PROJECTS UNDER REP. TG GUINGONA III

(Status of projects as of November 2008) MUNICIPALITY OF

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR LGU Construction of 500,000.00 CDF-2T-10M-05 A-05-03889/ 08.25.05 DPWH-I0-DEO Phase I Completed Municipal Trial Court Bldg. -waiting for additional fund for continuation

Kulasihan 1.Construction of Multi- 1,000,000.00 CDF-30M-2T-04 A-04-03888 DPWH I- DEO MOA w/ Brgy. TURNED-OVER/ purpose Bldg. (Covered 05.08.07 Court)

2.Continuation of the CDF-20M-3T-05 Construction of Multi- 600,000.00 ROCS-05-06927/12.1 DPWH I- DEO purpose Bldg. (Covered 4.05 Court) PhaseII CDF-10M-1T-07 3. Livelihood Project for the SK of Kulasihan 100,000.00 CDF-1T-07 DTI-Buk MOA with the Turned-over 4. Renovation of SK organization 09.10.08 Office 40,000.00 ROCS-07-08749/ DSWD-Reg 10 Check issued/ 11.09.07 Under Small Infra October 2008 Bugcaon Construction of Water 1,000,000.00 CDF-30M-2T-04 A-04-03888 DPWH I- DEO Admin. TURNED-OVER System /08.08.05

Purchase of 1 computer CDF-05 set for Bugcaon National 50,000.00 DEPED Division- Turned-over High School BUK 07.04.06 1 PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR Bantuanon Construction of Multi- 500000.00 CDF-20M-3T-05 A-05-06489/ 12.12.05 DPWH Phase II Completed Purpose Bldg (Covered Court) *waiting for additional fund for continuation Kibangay Construction of Water 1,000,000.00 CDF–5M-2T-04 ROX-04-251 / DPWH I- DEO Contractor TURNED-OVER System 11.18.04 04.05.06

Alanib Construction of Flood 700000.00 CDF-10M-1T-04 A-05-01415/ DPWH Contractor TURNED-OVER Control Canal Lining 03.09.05 04.05.06

Kaatuan Construction of Multi- 500,000.00 1.CDF-10M-1T-0 1.A-05-01415/ 1.DPWH Contractor Phase I Completed Purpose Bldg. 4 03.09.05 *waiting for (Brgy Office) additional fund for continuation

Continuation of Multi- 500,000.00 CDF-1T-10M-07 A-07-07323/10.18.07 DPWH-I-DEO -Project Completed purpose Bldg (Brgy Office-Phase II) Baclayon 1. Legal assistance-Land *** Decision delivered conflict of BAMCO (Baclayon Multi- purpose Coop)

2. Construction of Multi-purpose bldg. 1,500,000 CDF-20M-1T-08 A-08-06303/ 08.27.08 DPWH I- DEO Pre-implementation (Covered Court) activity

2 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE ISSUED AGENCY IMPLEMENTOR Victory Poblacion Construction of Multi- 1,000,000.00 CDF-30M-2T-04 A-04-03888 DPWH I- DEO Contractor TURNED-OVER purpose Bldg. (Covered Court) Phase I

Continuation of the Construction of Multi- CDF-20M-3T-05 purpose Bldg. (Covered 600,000.00 ROCS-05-06927/12.1 DPWH I- DEO Court)Phase II 4.05

Construction of Farm to DA-07 Market Road of Molabuk 1,000,000.00 For Implementation Capitan Juan Songco Balila Purchase of 1 computer Sen. Villar DepEd-Division of DepEd-Division of Turned-over set for Balila ES Bukidnon

Purchase of 1 computer set for Lantapan DepEd-Division of DepEd-Division of Turned-over National High School Bukidnon Bukidnon

3 Cawayan Construction of Multi- 500,000.00 CDF-20M-3T- A-05-06489/ 12.12.05 DPWH I-DEO Contractor Phase I Completed purpose Bldg (Covered 05 Court) A-08-06303/ 08.27.08 Continuation of Covered 1,000,000.00 CDF-20M-1T-08 DPWH I-DEO Pre-implementation Court activity Basac

MUNICIPALITY OF

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED LGU Community 170,750.00 DSWD-REG 10 LMI Completed Handicrafts plus 30,000 Workshop for Small, (20 tribal weavers) Mat, Basket and Hinabol Weavers of Impasugong

Financial assistance to LGU 400,000.00 CDF-20M-3T-05 LGU LGU Implemented

Capitan Bayong 1. Construction of 1. 400,000.00 1. DPWH-CO-04 1.A-04-04701 / 1.DPWH I- DEO 1. MOA w/ LGU Phase I Completed Multi-purpose Bldg. (Minority) 12.15.04 (Covered Court) Phase I 2. Continuation of the 2. 500,000.00 2. CDF-20M-3T-06 2. 2.DPWH I- DEO Phase II Completed Construction of Multi- A-05-06489/12.12.05 purpose Bldg (Covered Court) Phase II Impalutao Spring Dev’t. Project 700000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. Phase I Completed 12.14.04 * waiting for additional fund for continuation 4 Kibenton Construction of Water 1. 500,000.00 1.CDF-30M-2T-04 1.A-04-03888 / 1.DPWH I- DEO 1. Admin. Project Completed System 12.13.04 Cawayan Construction of 400000.00 CDF-10M-2T-05 A-05-03889/ DPWH I-DEO MOA w/ LGU Completed as per School Building 08.25.05 amount programmed Hagpa

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Dumalaguing Construction of 500000.00 CDF-20M-3T-05 A-05-06489/ DPWH I-DEO By Admin Project completed Water System 12.12.05 Bontongon Construction of 500000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO MOA w/ LGU Phase I Completed Multi-purpose Bldg. 12.13.04 (Health Center) * waiting for additional fund for ceiling Sayawan Guihean La Fortuna Construction of 500,000.00 CDF-30M-2T-04 A-05-02838/ DPWH I- DEO MOA w/ LGU Phase I Completed School building w/ 2 07.08.05 *waiting for additional Classrooms. fund for completion

