FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Region X 1,228 projects 36,227,088,000 1st District Engineering Office 139 projects 4,791,103,000 BUKIDNON (FOURTH) 28 projects 1,274,518,000 OO1: Ensure Safe and Reliable National Road System 14 projects 1,029,018,000

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 197,000,000 Roads - Primary Roads

1. P00400633MN 310104100197000 53,000,000 - K1528 + 514 - K1529 + 000, K1530 + 896 - K1531 + 456, K1531 + 487 - K1533 + 000

P00400633MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 5.014 51,145,000 Central Office / Pavement - at Specific Locations Concrete Bukidnon 1st along Sayre Highway (S00639MN) Pavement District K1528 + 514 - K1533 + 000 Engineering Office

P00400633MN-EAO 1,855,000 Central Office / Bukidnon 1st District Engineering Office

2. P00400634MN 310104100254000 34,000,000 Sayre Highway - K1534 + 000 - K1534 + 860

P00400634MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 3.132 33,320,000 Bukidnon 1st Pavement - at Specific Locations Concrete District along Sayre Highway (S00639MN) Pavement Engineering Office K1534 + 000 - K1534 + 860 / Bukidnon 1st District Engineering Office

P00400634MN-EAO 680,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

3. P00401518MN 310104100198000 110,000,000 Sayre Highway - K1534 + 860 - K1535 + 091, K1535 + 121 - K1538 + 200

P00401518MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 10.294 106,150,000 Central Office / Pavement - at Specific Locations Concrete Region X along Sayre Highway (S00639MN) Pavement K1534 + 860 - K1538 + 200

P00401518MN-EAO 3,850,000 Central Office / Region X

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 20,000,000 Collapse, and Landslide - Secondary Roads

4. P00400084MN 310108100449000 20,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1592 + 680 - K1592 + 910

MYPS: 03/03/2020 02:36:37 pm Page 1 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400084MN-CW1 Construction of Road Slope Construction of Square 2,000.000 19,600,000 Bukidnon 1st Protection Structure - along Road Slope meters District Kapalong-Talaingod-Valencia Protection Engineering Office (Bukidnon) Rd (S00641MN) K1592 Structure / Bukidnon 1st + 680 - K1592 + 910 District Engineering Office

P00400084MN-EAO 400,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 103,593,000 National Roads - Primary Roads

5. P00401419MN 310110100168000 30,000,000 Sayre Highway - K1535 + 125 - K1535 + 606

P00401419MN-CW1 Construction of Drainage Structure Construction of Lineal 481.000 29,400,000 Bukidnon 1st along Road - along Sayre Highway Drainage meters District (S00639MN) K1535 + 125 - K1535 + Structure along Engineering Office 606 Road / Bukidnon 1st District Engineering Office

P00401419MN-EAO 600,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

6. P00401448MN 310110100105000 73,593,000 Sayre Highway - K1533 + 000 - K1534 + 000

P00401448MN-CW1 Construction of Drainage Structure Construction of Lineal 1,523.000 71,017,245 Central Office / along Road - along Sayre Highway Drainage meters Bukidnon 1st (S00639MN) K1533 + 000 - K1534 + Structure along District 000 Road Engineering Office

P00401448MN-EAO 2,575,755 Central Office / Bukidnon 1st District Engineering Office

Network Development - Road Widening - Secondary Roads 47,000,000

7. P00400207MN 310202100661000 47,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1602 + 000 - K1603 + 300

MYPS: 03/03/2020 02:36:37 pm Page 2 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400207MN-CW1 Road Widening - along Road Widening Lane Km 2.600 46,060,000 Bukidnon 1st Kapalong-Talaingod-Valencia District (Bukidnon) Rd (S00641MN) K1602 Engineering Office + 000 - K1603 + 300 / Bukidnon 1st District Engineering Office

P00400207MN-EAO 940,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 650,000,000

8. P00401190MN 310204100857000 110,000,000 Valencia City- Diversion Road, Package 8, Bukidnon

P00401190MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.440 106,150,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 8, Bukidnon

P00401190MN-EAO 3,850,000 Central Office / Region X

9. P00401241MN 310204100849000 110,000,000 Sayre Highway Parallel Road II (Valencia City Section), Package 20, Bukidnon

P00401241MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.180 106,150,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Valencia City Section), Package 20, Bukidnon

P00401241MN-EAO 3,850,000 Central Office / Region X

10. P00401242MN 310204100850000 110,000,000 Sayre Highway Parallel Road II (Valencia City Section), Package 21, Bukidnon

P00401242MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.740 106,150,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Valencia City Section), Package 21, Bukidnon

P00401242MN-EAO 3,850,000 Central Office / Region X

11. P00401516MN 310204100858000 100,000,000 Valencia City-Pangantucan Diversion Road, Package 9, Bukidnon

P00401516MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.120 96,500,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 9, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 3 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401516MN-EAO 3,500,000 Central Office / Region X

12. P00401517MN 310204100852000 110,000,000 Sayre Highway Parallel Road II, Package 22, Bukidnon

P00401517MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.000 106,150,000 Central Office / Sayre Highway Parallel Road II, Concrete Road Region X Package 22, Bukidnon

P00401517MN-EAO 3,850,000 Central Office / Region X

13. P00401538MN 310204100856000 110,000,000 Valencia City-Pangantucan Diversion Road, Package 10, Bukidnon

P00401538MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.292 106,150,000 Central Office / Valencia City-Pangantucan Concrete Road Region X Diversion Road, Package 10, Bukidnon

P00401538MN-EAO 3,850,000 Central Office / Region X

Bridge - Retrofitting/ Strengthening of Permanent Bridges 11,425,000

14. P00400920MN 310303100959000 11,425,000 Panlibatuhan Br. (B01884MN) along Sayre Highway

P00400920MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 11,196,500 Bukidnon 1st Bridge - Panlibatuhan Br. Strengthening of Bridges District (B01884MN) along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office

P00400920MN-EAO 228,500 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 1 projects 100,000,000

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 100,000,000 and Principal Rivers

15. P00420612MN 320102101057000 100,000,000 Construction of Flood Mitigation Structures within Mindanao River Basin (along Pulangui River), Upstream of New Batangan Bridge, Brgy. Section, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 4 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420612MN-CW1 Construction of Flood Mitigation Construction of Lineal 569.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Mitigation Structures within Structure District Mindanao River Basin (along Engineering Office Pulangui River), Upstream of New Batangan Bridge, Brgy. Poblacion Section, Bukidnon

P00420612MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office Convergence and Special Support Program 1 projects 37,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 37,000,000

16. P00431542MN 300203100954000 37,000,000 Access Road leading to Salawao Cave, Valencia City, Bukidnon

P00431542MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.320 36,260,000 Bukidnon 1st Access Road leading to Salawao Concrete Road District Cave, Valencia City, Bukidnon Engineering Office / Bukidnon 1st District Engineering Office

P00431542MN-EAO 740,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office Local Program 12 projects 108,500,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 26,500,000 Program

17. P00440775MN 300104217721000 10,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Guinoyuran, Valencia City, Bukidnon

P00440775MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Guinoyuran, / Bukidnon 1st Valencia City, Bukidnon District Engineering Office

P00440775MN-EAO 100,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 5 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

18. P00440776MN 300104217724000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Lourdes, Valencia City, Bukidnon

P00440776MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Lourdes, Valencia / Bukidnon 1st City, Bukidnon District Engineering Office

P00440776MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

19. P00440777MN 300104204254000 3,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Lumbo, Valencia City, Bukidnon

P00440777MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Lumbo, Valencia / Bukidnon 1st City, Bukidnon District Engineering Office

P00440777MN-EAO 35,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

20. P00440778MN 300104217726000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Valencia City, Bukidnon

P00440778MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Poblacion, Valencia / Bukidnon 1st City, Bukidnon District Engineering Office

P00440778MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

21. P00440779MN 300104217728000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Sinayawan, Valencia City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 6 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440779MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Sinayawan, Valencia / Bukidnon 1st City, Bukidnon District Engineering Office

P00440779MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

22. P00443875MN 300104217759000 5,000,000 Improvement of Old City Health Office for the Construction of a Dialysis Center, Brgy. Poblacion, Valencia, Bukidnon

P00443875MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 1st Building - Improvement of Old City Multi Purpose Buildings District Health Office for the Construction Building Engineering Office of a Dialysis Center, Brgy. / Bukidnon 1st Poblacion, Valencia, Bukidnon District Engineering Office

P00443875MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 68,000,000

23. P00440789MN 300117207324000 5,000,000 Construction of Road, Brgy. Catumbalon, Valencia City, Bukidnon

P00440789MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.640 4,950,000 Bukidnon 1st Construction of Road, Brgy. Concrete Road District Catumbalon, Valencia City, Engineering Office Bukidnon / Bukidnon 1st District Engineering Office

P00440789MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

24. P00440790MN 300117207328000 3,000,000 Construction of Road, Brgy. Guinoyuran, Valencia City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 7 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440790MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 2,970,000 Bukidnon 1st Construction of Road, Brgy. Concrete Road District Guinoyuran, Valencia City, Engineering Office Bukidnon / Bukidnon 1st District Engineering Office

P00440790MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

25. P00443116MN 300117207325000 50,000,000 Construction of Local Roads, Brgy. Banlag, Valencia City, Bukidnon

P00443116MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.400 49,500,000 Bukidnon 1st Construction of Local Roads, Brgy. Concrete Road District Banlag, Valencia City, Bukidnon Engineering Office / Bukidnon 1st District Engineering Office

P00443116MN-EAO 500,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

26. P00444036MN 300117207327000 10,000,000 Construction of Local Roads at Brgy. Poblacion, Valencia City, Bukidnon

P00444036MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.880 9,900,000 Bukidnon 1st Construction of Local Roads at Concrete Road District Brgy. Poblacion, Valencia City, Engineering Office Bukidnon / Bukidnon 1st District Engineering Office

P00444036MN-EAO 100,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Local Roads and Bridges - Local Bridges - Local Infrastructure Program 5,000,000

27. P00444357MN 300119200397000 5,000,000 Construction of Pedestrian Overpass (Bridge), Brgy. Lumbo, Valencia City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 8 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444357MN-CW1 Construction of Bridge - Construction of Square 62.200 4,950,000 Bukidnon 1st Construction of Pedestrian Bridge meters District Overpass (Bridge), Brgy. Lumbo, Engineering Office Valencia City, Bukidnon / Bukidnon 1st District Engineering Office

P00444357MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 9,000,000

28. P00440787MN 300121200885000 9,000,000 Construction of Water Supply - Level II, Brgy. Lilingayon, Valencia City, Bukidnon

P00440787MN-CW1 Construction of Water Supply Construction of Number of 1.000 8,910,000 Bukidnon 1st Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Lilingayon, Systems Supply Engineering Office Valencia City, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440787MN-EAO 90,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office BUKIDNON (SECOND) 111 projects 3,516,585,000 OO1: Ensure Safe and Reliable National Road System 42 projects 2,702,000,000

Asset Preservation - Preventive Maintenance - Primary Roads 20,000,000

29. P00401432MN 310101100376000 20,000,000 Sayre Highway - K1500 + 444 - K1500 + 547, K1500 + 588 - K1500 + 632, K1514 + 218 - K1514 + 780

P00401432MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.418 19,600,000 Bukidnon 1st Asphalt Overlay - at Specific Maintenance of District Locations along Sayre Highway Road: Asphalt Engineering Office (S00639MN) K1500 + 444 - K1514 + Overlay / Bukidnon 1st 780 District Engineering Office

P00401432MN-EAO 400,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 9 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Asset Preservation - Preventive Maintenance - Tertiary Roads 144,804,000

30. P00400530MN 310103100420000 144,804,000 Jct SH Aglayan-Zamboanguita Rd - K1523 + 580 - K1527 + 930, K1527 + 990 - K1531 + 250, K1532 + 076 - K1533 + 071, K1534 + 087 - K1534 + 945, K1535 + 089 - K1537 + 139

P00400530MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 23.118 139,735,860 Central Office / Asphalt Overlay - at Specific Maintenance of Region X Locations along Jct SH Road: Asphalt Aglayan-Zamboanguita Rd Overlay (S00631MN) K1523 + 580 - K1537 + 139

P00400530MN-EAO 5,068,140 Central Office / Region X

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 29,500,000 Roads - Primary Roads

31. P00400641MN 310104100253000 29,500,000 Sayre Highway - K1475 + 000 - K1475 + 425, K1482 + 000 - K1482 + 216, K1482 + 443 - K1482 + 786, K1493 + 750 - K1493 + 805, K1506 + 540 - K1506 + 835

P00400641MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 2.668 28,910,000 Bukidnon 1st Pavement - at Specific Locations Concrete District along Sayre Highway (S00639MN) Pavement Engineering Office K1475 + 000 - K1506 + 835 / Bukidnon 1st District Engineering Office

P00400641MN-EAO 590,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 133,000,000 Roads - Tertiary Roads

32. P00400635MN 310106100527000 36,000,000 Jct SH Aglayan-Zamboanguita Rd - K1541 + 443 - K1542 + 000, K1557 + 000 - K1557 + 256, K1557 + 286 - K1557 + 406, K1561 + 223 - K1561 + 365, K1561 + 421 - K1561 + 579, K1563 + 814 - K1563 + 945, K1563 + 969 - K1564 + 156

P00400635MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 3.140 35,280,000 Bukidnon 1st Pavement - at Specific Locations Concrete District along Jct SH Pavement Engineering Office Aglayan-Zamboanguita Rd / Bukidnon 1st (S00631MN) K1541 + 443 - K1564 + District 156 Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 10 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400635MN-EAO 720,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

33. P00400638MN 310106100387000 97,000,000 Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1526 + 102 - K1528 + 000, K1532 + 298 - K1533 + 000, K1534 + 445 - K1535 + 731, K1537 + 229 - K1538 + 000

P00400638MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 9.012 93,605,000 Central Office / Pavement - at Specific Locations Concrete Bukidnon 1st along Jct Pavement District SH-Aglayan-Alanib-Ticalaan Rd Engineering Office (Aglayan-Basak) (S00633MN) K1526 + 102 - K1538 + 000

P00400638MN-EAO 3,395,000 Central Office / Bukidnon 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 119,784,000 Collapse, and Landslide - Secondary Roads

34. P00400081MN 310108100330000 86,784,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1539 + 728 - K1539 + 838, K1540 + 000 - K1540 + 150

P00400081MN-CW1 Construction of Road Slope Construction of Square 8,678.400 83,746,560 Central Office / Protection Structure - at Specific Road Slope meters Bukidnon 1st Locations along Protection District Kapalong-Talaingod-Valencia Structure Engineering Office (Bukidnon) Rd (S00641MN) K1539 + 728 - K1540 + 150

P00400081MN-EAO 3,037,440 Central Office / Bukidnon 1st District Engineering Office

35. P00400082MN 310108100448000 33,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1538 + (-090) - K1538 + 000

P00400082MN-CW1 Construction of Road Slope Construction of Square 3,300.000 32,340,000 Bukidnon 1st Protection Structure - along Road Slope meters District Kapalong-Talaingod-Valencia Protection Engineering Office (Bukidnon) Rd (S00641MN) K1538 Structure / Bukidnon 1st + (-090) - K1538 + 000 District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 11 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400082MN-EAO 660,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 18,500,000 Collapse, and Landslide - Tertiary Roads

36. P00400083MN 310109100480000 18,500,000 Jct SH Aglayan-Zamboanguita Rd - K1530 + 500 - K1530 + 530, K1530 + 825 - K1530 + 845, K1531 + 670 - K1531 + 685

P00400083MN-CW1 Construction of Road Slope Construction of Square 1,850.000 18,130,000 Bukidnon 1st Protection Structure - at Specific Road Slope meters District Locations along Jct SH Protection Engineering Office Aglayan-Zamboanguita Rd Structure / Bukidnon 1st (S00631MN) K1530 + 500 - K1531 + District 685 Engineering Office

P00400083MN-EAO 370,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Network Development - Road Widening - Primary Roads 98,500,000

37. P00401327MN 310201100602000 18,500,000 Sayre Highway - K1514 + 780 - K1515 + 205

P00401327MN-CW1 Road Widening - along Sayre Road Widening Lane Km 0.786 18,130,000 Bukidnon 1st Highway (S00639MN) K1514 + 780 District - K1515 + 205 Engineering Office / Bukidnon 1st District Engineering Office

P00401327MN-EAO 370,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

38. P00401526MN 310201100494000 80,000,000 Sayre Highway - K1504 + 158 - K1505 + 371, K1506 + 155 - K1506 + 382

P00401526MN-CW1 Road Widening - at Specific Road Widening Lane Km 1.550 28,950,000 Central Office / Locations along Sayre Highway Region X (S00639MN) K1504 + 158 - K1506 + 382

MYPS: 03/03/2020 02:36:37 pm Page 12 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401526MN-CW2 Rehabilitation / Major Repair of Rehabilitation / Lineal 1.538 19,300,000 Central Office / Drainage Structure along Road - at Major Repair of meters Region X Specific Locations along Sayre Drainage Highway (S00639MN) K1504 + 158 Structure along - K1506 + 382 Road

P00401526MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 12,335.000 30,000,000 Central Office / Locations along Sayre Highway meters Region X (S00639MN)

P00401526MN-EAO 1,750,000 Central Office / Region X

Network Development - Road Widening - Secondary Roads 402,500,000

39. P00400204MN 310202100524000 100,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1555 + 231 - K1558 + 000

P00400204MN-CW1 Road Widening - along Road Widening Lane Km 5.538 96,500,000 Central Office / Kapalong-Talaingod-Valencia Bukidnon 1st (Bukidnon) Rd (S00641MN) K1555 District + 231 - K1558 + 000 Engineering Office

P00400204MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office

40. P00400205MN 310202100525000 67,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1564 + 198 - K1566 + 203

P00400205MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.010 64,655,000 Central Office / Locations along Bukidnon 1st Kapalong-Talaingod-Valencia District (Bukidnon) Rd (S00641MN) K1564 Engineering Office + 198 - K1566 + 203

P00400205MN-EAO 2,345,000 Central Office / Bukidnon 1st District Engineering Office

41. P00401398MN 310202100660000 40,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1554 + 000 - K1555 + 182

P00401398MN-CW1 Road Widening - along Road Widening Lane Km 2.364 39,200,000 Bukidnon 1st Kapalong-Talaingod-Valencia District (Bukidnon) Rd (S00641MN) K1554 Engineering Office + 000 - K1555 + 182 / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 13 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401398MN-EAO 800,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

42. P00401408MN 310202100523000 68,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1552 + 000 - K1554 + 000

P00401408MN-CW1 Road Widening - along Road Widening Lane Km 4.000 65,620,000 Central Office / Kapalong-Talaingod-Valencia Bukidnon 1st (Bukidnon) Rd (S00641MN) K1552 District + 000 - K1554 + 000 Engineering Office

P00401408MN-EAO 2,380,000 Central Office / Bukidnon 1st District Engineering Office

43. P00401524MN 310202100526000 127,500,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1548 + 702 - K1549 + 665, K1561 + 367 - K1564 + 173

P00401524MN-CW1 Road Widening - at Specific Road Widening Lane Km 7.538 123,037,500 Central Office / Locations along Region X Kapalong-Talaingod-Valencia (Bukidnon) Rd (S00641MN) K1548 + 702 - K1564 + 173

P00401524MN-EAO 4,462,500 Central Office / Region X

Network Development - Road Widening - Tertiary Roads 409,912,000

44. P00400212MN 310203100291000 55,000,000 Jct SH Aglayan-Zamboanguita Rd - K1523 + 850 - K1525 + 500

P00400212MN-CW1 Road Widening - along Jct SH Road Widening Lane Km 3.298 53,075,000 Central Office / Aglayan-Zamboanguita Rd Bukidnon 1st (S00631MN) K1523 + 850 - K1525 + District 500 Engineering Office

P00400212MN-EAO 1,925,000 Central Office / Bukidnon 1st District Engineering Office

45. P00400213MN 310203100293000 100,000,000 Jct SH Aglayan-Zamboanguita Rd - K1527 + 960 - K1530 + 650

P00400213MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.390 96,500,000 Central Office / Locations along Jct SH Bukidnon 1st Aglayan-Zamboanguita Rd District (S00631MN) K1527 + 960 - K1530 + Engineering Office 650

MYPS: 03/03/2020 02:36:37 pm Page 14 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400213MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office

46. P00401431MN 310203100289000 100,000,000 Jct SH Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1518+996 - K1519+339; K1519+354 - K1520+608; K1520+633 - K1522+500

P00401431MN-CW1 Road Widening - at Specific Road Widening Lane Km 7.030 96,500,000 Central Office / Locations along Jct Bukidnon 1st SH-Aglayan-Alanib-Ticalaan Rd District (Aglayan-Basak) (S00633MN) Engineering Office K1518 + 996 - K1522 + 500

P00401431MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office

47. P00401450MN 310203100290000 74,912,000 Jct SH Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak) - K1522 + 500 - K1523 + 103, K1524+146 - K1526+000

P00401450MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.138 72,290,080 Central Office / Locations along Jct Bukidnon 1st SH-Aglayan-Alanib-Ticalaan Rd District (Aglayan-Basak) (S00633MN) Engineering Office K1522 + 500 - K1526 + 000

P00401450MN-EAO 2,621,920 Central Office / Bukidnon 1st District Engineering Office

48. P00401529MN 310203100292000 80,000,000 Jct SH Aglayan-Zamboanguita Rd - K1525 + 500 - K1527 + 960

P00401529MN-CW1 Road Widening - along Jct SH Road Widening Lane Km 4.914 77,200,000 Central Office / Aglayan-Zamboanguita Rd Bukidnon 1st (S00631MN) K1525 + 500 - K1527 + District 960 Engineering Office

P00401529MN-EAO 2,800,000 Central Office / Bukidnon 1st District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 853,200,000

49. P00401240MN 310204100841000 150,000,000 Sayre Highway Parallel Road I ( - - Impasug-ong Section), Package 9, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 15 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401240MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.000 144,750,000 Central Office / Sayre Highway Parallel Road I Concrete Road Region X (Libona - Manolo Fortich - Impasug-ong Section), Package 9, Bukidnon

P00401240MN-EAO 5,250,000 Central Office / Region X

50. P00401243MN 310204100842000 150,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section), Package 17, Bukidnon

P00401243MN-CW1 Construction of Gravel Road - Construction of Lane Km 6.572 144,750,000 Central Office / Sayre Highway Parallel Road II Gravel Road Region X (Manolo Fortich-Valencia City Section), Package 17, Bukidnon

P00401243MN-EAO 5,250,000 Central Office / Region X

51. P00401244MN 310204100843000 150,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section), Package 18, Bukidnon

P00401244MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.859 97,385,144 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Manolo Fortich-Valencia City Section), Package 18, Bukidnon

P00401244MN-CW2 Construction of Gravel Road - Construction of Lane Km 4.138 47,364,856 Sayre Highway Parallel Road II Gravel Road (Manolo Fortich-Valencia City Section), Package 18, Bukidnon

P00401244MN-EAO 5,250,000 Central Office / Region X

52. P00401245MN 310204100844000 150,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section), Package 19, Bukidnon

P00401245MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.085 144,750,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Manolo Fortich-Valencia City Section), Package 19, Bukidnon

P00401245MN-EAO 5,250,000 Central Office / Region X

53. P00401525MN 310204100845000 150,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section), Package 20, Bukidnon

P00401525MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.666 144,750,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Manolo Fortich-Valencia City Section), Package 20, Bukidnon

P00401525MN-EAO 5,250,000 Central Office / Region X

MYPS: 03/03/2020 02:36:37 pm Page 16 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

54. P00401527MN 310204100851000 103,200,000 Sayre Highway Parallel Road II (Valencia City Section), Package 23, Bukidnon

P00401527MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.732 99,588,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Valencia City Section), Package 23, Bukidnon

P00401527MN-EAO 3,612,000 Central Office / Region X

Network Development - Construction of Missing Links/ New Roads 191,800,000

55. P00401337MN 310205100434000 116,800,000 Completion of the East-West lateral road connecting Agusan Del Sur/ Agusan del Norte to Bukidnon, Damay-Calabugao-Adtolawon Road, Package 18, Bukidnon

P00401337MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.936 112,712,000 Central Office / Completion of the East-West Concrete Road Region X lateral road connecting Agusan Del Sur/ Agusan del Norte to Bukidnon, Damay-Calabugao-Adtolawon Road, Package 18, Bukidnon

