FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act
Total Page:16
File Type:pdf, Size:1020Kb
FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Region X 1,228 projects 36,227,088,000 Bukidnon 1st District Engineering Office 139 projects 4,791,103,000 BUKIDNON (FOURTH) 28 projects 1,274,518,000 OO1: Ensure Safe and Reliable National Road System 14 projects 1,029,018,000 Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 197,000,000 Roads - Primary Roads 1. P00400633MN 310104100197000 53,000,000 Sayre Highway - K1528 + 514 - K1529 + 000, K1530 + 896 - K1531 + 456, K1531 + 487 - K1533 + 000 P00400633MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 5.014 51,145,000 Central Office / Pavement - at Specific Locations Concrete Bukidnon 1st along Sayre Highway (S00639MN) Pavement District K1528 + 514 - K1533 + 000 Engineering Office P00400633MN-EAO 1,855,000 Central Office / Bukidnon 1st District Engineering Office 2. P00400634MN 310104100254000 34,000,000 Sayre Highway - K1534 + 000 - K1534 + 860 P00400634MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 3.132 33,320,000 Bukidnon 1st Pavement - at Specific Locations Concrete District along Sayre Highway (S00639MN) Pavement Engineering Office K1534 + 000 - K1534 + 860 / Bukidnon 1st District Engineering Office P00400634MN-EAO 680,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office 3. P00401518MN 310104100198000 110,000,000 Sayre Highway - K1534 + 860 - K1535 + 091, K1535 + 121 - K1538 + 200 P00401518MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 10.294 106,150,000 Central Office / Pavement - at Specific Locations Concrete Region X along Sayre Highway (S00639MN) Pavement K1534 + 860 - K1538 + 200 P00401518MN-EAO 3,850,000 Central Office / Region X Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 20,000,000 Collapse, and Landslide - Secondary Roads 4. P00400084MN 310108100449000 20,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1592 + 680 - K1592 + 910 MYPS: 03/03/2020 02:36:37 pm Page 1 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400084MN-CW1 Construction of Road Slope Construction of Square 2,000.000 19,600,000 Bukidnon 1st Protection Structure - along Road Slope meters District Kapalong-Talaingod-Valencia Protection Engineering Office (Bukidnon) Rd (S00641MN) K1592 Structure / Bukidnon 1st + 680 - K1592 + 910 District Engineering Office P00400084MN-EAO 400,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 103,593,000 National Roads - Primary Roads 5. P00401419MN 310110100168000 30,000,000 Sayre Highway - K1535 + 125 - K1535 + 606 P00401419MN-CW1 Construction of Drainage Structure Construction of Lineal 481.000 29,400,000 Bukidnon 1st along Road - along Sayre Highway Drainage meters District (S00639MN) K1535 + 125 - K1535 + Structure along Engineering Office 606 Road / Bukidnon 1st District Engineering Office P00401419MN-EAO 600,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office 6. P00401448MN 310110100105000 73,593,000 Sayre Highway - K1533 + 000 - K1534 + 000 P00401448MN-CW1 Construction of Drainage Structure Construction of Lineal 1,523.000 71,017,245 Central Office / along Road - along Sayre Highway Drainage meters Bukidnon 1st (S00639MN) K1533 + 000 - K1534 + Structure along District 000 Road Engineering Office P00401448MN-EAO 2,575,755 Central Office / Bukidnon 1st District Engineering Office Network Development - Road Widening - Secondary Roads 47,000,000 7. P00400207MN 310202100661000 47,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1602 + 000 - K1603 + 300 MYPS: 03/03/2020 02:36:37 pm Page 2 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400207MN-CW1 Road Widening - along Road Widening Lane Km 2.600 46,060,000 Bukidnon 1st Kapalong-Talaingod-Valencia District (Bukidnon) Rd (S00641MN) K1602 Engineering Office + 000 - K1603 + 300 / Bukidnon 1st District Engineering Office P00400207MN-EAO 940,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Network Development - Construction of By-Pass and Diversion Roads 650,000,000 8. P00401190MN 310204100857000 110,000,000 Valencia City-Pangantucan Diversion Road, Package 8, Bukidnon P00401190MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.440 106,150,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 8, Bukidnon P00401190MN-EAO 3,850,000 Central Office / Region X 9. P00401241MN 310204100849000 110,000,000 Sayre Highway Parallel Road II (Valencia City Section), Package 20, Bukidnon P00401241MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.180 106,150,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Valencia City Section), Package 20, Bukidnon P00401241MN-EAO 3,850,000 Central Office / Region X 10. P00401242MN 310204100850000 110,000,000 Sayre Highway Parallel Road II (Valencia City Section), Package 21, Bukidnon P00401242MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.740 106,150,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Valencia City Section), Package 21, Bukidnon P00401242MN-EAO 3,850,000 Central Office / Region X 11. P00401516MN 310204100858000 100,000,000 Valencia City-Pangantucan Diversion Road, Package 9, Bukidnon P00401516MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.120 96,500,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 9, Bukidnon MYPS: 03/03/2020 02:36:37 pm Page 3 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00401516MN-EAO 3,500,000 Central Office / Region X 12. P00401517MN 310204100852000 110,000,000 Sayre Highway Parallel Road II, Package 22, Bukidnon P00401517MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.000 106,150,000 Central Office / Sayre Highway Parallel Road II, Concrete Road Region X Package 22, Bukidnon P00401517MN-EAO 3,850,000 Central Office / Region X 13. P00401538MN 310204100856000 110,000,000 Valencia City-Pangantucan Diversion Road, Package 10, Bukidnon P00401538MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.292 106,150,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 10, Bukidnon P00401538MN-EAO 3,850,000 Central Office / Region X Bridge - Retrofitting/ Strengthening of Permanent Bridges 11,425,000 14. P00400920MN 310303100959000 11,425,000 Panlibatuhan Br. (B01884MN) along Sayre Highway P00400920MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 11,196,500 Bukidnon 1st Bridge - Panlibatuhan Br. Strengthening of Bridges District (B01884MN) along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office P00400920MN-EAO 228,500 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 1 projects 100,000,000 Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 100,000,000 and Principal Rivers 15. P00420612MN 320102101057000 100,000,000 Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Upstream of New Batangan Bridge, Brgy. Poblacion Section, Bukidnon MYPS: 03/03/2020 02:36:37 pm Page 4 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00420612MN-CW1 Construction of Flood Mitigation Construction of Lineal 569.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Mitigation Structures within Structure District Mindanao River Basin (along Engineering Office Pulangui River), Upstream of New Batangan Bridge, Brgy. Poblacion Section, Bukidnon P00420612MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office Convergence and Special Support Program 1 projects 37,000,000 Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 37,000,000 16. P00431542MN 300203100954000 37,000,000 Access Road leading to Salawao Cave, Valencia City, Bukidnon P00431542MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.320 36,260,000 Bukidnon 1st Access Road leading to Salawao Concrete Road District Cave, Valencia City, Bukidnon Engineering Office / Bukidnon 1st District Engineering Office P00431542MN-EAO 740,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Local Program 12 projects 108,500,000 Buildings and Other Structures - Multipurpose / Facilities