NIA-5M-06 Implemented Rehabilitation of La 1,000,000.00 (thru the initiative Fortuna Communal of Cong. irrigation System Guingona)

5 Poblacion Construction of 200,000.00 Villar-05 Budget A-05-02689/ DPWH I-DEO Turned-over Pathway at Continuing 07.1.05 Impasugong Central Appropriations Elemntary School

Turn-over of Guns PNP-CO NA Turned-over

Bulonay

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Kalabugao 1.Construction of 250,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO MOA w/ LGU TURNED-OVER Water System at Sitio 12.14.04 10.15.05 San Vicente CDF-30M-2T-04 2.Construction of 250,000.00 ROCS-04-04186 / DPWH I- DEO MOA w/ LGU TURNED-OVER Water System at Sitio 12.14.04 10.15.05 San Fatima 3.Ricemill Project to 100,000.00 LMI Completed KADULUMHAN (275 rural and tribal (Kababayen sa women) Dumagat ug sa Hagpa Nagkahiusa)

6 MUNICIPALITY OF

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED LGU 1.Completion of 250,000.00 CDF-10M-1T-05 ROCS-05-01686/ LGU LGU Implemented Non- Formal 03.31.05 Learning Center

2.Maintenance of CDF-20M-3T-05 Implemented Road for all the brgys1,000,000 ROCS-05-06855/12 LGU LGU CDF-1T-20M-08 .14.05 3. Financial assistance to LGU 500,000.00 ROCS-08-06200/ LGU Waiting for the NCA 08.21.08

7 Iba 1. Completion of 300,000.00 CDF- Sen. A-05-02689/ DPWH I- DEO Contractor TURNED-OVER Multi-purpose Bldg. Villar-04 07.01.05 (Brgy Office)

2. Construction of 3,000,000.00 CDF-20M-3T-08 A-08-06303/ DPWH I- DEO Implemented Water System 08.27.08 Cananga-an 1.Construction of 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER Hanging Bridge 12.13.04 05.02.07 (Pulangui River) DA-5M-08 2. Const. of Farm to 2,000,000.00 A-08-02485/ DPWH I- DEO MOA w/ LGU on the process of Market Road 03.12.08 preparing the MOA

Capinonan 1. Purchase of lot for 250,000.00 CDF-05 LGU Barangay Implemented National High School Government

2.Rehabilitation of Capinonan 400,000.00 NIA-5M-06 NIA Implemented Communal Irrigation System

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED

8 Anlugan Construction of 300,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER Add’l. Water System 12.13.04 04.04.06

Repair of Classroom AVE Party List E/S 160,000.00 SARO No. DPWH I-DEO Implemented B-07-04243 Paradise 1. Spring 200,000.00 1. CDF- Sen. 1. A-04-04628 / 1.DPWH I- DEO 1. Admin. TURNED-OVER Development of Angara-04 12.15.04 04.04.06 Brgy. Proper

2.Completion of 2. DSWD-CO-04 2. .N/A Hanging Footbridge 80,000.00 2. DSWD-Reg.X 2. DSWD-Reg.X 2. Project Completed at Bobonawan Poblacion Spring Development 50000.00 CDF- Sen. A-04-04628 / DPWH I- DEO Admin. Project Completed at Sitio Buso Angara-04 12.1504 Freedom Playing Device for 55000.00 DSWD-CO-04 N/A DSWD-Reg.X DSWD-Reg.X TURNED-OVER Day Care Centers 04.04.06

Mandahican

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED

9 Lambagan Building Capabilities 120,000.00 DSWD REG X LMI Completed of % Women Organizations to (125 women Implement and microrentrepreneurs) Sustain SEA-K ( Sinanglanan, San Martin, , Imbatug, Cabulohan, Lambagan, Cabanglasan)

Additional funds for microlending (Sinanglanan, San Martin, Imbatug, 279,000.00 Cabulohan DSWD REG X LMI Implemented Lambagan)

Construction of Multi-purose Bldg. (Brgy Office) 500,000.00 CDF-1T-10M-07 A-07-07323/10.18.0DPWH-I-DEO Turned Over/ 12.10.08 7

10 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Imbatug Completion of Brgy 500,000.00 CDF- 3T-05 DPWH I- DEO Project Completed as Office per amount program

Building Capabilities 120,000.00 DTI-Bukidnon Completed of % Women (125 Organizations to microentrepreneurs) Implement and Sustain SEA-K ( Sinanglanan, San Martin, Malaybalay, Imbatug, Cabulohan, Lambagan, Cabanglasan)

Additional funds for microlending (Sinanglanan, San Martin, Imbatug, 279,000.00 Cabulohan (125 DTI-Bukidnon Implemented Lambagan) microentrepreneurs)

Completion of Brgy office 300,000.00

CDF-1T-10M-07 A-07-07323/ DPWH-I-DEO Project Completed 10.18.07 Cabulohan

11 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Mauswagon Construction of 200,000.00 CDF-20M-3T-05 ROCS-05-06855/ LGU LGU TURNED-OVER Squash Sotrage Bldg 12.14.05 10.21.06 for Capinon, Freedom, Mauswagon Multi- purpose Cooperative

Construction of CDF-20M-1T-08 Multi-purpose Bldg. 1,000,000.00 A-08-06303/ DPWH I- DEO Pre-implementation 08.27.08 activity Dalacutan Jasaan Construction of 500000.00 DA-5M-08 A-08-02485/ DPWH I- DEO MOA w/ LGU On the process of Footbridge (thru the initiative 03.12.08 preparing the MOA of Cong. Guingona) Mandaing Construction of 500000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. TURNED-OVER Add’l. Water System 12.14.04 04.04.06 for Mandaing Proper