P00401337MN-EAO 4,088,000 Central Office / Region X

56. P00401338MN 310205100442000 75,000,000 - Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Bulonay Proper to Ulayanon Section, Bukidnon

P00401338MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.580 72,375,000 Central Office / Malaybalay-Gingoog Road Concrete Road Bukidnon 1st (Gingoog City-Kalhaan, District Claveria-Bulonay-Malaybalay City), Engineering Office Bulonay Proper to Sitio Ulayanon Section, Bukidnon

P00401338MN-EAO 2,625,000 Central Office / Bukidnon 1st District Engineering Office

Network Development - Off-Carriageway Improvement - Tertiary Roads 14,000,000

57. P00401449MN 310209100263000 14,000,000 Jct SH-JP Rizal-Carillo-Capitol-DPWH Rd - K1506 + 538 - K1506 + 966

P00401449MN-CW1 Off-Carriageway Improvement: Off-Carriageway Number of 2.000 6,116,180 Bukidnon 1st Construction of Loading and Improvement: Loading District Unloading Bays - at Specific Construction of and Engineering Office Locations along Jct SH-JP Loading and Unloading / Bukidnon 1st Rizal-Carillo-Capitol-DPWH Rd Unloading Bays Bays District (S00623MN) K1506 + 538 - K1506 + Engineering Office 966

MYPS: 03/03/2020 02:36:37 pm Page 17 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401449MN-CW2 Off-Carriageway Improvement: Off-Carriageway Square 1,859.800 7,603,820 Bukidnon 1st Shoulder Paving / Construction - at Improvement: meters District Specific Locations along Jct SH-JP Shoulder Paving / Engineering Office Rizal-Carillo-Capitol-DPWH Rd Construction / Bukidnon 1st (S00623MN) K1506 + 538 - K1506 + District 966 Engineering Office

P00401449MN-EAO 280,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Network Development - Paving of Unpaved Roads - Secondary Roads 21,000,000

58. P00400440MN 310211100074000 21,000,000 Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1582 + 587 - K1582 + 734

P00400440MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 0.294 4,321,800 Bukidnon 1st Specific Locations along Unpaved Roads District Kapalong-Talaingod-Valencia Engineering Office (Bukidnon) Rd (S00641MN) K1582 / Bukidnon 1st + 587 - K1582 + 734 District Engineering Office

P00400440MN-CW2 Construction of Road Slope Construction of Square 1,659.000 16,258,200 Protection Structure - at Specific Road Slope meters Locations along Protection Kapalong-Talaingod-Valencia Structure (Bukidnon) Rd (S00641MN) K1582 + 587 - K1582 + 734

P00400440MN-EAO 420,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Network Development - Paving of Unpaved Roads - Tertiary Roads 40,000,000

59. P00400441MN 310212100158000 40,000,000 Jct SH Aglayan-Zamboanguita Rd - K1569 + 187 - K1570 + 092

P00400441MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 1.386 27,165,600 Bukidnon 1st Specific Locations along Jct SH Unpaved Roads District Aglayan-Zamboanguita Rd Engineering Office (S00631MN) K1569 + 187 - K1570 + / Bukidnon 1st 092 District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 18 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400441MN-CW2 Construction of Road Slope Construction of Square 1,228.000 12,034,400 Bukidnon 1st Protection Structure - at Specific Road Slope meters District Locations along Jct SH Protection Engineering Office Aglayan-Zamboanguita Rd Structure / Bukidnon 1st (S00631MN) K1569 + 187 - K1570 + District 092 Engineering Office

P00400441MN-EAO 800,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Bridge - Retrofitting/ Strengthening of Permanent Bridges 34,500,000

60. P00400826MN 310303100955000 5,000,000 Alalum Br. (B01498MN) along Sayre Highway

P00400826MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 4,900,000 Bukidnon 1st Bridge - Alalum Br. (B01498MN) Strengthening of Bridges District along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office

P00400826MN-EAO 100,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

61. P00400828MN 310303100956000 3,000,000 Kabakahan Br. (B01367MN) along Sayre Highway

P00400828MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 2,940,000 Bukidnon 1st Bridge - Kabakahan Br. Strengthening of Bridges District (B01367MN) along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office

P00400828MN-EAO 60,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

62. P00400829MN 310303100960000 15,000,000 Tugasan Br. (B01236MN) along Jct SH-Aglayan-Alanib-Ticalaan Rd (Aglayan-Basak)

MYPS: 03/03/2020 02:36:37 pm Page 19 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400829MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 14,700,000 Bukidnon 1st Bridge - Tugasan Br. (B01236MN) Strengthening of Bridges District along Jct Bridge Engineering Office SH-Aglayan-Alanib-Ticalaan Rd / Bukidnon 1st (Aglayan-Basak) District Engineering Office

P00400829MN-EAO 300,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

63. P00401478MN 310303100958000 3,000,000 Panambongon Br (B01235MN) along Jct SH Aglayan-Alanib-Ticalaan Road (Aglayan-Basak)

P00401478MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 2,940,000 Bukidnon 1st Bridge - Panambongon Br Strengthening of Bridges District (B01235MN) along Jct SH Bridge Engineering Office Aglayan-Alanib-Ticalaan Road / Bukidnon 1st (Aglayan-Basak) District Engineering Office

P00401478MN-EAO 60,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

64. P00401482MN 310303100957000 8,500,000 Komotal Br. (B01366MN) along Sayre Highway

P00401482MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 8,330,000 Bukidnon 1st Bridge - Komotal Br. (B01366MN) Strengthening of Bridges District along Sayre Highway Bridge Engineering Office / Bukidnon 1st District Engineering Office

P00401482MN-EAO 170,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Bridge - Widening of Permanent Bridges 171,000,000

65. P00400824MN 310305101096000 30,000,000 Mampilo Br. (B01649MN) along Kapalong-Talaingod-Valencia (Bukidnon) Rd

MYPS: 03/03/2020 02:36:37 pm Page 20 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400824MN-CW1 Widening of Bridge - Mampilo Br. Widening of Square 238.977 29,400,000 Bukidnon 1st (B01649MN) along Bridge meters District Kapalong-Talaingod-Valencia Engineering Office (Bukidnon) Rd / Bukidnon 1st District Engineering Office

P00400824MN-EAO 600,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

66. P00401476MN 310305100847000 75,000,000 Salug Br (B01650MN) along Kapalong-Talaingod-Valencia Road

P00401476MN-CW1 Widening of Bridge - Salug Br Widening of Square 400.000 72,375,000 Central Office / (B01650MN) along Bridge meters Bukidnon 1st Kapalong-Talaingod-Valencia Road District Engineering Office

P00401476MN-EAO 2,625,000 Central Office / Bukidnon 1st District Engineering Office

67. P00401477MN 310305101094000 30,000,000 Dalaingan Br along Jct SH Aglayan-Alanib-Ticalaan Road

P00401477MN-CW1 Widening of Bridge - Dalaingan Br Widening of Square 200.000 29,400,000 Bukidnon 1st along Jct SH Bridge meters District Aglayan-Alanib-Ticalaan Road Engineering Office / Bukidnon 1st District Engineering Office

P00401477MN-EAO 600,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

68. P00401479MN 310305101093000 4,500,000 Casisang Br (B01252MN) along Jct SH Impalambong-Old Casisang Road (Phase II)

P00401479MN-CW1 Widening of Bridge - Casisang Br Widening of Square 173.840 4,410,000 Bukidnon 1st (B01252MN) along Jct SH Bridge meters District Impalambong-Old Casisang Road Engineering Office (Phase II) / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 21 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401479MN-EAO 90,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

69. P00401480MN 310305101095000 8,500,000 Mamala Bridge (B01251MN) along Jct SH Impalambong-Old Casisang Road (Phase II)

P00401480MN-CW1 Widening of Bridge - Mamala Widening of Square 151.600 8,330,000 Bukidnon 1st Bridge (B01251MN) along Jct SH Bridge meters District Impalambong-Old Casisang Road Engineering Office (Phase II) / Bukidnon 1st District Engineering Office

P00401480MN-EAO 170,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

70. P00401481MN 310305101092000 23,000,000 Bugcaon Br (B01231MN) along Jct SH Aglayan-Alanib-Ticalaan Road

P00401481MN-CW1 Widening of Bridge - Bugcaon Br Widening of Square 123.200 22,540,000 Bukidnon 1st (B01231MN) along Jct SH Bridge meters District Aglayan-Alanib-Ticalaan Road Engineering Office / Bukidnon 1st District Engineering Office

P00401481MN-EAO 460,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 3 projects 300,000,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 100,000,000

71. P00420389MN 320101104230000 100,000,000 Construction of Flood Control Dike and Flood Wall with Steel Sheet Files, Upstream along Mohon, Sta. Cruz Section, Bukidnon

P00420389MN-CW1 Construction of Dike - Construction Construction of Lineal 320.000 96,500,000 Central Office / of Flood Control Dike and Flood Dike meters Flood Control Wall with Steel Sheet Files, Management Upstream along Mohon, Sta. Cruz Cluster Section, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 22 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420389MN-EAO 3,500,000 Central Office / Flood Control Management Cluster

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 200,000,000 and Principal Rivers

72. P00420613MN 320102101058000 100,000,000 Construction of Flood Mitigation Structures within Mindanao River Basin (Bonacao Stream), San Fernando Section, Bukidnon

P00420613MN-CW1 Construction of Flood Mitigation Construction of Lineal 748.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Mitigation Structures within Structure District Mindanao River Basin (Bonacao Engineering Office Stream), San Fernando Section, Bukidnon

P00420613MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office

73. P00420614MN 320102101059000 100,000,000 Construction of Flood Mitigation Structures within Mindanao River Basin (Pangian Creek), Section, Bukidnon

P00420614MN-CW1 Construction of Flood Mitigation Construction of Lineal 1,608.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Mitigation Structures within Structure District Mindanao River Basin (Pangian Engineering Office Creek), Cabanglasan Section, Bukidnon

P00420614MN-EAO 3,500,000 Central Office / Bukidnon 1st District Engineering Office Convergence and Special Support Program 7 projects 192,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 50,000,000

74. P00431539MN 300203100012000 50,000,000 Access Road leading to Cinchona Reforestation Area, Brgy. Kaatuan, , Bukidnon

P00431539MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.080 49,000,000 Bukidnon 1st Access Road leading to Cinchona Concrete Road District Reforestation Area, Brgy. Kaatuan, Engineering Office Lantapan, Bukidnon / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 23 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431539MN-EAO 1,000,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 95,538,000 Economic Zones

75. P00431540MN 300204100040000 41,820,000 Jct. Sayre Highway lmpasug-ong-Intavas-Mt. Kitanglad Road connecting Mindanao International Container Terminal-International Port to Puyat Cut-Flower Farms and DOLE High Value Crops, Impasug-ong, Bukidnon

P00431540MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.400 40,983,600 Bukidnon 1st Jct. Sayre Highway Concrete Road District lmpasug-ong-Intavas-Mt. Kitanglad Engineering Office Road connecting Mindanao / Bukidnon 1st International Container District Terminal-International Port to Engineering Office Puyat Cut-Flower Farms and DOLE Philippines High Value Crops, Impasug-ong, Bukidnon

P00431540MN-EAO 836,400 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

76. P00431541MN 300204100425000 53,718,000 NRJ to Kinilatan, Cawayan, Lantapan, Bukidnon connecting to DOLE Phils. and Del Monte Phils., Inc. Packing Shed in support of the Banana and Pineapple Industries, Lantapan, Bukidnon

P00431541MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.400 51,837,870 Central Office / NRJ to Kinilatan, Cawayan, Concrete Road Bukidnon 1st Lantapan, Bukidnon connecting to District DOLE Phils. and Del Monte Phils., Engineering Office Inc. Packing Shed in support of the Banana and Pineapple Industries, Lantapan, Bukidnon

P00431541MN-EAO 1,880,130 Central Office / Bukidnon 1st District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 46,462,000

77. P00431671MN 300207100256000 5,642,000 Construction of Female Barracks, 4th Division (Mentor) Training School, 4th Infantry Division, PA, Camp Osito D. Bahian, Malaybalay City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 24 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431671MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 5,529,160 Bukidnon 1st Construction of Female Barracks, Other Facilities Facilities District 4th Division (Mentor) Training Engineering Office School, 4th Infantry Division, PA, / Bukidnon 1st Camp Osito D. Bahian, Malaybalay District City, Bukidnon Engineering Office

P00431671MN-EAO 112,840 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

78. P00431675MN 300207100257000 10,000,000 Construction of New Enlisted Personnel Barracks with Supply Room, 403rd Infantry (Peacemaker) Brigade, 4ID, PA, Camp Osito D. Bahian, Malaybalay City, Bukidnon

P00431675MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 9,800,000 Bukidnon 1st Construction of New Enlisted Other Facilities Facilities District Personnel Barracks with Supply Engineering Office Room, 403rd Infantry / Bukidnon 1st (Peacemaker) Brigade, 4ID, PA, District Camp Osito D. Bahian, Malaybalay Engineering Office City, Bukidnon

P00431675MN-EAO 200,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

79. P00431677MN 300207100258000 15,000,000 Construction of Staff Officers' Quarters (SOQ) inside the 403rd Infantry (Peacemaker) Brigade, 4th Infantry division, Philippine Army, Camp Osito D. Bahian, Impalambong, Brgy. 10, Malaybalay CIty, Bukidnon

P00431677MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 14,700,000 Bukidnon 1st Construction of Staff Officers' Other Facilities Facilities District Quarters (SOQ) inside the 403rd Engineering Office Infantry (Peacemaker) Brigade, 4th / Bukidnon 1st Infantry division, Philippine Army, District Camp Osito D. Bahian, Engineering Office Impalambong, Brgy. 10, Malaybalay CIty, Bukidnon

P00431677MN-EAO 300,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 25 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

80. P00431691MN 300207100146000 15,820,000 Construction Standard Bukidnon PPO Headquarters, Camp Ramon Onahon, Malaybalay City, Bukidnon

P00431691MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 15,266,300 Central Office / Construction Standard Bukidnon Other Facilities Facilities Region X PPO Headquarters, Camp Ramon Onahon, Malaybalay City, Bukidnon

P00431691MN-EAO 553,700 Central Office / Region X Local Program 59 projects 322,585,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 21,000,000

81. P00442894MN 300105200311000 21,000,000 Construction of Two-Storey Quality Assurance Building of DPWH Bukidnon 1st DEO, Malaybalay, Bukidnon

P00442894MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 20,580,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Two-Storey Quality Assurance Building Engineering Office Building of DPWH Bukidnon 1st / Bukidnon 1st DEO, Malaybalay, Bukidnon District Engineering Office

P00442894MN-EAO 420,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 266,085,000 Program

82. P00440707MN 300104217736000 2,000,000 Construction of Multi-Purpose Building, Brgy. Impalutao, Impasug-ong, Bukidnon

P00440707MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Impalutao, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00440707MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

83. P00440708MN 300104217740000 3,500,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Impasug-ong, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 26 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440708MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00440708MN-EAO 35,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

84. P00440709MN 300104217738000 2,500,000 Construction of Multi-Purpose Building, Brgy. Kalabugao, Impasug-ong, Bukidnon

P00440709MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Kalabugao, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00440709MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

85. P00440710MN 300104217730000 2,500,000 Construction of Multi-Purpose Building, Brgy. Bulonay, Impasug-ong, Bukidnon

P00440710MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Bulonay, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00440710MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

86. P00440711MN 300104217741000 2,000,000 Construction of Multi-Purpose Building, Brgy. Sayawan, Impasug-ong, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 27 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440711MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Sayawan, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00440711MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

87. P00440712MN 300104217737000 3,500,000 Construction of Multi-Purpose Building, Brgy. Ka-atoan, Lantapan, Bukidnon

P00440712MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Ka-atoan, Lantapan, Bukidnon / Bukidnon 1st District Engineering Office

P00440712MN-EAO 35,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

88. P00440713MN 300104217716000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Alanib, Lantapan, Bukidnon

P00440713MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Alanib, Lantapan, / Bukidnon 1st Bukidnon District Engineering Office

P00440713MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

89. P00440715MN 300104217723000 2,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Kibangay, Lantapan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 28 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440715MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Kibangay, Lantapan, / Bukidnon 1st Bukidnon District Engineering Office

P00440715MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

90. P00440722MN 300104217764000 1,000,000 Rehabilitation of Multi-Purpose Building, Brgy. 8, Malaybalay City, Bukidnon

P00440722MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,000,000 Bukidnon 1st Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. 8, Malaybalay City, Building / Bukidnon 1st Bukidnon District Engineering Office

91. P00440723MN 300104217732000 2,500,000 Construction of Multi-Purpose Building, Brgy. Casisang, Malaybalay City, Bukidnon

P00440723MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Casisang, Malaybalay City, / Bukidnon 1st Bukidnon District Engineering Office

P00440723MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

92. P00440724MN 300104217742000 3,500,000 Construction of Multi-Purpose Building, Casisang Senior High School, Brgy. Casisang, Malaybalay City, Bukidnon

P00440724MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Casisang Building Engineering Office Senior High School, Brgy. Casisang, / Bukidnon 1st Malaybalay City, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 29 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440724MN-EAO 35,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

93. P00440725MN 300104217727000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. San Martin, Malaybalay City, Bukidnon

P00440725MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. San Martin, / Bukidnon 1st Malaybalay City, Bukidnon District Engineering Office

94. P00440732MN 300104217731000 2,000,000 Construction of Multi-Purpose Building, Brgy. , Malaybalay City, Bukidnon

P00440732MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Busdi, Malaybalay City, Bukidnon / Bukidnon 1st District Engineering Office

P00440732MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

95. P00440734MN 300104217733000 2,000,000 Construction of Multi-Purpose Building, Brgy. Freedom, Cabanglasan, Bukidnon

P00440734MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Freedom, Cabanglasan, Bukidnon / Bukidnon 1st District Engineering Office

P00440734MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

96. P00440735MN 300104217735000 2,000,000 Construction of Multi-Purpose Building, Brgy. Iba, Cabanglasan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 30 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440735MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Iba, Building Engineering Office Cabanglasan, Bukidnon / Bukidnon 1st District Engineering Office

P00440735MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

97. P00440736MN 300104217720000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Capinonan, Cabanglasan, Bukidnon

P00440736MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Capinonan, / Bukidnon 1st Cabanglasan, Bukidnon District Engineering Office

P00440736MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

98. P00440737MN 300104217729000 1,000,000 Construction (Completion) of Multi-Purpose Building, Cabuluhan Paradise National High School, Brgy. Poblacion, Cabanglasan, Bukidnon

P00440737MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Cabuluhan Paradise / Bukidnon 1st National High School, Brgy. District Poblacion, Cabanglasan, Bukidnon Engineering Office

99. P00440739MN 300104217739000 1,000,000 Construction of Multi-Purpose Building, Brgy. Malayanan, San Fernando, Bukidnon

P00440739MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Malayanan, San Fernando, / Bukidnon 1st Bukidnon District Engineering Office

100. P00443856MN 300104217717000 20,000,000 Construction of Multi-Purpose Building (Administration Building), Brgy. Balila, Lantapan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 31 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443856MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Administration Building), Brgy. / Bukidnon 1st Balila, Lantapan, Bukidnon District Engineering Office

P00443856MN-EAO 200,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

101. P00443857MN 300104217718000 15,000,000 Construction of Multi-Purpose Building (Administration Building), Brgy. Poblacion, Impasugong, Bukidnon

P00443857MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Administration Building), Brgy. / Bukidnon 1st Poblacion, Impasugong, Bukidnon District Engineering Office

P00443857MN-EAO 150,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

102. P00443858MN 300104217719000 15,000,000 Construction of Multi-Purpose Building, Brgy. Iba, Cabanglasan, Bukidnon

P00443858MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Iba, Building Engineering Office Cabanglasan, Bukidnon / Bukidnon 1st District Engineering Office

P00443858MN-EAO 150,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

103. P00443859MN 300104217743000 2,500,000 Construction of Covered Court, Anlugan Compound, Brgy. Anlugan, Cabanglasan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 32 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443859MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court, Anlugan Compound, Brgy. Building Engineering Office Anlugan, Cabanglasan, Bukidnon / Bukidnon 1st District Engineering Office

P00443859MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

104. P00443860MN 300104217744000 2,500,000 Construction of Covered Court, Sitio San Vicente, Brgy. Canangaan, Cabanglasan, Bukidnon

P00443860MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court, Sitio San Vicente, Brgy. Building Engineering Office Canangaan, Cabanglasan, / Bukidnon 1st Bukidnon District Engineering Office

P00443860MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

105. P00443861MN 300104217745000 5,000,000 Construction of Multi-Purpose Building (Community Hospital), Brgy. Poblacion, Impasug-ong, Bukidnon

P00443861MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Community Hospital), Brgy. / Bukidnon 1st Poblacion, Impasug-ong, Bukidnon District Engineering Office

P00443861MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

106. P00443862MN 300104217746000 2,500,000 Construction of Covered Court, Hagpa Elementary School, Impasug-ong, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 33 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443862MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court, Hagpa Elementary School, Building Engineering Office Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00443862MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

107. P00443863MN 300104217747000 3,000,000 Construction of Covered Court (Bukidnon State University), Brgy. Poblacion, Impasug-ong, Bukidnon

P00443863MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court (Bukidnon State University), Building Engineering Office Brgy. Poblacion, Impasug-ong, / Bukidnon 1st Bukidnon District Engineering Office

P00443863MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

108. P00443864MN 300104217748000 3,000,000 Construction of Covered Court, Tulugan Central Compound, Brgy. Songco, Lantapan, Bukidnon

P00443864MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court, Tulugan Central Compound, Building Engineering Office Brgy. Songco, Lantapan, Bukidnon / Bukidnon 1st District Engineering Office

P00443864MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

109. P00443865MN 300104217749000 5,000,000 Construction of Multi-Purpose Building at Bukidnon State University, Brgy. Poblacion Lantapan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 34 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443865MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building at Building Engineering Office Bukidnon State University, Brgy. / Bukidnon 1st Poblacion Lantapan, Bukidnon District Engineering Office

P00443865MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

110. P00443866MN 300104217750000 3,000,000 Construction of Covered Court, Lantapan Senior High School, Poblacion, Lantapan, Bukidnon

P00443866MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court, Lantapan Senior High Building Engineering Office School, Poblacion, Lantapan, / Bukidnon 1st Bukidnon District Engineering Office

P00443866MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

111. P00443867MN 300104217751000 5,000,000 Construction of Multi-Purpose Building (Women's Center), City Hall Compound, Brgy. Casisang, Malaybalay City, Bukidnon

P00443867MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Women's Building Engineering Office Center), City Hall Compound, Brgy. / Bukidnon 1st Casisang, Malaybalay City, District Bukidnon Engineering Office

P00443867MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

112. P00443868MN 300104217752000 3,000,000 Construction of Multi-Purpose Building (Covered Court) Bukidnon Provincial Police Office, Fortich St. Malaybalay City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 35 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443868MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Covered Building Engineering Office Court) Bukidnon Provincial Police / Bukidnon 1st Office, Fortich St. Malaybalay City, District Bukidnon Engineering Office

P00443868MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

113. P00443869MN 300104217753000 30,000,000 Construction of Track and Field and Track Oval, Brgy. Laguitas, Malaybalay City, Bukidnon

P00443869MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 29,700,000 Central Office / Building - Construction of Track Multi Purpose Buildings Region X and Field and Track Oval, Brgy. Building Laguitas, Malaybalay City, Bukidnon

P00443869MN-EAO 300,000 Central Office / Region X

114. P00443870MN 300104217754000 30,000,000 Construction of Perimeter Fence (with Fence Lights), Brgy. Laguitas, Malaybalay City, Bukidnon

P00443870MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 29,700,000 Central Office / Building - Construction of Multi Purpose Buildings Region X Perimeter Fence (with Fence Building Lights), Brgy. Laguitas, Malaybalay City, Bukidnon

P00443870MN-EAO 300,000 Central Office / Region X

115. P00443871MN 300104217755000 30,000,000 Construction of Grandstand A, Brgy. Laguitas, Malaybalay City, Bukidnon

P00443871MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 29,700,000 Central Office / Building - Construction of Multi Purpose Buildings Region X Grandstand A, Brgy. Laguitas, Building Malaybalay City, Bukidnon

