION AND CERTIFICATION RECORD

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Store Room (Tuen Mun Fire Station) -MA 42A Date: 24-Jan-03 Time: 16:43

Sampler Model: GS2310 Serial no. : 1361 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Flow (corrected )  H P P Intercept (b): 0.027587 Pstd Ta Correction coeff. (r) 0.99935

1 Pa Tstd Standard pressure (mmHg) Pstd: 760.0 Qstd  P ( H P P  b) Standard temp. (K) Tstd: 292.00 m Pstd Ta Calibration pressure (mmHg) Pa: 758.5 Calibration temp. (K) Ta: 303.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 13.2 3.599 1.770 56.0 2 10.6 3.226 1.584 50.0 3 8.4 2.871 1.409 44.0 4 5.2 2.259 1.106 34.0 5 3.2 1.772 0.864 27.0

Correlation Coefficient : 0.9996

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 32.285x - 1.2734

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 1 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Tuen MunTown Plaza - MA50 Date: 24-Jan-03 Time: 14:30

Sampler Model: GS2310 Serial no. : 1777 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Intercept (b): 0.027587 Flow (corrected )  H P P Correction coeff. (r) 0.99935 Pstd Ta

Standard pressure (mmHg) Pstd: 760.0 1 Pa Tstd Standard temp. (K) Tstd: 292.00 Qstd  P ( H P P  b) m Pstd Ta Calibration pressure (mmHg) Pa: 765.8 Calibration temp. (K) Ta: 294.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 12.8 3.616 1.778 57.0 2 10.1 3.212 1.578 51.0 3 8.3 2.912 1.429 45.0 4 5.7 2.413 1.182 34.0 5 3.3 1.836 0.896 24.0

Correlation Coefficient : 0.9981

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

70.0

60.0

50.0

40.0

30.0 Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 38.477x - 10.604

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 2 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Assembly of God Paul Church Kindergarten (MA155) Date: 23-Jan-03 Time: 16:01

Sampler Model: GS2310 Serial no. : 1770 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Intercept (b): 0.027587 Pa Tstd Correction coeff. (r) 0.99935 Flow (corrected )  H P P Pstd Ta

Standard pressure (mmHg) Pstd: 764.0 Standard temp. (K) Tstd: 292.00 1 Pa Tstd Qstd  P ( H P P  b) Calibration pressure (mmHg) Pa: 758.5 m Pstd Ta Calibration temp. (K) Ta: 303.0

Sample no. Pressure Drop (H), inch Flow (corrected), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 13.0 3.563 1.751 58.0 2 10.9 3.262 1.603 50.0 3 8.8 2.931 1.439 42.0 4 5.7 2.359 1.155 31.0 5 3.5 1.849 0.902 18.0

Correlation Coefficient : 0.9986

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

70.0

60.0

50.0

40.0

30.0 Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 45.929x - 23.121 Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 3 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Holy Redeemer Catholic Church (MA45) Date: 24-Jan-03 Time: 13:44

Sampler Model: GS2310 Serial no. : 1703 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Flow (corrected )  H P P Intercept (b): 0.027587 Pstd Ta Correction coeff. (r) 0.99935

1 Pa Tstd Standard pressure (mmHg) Pstd: 760.0 Qstd  P ( H P P  b) Standard temp. (K) Tstd: 292.00 m Pstd Ta Calibration pressure (mmHg) Pa: 765.8 Calibration temp. (K) Ta: 294.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 13.4 3.699 1.819 57.0 2 10.5 3.275 1.609 46.0 3 8.8 2.998 1.472 39.0 4 5.3 2.327 1.139 28.0 5 3.2 1.808 0.882 18.0

Correlation Coefficient : 0.9952

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 40.465x - 18.409

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 4 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC203 Site Location: Queen Elizabeth Primary School (14/05) Date: 24-Jan-03 Time: 11:09 Transfer Std. type: Orifice, 1185

Standard Slope of orifice (m): 2.01844 Pressure (mmHg): 761 Standard Intercept of orifice (b): 0.027587 Temp. (K) 295 Correction coeff. Of orifice(r) 0.99935

Sample no. Pressure Drop Qstd / Qa Qstd I 1 8.6 2.949 1.448 47.0 2 7.5 2.754 1.351 43.0 3 6.2 2.504 1.227 37.0 4 4.4 2.110 1.032 28.0 5 2.9 1.713 0.835 20.0