12 MUNICIPALITY OF SAN FERNANDO

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED LGU Financial assistance to 2500000.00 CDF-1T-20M-0 ROCS-08-06200/ LGU LGU 8 08.21.08 Halapitan Construction of Flood 500,000.00 CDF-20M-3T-0A-05-06489/ DPWH I- DEO Contractor TURNED-OVER Control project at 5 12.12.05 08.11.06 Halapitan National High School

Nala Communal 500,000.00 NIA-5M-06 NIA Implemented Irrigation System (New (thru the Project) initiative of Cong. Promoting Farm Guingona) DSWD REG X LMI Implemented Enterprise through goat 511,567.10 production (6 community (Namnam, Magkalungay, based operation) Halapitan, Malayanan, Cayaga Kalagangan 1. Construction of 1,500,000.00 CDF-10M-2T A-05-03889/ DPWH I- DEO Contractor Phase I Completed Covered Court 08.25.05 * waiting for additional fund for continuation

2. Micro-lending Project 144,000.00 LMI Completed of Nagkahiusang (223 micro- Kababayen-an sa entrepreneurs) Kalagangan 13 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Namnam Construction of Sumpitan 10000000.00 CDF-30M-2T-0 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER Bridge 4 12.13.04 04.31.07 Bonacao Constriction of spillway 1000000.00 CDF-20M-3T-0ROCS-05-06929/ DPWH I- DEO Contractor Project Completed as per for Namnam River 5 12.14.05 program -included in the appropriation of the on-going const. of Valencia-Talaingod Road of the DPWH Project Tugop Construction of Multi- 400,000.00 CDF-30M-2T-0A-04-03888 DPWH I- DEO Contractor Phase I Completed purpose Bldg. 4 (Day Care Center) * waiting for additional fund for continuation Little Baguio Durian Electrification 991,007.00 NEA-04 N/A FIBECO FIBECO COMPLETED

Construction of Canal 150,000.00 CDF-30M-2T-0A-04-03888 TURNED-OVER 4 DPWH I- DEO Contractor 09.29.05 Cabuling 1. Electrification 882,613.00 NEA-04 N/A FIBECO FIBECO COMPLETED

2. Construction of Multi- 500,000.00 CDF-20M-1T-0A-08-06303/ DPWH I- DEO Pre-implementation activity purpose Pavements 8 08.27.08

Sacramento Valley Water System Dev’t. 500000.00 CDF-30M-2T-0A-04-03888 DPWH I- DEO Admin. TURNED-OVER Project 4 04.06.06

14 Sto. Domingo

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Malayanan Construction of Farm to 1,000,000.00 DAR Funded E-05-07630/ DPWH I- DEO Lease Contract with Completed Market Road project 12.29.05 LGU *waiting for additional fund for continuation

Construction of Farm to 1,000,000.00 DA-07 DPWH I- DEO Project On-going Market Road

Implemented Promoting Farm based 700,000 DSWD-REG X LMI enterprise through Goat (6 community Production based organizations (Namnam, Magkalungay,Halapitan, Malayanan, Cayaga Kibongkog Construction of Water 150,000.00 CDF- Sen. A-04-04628 / DPWH I- DEO Admin TURNED-OVER System Angara -04 12.15.04 04.06.06

San Jose Magkalungay Promoting Farm 511,567.10 CDF-05 DSWD REG X LMI On-going Enterprise through goat (6 community production based operation) (Namnam, Magkalungay,cayaga Halapitan, Malayanan,

15 Dao Construction of Health 500000.00 CDF-1T-10M-0A-07-07323/ DPWH-I-DEO Project completed Center 7 10.18.07 Nacabuklad Const. of Farm to Market 700000.00 DAR-07 DPWH-I-DEO Lease contract with Project Completed Road LGU of San Fernando

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTIN PROJECT STATUS FUNDING NUMBER AND G AGENCY IMPLEMENTOR DATE ISSUED Mabuhay Construction of Bridge 2000000.00 CDF- ROX-04-251 / DPWH I- DEO Admin TURNED-OVER 5M-2T-04 11.18.04 04.06.06 Matupe Electrification 1110424.00 NEA-04 N/A FIBECO FIBECO COMPLETED

Iglugsad Candelaria Palacpacan Electrification 1006200.00 DOE N/A FIBECO FIBECO Project Completed

Cayaga Promoting Farm Enterprise 511,567.10 DSWD-Reg.10 Completed through goat production (6 community (Namnam, Magkalungay, based operation) Halapitan, Malayanan, Cayaga Bulalang Completion of Water System 150000.00 CDF- Sen. A-04-04628 / DPWH I-DEO Admin. Project Completed Angara-04 12.15.04 -ready for turn-over Kawayan 1. Rehabililitation of 600,000.00 NIA-5m-06 Implemented Communal Irrigation system -Project completed as per 2. Const. of Farm to 700,000.00 DAR-07 DPWH-I-DEO amount programmed Market Road

16 CITY OF VALENCIA

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED

17 LGU 1.Turn-over of Guns N/A PNP-CO Turned-over

2. Financial Assistance 200,000.00 CDF-10M-1T-05 LGU DA-Valencia Implemented to LGU-DA

3.Financial Assistance CDF-20M-3T-05 to LGU for the projects 1,000,000.00 LGU DepEd Valencia Turned-over of DepEd Interim Division of Valencia includes various projects of schools under Valencia Interim also; a. Repair of guest house b. 2 units computer c. 3 iarcon units d. 1 unit photocopier machine

4.Financial Assistance to LGU( Valencia City Fire Department) for Purchase of Fire CDF-20M-3T-05 Extinguisher for 31 barangays of Valencia 700,000.00 LGU Valencia City Fire Turned-over Department

18 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED LGU 5. Installation of Fire 300,000.00 CDF-20M-3T-05 LGU Valencia City Water Turned-over Hydrants to selected District areas ( 3,5,7,11,12 and Hagkol) and Purchase of Two-way radios