P00443871MN-EAO 300,000 Central Office / Region X

116. P00443872MN 300104217756000 22,500,000 Construction of Grandstand B, Brgy. Laguitas, Malaybalay, Bukidnon

P00443872MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 22,275,000 Central Office / Building - Construction of Multi Purpose Buildings Region X Grandstand B, Brgy. Laguitas, Building Malaybalay, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 36 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443872MN-EAO 225,000 Central Office / Region X

117. P00443873MN 300104217757000 5,000,000 Construction/Completion of the Public Market, Sitio Malantao, Poblacion, San Fernando, Bukidnon

P00443873MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 1st Building - Construction/Completion Multi Purpose Buildings District of the Public Market, Sitio Building Engineering Office Malantao, Poblacion, San / Bukidnon 1st Fernando, Bukidnon District Engineering Office

P00443873MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

118. P00443874MN 300104217758000 2,500,000 Completion of Bleachers of Covered Court, Brgy. Mabuhay, San Fernando, Bukidnon

P00443874MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Completion of Bleachers Multi Purpose Buildings District of Covered Court, Brgy. Mabuhay, Building Engineering Office San Fernando, Bukidnon / Bukidnon 1st District Engineering Office

P00443874MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

119. P00443876MN 300104217760000 2,500,000 Construction of Covered Court in Dumalaguing Elementary School in Brgy. Dumalaguing, Impasugong, Bukidnon

P00443876MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court in Dumalaguing Elementary Building Engineering Office School in Brgy. Dumalaguing, / Bukidnon 1st Impasugong, Bukidnon District Engineering Office

P00443876MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 37 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

120. P00443877MN 300104217761000 2,500,000 Construction of Covered Court (dome type) at Brgy. Poblacion, Impasug-ong, Bukidnon

P00443877MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Covered Multi Purpose Buildings District Court (dome type) at Brgy. Building Engineering Office Poblacion, Impasug-ong, Bukidnon / Bukidnon 1st District Engineering Office

P00443877MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

121. P00443878MN 300104217762000 2,000,000 Construction of Multi-Purpose Building (Covered Court) Brgy. 2, Malaybalay, Bukidnon

P00443878MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Covered Building Engineering Office Court) Brgy. 2, Malaybalay, / Bukidnon 1st Bukidnon District Engineering Office

P00443878MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

122. P00443879MN 300104217763000 2,000,000 Construction of Multi-Purpose Building (Covered Court) Brgy. La Fortuna, Impasug-ong, Bukidnon

P00443879MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Covered Building Engineering Office Court) Brgy. La Fortuna, / Bukidnon 1st Impasug-ong, Bukidnon District Engineering Office

P00443879MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

123. P00443882MN 300104217790000 13,085,000 Construction/Completion of the Culture and Arts Center, Brgy., Laguitas, Malaybalay, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 38 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443882MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 12,954,150 Central Office / Building - Construction/Completion Multi Purpose Buildings Region X of the Northern Mindanao Culture Building and Arts Center, Brgy., Laguitas, Malaybalay, Bukidnon

P00443882MN-EAO 130,850 Central Office / Region X

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 2,000,000 Program

124. P00440726MN 300107200941000 2,000,000 Rehabilitation of Flood Control Structure, Brgy. 1, Malaybalay City, Bukidnon

P00440726MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Lineal 148.000 1,980,000 Bukidnon 1st Flood Control Structure - Major Repair of meters District Rehabilitation of Flood Control Flood Control Engineering Office Structure, Brgy. 1, Malaybalay City, Structure / Bukidnon 1st Bukidnon District Engineering Office

P00440726MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 5,000,000

125. P00440727MN 300117207326000 2,000,000 Construction of Road, Brgy. , Malaybalay City, Bukidnon

P00440727MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.240 1,980,000 Bukidnon 1st Construction of Road, Brgy. Concrete Road District Dalwangan, Malaybalay City, Engineering Office Bukidnon / Bukidnon 1st District Engineering Office

P00440727MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

126. P00440728MN 300117207323000 3,000,000 Construction of Road, Brgy. Aglayan, Malaybalay City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 39 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440728MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 2,970,000 Bukidnon 1st Construction of Road, Brgy. Concrete Road District Aglayan, Malaybalay City, Engineering Office Bukidnon / Bukidnon 1st District Engineering Office

P00440728MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 28,500,000

127. P00440716MN 300121200891000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Kawayan, Lantapan, Bukidnon

P00440716MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Kawayan, Systems Supply Engineering Office Lantapan, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440716MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

128. P00440717MN 300121200892000 1,500,000 Improvement/Completion of Water System, Brgy. Kulasihan ( 10), Lantapan, Bukidnon

P00440717MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,485,000 Bukidnon 1st Systems - Water Supply Water District Improvement/Completion of Systems Supply Engineering Office Water System, Brgy. Kulasihan Systems / Bukidnon 1st (Purok 10), Lantapan, Bukidnon District Engineering Office

P00440717MN-EAO 15,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

129. P00440718MN 300121200895000 1,000,000 Rehabilitation of Water Supply - Level II, Brgy. Silae, Malaybalay City, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 40 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440718MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,000,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Silae, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

130. P00440719MN 300121200888000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Capitan Angel, Malaybalay City, Bukidnon

P00440719MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Capitan Systems Supply Engineering Office Angel, Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440719MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

131. P00440720MN 300121200898000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Sinanglanan, Malaybalay City, Bukidnon

P00440720MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Sinanglanan, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440720MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

132. P00440721MN 300121200894000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Santo Niño, Malaybalay City, Bukidnon

P00440721MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Santo Niño, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 41 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440721MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

133. P00440729MN 300121200893000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Mapulo, Malaybalay City, Bukidnon

P00440729MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Mapulo, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440729MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

134. P00440730MN 300121200887000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Caburacanan, Malaybalay City, Bukidnon

P00440730MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Systems Supply Engineering Office Caburacanan, Malaybalay City, Systems / Bukidnon 1st Bukidnon District Engineering Office

P00440730MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

135. P00440731MN 300121200889000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Indalaza, Malaybalay City, Bukidnon

P00440731MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Indalaza, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 42 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440731MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

136. P00440733MN 300121200886000 2,000,000 Construction of Water Supply - Level II, Brgy. Saint Peter, Malaybalay City, Bukidnon

P00440733MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 1st Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Saint Peter, Systems Supply Engineering Office Malaybalay City, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440733MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

137. P00440738MN 300121200890000 2,000,000 Rehabilitation of Water Supply - Level II, Brgy. Kalagangan, San Fernando, Bukidnon

P00440738MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,980,000 Bukidnon 1st Systems - Rehabilitation of Water Water Supply Water District Supply - Level II, Brgy. Kalagangan, Systems Supply Engineering Office San Fernando, Bukidnon Systems / Bukidnon 1st District Engineering Office

P00440738MN-EAO 20,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

138. P00444565MN 300121200896000 3,000,000 Rehabilitation/Improvement of Water System, Brgy. Bantuanon, Lantapan, Bukidnon

P00444565MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 2,970,000 Bukidnon 1st Systems - Water Supply Water District Rehabilitation/Improvement of Systems Supply Engineering Office Water System, Brgy. Bantuanon, Systems / Bukidnon 1st Lantapan, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 43 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444565MN-EAO 30,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

139. P00444566MN 300121200897000 5,000,000 Rehabilitation/Improvement of Lantapan Water System, Malinurog Source, Brgy. Songco, Lantapan, Bukidnon

P00444566MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 4,950,000 Bukidnon 1st Systems - Water Supply Water District Rehabilitation/Improvement of Systems Supply Engineering Office Lantapan Water System, Malinurog Systems / Bukidnon 1st Source, Brgy. Songco, Lantapan, District Bukidnon Engineering Office

P00444566MN-EAO 50,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 44 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Bukidnon 2nd District Engineering Office 167 projects 3,913,000,000 BUKIDNON (THIRD) 167 projects 3,913,000,000 OO1: Ensure Safe and Reliable National Road System 38 projects 3,060,713,000

Asset Preservation - Preventive Maintenance - Tertiary Roads 55,942,000

1. P00400535MN 310103100419000 55,942,000 Don Carlos- Rd - K1577 + 831 - K1579 + 262, K1579 + 281 - K1580 + 121

P00400535MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 4.678 53,984,030 Central Office / Asphalt Overlay - at Specific Maintenance of Bukidnon 2nd Locations along Don Road: Asphalt District Carlos-Kadingilan Rd (S01366MN) Overlay Engineering Office K1577 + 831 - K1580 + 121

P00400535MN-EAO 1,957,970 Central Office / Bukidnon 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 40,000,000 Roads - Primary Roads

2. P00401401MN 310104100255000 40,000,000 Bukidnon-Davao City Rd - K1575 + 240 - K1576 + 370

P00401401MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 1.200 20,580,000 Bukidnon 2nd Pavement - at Specific Locations Concrete District along Bukidnon-Davao City Rd Pavement Engineering Office (S00654MN) K1575 + 240 - K1576 + / Bukidnon 2nd 370 District Engineering Office

P00401401MN-CW2 Construction of Drainage Structure Construction of Lineal 1,636.000 18,620,000 along Road - at Specific Locations Drainage meters along Bukidnon-Davao City Rd Structure along (S00654MN) K1575 + 240 - K1576 + Road 370

P00401401MN-EAO 800,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 34,742,000 Roads - Secondary Roads

3. P00400643MN 310105100469000 34,742,000 -Maradugao Rd - K1560 + 361 - K1561 + 427

MYPS: 03/03/2020 02:36:37 pm Page 45 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400643MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 2.132 34,047,160 Bukidnon 2nd Pavement - at Specific Locations Concrete District along Maramag-Maradugao Rd Pavement Engineering Office (S00663MN) K1560 + 361 - K1561 + / Bukidnon 2nd 427 District Engineering Office

P00400643MN-EAO 694,840 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 369,600,000 Collapse, and Landslide - Primary Roads

4. P00400085MN 310107100123000 54,000,000 Bukidnon-Davao City Rd - K1591 + 450 - K1591 + 562

P00400085MN-CW1 Construction of Road Slope Construction of Square 3,000.000 52,110,000 Central Office / Protection Structure - along Road Slope meters Bukidnon 2nd Bukidnon-Davao City Rd Protection District (S00654MN) K1591 + 450 - K1591 + Structure Engineering Office 562

P00400085MN-EAO 1,890,000 Central Office / Bukidnon 2nd District Engineering Office

5. P00400086MN 310107100124000 59,000,000 Bukidnon-Davao City Rd - K1604 + 100 - K1604 + 193, K1604 + 300 - K1604 + 395, K1604 + 450 - K1604 + 540, K1604 + 595 - K1604 + 710

P00400086MN-CW1 Construction of Road Slope Construction of Square 3,277.480 56,935,000 Central Office / Protection Structure - at Specific Road Slope meters Bukidnon 2nd Locations along Bukidnon-Davao Protection District City Rd (S00654MN) K1604 + 100 - Structure Engineering Office K1604 + 710

P00400086MN-EAO 2,065,000 Central Office / Bukidnon 2nd District Engineering Office

6. P00400088MN 310107100125000 84,600,000 Bukidnon-Davao City Rd - K1605 + 950 - K1606 + 030, K1606 + 095 - K1606 + 145

P00400088MN-CW1 Construction of Road Slope Construction of Square 4,700.000 81,639,000 Central Office / Protection Structure - at Specific Road Slope meters Bukidnon 2nd Locations along Bukidnon-Davao Protection District City Rd (S00654MN) K1605 + 950 - Structure Engineering Office K1606 + 145

MYPS: 03/03/2020 02:36:37 pm Page 46 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400088MN-EAO 2,961,000 Central Office / Bukidnon 2nd District Engineering Office

7. P00400090MN 310107100126000 100,000,000 Bukidnon-Davao City Rd - K1607 + 250 - K1607 + 310, K1607 + 585 - K1607 + 700

P00400090MN-CW1 Construction of Road Slope Construction of Square 5,689.000 96,500,000 Central Office / Protection Structure - at Specific Road Slope meters Bukidnon 2nd Locations along Bukidnon-Davao Protection District City Rd (S00654MN) K1607 + 250 - Structure Engineering Office K1607 + 700

P00400090MN-EAO 3,500,000 Central Office / Bukidnon 2nd District Engineering Office

8. P00400092MN 310107100127000 72,000,000 Bukidnon-Davao City Rd - K1607 + 900 - K1607 + 980

P00400092MN-CW1 Construction of Road Slope Construction of Square 4,000.000 69,480,000 Central Office / Protection Structure - along Road Slope meters Bukidnon 2nd Bukidnon-Davao City Rd Protection District (S00654MN) K1607 + 900 - K1607 + Structure Engineering Office 980

P00400092MN-EAO 2,520,000 Central Office / Bukidnon 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 82,000,000 Collapse, and Landslide - Secondary Roads

9. P00400093MN 310108100331000 82,000,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1605 + 560 - K1605 + 675

P00400093MN-CW1 Construction of Road Slope Construction of Square 1,725.000 79,130,000 Central Office / Protection Structure - along Sayre Road Slope meters Bukidnon 2nd Highway (Jct Bukidnon-Davao City Protection District Rd-Cotabato Bdry) (S00652MN) Structure Engineering Office K1605 + 560 - K1605 + 675

P00400093MN-EAO 2,870,000 Central Office / Bukidnon 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 26,800,000 National Roads - Secondary Roads

10. P00400347MN 310111100243000 26,800,000 Maramag-Maradugao Rd - K1558 + 079 - K1559 + 180

MYPS: 03/03/2020 02:36:37 pm Page 47 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400347MN-CW1 Construction of Drainage Structure Construction of Lineal 1,656.000 26,264,000 Bukidnon 2nd along Road - at Specific Locations Drainage meters District along Maramag-Maradugao Rd Structure along Engineering Office (S00663MN) K1558 + 079 - K1559 + Road / Bukidnon 2nd 180 District Engineering Office

P00400347MN-EAO 536,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 278,453,000

11. P00400216MN 310201100495000 115,000,000 Sayre Highway - K1540 + (-194) - K1542 + 852

P00400216MN-CW1 Road Widening - along Sayre Road Widening Lane Km 6.072 110,975,000 Central Office / Highway (S00647MN) K1540 + Region X (-194) - K1542 + 852

P00400216MN-EAO 4,025,000 Central Office / Region X

12. P00400217MN 310201100497000 88,114,000 Sayre Highway - K1559 + 000 - K1561 + 500

P00400217MN-CW1 Road Widening - along Sayre Road Widening Lane Km 4.972 85,030,010 Central Office / Highway (S00647MN) K1559 + 000 Bukidnon 2nd - K1561 + 500 District Engineering Office

P00400217MN-EAO 3,083,990 Central Office / Bukidnon 2nd District Engineering Office

13. P00400229MN 310201100496000 55,400,000 Sayre Highway - K1544 + 000 - K1545 + 335

P00400229MN-CW1 Road Widening - at Specific Road Widening Lane Km 2.684 50,180,000 Central Office / Locations along Sayre Highway Bukidnon 2nd (S00647MN) K1544 + 000 - K1545 + District 335 Engineering Office

P00400229MN-CW2 Off-Carriageway Improvement: Off-Carriageway Square 2,013.000 3,281,000 Construction of Median/Center Improvement: meters Island - at Specific Locations along Construction of Sayre Highway (S00647MN) K1544 Median/Center + 000 - K1545 + 335 Island

P00400229MN-EAO 1,939,000 Central Office / Bukidnon 2nd District Engineering Office MYPS: 03/03/2020 02:36:37 pm Page 48 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

14. P00401488MN 310201100603000 19,939,000 Bukidnon-Davao City Rd - K1611 + 921 - K1612 + 072, K1612 + 090 - K1612 + 390

P00401488MN-CW1 Road Widening - at Specific Road Widening Lane Km 0.904 19,540,220 Bukidnon 2nd Locations along Bukidnon-Davao District City Rd (S00654MN) K1611 + 921 - Engineering Office K1612 + 390 / Bukidnon 2nd District Engineering Office

P00401488MN-EAO 398,780 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Network Development - Road Widening - Secondary Roads 453,588,000

15. P00400219MN 310202100529000 100,000,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1566 + 000 - K1568 + 000, K1574 + 000 - K1575 + 000

P00400219MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.664 78,596,355 Central Office / Locations along Sayre Highway (Jct Bukidnon 2nd Bukidnon-Davao City Rd-Cotabato District Bdry) (S00652MN) K1566 + 000 - Engineering Office K1575 + 000

P00400219MN-CW2 Off-Carriageway Improvement: Off-Carriageway Square 2,937.000 17,903,645 Construction of Median/Center Improvement: meters Island - at Specific Locations along Construction of Sayre Highway (Jct Median/Center Bukidnon-Davao City Rd-Cotabato Island Bdry) (S00652MN) K1566 + 000 - K1575 + 000

P00400219MN-EAO 3,500,000 Central Office / Bukidnon 2nd District Engineering Office

16. P00400220MN 310202100530000 92,800,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1575 + 000 - K1575 + 500, K1577 + 100 - K1579 + 400

P00400220MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.596 89,552,000 Central Office / Locations along Sayre Highway (Jct Region X Bukidnon-Davao City Rd-Cotabato Bdry) (S00652MN) K1575 + 000 - K1579 + 400

P00400220MN-EAO 3,248,000 Central Office / Region X

MYPS: 03/03/2020 02:36:37 pm Page 49 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

17. P00400221MN 310202100531000 93,400,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1579 + 400 - K1579 + 774, K1579 + 794 - K1580 + 000, K1582 + 800 - K1585 + 000

P00400221MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.560 90,131,000 Central Office / Locations along Sayre Highway (Jct Region X Bukidnon-Davao City Rd-Cotabato Bdry) (S00652MN) K1579 + 400 - K1585 + 000

P00400221MN-EAO 3,269,000 Central Office / Region X

18. P00400222MN 310202100532000 68,000,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1586 + 100 - K1588 + 100

P00400222MN-CW1 Road Widening - along Sayre Road Widening Lane Km 4.006 65,620,000 Central Office / Highway (Jct Bukidnon-Davao City Bukidnon 2nd Rd-Cotabato Bdry) (S00652MN) District K1586 + 100 - K1588 + 100 Engineering Office

P00400222MN-EAO 2,380,000 Central Office / Bukidnon 2nd District Engineering Office

19. P00400223MN 310202100663000 46,610,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1598 + 700 - K1600 + 000

P00400223MN-CW1 Road Widening - along Sayre Road Widening Lane Km 2.600 45,677,800 Bukidnon 2nd Highway (Jct Bukidnon-Davao City District Rd-Cotabato Bdry) (S00652MN) Engineering Office K1598 + 700 - K1600 + 000 / Bukidnon 2nd District Engineering Office

P00400223MN-EAO 932,200 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

20. P00400224MN 310202100664000 44,028,000 Sayre Highway (Jct Bukidnon-Davao City Rd-Cotabato Bdry) - K1604 + 000 - K1605 + 273

P00400224MN-CW1 Road Widening - along Sayre Road Widening Lane Km 2.456 43,147,440 Bukidnon 2nd Highway (Jct Bukidnon-Davao City District Rd-Cotabato Bdry) (S00652MN) Engineering Office K1604 + 000 - K1605 + 273 / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 50 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400224MN-EAO 880,560 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

21. P00400225MN 310202100662000 8,750,000 Maramag-Maradugao Rd - K1576 + 600 - K1576 + 850

P00400225MN-CW1 Road Widening - along Road Widening Lane Km 0.500 8,575,000 Bukidnon 2nd Maramag-Maradugao Rd District (S00663MN) K1576 + 600 - K1576 + Engineering Office 850 / Bukidnon 2nd District Engineering Office

P00400225MN-EAO 175,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Network Development - Road Widening - Tertiary Roads 227,735,000

22. P00400226MN 310203100287000 100,000,000 Don Carlos-Kadingilan Rd - K1570 + 000 - K1573 + 000

P00400226MN-CW1 Road Widening - along Don Road Widening Lane Km 6.154 96,500,000 Central Office / Carlos-Kadingilan Rd (S01366MN) Bukidnon 2nd K1570 + 000 - K1573 + 000 District Engineering Office

P00400226MN-EAO 3,500,000 Central Office / Bukidnon 2nd District Engineering Office

23. P00400227MN 310203100288000 85,000,000 Don Carlos-Kadingilan Rd - K1580 + 893 - K1582 + 608, K1582 + 637 - K1583 + 621

P00400227MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.468 82,025,000 Central Office / Locations along Don Bukidnon 2nd Carlos-Kadingilan Rd (S01366MN) District K1580 + 893 - K1583 + 621 Engineering Office

P00400227MN-EAO 2,975,000 Central Office / Bukidnon 2nd District Engineering Office

24. P00400228MN 310203100386000 42,735,000 Don Carlos-Kadingilan Rd - K1588 + 000 - K1589 + 222

MYPS: 03/03/2020 02:36:37 pm Page 51 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400228MN-CW1 Road Widening - along Don Road Widening Lane Km 2.562 41,880,300 Bukidnon 2nd Carlos-Kadingilan Rd (S01366MN) District K1588 + 000 - K1589 + 222 Engineering Office / Bukidnon 2nd District Engineering Office

P00400228MN-EAO 854,700 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 950,000,000

25. P00401194MN 310204100827000 125,000,000 Kadingilan-Bukidnon/North Cotabato By-Pass Road, Package 7, Bukidnon

P00401194MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.004 120,625,000 Central Office / Kadingilan-Bukidnon/North Concrete Road Region X Cotabato By-Pass Road, Package 7, Bukidnon

P00401194MN-EAO 4,375,000 Central Office / Region X

26. P00401196MN 310204100824000 125,000,000 Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Extension, Package 10, Bukidnon

P00401196MN-CW1 Construction of Gravel Road - Jct. Construction of Lane Km 6.813 120,625,000 Central Office / Maramag-Maradugao Road-Jct. Gravel Road Region X Lampanusan Road Extension, Package 10, Bukidnon

P00401196MN-EAO 4,375,000 Central Office / Region X

27. P00401197MN 310204100825000 125,000,000 Jct. Maramag-Maradugao Road-Jct. Lampanusan Road Extension, Package 9, Bukidnon

P00401197MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.667 120,625,000 Central Office / Jct. Maramag-Maradugao Road-Jct. Concrete Road Region X Lampanusan Road Extension, Package 9, Bukidnon

P00401197MN-EAO 4,375,000 Central Office / Region X

28. P00401246MN 310204100848000 150,000,000 Sayre Highway Parallel Road II (Quezon Section), Package 16, Bukidnon

P00401246MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.560 144,750,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Quezon Section), Package 16, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 52 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401246MN-EAO 5,250,000 Central Office / Region X

29. P00401340MN 310204100828000 125,000,000 Kadingilan-Bukidnon/North Cotabato By-Pass Road, Package 8, Bukidnon

P00401340MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.031 120,625,000 Central Office / Kadingilan-Bukidnon/North Concrete Road Region X Cotabato By-Pass Road, Package 8, Bukidnon

P00401340MN-EAO 4,375,000 Central Office / Region X

30. P00401341MN 310204100512000 300,000,000 Jct. Buda, Quezon -Jct. Valencia- Talaingod Road-Kalagangan, San Fernando Alternate/By Pass Road, Package 9, Bukidnon

P00401341MN-CW1 Construction of Concrete Road - Construction of Lane Km 14.000 289,500,000 Central Office / Jct. Buda, Quezon -Jct. Valencia- Concrete Road Region X Talaingod Road-Kalagangan, San Fernando Alternate/By Pass Road, Package 9, Bukidnon

P00401341MN-EAO 10,500,000 Central Office / Region X

Network Development - Construction of Missing Links/ New Roads 400,000,000

31. P00401192MN 310205100432000 125,000,000 Bukidnon-Davao (Jct. Sinuda-Kalagangan, San Fernando), Package 18, Bukidnon

P00401192MN-CW1 Construction of Concrete Road - Construction of Lane Km 9.496 120,625,000 Central Office / Bukidnon-Davao (Jct. Concrete Road Region X Sinuda-Kalagangan, San Fernando), Package 18, Bukidnon

P00401192MN-EAO 4,375,000 Central Office / Region X

32. P00401193MN 310205100433000 125,000,000 Bukidnon-Davao (Jct. Sinuda-Kalagangan, San Fernando), Package 19, Bukidnon

P00401193MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.680 120,625,000 Central Office / Bukidnon-Davao (Jct. Concrete Road Region X Sinuda-Kalagangan, San Fernando), Package 19, Bukidnon

P00401193MN-EAO 4,375,000 Central Office / Region X

33. P00401195MN 310205100445000 150,000,000 Puntian-Arakan Road, Package 9, Bukidnon

P00401195MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.170 144,750,000 Central Office / Puntian-Arakan Road, Package 9, Concrete Road Region X Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 53 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401195MN-EAO 5,250,000 Central Office / Region X

