Preparatory Survey on Lakhra Coal Fired Thermal Power Plant Construction Project in Pakistan

Total Page:16

File Type:pdf, Size:1020Kb

Preparatory Survey on Lakhra Coal Fired Thermal Power Plant Construction Project in Pakistan The Islamic Republic of Pakistan GENCO Holding Company Limited Preparatory Survey on Lakhra Coal Fired Thermal Power Plant Construction Project in Pakistan FINAL REPORT October 2016 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) Nippon Koei Co., Ltd Mitsui Consultants Co., Ltd. 4R JR(先) 16-040 FINAL REPORT for The Preparatory Survey on Lakhra Coal Fired Thermal Power Plant Construction Project in Pakistan CONTENTS Chapter 1 INTRODUCTION 1.1 Background of the Survey ......................................................................................................... 1 - 1 1.1.1 Deficit of Power Supply ........................................................................................................ 1 - 1 1.1.2 Generation Mix ..................................................................................................................... 1 - 1 1.1.3 Government Policy ............................................................................................................... 1 - 1 1.1.4 JICA Action ........................................................................................................................ 1 - 1 1.2 Objective of the Survey .............................................................................................................. 1 - 1 1.3 Rational of Coal Fired Thermal Generation ............................................................................... 1 - 2 1.4 Survey Area ............................................................................................................................... 1 - 3 1.5 Scope of the Survey .................................................................................................................. 1 - 3 1.6 Schedule of the Survey .............................................................................................................. 1 - 4 Chapter 2 Basic Data and Information 2.1 National Power Policy 2013 ....................................................................................................... 2 - 1 2.2 Development of Thar Coalfield .................................................................................................. 2 - 5 2.2.1 Summary of the Development Status ................................................................................. 2 - 5 2.2.2 Power Plant Construction Plan in Thar Coalfield .................................................................. 2 - 7 2.2.3 Block II ................................................................................................................................. 2 - 7 2.2.4 Block I ................................................................................................................................. 2 - 9 2.2.5 Block VI ................................................................................................................................ 2 - 10 2.3 Existing and Future Planned Generation Capacity .................................................................... 2 - 13 2.3.1 Existing Generation Capacity (except KESC) ...................................................................... 2 - 13 2.3.2 Generation (except KESC) in 2011-12 ................................................................................. 2 - 13 2.3.3 Future Generation Development Plan .................................................................................. 2 - 14 2.3.4 Power Demand .................................................................................................................... 2 - 15 2.3.5 Prioritized Projects Pushed by the Government other than Gaddani ................................... 2 - 16 2.4 Pakistan Power Park in Gaddani ............................................................................................... 2 - 17 2.4.1 Background of Gaddani ........................................................................................................ 2 - 17 2.4.2 Organization of the Power Park ........................................................................................... 2 - 17 2.4.3 Outline Plan .......................................................................................................................... 2 - 18 2.4.4 Budget for the Project ........................................................................................................... 2 - 19 2.4.5 Preparatory Work Schedule ................................................................................................. 2 - 19 2.4.6 Transmission Line from Gaddani .......................................................................................... 2 - 20 2.5 Oil to Coal Conversion ............................................................................................................... 2 - 21 2.6 Circular Debt .............................................................................................................................. 2 - 21 2.6.1 Circular Debt in the Power Sector ........................................................................................ 2 - 21 2.6.2 Clearance of Circular Debt ................................................................................................... 2 - 21 2.7 Upfront Tariff for Coal Thermal Generation ................................................................................ 2 - 22 2.7.1 Upfront Tariff ......................................................................................................................... 2 - 22 2.7.2 Operation and Maintenance (O&M) Cost ............................................................................. 2 - 23 2.8 Power Tariff for Consumer ......................................................................................................... 2 - 24 2.9 Budget for Infrastructures for Thar Coalfields ............................................................................ 2 - 25 2.9.1 Budget for the Infrastructures allocated by Government of Sindh ........................................ 2 - 25 2.9.2 Issues on Infrastructure ........................................................................................................ 2 - 26 2.10 Organization of the Power Sector .............................................................................................. 2 - 27 2.10.1 Power Sector Organization in the Federal Government ....................................................... 2 - 27 2.10.2 Organization of the Jamshoro Power Station ....................................................................... 