6. Financial Assistance CDF-20M-3T-05 LGU Valencia Bukidnon Turned-over to LGU Valencia for the 150,000.00 Achievers Multi- livelihood projects of purpose Cooperative Valencia Bukidnon Achievers Multi- purpose Cooperative CDF-20M-3T-05 7. Financial assistance to LGU Valencia for the LGU Valencia Post Office Turned-over Philippine Postal 150,000.00 Corporation

8. Financial Assistance CDF-20M-3T-05 to LGU Valencia for the livelihood projects of Valencia City Chamber of 300,000.00 LGU Valencia City Chamber Turned-over Commerce & Industry of Commerce & Industry Livelihood proj

19 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED 9. Livelihood project 291,000,000 CDF-1T-07 DTI BUK Turned-over/ for Market Vendors 08.01.08 Assoc. of Valencia

10. Livelihood project 291,000,000 CDF-1T-07 DTI BUK Turned-over/ for Valencia Muslim 09.10.08 Vendors Association

11. Livelihood project for Valencia Water 291,000,000 CDF-1T-07 DTI BUK Turned-over/ District Employees 08.01.08 Multi-purpose Cooperative

12. Livelihood project for New Life Ministry 200,000.00 CDF-1T-07 DTI BUK Turned-over/ Foundation Inc. 08.01.08

13. Financial assistance to LGU for the Fire Victims of Valencia 500,000.00 Se. Villar-08 LGU Turned-over/ Public Market 08.01.08 14. Financial assistance to LGU

1,000,000.00 CDF-1T-20M-08 ROCS-08-06200/ LGU Waiting for the 08.21.08 NCA

20 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED

21 Poblacion 1.Well Drilling at New 2,000,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH-I-DEO MOA w/ Valencia Project Completed Deep Well Site (near 12.14.04 Water District Alemars Area) Project Completed CDF-20M-3T-05 2.Completion of 500,000.00 A-05-06489/ 12.12.05DPWH-I-DEO Contractor Valencia City Central Elementary School Multi-purpose Bldg CDF-3T-05 Implemented

3.Valencia NHS- 35,000.00 DepED-Valencia Installation of EMIS & NDEP Drop-in Centers CDF-3T-05 4.Valencia City Central Implemented School- Educational 30,000.00 Instruction Facilities DepEd-Valencia for visually impaired pupils

5.Construction of CDF-20M-1T-08 Pre- Multi-purpose Bldg for A-08-06303 implementation Purok 17-C Poblacion 250,000.00 DPWH I- DEO activity

22 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Sinayawan 1. Construction of 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Completed Multi-purpose Bldg. 12.13.04 (Covered Court) Phase I CDF-20M-3T-05 Phase II 2. Construction of 500,000.00 A-05-06489/ 12.12.05DPWH I- DEO Completed Multi-purpose Bldg Completed (Phase II) 38 women and men rice farmers 3.Marketing Support to 150,000.00 organic rice producers in Valencia 3 FARMERS (MAKAKABUS) ORGANIZATIO N Implemented 4.PRIME- promoting 344,000.00 Entrepreneurship and Sinayawan and market enhancement AFARBAMMCO program-capacity CDF-3T-05 Building for PO’s Implemented 5.Sinayawan CES- 35,000.00 CDF-20M-1T-08 Perimeter Fence A-08-06303/ 08.27.08 Pre- 3. Construction of 1,000,000.00 DPWH I- DEO implementation Covered Court activity (PhaseIII) Bagontaas Construction of Bgy. 1700000.00 CDF-10M-2T A-05-03889/ 08.25.05DPWH I-DEO Contractor Phase I Completed Office

23 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED

24 Guinoyuran 1. Construction of 850,000.00 CDF- 5M-2T-04 ROX-04-251 / DPWH I- DEO Contractor 1.TURNED-OVER Concrete Flood Control 11.18.04 04.03.06 2.Phase II 2. Construction of DPWH-CO-04 Completed Multi-purpose Building 500,000.00 (Minority) A-04-04701 / DPWH I- DEO Contractor *waiting for (Covered Court) 12.15.04 additional fund for completion 3. Construction of Solar Drier at Sitio Lake Apo 3.TURNED-OVER CDF-05 04.03.06 100,000.00 A-05-02689/ DPWH I- DEO Contractor 4. Livelihood program 07.01.05 for federation of -Implemented & purok leaders of CDF-05 Guinoyuran 50,000.00 DSWD REG X LMI

5. Purchase of 1 computer set for Guinoyuran ES Turned-over Sen. Villar 50,000.00

25 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Guinoyuran 6. Procurement of 100 pcs. CDF-05 Youth DSWD REG X Turned-over monoblock chairs for project c/o Guinoyuran NHS- Deewai Annex

7. Capability Building 50,000 plus CDF-05 DSWD REG X LMI for Cum Livelihood additional 50,000 as Implemented assistance to Women’s loan Association for its garment production - additional 100,000 CDF-1T-07 DTI Buk Pre- project (Lake Apo implementation womens) activity

8. Magsal ES- Const. of DepEd Valencia DepEd Valencia Implemented Covered Court 10,000.00 CDF-3T-05

9. Guinoyuran ES DepEd Valencia DepEd Valencia Implemented 50,000.00 CDF-3T-05 10.Cabanbanagan ES Implemented 30,000.00 CDF-3T-05 DepEd Valencia DepEd Valencia

26 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Batangan 1. Community 91,000.00 1.DSWD-CO-04 N/A 1.DSWD-Reg.X DSWD-Reg.X Project Completed Electrification (Purok6)

2. BatanganCES- CDF-3T-05 Implemented Const. of Covered 100,000.00 Court Tongan-Tongan ARC Greenfields 5,411,742.66 Loan/ LGU/ DAR N/A DAR-LGU LGU Project Completed (Irrigation Service as per program Facilities & Service Roads) Lopez & Sto. Nino Area DSWD-CO-04 TURNED-OVER Improvement of Solar 70,000.00 DSWD-Reg.X DSWD-Reg X 04.03.06 Drier at Purok 3 Curvada