Network Development - Off-Carriageway Improvement - Primary Roads 78,383,000

34. P00400443MN 310207100109000 5,000,000 Sayre Highway - K1545 + 558 - K1545 + 618, K1545 + 746 - K1545 + 806

P00400443MN-CW1 Off-Carriageway Improvement: Off-Carriageway Number of 2.000 4,900,000 Bukidnon 2nd Construction of Loading and Improvement: Loading District Unloading Bays - at Specific Construction of and Engineering Office Locations along Sayre Highway Loading and Unloading / Bukidnon 2nd (S00647MN) K1545 + 558 - K1545 + Unloading Bays Bays District 806 Engineering Office

P00400443MN-EAO 100,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

35. P00400444MN 310207100110000 33,000,000 Sayre Highway - K1555 + 270 - K1557 + 078

P00400444MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 1.000 32,340,000 Bukidnon 2nd Construction of Bike Lanes - along Improvement: meters District Sayre Highway (S00647MN) K1555 Construction of Engineering Office + 270 - K1557 + 078 Bike Lanes / Bukidnon 2nd District Engineering Office

P00400444MN-EAO 660,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

36. P00401400MN 310207100111000 40,383,000 Sayre Highway - K1555 + 270 - K1559 + 000

P00401400MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 5,529.000 39,575,340 Bukidnon 2nd Construction of Median/Center Improvement: meters District Island - along Sayre Highway Construction of Engineering Office (S00647MN) K1555 + 270 - K1559 Median/Center / Bukidnon 2nd + 000 Island District Engineering Office

P00401400MN-EAO 807,660 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 54 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Bridge - Widening of Permanent Bridges 63,470,000

37. P00401392MN 310305101097000 45,000,000 Mulita Br. (B01415MN) along Don Carlos-Kadingilan Rd

P00401392MN-CW1 Widening of Bridge - Mulita Br. Widening of Square 400.680 44,100,000 Bukidnon 2nd (B01415MN) along Don Bridge meters District Carlos-Kadingilan Rd Engineering Office / Bukidnon 2nd District Engineering Office

P00401392MN-EAO 900,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

38. P00401399MN 310305101196000 18,470,000 Musuan Br. (B01373MN) along Sayre Highway

P00401399MN-CW1 Widening of Bridge - Musuan Br. Widening of Square 152.640 17,823,550 Central Office / (B01373MN) along Sayre Highway Bridge meters Region X

P00401399MN-EAO 646,450 Central Office / Region X Convergence and Special Support Program 7 projects 417,980,000

Construction/ Improvement of Access Roads leading to Airports 382,080,000

39. P00431544MN 300201100056000 150,000,000 Access Road leading to Proposed Bukidnon Airport (Jct. KKK Road/ Langcataon, Pangantucan-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package III

P00431544MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.320 86,850,000 Central Office / Access Road leading to Proposed Concrete Road Region X Bukidnon Airport (Jct. KKK Road/ Langcataon, Pangantucan-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package III

P00431544MN-CW2 Construction of Concrete Bridge - Construction of Square 381.600 57,900,000 Access Road leading to Proposed Concrete Bridge meters Bukidnon Airport (Jct. KKK Road/ Langcataon, Pangantucan-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package III

P00431544MN-EAO 5,250,000 Central Office / Region X

MYPS: 03/03/2020 02:36:37 pm Page 55 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

40. P00431545MN 300201100058000 150,000,000 Access Road leading to Proposed Bukidnon Airport (Jct. Maramag-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package IV

P00431545MN-CW1 Construction of Concrete Road - Construction of Lane Km 8.160 144,750,000 Central Office / Access Road leading to Proposed Concrete Road Region X Bukidnon Airport (Jct. Maramag-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package IV

P00431545MN-EAO 5,250,000 Central Office / Region X

41. P00431776MN 300201100057000 82,080,000 Access Road leading to Proposed Bukidnon Airport (Jct. KKK Road/ Langcataon, Pangantucan-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package IV

P00431776MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.600 79,207,200 Central Office / Access Road leading to Proposed Concrete Road Region X Bukidnon Airport (Jct. KKK Road/ Langcataon, Pangantucan-Jct. Don Carlos-Kadingilan Road/ San Nicolas Section), Don Carlos, Bukidnon, Package IV

P00431776MN-EAO 2,872,800 Central Office / Region X

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 21,400,000

42. P00431543MN 300203101314000 21,400,000 NRJ (Camp 1 - Davao Road) leading to Maramag Falls Road, Maramag, Bukidnon

P00431543MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.712 20,972,000 Bukidnon 2nd NRJ (Camp 1 - Davao Road) leading Concrete Road District to Maramag Falls Road, Maramag, Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00431543MN-EAO 428,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 14,500,000

43. P00431668MN 300207100259000 5,500,000 Construction of Administration Building at Headquarters, 88th Infantry (Maringal) Battalion, 4ID, PA, Purok 10, South Poblacion, Maramag, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 56 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431668MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 5,390,000 Bukidnon 2nd Construction of Administration Other Facilities Facilities District Building at Headquarters, 88th Engineering Office Infantry (Maringal) Battalion, 4ID, / Bukidnon 2nd PA, Purok 10, South Poblacion, District Maramag, Bukidnon Engineering Office

P00431668MN-EAO 110,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

44. P00431669MN 300207100260000 2,000,000 Construction of Communication Building at Headquarters, 88th Infantry (Maringal) Battalion, 4ID, PA, Purok 10, South Poblacion, Maramag, Bukidnon

P00431669MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 1,960,000 Bukidnon 2nd Construction of Communication Other Facilities Facilities District Building at Headquarters, 88th Engineering Office Infantry (Maringal) Battalion, 4ID, / Bukidnon 2nd PA, Purok 10, South Poblacion, District Maramag, Bukidnon Engineering Office

P00431669MN-EAO 40,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

45. P00431676MN 300207100261000 7,000,000 Construction of Perimeter Fence including Gates at Headquarters, 88th Infantry (Maringal) Battalion, 4ID, PA, Purok 10, South Poblacion, Maramag, Bukidnon

P00431676MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,860,000 Bukidnon 2nd Construction of Perimeter Fence Other Facilities Facilities District including Gates at Headquarters, Engineering Office 88th Infantry (Maringal) Battalion, / Bukidnon 2nd 4ID, PA, Purok 10, South Poblacion, District Maramag, Bukidnon Engineering Office

P00431676MN-EAO 140,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office Local Program 122 projects 434,307,000

Buildings and Other Structures - School Buildings - Local Infrastructure Program 4,000,000

46. P00440747MN 300102200439000 2,000,000 Construction of School Building, Brgy. Cabadiangan, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 57 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440747MN-CW1 Construction of School Buildings - Construction of Number of 1.000 1,980,000 Bukidnon 2nd Construction of School Building, School Buildings School District Brgy. Cabadiangan, Don Carlos, Buildings Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00440747MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

47. P00440767MN 300102200440000 2,000,000 Construction of School Building, Butong Elementary School, Brgy. Butong, Quezon, Bukidnon

P00440767MN-CW1 Construction of School Buildings - Construction of Number of 1.000 1,980,000 Bukidnon 2nd Construction of School Building, School Buildings School District Butong Elementary School, Brgy. Buildings Engineering Office Butong, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440767MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 11,000,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

48. P00443231MN 300103202721000 1,500,000 Construction (Completion) of Multi-purpose Building (Covered Court), Brgy. Kibatang, Don Carlos, Bukidnon

P00443231MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,470,000 Bukidnon 2nd Building - Construction Multi Purpose Buildings District (Completion) of Multi-purpose Building Engineering Office Building (Covered Court), Brgy. / Bukidnon 2nd Kibatang, Don Carlos, Bukidnon District Engineering Office

P00443231MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

49. P00443232MN 300103202722000 2,500,000 Construction of Multi-purpose Building ( Hall), Brgy. Pualas, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 58 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443232MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building (Barangay Building Engineering Office Hall), Brgy. Pualas, Don Carlos, / Bukidnon 2nd Bukidnon District Engineering Office

P00443232MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

50. P00443233MN 300103202723000 2,000,000 Construction of Multi-purpose Building (Covered Court) - at BUSCO Elementary School, Brgy. Butong, Quezon, Bukidnon

P00443233MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building (Covered Building Engineering Office Court) - at BUSCO Elementary / Bukidnon 2nd School, Brgy. Butong, Quezon, District Bukidnon Engineering Office

P00443233MN-EAO 40,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

51. P00443234MN 300103202724000 1,500,000 Rehabilitation of Multi-purpose Building (Covered Court), Brgy. Don Carlos Norte, Don Carlos, Bukidnon

P00443234MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,470,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Multi-purpose Multi Purpose Engineering Office Building (Covered Court), Brgy. Don Building / Bukidnon 2nd Carlos Norte, Don Carlos, Bukidnon District Engineering Office

P00443234MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

52. P00443235MN 300103202725000 1,500,000 Rehabilitation of Multi-purpose Building (Covered Court), Brgy. Paitan, Quezon, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 59 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443235MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,470,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Multi-purpose Multi Purpose Engineering Office Building (Covered Court), Brgy. Building / Bukidnon 2nd Paitan, Quezon, Bukidnon District Engineering Office

P00443235MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

53. P00443236MN 300103202726000 2,000,000 Rehabilitation of Multi-purpose Building (Day Care Center), Brgy. Kianggat, , Bukidnon

P00443236MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,960,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Multi-purpose Multi Purpose Engineering Office Building (Day Care Center), Brgy. Building / Bukidnon 2nd Kianggat, Dangcagan, Bukidnon District Engineering Office

P00443236MN-EAO 40,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 191,500,000 Program

54. P00440742MN 300104217786000 2,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Dangcagan, Bukidnon

P00440742MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Dangcagan, Bukidnon / Bukidnon 2nd District Engineering Office

P00440742MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

55. P00440743MN 300104217772000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bismartz, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 60 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440743MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Bismartz, Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

P00440743MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

56. P00440750MN 300104217836000 2,000,000 Construction of Multi-Purpose Building, San Andres National High School, Brgy. Cabadiangan, Kadingilan, Bukidnon

P00440750MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, San Andres Building Engineering Office National High School, Brgy. / Bukidnon 2nd Cabadiangan, Kadingilan, Bukidnon District Engineering Office

P00440750MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

57. P00440753MN 300104217777000 2,000,000 Construction of Multi-Purpose Building, Brgy. Kiorao, , Bukidnon

P00440753MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Kiorao, Kibawe, Bukidnon / Bukidnon 2nd District Engineering Office

P00440753MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

58. P00440757MN 300104217771000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bershiba, , Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 61 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440757MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Bershiba, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00440757MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

59. P00440758MN 300104217773000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bolocaon, Kitaotao, Bukidnon

P00440758MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Bolocaon, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00440758MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

60. P00440761MN 300104217784000 2,000,000 Construction of Multi-Purpose Building, Brgy. Pagan, Kitaotao, Bukidnon

P00440761MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Pagan, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00440761MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

61. P00440764MN 300104217788000 2,000,000 Construction of Multi-Purpose Building, Brgy. Santo Rosario, Kitaotao, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 62 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440764MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Santo Building Engineering Office Rosario, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00440764MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

62. P00440768MN 300104217778000 2,000,000 Construction of Multi-Purpose Building, Brgy. Linabo, Quezon, Bukidnon

P00440768MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Linabo, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440768MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

63. P00440769MN 300104217779000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lipa, Quezon, Bukidnon

P00440769MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Lipa, Building Engineering Office Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440769MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

64. P00440770MN 300104217780000 2,000,000 Construction of Multi-Purpose Building, Brgy. Manuto, Quezon, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 63 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440770MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Manuto, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440770MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

65. P00440771MN 300104217782000 2,000,000 Construction of Multi-Purpose Building, Brgy. Minongan, Quezon, Bukidnon

P00440771MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Minongan, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440771MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

66. P00440772MN 300104217785000 2,000,000 Construction of Multi-Purpose Building, Brgy. Pinilayan, Quezon, Bukidnon

P00440772MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Pinilayan, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440772MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

67. P00440774MN 300104217787000 2,000,000 Construction of Multi-Purpose Building, Brgy. Santa Cruz, Quezon, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 64 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440774MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Santa Building Engineering Office Cruz, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00440774MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

68. P00443880MN 300104217766000 20,000,000 Construction of Multi-Purpose Building (Sports Complex), Kibawe, Bukidnon

P00443880MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Sports Building Engineering Office Complex), Kibawe, Bukidnon / Bukidnon 2nd District Engineering Office

P00443880MN-EAO 200,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

69. P00443881MN 300104217767000 15,000,000 Construction of Multi-Purpose Building (Municipal Risk Reduction Management Office), Maramag, Bukidnon

P00443881MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Municipal Building Engineering Office Risk Reduction Management / Bukidnon 2nd Office), Maramag, Bukidnon District Engineering Office

P00443881MN-EAO 150,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

70. P00443883MN 300104217791000 5,000,000 Extension of Bus Terminal Building, Purok 9, Poblacion, , Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 65 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443883MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Extension of Bus Multi Purpose Buildings District Terminal Building, Purok 9, Building Engineering Office Poblacion, Damulog, Bukidnon / Bukidnon 2nd District Engineering Office

P00443883MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

71. P00443884MN 300104217792000 5,000,000 Improvement of Public Plaza, Brgy. Poblacion, Dangcagan, Bukidnon

P00443884MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Improvement of Public Multi Purpose Buildings District Plaza, Brgy. Poblacion, Dangcagan, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443884MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

72. P00443885MN 300104217793000 5,000,000 Construction of Municipal Covered Court, Brgy. Don Carlos Sur (Poblacion), Don Carlos, Bukidnon

P00443885MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Municipal Covered Court, Brgy. Building Engineering Office Don Carlos Sur (Poblacion), Don / Bukidnon 2nd Carlos, Bukidnon District Engineering Office

P00443885MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

73. P00443886MN 300104217794000 1,000,000 Rehabilitation/Improvement of School Stage, Kibatang Elementary School, Brgy. Kibatang, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 66 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443886MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,000,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation/Improvement of Multi Purpose Engineering Office School Stage, Kibatang Elementary Building / Bukidnon 2nd School, Brgy. Kibatang, Don Carlos, District Bukidnon Engineering Office

74. P00443887MN 300104217795000 1,000,000 Rehabilitation of Covered Court, Don Carlos National High School, Brgy. Sinanguyan, Don Carlos, Bukidnon

P00443887MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,000,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Covered Court, Multi Purpose Engineering Office Don Carlos National High School, Building / Bukidnon 2nd Brgy. Sinanguyan, Don Carlos, District Bukidnon Engineering Office

75. P00443888MN 300104217796000 5,000,000 Construction of Covered Court in San Andres National High School - Annex Balaoro, Brgy. Balaoro, Kadingilan, Bukidnon

P00443888MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court in San Andres National High Building Engineering Office School - Annex Balaoro, Brgy. / Bukidnon 2nd Balaoro, Kadingilan, Bukidnon District Engineering Office

P00443888MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

76. P00443889MN 300104217797000 12,000,000 Construction of Multi-Purpose Building (Kibawe Sports Complex), Brgy. East Kibawe, Kibawe, Bukidnon

P00443889MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 11,880,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Kibawe Building Engineering Office Sports Complex), Brgy. East / Bukidnon 2nd Kibawe, Kibawe, Bukidnon District Engineering Office

P00443889MN-EAO 120,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

77. P00443890MN 300104217798000 3,500,000 Construction of Covered Court, Brgy. Balintawak, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 67 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443890MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Balintawak, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443890MN-EAO 35,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

78. P00443891MN 300104217799000 2,500,000 Construction of Concrete Fence, Brgy. Natulongan, Kibawe, Bukidnon

P00443891MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 2,475,000 Bukidnon 2nd Construction of Concrete Fence, Other Facilities Facilities District Brgy. Natulongan, Kibawe, Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443891MN-EAO 25,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

79. P00443892MN 300104217800000 3,000,000 Construction of Covered Court Brgy. Bukang Liwayway, Kibawe, Bukidnon

P00443892MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court Brgy. Bukang Liwayway, Building Engineering Office Kibawe, Bukidnon / Bukidnon 2nd District Engineering Office

P00443892MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

80. P00443893MN 300104217801000 3,000,000 Construction of Covered Court, Brgy. Magsaysay, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 68 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443893MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Magsaysay, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443893MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

81. P00443894MN 300104217802000 3,000,000 Construction of Covered Court, Brgy. Tumaras, Kibawe, Bukidnon

P00443894MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Tumaras, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443894MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

82. P00443895MN 300104217803000 3,000,000 Construction of Covered Court, Brgy. Sanipon, Kibawe, Bukidnon

P00443895MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Sanipon, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443895MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

83. P00443896MN 300104217804000 3,000,000 Construction of Covered Court, Brgy. Mascariñas, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 69 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443896MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Mascariñas, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443896MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

84. P00443897MN 300104217805000 3,000,000 Construction of Covered Court, Brgy. Pinamula, Kibawe, Bukidnon

P00443897MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Pinamula, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443897MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

85. P00443898MN 300104217806000 1,500,000 Rehabilitation of Brgy. Office, Brgy. Cagawasan, Kibawe, Bukidnon

P00443898MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,485,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Brgy. Office, Brgy. Multi Purpose Engineering Office Cagawasan, Kibawe, Bukidnon Building / Bukidnon 2nd District Engineering Office

P00443898MN-EAO 15,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

86. P00443899MN 300104217807000 1,500,000 Construction of Health Center Building, Brgy. Spring, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 70 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443899MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Bukidnon 2nd Building - Construction of Health Multi Purpose Buildings District Center Building, Brgy. Spring, Building Engineering Office Kibawe, Bukidnon / Bukidnon 2nd District Engineering Office

P00443899MN-EAO 15,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

87. P00443900MN 300104217808000 5,000,000 Construction of Covered Court, Brgy. Digongan, Kitaotao, Bukidnon

P00443900MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Digongan, Kitaotao, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443900MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

88. P00443901MN 300104217809000 5,000,000 Construction/Completion of the Development of Municipal Ground/Plaza, Anahawon, Maramag, Bukidnon

P00443901MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction/Completion Multi Purpose Buildings District of the Development of Municipal Building Engineering Office Ground/Plaza, Anahawon, / Bukidnon 2nd Maramag, Bukidnon District Engineering Office

P00443901MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

89. P00443902MN 300104217810000 3,000,000 Construction of Multi-Purpose Building, Mindanaw Tribal School Inc., Purok 6A, Panadtalan, Maramag Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 71 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443902MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Mindanaw Building Engineering Office Tribal School Inc., Purok 6A, / Bukidnon 2nd Panadtalan, Maramag Bukidnon District Engineering Office

P00443902MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

90. P00443903MN 300104217811000 2,000,000 Construction of School Stage San Miguel Central Elementary School, Brgy. San Miguel, Maramag Bukidnon

P00443903MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of School Multi Purpose Buildings District Stage San Miguel Central Building Engineering Office Elementary School, Brgy. San / Bukidnon 2nd Miguel, Maramag Bukidnon District Engineering Office

P00443903MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

91. P00443904MN 300104217812000 5,000,000 Construction of Municipal Jail, Municipal Compound, Brgy. Libertad, Quezon, Bukidnon.

P00443904MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Municipal Jail, Municipal Building Engineering Office Compound, Brgy. Libertad, / Bukidnon 2nd Quezon, Bukidnon. District Engineering Office

P00443904MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

92. P00443905MN 300104217813000 1,000,000 Construction of Multi-Purpose Building, (Daycare Center) Purok 5, Brgy. San Miguel, Maramag, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 72 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443905MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, (Daycare Building Engineering Office Center) Purok 5, Brgy. San Miguel, / Bukidnon 2nd Maramag, Bukidnon District Engineering Office

93. P00443906MN 300104217814000 3,000,000 Construction/Completion of Multi-Purpose Building, Brgy. Libertad, Quezon, Bukidnon

P00443906MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction/Completion Multi Purpose Buildings District of Multi-Purpose Building, Brgy. Building Engineering Office Libertad, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00443906MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

94. P00443907MN 300104217815000 2,000,000 Repair/Rehabilitation of Covered Court, Brgy. Old Damulog, Damulog, Bukidnon

P00443907MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,980,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Repair/Rehabilitation of Covered Multi Purpose Engineering Office Court, Brgy. Old Damulog, Building / Bukidnon 2nd Damulog, Bukidnon District Engineering Office

P00443907MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

95. P00443908MN 300104217816000 2,000,000 Rehabilitation/Construction of Brgy. Hall, Brgy. Camp 1, Maramag, Bukidnon

P00443908MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Multi Purpose Buildings District Rehabilitation/Construction of Building Engineering Office Brgy. Hall, Brgy. Camp 1, Maramag, / Bukidnon 2nd Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 73 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443908MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

96. P00443909MN 300104217817000 2,000,000 Construction of Multi-Purpose Building (Warehouse ), Brgy. San Isidro, Damulog, Bukidnon

P00443909MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Warehouse ), Brgy. San Isidro, / Bukidnon 2nd Damulog, Bukidnon District Engineering Office

P00443909MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

97. P00443910MN 300104217818000 2,000,000 Construction of Covered Court, Brgy. New Visayas, Dangcagan, Bukidnon

P00443910MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. New Visayas, Building Engineering Office Dangcagan, Bukidnon / Bukidnon 2nd District Engineering Office

P00443910MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

98. P00443911MN 300104217819000 2,000,000 Construction of Covered Court, Brgy. Kapalaran, Dangcagan, Bukidnon

P00443911MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Kapalaran, Dangcagan, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 74 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443911MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

99. P00443912MN 300104217820000 2,000,000 Construction of Multi-Purpose Building, Brgy. Minsalagan, Don Carlos, Bukidnon,

P00443912MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Minsalagan, Don Carlos, Bukidnon, / Bukidnon 2nd District Engineering Office

P00443912MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

100. P00443913MN 300104217821000 2,000,000 Construction of Multi-Purpose Building (Warehouse with Solar Drier), Brgy. San Antonio East, Don Carlos, Bukidnon

P00443913MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Warehouse with Solar Drier), Brgy. / Bukidnon 2nd San Antonio East, Don Carlos, District Bukidnon Engineering Office

P00443913MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

101. P00443914MN 300104217822000 2,000,000 Construction of Multi-Purpose Building (SK Building), Don Carlos, Bukidnon

P00443914MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (SK Building Engineering Office Building), Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 75 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443914MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

102. P00443915MN 300104217823000 2,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Kadingilan, Bukidnon

P00443915MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Kadingilan, Bukidnon / Bukidnon 2nd District Engineering Office

P00443915MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

103. P00443916MN 300104217824000 2,000,000 Construction of Covered Court, Brgy. Kisawa, Kibawe, Bukidnon

P00443916MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Kisawa, Kibawe, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443916MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

104. P00443917MN 300104217825000 2,000,000 Construction of Covered Court, Brgy. Binoongan, Kitaotao, Bukidnon

P00443917MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Binoongan, Kitaotao, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 76 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443917MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

105. P00443918MN 300104217826000 2,000,000 Construction of Multi-Purpose Building, Brgy. Tandong, Kitaotao, Bukidnon

P00443918MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Tandong, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00443918MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

106. P00443919MN 300104217827000 2,000,000 Construction of Covered Court, Brgy. Kalumihan, Kitaotao, Bukidnon

P00443919MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. Kalumihan, Kitaotao, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00443919MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

107. P00443920MN 300104217828000 2,000,000 Construction of Brgy. Hall, Brgy. Calapaton, Kitaotao, Bukidnon

P00443920MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Brgy. Multi Purpose Buildings District Hall, Brgy. Calapaton, Kitaotao, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 77 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443920MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

108. P00443921MN 300104217829000 2,000,000 Construction of Covered Court, Brgy. South Poblacion, Maramag, Bukidnon

P00443921MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Covered Multi Purpose Buildings District Court, Brgy. South Poblacion, Building Engineering Office Maramag, Bukidnon / Bukidnon 2nd District Engineering Office

P00443921MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

109. P00443922MN 300104217830000 2,000,000 Construction of Multi-Purpose Building (Senior Citizen's Building), Brgy. Mahayag, Quezon, Bukidnon

P00443922MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (Senior Building Engineering Office Citizen's Building), Brgy. Mahayag, / Bukidnon 2nd Quezon, Bukidnon District Engineering Office