2 - 28 2.10.3 Organization of IPP HUBCO Power Station ....................................................................... 2 - 30 2.10.4 Organization of Power Station in Japan ............................................................................... 2 - 31 Chapter 3 Selection of the Suitable Site 3.1 General ...................................................................................................................................... 3 - 1 3.1.1 Criteria for the Site Selection .............................................................................................. 3 - 1 3.1.2 Identification of Candidate Site ............................................................................................. 3 - 2 3.1.3 Major Issues Affecting Site Selection ................................................................................... 3 - 8 3.2 Site Conditions........................................................................................................................... 3 - 11 3.2.1 Mine mouth in Thar .............................................................................................................. 3 - 11 3.2.2 Indus River Area ................................................................................................................... 3 - 16 3.2.3 Karachi Port Area ................................................................................................................. 3 - 21 3.3 Infrastructures ............................................................................................................................ 3 - 24 3.3.1 Mine mouth in Thar .............................................................................................................. 3 - 24 3.3.2 Indus River Area ................................................................................................................... 3 - 56 3.3.3 Karachi Port Area ................................................................................................................. 3 - 73 3.4 Selection of Major Technology ................................................................................................... 3 - 81 3.4.1 Usage of Coal ...................................................................................................................... 3 - 81 3.4.2 Plant Size and Steam Condition ........................................................................................... 3 - 89 3.4.3 Condenser Cooling and Vacuum .......................................................................................... 3 - 93 3.5 Selection of Candidate Site ....................................................................................................... 3 - 97 3.5.1 Evaluation of Technical Aspect ............................................................................................. 3 - 97 3.5.2 Evaluation of Economical Aspect ......................................................................................... 3 - 103 3.5.3 Conclusion...........................................................................................................................
Recommended publications
  • Pakistan” of the Ron Nessen Papers at the Gerald R
    The original documents are located in Box 124, folder “Pakistan” of the Ron Nessen Papers at the Gerald R. Ford Presidential Library. Copyright Notice The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Ron Nessen donated to the United States of America his copyrights in all of his unpublished writings in National Archives collections. Works prepared by U.S. Government employees as part of their official duties are in the public domain. The copyrights to materials written by other individuals or organizations are presumed to remain with them. If you think any of the information displayed in the PDF is subject to a valid copyright claim, please contact the Gerald R. Ford Presidential Library. Digitized from Box 124 of The Ron Nessen Papers at the Gerald R. Ford Presidential Library MEMORANDUM THE WHITE HOUSE WASHINGTON January 10, 1975 MEMORANDUM FOR: RON NESSEN FROM: LESJANKA SUBJECT: Morning Press Items IT EMS TO BE ANNOUNCED OR VOLUNTEERED: 1. Announcement of Bhutto Visit: 11The President has invited the Prime Minister of Pakistan Zulfikar Ali Bhutto and Begum Nusrat Bhutto to Washington for an Official Visit February 4-7. The Prime Minister will meet with President Ford on February 5 and with other high level officials during his visit. The President and Mrs. Ford will host a dinner at the White House in honor of the Prime Minister and Begum Nusrat Bhutto on the evening of February 5. Secretary Kissinger conveyed this invitation to Prime Minister Bhutto during his visit to Pakistan October 31 - November 1, 1974.
    [Show full text]
  • Annexure D: Thar Coal Analysis
    American Journal of Scientific Research 160 ISSN 1450-223X Issue 11(2010), pp.92-102 Annexure-'D' © EuroJournals Publishing, Inc. 2010 http://www.eurojournals.com/ajsr.htm Composition, Trace Element Contents and Major Ash Constituents of Thar Coal, Pakistan M. Afzal Farooq Choudry Department of Environmental Science, FUUAST, Karachi, Pakistan E-mail: [email protected] Yasmin Nurgis Environmental Research Center, Bahria University, Karachi, Pakistan E-mail: [email protected] Mughal Sharif Environmental Research Center, Bahria University, Karachi, Pakistan E-mail: [email protected] Amjad Ali Mahmood Geological Survey of Pakistan, Karachi, Pakistan Haq Nawaz Abbasi Department of Environmental Science, FUUAST, Karachi, Pakistan E-mail: [email protected] Abstract Thar coalfield is a part of the Thar Desert of Pakistan. Pakistan has coal reserves of 185 billion tons, of this Thar coal reserves account for 175 billion tons spread over a single geographically contained area of 9100 sq km in the south eastern part of the Sindh. It is bounded in the north, east and south by India, in the west by the irrigated Indus river flood plain. The terrain is sandy and rough with sand dunes forming the topography. Various physio-chemical parameters including chemical composition of coal ashes, distribution of trace elements in them, were analyzed to understand the coal prospects and its share in the domestic energy production. In addition a preliminary study have also undertaken on the factors that effect the chemical composition of coal ashes. The apparent rank is high volatile Lignite “B” coal. Arithmetic mean values for proximate analysis of coals (as received basis; n=54) show these coals to be 6.83% Ash, 29.55% volatile matter, 19.2% fixed carbon and 44.3% moisture and have a heat of combustion of 6094 BTU/lb.