Tongan-tongan 200,000.00 Implemented Woodworking Project (33 rural workers) Mabuhay Const. of Multi-purpose 1000000.00 CDF-10M-2T A-05-03889/ DPWH I- DEO Contractor Phase I Completed Bldg. 08.25.05 (Covered Court)

27 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Laligan 1. Construction of 500,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Admin. TURNED-OVER Water System 12.14.04 09.23.05

Kahaponan Day Care Facilities 15,000.00 DSWD-CO-04 N/A DSWD-Reg.X DSWD-Reg.X TURNED-OVER (Charity DCC) 11.25.05

Construction of Multi- 1,000,000.00 CDF-1T-10M- A-07-07323/ 10.18.07DPWH I-DEO -Project Completed- purpose Bldg. 07 ready for turn-over (Covered Court) Signing of MOA Livelihood project for 120,000.00 CDF-1T/2T-07 DTI-BUK AFARBAMCO Construction of Multi- 300,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I completed purpose Bldg. 12.13.04 *waiting for (Senior Citizen Bldg.) additional fund for continuation Mailag ES- Renovation CDF-3T-05 of Classrooms 50,000.00 Implemented

Continuation of Multi- purpose Bldg. CDF-20M-1T-08 (Senior Citizen Bldg.) 500,000.00 A-08-06303/ 08.27.08DPWH I- DEO Pre-implementation activity

28 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Catumbalon 1. Expansion of Brgy. 300,000.00 1.CDF-30M-2T-0 1. ROCS-04-04186 / 1.DPWH I- DEO 1. Admin. TURNED-OVER Water System at P5 4 12.14.04 09.23.05

2. Catumbalon ES- 30,000.00 CDF-3T-05 Implemented Perimeter Fence Lumbo Construction of 1 450000.00 DepEd- DPWH I-DEO Contractor Project Completed Classroom Secretary’s Discretionary Fund Mt. Nebo Construction of Multi- 1,000,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Completed purpose Bldg. 12.13.04 (Covered Court) CDF-20M-1T-08 Continuation of 1,000,000.00 A-08-06303/ 08.27.08DPWH I- DEO Pre-implementation Covered court activity Tugaya Construction of Water 500,000.00 CDF-30M-2T-04 ROCS-04-04186 / 1.DPWH I- DEO 1. Admin Phase I-Completed System 12.14.04 DepEd- Secretary’s Project Completed Construction of 1 450,000.00 Discretionary Fund DPWH-I-DEO Classroom CDF-20M-1T-08 Pre-implementation activity Construction of Multi- 1,000,000.00 A-08-06303/ 08.27.08 purpose Bldg.

29 BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Dagat Kidavao Electrification of Purok 500000.00 CDF-1T-15M NEA FIBECO Waiting for the Katipunan 07 (Soft) SARO Maapag Construction of Multi- 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Completed purpose Bldg. 12.13.04 *waiting for additional fund for continuation CDF-3T-05 Implemented Maapag ES- Const. of 50,000.00 Stage Colonia 1.Day Care Facilities 30,000.00 1. DSWD-CO-04 1. N/A 1.DSWD-Reg.X 1.DSWD-Reg.X TURNED-OVER (Alpha DCC, Omega 11.25.06 DCC) CDF-3T-05 Implemented 2. Colonia ES- School 50,000.00 Covered Court Lilingayon Construction of School 450,000.00 CDF- Sen. A-04-04628 / DPWH I- DEO MOA w/ LGU Project Completed Building 1 Classroom Angara-04 12.15.04 -ready for turn- over

Legal assistance of Decision turned- water dispute over

30 Nabag-o 1. Construction of 500,000.00 CDF-20M-3T-05 A-05-06489/ 12.12.051.DPWH I- DEO Contractor Phase I Completed Multi-purpose Bldg (Barangay Office) CDF-3T-05 Implemented 2. Nabag-o ES- Const. 30,000.00 DepEd-Valencia DepEd Valencia of Cemented Pathway & Flower Boxes 3. Construction of CDF-1T-10M-07 A-07-07323/10.18.07 Project completed Multi-purpose Bldg 500,000.00 DPWH-I-DEO (Barangay Office-Phase II)

BARANGAY PROJECT AMOUNT SOURCE OF SARO NUMBER IMPLEMENTING PROJECT STATUS FUNDING AND DATE AGENCY IMPLEMENTOR ISSUED Sugod 1. Construction of 1,500,000.00 1.CDF-10M-2T 1. A-05-03889/ 1. DPWH I-DEO 1. Contractor Phase I Completed Covered Court 08.25.05 *waiting for additional fund for continuation

2. Sugod E/S Perimeter 40,000.00 CDF-3T-05 DepEd-Valencia Implemented fence Concepcion Electrification Project 1000000.00 CDF-2T-5M-07 NEA Fibeco Waiting for SARO (Soft) Pinatilan Pinatilan ES- Repair of 30000.00 CDF-3T-05 DepEd-Valencia Implemented H.E. Bldg. Barobo Purchase of 1 computer Sen. Villar DepEd Division of DepEd Division of Turned-over set for Barobo ES Bukidnon Bukidnon San Isidro Completion of Multi- 400000.00 CDF-1T-10M-07 A-07-07323/ 10.18.07DPWH-I-DEO Project completed- purpose Bldg. ready for turn-over 31 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTIN PROJECT STATUS FUNDING NUMBER AND G AGENCY IMPLEMENTOR DATE ISSUED Lourdes 1Construction of 500,000.00 .CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Phase I Multi-purpose Bldg. 12.13.04 Completed (Covered Court)Phase I

Continuation of the CDF-20M-3T-05 Phase II Construction of 500,000.00 A-05-06489/ DPWH I- DEO completed Multi-purpose Bldg 12.12.05 (Phase II) CDF-20M-1T-08 Continuation of the Construction of 1,000,000.00 A-08-06303/08.27DPWH I- DEO Pre- Multi-purpose Bldg .08 implementation (Phase III) activity Sinabuagan