P00443922MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

110. P00443923MN 300104217831000 2,000,000 Rehabilitation of Covered Court, Brgy. Paitan, Quezon, Bukidnon

P00443923MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,980,000 Bukidnon 2nd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Covered Court, Multi Purpose Engineering Office Brgy. Paitan, Quezon, Bukidnon Building / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 78 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443923MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

111. P00443924MN 300104217832000 5,000,000 Construction/ repair of Senior Citizen's Building at Purok 7 Bocbok, Don Carlos, Bukidnon

P00443924MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction/ repair of Multi Purpose Buildings District Senior Citizen's Building at Purok 7 Building Engineering Office Bocbok, Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

P00443924MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

112. P00443925MN 300104217833000 1,000,000 Construction of Multi-Purpose Building (Community Center), Brgy. San Nicolas, Don Carlos, Bukidnon

P00443925MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building Building Engineering Office (Community Center), Brgy. San / Bukidnon 2nd Nicolas, Don Carlos, Bukidnon District Engineering Office

113. P00443926MN 300104217834000 1,500,000 Construction of Multi-Purpose Building (reading center) Brgy. Embayao, Don Carlos, Bukidnon

P00443926MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (reading Building Engineering Office center) Brgy. Embayao, Don Carlos, / Bukidnon 2nd Bukidnon District Engineering Office

P00443926MN-EAO 15,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

114. P00443927MN 300104217835000 2,000,000 Construction of Multi-Purpose Building, Brgy. Mahayahay, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 79 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443927MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Mahayahay, Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

P00443927MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 23,307,000 Improvement of Various Infrastructure including Local Projects

115. P00442884MN 300116203199000 21,307,000 Concreting of Road, Purok 1, 2, 3 and 4, West Kibawe, Kibawe, Bukidnon

P00442884MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.130 20,880,860 Bukidnon 2nd Concreting of Road, Purok 1, 2, 3 Concrete Road District and 4, West Kibawe, Kibawe, Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00442884MN-EAO 426,140 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

116. P00443652MN 300116203200000 2,000,000 Concreting of Barangay Road, Brgy. San Miguel, Maramag, Bukidnon

P00443652MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.220 1,960,000 Bukidnon 2nd Concreting of Barangay Road, Brgy. Concrete Road District San Miguel, Maramag, Bukidnon Engineering Office / Bukidnon 2nd District Engineering Office

P00443652MN-EAO 40,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 111,000,000

117. P00440752MN 300117207329000 2,000,000 Construction of Road, Brgy. Bukang Liwayway, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 80 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440752MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Bukidnon 2nd Construction of Road, Brgy. Bukang Concrete Road District Liwayway, Kibawe, Bukidnon Engineering Office / Bukidnon 2nd District Engineering Office

P00440752MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

118. P00440766MN 300117207330000 2,000,000 Construction of Road, Brgy. Kuya, Maramag, Bukidnon

P00440766MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Bukidnon 2nd Construction of Road, Brgy. Kuya, Concrete Road District Maramag, Bukidnon Engineering Office / Bukidnon 2nd District Engineering Office

P00440766MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

119. P00444041MN 300117207332000 15,000,000 Concreting of Road, P-2 Libertad, Quezon, Bukidnon

P00444041MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.967 14,850,000 Bukidnon 2nd Concreting of Road, P-2 Libertad, Concrete Road District Quezon, Bukidnon Engineering Office / Bukidnon 2nd District Engineering Office

P00444041MN-EAO 150,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

120. P00444045MN 300117207334000 52,000,000 Construction of Road leading to Simsiman Lake, Brgy. Cabadiangan, Kadingilian, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 81 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444045MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.966 51,480,000 Bukidnon 2nd Construction of Road leading to Concrete Road District Simsiman Lake, Brgy. Cabadiangan, Engineering Office Kadingilian, Bukidnon / Bukidnon 2nd District Engineering Office

P00444045MN-EAO 520,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

121. P00444048MN 300117207335000 20,000,000 Concreting of Jct. Maramag - Maradugao Road, Sitio Basin to Sitio Lower Magsaysay Road, Brgy. Kuya, Maramag, Bukidnon

P00444048MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.160 19,800,000 Bukidnon 2nd Concreting of Jct. Maramag - Concrete Road District Maradugao Road, Sitio Basin to Engineering Office Sitio Lower Magsaysay Road, Brgy. / Bukidnon 2nd Kuya, Maramag, Bukidnon District Engineering Office

P00444048MN-EAO 200,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

122. P00444050MN 300117207336000 15,000,000 Construction of Southern Bukidnon Agri-Industrial Economic Zone Road Network Development Project (Don Carlos Section), Don Carlos, Bukidnon

P00444050MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.008 14,850,000 Central Office / Construction of Southern Bukidnon Concrete Road Region X Agri-Industrial Economic Zone Road Network Development Project (Don Carlos Section), Don Carlos, Bukidnon

P00444050MN-EAO 150,000 Central Office / Region X

123. P00444053MN 300117207337000 5,000,000 Concreting of Local Road Junction Sayre Highway to Bayabason, Brgy. Hall to Purok 6, Bayabason, Maramag, Bukidnon

P00444053MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.653 4,950,000 Bukidnon 2nd Concreting of Local Road Junction Concrete Road District Sayre Highway to Bayabason, Brgy. Engineering Office Hall to Purok 6, Bayabason, / Bukidnon 2nd Maramag, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 82 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444053MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / 37,000,000 Improvement of Various Infrastructure including Local Projects

124. P00444379MN 300120200288000 2,500,000 Construction of Water System, Brgy. Angga-an, Damulog, Bukidnon

P00444379MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Angga-an, Damulog, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444379MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

125. P00444380MN 300120200289000 2,500,000 Construction of Water System, Brgy. Bagongbayan, Kadingilan, Bukidnon

P00444380MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Bagongbayan, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444380MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

126. P00444381MN 300120200290000 2,500,000 Construction of Water System, Brgy. Barongcot, Dangcagan, Bukidnon

P00444381MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Barongcot, Systems Supply Engineering Office Dangcagan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 83 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444381MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

127. P00444382MN 300120200291000 2,500,000 Construction of Water System, Brgy. Colambugon, Maramag, Bukidnon

P00444382MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Colambugon, Systems Supply Engineering Office Maramag, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444382MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

128. P00444383MN 300120200292000 2,000,000 Construction of Water System, Brgy. Kiharong, Maramag, Bukidnon

P00444383MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,960,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Kiharong, Maramag, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444383MN-EAO 40,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

129. P00444384MN 300120200293000 2,500,000 Construction of Water System, Brgy. Lagandang, Damulog, Bukidnon

P00444384MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Lagandang, Systems Supply Engineering Office Damulog, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 84 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444384MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

130. P00444385MN 300120200294000 2,500,000 Construction of Water System, Brgy. Maican, Damulog, Bukidnon

P00444385MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Maican, Damulog, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444385MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

131. P00444386MN 300120200295000 2,500,000 Construction of Water System, Brgy. Miaray, Dangcagan, Bukidnon

P00444386MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Miaray, Dangcagan, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444386MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

132. P00444387MN 300120200296000 2,500,000 Construction of Water System, Brgy. Panganan, Kitaotao, Bukidnon

P00444387MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Panganan, Kitaotao, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 85 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444387MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

133. P00444388MN 300120200297000 2,500,000 Construction of Water System, Brgy. Romagooc, Kibawe, Bukidnon

P00444388MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Romagooc, Kibawe, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444388MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

134. P00444389MN 300120200298000 2,500,000 Construction of Water System, Brgy. San Andres, Kadingilan, Bukidnon

P00444389MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. San Andres, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444389MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

135. P00444390MN 300120200299000 2,500,000 Construction of Water System, Brgy. San Roque, Don Carlos, Bukidnon

P00444390MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. San Roque, Don Systems Supply Engineering Office Carlos, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 86 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444390MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

136. P00444391MN 300120200300000 2,500,000 Construction of Water System, Brgy. Sinuda, Kitaotao, Bukidnon

P00444391MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Sinuda, Kitaotao, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444391MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

137. P00444392MN 300120200301000 2,500,000 Construction of Water System, Brgy. Sta. Felomina, Quezon, Bukidnon

P00444392MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Sta. Felomina, Systems Supply Engineering Office Quezon, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444392MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

138. P00444393MN 300120200302000 2,500,000 Construction of Water System, Brgy. Talahiron, Kibawe, Bukidnon

P00444393MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,450,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Talahiron, Kibawe, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 87 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444393MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 56,500,000

139. P00440740MN 300121200905000 2,000,000 Construction of Water Supply - Level II, Brgy. Kitingting, Damulog, Bukidnon

P00440740MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Kitingting, Systems Supply Engineering Office Damulog, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440740MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

140. P00440741MN 300121200910000 2,000,000 Construction of Water Supply - Level II, Brgy. Migcawayan, Damulog, Bukidnon

P00440741MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Systems Supply Engineering Office Migcawayan, Damulog, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440741MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

141. P00440744MN 300121200902000 2,000,000 Construction of Water Supply - Level II, Brgy. Kalubihon, Don Carlos, Bukidnon

P00440744MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Kalubihon, Systems Supply Engineering Office Don Carlos, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 88 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440744MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

142. P00440745MN 300121200907000 2,000,000 Construction of Water Supply - Level II, Brgy. Mahayahay, Don Carlos, Bukidnon

P00440745MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Mahayahay, Systems Supply Engineering Office Don Carlos, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440745MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

143. P00440746MN 300121200908000 2,000,000 Construction of Water Supply - Level II, Brgy. Manlamonay, Don Carlos, Bukidnon

P00440746MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Systems Supply Engineering Office Manlamonay, Don Carlos, Systems / Bukidnon 2nd Bukidnon District Engineering Office

P00440746MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

144. P00440748MN 300121200904000 2,000,000 Construction of Water Supply - Level II, Brgy. Kibogtok, Kadingilan, Bukidnon

P00440748MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Kibogtok, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 89 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440748MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

145. P00440749MN 300121200899000 2,000,000 Construction of Water Supply - Level II, Brgy. Bagor, Kadingilan, Bukidnon

P00440749MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Bagor, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440749MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

146. P00440751MN 300121200903000 2,000,000 Construction of Water Supply - Level II, Brgy. Kibalagon, Kadingilan, Bukidnon

P00440751MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Kibalagon, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440751MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

147. P00440754MN 300121200906000 2,000,000 Construction of Water Supply - Level II, Brgy. Magsaysay, Kibawe, Bukidnon

P00440754MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Magsaysay, Systems Supply Engineering Office Kibawe, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 90 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440754MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

148. P00440755MN 300121200914000 2,000,000 Construction of Water Supply - Level II, Brgy. Spring, Kibawe, Bukidnon

P00440755MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Spring, Systems Supply Engineering Office Kibawe, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440755MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

149. P00440756MN 300121200927000 2,000,000 Construction of Water Supply - Level II, Brgy. Tumaras, Kibawe, Bukidnon

P00440756MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Tumaras, Systems Supply Engineering Office Kibawe, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440756MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

150. P00440759MN 300121200901000 2,000,000 Construction of Water Supply - Level II, Brgy. Kahusayan, Kitaotao, Bukidnon

P00440759MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Kahusayan, Systems Supply Engineering Office Kitaotao, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 91 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440759MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

151. P00440760MN 300121200909000 2,000,000 Construction of Water Supply - Level II, Brgy. Metebagao, Kitaotao, Bukidnon

P00440760MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Metebagao, Systems Supply Engineering Office Kitaotao, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440760MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

152. P00440762MN 300121200913000 2,000,000 Construction of Water Supply - Level II, Brgy. Sinaysayan, Kitaotao, Bukidnon

P00440762MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Sinaysayan, Systems Supply Engineering Office Kitaotao, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440762MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

153. P00440763MN 300121200911000 2,000,000 Construction of Water Supply - Level II, Brgy. San Isidro, Kitaotao, Bukidnon

P00440763MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. San Isidro, Systems Supply Engineering Office Kitaotao, Bukidnon Systems / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 92 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440763MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

154. P00440765MN 300121200900000 2,000,000 Construction of Water Supply - Level II, Brgy. Danggawan, Maramag, Bukidnon

P00440765MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Danggawan, Systems Supply Engineering Office Maramag, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440765MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

155. P00440773MN 300121200912000 2,000,000 Construction of Water Supply - Level II, Brgy. San Roque, Quezon, Bukidnon

P00440773MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. San Roque, Systems Supply Engineering Office Quezon, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00440773MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

156. P00444567MN 300121200915000 1,000,000 Construction of Water Facility Project, Brgy. Camp 1, Maramag, Bukidnon

P00444567MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,000,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District Facility Project, Brgy. Camp 1, Systems Supply Engineering Office Maramag, Bukidnon Systems / Bukidnon 2nd District Engineering Office

157. P00444568MN 300121200916000 2,000,000 Construction of Water System, Brgy. Buyot, Don Carlos, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 93 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444568MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Buyot, Don Carlos, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444568MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

158. P00444569MN 300121200917000 2,000,000 Construction of Water System, Brgy. Calaocalao, Don Carlos, Bukidnon

P00444569MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Calaocalao, Don Systems Supply Engineering Office Carlos, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444569MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

159. P00444570MN 300121200918000 2,000,000 Construction of Water System, Brgy. San Francisco, Don Carlos, Bukidnon

P00444570MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. San Francisco, Don Systems Supply Engineering Office Carlos, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444570MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

160. P00444571MN 300121200919000 2,000,000 Construction of Water System, Brgy. Matampay, Kadingilan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 94 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444571MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Matampay, Systems Supply Engineering Office Kadingilan, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444571MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

161. P00444572MN 300121200920000 2,000,000 Construction of Water System, Brgy. Sampaguita, Kibawe, Bukidnon

P00444572MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Sampaguita, Kibawe, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444572MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

162. P00444573MN 300121200921000 2,000,000 Construction of Water System, Brgy. Base Camp, Maramag, Bukidnon

P00444573MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Base Camp, Systems Supply Engineering Office Maramag, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444573MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

163. P00444574MN 300121200922000 2,000,000 Construction of Water System, Brgy. Dagumbaan, Maramag, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 95 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444574MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Dagumbaan, Systems Supply Engineering Office Maramag, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444574MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

164. P00444575MN 300121200923000 2,000,000 Construction of Water System, Brgy. Cawayan Quezon, Bukidnon

P00444575MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction of Water Water Supply Water District System, Brgy. Cawayan Quezon, Systems Supply Engineering Office Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444575MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

165. P00444576MN 300121200924000 2,000,000 Construction/Completion of Water System, Brgy. Palacapao, Quezon, Bukidnon

P00444576MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 2nd Systems - Construction/Completion Water Supply Water District of Water System, Brgy. Palacapao, Systems Supply Engineering Office Quezon, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444576MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

166. P00444577MN 300121200925000 1,750,000 Construction of Reservoir of P1A Water System, P1A, Brgy. Talahiron, Kibawe, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 96 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444577MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,732,500 Bukidnon 2nd Systems - Construction of Reservoir Water Supply Water District of P1A Water System, P1A, Brgy. Systems Supply Engineering Office Talahiron, Kibawe, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444577MN-EAO 17,500 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

167. P00444578MN 300121200926000 1,750,000 Construction of Reservoir and Water System, Brgy. Talahiron, Kibawe, Bukidnon

P00444578MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,732,500 Bukidnon 2nd Systems - Construction of Reservoir Water Supply Water District and Water System, Brgy. Talahiron, Systems Supply Engineering Office Kibawe, Bukidnon Systems / Bukidnon 2nd District Engineering Office

P00444578MN-EAO 17,500 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 97 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Bukidnon 3rd District Engineering Office 109 projects 4,157,034,000 BUKIDNON (FIRST) 72 projects 3,157,995,000 OO1: Ensure Safe and Reliable National Road System 27 projects 2,282,495,000

Asset Preservation - Preventive Maintenance - Primary Roads 176,462,000

1. P00400528MN 310101100270000 76,462,000 Sayre Highway - K1438 + 210 - K1439 + 900

P00400528MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.760 73,785,830 Central Office / Asphalt Overlay - at Specific Maintenance of Bukidnon 3rd Locations along Sayre Highway Road: Asphalt District (S00621MN) K1438 + 210 - K1439 + Overlay Engineering Office 900

P00400528MN-EAO 2,676,170 Central Office / Bukidnon 3rd District Engineering Office

2. P00400529MN 310101100271000 100,000,000 Sayre Highway - K1466 + 000 - K1467 + 136, K1468 + 882 - K1470 + 026

P00400529MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.864 96,500,000 Central Office / Asphalt Overlay - at Specific Maintenance of Bukidnon 3rd Locations along Sayre Highway Road: Asphalt District (S00621MN) K1466 + 000 - K1470 + Overlay Engineering Office 026

P00400529MN-EAO 3,500,000 Central Office / Bukidnon 3rd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 54,694,000 Roads - Primary Roads

3. P00400632MN 310104100196000 54,694,000 Sayre Highway - K1453 + 812 - K1455 + 000, K1457 + 921 - K1458 + 305, K1459 + 919 - K1460 + 636

P00400632MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 4.756 52,779,710 Central Office / Pavement - at Specific Locations Concrete Bukidnon 3rd along Sayre Highway (S00621MN) Pavement District K1453 + 812 - K1460 + 636 Engineering Office

P00400632MN-EAO 1,914,290 Central Office / Bukidnon 3rd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 31,113,000 Roads - Secondary Roads

MYPS: 03/03/2020 02:36:37 pm Page 98 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

4. P00400631MN 310105100470000 31,113,000 CDO City-Dominorog-Camp Kibaritan Rd - K1501 + 260 - K1502 + 387, K1502 + 548 - K1502 + 600

P00400631MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 2.250 30,490,740 Bukidnon 3rd Pavement - at Specific Locations Concrete District along CDO City-Dominorog-Camp Pavement Engineering Office Kibaritan Rd (S01321MN) K1501 + / Bukidnon 3rd 260 - K1502 + 600 District Engineering Office

P00400631MN-EAO 622,260 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 49,320,000 Collapse, and Landslide - Primary Roads

5. P00400096MN 310107100164000 49,320,000 Sayre Highway - K1466 + 650 - K1467 + 050, K1467 + 960 - K1468 + 350

P00400096MN-CW1 Construction of Road Slope Construction of Square 4,110.000 48,333,600 Bukidnon 3rd Protection Structure - at Specific Road Slope meters District Locations along Sayre Highway Protection Engineering Office (S00621MN) K1466 + 650 - K1468 + Structure / Bukidnon 3rd 350 District Engineering Office

P00400096MN-EAO 986,400 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 38,000,000 Collapse, and Landslide - Tertiary Roads

6. P00400097MN 310109100483000 38,000,000 Jct SH-Manolo Fortich-Libona-Indahag Rd - K1479 + 359 - K1479 + 710, K1480 + 000 - K1480 + 594

P00400097MN-CW1 Construction of Road Slope Construction of Square 3,800.000 37,240,000 Bukidnon 3rd Protection Structure - at Specific Road Slope meters District Locations along Jct SH-Manolo Protection Engineering Office Fortich-Libona-Indahag Rd Structure / Bukidnon 3rd (S01353MN) K1479 + 359 - K1480 + District 594 Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 99 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400097MN-EAO 760,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Network Development - Road Widening - Primary Roads 10,997,000

7. P00400234MN 310201100604000 1,951,000 Sayre Highway - K1438 + (-226) - K1438 + (-118)

P00400234MN-CW1 Road Widening - along Sayre Road Widening Lane Km 0.108 1,911,980 Bukidnon 3rd Highway (S00621MN) K1438 + District (-226) - K1438 + (-118) Engineering Office / Bukidnon 3rd District Engineering Office

P00400234MN-EAO 39,020 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

8. P00400235MN 310201100605000 9,046,000 Sayre Highway - K1464 + 160 - K1464 + 508, K1464 + 667 - K1464 + 820

P00400235MN-CW1 Road Widening - at Specific Road Widening Lane Km 0.501 8,865,080 Bukidnon 3rd Locations along Sayre Highway District (S00621MN) K1464 + 160 - K1464 + Engineering Office 820 / Bukidnon 3rd District Engineering Office

P00400235MN-EAO 180,920 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Network Development - Road Widening - Secondary Roads 100,000,000

9. P00400236MN 310202100519000 100,000,000 CDO City-Dominorog-Camp Kibaritan Rd - K1469 + 607 - K1471 + 024, K1499 + 746 - K1500 + 1101

P00400236MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.552 93,981,350 Central Office / Locations along CDO Bukidnon 3rd City-Dominorog-Camp Kibaritan Rd District (S01321MN) K1469 + 607 - K1500 + Engineering Office 1101

MYPS: 03/03/2020 02:36:37 pm Page 100 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400236MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 13,883.000 2,610,000 Central Office / Locations along CDO meters Bukidnon 3rd City-Dominorog-Camp Kibaritan Rd District (S01321MN) Engineering Office

P00400236MN-EAO 3,408,650 Central Office / Bukidnon 3rd District Engineering Office

Network Development - Road Widening - Tertiary Roads 281,170,000

10. P00400239MN 310203100294000 73,707,000 Jct SH-Manolo Fortich-Libona-Indahag Rd - K1449 + 042 - K1451 + 766

P00400239MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.752 66,652,550 Central Office / Locations along Jct SH-Manolo Bukidnon 3rd Fortich-Libona-Indahag Rd District (S01353MN) K1449 + 042 - K1451 + Engineering Office 766

P00400239MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 35,669.000 4,637,000 Central Office / Locations along Jct SH-Manolo meters Bukidnon 3rd Fortich-Libona-Indahag Rd District (S01353MN) Engineering Office

P00400239MN-EAO 2,417,450 Central Office / Bukidnon 3rd District Engineering Office

11. P00400240MN 310203100295000 83,684,000 Jct SH-Sn Miguel-Del Monte Airport Rd - K1444 + (-582) - K1446 + 134

P00400240MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.784 77,230,880 Central Office / Locations along Jct SH-Sn Bukidnon 3rd Miguel-Del Monte Airport Rd District (S01352MN) K1444 + (-582) - Engineering Office K1446 + 134

P00400240MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 20,291.000 3,652,000 Central Office / Locations along Jct SH-Sn meters Bukidnon 3rd Miguel-Del Monte Airport Rd District (S01352MN) Engineering Office

P00400240MN-EAO 2,801,120 Central Office / Bukidnon 3rd District Engineering Office

12. P00400241MN 310203100390000 50,000,000 Misamis Or-Bukidnon-Agusan Rd - K1431 + 470 - K1432 + 295, K1432 + 320 - K1432 + 765

MYPS: 03/03/2020 02:36:37 pm Page 101 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400241MN-CW1 Road Widening - at Specific Road Widening Lane Km 2.484 49,000,000 Bukidnon 3rd Locations along Misamis District Or-Bukidnon-Agusan Rd Engineering Office (S01322MN) K1431 + 470 - K1432 + / Bukidnon 3rd 765 District Engineering Office

P00400241MN-EAO 1,000,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

13. P00401402MN 310203100388000 39,755,000 Jct SH-Manolo Fortich-Libona-Indahag Rd - K1457 + 470 - K1458 + 463

P00401402MN-CW1 Road Widening - along Jct Road Widening Lane Km 1.952 38,959,900 Bukidnon 3rd SH-Manolo Fortich-Libona-Indahag District Rd (S01353MN) K1457 + 470 - Engineering Office K1458 + 463 / Bukidnon 3rd District Engineering Office

P00401402MN-EAO 795,100 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

14. P00401539MN 310203100387000 34,024,000 Jct SH-Manolo Fortich-Libona-Indahag Rd - K1451 + 766 - K1452 + 207.50, K1452+237.50 - K1452+920.4

P00401539MN-CW1 Road Widening - at Specific Road Widening Lane Km 2.341 33,343,520 Bukidnon 3rd Locations along Jct SH-Manolo District Fortich-Libona-Indahag Rd Engineering Office (S01353MN) K1451 + 766 - / Bukidnon 3rd K1452+920.4 District Engineering Office

P00401539MN-EAO 680,480 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 1,330,739,000

15. P00401198MN 310204100826000 150,000,000 Jct. Sayre Highway Dalirig - Kisolon By-Pass Road, Package 5, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 102 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401198MN-CW1 Construction of Gravel Road - Jct. Construction of Lane Km 6.000 144,750,000 Central Office / Sayre Highway Dalirig - Kisolon Gravel Road Region X By-Pass Road, Package 5, Bukidnon

