Last updated: 1 July 2021

Railway-related Facilities under Settlement Monitoring within Railway Protection Areas

The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension.

Total number of facilities currently under settlement monitoring: 76

Number of facilities where settlement monitoring has ceased since last announcement on 1 June 2021: 3

Number of newly-added facilities under settlement monitoring since last announcement on 1 June 2021: 9

Number of facilities under settlement monitoring with relevant works currently suspended: 2

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Line Civil Engineering Tseung Kwan O – 4 Civil works Public works and Development Near 20 +10 Tunnel Department Private Package 1 Building 6 project (Note 1) Ho Man Tin Station 71 -42 property development project works Footbridge connecting East Highways Bay Station and 104 Kowloon Cultural Centre and Civil works Public works 20 -3 Department Depot

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Drainage Services Between Kwun Tong and 128 Revitalisation of Tsui Ping River Civil works Public works 20 +3 Department Lam Tin stations Public Housing Development at Building Underground water main 91* North Public works 20 -28 project Housing Authority on Tung Chau Street Reclamation Site 1 (East) Private Redevelopment project at No. Building Between Central and 101 project (Note 1) 20 +2 10 project Admiralty stations works Private Redevelopment Project at No. Building Between 130 project (Note 1) 20 -2 200 project and Jordan stations works Private Redevelopment Project at 1-1A Building 135 project (Note 1) 20 -2 & 2-2A Humphreys Avenue project works Retrofitting of Escalators for Footbridge across Public Highways 138 Civil works 20 -2 Road – Kwai Chung near Tai Wo Works Department Hau Station Private Redevelopment Project at 916- Building Between and 144 project (Note 1) 20 -1 922 Wan Road project Mei Foo stations works Private Redevelopment Project at 924- Building Between Lai Chi Kok and 145 project (Note 1) 20 -1 926 Road project Mei Foo stations works Provision of New External MTR 146 Passengers Lift near Entrance A Civil works Corporation (Note 1) 20 -1 at Mei Foo Station works Island Line

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Private Redevelopment project at No. 2 Building Between Central and 18 project (Note 1) 20 -3 Murray Road project Admiralty stations works Private Redevelopment project at No.2 Building Between Central and 19 project (Note 1) 20 +6 Murray Road project Admiralty stations works Private Redevelopment project at No. Building Between Wan Chai and 74 project (Note 1) 20 +3 369-371 Hennessy Road project Causeway Bay stations works Redevelopment project at No. Private 46-56 Queen’s Road East, No. 2- Building Between Admiralty and 90 project (Note 1) 20 +2 12 Anton Street and No. 1-11 project Wan Chai stations works Landale Street Private Redevelopment project at No. Building 100 project (Note 1) Station 20 -2 78-90 Wing Lok Street project works Upgrading of Salt Water Supplies 112 Civil works Public works 20 +2 Water Supply System Department Private Redevelopment project at No. Building Between Wan Chai and 119 project (Note 1) 20 -3 472 Hennessy Road project Causeway Bay stations works Private Development project at No.78 Building 120 project (Note 1) Station 20 -1 Road project works Private Redevelopment project at No. Building Between Wan Chai and 125 project (Note 1) 20 -1 199-203 Hennessy Road project Causeway Bay stations works Private Redevelopment project at No. Building Between and 126 project (Note 1) 20 +2 383-385 King's Road project stations works

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Private Redevelopment project at No. Building 127 project (Note 1) Station 20 +2 44-50 project works Private Redevelopment Project at 20 Building 133 project (Note 1) Central Station 20 -3 Central project works Private Redevelopment Project at 152- Building Between Sai Ying Pun 134 project (Note 1) 20 +3 155 Central project and Sheung Wan stations works Station Private Building 67 Package 2 property project (Note 1) Wong Chuk Hang Depot 20 -6 project development works

Wong Chuk Hang Station Private Wong Chuk Hang Station Building 89 Package 3 property project (Note 1) and Wong Chuk Hang 20 -2 project development works Depot

