2016-17 Outcome Performance Budget Railways 2016-17

Total Page:16

File Type:pdf, Size:1020Kb

2016-17 Outcome Performance Budget Railways 2016-17 2016-17 OUTCOME and PERFORMANCE BUDGET of RAILWAYS for 2016-17 Ministry of Railways (Railway Board) 25 /February, 2016 GOVERNMENT OF INDIA 2016-17 OUTCOME and PERFORMANCE BUDGET of RAILWAYS for 2016-17 Ministry of Railways (Railway Board) 25 /February, 2016 CONTENTS Page No. †¬μÖÖμÖ/Chapter - I Introduction 1 - 3 †¬μÖÖμÖ/Chapter - II ×­Ö¯ÖÖ¤ü­Ö/Financial and 4 - 9 Physical Performance †¬μÖÖμÖ/Chapter - III μÖÖê•Ö­ÖÖ/XII Five Year Plan 2012- 10 - 13 2017 †¬μÖÖμÖ/Chapter - IV /A Few Salient 14 - 46 Outcomes of Rail Operations †¬μÖÖμÖ/Chapter - V ×¾ÖßÖÖ¸/üNetwork Expansion 47 – 49 †¬μÖÖμÖ/Chapter - VI Safety 50 – 51 †¬μÖÖμÖ/Chapter - VII †Ö¸ü.›üß.‹ÃÖ.†Öê./Production 52 – 67 Units & R.D.S.O 68 ANNEXURE – A Sale of Scrap & Afforestation 2015 69 – 76 ANNEXURE – B Train Services in 2015 C 1 – C 104 ANNEXURE – C Performance of Projects costing more than Rs. 5 crore each ANNEXURE – D Physical & Financial Targets and Progress of S.R.S.F works CHAPTER I INTRODUCTION The Indian Railways is a departmental commercial undertaking of the Government of India. The formation of policy and overall control of the railways is vested in Railway Board comprising the Chairman, who is an ex-officio Principal Secretary to Government of India, Financial Commissioner and other functional Members for Traffic, Engineering, Mechanical, Electrical and Staff matters, all ex- officio Secretaries to Government of India. The Indian Railway system is managed through 17 zones and 68 operating divisions. Apart from the zonal Railways representing the operational part of the system, there are eight production units engaged in manufacture of rolling stock and other related items. Research, Designs and Standards Organization (RDSO) is the sole research and development wing of Indian Railways, functioning as the technical adviser and consultant to the Ministry, Zonal Railways and Production Units with the status of a Zonal Railway. The Indian Railway has several Public Sector Undertakings/ affiliated organizations working under the overall control of the Ministry of Railways. Box – 1 Indian Railways: A historical legacy One hundred sixty one years ago, one April afternoon, history was made at Bori Bunder in Mumbai when to the booming sound of a 21 gun salute, the first train on Indian soil started its maiden journey of 21 miles (34 km) to Thane. The steam engine and metal track had become a reality in India. Since then the ubiquitous rail track has traveled the length and breadth of the subcontinent, weaving an iron link among the diverse people of India. The Railway finances have been separated from the General finances as per the Separation Convention, 1924. This convention has been carried forward by the Railway Convention Committee of the Parliament, which determines the financial relation of the Railways and the General finances. The Railway Convention Committee also determines the rate of dividend which the Railways are required to pay to the General Revenues on the amount invested in former by the latter. The Railway Budget is normally presented to the Parliament ahead of the General Budget. Though the Railway Budget is separately presented to the Parliament, the figures relating to the receipt and expenditure of the Railways are also shown in the General Budget, since the receipt and expenditure of the Railways are a part and parcel of the total receipts and expenditure of the Government of India. 1 The Indian Railway is the world’s largest government railway. The Railway functions as a vertically integrated organization providing Passenger and Freight services. It is a single system which consists of 66,030 route km of track that criss-cross the country, on which more than 22,300 number of trains ply, carrying about 23 million passengers and hauling nearly 3.02 million tonnes of freight every day, thereby contributing to the economic growth of the country and at the same time promoting national integration. As compared to road transport, the railway has a number of intrinsic advantages as it is five to six times more energy efficient, four times more efficient in land use and significantly superior from the standpoint of environment impact and safety. Indian Railways, therefore, rightly occupies pride of place in the growth and development of the nation. The railway service is rendered through a nation wide rail infrastructure covering track, stations, sidings, freight terminals, locomotives, coaches and wagons and a myriad of infrastructure inputs like signaling, telecom, electrical installations, maintenance workshops etc. The output and outcomes achieved by the Railways in terms of Passengers and Freight carried results from the interwoven activities of the various infrastructure inputs comprising the Railway Infrastructure. While a direct one to one correlation in terms