P00401198MN-EAO 5,250,000 Central Office / Region X

16. P00401199MN 310204100830000 120,000,000 Manolo Fortich- Alternate/Bypass Road, Siloo Section, Package 1, Bukidnon

P00401199MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.362 115,800,000 Central Office / Manolo Fortich-Misamis Oriental Concrete Road Region X Alternate/Bypass Road, Siloo Section, Package 1, Bukidnon

P00401199MN-EAO 4,200,000 Central Office / Region X

17. P00401200MN 310204100831000 120,000,000 Manolo Fortich-Misamis Oriental Alternate/Bypass Road, Siloo Section, Package 2, Bukidnon

P00401200MN-CW1 Construction of Gravel Road - Construction of Lane Km 3.318 115,800,000 Central Office / Manolo Fortich-Misamis Oriental Gravel Road Region X Alternate/Bypass Road, Siloo Section, Package 2, Bukidnon

P00401200MN-EAO 4,200,000 Central Office / Region X

18. P00401201MN 310204100803000 150,000,000 Diversion Road Extension (Jct. Sayre Highway (Balubal)- Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mindagat Section, Bukidnon

P00401201MN-CW1 Construction of Concrete Road - Construction of Lane Km 7.980 144,750,000 Central Office / Cagayan de Oro Diversion Road Concrete Road Region X Extension (Jct. Sayre Highway (Balubal)- Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mindagat Section, Bukidnon

P00401201MN-EAO 5,250,000 Central Office / Region X

19. P00401202MN 310204100802000 150,000,000 Cagayan de Oro Diversion Road Extension (Jct. Sayre Highway (Balubal)- Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mindagat - Poblacion Section, Bukidnon

P00401202MN-CW1 Construction of Gravel Road - Construction of Lane Km 8.054 144,750,000 Central Office / Cagayan de Oro Diversion Road Gravel Road Region X Extension (Jct. Sayre Highway (Balubal)- Manolo Fortich-Malitbog-Claveria-Eureka, Gingoog City Road), Mindagat - Poblacion Section, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 103 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401202MN-EAO 5,250,000 Central Office / Region X

20. P00401203MN 310204100839000 130,000,000 Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Package 10, Bukidnon

P00401203MN-CW1 Construction of Concrete Bridge - Construction of Square 286.200 36,196,185 Central Office / Sayre Highway Parallel Road I Concrete Bridge meters Region X (Libona - Manolo Fortich - Impasug-ong Section), Package 10, Bukidnon

P00401203MN-CW2 Construction of Concrete Bridge - Construction of Square 572.400 60,303,815 Sayre Highway Parallel Road I Concrete Bridge meters (Libona - Manolo Fortich - Impasug-ong Section), Package 10, Bukidnon

P00401203MN-CW3 Construction of Gravel Road - Construction of Lane Km 0.601 28,950,000 Sayre Highway Parallel Road I Gravel Road (Libona - Manolo Fortich - Impasug-ong Section), Package 10, Bukidnon

P00401203MN-EAO 4,550,000 Central Office / Region X

21. P00401204MN 310204100840000 120,000,000 Sayre Highway Parallel Road I (Libona - Manolo Fortich - Impasug-ong Section), Package 11, Bukidnon

P00401204MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.216 115,800,000 Central Office / Sayre Highway Parallel Road I Concrete Road Region X (Libona - Manolo Fortich - Impasug-ong Section), Package 11, Bukidnon

P00401204MN-EAO 4,200,000 Central Office / Region X

22. P00401205MN 310204100846000 130,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section),Package 14, Bukidnon

P00401205MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.886 125,450,000 Central Office / Sayre Highway Parallel Road II Concrete Road Region X (Manolo Fortich-Valencia City Section),Package 14, Bukidnon

P00401205MN-EAO 4,550,000 Central Office / Region X

23. P00401206MN 310204100847000 130,000,000 Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section),Package 15, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 104 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401206MN-CW1 Construction of Gravel Road - Construction of Lane Km 7.410 125,450,000 Central Office / Sayre Highway Parallel Road II Gravel Road Region X (Manolo Fortich-Valencia City Section),Package 15, Bukidnon

P00401206MN-EAO 4,550,000 Central Office / Region X

24. P00401207MN 310204100829000 85,750,000 Mangima-Agusan Canyon By-Pass Road, Bukidnon

P00401207MN-CW1 Construction of Gravel Road - Construction of Lane Km 1.070 77,233,775 Central Office / Mangima-Agusan Canyon By-Pass Gravel Road Region X Road, Bukidnon

P00401207MN-ROW ROW Acquisition - ROW Acquisition Square 38,100.000 5,715,000 Central Office / Mangima-Agusan Canyon By-Pass meters Region X Road, Bukidnon

P00401207MN-EAO 2,801,225 Central Office / Region X

25. P00401342MN 310204100541000 44,989,000 By-Pass Road, Bukidnon

P00401342MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.140 40,371,100 Bukidnon 3rd Talakag By-Pass Road, Bukidnon Concrete Road District Engineering Office / Bukidnon 3rd District Engineering Office

P00401342MN-ROW ROW Acquisition - Talakag By-Pass ROW Acquisition Square 20,291.000 3,794,000 Bukidnon 3rd Road, Bukidnon meters District Engineering Office / Bukidnon 3rd District Engineering Office

P00401342MN-EAO 823,900 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Network Development - Construction of Missing Links/ New Roads 150,000,000

26. P00401208MN 310205100437000 150,000,000 Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Package 12, Bukidnon

P00401208MN-CW1 Construction of Gravel Road - Construction of Lane Km 8.000 144,750,000 Central Office / Impasug-ong Bdry. Bukidnon Gravel Road Region X (Siloo)-Misamis Oriental (Eureka), Package 12, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 105 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401208MN-EAO 5,250,000 Central Office / Region X

Bridge - Replacement of Permanent Weak Bridges 60,000,000

27. P00400839MN 310302100191000 60,000,000 Alae Old Br. (B01493MN) along Sayre Highway

P00400839MN-CW1 Replacement of Bridge - Alae Old Replacement of Square 292.800 57,900,000 Central Office / Br. (B01493MN) along Sayre Bridge meters Bukidnon 3rd Highway District Engineering Office

P00400839MN-EAO 2,100,000 Central Office / Bukidnon 3rd District Engineering Office Convergence and Special Support Program 2 projects 287,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 137,000,000

28. P00431558MN 300203100002000 137,000,000 Access Road from Cagayan de Oro City leading to Ultra Winds Mountain Resort, Pualas, , Bukidnon

P00431558MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.724 132,205,000 Central Office / Access Road from Cagayan de Oro Concrete Road Region X City leading to Ultra Winds Mountain Resort, Pualas, Baungon, Bukidnon

P00431558MN-EAO 4,795,000 Central Office / Region X

Construction/ Improvement of Access Roads leading to Trades, Industries and 150,000,000 Economic Zones

29. P00431559MN 300204100424000 150,000,000 Jct. (Manolo Fortich) Sankanan-Kalugmanan-Dahilayan Road connecting Mindanao lnternational Container Terminal(Hineleban Coffee Processing Plant) and Pegasus-CP Floriculture Company (Cutflower Exporter) in support of Transport and Logistics, Manolo Fortich, Bukidnon

P00431559MN-CW1 Construction of Concrete Road - Construction of Lane Km 10.884 144,750,000 Central Office / Jct. (Manolo Fortich) Concrete Road Region X Sankanan-Kalugmanan-Dahilayan Road connecting Mindanao lnternational Container Terminal(Hineleban Coffee Processing Plant) and Pegasus-CP Floriculture Company (Cutflower Exporter) in support of Transport and Logistics, Manolo Fortich, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 106 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431559MN-EAO 5,250,000 Central Office / Region X Local Program 43 projects 588,500,000

Buildings and Other Structures - School Buildings - Local Infrastructure Program 35,000,000

30. P00440681MN 300102200441000 20,000,000 Construction of 20CL 4 Storey School Building, Phase II, NBCC Academic Center, Brgy. Tankulan, Manolo Fortich, Bukidnon

P00440681MN-CW1 Construction of School Buildings - Construction of Number of 1.000 19,800,000 Bukidnon 3rd Construction of 20CL 4 Storey School Buildings School District School Building, Phase II, NBCC Buildings Engineering Office Academic Center, Brgy. Tankulan, / Bukidnon 3rd Manolo Fortich, Bukidnon District Engineering Office

P00440681MN-EAO 200,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

31. P00443188MN 300102200442000 15,000,000 Construction of School Building, Northern Bukidnon Community College, Manolo Fortich, Bukidnon

P00443188MN-CW1 Construction of School Buildings - Construction of Number of 1.000 14,850,000 Bukidnon 3rd Construction of School Building, School Buildings School District Northern Bukidnon Community Buildings Engineering Office College, Manolo Fortich, Bukidnon / Bukidnon 3rd District Engineering Office

P00443188MN-EAO 150,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 185,000,000 Program

32. P00440682MN 300104217847000 1,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Lindaban, Manolo Fortich, Bukidnon

P00440682MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Lindaban, Manolo / Bukidnon 3rd Fortich, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 107 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440682MN-EAO 15,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

33. P00440683MN 300104217843000 2,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Kalugmanan, Manolo Fortich, Bukidnon

P00440683MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Kalugmanan, / Bukidnon 3rd Manolo Fortich, Bukidnon District Engineering Office

P00440683MN-EAO 25,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

34. P00440684MN 300104217839000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Agusan Canyon, Manolo Fortich, Bukidnon

P00440684MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Agusan Canyon, / Bukidnon 3rd Manolo Fortich, Bukidnon District Engineering Office

P00440684MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

35. P00440686MN 300104217848000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Mantibugao, Manolo Fortich, Bukidnon

P00440686MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Mantibugao, / Bukidnon 3rd Manolo Fortich, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 108 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440686MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

36. P00440689MN 300104217856000 3,000,000 Construction of Multi-Purpose Building, Brgy. Lingion, Talakag, Bukidnon

P00440689MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Lingion, Talakag, Bukidnon / Bukidnon 3rd District Engineering Office

P00440689MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

37. P00440690MN 300104217871000 2,500,000 Construction of Multi-Purpose Building, Tikalaan National High School, Brgy. Tikalaan, Talakag, Bukidnon

P00440690MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Tikalaan Building Engineering Office National High School, Brgy. / Bukidnon 3rd Tikalaan, Talakag, Bukidnon District Engineering Office

P00440690MN-EAO 25,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

38. P00440694MN 300104217850000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Malitbog, Bukidnon

P00440694MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Poblacion, / Bukidnon 3rd Malitbog, Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 109 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440694MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

39. P00440697MN 300104217842000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Crossing, Libona, Bukidnon

P00440697MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Crossing, Libona, / Bukidnon 3rd Bukidnon District Engineering Office

P00440697MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

40. P00440698MN 300104217852000 1,000,000 Construction (Completion) of Multi-Purpose Building, Libona National High School, Brgy. Crossing, Libona, Bukidnon

P00440698MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Libona National High / Bukidnon 3rd School, Brgy. Crossing, Libona, District Bukidnon Engineering Office

41. P00440701MN 300104217837000 1,500,000 Construction (Completion) of Multi-Purpose Building, Baungon National High School, Brgy. Danatag, Baungon, Bukidnon

P00440701MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Baungon National High / Bukidnon 3rd School, Brgy. Danatag, Baungon, District Bukidnon Engineering Office

P00440701MN-EAO 15,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

42. P00440702MN 300104217841000 1,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Buenavista, Baungon, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 110 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440702MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Buenavista, / Bukidnon 3rd Baungon, Bukidnon District Engineering Office

P00440702MN-EAO 15,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

43. P00440703MN 300104217857000 2,000,000 Construction of Multi-Purpose Building, Brgy. Mabuhay, Baungon, Bukidnon

P00440703MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Mabuhay, Baungon, Bukidnon / Bukidnon 3rd District Engineering Office

P00440703MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

44. P00440705MN 300104217859000 3,000,000 Construction of Multi-Purpose Building, National High School, Brgy. Vista Villa, Sumilao, Bukidnon

P00440705MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Sumilao Building Engineering Office National High School, Brgy. Vista / Bukidnon 3rd Villa, Sumilao, Bukidnon District Engineering Office

P00440705MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

45. P00440706MN 300104217855000 3,000,000 Construction of Multi-Purpose Building, Brgy. Kisolon, Sumilao, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 111 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440706MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Kisolon, Sumilao, Bukidnon / Bukidnon 3rd District Engineering Office

P00440706MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

46. P00443628MN 300104213379000 100,000,000 Construction of Multi-Purpose Building for Northern Bukidnon State College, Sitio Kihare, Brgy. Poblacion, Manolo Fortich, Bukidnon

P00443628MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 99,000,000 Central Office / Building - Construction of Multi Purpose Buildings Bukidnon 3rd Multi-Purpose Building for Building District Northern Bukidnon State College, Engineering Office Sitio Kihare, Brgy. Poblacion, Manolo Fortich, Bukidnon

P00443628MN-EAO 1,000,000 Central Office / Bukidnon 3rd District Engineering Office

47. P00443928MN 300104217860000 5,000,000 Improvement of Public Market, Brgy. Imbatug, Baungon, Bukidnon

P00443928MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Improvement of Public Multi Purpose Buildings District Market, Brgy. Imbatug, Baungon, Building Engineering Office Bukidnon / Bukidnon 3rd District Engineering Office

P00443928MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

48. P00443930MN 300104217862000 5,000,000 Completion of Multi-Purpose Building, Brgy. Poblacion, Libona, Bukidnon

P00443930MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Completion of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Libona, Bukidnon / Bukidnon 3rd District Engineering Office MYPS: 03/03/2020 02:36:37 pm Page 112 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443930MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

49. P00443931MN 300104217863000 5,000,000 Construction/Completion of Legislative Building, Poblacion, Malitbog, Bukidnon

P00443931MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Construction/Completion Multi Purpose Buildings District of Legislative Building, Poblacion, Building Engineering Office Malitbog, Bukidnon / Bukidnon 3rd District Engineering Office

P00443931MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

50. P00443932MN 300104217864000 3,000,000 Construction/Rehabilitation/Completion of Building (Liga ng Mga Brgy.), NGC Site, Tankulan, Manolo Fortich, Bukidnon

P00443932MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Multi Purpose Buildings District Construction/Rehabilitation/Compl Building Engineering Office etion of Building (Liga ng Mga / Bukidnon 3rd Brgy.), NGC Site, Tankulan, Manolo District Fortich, Bukidnon Engineering Office

P00443932MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

51. P00443933MN 300104217865000 2,500,000 Construction of Covered Court, Ticala Elementary School, Brgy. Ticala Manolo Fortich, Bukidnon

P00443933MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 3rd Building - Construction of Covered Multi Purpose Buildings District Court, Ticala Elementary School, Building Engineering Office Brgy. Ticala Manolo Fortich, / Bukidnon 3rd Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 113 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443933MN-EAO 25,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

52. P00443934MN 300104217866000 3,000,000 Completion of Covered Court of Brgy. Lingi-on, Manolo Fortich, Bukidnon

P00443934MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Completion of Covered Multi Purpose Buildings District Court of Brgy. Lingi-on, Manolo Building Engineering Office Fortich, Bukidnon / Bukidnon 3rd District Engineering Office

P00443934MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

53. P00443936MN 300104217868000 5,000,000 Construction of Multi-Purpose Building, Municipal Compound, Brgy. Kisolon, Sumilao, Bukidnon

P00443936MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Municipal Building Engineering Office Compound, Brgy. Kisolon, Sumilao, / Bukidnon 3rd Bukidnon District Engineering Office

P00443936MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

54. P00443937MN 300104217869000 5,000,000 Construction of Multi-Purpose Building (New Market site), Brgy. 1, Talakag, Bukidnon

P00443937MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building (New Building Engineering Office Market site), Brgy. 1, Talakag, / Bukidnon 3rd Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 114 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443937MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

55. P00443938MN 300104217870000 20,000,000 Construction of the Northern Bukidnon Community College Academic Center, Phase 2, Brgy. Tankulan, Manolo Fortich, Bukidnon

P00443938MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Bukidnon 3rd Building - Construction of the Multi Purpose Buildings District Northern Bukidnon Community Building Engineering Office College Academic Center, Phase 2, / Bukidnon 3rd Brgy. Tankulan, Manolo Fortich, District Bukidnon Engineering Office

P00443938MN-EAO 200,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 320,000,000

56. P00440687MN 300117207342000 2,000,000 Construction of Road, Brgy. Dalirig, Manolo Fortich, Bukidnon

P00440687MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.216 1,980,000 Bukidnon 3rd Construction of Road, Brgy. Dalirig, Concrete Road District Manolo Fortich, Bukidnon Engineering Office / Bukidnon 3rd District Engineering Office

P00440687MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

57. P00440688MN 300117207339000 3,000,000 Construction of Road, Brgy. Alae, Manolo Fortich, Bukidnon

P00440688MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.154 2,970,000 Bukidnon 3rd Construction of Road, Brgy. Alae, Concrete Road District Manolo Fortich, Bukidnon Engineering Office / Bukidnon 3rd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 115 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440688MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

58. P00443760MN 300117205382000 100,000,000 Construction of East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, package 7B, Bukidnon

P00443760MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.000 99,000,000 Central Office / Construction of East-West Lateral Concrete Road Region X Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, package 7B, Bukidnon

P00443760MN-EAO 1,000,000 Central Office / Region X

59. P00443761MN 300117205383000 100,000,000 Construction of East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, Package 7C, Bukidnon

P00443761MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.000 99,000,000 Central Office / Construction of East-West Lateral Concrete Road Region X Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, Package 7C, Bukidnon

P00443761MN-EAO 1,000,000 Central Office / Region X

60. P00443762MN 300117205384000 100,000,000 Construction of East-West Lateral Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, Package 5B, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 116 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443762MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.000 99,000,000 Central Office / Construction of East-West Lateral Concrete Road Region X Road Connecting Agusan Del Sur to Bukidnon (Jct. CDO City-Camp Kibaritan-Dominimorog Road to Jct. Manolo Fortich - Libona-Indahag Road) (Talakag - Baungon Section) incl. ROW, Package 5B, Bukidnon

P00443762MN-EAO 1,000,000 Central Office / Region X

61. P00444055MN 300117207340000 15,000,000 Construction of Northern Bukidnon Agri-Industrial Economic Zone Road Network Development Project (Baungon Section), Baungon, Bukidnon

P00444055MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.930 14,850,000 Central Office / Construction of Northern Bukidnon Concrete Road Region X Agri-Industrial Economic Zone Road Network Development Project (Baungon Section), Baungon, Bukidnon

P00444055MN-EAO 150,000 Central Office / Region X

Water Management Facilities - Water Supply - Local Infrastructure Program 48,500,000

62. P00440685MN 300121200938000 500,000 Construction of Water Supply - Level II, Brgy. Maluko, Manolo Fortich, Bukidnon

P00440685MN-CW1 Construction of Water Supply Construction of Number of 1.000 500,000 Bukidnon 3rd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Maluko, Systems Supply Engineering Office Manolo Fortich, Bukidnon Systems / Bukidnon 3rd District Engineering Office

63. P00440691MN 300121200932000 500,000 Construction (Completion) of Water Supply - Level II, Brgy. San Isidro, Talakag, Bukidnon

P00440691MN-CW1 Construction of Water Supply Construction of Number of 1.000 500,000 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. San Isidro, Talakag, Systems / Bukidnon 3rd Bukidnon District Engineering Office

64. P00440692MN 300121200933000 3,500,000 Construction (Completion) of Water Supply - Level II, Brgy. San Luis, Malitbog, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 117 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440692MN-CW1 Construction of Water Supply Construction of Number of 1.000 3,465,000 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. San Luis, Malitbog, Systems / Bukidnon 3rd Bukidnon District Engineering Office

P00440692MN-EAO 35,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

65. P00440693MN 300121200935000 2,000,000 Construction (Completion) of Water Supply - Level II, Brgy. Santa Ines, Malitbog, Bukidnon

P00440693MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. Santa Ines, Malitbog, Systems / Bukidnon 3rd Bukidnon District Engineering Office

P00440693MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

66. P00440695MN 300121200939000 2,000,000 Construction of Water Supply - Level II, Brgy. Omagling, Malitbog, Bukidnon

P00440695MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 3rd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Omagling, Systems Supply Engineering Office Malitbog, Bukidnon Systems / Bukidnon 3rd District Engineering Office

P00440695MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

67. P00440696MN 300121200929000 1,250,000 Construction (Completion) of Water Supply - Level II, Brgy. Laturan, Libona, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 118 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440696MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,237,500 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. Laturan, Libona, Systems / Bukidnon 3rd Bukidnon District Engineering Office

P00440696MN-EAO 12,500 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

68. P00440699MN 300121200936000 2,000,000 Construction of Water Supply - Level II, Brgy. Capihan, Libona, Bukidnon

P00440699MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Bukidnon 3rd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Capihan, Systems Supply Engineering Office Libona, Bukidnon Systems / Bukidnon 3rd District Engineering Office

P00440699MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

69. P00440700MN 300121200934000 1,000,000 Construction (Completion) of Water Supply - Level II, Brgy. Santa Fe, Libona, Bukidnon

P00440700MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,000,000 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. Santa Fe, Libona, Systems / Bukidnon 3rd Bukidnon District Engineering Office

70. P00440704MN 300121200928000 750,000 Construction (Completion) of Water Supply - Level II, Brgy. Kisolon, Sumilao, Bukidnon

P00440704MN-CW1 Construction of Water Supply Construction of Number of 1.000 750,000 Bukidnon 3rd Systems - Construction Water Supply Water District (Completion) of Water Supply - Systems Supply Engineering Office Level II, Brgy. Kisolon, Sumilao, Systems / Bukidnon 3rd Bukidnon District Engineering Office

71. P00444579MN 300121200930000 15,000,000 Construction of Municipal Water Supply System, Level II, Sumilao, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 119 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444579MN-CW1 Construction of Water Supply Construction of Number of 1.000 14,850,000 Bukidnon 3rd Systems - Construction of Water Supply Water District Municipal Water Supply System, Systems Supply Engineering Office Level II, Sumilao, Bukidnon Systems / Bukidnon 3rd District Engineering Office

P00444579MN-EAO 150,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

72. P00444580MN 300121200931000 20,000,000 Completion of Municipal Water Supply System, Level II, Baungon, Bukidnon

P00444580MN-CW1 Construction of Water Supply Construction of Number of 1.000 19,800,000 Bukidnon 3rd Systems - Completion of Municipal Water Supply Water District Water Supply System, Level II, Systems Supply Engineering Office Baungon, Bukidnon Systems / Bukidnon 3rd District Engineering Office

P00444580MN-EAO 200,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office BUKIDNON (FOURTH) 37 projects 999,039,000 OO1: Ensure Safe and Reliable National Road System 15 projects 738,689,000

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 50,000,000 Collapse, and Landslide - Tertiary Roads

73. P00400098MN 310109100482000 50,000,000 Jct Maradugao-Camp Kibaritan-Dominorog Rd - K1606 + 276 - K1606 + 356

P00400098MN-CW1 Construction of Road Slope Construction of Square 3,333.330 49,000,000 Bukidnon 3rd Protection Structure - along Jct Road Slope meters District Maradugao-Camp Protection Engineering Office Kibaritan-Dominorog Rd Structure / Bukidnon 3rd (S01371MN) K1606 + 276 - K1606 + District 356 Engineering Office

P00400098MN-EAO 1,000,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Network Development - Road Widening - Secondary Roads 143,216,000

MYPS: 03/03/2020 02:36:37 pm Page 120 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

74. P00400243MN 310202100665000 43,216,000 Maramag-Maradugao Rd - K1585 + 1027.60 - K1587 + 102.6

P00400243MN-CW1 Road Widening - along Road Widening Lane Km 2.058 42,351,680 Bukidnon 3rd Maramag-Maradugao Rd District (S01373MN) K1585 + 1027.60 - Engineering Office K1587 + 102.6 / Bukidnon 3rd District Engineering Office

P00400243MN-EAO 864,320 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

75. P00401519MN 310202100527000 100,000,000 Maramag-Maradugao Rd - K1587 + 103 - K1589 + 451

P00401519MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.900 94,712,820 Central Office / Locations along Bukidnon 3rd Maramag-Maradugao Rd District (S01373MN) K1587+103 - Engineering Office K1589+451

P00401519MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 14,246.000 1,852,000 Central Office / Locations along meters Bukidnon 3rd Maramag-Maradugao Rd District (S01373MN) Engineering Office

P00401519MN-EAO 3,435,180 Central Office / Bukidnon 3rd District Engineering Office