Wong Chuk Hang Station Private Wong Chuk Hang Station Building 132 Package 4 property project (Note 1) and Wong Chuk Hang 20 -0 project development works Depot Civil Engineering Between Tiu King Leng Footbridge of Tseung Kwan O – 75 Civil works Public works and Development and Tseung Kwan O 20 -1 Lam Tin Tunnel Department stations Private Building 78 Works at Tseung Kwan O Depot project (Note 1) Tseung Kwan O Depot 20 -6 project works

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Civil Engineering Near Tseung Kwan O 79 Cross Bay Link, Tseung Kwan O Civil works Public works and Development 20 -3 Depot Department Private Composite Development on Ko Building Ventilation Building at 98 project (Note 1) 20 +6 Chiu Road project works Private Yau Tong Ventilation Building Building Ventilation Building at 106 project (Note 1) 20 +6 property development project Yau Tong works Public Housing Development at Hong Kong Pak Shing Kok ventilation 113 Civil works Public works 20 -1 Chiu Shun Road Housing Authority Building Between Tseung Kwan O and Hang Hau stations, Water Supplies 121 Mainlaying in Tseung Kwan O Civil works Public works and between Tseung 20 -1 Department Kwan O and LOHAS Park stations Line, Airport Express and Private Hong Kong International Airport Building Between Airport and 29 project (Note 1) 20 -4 Three-runway System project AsiaWorld-Expo stations works Between Siu Ho Wan and Civil Engineering Tung Chung New Town 30 Civil works Public works and Development 20 -5 Extension Relevant works has been Department completed thus settlement monitoring ceased in June 2021 Highways Between Kowloon and 73 Central Kowloon Route Civil works Public works 20 -12 Department Olympic stations

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Between Airport and AsiaWorld-Expo stations Private Airport Authority Office Tower Building 87 project (Note 1) 20 -1 Development project Relevant works has been works completed thus settlement monitoring ceased in June 2021 Private Airport Terminal 2 Building 102 project (Note 1) Airport Station 20 -5 demolition work project works Architectural Tsim Sha Tsui Fire Station Building Between Kowloon and 111 Public works Services 20 -12 Complex on To Wah Road project Olympic stations Department

Central Kowloon Route Highways Between Kowloon and 123 Civil works Public works 20 +4 Ventilation Building Department Olympic stations

East Rail Line Private Station property Building 38 project (Note 1) 50 -45 development project works MTR Lo Wu Station improvement Building 88 Corporation (Note 1) Lo Wu Station 20 -6 works project works Private Comprehensive Development at Building Between University and 103 project (Note 1) 20 -2 Pak Shek Kok project Tai Po Market stations works Shek Wu Hui Effluent Polishing Drainage Services Between Sheung Shui 107 Civil works Public works 20 -7 Plant work Department and Lo Wu stations

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Provision of barrier-free facilities Highways Between and Fo 108 Civil works Public works 20 -3 for highway structures Department Tan stations

Construction of Tong Hang No.3 Water Supplies Between Tai Wo and 110 Fresh Water Service Reservoir Civil works Public works 20 -3 Department Fanling stations and Associated Mainlaying

Road widening and retrofitting Civil Engineering Between Sha Tin and 115 noise barriers on Tai Po Road Civil works Public works and Development 20 -2 stations (Sha Tin Section) Department

Central Kowloon Route - Central Highways Between and 136 Civil works Public works 20 -2 Tunnel works Department East stations

Tuen Ma Line Private Between Kam Sheung Station viaduct Building 45 project (Note 1) Road and Yuen Long 20 -13 column improvement works project works stations Private Property development project – Building -13 53* project (Note 1) Near 20 Grand YOHO project (Note 2) works Private Yuen Long Station property Building 56 project (Note 1) Yuen Long Station 20 -8 development project works Private Industrial development project Building Between Mei Foo and 69 project (Note 1) 20 -2 on Wing Kei Road, Kwai Chung project Tsuen Wan West stations works

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Private Between Kam Sheung Building 72 Commercial project near project (Note 1) Road and Yuen Long 20 +4 project works stations