of inputs and outcomes of each activity is not easy to render in a transport sector like the Railways, the Performance cum Outcome Budget attempts to give a better insight in to the multifarious activities of the railways that, when combined, generate the outcome of transportation services. Box – 2 Rail Infrastructure as on 31.03.2015 Route Kms: 66,030 o Broad Gauge (58,825); o Metre Gauge (4,908) & o Narrow Gauge (2,297); Running Track Kms: 90,803; o Broad Gauge (83,266); o Metre Gauge (5,240) & o Narrow Gauge (2,297); Electrified Route Kms: 22,224 Rolling Stock: o Wagons: 2,45,350 wagon units o Locomotives: 10,773 nos. o Coaches: 63,045 nos. This performance cum outcome budget seeks to report on the Outcomes of the Rail services in terms of through put, financial results, addition to capacity, and outcomes for the traveling public and rail users. The Performance Budget of Railways has been prepared in pursuance of the recommendations of the Standing Committee contained in their VI Report (1993-94) on Demands for Grants (Railways), 1994-95. This document inter alia indicates the comparative performance of Indian Railways in respect of Revenue and Expenditure vis-à-vis the targets. The performance in respect of works costing Rs. 5 crore and above, including transfer of funds from one work to other; target dates of completion of the projects are also indicated. It also gives a summary appraisal of the Railway’s performance including shortfalls, if any, in respect of revenue earnings, expenditure, works performance as provided in the ongoing Five Year Plan and Annual Plan. 2 The Outcome Budget for Railways has been introduced from 2006-07 keeping in view the guidelines of the Government for converting financial outlays into physical outcomes. The Railway has a mechanism to measure the development outcomes of all major programmes giving importance to converting financial outlays into physical outcomes, with quarterly measurable and monitorable targets, to improve the quality of implementation of the projects. The Outcome Budget 2016-17 tries to bring out the achievements/highlights that the Railway has tried to deliver upto 2014-15 for the benefit of the people of the country. This Railway budget document provides an insight not only to the outlays provided under various plan heads, but also the targets set vis-a-vis the progress achieved in measurable terms, a feature unique to this Ministry’s budget documents. Some of the information relating to Outcome Budget is also available in other budget documents, like, Explanatory Memorandum where Traffic Plan for goods and passengers as also efficiency indices, like, Plan Targets and achievements are given. The quantifiable performance units of expenditure relating to non-plan expenditure for Demand No. 4 to 12 are included in the respective Demands for Grants (Part II). ***** 3 CHAPTER II FINANCIAL AND PHYSICAL PERFORMANCE TABLE I (Rupees in crore) Key Financial Indicators Financial Perform ance Actuals Budge t Re vise d Growth over 2014-15 2015-16 2015-16 2014-15 Particulars Receipts (a) Passenger Earnings 42190 50175 45126 6.96% (b) Other Coaching 3998 4612 4325 8.19% (b) G oods 105791 121423 111853 5.73% (c) Sundry other Earnings 5093 7318 5580 9.56% Total Traffic Earnings 157072 183528 166884 6.25% Clearance from Traffic Outstandings -361 50 50 -113.85% Gross Traffic Receipts 156711 183578 166934 6.52% M iscellaneous Receipts 4307 4979 3971 -7.80% Total Re ceipts 161017 188557 170905 6.14% Expenditure Ordinary W orking Expenses 105996 119410 110690 4.43% Appropriation to Pension Fund 29225 34900 34500 18.05% Appropriation to Depreciation Reserve Fund 7775 7900 5500 -29.3% Total W orking Expenditure 142996 162210 150690 5.38% M iscellaneous Expenditure 1183 1270 1217 2.90% Total Ex penditure 144179 163480 151907 5.36% Dividend payable to General Revenues 9174 10811 8495 -7.4% Ne t S urplus a fte r pa ym e nt of Divide nd 7665 14266 10502 37.0% Operating Ratio 91.3% 88.5% 90.5% x Gross Earnings placed at Rs1,66,884 cr in RE 2015-16 are less than the Budget Estimates by Rs 16,644 cr. While freight earnings are expected to grow at 5.73% over 2014-15, Passenger revenues reflect a growth of 6.96%. x The budgeted Ordinary Working Expenses of Rs. 1,19,410 crore have been reduced in the Revised Estimates 2015-16 mainly on account of savings under Staff cost, Fuel, Lease and Miscellaneous expenditure. TABLE II Key Performance Indicators Actuals Budget Revised Particulars 2014-15 2015-16 2015-16 Ratio of Net Revenue to Capital 7.0 8.8 6.8 Operating Ratio 91.3% 88.5% 90.5% 4 TABLE III Passenger and Freight Performance Actuals Revised Actual to Actual to 2014-15 Estimates, end of end of 2015-16 December, December, 2014 2015 No. of Passengers Originating (in millions) 8224.12 8101 6252.91 6135.57 Passenger Earnings (Rs. in crores) 42189.61 45126.15 31406.93 33105.08 Freight Loading ( in million tonnes) 1095.26 1107 806.38 814.70 Freight Earnings (Rs.