Network Development - Road Widening - Tertiary Roads 316,173,000

76. P00400245MN 310203100389000 45,000,000 -Lampanusan Rd - K1606 + 634 - K1608 + 435

P00400245MN-CW1 Road Widening - along Road Widening Lane Km 3.000 44,100,000 Bukidnon 3rd Kalilangan-Lampanusan Rd District (S00672MN) K1606 + 634 - K1608 + Engineering Office 435 / Bukidnon 3rd District Engineering Office

P00400245MN-EAO 900,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 121 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

77. P00400246MN 310203100298000 81,673,000 Maramag-Maradugao Rd - K1590 + (-569) - K1590 + 929

P00400246MN-CW1 Road Widening - along Road Widening Lane Km 3.192 78,814,445 Central Office / Maramag-Maradugao Rd Bukidnon 3rd (S01374MN) K1590 + (-569) - District K1590 + 929 Engineering Office

P00400246MN-EAO 2,858,555 Central Office / Bukidnon 3rd District Engineering Office

78. P00401404MN 310203100296000 100,000,000 Kibawe-Kadingilan-Kalilangan Rd - K1605+-401 - K1605+756, K1605+790 - K1606+759, K1608+113 - K1608+702

P00401404MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.278 91,675,000 Central Office / Locations along Bukidnon 3rd Kibawe-Kadingilan-Kalilangan Rd District (S01355MN) K1605+-401 - Engineering Office K1608+702

P00401404MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 26,316.000 5,000,000 Central Office / Locations along meters Bukidnon 3rd Kibawe-Kadingilan-Kalilangan Rd District (S01355MN) Engineering Office

P00401404MN-EAO 3,325,000 Central Office / Bukidnon 3rd District Engineering Office

79. P00401520MN 310203100297000 89,500,000 Kibawe-Kadingilan-Kalilangan Rd - K1608+702 - K1611+103

P00401520MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.714 81,542,500 Central Office / Locations along Bukidnon 3rd Kibawe-Kadingilan-Kalilangan Rd District (S01355MN) K1608+702 - Engineering Office K1611+103

P00401520MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 26,316.000 5,000,000 Central Office / Locations along meters Bukidnon 3rd Kibawe-Kadingilan-Kalilangan Rd District (S01355MN) Engineering Office

P00401520MN-EAO 2,957,500 Central Office / Bukidnon 3rd District Engineering Office

Network Development - Construction of Missing Links/ New Roads 80,000,000

80. P00401211MN 310205100440000 80,000,000 Jct. Maramag-Maradugao Road-Jct. Lampanusan Road, Package 6, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 122 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401211MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.574 77,200,000 Central Office / Jct. Maramag-Maradugao Road-Jct. Concrete Road Region X Lampanusan Road, Package 6, Bukidnon

P00401211MN-EAO 2,800,000 Central Office / Region X

Network Development - Paving of Unpaved Roads - Secondary Roads 18,480,000

81. P00401403MN 310211100075000 18,480,000 Jct. Maradugao-Camp Kibaritan-Dominorog Road- K1626+-579 - K1626+-139

P00401403MN-CW1 Paving of Unpaved Roads - along Paving of Lane Km 0.880 18,110,400 Bukidnon 3rd Jct Maradugao-Camp Unpaved Roads District Kibaritan-Dominorog Rd Engineering Office (S01372MN) K1626+-579 - K1626+ / Bukidnon 3rd -139 District Engineering Office

P00401403MN-EAO 369,600 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Bridge - Widening of Permanent Bridges 130,820,000

82. P00400840MN 310305101098000 18,720,000 Bugwak Br. (B01090MN) along Barandias-Dominorog Rd

P00400840MN-CW1 Widening of Bridge - Bugwak Br. Widening of Square 148.824 18,345,600 Bukidnon 3rd (B01090MN) along Bridge meters District Barandias-Dominorog Rd Engineering Office / Bukidnon 3rd District Engineering Office

P00400840MN-EAO 374,400 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

83. P00400841MN 310305101103000 24,360,000 Olayan Br. (B01091MN) along Barandias-Dominorog Rd

P00400841MN-CW1 Widening of Bridge - Olayan Br. Widening of Square 193.662 23,872,800 Bukidnon 3rd (B01091MN) along Bridge meters District Barandias-Dominorog Rd Engineering Office / Bukidnon 3rd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 123 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400841MN-EAO 487,200 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

84. P00400842MN 310305101102000 28,320,000 Mulita Upper Br. (B01439MN) along Maramag-Maradugao Rd

P00400842MN-CW1 Widening of Bridge - Mulita Upper Widening of Square 225.144 27,753,600 Bukidnon 3rd Br. (B01439MN) along Bridge meters District Maramag-Maradugao Rd Engineering Office / Bukidnon 3rd District Engineering Office

P00400842MN-EAO 566,400 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

85. P00400843MN 310305101101000 22,920,000 Marabog Br. (B01443MN) along Maramag-Maradugao Rd

P00400843MN-CW1 Widening of Bridge - Marabog Br. Widening of Square 182.214 22,461,600 Bukidnon 3rd (B01443MN) along Bridge meters District Maramag-Maradugao Rd Engineering Office / Bukidnon 3rd District Engineering Office

P00400843MN-EAO 458,400 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

86. P00400844MN 310305101099000 22,500,000 Kilisawon Br. (B01441MN) along Maramag-Maradugao Rd (Phase II)

P00400844MN-CW1 Widening of Bridge - Kilisawon Br. Widening of Square 95.400 22,050,000 Bukidnon 3rd (B01441MN) along Bridge meters District Maramag-Maradugao Rd (Phase II) Engineering Office / Bukidnon 3rd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 124 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400844MN-EAO 450,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

87. P00400845MN 310305101100000 14,000,000 Lantay Br. (B01442MN) along Maramag-Maradugao Rd (Phase II)

P00400845MN-CW1 Widening of Bridge - Lantay Br. Widening of Square 103.510 13,720,000 Bukidnon 3rd (B01442MN) along Bridge meters District Maramag-Maradugao Rd (Phase II) Engineering Office / Bukidnon 3rd District Engineering Office

P00400845MN-EAO 280,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office Convergence and Special Support Program 7 projects 163,850,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 48,350,000

88. P00431680MN 300203101315000 48,350,000 Access Road leading to Napalit Lake, Brgy. Pigtauranan, Pangantucan, Bukidnon

P00431680MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.612 47,383,000 Bukidnon 3rd Access Road leading to Napalit Concrete Road District Lake, Brgy. Pigtauranan, Engineering Office Pangantucan, Bukidnon / Bukidnon 3rd District Engineering Office

P00431680MN-EAO 967,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 115,500,000

89. P00431670MN 300207100262000 6,500,000 Construction of Covered Pathwalk of Mindanao Army Training Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 125 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431670MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,370,000 Bukidnon 3rd Construction of Covered Pathwalk Other Facilities Facilities District of Mindanao Army Training Group, Engineering Office TRADOC, PA, Kibaritan Military / Bukidnon 3rd Reservation, Kalilangan, Bukidnon District Engineering Office

P00431670MN-EAO 130,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

90. P00431673MN 300207100263000 3,500,000 Construction of Motorpool, Mindanao Army Training Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

P00431673MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 3,430,000 Bukidnon 3rd Construction of Motorpool, Other Facilities Facilities District Mindanao Army Training Group, Engineering Office TRADOC, PA, Kibaritan Military / Bukidnon 3rd Reservation, Kalilangan, Bukidnon District Engineering Office

P00431673MN-EAO 70,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

91. P00431674MN 300207100264000 10,000,000 Construction of Multipurpose Administration Building, Kibaritan Military Reservation, Brgy. Malinao, Kalilangan, Bukidnon

P00431674MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 9,800,000 Bukidnon 3rd Construction of Multipurpose Other Facilities Facilities District Administration Building, Kibaritan Engineering Office Military Reservation, Brgy. / Bukidnon 3rd Malinao, Kalilangan, Bukidnon District Engineering Office

P00431674MN-EAO 200,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

92. P00431678MN 300207100266000 12,000,000 Construction Water System, Mindanao Army Training Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 126 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431678MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 11,760,000 Bukidnon 3rd Construction Water System, Other Facilities Facilities District Mindanao Army Training Group, Engineering Office TRADOC, PA, Kibaritan Military / Bukidnon 3rd Reservation, Kalilangan, Bukidnon District Engineering Office

P00431678MN-EAO 240,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

93. P00431781MN 300207100265000 10,000,000 Construction of Perimeter fence of Mindanao Army Training Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

P00431781MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 9,800,000 Bukidnon 3rd Construction of Perimeter fence of Other Facilities Facilities District Mindanao Army Training Group, Engineering Office TRADOC, PA, Kibaritan Military / Bukidnon 3rd Reservation, Kalilangan, Bukidnon District Engineering Office

P00431781MN-EAO 200,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

94. P00431782MN 300207100142000 73,500,000 Construction of Roadnetwork w/ curb and gutter of Mindanao Army Training Reservation, Kalilangan, Bukidnon, Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

P00431782MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.240 70,927,500 Central Office / Construction of Roadnetwork w/ Concrete Road Bukidnon 3rd curb and gutter of Mindanao Army District Training Reservation, Kalilangan, Engineering Office Bukidnon, Group, TRADOC, PA, Kibaritan Military Reservation, Kalilangan, Bukidnon

P00431782MN-EAO 2,572,500 Central Office / Bukidnon 3rd District Engineering Office Local Program 15 projects 96,500,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 36,000,000 Program

95. P00440780MN 300104217844000 10,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Kimanait, Pangantucan, Bukidnon MYPS: 03/03/2020 02:36:37 pm Page 127 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440780MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Kimanait, / Bukidnon 3rd Pangantucan, Bukidnon District Engineering Office

P00440780MN-EAO 100,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

96. P00440781MN 300104217840000 2,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Bangahan, Pangantucan, Bukidnon

P00440781MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Bangahan, / Bukidnon 3rd Pangantucan, Bukidnon District Engineering Office

P00440781MN-EAO 25,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

97. P00440782MN 300104217838000 2,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Adtuyon, Pangantucan, Bukidnon

P00440782MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Adtuyon, / Bukidnon 3rd Pangantucan, Bukidnon District Engineering Office

P00440782MN-EAO 25,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

98. P00440783MN 300104217851000 3,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Pangantucan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 128 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440783MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Poblacion, / Bukidnon 3rd Pangantucan, Bukidnon District Engineering Office

P00440783MN-EAO 35,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

99. P00440784MN 300104217845000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Kinura, Kalilangan, Bukidnon

P00440784MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Kinura, Kalilangan, / Bukidnon 3rd Bukidnon District Engineering Office

P00440784MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

100. P00440785MN 300104217849000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Kalilangan, Bukidnon

P00440785MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Poblacion, / Bukidnon 3rd Kalilangan, Bukidnon District Engineering Office

P00440785MN-EAO 20,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

101. P00440786MN 300104217846000 3,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Lampanusan, Kalilangan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 129 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440786MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Bukidnon 3rd Building - Construction Multi Purpose Buildings District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Lampanusan, / Bukidnon 3rd Kalilangan, Bukidnon District Engineering Office

P00440786MN-EAO 35,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

102. P00443929MN 300104217861000 5,000,000 Rehabilitation of Old Sanggunian Bayan Building, Brgy. West Poblacion, Kalilangan, Bukidnon

P00443929MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Bukidnon 3rd Multi Purpose Building - Major Repair of Buildings District Rehabilitation of Old Sanggunian Multi Purpose Engineering Office Bayan Building, Brgy. West Building / Bukidnon 3rd Poblacion, Kalilangan, Bukidnon District Engineering Office

P00443929MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

103. P00443935MN 300104217867000 5,000,000 Construction/Completion of the Lake Napalit Eco Tourism Function Hall Building, Brgy. Pigtauranan, Pangantucan, Bukidnon

P00443935MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 3rd Building - Construction/Completion Multi Purpose Buildings District of the Lake Napalit Eco Tourism Building Engineering Office Function Hall Building, Brgy. / Bukidnon 3rd Pigtauranan, Pangantucan, District Bukidnon Engineering Office

P00443935MN-EAO 50,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 40,000,000 Program

104. P00444673MN 300107200942000 10,000,000 Construction of Flood Control Structure along Saguiaran River Package 1, Kalilangan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 130 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444673MN-CW1 Construction of Flood Mitigation Construction of Lineal 138.500 9,900,000 Bukidnon 3rd Structure - Construction of Flood Flood Mitigation meters District Control Structure along Saguiaran Structure Engineering Office River Package 1, Kalilangan, / Bukidnon 3rd Bukidnon District Engineering Office

P00444673MN-EAO 100,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

105. P00444674MN 300107200943000 10,000,000 Construction of Flood Control Structure along Saguiaran River, Kalilangan Package 2, Bukidnon

P00444674MN-CW1 Construction of Flood Mitigation Construction of Lineal 137.500 9,900,000 Bukidnon 3rd Structure - Construction of Flood Flood Mitigation meters District Control Structure along Saguiaran Structure Engineering Office River, Kalilangan Package 2, / Bukidnon 3rd Bukidnon District Engineering Office

P00444674MN-EAO 100,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

106. P00444675MN 300107200944000 10,000,000 Construction of Flood Control Structure along Saguiaran River Package 3, Kalilangan, Bukidnon

P00444675MN-CW1 Construction of Flood Mitigation Construction of Lineal 136.500 9,900,000 Bukidnon 3rd Structure - Construction of Flood Flood Mitigation meters District Control Structure along Saguiaran Structure Engineering Office River Package 3, Kalilangan, / Bukidnon 3rd Bukidnon District Engineering Office

P00444675MN-EAO 100,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

107. P00444676MN 300107200945000 10,000,000 Construction of Flood Control Structure along Saguiaran River Package 4, Kalilangan, Bukidnon

MYPS: 03/03/2020 02:36:37 pm Page 131 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444676MN-CW1 Construction of Flood Mitigation Construction of Lineal 156.000 9,900,000 Bukidnon 3rd Structure - Construction of Flood Flood Mitigation meters District Control Structure along Saguiaran Structure Engineering Office River Package 4, Kalilangan, / Bukidnon 3rd Bukidnon District Engineering Office

P00444676MN-EAO 100,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 15,000,000

108. P00444058MN 300117207341000 15,000,000 Construction of Southern Bukidnon Agri-Industrial Economic Zone Road Network Development Project (Pangantucan Section), Pangantucan, Bukidnon

P00444058MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.918 14,850,000 Central Office / Construction of Southern Bukidnon Concrete Road Region X Agri-Industrial Economic Zone Road Network Development Project (Pangantucan Section), Pangantucan, Bukidnon

P00444058MN-EAO 150,000 Central Office / Region X

Water Management Facilities - Water Supply - Local Infrastructure Program 5,500,000

109. P00440788MN 300121200937000 5,500,000 Construction of Water Supply - Level II, Brgy. Malinao, Kalilangan, Bukidnon

P00440788MN-CW1 Construction of Water Supply Construction of Number of 1.000 5,445,000 Bukidnon 3rd Systems - Construction of Water Water Supply Water District Supply - Level II, Brgy. Malinao, Systems Supply Engineering Office Kalilangan, Bukidnon Systems / Bukidnon 3rd District Engineering Office

P00440788MN-EAO 55,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 132 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Cagayan de Oro City 1st District Engineering Office 51 projects 2,283,041,000 CAGAYAN DE ORO CITY (FIRST) 51 projects 2,283,041,000 OO1: Ensure Safe and Reliable National Road System 17 projects 1,406,000,000

Asset Preservation - Preventive Maintenance - Primary Roads 8,000,000

1. P00400536MN 310101100377000 8,000,000 Butuan City-Cagayan de Oro City- City Rd - K1444 + 000 - K1444 + 730

P00400536MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.434 7,840,000 Cagayan de Oro Asphalt Overlay - along Butuan Maintenance of City 1st District City-Cagayan de Oro City-Iligan City Road: Asphalt Engineering Office Rd (S01246MN) K1444 + 000 - Overlay / Cagayan de Oro K1444 + 730 City 1st District Engineering Office

P00400536MN-EAO 160,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Asset Preservation - Preventive Maintenance - Secondary Roads 120,400,000

2. P00400537MN 310102100561000 20,400,000 Carmen-Patag-Bulua Rd - (S00584MN) Chainage 000 - Chainage 400, K1440 + 660 - K1442 + 000, K1443 + 328 - K1443 + 581

P00400537MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 3.530 19,992,000 Cagayan de Oro Asphalt Overlay - at Specific Maintenance of City 1st District Locations along Road: Asphalt Engineering Office Carmen-Patag-Bulua Rd Overlay / Cagayan de Oro (S00584MN) Chainage 0 - Chainage City 1st District 400, (S00592MN) K1440 + 660 - Engineering Office K1443 + 581

P00400537MN-EAO 408,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

3. P00400538MN 310102100407000 100,000,000 CDO-Airport-Bukidnon Rd - K1443 + 680 - K1444 + 000, K1444 + 050 - K1449 + 280

P00400538MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 18.178 96,500,000 Central Office / Asphalt Overlay - at Specific Maintenance of Cagayan de Oro Locations along Road: Asphalt City 1st District CDO-Airport-Bukidnon Rd Overlay Engineering Office (S00591MN) K1443 + 680 - K1449 + 280

MYPS: 03/03/2020 02:36:37 pm Page 133 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400538MN-EAO 3,500,000 Central Office / Cagayan de Oro City 1st District Engineering Office

Asset Preservation - Preventive Maintenance - Tertiary Roads 3,750,000

4. P00401451MN 310103100596000 3,750,000 Jct Natl H-Way-Bulua Rd - (S00605MN) Chainage 000 - Chainage 479

P00401451MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.958 3,675,000 Cagayan de Oro Asphalt Overlay - along Jct Natl Maintenance of City 1st District H-Way-Bulua Rd (S00605MN) Road: Asphalt Engineering Office Chainage 0 - Chainage 479 Overlay / Cagayan de Oro City 1st District Engineering Office

P00401451MN-EAO 75,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 100,000,000 Collapse, and Landslide - Tertiary Roads

5. P00400072MN 310109100283000 100,000,000 Lumbia-Uguiaban By-Pass Rd - (S00618MN) Chainage 082 - Chainage 174, Chainage 194 - Chainage 240, Chainage 334 - Chainage 636, Chainage 2566 - Chainage 2706

P00400072MN-CW1 Construction of Road Slope Construction of Square 6,444.440 96,500,000 Central Office / Protection Structure - at Specific Road Slope meters Cagayan de Oro Locations along Lumbia-Uguiaban Protection City 1st District By-Pass Rd (S00618MN) Chainage Structure Engineering Office 82 - Chainage 2706

P00400072MN-EAO 3,500,000 Central Office / Cagayan de Oro City 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 44,030,000 National Roads - Primary Roads

6. P00400350MN 310110100170000 44,030,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1439 + 700 - K1440 + 207.8, K1441 + 240 - K1441 + 420, K1441 + 500 - K1441 + 550, K1441 + 562 - K1442 + 407

P00400350MN-CW1 Construction of Drainage Structure Construction of Lineal 1,562.800 43,149,400 Cagayan de Oro along Road - at Specific Locations Drainage meters City 1st District along Butuan City-Cagayan de Oro Structure along Engineering Office City-Iligan City Rd (S01246MN) Road / Cagayan de Oro K1439 + 700 - K1442 + 407 City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 134 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400350MN-EAO 880,600 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 10,300,000 National Roads - Secondary Roads

7. P00400351MN 310111100245000 10,300,000 Carmen-Patag-Bulua Rd - K1441 + 293 - K1441 + 672, K1441 + 808 - K1442 + 241

P00400351MN-CW1 Construction of Drainage Structure Construction of Lineal 825.000 10,094,000 Cagayan de Oro along Road - at Specific Locations Drainage meters City 1st District along Carmen-Patag-Bulua Rd Structure along Engineering Office (S00592MN) K1441 + 293 - K1442 + Road / Cagayan de Oro 241 City 1st District Engineering Office

P00400351MN-EAO 206,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Network Development - Road Widening - Secondary Roads 218,520,000

8. P00400185MN 310202100520000 98,695,000 CDO-Airport-Bukidnon Rd - K1440 + 658 - K1441 + 263, K1449 + 847 - K1450 + 960, K1450 + 073 - K1450 + 873

P00400185MN-CW1 Road Widening - at Specific Road Widening Lane Km 3.151 49,490,990 Central Office / Locations along Cagayan de Oro CDO-Airport-Bukidnon Rd City 1st District (S00591MN) K1440 + 658 - K1450 + Engineering Office 960

P00400185MN-CW2 Construction of Road Slope Construction of Square 6,400.000 41,297,175 Protection Structure - at Specific Road Slope meters Locations along Protection CDO-Airport-Bukidnon Rd Structure (S00591MN) K1440 + 658 - K1450 + 960

P00400185MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 1,670.000 4,614,000 Central Office / Locations along meters Cagayan de Oro CDO-Airport-Bukidnon Rd City 1st District (S00591MN) Engineering Office

P00400185MN-EAO 3,292,835 Central Office / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 135 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

9. P00400186MN 310202100666000 20,000,000 Carmen-Patag-Bulua Rd - K1441 + 670 - K1441 + 840

P00400186MN-CW1 Road Widening - at Specific Road Widening Lane Km 0.170 2,450,000 Cagayan de Oro Locations along City 1st District Carmen-Patag-Bulua Rd Engineering Office (S00592MN) K1441 + 670 - K1441 + / Cagayan de Oro 840 City 1st District Engineering Office

P00400186MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 1,632.000 17,500,000 Cagayan de Oro Locations along meters City 1st District Carmen-Patag-Bulua Rd Engineering Office (S00592MN) / Cagayan de Oro City 1st District Engineering Office

P00400186MN-EAO 50,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

10. P00400187MN 310202100521000 99,825,000 CDO-Airport-Bukidnon Rd - K1458 + 716 - K1459 + 090, K1460 + 000 - K1461 + 933, K1462 + 488 - K1463 + 520

P00400187MN-CW1 Road Widening - at Specific Road Widening Lane Km 6.718 93,148,555 Central Office / Locations along Cagayan de Oro CDO-Airport-Bukidnon Rd City 1st District (S00591MN) K1458 + 716 - K1463 + Engineering Office 520

P00400187MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 16,180.000 3,298,000 Central Office / Locations along meters Cagayan de Oro CDO-Airport-Bukidnon Rd City 1st District (S00591MN) Engineering Office

P00400187MN-EAO 3,378,445 Central Office / Cagayan de Oro City 1st District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 901,000,000

11. P00401166MN 310204100812000 146,000,000 CDO-New Western Diversion Road, (Kauswagan-Bonbon), Package 5, Cagayan de Oro City

P00401166MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.328 82,990,000 Central Office / CDO-New Western Diversion Road, Concrete Road Region X (Kauswagan-Bonbon), Package 5, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 136 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401166MN-ROW ROW Acquisition - CDO-New ROW Acquisition Square 32,700.000 60,000,000 Central Office / Western Diversion Road, meters Region X (Kauswagan-Bonbon), Package 5, Cagayan de Oro City

P00401166MN-EAO 3,010,000 Central Office / Region X

12. P00401167MN 310204100811000 150,000,000 CDO-New Western Diversion Road, (Canito-an-Cagayan De Oro Coastal Road), Package 5, Cagayan de Oro City

P00401167MN-CW1 Construction of Concrete Bridge - Construction of Square 6,698.580 144,750,000 Central Office / CDO-New Western Diversion Road, Concrete Bridge meters Region X (Canito-an-Cagayan De Oro Coastal Road), Package 5, Cagayan de Oro City

P00401167MN-EAO 5,250,000 Central Office / Region X

13. P00401168MN 310204100800000 150,000,000 Cagayan de Oro (PCE) Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), (Taglimao-Bagocboc Section), Cagayan de Oro City

P00401168MN-CW1 Construction of Gravel Road - Construction of Lane Km 3.066 144,750,000 Central Office / Cagayan de Oro (PCE) Gravel Road Region X Bypass/Alternate Road Extension (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), (Taglimao-Bagocboc Section), Cagayan de Oro City

P00401168MN-EAO 5,250,000 Central Office / Region X

14. P00401169MN 310204100823000 75,000,000 Jct CDO Talakag Road / Macapagal Drive - Upper Carmen - Patag - Jct BCIR/ Kauswagan, Cagayan de Oro City

P00401169MN-CW1 Construction of Concrete Road - Jct Construction of Lane Km 1.000 25,090,000 Central Office / CDO Talakag Road / Macapagal Concrete Road Region X Drive - Upper Carmen - Patag - Jct BCIR/ Kauswagan, Cagayan de Oro City