32 Vintar 1. Completion of 250,000.00 1.CDF- Sen. 1. A-05-02689/ 1.DPWH I-DEO Contractor TURNED-OVER Multi-purpose Bldg. Villar-04 07.01.15

2. Electrification of 500,000.00 CDF-1T-15M-07 NEA FIBECO Waiting for the Purok 9 & Purok 10 (Soft) SARO San Carlos San Carlos ES- 30,000.00 CDF-3T-05 DepEd Valencia Implemented Repair of 1 CL

Construction of Water 500,000.00 CDF-1T-10M-07 A-07-07323/ DPWH-I-DEO Project Completed Syem 10.18.07

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTIN PROJECT STATUS FUNDING NUMBER AND G AGENCY IMPLEMENTOR DATE ISSUED Lurogan Lurugan ES- 20,000.00 CDF-3T-05 DepEd Valencia Implemented Repainting of 3 CL

Kilangi ES- 20,000.00 CDF-3T-05 Implemented Energization of DepEd Valencia School

33 CITY OF MALAYBALAY

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED

34 LGU 1.Construction of 500,000.00 CDF-10M-2T-05 A-05-03889/ DPWH-I-DEO Contractor Project Completed as DepEd Training 08.25.05 per amount Center programmed

2.Construction of 1.5M CDF-10M-1T-05 Malaybalay A-05-01415/ DPWH-I-DEO By Admin Project Completed as Diversion Road 03.09.05 per amount CDF-10M-2T-05 programmed

3.Construction of 300,000 A-05-03889/ Multi-purpose Bldg PNP-CO 08.25.05 DPWH-I-DEO By Admin Project Completed as (Girl Scouts of the per programmed Phil.)

4.Turn-over of Guns N/A CDF-05

5.Financial assistance to LGU for 300,000.00 LGU Association of Turned-over installation of fire Barangay Captains extinguishers to all (ABC)of Malaybalay barangays CDF-05 Turned-over

6.Financial assistance for DPWH-1st 1,400,000.00 LGU LGU District Engineering (1M goes to the Turned-over Office vehicle, the remaining 400k goes to the Crisis Intervention Program & Livelihood

35 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED LGU 7.Hinabol Handicraft 50,000.00 LMI Implemented Production by FEDWOMB Malaybalay chapter

8. Financial assistance to LGU 500,000.00 CDF-1T-15M-07 LGU Waiting for the SARO 9. Financial CDF-2T-5M-07 assistance to LGU 750,000.00 LGU Implemented

10. Const. of SPED -through the bldg. 4,000,000.00 initiative of Cong. DPWH Completed as per Guingona amount programmed but DepEd request for additional funding CDF-1T-15M-07 11. Support to Check turned-over Lindungawan 300,000.00 DTI-Buk Marketing Outlet for OTOP Buk products and potential products from SMEs: Indigenous Peoples Apostolate (IPA)

36 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED LGU 12. Construction of 1,000,000.00 CDF-20M-1T-08 A-08-06303/ DPWH I-DEO Pre-implementation Training Center of 08.27.08 activity DepEd Division, Bukidnon CDF-20M-1T-08 13. Construction of 3,500,000.00 A-08-06303/ DPWH I-DEO Pre-implementation Alumni Center & 08.27.08 activity Museum of BSU CDF-1T-20M-08

14.Financial 4,200,000.00 ROCS-08-06200/ LGU NCA received assistance to LGU for 08.21.08 implementation of various programs & projects Construction of 450,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I-DEO Contractor TURNED-OVER Public Market 12.14.04 04.07.06

CDF-20M-3T-05 Social Microcredit 100,000.00 LGU-Malaybalay LGU-DSWD Implemented and Savings Mobilization (Womens) Sen. Villar-06 LGU-Malaybalay Barangay Government Implemented Spring Dev’t for Sitio 50,000.00 Binatunan

37 1. Rehabilitation of 200,000.00 NIA-5M-06 NIA Implemented Paiwaig Communal Irrigation System 2. Construction of 2,000,000 CDF-1T-10M-07 A-07-07323/ Implemented Water System DA-5M-08 10.18.07 3. Const. of Spillway 2,500,000 A-08-02485/03.12DPWH I-DEO Signing of MOA .08

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Violeta 1. Construction of 1. 150,000.00 1.CDF-10M-1T-0 1.A-05-01415/ 1. DPWH I- DEO By Admin TURNED-OVER Multi-Purpose Bldg 5 03.09.05 04.07.06 for Purok 2 -with certificate of acceptance

2.Construction of 2. 150,000.00 2.CDF-10M-1T-0 2.A-05-01415/ 2. 1. DPWH I- DEO By Admin TURNED-OVER Multi-Purpose Bldg 5 03.09.05 04.07.06 for Purok 3 -with certificate of acceptance 3.Construction of 3. 150,000.00 3.CDF-10M-1T-0 3.A-05-01415/ 3. 1. DPWH I- DEO By Admin TURNED-OVER Multi-Purpose Bldg 5 03.09.05 04.07.06 for Purok 4 -with certificate of acceptance TURNED-OVER 4.Construction of 4. 150,000.00 4.CDF-10M-1T-0 4.A-05-01415/ 4. 1. DPWH I- DEO By Admin 04.07.06 Multi-Purpose Bldg 5 03.09.05 -with certificate of for Purok 5 acceptance

38 Rehabilitation of 500,000.00 NIA-5M-07 NIA Implemented New Ilocos Communal Irrigation System

Construction of 2,000,000.00 CDF-1T-10M-08 A-07-07323/ Implemented Water System 10.18.07

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED

39 Construction of Farm 1,000,000.00 DAR Funded E-05-07630/ DPWH I- DEO Lease contract with Phase I Completed to Market Road Apo project 12.29.05 the LGU of San Macote-Malayanan Fernando

Construction of Farm to Market Road Apo 1,000,000.00 DA Funded DPWH I- DEO Lease contract with Project On-going Macote-Malayanan project the LGU of San Fernando