Recommended publications
  • GOLDEN CHARIOT Bangalore - Mysore - Hassan - Hospet - Hampi - Gadag - Badami - Goa - Bangalore
    DURATION 07N/08D GOLDEN CHARIOT Bangalore - Mysore - Hassan - Hospet - Hampi - Gadag - Badami - Goa - Bangalore WWW.RAZDANHOLIDAYS.COM About The Golden Chariot train journey is the best way to experience the major and also offbeat tourism destinations of South India. It has recently been awarded the ‘Asia’s leading luxury train’ award at the World Travel Awards, 2013. Page !2 of ! 2 ! Brief Itinerary Day 1 Monday, Bangalore 1800 hrs - Reporting Time 1900 hrs - Departure from Bangalore Day 2 Tuesday, Mysore 0830 hrs - Sight seeing trip of Mysore 0100 hrs - Return to Golden Chariot. Day 4 Thursday, Hassan - Halebid / Belur - Sravanbelagola 0600 hrs - Departure from Mysore 0840 hrs - Arrival at Hassan 0930 hrs - Drive down to Halebid / Belur 1300 hrs - Come back to the train and have lunch onboard. 1600 hrs - Drive down to Sravanbelagola to visit Jain Temple 1900 hrs - Return to train again 1940 hrs - Depart for TB DAM. Day 5 Friday, TB DAM - Hospet / Hampi 0530 hrs - Arrival at TB DAM 0830 hrs - Drive up the hill for breakfast. 0930 hrs - Train to Hospet / Hampi 1300 hrs - Lunch on train 1530 hrs - Hampi 1900 hrs - Dinner on train. 2000 hrs - Departure from TB DAM Day 6 - Saturday - Gadag - Aihole & Pattadakal - Badami 0530 hrs - Arrival at Gadag 0830 hrs - Drive to Aihole & Pattadakal 1300-1600 hrs - Lunch at Badami Court. 1600-1800 hrs - Exploring Badami 1900 hrs - Dinner onboard 2000 hrs - Departure for Goa Day 7 - Sunday, Goa 0530 hrs - Arrival at Goa 0900 hrs - Drive to Mapple Viva. 1200-1600 hrs - Lunch and then outing at the Calangute Beach 1800 hrs - Return to Train.