Correlation coeff. of calibration : 0.99956

Plot of Linear Regression Actual Flow Rate ( Qstd ) against Flow Indication (I) at Queen EliZabeth Primary ( 14/05 )

50.0 45.0 40.0 35.0 30.0 25.0 20.0 15.0 Flow Indication ( I ) Flow 10.0 5.0 0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 y = 44.595x - 17.55 Actual Flow Rate (m3/min.) Qstd

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 5 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 Site Location: Kwok Yat Wai College (14/06) Date: 24-Jan-03 Time: 17:50 Transfer Std. type: Orifice, 1185

Standard Slope of orifice (m): 2.01844 Pressure (mmHg): 761 Standard Intercept of orifice (b): 0.027587 Temp. (K) 294 Correction coeff. Of orifice(r) 0.99935

Sample no. Pressure Drop Qstd / Qa Qstd I 1 8.4 2.920 1.433 54.0 2 7.0 2.665 1.307 47.0 3 5.9 2.447 1.199 41.0 4 4.6 2.161 1.057 34.0 5 2.1 1.460 0.710 21.0

Correlation coeff. of calibration : 0.99472

Plot of Linear Regression Actual Flow Rate ( Qstd ) against Flow Indication (I) at Kwok Yat Wai College (14/06)

60.0

50.0

40.0

30.0

20.0 Flow Indication (I) Indication Flow 10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 Actual Flow Rate (m3/min.)Qstd y = 45.296x - 12.282

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 6 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: QE School Old Student's Association Secondary School (MA33) Date: 23-Jan-03 Time: 10:49

Sampler Model: GS2310 Serial no. : 1698 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Intercept (b): 0.027587 Flow (corrected )  H P P Correction coeff. (r) 0.99935 Pstd Ta

Standard pressure (mmHg) Pstd: 760.0 1 Pa Tstd Standard temp. (K) Tstd: 294.00 Qstd  P ( H P P  b) m Pstd Ta Calibration pressure (mmHg) Pa: 758.5 Calibration temp. (K) Ta: 303.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 6.9 2.602 1.276 43.0 2 5.7 2.365 1.158 40.0 3 4.6 2.125 1.039 36.0 4 3.2 1.772 0.864 28.0 5 2.1 1.436 0.698 23.0

Correlation Coefficient : 0.9960

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

50.0

45.0

40.0

35.0

30.0

25.0

20.0 Flow Indication (I) Flow Indication 15.0

10.0

5.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 Actual flow rate (m3/min.) Qstd y = 36.056x - 2.3072

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 7 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: (HKFYG) Lee Shau Kee Primary School - MA120 Date: 23-Jan-03 Time: 15:09

Sampler Model: GS2310 Serial no. : 1713 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Intercept (b): 0.027587 Flow (corrected )  H P P Correction coeff. (r) 0.99935 Pstd Ta

Standard pressure (mmHg) Pstd: 760.0 1 Pa Tstd Qstd  P ( H P P  b) Standard temp. (K) Tstd: 294.00 m Pstd Ta Calibration pressure (mmHg) Pa: 758.5 Calibration temp. (K) Ta: 303.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 13.4 3.627 1.783 56.0 2 10.5 3.210 1.577 48.0 3 8.3 2.854 1.400 42.0 4 5.6 2.344 1.148 33.0 5 3.2 1.772 0.864 24.0

Correlation Coefficient : 0.9994

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 34.771x - 6.4969

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 8 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Tin Yiu Estate II (MA15A) Date: 23-Jan-03 Time: 11:44

Sampler Model: GS2310 Serial no. : 1296 Calibrator Orifice no.: 1185 Pa Tstd Flow (corrected )  H P P Slope (m): 2.01844 Pstd Ta Intercept (b): 0.027587 Correction coeff. (r) 0.99935 1 Pa Tstd Qstd  P ( H P P  b) Standard pressure (mmHg) Pstd: 766.0 m Pstd Ta Standard temp. (K) Tstd: 294.50 Calibration pressure (mmHg) Pa: 758.5 Calibration temp. (K) Ta: 303.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 12.8 3.531 1.735 57.0 2 10.6 3.213 1.578 50.0 3 8.6 2.894 1.420 43.0 4 5.7 2.356 1.154 34.0 5 3.4 1.820 0.888 23.0

