Questions for Oral Answers and Their Replies”

Total Page:16

File Type:pdf, Size:1020Kb

Questions for Oral Answers and Their Replies” 1 (49th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Saturday, the 26th January, 2013 (Originally Starred Question Nos. 23,24,25, 28, 35, 42, 43, 44, 19, 30, 31, 32, 33, 38, 129, 131, 133, 135, 137, 138, 139, 142, 143, 144 and 145 were set down for answer during the 48th Session) 23. *Ms. Tahira Aurangzeb: Will the Minister for Water and Power be pleased to state: (a) whether it is a fact that two Power Plants for the generation of electricity are being installed at Tharparkar; (b) if so, the annual quantum of electricity to be generated therefrom alongwith the time by which the generation of electricity will be started therefrom? Minister for Water and Power (Ch. Ahmed Mukhtar): (a) Two Power Plants of 50 MW each (IGCC 2009) were approved by the ECNEC on January 9, 2011 at a cost of Rs.8898.70 million for the generation of electricity at Tharparkar. Funds of Rs 900.00 million have so far been released by the Finance Division, GoP vide their letter No.F.4(1)PF.IV/ 2012-44 dated 27-08-2012. The spade work has been started at site. On receipt of remaining funds in accordance with the requirement and schedule, the project would be completed within two years. (b) Around 250 million of energy units will be generated annually after COD to be achieved after 2 years at 60% load factor. 2 24. *Ms. Tasneem Siddiqui: Will the Minister for Water and Power be pleased to state whether it is possible to end the load shedding of electricity In the country; if so, the steps taken in this regard so far? Minister for Water and Power (Ch. Ahmed Mukhtar): Yes it is possible (b) and the steps taken to overcome the gap between supply and demand are as under:— Supply side measures, Supply side measure consist of the following areas: 1. Addition of new power plants: (i) Addtion of Wapda Hydel Projects. (ii) Addition of IPPs.(Independent Power Plants). (iii) Addition of Public Sector Plants. 2. Rehabilitation of GENCOs Plants. (Public Sector Power Plants) 3. Supply of gas to thermal power plants and IPPs. 4. Supply of High Sulphur Fuel Oil (HSFO) and Low Sulphur Fuel Oil (LSFO) to GENCOs and IPPs plants. Demand side measures • Disconnection of bill board and neon sign, encouragement to convert to solar power systems. • Switching off alternate street lights points and conversion of street lights to solar system / LEDs ( in the longer run). • Ornamental lights- complete elimination. 3 • Ceremonial lights- complete elimination. • Sports lighting / usage- ban till the crises remains • Liaison with provincial agriuculature departments for eduacation of Agri tube- well users for. i. Night time usage from 10:00 PM to 06:00 AM. ii. use of standard motor/pumps iii. Re-winding with standard wire etc. • Installation of LT (Low Tension) capaictors on consumer premises etc to enhance life of customer appliances etc liaison with local manufacturers/ farmer chambers. • Replacement of incandicent lamps with CFLs (energy savers). • Installation of Time of day(TOD) satic meters on 3 phase domestic and commercial consumers having load 5 KW and above. • Staggering of the holidays in industry and Govt. offices. • Closure of shopping malls and commercial centers/markets/plazas at 08:00pm through awareness program. • Marriage halls must be closed at 10:00pm • Usage of air conditoners in Govt. offices for grade 20 and above after 11:00AM. • Campaign to keep AC themostat at 26 C minimum. • Five days working in a week in Govt. departments and affiliated institutions. 25. *Ms. Khalida Mansoor: Will the Minister for Water and Power be pleased to state: (a) whether it is a fact that Norway has offered to generate electricity from the sea waves; if so, the details thereof; and 4 (b) the time by which the electricity will be generated therefrom? Minister for Water and Power (Ch. Ahmed Mukhtar): (a) No such proposal is under process in Ministry of Water and Power. (b) Not Applicable. 