    [Show full text]
  • November, 2015 Issue of Integral News
    From: ICF Staff Club To frAG129/18, VII Main Rd AnnaNagar,Chennai-40 ---------------------------------------- ----------------------------------- -------------------------------------------------------------------------------------------------------------------------------------- Issue# 121 Free Monthly News Bulletin – for Internal Circulation November 2015 Email: [email protected] Contact: 900 314 1464, 9539, 9659, 9731, Rly 46490, 47661 Chief Editor: K.Ravi, SSE/Shop80 Associate Editors: M.A.Jaishankar, SSE/Proj A.R.S.Ravindra, SSE/Proj Treasurer:R.Mehalan, SE/IT Shell Offices: R.Thilak, Tech Trainee S.K.Satishkumar, SSE/Proj K.Sekar, Ch.OS/Engg N.Jeganivasan, Stores Inspector N.Ganesh,SSE/MPO/S S.Ghatikachalarao,SSE/WS th N.Devaraju, SSE/Plant Shri Ashok K Agarwal, GM, administering Vigilance Pledge on 26 Oct. V.Sasikala, OS/PB B.Jayalalitha, Accts Asst Shell Shops: P.Baskaran, SSE/40 A-shed: R.Nagarajan,, SSE/10 B-shed: A.V.Gopalakrishna, SSE/22 Shop 24,25,26: N.Ravikumar, SSE/26 D&L-shed:P.T.Sreevalsan, SSE/13 40,J,E: R.Lakshminarayanan, SSE/40 48,RPF: R.Senthilnathan,SSE48 11,23,41,TS:R.Jegathiswaran,SSE/41 Insp: J.Ananthakumar,SSE/42 Progress: P.K.Panda,SSE/PCO CMT: G.Sivakumar, CMS-1 Electrical:D.T.Vijayaraj,SSE/45 Stores : K.Sundar, OS/RB1/SD Fur Offices:Harikumar.NV,SSE/MPO Accts: Sudharsan.MN,SSO/Accts PlgF,TS: G.V.Ramesh,SSE/TS/F Stores:V.Annamalai,OS/P7 Fur Shops: R.Sundarrajan,SSE/30 30: Bipinkumar Karn, SSE/30 32,34: P.Sathyanarayanan, SSE/PC32 GM visiting ICF stall in International Railway Equipment Exhibition
    [Show full text]
  • Mmf Unpaid Consolidated In
    MAHINDRA & MAHINDRA FINANCIAL SERVICES LTD :- UNPAID DIVIDEND DATA AS ON 24-07-2014 Father/ Father/ Husban Father/ Husband d Husban Proposed Date of FirstNa Middle d Last Amount Due in transfer to IEPF (DD- SLNO First Name Middle Name Last Name me Name Name Address Country State District Pincode Folio No of Securities Investment Type Rs. MON-YYYY) RAMESH SING NA STAR AUTOMOBILES MUKHTIYAR GANJ SATNA (M INDIA MADHYA SATNA 485001 MMF0000881 Amount for unclaimed and unpaid 114,284.00 22-AUG-2014 1 P) PRADESH dividend SATYANARAYANA REDDY LINGAMPALLY NA R. NO. 2-5-33, NAKKALAGUTTA, HANAMKONDA, INDIA ANDHRA WARANGAL 506001 MMF0000070 Amount for unclaimed and unpaid 5,000.00 22-AUG-2014 2 WARANGAL PRADESH dividend S G JAYARAJ INV LEASING NA NO. 4 & 5, NORTH VELLI STREET MADURAI INDIA TAMIL NADU MADURAI 625001 MMF0000079 Amount for unclaimed and unpaid 5,000.00 22-AUG-2014 3 dividend SHOP 2 SHATRUGHAN CAM SECTOR 18, NR. MAHARASHT NAVI Amount for unclaimed and unpaid 4 AMARNATH BHATIA NA MAFCO NEW BOMBAY BOMBAH INDIA RA MUMBAI 400705 MMF0000526 dividend 2,500.00 22-AUG-2014 132/1 PARK VIEW OPP. KAMALA NEHRU PARK MAHARASHT Amount for unclaimed and unpaid 5 ASHOK BHATIA NA POONA INDIA RA PUNE 411004 MMF0000587 dividend 3,800.00 22-AUG-2014 MADHYA Amount for unclaimed and unpaid 6 PREET INDER SINGH NA E1/31, AREA COLONY BHOPAL INDIA PRADESH BHOPAL MMF0000398 dividend 500.00 22-AUG-2014 MAHARASHT Amount for unclaimed and unpaid 7 JEETENDRA PAWAR NA C/O RAGHAVAN IYENGAR M M F S L BOMBAY INDIA RA MUMBAI MMF0000722 dividend 1,000.00 22-AUG-2014 W/O.