    [Show full text]
  • Solutions for Energy Crisis in Pakistan I
    Solutions for Energy Crisis in Pakistan i ii Solutions for Energy Crisis in Pakistan Solutions for Energy Crisis in Pakistan iii ACKNOWLEDGEMENTS This volume is based on papers presented at the two-day national conference on the topical and vital theme of Solutions for Energy Crisis in Pakistan held on May 15-16, 2013 at Islamabad Hotel, Islamabad. The Conference was jointly organised by the Islamabad Policy Research Institute (IPRI) and the Hanns Seidel Foundation, (HSF) Islamabad. The organisers of the Conference are especially thankful to Mr. Kristof W. Duwaerts, Country Representative, HSF, Islamabad, for his co-operation and sharing the financial expense of the Conference. For the papers presented in this volume, we are grateful to all participants, as well as the chairpersons of the different sessions, who took time out from their busy schedules to preside over the proceedings. We are also thankful to the scholars, students and professionals who accepted our invitation to participate in the Conference. All members of IPRI staff — Amjad Saleem, Shazad Ahmad, Noreen Hameed, Shazia Khurshid, and Muhammad Iqbal — worked as a team to make this Conference a success. Saira Rehman, Assistant Editor, IPRI did well as stage secretary. All efforts were made to make the Conference as productive and result oriented as possible. However, if there were areas left wanting in some respect the Conference management owns responsibility for that. iv Solutions for Energy Crisis in Pakistan ACRONYMS ADB Asian Development Bank Bcf Billion Cubic Feet BCMA
    [Show full text]
  • Power Project at Keti Bundar
    INFORMATION MEMORANDUM 2X660 MW IMPORTED/THAR COAL POWER PROJECTS AT KETI BANDER SINDH COAL AUTHORITY ENERGY DEPARTMENT GOVERNMENT OF SINDH Bungalow No.16 E Street, Zamzama Park, DHA Phase-V, Karachi. Phone: 99251507 1 THE LAND AND THE GOVERNMENT Pakistan, a land of many splendors and opportunities, the repository of a unique blend of history and culture from the East and the west, the cradle of one of the oldest civilizations which developed around the Indus Valley. It is the ninth most popular country of the world with 132.35 million tough, conscientious, hard working people, wishing and striving hard to enter into the 21st century as equal partners in the community of developed nations. It is located between 23 and 37 degrees latitude north and 61 and 76 degrees longitude east. Flanked by Iran and land- locked Afghanistan in the west and the Central Asian Republics and China in the north, Pakistan can rightly boost of having a significant location advantages with a vast only partially tapped market of 200 million people. The affluent Gulf States are just across the Arabian Sea to the south and provide an additional opportunity of a high consumption market. The geographical location, with one of the highest peaks of the world in the north and vast plains in the south, offers an unusual diversity of temperatures ranging from sub-zero levels on the mountains in winter to scorching heat in the plains in summer, providing friendly habitat to exquisite range of flora and fauna and a large variety of agricultural crops used for both foods and raw material for industries.