28. *Mrs. Nisar Tanveer: Will the Minister for Water and Power be pleased to state: (a) the ratio of energy of all sources added in the national grid as on March 17th, 2008; (b) the ratio of energy of allsources added in the national grid as on September 15th, 2012; (c) the Programmes/projects of electricity/energy production which were in progress on March, 2008 alongwith the specification and present status thereof; (d) the Programmes/projects of electricity launched since March 17, 2008 till date alongwith the specification and present status thereof; and (e) the year and project-wise amount spent on the electricity projects since March, 2008 till date? Minister for Water and Power (Ch. Ahmed Mukhtar): (a) The ratio of energy of all sources added in the national grid as on March 17, 2008 is as under:— —————————————————————————————— Sr. No. Source Capacity (MW) Ratio (%) —————————————————————————————— 1. Hydel Generation 6,376 41.31 2. Thermal Gencos 3,580 23.20 3. Thermal (IPPs excluding Nuclear 5,178 33.55 4. Thermal (Nuclear) 300 1.94 —————————————————————————————— Total Energy Generation 15,434 100.00 —————————————————————————————— 5 (b) The ratio of energy of all sources added in the National Grid as on September 15, 2012 is as under:— —————————————————————————————— Sr. No. Source Capacity (MW) Ratio (%) —————————————————————————————— 1. Hydel Generation 6,448 41.31 2. Thermal Gencos 3,580 23.20 3. Thermal (IPPs excluding Nuclear 7,668 33.55 4. Thermal (Nuclear) 615 1.94 —————————————————————————————— Total Energy Generation 18,331 100.00 —————————————————————————————— (c) Two Power Projects of net installed capacity of 950 MW through public sector were underway by PEPCO. Around 1500 MW hydel projects were at different level of completion since March 2008. The details can be seen at Annex-I. (d) The attached list indicates the projects underway since 17th March 2008. Details can be seen at Annex-II. (e) Year and Project wise amount spent on the projects since March 2008 can be seen at Annex-III. (Annexures have been placed in the National Assembly Library) 35. *Mrs. Munira Shakir: Will the Minister for Water and Power be pleased to state whether it is a fact that new water reservoirs have been constructed to store the rain and flood water in the country during the last four years till date; if so, the details thereof? Minister for Water and Power (Ch. Ahmed Mukhtar): Khyber Pakhtunkhwa: It is correct that new reservoirs are constructed to store the rain flood water in the province of Khyber Pakhtunkhwa. 6 In the Directorate General, Small dams, Irrigation Department Khyber Pakhtunkhwa, the following 02 No. PSDP Schemes have been approved during 2006-07 & 2007-08 respectively. The details of completed/under construction small dams are as under:— I. Construction of 20 No, Small Dams in Khyber Pakhtunkhwa, PSDP 2012-13 No. 29. —————————————————————————————— S. No. Name of Sub-Project Status ———————————————————————————————————————— i. Construction of Karak Dam Distt. Karak Physically Completed ii. Construction of Loughar Dam Distt Karak Physically Completed iii. Construction of Khair Bara Dam Distt. Haripur Physically Completed iv.. Construction of Jabba Khattak Dam Distt. Nowshera Physically Completed v. Construction of Darmalak Dam Distt. Kohat Under Constn. vi Construction of Ghole Banda Dam Distt. Karak Under Constn. vii Construction of Mardan Khel dam District Karak Under Constn. viii Construction of Zamir Gul Dam Distt Kohat Recently approved ———————————————————————————————————————— II. Construction of Sanam, Palai & Kundal Dams in Khyber Pakhtunkhwa, PSDP 2012-13 No. 37 —————————————————————————————— S. No. Name of Sub-Project Status ———————————————————————————————————————— i Construction of Palai Dam Distt. Charsadda Under Constn. ii Construction of Kundal Dam Distt. Swabi Recently approved iii Construction of