    [Show full text]
  • Metro Railway Kolkata Presentation for Advisory Board of Metro Railways on 29.6.2012
    METRO RAILWAY KOLKATA PRESENTATION FOR ADVISORY BOARD OF METRO RAILWAYS ON 29.6.2012 J.K. Verma Chief Engineer 8/1/2012 1 Initial Survey for MTP by French Metro in 1949. Dum Dum – Tollygunge RTS project sanctioned in June, 1972. Foundation stone laid by Smt. Indira Gandhi, the then Prime Minister of India on December 29, 1972. First train rolled out from Esplanade to Bhawanipur (4 km) on 24th October, 1984. Total corridor under operation: 25.1 km Total extension projects under execution: 89 km. June 29, 2012 2 June 29, 2012 3 SEORAPFULI BARRACKPUR 12.5KM SHRIRAMPUR Metro Projects In Kolkata BARRACKPUR TITAGARH TITAGARH 10.0KM BARASAT KHARDAH (UP 17.88Km) KHARDAH 8.0KM (DN 18.13Km) RISHRA NOAPARA- BARASAT VIA HRIDAYPUR PANIHATI AIRPORT (UP 15.80Km) (DN 16.05Km)BARASAT 6.0KM SODEPUR PROP. NOAPARA- BARASAT KONNAGAR METROMADHYAMGRAM EXTN. AGARPARA (UP 13.35Km) GOBRA 4.5KM (DN 13.60Km) NEW BARRACKPUR HIND MOTOR AGARPARA KAMARHATI BISARPARA NEW BARRACKPUR (UP 10.75Km) 2.5KM (DN 11.00Km) DANKUNI UTTARPARA BARANAGAR BIRATI (UP 7.75Km) PROP.BARANAGAR-BARRACKPORE (DN 8.00Km) BELGHARIA BARRACKPORE/ BELA NAGAR BIRATI DAKSHINESWAR (2.0Km EX.BARANAGAR) BALLY BARANAGAR (0.0Km)(5.2Km EX.DUM DUM) SHANTI NAGAR BIMAN BANDAR 4.55KM (UP 6.15Km) BALLY GHAT RAMKRISHNA PALLI (DN 6.4Km) RAJCHANDRAPUR DAKSHINESWAR 2.5KM DAKSHINESWAR BARANAGAR RD. NOAPARA DAKSHINESWAR - DURGA NAGAR AIRPORT BALLY HALT NOAPARA (0.0Km) (2.09Km EX.DMI) HALDIRAM BARANAGAR BELUR JESSOR RD DUM DUM 5.0KM DUM DUM CANT. CANT 2.60KM NEW TOWN DUM DUM LILUAH KAVI SUBHAS- DUMDUM DUM DUM ROAD CONVENTION CENTER DUM DUM DUM DUM - BELGACHIA KOLKATA DASNAGAR TIKIAPARA AIRPORT BARANAGAR HOWRAH SHYAM BAZAR RAJARHAT RAMRAJATALA SHOBHABAZAR Maidan BIDHAN NAGAR RD.
    [Show full text]
  • IBPS PO 2016 Capsule by Affairscloud.Pdf
    AC Booster IBPS PO 2016 Hello Dear AC Aspirants, Here we are providing best AC Booster for IBPS PO 2016 keeping in mind of upcoming IBPS PO exam which cover General Awareness section . PLS find out the links of AffairsCloud Exam Capsule and all also the link of 6 months AC monthly capsules + pocket capsules and Static Capsule which cover almost all questions of GA section of IBPS PO. All the best for IBPS PO Exam with regards from AC Team. Kindly Check Other Capsules • Afffairscloud Exam Capsule • Current Affairs Study Capsule • Current Affairs Pocket Capsule • Static General Knowledge capsule Help: If You Satisfied with our Capsule mean kindly donate some amount to BoscoBan.org (Facebook.com/boscobengaluru ) or Kindly Suggest this site to our family members & friends !!! AC Booster – IBPS PO 2016 Table of Contents BANKING & FINANCIAL AWARENESS .................................................................................................. 2 INDIAN AFFAIRS ......................................................................................................................................... 26 INTERNATIONAL NEWS ........................................................................................................................... 50 NATIONAL & INTERNATIONAL AWARDS .......................................................................................... 67 IMPORTANT APPOINTMENTS ................................................................................................................ 72 BUSINESS .....................................................................................................................................................