    [Show full text]
  • Economic and Social Council (ECOSOC) Question Of
    23rd Annual Session of the Seoul Model United Nations ​ Forum: Economic and Social Council (ECOSOC) ​ Question of: Developing strategies for rebuilding the economics of ​ less economically developed countries (LEDC) after the Covid-19 pandemic Student Officer: Andrew Choi, Deputy Assistant Chair ​ ​ Introduction The current COVID-19 pandemic, more commonly known as the coronavirus pandemic, is considered a global epidemic that is deemed to be severe, leaving a lasting impact on personal health and livelihoods.As the virus is becoming increasingly stringent, on January 30th of 2020, the World Health Organization (WHO) has avowed that the current issue is considered a Public Health Emergency of International Concern.1 Additionally, according to the Center for Systems Science and Engineering (CSSE) at the John Hopkins University (JHU), there are 12million confirmed cases and about five hundred thousand deaths globally as of July 10th.2 This virus has caused consequences to reach further than the spread of the disease itself. Since the condition limits all forms of interaction between individuals, companies, and even between countries, economic growth is hindered. With more than a third of the global population experiencing a lockdown, it is evident that the virus is causing permanent changes in the global economy.3 The pandemic was first introduced in Wuhan, China, in December of 2019.4 With the virus being extremely contagious, it can be spread in numerous ways: close contact between 1 Statement on the second meeting of the International
    [Show full text]
  • Planting Trees in Large Numbers Will Not Mitigate Carbon Emission to the Desired Level but Conservation of Old Forests Will Do
    International Journal of Scientific & Engineering Research Volume 10, Issue 7, July-2019 758 ISSN 2229-5518 PLANTING TREES IN LARGE NUMBERS WILL NOT MITIGATE CARBON EMISSION TO THE DESIRED LEVEL BUT CONSERVATION OF OLD FORESTS WILL DO UMA SHANKER SINGH IFS PhD ABSTRACT-The old forest ecosystem is more effective than new plantations in term of sequestering carbon; in an estimate this has been claimed that conservation of old forest is 40 times more effective than planted forest. Forests help mitigate climate change by sucking out carbon dioxide from the atmosphere, locking it away in their trunks and soil. But re-greening efforts in many countries rely on the expansion of plantations, where commercially important crops are grown, rather than forest restoration. Plantation is a very complex issue in India and requires many components to be integrated with each other and availability of land is one of them. Land has become a scarcer resource with each passing day as the world population is competing with the available land for many developmental activities and agricultural demands. For a mega-forest plantation like this, there is a strong need of huge investment in this sector and this has to be socially and ecologically viable from social audit point of view. This also needs very large areas and the size of the land required will vary with the objective of the plantation but the core issue is non-availability of suitable land in India. The legal infrastructure related to the forests and the forest departments across the states need radical reforms in order to meet the massive plantations, country is undertaking in the face of climate change mitigation after Bonn change summit in 2011.
    [Show full text]
  • The Islamia University of Bahawalpur, P a K I S T a N
    IUB Scores 100% in HEC Online Classes Dashboard The Islamia University of Bahawalpur, P a k i s t a n Vol. 21 October–December, 2020 Khawaja Ghulam Farid (RA) Seminar and Mehfil-e-Kaafi | 17 Federal Minister for National Food Security Additional IG Police South Punjab Commissioner Bahawalpur Inaugurates Visits IUB Agriculture Farm | 04 Visits IUB | 04 4 New Buses | 09 MD Pakistan Bait ul Mal Visits IUB | 03 Inaugural Ceremony of the Project Punjab Information Technology Board Cut-Flower and Vegetable Production Praises IUB E-Rozgar Center | 07 Research and Training Cell | 13 Honourable Governor Advises IUB to be Student-Centric and Employee-Friendly Engr. Prof. Dr. Athar Mahboob, Vice Chancellor, briefed the Senate meeting of the University. particular, the Governor advised Vice Chancellor, the Islamia Honourable Chancellor about the The Governor appreciated the to University to be more student- University of Bahawalpur made a progress of the Islamia University performance of Islamia University centric and employee-friendly as courtesy call on Governor Punjab of Bahawalpur. Other matters of Bahawalpur and assured of his these ingredients were necessary and Chancellor of the University, discussed included the scheduling wholehearted support to Islamia for world-class universities. Chaudhary Muhammad Sarwar. of upcoming Convocation and University of Bahawalpur. In Governor Punjab Chaudhary Muhammad Sarwar exchanging views with Engr. Prof. Dr. Athar Mahboob, Vice Chancellor National Convention on Peaceful University Campuses Engr. Prof. Dr. Athar Mahboob, Vice Chancellor, the Islamia University of Bahawalpur attended the Vice Chancellor’s Convention on peaceful Universities held in joint collaboration of the Higher Education Commission of Pakistan and Inter University Consortium for Promotion of Social Sciences.