Sanam Dam Distt. Dir Lower Under process for approval. ———————————————————————————————————————— WAPDA: To “store rain and flood water” following dams have been constructed during the last four years:— 7 ———————————————————————————————————————— Storage Generation Sr. Name of Location Live/Gross Capacity Completion No. Project (MAF) (MW} date ———————————————————————————————————————— 1. Mangle Dam Mirpur AJ&K 4.405 / **120 *December, Raising 4.50 2009 2. Satpara Dam Skardu, Gilgit- 0.053 / 17.3 June, Baltistan 0.093 2012 3. Sabakzai Dam Zhob Town, 0.014/ — June, Balochistan 0.032 2009 —————————————————————————————— * Resettlement work are in progress ** Additional 42. *Rana Mahmood -ul- Hassan: Will the Minister for Water and Power be pleased to state: (a) the average transmission and distribution losses of each DISCO as on March, 2008 and at present respectively; (b) whether it is a fact that the maintenance of transmission and distribution lines have not been made during the last four years till date; if so, the reasons thereof; (c) the impact of such losses to the respective consumers of the said DISCOs; and (d) the steps being taken to control the said losses? Minister for Water and Power (Ch. Ahmed Mukhtar): (a) Transmission and Distribution losses vary from month to month depending on weather conditions and industrial / agriculture demand. Therefore accumulative average losses of a year show the clear picture instead of comparing it on month basis Losses for the year 2008-2009 & 2011-2012 are given hereunder:— 8 —————————————————————————————— Name of DISCOs Average transmission and distributation losses (%age) ———————————— 2008-2009 2011-2012 —————————————————————————————— LESCO 13.3 13.5 GEPCO 11.0 11.2 FESCO 10.7 10.9 IESCO 10.8 9.5 MEPCO 18.4 17.9 PESCO+TESCO 35.3 35.1 HESCO+SEPCO 35.1 38.8 QUESCO 20.1 20.9 DISCOs TOTAL 19.4 19.4 —————————————————————————————— GRANT TOTAL with (KESC & IPPs) 18.2 18.2 —————————————————————————————— However, losses of DISCOs as on March 2008 and September 2012 are given for information at Annex-I. (b) Maintenance of lines is a continuous process and is being carried out regularly for continuity of healthy power supply to the customers.
Recommended publications
  • Annual Development Programme
    ANNUAL DEVELOPMENT PROGRAMME 16 - PROGRAMME 2015 PROGRAMME DEVELOPMENT ANNUAL GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT JUNE, 2015 www.khyberpakhtunkhwa.gov.pk FINAL ANNUAL DEVELOPMENT PROGRAMME 2015-16 GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT http://www.khyberpakhtunkhwa.gov.pk Annual Development Programme 2015-16 Table of Contents S.No. Sector/Sub Sector Page No. 1 Abstract-I i 2 Abstract-II ii 3 Abstract-III iii 4 Abstract-IV iv-vi 5 Abstract-V vii 6 Abstract-VI viii 7 Abstract-VII ix 8 Abstract-VIII x-xii 9 Agriculture 1-21 10 Auqaf, Hajj 22-25 11 Board of Revenue 26-27 12 Building 28-34 13 Districts ADP 35-35 14 DWSS 36-50 15 E&SE 51-60 16 Energy & Power 61-67 17 Environment 68-69 18 Excise, Taxation & NC 70-71 19 Finance 72-74 20 Food 75-76 21 Forestry 77-86 22 Health 87-106 23 Higher Education 107-118 24 Home 119-128 25 Housing 129-130 26 Industries 131-141 27 Information 142-143 28 Labour 144-145 29 Law & Justice 146-151 30 Local Government 152-159 31 Mines & Minerals 160-162 32 Multi Sectoral Dev. 163-171 33 Population Welfare 172-173 34 Relief and Rehab. 174-177 35 Roads 178-232 36 Social Welfare 233-238 37 Special Initiatives 239-240 38 Sports, Tourism 241-252 39 ST&IT 253-258 40 Transport 259-260 41 Water 261-289 Abstract-I Annual Development Programme 2015-16 Programme-wise summary (Million Rs.) S.# Programme # of Projects Cost Allocation %age 1 ADP 1553 589965 142000 81.2 Counterpart* 54 19097 1953 1.4 Ongoing 873 398162 74361 52.4 New 623 142431 35412 24.9 Devolved ADP 3 30274 30274 21.3 2 Foreign Aid* * 148170 32884 18.8 Grand total 1553 738135 174884 100.0 Sector-wise Throwforward (Million Rs.) S.# Sector Local Cost Exp.