    [Show full text]
  • Government of India Ministry of Railways Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO.2564 TO BE ANSWERED ON 04.12.2019 REVENUE IN RAILWAYS 2564. SHRI PRATHAP SIMHA: Will the Minister of RAILWAYS be pleased to state: (a) the details of revenue generated /loss incurred by the Railways during the last three years and the current year, year and State- wise; (b) whether the Railways has assessed the key areas/sectors, incurring losses and if so, the details thereof; (c) whether any target has been fixed by the Railways to increase its revenue and if so, the details thereof; and (d) whether the Government is considering to formulate various business models, including the Public-Private Partnership (PPP) Mode to meet revenue gap and if so, the details thereof? ANSWER MINISTER OF RAILWAYS AND COMMERCE & INDUSTRY (SHRI PIYUSH GOYAL) (a) to (d) A Statement is laid on the Table of the House. ***** STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF UNSTARRED QUESTION NO. 2564 BY SHRI PRATHAP SIMHA TO BE ANSWERED IN LOK SABHA ON 04.12.2019 REGARDING REVENUE IN RAILWAYS (a): The details of revenue and surplus generated by the Railways during the last three years and current year, year-wise is as under:- (₹ in crore) Year Total Receipts Surplus Generated 2016-17 165382.48 4913.00 2017-18 178929.64 1665.61 2018-19 190507.37 3773.86 2019-20 (upto Oct.-2019) 130962.41 * * Surplus /Shortfall is calculated on yearly basis after closure of Annual Account. State-wise data is not being compiled. (b): Indian Railways carries out certain transport activities which are uneconomic in nature but carried out in the larger interest of the country.
    [Show full text]
  • Howrah, West Bengal
    Howrah, West Bengal 1 Contents Sl. No. Page No. 1. Foreword ………………………………………………………………………………………….. 4 2. District overview ……………………………………………………………………………… 5-16 3. Hazard , Vulnerability & Capacity Analysis a) Seasonality of identified hazards ………………………………………………… 18 b) Prevalent hazards ……………………………………………………………………….. 19-20 c) Vulnerability concerns towards flooding ……………………………………. 20-21 d) List of Vulnerable Areas (Village wise) from Flood ……………………… 22-24 e) Map showing Flood prone areas of Howrah District ……………………. 26 f) Inundation Map for the year 2017 ……………………………………………….. 27 4. Institutional Arrangements a) Departments, Div. Commissioner & District Administration ……….. 29-31 b) Important contacts of Sub-division ………………………………………………. 32 c) Contact nos. of Block Dev. Officers ………………………………………………… 33 d) Disaster Management Set up and contact nos. of divers ………………… 34 e) Police Officials- Howrah Commissionerate …………………………………… 35-36 f) Police Officials –Superintendent of Police, Howrah(Rural) ………… 36-37 g) Contact nos. of M.L.As / M.P.s ………………………………………………………. 37 h) Contact nos. of office bearers of Howrah ZillapParishad ……………… 38 i) Contact nos. of State Level Nodal Officers …………………………………….. 38 j) Health & Family welfare ………………………………………………………………. 39-41 k) Agriculture …………………………………………………………………………………… 42 l) Irrigation-Control Room ………………………………………………………………. 43 5. Resource analysis a) Identification of Infrastructures on Highlands …………………………….. 45-46 b) Status report on Govt. aided Flood Shelters & Relief Godown………. 47 c) Map-showing Govt. aided Flood
    [Show full text]
  • CPI(Maoist) Celebrations
    Maoist Information Bulletin - 31 October 2014 - June 2015 Editorial ..... 2 CC Message on the Occasion of Martyr’s Week, 28 July 2015 ..... 6 CMC Call on the Occasion of the 14th Anniversary of PLGA ..... 17 10th Anniversary of the Formation of CPI(Maoist) Celebrations ..... 28 News from the Battlefield ..... 30 People’s Struggles ..... 56 Voices against War on People ..... 68 News from Behind the Bars ..... 77 News from the Counter-revolutionary Camp ..... 96 Pages from International Communist Movement ..... 121 Statements of CPI(Maoist) ..... 154 Central Committee Communist Party of India (Maoist) Editorial Compradors cannot bring prosperity to the people and the country; Only a united people’s revolutionary struggle will bring real prosperity In May this year, Narendra Modi-led struggle and the stepping-up of resistance of NDA government has completed one year in the masses in the guerrilla zones led by the office. This period has been characterised by Maoist Party and the PLGA. These an aggressive imposition of reactionary anti- developments are discussed in the present issue people policies by the Modi government in all of MIB. spheres of the Indian society – economic, Though the Maoist movement is a political, cultural and environmental – and the genuine opponent of the Modi government in growing antagonism of various classes, sections the country – a fact the central government has and groups of the oppressed masses against it. acknowledged by it several times – it by no Based on a dangerous mix of the feudal- means is its only adversary. In fact, had the Brahmanical Hindutva ideology with Maoists been the only major force resisting it, imperialist-dictated neo-liberalism, the anti- Modi government would have had much less people and anti-country treacherous policies of to worry.