Social Microcredit and Savings Mobilization 100,000.00 CDF-20M-3T-05 DPWH I- DEO LGU-Malaybalay Implemented (Womens)

Construction of Water System CDF-20M-1T-08 850,000.00 A-08-06303/ DPWH I- DEO Pre-implementation 08.27.08 activity

40 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Construction of 1,000,000.00 CDF-10M-2T A-05-03889/ DPWH I- DEO Contractor Phase I Completed Bridge at Purok 7 08.25.05

Social credit and 300,000.00 Sen. Cayetano DSWD REG X LMI Implemented micro- entrepreneurship (Bangcud, , Laguitas, Magsaysay) Pre-implementation Construction of 1,900,000.00 CDF-20M-1T-08 A-08-06303/ DPWH-I-DEO activity Bridge at Purok 7 – 08.27.08 Phase II

41 San Martin 1. Construction of 1 450,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Contractor Project Completed as unit Classroom at 120,000.00 12.14.04 per program San Martin Elem. (125 * waiting for Sch. microentrepreneurs additional fund

279,000.00 2. Building Plus 50,000 DSWD- REG X LMI Completed Capabilities of % Women Organizations to Implement and Sustain SEA-K (Sinanglanan, San Martin, Imbatug, Cabulohan, Lambagan)

3. Additional funds DSWD-REG X LMI On-going for microlending (Sinanglanan, San Martin, Imbatug, Cabulohan Lambagan)

BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Indalasa

42 Construction of 500,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor Project Completed as Multi-Purpose Bldg. 12.13.04 per amount program (Barangay Office) *waiting for additional fund for continuation

Rehabilitation of NIA-5M-06 Implemented Sawaga-Simaya CIS 1,000,000.00 (thru the initiative (LASSCIA) of Cong. Guingona)

CDF-05 Implemented Livelihood project DA-LGU of for LASSCIA 1,000,000.00 DA Region X Malaybalay

Miglamin Construction of 1,000,000.00 CDF-30M-2T-04 A-04-03888 / DPWH I- DEO Contractor TURNED-OVER Spillway (Busdi 12.13.04 River) CDF-20M-3T-05 Check issued Financial assistance 150,000 to LGU for the Tribal Council ofSitio Bendum, Busdi, Malaybalay,City

43 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Sto. Nino Construction of 1000000.00 CDF-20M-3T- A-05-06489/12.12DPWH I- DEO By Admin Project Completed Water System .05 Maligaya Kibalabag Electrification 1890289.00 NEA-04 / LGU N/A BUSECO 1. BUSECO COMPLETED Construction of 300000.00 CDF-1T-10M-07 A-07-07323/ DPWH I- DEO Project Completed Multi-purpose Bldg. 10.18.07 Books for 5 DCC 50,000.00 1. DSWD-C0-04 1. N/A 1.DSWD 1.DSWD TURNED-OVER/ (P2,5,8,9,10) 01.23.06

Purchase of 2.CICT 2. Turned-over computers *** Barangay 9 Financial assistance 10000.00 Check issued for Terminal Vendors Assoc. Barangay 1 Construction of 500000.00 CDF-1T-10M-07 A-07-07323/ DPWH I- DEO By admin Project completed Multi-purpsose Bldg. 10.18.07

44 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Barangay 11 Land problem of Legislative Office of Manila Their case has already Brgy 10 & Brgy 11 in coordination with Mayor been settled at the (BATMIRNA & Flores DENR Central Office MIRNABE) for action Barangay 3 Barangay 7 Construction of 500,000.00 CDF-20M-3T-05 A-05-06489/ DPWH I- DEO Phase I Completed Multi-purpose Bldg 12.12.05 CDF-20M-1T-08 Continuation of 1,000,000.00 A-08-06303/ DPWH I- DEO Pre-implementation Multi-purpose Bldg 08.27.28 activity Can-ayan Repair of Water 10000.00 Implemented System at Sitio Kiito Barangay 2 Purchase of Gas 50000.00 Implemented Range & Oven, meat grinder & 50 pcs monobloc Barangay 4 Completion of 150000.00 CDF- A-05-02689/ DPWH I- DEO Contractor Project Completed Elevated Sidewalk Sen.Villar-04 07.01.05

45 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Sinanglanan 1.Installation of 500,000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I-DEO Admin TURNED-OVER Water System for P7 12.14.04 01/13/06 and P8

2. .Building 120,000.00 DTI-Bukidnon Completed Capabilities of % (125 Women microentrepreneurs) Organizations to Implement and Sustain SEA-K (Sinanglanan, San Martin, Imbatug, Cabulohan, Lambagan) 3.Additional funds 279,000.00 DSWD REG X Implemented for microlending Plus 50,000 (Sinanglanan, San Martin, -additional 100,000 CDF-1T-07 DTI-Buk Pre-construction Imbatug,Cabulohan activity Lambagan) Kulaman Construction of 1000000.00 CDF-1T-10M-07 A-07-07323/ DPWH I- DEO For Spillway 10.18.07 implementation Sumpong Barangay 5 Zamboanguita Construction of 500000.00 CDF-30M-2T-04 ROCS-04-04186 / DPWH I- DEO Contractor Phase I Public Market 12.14.04 Completed *waiting for additional fund for continuation

46 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Barangay 10 Land problem of Legislative Office of Manila Their case has Brgy 10 & Brgy 11 in coordination with Mayor already been (BATMIRNA & Flores settled at the MIRNABE) DENR Central Office for action Aglayan Purchase of 2 50,000.00 CDF-20M-3T-05 Turned-over computer units for Aglayan ES Sen. Financial assistance 500,000.00 Magasaysay-07 Turned-over to Malaybalay Livestock Market Assoc.