    [Show full text]
  • Water Resources Development in Pakistan a Revisit of Past Studies
    World Water Day 22nd March, 2014 56 WATER RESOURCES DEVELOPMENT IN PAKISTAN A REVISIT OF PAST STUDIES By Engr. Abdul Khaliq Khan1 Abstract Three-fourths of the Earth’s surface is covered with water. Only 1% of the World’s water is usable, about 97% is salty sea water and 2% is frozen in glaciers and ice caps. All life on earth depends on water. Population is increasing and hence water availability per person is reducing. Civilizations have historically flourished around rivers and major waterways and for centuries these waterways have been a source of their livelihood. In modern times a remarkable irrigation network was developed by the British in the Indus river basin and at the time of partition the dividing line of the sub-continent disregarded not only the topography but also the irrigation boundaries of the then existing canal supply system. This created great challenges for the water resources development work in Pakistan. This paper discusses the importance of water and its role in the economic development of a country through increase in agricultural and industrial development. It traces the path as to how in Pakistan over the last 67 years various studies were carried out for the planning and development of water resources in the country. It discusses the steps that need to be taken today so that ample water is made available for our future generations for their survival. 1. INTRODUCTION All life on Earth depends on water, whether it is a plant in a desert, an animal in a wilderness, an insect in a rock crevice or a fish in a lake.
    [Show full text]
  • Pakistan Public Expenditure Management, Volume II
    Report No. 25665-PK PAKISTAN Public Expenditure Management Accelerated Development of Water Resources and Irrigated Agriculture VOLUME II January 28, 2004 Environment and Social Development Sector Unit Rural Development Sector Unit South Asia Region Document of the World Bank CURRENCY EQUIVALENTS Currency Unit = Pakistan Rupee US $1 = PKR 57.8 FISCAL YEAR July 1-June 30 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank MIS Management information system ADP Annual Development Plan MOWP Ministry of Water and Power AWB Area Water Board MTEF Medium Term Expenditure Framework BCM Billion cubic meters MTIP Medium Term Investment Plan CCA Canal command area NDP National Drainage Program DMP Drainage Master Plan NDS National Drainage System EFR Environmental Flow Requirement NSDS National System Drainage Study EIRR Economic internal rate of return NWFP North West Frontier Province FATA Federally Administered Tribal Areas NWP National Water Policy FGW Fresh groundwater OFWM On-farm water management FO Farmer organization O&M Operations and Maintenance GDP Gross development product PIDA Provincial Irrigation and Drainage Authority GIS Geographic Information System POE Panel of Experts GOP Government of Pakistan PRHS Pakistan Rural Household Survey HYV High yielding variety PSDP Public Sector Development Program IBIS Indus basin irrigation system PV Present Value IDA International Development Association RAP Revised Action Plan IPPs Independent Power Producers RBOD Right Bank Outfall Drain IRSA Indus River System Authority SCARP Salinity control
    [Show full text]