    [Show full text]
  • Department of Atomic Energy
    DEPARTMENT OF ATOMIC ENERGY The vision of the Department of Atomic Energy (DAE) is to empower India through application of nuclear science and technology, and to provide better quality of life to its citizens. During the period from May, 2014 till December 31, 2014, the programmes of the Department achieved impressive growth in various segments and domains. These are described below. In Nuclear Power generation,Unit 1 of the Kudankulam Nuclear Power Project-1 (KKNPP-1) of 1000 MWe commenced commercial operation on December 31, 2014. With this, the total number of operating power reactors is 20 with an installed capacity of 5680MWe. The second Unit, KKNPP – 2 is also in advanced stage of commissioning. During the calendar year 2014 the highest ever generation of 37146 MUs was recorded which is 10% higher than last year's generation. The Rajasthan Atomic Power Station (RAPS)-5 recorded a continuous run of 765 days which is the best in Asia and the second best in the world. Consent of the Haryana State Pollution Control Board (HSPCB) was obtained in October 2014 to establish the Gorakhpur AnuVidyutPariyojanaHarayana (GHAVP) Units-1&2 (2x700 MWe PHWRs). In the area of uranium exploration, over 16,535 tonnes of additional Uranium Oxide (U3O8) reserves have been established in Andhra Pradesh, Meghalaya and Jharkhand during the year thus taking the country's uranium resources to over 2, 14,158 tonnes of U3O8. The Tummalapalle uranium project is readying for commissioning in 2015-16. The mine has achieved the desired ore production capacity and adequate ore has been stockpiled.
    [Show full text]
  • BARASAT DMSION' PWD R^*O^. Rnoda Rovra Road
    Public Works DePartment Government of West Bengal Notification No. 3p-37ll3l43l-R/pl- dated 11.08.2015.-ln exercise of the power conferred by Section 5 of the West as the said Act), the Governor is Bengal Highways Act, lg64 (west Ben. Act XXVIII of 1964) (hereinafter referred to of clause (d) of section 2 pleased hereby to appoint, with immediate effect, the Highway Authority within the meaning its length under under the Public of the said Act as mentioned in column (4) of Schedule below, in respect of road and (3), respectively, of the said works Department in North 24 parganas district as mentioned in column (2) and column Schedule, for the purposes of the said Act:- SCHEDULE NORTH 24 PARGANAS DISTRICT DMSION: BARASAT DMSION' PWD q0- Highway sl. Name of the Road oE Authority No. (4) I (3) 5.00 I Yol Road (0.00 40.00 2 ET Eloeirhqf I Road kmo to 40.00 km (40-00 6.40 .t Elooirhof I Rond kmn to 46.40 km pa\El 0.50 4 ith hnth side ). D.":"L"r ljosnqhed Rnad (0 00 kmn to 13.00 13.00 3.00 gasirhat Flasnabad Road (13.00 kmp to 16'00 kmp) t 18.00 7 R^*o^. Rnoda Rovra Road (0.00 kmp to 18.00 km 1 5.60 8 gonsron gugda Boyra Road (18.00 kmp to 33'60 km) 16.00 9 BonguonChakdah Ro@ l.60 0 Bonsaon Diagonal MuniciPal Road t.20 i) Executive I Bongaon Station Road Engineer, Barasat 2.07 2 Gachha to BOP Road Division r 0.00 13 C,qiohqlq Gnhnrdansn Road ii) Assistant 0.80 4 Hakimpur Bithari Road Engineers under 15.50 5 Hasnabad Hingalgani Road Barasat Division r.80 6 Hasnabad Takighat Road having t7.60 7 Helencha Sindhrani Duttafulia Road jurisdiction of the 33.60 8 Hinealeani Dulduli Hemnagar Road road.