Correlation Coefficient : 0.9989

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Flow Indication 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 Actual flow rate (m3/min.) Qstd y = 39.434x - 12.033

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 9 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Tin Yau Court - MA10A Date: 23-Jan-03 Time: 14:20

Sampler Model: GS2310 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Pa Tstd Intercept (b): 0.027587 Flow (corrected )  H P P Correction coeff. (r) 0.99935 Pstd Ta

Standard pressure (mmHg) Pstd: 760.0 1 Pa Tstd Standard temp. (K) Tstd: 294.00 Qstd  P ( H P P  b) m Pstd Ta Calibration pressure (mmHg) Pa: 760.6 Calibration temp. (K) Ta: 297.0

Sample no. Pressure Drop (H), inch Flow (corrcted), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 8.7 2.956 1.451 51.0 2 7.5 2.744 1.346 44.0 3 5.8 2.413 1.182 39.0 4 4.1 2.029 0.992 30.0 5 2.6 1.616 0.787 23.0

Correlation Coefficient : 0.9951 Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 Actual flow rate (m3/min.) Qstd y = 41.269x - 10.117

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 10 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC 230 Site Location: San Hing Tsuen Date: 28-01-2003 Time: 17:55 Transfer Std. type: Orifice, 1185

Standard Slope of orifice (m): 2.01844 Pressure (mmHg): 763.58 Standard Intercept of orifice (b): 0.027587 Temp. (K) 290 Correction coeff. Of orifice(r) 0.99935

Sample no. Pressure Drop Qstd / Qa Qstd I 1 6.7 2.630 1.289 46.0 2 6.1 2.510 1.230 40.0 3 5.3 2.339 1.145 33.0 4 4.4 2.131 1.042 27.0 5 3.6 1.928 0.941 22.0 corelation coeff. of calibration : 0.99037

Plot of Linear Regression Actual Flow Rate ( Qstd ) against Flow Indication (I) at San Hing Tsuen 50 45 40 35 30

I 25 20 15 10 5 0 0 0.2 0.4 0.6 0.8 1 1.2 1.4 Qstd y = 66.817x - 44.04

Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 11 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Tin Chak Estate - MA123A Date: 24-Jan-03 Time: 1:35

Sampler Model: GS2310 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Intercept (b): 0.027587 Pa Tstd Correction coeff. (r) 0.99935 Flow (corrected )  H P P Pstd Ta

Standard pressure (mmHg) Pstd: 762.0 Standard temp. (K) Tstd: 293.80 1 Pa Tstd Qstd  P ( H P P  b) Calibration pressure (mmHg) Pa: 760.6 m Pstd Ta Calibration temp. (K) Ta: 296.0

Sample no. Pressure Drop (H), inch Flow (corrected), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 7.9 2.818 1.382 49.0 2 6.5 2.556 1.253 45.0 3 5.4 2.329 1.140 41.0 4 4.0 2.005 0.980 35.0 5 2.5 1.585 0.772 27.0

Correlation Coefficient : 0.9992

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Indication Flow 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 Actual flow rate (m3/min.) Qstd y = 36.295x - 0.7158 Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 12 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

High Volume Air Sampler Calibration Worksheet

Project Title: CC230 - KCRC LRT Civil, Permanent Way, Traction Power and Overhead Line Monitoring Location: Tin Yuet Estate - MA129A Date: 23-Jan-03 Time: 10:02

Sampler Model: GS2310 Calibrator Orifice no.: 1185 Slope (m): 2.01844 Intercept (b): 0.027587 Pa Tstd Correction coeff. (r) 0.99935 Flow (corrected )  H P P Pstd Ta

Standard pressure (mmHg) Pstd: 764.0 Standard temp. (K) Tstd: 291.20 1 Pa Tstd Qstd  P ( H P P  b) Calibration pressure (mmHg) Pa: 758.3 m Pstd Ta Calibration temp. (K) Ta: 296.0

Sample no. Pressure Drop (H), inch Flow (corrected), m3/min Actual flow rate (Qstd), m3/min Flow indication (I), arbitrary 1 7.0 2.645 1.297 55.0 2 6.1 2.469 1.210 52.0 3 4.7 2.167 1.060 48.0 4 3.4 1.843 0.900 41.0 5 2.2 1.483 0.721 35.0

Correlation Coefficient : 0.9976

Plot of Linear Regression Actual flow rate (Qstd) against Flow indication (I)