Financial assistance Sen. Villar- for Lantapan Habal- 40,000.00 Barangay Aglayan Ready for turn- habal Waiting shed over San Jose Construction of 1000000.00 CDF-20M-3T-05 A-05-06489/ DPWH I- DEO Project Water System 12.12.05 Completed Barangay 8 Barangay 6

47 BARANGAY PROJECT AMOUNT SOURCE OF SARO IMPLEMENTING PROJECT STATUS FUNDING NUMBER AND AGENCY IMPLEMENTOR DATE ISSUED Electrification 2575902.00 N/A BUSECO BUSECO COMPLETED Laguitas Construction of 1000000.00 CDF-20M-3T- A-05-06489/12.12DPWH I- DEO By Admin Project Water System .05 Completed Magsaysay Social Microcredit 300,000 DSWD REG X LMI Implemented and Savings Mobilization (Womens) 80 women (Bangcud, Aglayan, microentrepreneurs Laguitas, Magsaysay) St. Peter Financial assistance 250,000.00 CDF-20M-3T-05 LGU Check issued to to LGU for the the recipients projects of Barangay Kalasungay Tribal

48 SOFT PROJECTS

PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR ISSUED ISSUED SCHOLARSHIP 1.450,000.00 1.CDF-5M-2T-04 1. ROX-04237/ 1. 232159-4 Bukidnon State Bukidnon State Implemented 11.09.04 College College

3. 12,000.00 3.CDF-30M-2T- 3.ROCS-05-00263/ 3.232535-2/03.29.CHED-REGION II CHED-REGION II Implemented 04 02.04.05 05

Bukidnon State 4. 550,000.00 4.CDF-10M-1T-05 4.ROCS-05-01386/ 258738-4/09.24.0 College Bukidnon State Implemented 03.07.05 5 College 5.CDF-10M-1T-05 CMU 5. 300,000.00 5. ROCS-05-01387/ 5. 258559-0 CMU Implemented 6.CDF-10M-1T-05 03.07.05 08.15.05 TESDA- 6. 300,000.00 7. CDF-20M-3T-05 6. ROCS-05-01388/ 6. BUKIDNON TESDA-BUKIDNONImplemented 03.07.05 258740-6/09.24.0 CDF-20M-3T-05 5 Bukidnon State Bukidnon State 7. 740,000.00 7. College College Implemented ROCS-05-06857/12 7. 321959-1/ CDF-20M-3T-05 .14.05 02.14.06 CMU CMU 8. 260,000.00 Implemented 8.321958-0/ ROCS-05-06857/12 02.14.06 TESDA- TESDA-BUKIDNON 9. 260,900 .14.05 BUKIDNON Implemented 321957-6/ ROCS-05-06857/12 02.14.06 .14.05 49 PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR ISSUED ISSUED SCHOLARSHIP 217,500.00 CDF-1T-07 ROCS-07-08752/ TESDA- TESDA-BUKIDNON Waiting for the NCA 11.09.07 BUKIDNON CMU 400,000.00 CDF-1T-07 ROCS CMU Waiting for the NCA BSU 1,182,500.00 CDF-1T-07 BSU Waiting for the NCA

800,000.00 CDF-1T-20M-08 ROCS-08-06201 BSU Waiting for the NCA 08.21.08

50 CIDSS 1. 200,000.00 1.CDF-5M-2T-04 1. B-04-03513/ 1. 232146-5 1. DSWD- 1. DSWD- REGION 1.IMPLEMENTED 12.10.04 REGION –X –X

2. 1,874,000.00 2.CDF-30M-2T-04 2. B-04-04370/ 2. 232146-5 2. DSWD- 2. DSWD- REGION 2. IMPLEMENTED 12.15.04 REGION –X –X 3. CDF-10M-1T-05 3. 4,500,000.00 3.ROCS-05-01385/ 3. a. 321779-3 3. DSWD- 3. DSWD- REGION 3. IMPLEMENTED 03.07.05 (2M) 02.14.06 REGION –X –X b.259282-2 4. CDF-10M-2T-05 (2.5M) 10.19.05

4. 1,800,000.00 4. ROCS-05-03371/ 4. a. 259116-4 4. a. DSWD- 4. a.DSWD- 4.a. IMPLEMENTED 08.01.05 (1M) 02.014.06 CENTRAL CENTRAL OFFICE * from the 1M, OFFICE 600,000 has been realigned to DSWD Region X for the payment of BSC scholarship, so the remaining amount left is 400,000 (800,000) 10.19.05 b.259281-1 b. DSWD- b. DSWD- b. IMPLEMENTED

PROJECT BARANGAY AMOUNT SOURCE OF SARO NUMBER NCA NUMBER IMPLEMENTIN PROJECT STATUS FUNDING AND DATE AND DATE G AGENCY IMPLEMENTOR ISSUED ISSUED

51 CIDSS b.259281-1 b. DSWD- b. DSWD- b. IMPLEMENTED 5,382,500.00 CDF-1T-07 ROCS-07-08749/ DSWD-REG X DSWD-REG X For Implementation 11.09.07 DSWD-Central DSWD-Central Office (500k) Office

2,250,00.00 CDF-2T-07 ROCS-07-08758/ DSWD-REG X DSWD-REG X For Implementation 11.09.07 DSWD-Central DSWD-Central Office (250k) Office

1,500,000.00 CDF-1T-20M-08 ROCS-08-06201/ DSWD-REG X Waiting for NCA 08.21.08 LIVELIHOOD 5,792,500.00 CDF-1T/2T-07 DTI-Bukidnon Implemented

3,500,000.00 CDF-1T-20M-08 ROCS-08-06199/ 369261-4 DTI-Bukidnon NCA received 08.21.08 10.30.08 Establishment & 1,000,000.00 CDF-1T-07 ROCS-07-8754/ DENR REG X On-going protection of forest 11.09.07 and watersheds (Pantaron Range)

1,000,000.00 CDF-1T-20M-08 ROCS-08-06203/ 369265-1 NCA received 08.21.08 10.30.08

Prepared by: Jing Agripo

* note -Projects funded by other agencies were all the initiative of Cong. Guingona 52