  • TARIQ ALTAF 1 CURRICULUM VITAE Name : TARIQ ALTAF Nationality : Pakistani Date & Place of Birth : May 11, 1958 Lahore
    TARIQ ALTAF 1 CURRICULUM VITAE Name : TARIQ ALTAF Nationality : Pakistani Date & Place of Birth : May 11, 1958 Lahore - Pakistan Expertise : Hydraulics / Water Resources Engineering Contact Information : Cell +92 333 4262359 Email [email protected], [email protected] Website www.tariqaltaf.com Education : M.Sc. Water Resources Engineering (1987), George Washington University, Washington D.C. U.S.A. B.Sc. Civil Engineering (1981), University of Engineering and Technology Lahore – Pakistan Membership of Professional : Member Pakistan Engineering Council Associations Member, Institute of Engineers, Pakistan Member Pakistan Engineering Congress Training / Workshops / Seminars : International Conference on “New Challenges in Geotechnical Engineering”, at Lahore – Pakistan (January 2017). Consultative Seminar on “Finalization of Draft National Water Policy” at Islamabad – Pakistan (Nov.2016). Symposium on “The Vulnerability of Pakistan’s Water Sector to the Impacts of Climate Change” organized by Center for Climate Research and Development (CCRD) COMSATS Institute of Information Technology (CIIT) at Islamabad (May 2016). Symposium on “Pakistan-India Trans boundary Water Disputes” at Lahore – Pakistan (April 2016). Congress of “ICID (International Commission on Irrigation and Drainage)” at Lahore – Pakistan (October 2008). 2nd South Asia Water Forum at Islamabad – Pakistan (December 2002). Course on "Hydropower Development" organized by the Pakistan-German Hydropower Development Programme. Workshop on "Experience with HEC-2 for Computing
    [Show full text]
  • 10-35 Waterworldwaterday 22 March 2014Water and Anex Izharul
    World Water Day 22nd March, 2014 10 WATER ENERGY NEXUS By Dr. Izhar ul Haq1 SYNOPSIS Pakistan has on the average about 145 MAF of surface flows per annum. Out of this on average 103 MAF is diverted for irrigation at various barrages, 10 MAF is the system loss and 32 MAF goes down the last barrage into sea every year. Mangla and Tarbela two mega Dams were built as a part of the replacement works of the Indus Basin Plan. Their storage capacity has reduced due to sedimentation. There are about 100 small to medium dams on tributaries but their storage capacity is small. Pakistan has presently storage capacity of 10% of annual flows against 40% World average. Construction of Kalabagh Dam is stalled due to non consensus of the provinces. Diamer Basha Dam, having the approval of Council of Common Interest and Political Consensus, is ready for construction since 2008 and is still awaiting the financing arrangement for construction. These are only a couple of mega storage sites on main river Indus. Pakistan must build storage dams not only for food self sufficiency but also for cheap hydropower and flood mitigation. Pakistan has hydropower potential of 60,000 MW out of which it has exploited only 11%. The share of hydropower has reduced from 60% to 32% of the total power generated. The dependence on the imported fossil fuel (oil) has pushed the power tariff upwards. Pakistan has 18 small to medium hydel stations and only 3 stations greater than 1000 MW. The hydel power produced by Mangla and Tarbela has been the main stay in the economy of Pakistan.