60.0

50.0

40.0

30.0

Flow Indication (I) Indication Flow 20.0

10.0

0.0 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 Actual flow rate (m3/min.) Qstd y = 35.018x + 9.8753 Remark Qstd Range 1.1 - 1.7 1HPa = 0.750062 mmHg

EA00770/R24/1 March 2003 Appendix I - Page 13 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix I - Page 14 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix I - Page 15 of 15 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX J – SITE INSPECTION CHECKLIST

EM&A MONTHLY REPORT FOR FEBRUARY 2003

KCRC / IEC ENVIRONMENTAL SITE INSPECTION / AUDIT DEFICIENCY REGISTER

Site Inspection / CA / Ref. No. of Date Close- Audit Proposed Corrective / Action Follow-up Inspected by Observed Brief Description of Deficiency Spec. Ref. Reply out Preventive Action By Date Agreed Date Location Deficiency Issued Date (Yes / No) 24th Tuen J. Chan, (IEC) Remark Following up the previous 25th The U-channel and 11th Yes 18th Jan Mun audit, the contractor was Jan sedimentation tank will Feb Feb H. Leung, Roy No1 2003 reminded to clean the U- 2003 be clean-up regularly 2003 2003 Wong (KCRC) channel and sedimentation W.C. Lam tank (located near Tuen Mun (LCAL) Police Station) regulary. 24th Tuen J. Chan, (IEC) Remark The Contractor should cover 25th The open stockpile will 11th Yes 18th Jan Mun the exposed stockpile located Jan be removed. Feb Feb H. Leung, Roy No.2 2003 next to Tuen Mun Police 2003 2003 2003 Wong (KCRC) Station. W.C. Lam (LCAL) 24th Tuen J. Chan, (IEC) Remark The Contractor was reminded 25th Yes, house keeping will 11th Yes 18th Jan Mun to maintain good house Jan be maintained good. Feb Feb H. Leung, Roy No.3 2003 keeping at the site area next to 2003 2003 2003 Wong (KCRC) Tuen Mun Nullach. W.C. Lam (LCAL) 24th Tuen J. Chan, (IEC) Remark A drip tray holding a chemical 25th The water will be 11th Yes 18th Jan Mun drum was observed filled with Jan pumped out the drip Feb Feb H. Leung, Roy No.4 2003 water. The contractor was 2003 tray. 2003 2003 Wong (KCRC) reminded to keep the tray dry W.C. Lam and clean. (LCAL)

EA00770/R24/1 March 2003 Appendix J - Page 1 of 8 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

KCRC / IEC ENVIRONMENTAL SITE INSPECTION / AUDIT DEFICIENCY REGISTER

Site Inspection / CA / Ref. No. of Date Close- Audit Proposed Corrective / Action Follow-up Inspected by Observed Brief Description of Deficiency Spec. Ref. Reply out Preventive Action By Date Agreed Date Location Deficiency Issued Date (Yes / No) 24th Lam J. Chan, (IEC) Remark A new wheel washing basin 25th The silt will be 11th Yes 18th Jan Tei was constructed. The Jan removed regularly on Feb Feb H. Leung, Roy No.7 2003 Contractor was reminded to 2003 the basin 2003 2003 Wong (KCRC) clean the silt./mud regularly. W.C. Lam (LCAL) 24th Tin J. Chan, (IEC) Remark The contractor was reminded 25th Mud trails will be 11th Yes 18th Jan Shui to clean the mud trial observed Jan removed on the public Feb Feb H. Leung, Roy No.9 2003 Wai at stop 530. 2003 road. 2003 2003 Wong (KCRC) W.C. Lam (LCAL) 18th Tuen J. Chan, (IEC) Remark Following up the previous 20th The open stockpile will 24th Feb Mun audit, the contractor should Feb be removed on TM Feb H. Leung, Roy No.2 2003 cover the exposed stockpile, 2003 police station. 2003 Wong (KCRC) which is located next to TM W.C. Lam Police station, as soon as (LCAL) possible. 18th Tuen J. Chan, (IEC) Remark Mud Trail was observed at 20th Mud trail will be 24th Feb Mun public road near a site exit at Feb removed and keep Feb H. Leung, Roy No.5 2003 MJ8. The contractor was 2003 clean on the site exit 2003 Wong (KCRC) reminded to keep public road W.C. Lam clean (LCAL)