    [Show full text]
  • Thar Coal Power Generation Potential
    Private Power and Infrastructure Board Ministry of Water & Power Government of Pakistan Foreword NETWORK: completed upto coalfield in Thar Nagarparkar Granite area and connecting all major towns of Thar including coal fields with Karachi (ii) Sindh province is blessed ELECTRICITY: available upto coalfield, (iii) with abundant coal reserves. COMMUNICATION: optical fiber line available upto Over 90% of Pakistan's coal coalfield, provision of optical fiber network between reserves are in Sindh. Mithi Islamkot-Thario Halepoto (Tharcoal Project site) Exploitation of these coal is available, (iv) WATER SUPPLY: available upto resources for power coalfield, line from Mithi to Islamkot and to coal mine generation to meet Pakistan's growing energy needs is a has been completed and water is available at Thario matter of national Halepota (Tharcoal Project site) (v) REVERSE importance. Shaheed Mohtarma Benazir Bhutto made OSMOSIS PLANTS: established near coalfield, (vi) exploitation Pakistan's Coal resources for meeting power AIRSTRIP: at design stage the location has been selected generation needs of the country a corner stone of PPP's in between Bhope-jo-Tar and Sive-jo-Tar, (vii) manifesto for the 2008 elections. The present Federal ENVIRONMENT: EIA of coal mining and coal fired and Provincial Governments of PPP are committed to power generation to be initiated, (viii) RAILWAY LINE: realizing this vision. to make Thar coalfield accessible for development and transportation, scheme for construction of railway line Mohtarma Benzir Bhutto Shaheed in her second stint as from Varvai-Islamkot Mithi Naukot Drigri-Mirpurkhas- Prime Minister of Pakistan invited the Independent Power Hyderabad has been approved. Producers (IPPs) to facilitate private sector investment in power generation in the country, as she understood In order to exploit Thar Coal resources on a fast track the growing needs of energy in the country.
    [Show full text]
  • Kundian Forest Revival to Create Jobs: PM Imran Prime Minister
    Kundian forest revival to create jobs: PM Imran 24 February 2020 Prime Minister Imran Khan has said the revival of Kundian forest will provide job opportunities as human resources will be required to guard, water and nurture plants. Talking to the media after inaugurating tree plantation campaign here on Sunday, he said unfortunately, the huge Kundian forest, planted before the Partition, had been turned into a barren land owing to the apathy of the previous governments. He said of the total 19,271 acres of forest area, around 5,000 acres had some green cover while the rest 5,222 acres are barren and would be turned into forest by massive forestation during the next four years under 10 billion tree tsunami project. The prime minister, who planted a sapling, asked the locals to guard the forest against tree fellers and land grabbers. Under the spring tree plantation drive, 250 million saplings would be planted across the country with 1.3 million to be planted in one day as part of ‘Plant for Pakistan Day’ observed on the day. The prime minister said the young generation, particularly children, were required to be sensitised on the importance of trees and also called for its inclusion in the education curriculum. He said being rich with diverse weathers and water resources, Pakistan should be exporting food to the world instead of facing shortage. He said biodiversity in the Khyber-Pakhtunkhwa had revived following the success of one billion tree tsunami project. He said a considerable number of berry plants would be planted in the forest which would help produce honey as many investors were awaiting to invest in honey production.
    [Show full text]
  • Thar Coal Project and Local Community
    Thar Coal Project and Local Community Documenting Views and Experiences of Stakeholders By Shujauddin Qureshi Zeenia Shaukat National Commission for Human Rights (NCHR) Contents Acronyms 1 Introduction and Rationale 2 Background 4 Thar Coal Background 5 The Tharparkar Context 7 Social Change in Thar 10 Thar Coal Project: A Brief Overview 14 Thar Coal and Environmental Concerns 16 Socioeconomic Issues 22 The Gorano Reservoir Issue 24 Summary of interview/discussion with community on December 14, 2018 30 Thar Coal Projects and Community’s Experiences 32 Broader concerns regarding the Project 36 Conclusion 44 Recommendations 46 Annexures 47 Acronyms Coal REAP Coal Resources Evaluation and Appraisal Programme COD Commercial Operation Date CPEC China-Pakistan Economic Corridor CPIH China Power International Holding Ltd CSR Corporate Social Responsibility EDS Effluent Disposal Scheme EIA Environmental Impact Assessment FGD Focused Group Discussion GOP Government of Pakistan GOS Government of Sindh GSP Geological Survey of Pakistan HRCP Human Rights Commission of Pakistan IEE Initial Environmental Examination IUCN International Union of Conservation of Nature LBOD Left Bank Outfall Drain MW Mega Watt MIPPs Mining & Independent Power Producers MNA Member of National Assembly NCHR National Commission for Human Rights NEQs National Environmental Quality Standards NSDWQ National Standards for Drinking Water Quality PPHI People's Primary Healthcare Initiative facilities RO Reverse Osmosis SAZDA Sindh Arid Zone Development Authority SECMC Sindh Engro Coal Mining Company SEPA Sindh Environment Protection Agency SHC Sindh High Court SSR Sino Sindh Resources (Pvt) Ltd TRDP Tharparkar Rural Development Programme USAID United States Agency for International Development pg. 1 Thar Coal Project and Local Community Introduction and Rationale Tharparkar is considered to be one of the underdeveloped districts of Pakistan.