Kam Sheung Road Station Private Building Near Kam Sheung Road 83 Package 1 Property project (Note 1) 20 -7 project Station Development works

Private Mariners' Club Redevelopment Building 85 project (Note 1) East Tsim Sha Tsui Station 20 -2 Project project works

Civil Engineering Sewerage works of development Near Kam Sheung Road 92 Civil works Public works and Development 20 -7 at South, Yuen Long Station Department Private Kai Tak Area 1F Site 2 Building 93 project (Note 1) 20 -19 development project project works Private Kai Tak Area 1F Site 1 Building 94 project (Note 1) Kai Tak Station 20 -17 development project project works Private Kai Tak Area 1E Site 2 Building Between Diamond Hill 95 project (Note 1) 29 -23 development project project and Kai Tak stations works Public Rental Housing Development Phase 1 & 2 and Subsidised Sales Flats Building Hong Kong Diamond Station and 96 Public works 20 +2 Development at Diamond Hill project Housing Authority adjacent section Comprehensive Development Area

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Provision of universal accessibility facilities at Highways 117 Civil works Public works Near Station 20 -3 footbridges, elevated walkways Department and subways Private Highways Between and 118 Sai Sha Road widening works Civil works project 20 0 Department stations works Private Kai Tai Area 1E Site 1 Building Between Diamond Hill 124 project (Note 1) 20 +5 Development project project and Kai Tak stations works Public Housing Development at Building Hong Kong Between Kai Tak and 139 Public works 20 -14 Kai Tak Site 2B2 project Housing Authority Sung Wong Toi stations Public Housing Development at Building Hong Kong 140 Public works 20 -1 Kai Tak Site 2B6 project Housing Authority and adjacent section Kai Tak stage 2 infrastructure at Civil Engineering Between Kai Tak and 141 north apron area of Kai Tak Civil works Public works and Development 20 +2 Sung Wong Toi stations Airport Department Subsidised Sale Flats Building Hong Kong Between To Kwa Wan 142 Public works 20 -1 Development at Ko Shan Road project Housing Authority and Ho Man Tin stations Private Hotel Development at 1 Cheong Building 143 project (Note 1) Near 20 -4 Tung Road project works Light Rail Private Yuen Long Station property Building Near Light Rail 61 project (Note 1) 20 -14 development project Yuen Long Stop works Private property Building 62 project (Note 1) Light Rail Tin Wing Stop 150 -86 development project works

Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Between Light Rail Ferry Pier Stop and Melody Garden Stop Water mains works in Tuen Mun Water Supplies 80 Civil works Public works 20 -4 District Department Relevant works has been completed thus settlement monitoring ceased in June 2021 Universal accessibility facilities Highways Near Light Rail 105 works at footbridge on Ming Civil works Public works 20 -3 Department Shek Pai Stop Kum Road Walkway cover works in Highways Near Light Rail 122 Civil works Public works 20 +6 Department

Public Housing Development at Building Hong Kong Near Light Rail Tuen Mun 129 Public works 20 -8 Hang Fu Street project Housing Authority Swimming Pool Stop

MTR Road Stop Platform 1 Near Light Rail Tai Tong 131 Civil works Corporation (Note 1) 20 -1 Improvement Works Road Stop works

Risk-Based Improvement of Water Supplies Near Light Rail Depot 137 Civil works Public works 20 -1 Water Mains Department Stop High Speed Rail West Kowloon Cultural District – Private Hong Kong West 114 Integrated basement and Civil works project (Note 1) 20 -3 Kowloon Station underground road in zone 2A works

# The figure in each item represents the maximum movement among monitoring points as at 1 July 2021. “+” and “-“ represent raised and settled levels respectively. The figures are based on the MTR Corporation’s records.

* Relevant works were temporarily suspended.

Note 1: The private project works concerned are subject to the regulation of the Buildings Department in accordance with the Buildings Ordinance. Note 2: Relevant construction works were suspended during the second half of 2013 due to the settlement extent reaching its settlement limit. Preventive underpinning works for nearby railway facility are currently in progress.