EA00770/R24/1 March 2003 Appendix J - Page 2 of 8 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

KCRC / IEC ENVIRONMENTAL SITE INSPECTION / AUDIT DEFICIENCY REGISTER

Site Inspection / CA / Ref. No. of Date Close- Audit Proposed Corrective / Action Follow-up Inspected by Observed Brief Description of Deficiency Spec. Ref. Reply out Preventive Action By Date Agreed Date Location Deficiency Issued Date (Yes / No) 18th Tin J. Chan, (IEC) Remark Following up the previous 20th The site exit will be kept 24th Feb Shui audit, mud trail was observed Feb clean more frequently. Feb H. Leung, Roy No.7 2003 Wai at stop 530 but the situation 2003 2003 Wong (KCRC) has been improved. The W.C. Lam contractor should be keep (LCAL) public road clean.

EA00770/R24/1 March 2003 Appendix J - Page 3 of 8 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EM&A MONTHLY REPORT FOR FEBRUARY 2003

CET ENVIRONMENTAL SITE INSPECTION / AUDIT DEFICIENCY REGISTER

Site Inspection / CA / Ref. No. of Date Close- Audit Inspected Brief Description of Proposed Corrective / Action Follow-up Observed Spec. Ref. Reply out by Deficiencies Preventive Action Date Agreed Date Location Deficiencies Issued Date (Yes / No) 06th All Michael NA Open stockpile near the gate Part IV item 07th The open stockpile will be 11th Yes 14th Feb. Areas of stop 500 23(1) of the Air Feb. covered with tarpaulin Feb. Feb. 2003 Pollution Control 2003 2003 2003 Opens stockpile opposite of (Construction Lee Siu Kai School. Dust) Regulation. 13th All Michael NA Open stockpile outside Tin Part IV item 15th The open stockpile will be 18th Feb. Areas Yau Court Carpark without 23(1) of the Air Feb. covered with tarpaulin Feb. 2003 cover Pollution Control 2003 2003 (Construction Open stockpile outside Tin Dust) Yiu Est II without cover Regulation. Open stockpile inside the site where close to the gate Opens stockpile inside the site where opposite of Lee Siu Kee School.

EA00770/R24/1 March 2003 Appendix J - Page 4 of 8 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

CET ENVIRONMENTAL SITE INSPECTION / AUDIT DEFICIENCY REGISTER

Site Inspection / CA / Ref. No. of Date Close- Audit Inspected Brief Description of Proposed Corrective / Action Follow-up Observed Spec. Ref. Reply out by Deficiencies Preventive Action Date Agreed Date Location Deficiencies Issued Date (Yes / No) 20th All Michael NA Open stockpile inside the Part IV item 22nd The open stockpile will be 25th Feb. Areas site where opposite of Lee 23(1) of the Air Feb. removed. Feb. 2003 Siu Kee Pri School without Pollution Control 2003 2003 cover (Construction Dust) Open stockpile outside Tin Regulation. Shui Wai Methodist Primary School no cover Unpaved Road need more watering during dry Open stockpile outside Tin Yau Court carpark no cover.

EA00770/R24/1 March 2003 Appendix J - Page 5 of 8 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix J - Page 6 of 9 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix J - Page 7 of 9 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix J - Page 8 of 9 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix J - Page 9 of 9 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX K SUMMARY OF NOTIFICATION OF SUMMON AND STATUS

Summon Ref. Regulations Description of Offence Date Magistracy Date of Time of Outcome of Fine if Affected Issued Hearing Hearing Hearing Any No Notification of Summons were received in September 2001. No Notification of Summons were received in October 2001. No Notification of Summons were received in November 2001. No Notification of Summons were received in December 2001. No Notification of Summons were received in January 2002. No Notification of Summons were received in February 2002. No Notification of Summons were received in March 2002. No Notification of Summons were received in April 2002. No Notification of Summons were received in May 2002. FLS5381/2002 NCO Concreting of a bored pile at June Magistrates 23 July 09:30 hrs Leighton HK$ Tin Shui Road near Tin Wah 2002 Court at 2002 pleaded guilty 10,000 Estate after 19:00 without CNP Fanling with mitigation on 29 January 2002 FLS5382/2002 NCO Hammering of the casing of a June Magistrates 23 July 09:30 hrs Leighton HK$ bored pile at Tin Shui Road 2002 Court at 2002 pleaded guilty 10,000 near Tin Wah Estate after 19:00 Fanling with mitigation without CNP on 29 January 2002 No Notification of Summons was received in July 2002. No Notification of Summons was received in August 2002. No Notification of Summons was received in September 2002. No Notification of Summons was received in October 2002. No Notification of Summons was received in November 2002. No Notification of Summons was received in December 2002. No Notification of Summons was received in January 2003. No Notification of Summons was received in February 2003.