    [Show full text]
  • Environmental Impact Assessment Report ______
    Environmental Impact Assessment Report ________________________________________ Project Number: 47024-004 Loan Number: 3470-PAK Pehur High Level Canal Extension Project Prepared by Irrigation Department, Government of Khyber Pakhtunkhwa, Pakistan For the Asian Development Bank Date received by ADB: 16 Oct 2019 NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report “$” refer to US dollars. This environmental impact assessment report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PROJECT MANAGEMENT OFFICE (PMO) KHYBER PAKHTUNKHWA IRRIGATION DEPARTMENT GOVERNMENT OF KHYBER PAKHTUNKHWA PEHUR HIGH LEVEL CANAL EXTENSION PROJECT ADB LOAN NO. 3470 – PAK ENVIRONMENTAL IMPACT ASSESSMENT JUNE 2019 PROJECT IMPLEMENTATION CONSULTANTS: Engineering Consultants (Pvt.) Ltd, Sri Lanka (Lead Firm) Techno Legal Consultants (Pvt.) Ltd, Pakistan (JV Firm) AGES Consultants, Pakistan (JV Firm) Geotechnical Consultancy Services, Pakistan (JV Firm) Pehur High Level Canal Extension Project Environmental Impact Assessment Report TABLE OF CONTENTS EXECUTIVE SUMMARY
    [Show full text]
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • Development Expenditure (Volume-IV) Budget Estimates 2021-22
    For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101
    [Show full text]
  • Annual Flood Report 2010
    Report on Floods 2010 GOVERNMENT OF PAKISTAN MINISTRY OF WATER AND POWER ANNUAL FLOOD REPORT 2010 Pictures of 2010‐Floods OFFICE OF THE CHIEF ENGINEERING ADVISER & CHAIRMAN, FEDERAL FLOOD COMMISSION ISLAMABAD Federal Flood Commission, Ministry of Water & Power 1 Report on Floods 2010 Table of Contents Serial # Description Page # Executive Summary 4 Acknowledgement 6 1. FLOODS IN PAKISTAN 7 1.1 Indus Basin River System 7 1.2 Causes of Floods in Pakistan 9 1.3 Impact of Global Warming 10 1.4 Historical Flood Events 11 1.5 Integrated Approach in Flood Management 12 2. FEDERAL FLOOD COMMISSSION 13 2.1 Historic Perspective 13 2.2 Functions 13 2.3 Achievements 13 3. FLOOD MANAGEMENT MECHANISM 18 3.1 Organizations involved and responsibilities 18 3.2 Pre-Flood Meetings 23 3.3 Flood Communication Cell 23 3.4 Flood Warning Dissemination System 24 4. FLOODS 2010 26 4.1 Official Seasonal Monsoon Rainfall Forecast 30 4.2 Flooding Pattern during 2010 Flood Season 31 4.3 Overall Assessment of 2010 Monsoon Season 39 4.4 Country-wide Losses/ Damages due to 2010 Floods 39 4.5 2010 Floods-Damages and Needs Assessment 40 5. LESSONS LEARNT 43 6. FUTURE MITIGATION STRATEGIES 44 6.1 Comprehensive Flood Management Plan Studies 44 6.2 Status of Flood Damage Restoration/ Reconstruction Plans 45 6.3 Mechanism for implementation of Restoration/ 48 Reconstruction Works 6.4 Pre-emptive Measures to Avert the Possibility of the Impact 49 of un-expected Floods in monsoon season (2011) 6.5 Post Flood meeting of Federal Flood Commission 50 Federal Flood Commission, Ministry
    [Show full text]
  • Psdp 2008-2009
    WATER & POWER DIVISION (WATER SECTOR) (Million Rupees) Sl. Name, Location & Status of the Estimated Cost Expenditure Throw- Allocation for 2008-09 No Scheme Total Foreign upto June forward as Rupee Foreign Total Loan 2008 on 01-7-08 Loan 1 2 3 4 5 6 7 8 9 On-going 1 Raising of Mangla Dam 62553.000 0.000 59896.310 2656.690 18000.000 0.000 18000.000 2 Mirani Dam 5861.000 0.000 4931.540 929.460 300.000 0.000 300.000 3 Resettlement Action Plan - Mirani Dam 1243.940 0.000 662.690 581.250 50.000 0.000 50.000 4 Sabakzai Dam 1576.550 0.000 1455.970 120.580 120.000 0.000 120.000 5 Kurram Tangi Dam 17205.266 5368.222 874.710 16330.556 500.000 0.000 500.000 6 Satpara Multipurpose Dam 2090.431 195.786 2442.040 0.000 100.000 0.000 100.000 7 Gomal Zam Dam 12829.000 4964.000 3678.610 9150.390 2000.000 0.000 2000.000 8 Greater Thal Canal (Phase - I) 30467.000 0.000 8091.530 22375.470 1500.000 0.000 1500.000 9 Kachhi Canal (Phase - I) 31204.000 0.000 19517.820 11686.180 8500.000 0.000 8500.000 10 Rainee Canal (Phase - I) 18861.580 0.000 5871.730 12989.850 3000.000 0.000 3000.000 11 Lower Indus Right Bank Irrigation & 14707.000 0.000 11072.110 3634.890 2500.000 0.000 2500.000 Drainage, Sindh 12 Balochistan Effluent Disposal into RBOD.