    [Show full text]
  • Expert Panel Endorses CM's 3 Capital Proposal
    Follow us on: RNI No. APENG/2018/764698 @TheDailyPioneer facebook.com/dailypioneer Established 1864 Published From OPINION 6 MONEY 8 SPORTS 12 VIJAYAWADA DELHI LUCKNOW AN INFLUENTIAL RBI TO BUY, SELL RS 10K BUMRAH EXPECTED TO BHOPAL RAIPUR CHANDIGARH DIASPORA CR BONDS ON MONDAY PLAY EARLY NEXT YEAR BHUBANESWAR RANCHI DEHRADUN HYDERABAD *Late City Vol. 2 Issue 50 VIJAYAWADA, SATURDAY DECEMBER 21, 2019; PAGES 12 `3 *Air Surcharge Extra if Applicable KALYANRAM AS PURE EVIL { Page 11 } www.dailypioneer.com IMA SEEKS PM'S HELP ON CENTRAL LAW ANGRY OVER MUSHARRAF VERDICT, INTERNET SUSPENDED FOR 45 HRS CBI COURT CONVICTS 23-YR-OLD FOR TO CHECK VIOLENCE AGAINST MEDICOS PAK WANTS REMOVAL OF JUDGE IN MAJOR CITIES OF UP, WB RAPE-MURDER OF TECHIE IN RANCHI he IMA has sought Prime Minister Narendra Modi's intervention to urious over a special court's verdict to drag Gen (retd.) Pervez n an unprecedented clampdown, internet services were suspended across special CBI court in Ranchi on Friday convicted a 23-year-old Tbring a Central law to protect medical professionals from violence, FMusharraf''s corpse to the Parliament and hang it for three days, the Imajor cities in Uttar Pradesh and a few sensitive ones in West Bengal and Ahabitual offender, Rahul Raj, for the rape and murder of an after a draft bill in this regard was put on the back- Pakistan government on Thursday said that it will move to the Supreme Karnataka as central and state governments doubled down on efforts to engineering student, on the fourth anniversary of Delhi's Nirbhaya case, burner with the Home Ministry dismissing the need Judicial Council to unseat the "mentally unfit" head check the spread of rage against the new citizenship law.
    [Show full text]
  • Investigation on Growth of Oil Degrading Thermophilic Bacteria Isolated from Hot Spring
    BIOSCIENCES BIOTECHNOLOGY RESEARCH ASIA, December 2018. Vol. 15(4), p. 805-815 Investigation on Growth of Oil Degrading Thermophilic Bacteria Isolated from Hot Spring Iqbal Ansari*1, Ritesh Kumar2, Muniyan Sundararajan3, Deblina Maiti1, Mohd Ashraf Rather4 and Meemshad Ali5 1Ph.D Scholar, Academy of Scientific and Innovative Research (AcSIR), CSIR-CIMFR, Dhanbad, Jharkhand, India. 2Scientist, CSIR-CIMFR, Dhanbad-826015, India. 3Principal Scientist, CSIR-CIMFR, Dhanbad-826015, India. 4Department of Fisheries Biology, College of Fisheries, Ratnagiri-India. 5Department of Biotechnology, VBU, Hazaribagh, India. http://dx.doi.org/10.13005/bbra/2689 (Received: 13 October 2018; accepted: 27 November 2018) Oil spills are one of the key concerns of oil industry. The main distress of environmental specialists is the hazard to the marine ecosystem, caused due to offshore oilspills.In the present studythe oil degrading potential of isolated bacteria on different media composition was carried out. From the study, it has been found that oil degrading thermophilic bacteria are capable of degrading soyabean oil, olive oil, tween20, glycerol and crude petroleum oil. The culture of thermophilicwas performed in thermus agar media and it was observed from the experimental study that the growth of thermophilic bacteria was moderately good at the range of 50oC to 60oC and 60oC to 70oC but declines after 70oC; no growth was observed in the range of 25oC to 50oC. It has also detected that the decaying capability of the thermophilic bacteria in Olive oil is initially better than soyabean oil during first six hours culture afterward its performance is better in soyabean oil than Olive oil. The present study is of special environmental significance as it can be efficiently used for bioremediation of oil polluted water.
    [Show full text]