    [Show full text]
  • Oracle Power
    THIS DOCUMENT IS IMPORTANT AND REQUIRES YOUR IMMEDIATE ATTENTION. If you are in any doubt about the contents of this document or as to what action you should take, you should immediately consult an independent professional adviser authorised under the Financial Services and Markets Act 2000, as amended (“FSMA”), who specialises in advising on the acquisition of shares and other securities, or another appropriate adviser if you are in a country outside the United Kingdom, before taking any action. This document comprises an AIM admission document which has been prepared in accordance with the AIM Rules for Companies and has been issued in connection with the application for Admission. This document does not constitute a prospectus for the purposes of the Prospectus Rules made under section 73A of FSMA and contains no offer to the public within the meaning of sections 85 and 102B of FSMA or otherwise. This document has not been, and will not be, approved or examined by the Financial Services Authority (“FSA”) pursuant to section 85 of FSMA and a copy has not been delivered to the FSA under regulation 3.2 of the Prospectus Rules, the UK Listing Authority or any other authority which could be a competent authority for the purposes of the Prospectus Directive. PROSPECTIVE INVESTORS SHOULD READ THE WHOLE OF THE TEXT OF THIS DOCUMENT AND SHOULD BE AWARE THAT AN INVESTMENT IN THE COMPANY IS SPECULATIVE AND INVOLVES A HIGH DEGREE OF RISK AND MAY RESULT IN THE LOSS OF THE ENTIRE INVESTMENT AND MAY NOT BE SUITABLE FOR ALL RECIPIENTS OF THIS DOCUMENT.
    [Show full text]
  • Sustainable Forest Management to Secure Multiple Benefits in Pakistan’S High Conservation Areas
    © UNDP Pakistan Sustainable forest management can help conserve biodiversity, mitigate climate change and secure forest ecosystem services. Sustainable Forest Management to Secure Multiple Benefits in Pakistan’s High Conservation Areas Sustainable forest management is a means of protecting forests whilst offering direct benefits to QUICK FACTS people and the environment. It contributes to local Duration: 2016 - 2020 livelihoods and offers environmental benefits such as Implementation partner: Government of Pakistan, carbon sequestration and conserving water, soil and Governments of Sindh, Khyber Pakhtunkhwa and biodiversity. Punjab Funding partner: Global Environment Facility (GEF) Less than 5 percent of Pakistan’s total area is under and UNDP forest cover, and 1.5 percent of these forests are lost Location: Khyber-Pakhtunkhwa, Punjab, Sindh every year. This has profound impacts on Pakistan’s Annual budget (2019): US$ 2,186,701 biodiversity, environment and agriculture. With Muhammad Sohail, Programme Officer, climate change, such events are becoming more Contact: Environment and Climate Change Unit, UNDP frequent and more devastating, pointing to the [email protected] For more information: www.pk.undp.org United Nations Development Programme Tel: +92 51 835 5600 August 2019 4th Floor, Serena Business Complex Fax: +92 51 265 5014 Khayaban-e-Suharwardy, G-5/1, Islamabad, Pakistan Environment and Climate Change Sustainable Forest Management to Secure Multiple Benefits in Pakistan’s High Conservation Areas urgent need to conserve Pakistan’s indigenous • Two inspection quarters/huts were constructed (1 forests. in Sukkur and 1 in Kot-Dingano); one is renovated in Chakwal; and one is under construction and Poverty, weak controls and lack of awareness one is renovated in Kaghan.
    [Show full text]