    [Show full text]
  • 3 Table of Contents
    TABLE OF CONTENTS TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE GENERAL ABSTRACT 20132013----20142014 General Abstract of Revenue s & Expenditure for the Year i 2013-2014 Budget at a Glance ii Summary Position of Revenues for the Year 2012 -13 & iii 2013-2014 Summary Position of Expenditure for the Year 2012 -13 iv & 2013-2014 20122012----20132013 AN OVERVIEW 1 Current Revenue Expenditure 1 2 Sectoral Expenditure 4 3 Provincial Revenue Receipts 16 4 Capital Receipts and Expenditures 22 5 Local Government Act 2012 29 GROWTH AND DEVELOPDEVELOPMENTMENT 6 Hydro Electric Power Potential 32 7 Revenues from Oil and Gas 37 8 7th National Finance Commission 44 PUBLIC FINANCIAL MANAGEMENT 9 Public Financial Management (PFM) 48 10 Bank of Khyber 60 11 Funds Management 66 12 Annual Development Programme 2013-14 71 www.financekpp.gov.pk TABLE OF CONTENTS TABLE OF CONTENTS ANNEXURES DESCRIPTION PAGE I CDL Liabilities as on 01-07-2013 109 II Detail of Premature Debt Retirement 110 III Foreign Exchange Loan Liabilities as on 01-07-2013 111 Disbursement of Loans in R/o of Ongoing Foreign IV 113 Projects Share as on 30-06-2013 V General Revenue Receipts 114 VI Current Revenue Expenditure 117 Development Budget by Sector for the Year 2012-13 VII 119 & 2013-14 Annual Development Programme Since 1971-72 on VIII 124 ward Growth in Current Revenue Budget & Revenue IX 125 Receipts Since 1974-75 on ward Grant Wise General Abstract of Current Budget for the X 127 Year 2013-14 www.financekpp.gov.pk FOREWORD White Paper reflects the Provincial Government’s policies and presents an overview of the financial position of the Provincial Government.
    [Show full text]
  • NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS for ORAL ANSWERS and THEIR REPLIES” to Be Asked A
    1 (54th Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Wednesday, the 14th March, 2018 36. *Ms. Khalida Mansoor: (Deferred during 50th Session) Will the Minister for Water Resources be pleased to state the location where the Munda Mohmand Dam is being constructed at present? Minister for Water Resources (Syed Javed Ali Shah): The Project is proposed to be constructed across Swat River at a distance of about 48 km from Peshawar and 5 km upstream of existing Munda Headworks in Mohmand Agency, FATA. 63. *Ms. Tahira Aurangzeb: (Deferred during 52nd Session) Will the Minister for Water Resources be pleased to state: (a) the name of proposed site for the construction of Akhori Dam; and (b) whether construction work of said Dam has been started? Minister for Water Resources (Syed Javed Ali Shah): (a) Akhori Dam site (600 MW and 6.0 MAF) is proposed to be constructed on a small tributary of Haro River, near Akhori Village across Nandna Kas, in Attock District of Punjab. (b) Construction of Akhori Dam, Project has not been started ,yet. The Project status is as follows: 2 Feasibility study of Akhori Dam Project was completed in January 2006. PC-II for Detailed Engineering Design and Tender Documents of the Project amounting to Rs. 818.00 Million submitted to Ministry of Water & Power on June 23, 2006 for approval. Detailed Engineering Design and Construction of the Project is pending on the want of consensus among provinces. 67.
    [Show full text]