EA00770/R24/1 March 2003 Appendix K - Page 1 of 1 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX L CONSTRUCTION PROGRAMME FOR THE NEXT THREE MONTHS

EA00770/R24/1 March 2003 Appendix L - Page 1 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 2 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 3 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 4 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 5 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 6 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report - February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

EA00770/R24/1 March 2003 Appendix L - Page 7 of 7 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX M NOE LOG

NoE No. NoE Issue Date Date of Monitoring Sampling Location Description

No NoE was received in September 2001 No NoE was received in October 2001 No NoE was received in November 2001 No NoE was received in December 2001 No NoE was received in January 2002 No NoE was received in February 2002 NE-03852-CC-230-NSR-MN48-00 21-Mar-02 25-Feb-02 MN48 Limit Level Exceedance of Noise / / 2-Apr-02 MN155 Limit Level Exceedance of Noise NE-03927-CC-230-NSR-MN48-00 11-Apr-02 25-Mar-02 MN48 Limit Level Exceedance of Noise NE-04106-CC-230-NSR-MN48-00 / 22-Apr-02 MN48 Limit Level Exceedance of Noise

No NoE was received in June 2002 No NoE was received in July 2002 No NoE was received in August 2002 No NoE was received in July 2002 No NoE was received in August 2002 No NoE was received in September 2002 No NoE was received in October 2002 No NoE was received in November 2002 No NoE was received in December 2002 No NoE was received in January 2003 No NoE was received in February 2003

EA00770/R24/1 March 2003 Appendix M - Page 1 of 1 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line

APPENDIX N1 – STANDARD AND GUIDANCE FOR ARCHAEOLOGICAL WATCHING BRIEF

STANDARD AND GUIDANCE FOR AN ARCHAEOLOGICAL WATCHING BRIEF

STANDARD

THE STANDARD

An archaeological watching brief will record the archaeological resource during development within a specified area using appropriate methods and practices. These will satisfy the stated aims of the project, and comply with the Code of conduct, Code of approved practice for the regulation of contractual arrangements in field archaeology, and other relevant by- laws of the IFA.

DEFINITION OF AN ARCHAEOLOGICAL WATCHING BRIEF

The definition of an archaeological watching brief is a formal programme of observation and investigation conducted during any operation carried out for non-archaeological reasons. This will be within a specified area or site on land, inter-tidal zone or underwater, where there is a possibility that archaeological deposits may be disturbed or destroyed. The programme will result in the preparation of a report and ordered archive.

This definition and Standard do not cover chance observations which should lead to an appropriate archaeological project being designed and implemented, nor do they apply to monitoring for preservation of remains in situ.

Purpose of Watching Brief

The purpose of a watching brief is:

S to allow, within the resources available, the preservation by record of archaeological deposits, the presence and nature of which could not be established (or established with sufficient accuracy) in advance of development or other potentially disruptive works

S to provider an opportunity, if needed, for the watching archaeologist to signal to all interested parties, before the destruction of the material in question, that an archaeological find ahs been made for which the resources allocated to the watching brief itself are not sufficient to support treatment to a satisfactory and proper standard

A watching brief is not intended to reduce the requirement for excavation or preservation of known or inferred deposits, and it is intended to guide, no replace, any requirement for contingent excavation or preservation of possible deposits.

The objective of a watching brief is to establish and make available information about the archaeological resource existing on a site.

EA00770/R24/1 March 2003 Appendix N1 - Page 1 of 1 C:\LightRail\Feb2003.doc KCRC Contract No. CC230 Monthly EM&A Report – February 2003 Light Rail Extension – Civil, Permanent Way, Traction Power and Overhead Line APPENDIX N2 – ARCHAEOLOGICAL MONITORING LOCATIONS

EA00770/R24/1 March 2003 Appendix N2 - Page 1 of 1 C:\LightRail\Feb2003.doc