P00401169MN-CW2 Construction of Road Slope Construction of Square 5,000.000 37,466,125 Protection Structure - Jct CDO Road Slope meters Talakag Road / Macapagal Drive - Protection Upper Carmen - Patag - Jct BCIR/ Structure Kauswagan, Cagayan de Oro City

P00401169MN-ROW ROW Acquisition - Jct CDO Talakag ROW Acquisition Square 20,000.000 10,175,000 Central Office / Road / Macapagal Drive - Upper meters Region X Carmen - Patag - Jct BCIR/ Kauswagan, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 137 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401169MN-EAO 2,268,875 Central Office / Region X

15. P00401170MN 310204100832000 80,000,000 Opol Diversion Road (Opol-Canitoan), Cagayan de Oro City

P00401170MN-CW1 Construction of Gravel Road - Opol Construction of Lane Km 3.650 77,200,000 Central Office / Diversion Road (Opol-Canitoan), Gravel Road Region X Cagayan de Oro City

P00401170MN-EAO 2,800,000 Central Office / Region X

16. P00401172MN 310204100810000 150,000,000 CDOC-Iligan Hinterland Road (Jct. CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 5, Cagayan de Oro City

P00401172MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.610 144,750,000 Central Office / CDOC-Iligan Hinterland Road (Jct. Concrete Road Region X CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 5, Cagayan de Oro City

P00401172MN-EAO 5,250,000 Central Office / Region X

17. P00401343MN 310204100799000 150,000,000 Cagayan de Oro (PCE) Bypass/Alternate Road (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Lumbia Section, Cagayan de Oro City

P00401343MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.277 118,367,865 Central Office / Cagayan de Oro (PCE) Concrete Road Region X Bypass/Alternate Road (Jct. Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Lumbia Section, Cagayan de Oro City

P00401343MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 27,339.442 27,339,000 Central Office / (PCE) Bypass/Alternate Road (Jct. meters Region X Lumbia/CDO-Camp Kibaritan Road-Pagatpat-Jct. BCIR), Lumbia Section, Cagayan de Oro City

P00401343MN-EAO 4,293,135 Central Office / Region X OO2: Protect Lives and Properties Against Major Floods 1 projects 200,000,000

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 200,000,000 and Principal Rivers

18. P00420615MN 320102101060000 200,000,000 Construction of Iponan Flood Control Project, Bulua Side, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 138 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420615MN-CW1 Construction of Flood Mitigation Construction of Lineal 560.000 193,000,000 Central Office / Structure - Construction of Iponan Flood Mitigation meters Region X Flood Control Project, Bulua Side, Structure Cagayan de Oro City

P00420615MN-EAO 7,000,000 Central Office / Region X Convergence and Special Support Program 2 projects 236,641,000

Construction/ Improvement of Access Roads leading to Airports 176,641,000

19. P00431666MN 300201100059000 176,641,000 CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Cagayan de Oro City, Package IV

P00431666MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.880 99,091,025 Central Office / CDO-Opol-El Concrete Road Region X Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Cagayan de Oro City, Package IV

P00431666MN-CW2 Construction of Road Slope Construction of Square 1.600 45,658,975 Protection Structure - CDO-Opol-El Road Slope meters Salvador-Alubijid-Laguindingan Protection Airport (Pueblo de Oro/CDO Structure Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Cagayan de Oro City, Package IV

P00431666MN-ROW ROW Acquisition - CDO-Opol-El ROW Acquisition Square 53,282.000 26,641,000 Central Office / Salvador-Alubijid-Laguindingan meters Region X Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Cagayan de Oro City, Package IV

P00431666MN-EAO 5,250,000 Central Office / Region X

Construction/ Improvement of Various Infrastructure in support of National Security 60,000,000

20. P00431672MN 300207100137000 60,000,000 Construction of Headquarters Administration Building, Camp Evangelista, 4ID PA, Brgy. Patag, Cagayan de Oro City, Misamis Oriental

P00431672MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 57,900,000 Central Office / Construction of Headquarters Other Facilities Facilities Cagayan de Oro Administration Building, Camp City 1st District Evangelista, 4ID PA, Brgy. Patag, Engineering Office Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 139 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431672MN-EAO 2,100,000 Central Office / Cagayan de Oro City 1st District Engineering Office Local Program 31 projects 440,400,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 306,400,000

21. P00442895MN 300105200256000 48,500,000 Improvement of DPWH-X Old Administrative and Office of the Regional Director Building, DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442895MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 46,802,500 Central Office / Building - Improvement of DPWH-X Multi Purpose Buildings Region X Old Administrative and Office of Building the Regional Director Building, DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442895MN-EAO 1,697,500 Central Office / Region X

22. P00442897MN 300105200244000 141,000,000 Construction of DPWH X Multi-Level Parking, DPWH X Compund, Engineer's Hill, Bulua, Cagayan de Oro City

P00442897MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 136,065,000 Central Office / Building - Construction of DPWH X Multi Purpose Buildings Region X Multi-Level Parking, DPWH X Building Compund, Engineer's Hill, Bulua, Cagayan de Oro City

P00442897MN-EAO 4,935,000 Central Office / Region X

23. P00442898MN 300105200242000 51,000,000 Construction of DPWH X Employee's Quarters, Annex ''C'' DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442898MN-CW1 Construction of Multi Purpose Construction of Number of 2.000 49,215,000 Central Office / Building - Construction of DPWH X Multi Purpose Buildings Region X Employee's Quarters, Annex ''C'' Building DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442898MN-EAO 1,785,000 Central Office / Region X

24. P00442899MN 300105200255000 2,709,000 DPWH Regional Office X Radio/CCTV Tower, Engineer's Hill, Bulua, Cagayan de Oro City

P00442899MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,614,185 Central Office / Building - DPWH Regional Office X Multi Purpose Buildings Region X Radio/CCTV Tower, Engineer's Hill, Building Bulua, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 140 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442899MN-EAO 94,815 Central Office / Region X

25. P00442900MN 300105200243000 35,000,000 Construction of DPWH X General Services Office Building, DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442900MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 33,775,000 Central Office / Building - Construction of DPWH X Multi Purpose Buildings Region X General Services Office Building, Building DPWH X Compound, Engineer's Hill, Bulua, Cagayan de Oro City

P00442900MN-EAO 1,225,000 Central Office / Region X

26. P00442916MN 300105200246000 28,191,000 Construction of Multi-Purpose Building of DPWH Cagayan de Oro City, 1st District Engineering Office, Bulua, Cagayan de Oro

P00442916MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 27,204,315 Central Office / Building - Construction of Multi Purpose Buildings Cagayan de Oro Multi-Purpose Building of DPWH Building City 1st District Cagayan de Oro City, 1st District Engineering Office Engineering Office, Bulua, Cagayan de Oro

P00442916MN-EAO 986,685 Central Office / Cagayan de Oro City 1st District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 39,000,000 Program

27. P00440997MN 300104217879000 6,000,000 Rehabilitation of Multi-Purpose Building, Bongbongon Elementary School, Brgy. Kauswagan, Cagayan de Oro City, Misamis Oriental

P00440997MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 5,940,000 Cagayan de Oro Multi Purpose Building - Major Repair of Buildings City 1st District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Bongbongon Elementary Building / Cagayan de Oro School, Brgy. Kauswagan, Cagayan City 1st District de Oro City, Misamis Oriental Engineering Office

P00440997MN-EAO 60,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

28. P00440998MN 300104217872000 3,000,000 Construction (Completion) of Multi-Purpose Building, NHA Fire Station, Brgy. Kauswagan, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 141 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440998MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Construction Multi Purpose Buildings City 1st District (Completion) of Multi-Purpose Building Engineering Office Building, NHA Fire Station, Brgy. / Cagayan de Oro Kauswagan, Cagayan de Oro City, City 1st District Misamis Oriental Engineering Office

P00440998MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

29. P00441004MN 300104217875000 6,000,000 Construction of Multi-Purpose Building, CDORSHP 3, Brgy. Iponan, Cagayan de Oro City, Misamis Oriental

P00441004MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 1st District Multi-Purpose Building, CDORSHP Building Engineering Office 3, Brgy. Iponan, Cagayan de Oro / Cagayan de Oro City, Misamis Oriental City 1st District Engineering Office

P00441004MN-EAO 60,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

30. P00441005MN 300104217874000 6,000,000 Construction of Multi-Purpose Building, Brgy. Iponan, Cagayan de Oro City, Misamis Oriental

P00441005MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 1st District Multi-Purpose Building, Brgy. Building Engineering Office Iponan, Cagayan de Oro City, / Cagayan de Oro Misamis Oriental City 1st District Engineering Office

P00441005MN-EAO 60,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

31. P00441006MN 300104217876000 6,000,000 Construction of Multi-Purpose Building, Sitio Langag, Brgy. Dansolihon, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 142 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441006MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 1st District Multi-Purpose Building, Sitio Building Engineering Office Langag, Brgy. Dansolihon, Cagayan / Cagayan de Oro de Oro City, Misamis Oriental City 1st District Engineering Office

P00441006MN-EAO 60,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

32. P00441007MN 300104217873000 6,000,000 Construction of Multi-Purpose Building, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00441007MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 1st District Multi-Purpose Building, Brgy. Building Engineering Office Carmen, Cagayan de Oro City, / Cagayan de Oro Misamis Oriental City 1st District Engineering Office

P00441007MN-EAO 60,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

33. P00443939MN 300104217877000 3,000,000 Construction and/or Repair/Rehabilitation of Multi-Purpose Building, Brgy. Carmen, Cagayan De Oro City

P00443939MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Construction and/or Multi Purpose Buildings City 1st District Repair/Rehabilitation of Building Engineering Office Multi-Purpose Building, Brgy. / Cagayan de Oro Carmen, Cagayan De Oro City City 1st District Engineering Office

P00443939MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

34. P00443940MN 300104217878000 3,000,000 Construction of Multi-Purpose Building (Senior Citizen/VAWC), Brgy. Pigsag-an, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 143 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443940MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 1st District Multi-Purpose Building (Senior Building Engineering Office Citizen/VAWC), Brgy. Pigsag-an, / Cagayan de Oro Cagayan de Oro City City 1st District Engineering Office

P00443940MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure 8,000,000 Program

35. P00444605MN 300109200743000 5,000,000 Construction of drainage (main road), Upper Balulang, Brgy. Balulang, Cagayan de Oro City

P00444605MN-CW1 Construction of Drainage Structure Construction of Lineal 620.000 4,950,000 Cagayan de Oro - Construction of drainage (main Drainage meters City 1st District road), Upper Balulang, Brgy. Structure Engineering Office Balulang, Cagayan de Oro City / Cagayan de Oro City 1st District Engineering Office

P00444605MN-EAO 50,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

36. P00444606MN 300109200744000 3,000,000 Construction of drainage (Brgy. hall to Balulang National High School), Brgy. Balulang, Cagayan de Oro City

P00444606MN-CW1 Construction of Drainage Structure Construction of Lineal 475.000 2,970,000 Cagayan de Oro - Construction of drainage (Brgy. Drainage meters City 1st District hall to Balulang National High Structure Engineering Office School), Brgy. Balulang, Cagayan de / Cagayan de Oro Oro City City 1st District Engineering Office

P00444606MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 87,000,000

37. P00440990MN 300117207356000 3,000,000 Construction of Road, Zone 8, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 144 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440990MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.610 2,970,000 Cagayan de Oro Construction of Road, Zone 8, Brgy. Concrete Road City 1st District Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00440990MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

38. P00440991MN 300117207353000 2,000,000 Construction of Road, Zone 6, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00440991MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.433 1,980,000 Cagayan de Oro Construction of Road, Zone 6, Brgy. Concrete Road City 1st District Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00440991MN-EAO 20,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

39. P00440992MN 300117207355000 1,000,000 Construction of Road, Zone 7, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00440992MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.204 1,000,000 Cagayan de Oro Construction of Road, Zone 7, Brgy. Concrete Road City 1st District Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

40. P00440993MN 300117207357000 4,000,000 Construction of Road, Zone 9, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00440993MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.841 3,960,000 Cagayan de Oro Construction of Road, Zone 9, Brgy. Concrete Road City 1st District Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 145 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440993MN-EAO 40,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

41. P00440994MN 300117207350000 2,000,000 Construction of Road, Zone 10, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00440994MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.390 1,980,000 Cagayan de Oro Construction of Road, Zone 10, Concrete Road City 1st District Brgy. Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00440994MN-EAO 20,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

42. P00440995MN 300117207351000 2,000,000 Construction of Road, Zone 9, Brgy. Carmen, Cagayan de Oro City

P00440995MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.442 1,980,000 Cagayan de Oro Construction of Road, Zone 9, Brgy. Concrete Road City 1st District Carmen, Cagayan de Oro City Engineering Office / Cagayan de Oro City 1st District Engineering Office

P00440995MN-EAO 20,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

43. P00440996MN 300117207352000 2,000,000 Construction of Road, Zone 12, Brgy. Carmen, Cagayan de Oro City, Misamis Oriental

P00440996MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.514 1,980,000 Cagayan de Oro Construction of Road, Zone 12, Concrete Road City 1st District Brgy. Carmen, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 146 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440996MN-EAO 20,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

44. P00440999MN 300117207345000 3,000,000 Construction of Road, Brgy. Bulua, Cagayan de Oro City, Misamis Oriental

P00440999MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.729 2,970,000 Cagayan de Oro Construction of Road, Brgy. Bulua, Concrete Road City 1st District Cagayan de Oro City, Misamis Engineering Office Oriental / Cagayan de Oro City 1st District Engineering Office

P00440999MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

45. P00441000MN 300117207343000 8,000,000 Construction of Road with Drainage, Brgy. Iponan, Cagayan de Oro City, Misamis Oriental

P00441000MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.996 7,920,000 Cagayan de Oro Construction of Road with Concrete Road City 1st District Drainage, Brgy. Iponan, Cagayan de Engineering Office Oro City, Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00441000MN-EAO 80,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

46. P00441001MN 300117207354000 2,000,000 Construction of Road, Bulua-Patag Road, Brgy. Bulua, Cagayan de Oro City

P00441001MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.532 1,980,000 Cagayan de Oro Construction of Road, Bulua-Patag Concrete Road City 1st District Road, Brgy. Bulua, Cagayan de Oro Engineering Office City / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 147 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441001MN-EAO 20,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

47. P00441002MN 300117207349000 3,000,000 Construction of Road, Zone 1, Brgy. Bulua, Cagayan de Oro City, Misamis Oriental

P00441002MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.481 2,970,000 Cagayan de Oro Construction of Road, Zone 1, Brgy. Concrete Road City 1st District Bulua, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00441002MN-EAO 30,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

48. P00441003MN 300117207344000 5,000,000 Construction of Road, Brgy. Canito-An, Cagayan de Oro City, Misamis Oriental

P00441003MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.360 4,950,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 1st District Canito-An, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 1st District Engineering Office

P00441003MN-EAO 50,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

49. P00444060MN 300117207346000 20,000,000 Concreting of Road, Barangay Carmen, Cagayan de Oro City

P00444060MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.700 19,800,000 Cagayan de Oro Concreting of Road, Barangay Concrete Road City 1st District Carmen, Cagayan de Oro City Engineering Office / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 148 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444060MN-EAO 200,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

50. P00444063MN 300117207347000 15,000,000 Concreting of Road, Barangay Kauswagan, Cagayan de Oro City

P00444063MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.000 14,850,000 Cagayan de Oro Concreting of Road, Barangay Concrete Road City 1st District Kauswagan, Cagayan de Oro City Engineering Office / Cagayan de Oro City 1st District Engineering Office

P00444063MN-EAO 150,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

51. P00444065MN 300117207348000 15,000,000 Concreting of Road, Barangay Bulua, Cagayan de Oro City

P00444065MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.000 14,850,000 Cagayan de Oro Concreting of Road, Barangay Concrete Road City 1st District Bulua, Cagayan de Oro City Engineering Office / Cagayan de Oro City 1st District Engineering Office

P00444065MN-EAO 150,000 Cagayan de Oro City 1st District Engineering Office / Cagayan de Oro City 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 149 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Cagayan de Oro City 2nd District Engineering Office 71 projects 2,890,000,000 CAGAYAN DE ORO CITY (SECOND) 71 projects 2,890,000,000 OO1: Ensure Safe and Reliable National Road System 26 projects 1,592,873,000

Asset Preservation - Preventive Maintenance - Primary Roads 45,000,000

1. P00400539MN 310101100378000 45,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1433 + 000 - K1434 + 022, K1437 + 000 - K1437 + 400

P00400539MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 8.670 44,100,000 Cagayan de Oro Asphalt Overlay - at Specific Maintenance of City 2nd District Locations along Butuan Road: Asphalt Engineering Office City-Cagayan de Oro City-Iligan City Overlay / Cagayan de Oro Rd (S01245MN) K1433 + 000 - City 2nd District K1437 + 400 Engineering Office

P00400539MN-EAO 900,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Preventive Maintenance - Secondary Roads 85,982,000

2. P00400540MN 310102100562000 6,567,000 Carmen-Patag-Bulua Rd - (S00586MN) Chainage 000 - Chainage 317

P00400540MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.958 6,435,660 Cagayan de Oro Asphalt Overlay - at Specific Maintenance of City 2nd District Locations along Road: Asphalt Engineering Office Carmen-Patag-Bulua Rd Overlay / Cagayan de Oro (S00586MN) Chainage 0 - Chainage City 2nd District 317 Engineering Office

P00400540MN-EAO 131,340 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

3. P00400541MN 310102100563000 48,639,000 Corrales Extension St. - Port Road - K1438 + (-349) - K1439 + 558

P00400541MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 4.890 47,666,220 Cagayan de Oro Asphalt Overlay - at Specific Maintenance of City 2nd District Locations along Corrales Extension Road: Asphalt Engineering Office St. - Port Road (S01244MN) K1438 Overlay / Cagayan de Oro + (-349) - K1439 + 558 City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 150 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400541MN-EAO 972,780 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

4. P00400542MN 310102100564000 30,776,000 Don A Velez St - K1438 + 140 - K1439 + 168

P00400542MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 3.728 30,160,480 Cagayan de Oro Asphalt Overlay - at Specific Maintenance of City 2nd District Locations along Don A Velez St Road: Asphalt Engineering Office (S00583MN) K1438 + 140 - K1439 + Overlay / Cagayan de Oro 168 City 2nd District Engineering Office

P00400542MN-EAO 615,520 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 21,281,000 Roads - Secondary Roads

5. P00400646MN 310105100471000 21,281,000 CDO-Port Rd - K1439 + 490 - K1440 + 175

P00400646MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 1.324 20,855,380 Cagayan de Oro Pavement - at Specific Locations Concrete City 2nd District along CDO-Port Rd (S00606MN) Pavement Engineering Office K1439 + 490 - K1440 + 175 / Cagayan de Oro City 2nd District Engineering Office

P00400646MN-EAO 425,620 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 45,000,000 Collapse, and Landslide - Primary Roads

6. P00400078MN 310107100165000 45,000,000 Sayre Highway - K1428+009 - K1428+172

P00400078MN-CW1 Construction of Road Slope Construction of Square 3,833.330 44,100,000 Cagayan de Oro Protection Structure - along Sayre Road Slope meters City 2nd District Highway (S00577MN) K1428+009 - Protection Engineering Office K1428+172 Structure / Cagayan de Oro City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 151 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400078MN-EAO 900,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 19,054,000 National Roads - Primary Roads

7. P00400352MN 310110100172000 19,054,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1435 + 667 - K1436 + 539

P00400352MN-CW1 Construction of Drainage Structure Construction of Lineal 879.000 18,672,920 Cagayan de Oro along Road - along Butuan Drainage meters City 2nd District City-Cagayan de Oro City-Iligan City Structure along Engineering Office Rd (S01245MN) K1435 + 667 - Road / Cagayan de Oro K1436 + 539 City 2nd District Engineering Office

P00400352MN-EAO 381,080 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 4,014,000 National Roads - Secondary Roads

8. P00400353MN 310111100247000 4,014,000 Corrales Extension St. - Port Road - K1439 + 171 - K1439 + 558

P00400353MN-CW1 Construction of Drainage Structure Construction of Lineal 387.000 3,933,720 Cagayan de Oro along Road - along Corrales Drainage meters City 2nd District Extension St. - Port Road Structure along Engineering Office (S01244MN) K1439 + 171 - K1439 + Road / Cagayan de Oro 558 City 2nd District Engineering Office

P00400353MN-EAO 80,280 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 3,632,000 National Roads - Tertiary Roads

9. P00400354MN 310112100227000 3,632,000 Jct Natl H-Way-Camp Alagar Rd - (S00589MN) Chainage 120 - Chainage 490

MYPS: 03/03/2020 02:36:37 pm Page 152 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400354MN-CW1 Construction of Drainage Structure Construction of Lineal 370.000 3,559,360 Cagayan de Oro along Road - along Jct Natl Drainage meters City 2nd District H-Way-Camp Alagar Rd Structure along Engineering Office (S00589MN) Chainage 120 - Road / Cagayan de Oro Chainage 490 City 2nd District Engineering Office

P00400354MN-EAO 72,640 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 112,000,000

10. P00400321MN 310201100493000 112,000,000 Sayre Highway - K1426 + 154 - K1429 + 100, K1430 + 205 - K1431 + 703

P00400321MN-CW1 Road Widening - at Specific Road Widening Lane Km 6.032 108,080,000 Central Office / Locations along Sayre Highway Region X (S00577MN) K1426 + 154 - K1431 + 703

P00400321MN-EAO 3,920,000 Central Office / Region X

Network Development - Construction of By-Pass and Diversion Roads 1,100,000,000

11. P00401176MN 310204100801000 150,000,000 Cagayan de Oro Coastal Road, (Punta-Macabalan Section), Package 5, Cagayan de Oro City

P00401176MN-CW1 Construction of Gravel Road - Construction of Lane Km 2.240 135,100,000 Central Office / Cagayan de Oro Coastal Road, Gravel Road Region X (Punta-Macabalan Section), Package 5, Cagayan de Oro City

P00401176MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 10,000.000 10,000,000 Central Office / Coastal Road, (Punta-Macabalan meters Region X Section), Package 5, Cagayan de Oro City

P00401176MN-EAO 4,900,000 Central Office / Region X

12. P00401180MN 310204100817000 130,000,000 Eastern Interior Bypass Road (Gusa Puerto/ Jct Sayre Highway), Package 3, Cagayan de Oro City

P00401180MN-CW1 Construction of Gravel Road - Construction of Lane Km 1.197 28,950,000 Central Office / Eastern Interior Bypass Road (Gusa Gravel Road Region X Puerto/ Jct Sayre Highway), Package 3, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 153 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401180MN-ROW ROW Acquisition - Eastern Interior ROW Acquisition Square 125,000.000 100,000,000 Central Office / Bypass Road (Gusa Puerto/ Jct meters Region X Sayre Highway), Package 3, Cagayan de Oro City

P00401180MN-EAO 1,050,000 Central Office / Region X

13. P00401181MN 310204100818000 131,500,000 Eastern Interior Bypass Road (Gusa Puerto/ Jct Sayre Highway), Package 4, Cagayan de Oro City

P00401181MN-CW1 Construction of Concrete Bridge - Construction of Square 4,358.600 102,772,500 Central Office / Eastern Interior Bypass Road (Gusa Concrete Bridge meters Region X Puerto/ Jct Sayre Highway), Package 4, Cagayan de Oro City

P00401181MN-ROW ROW Acquisition - Eastern Interior ROW Acquisition Square 20,000.000 25,000,000 Central Office / Bypass Road (Gusa Puerto/ Jct meters Region X Sayre Highway), Package 4, Cagayan de Oro City

P00401181MN-EAO 3,727,500 Central Office / Region X

14. P00401345MN 310204100961000 45,000,000 Puerto-Claveria By-Pass Road, (Cagayan de Oro City Section), Package 3, Cagayan de Oro City

P00401345MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.040 36,670,000 Central Office / Puerto-Claveria By-Pass Road, Concrete Road Region X (Cagayan de Oro City Section), Package 3, Cagayan de Oro City

P00401345MN-ROW ROW Acquisition - Puerto-Claveria ROW Acquisition Square 14,000.000 7,000,000 Central Office / By-Pass Road, (Cagayan de Oro City meters Region X Section), Package 3, Cagayan de Oro City

P00401345MN-EAO 1,330,000 Central Office / Region X

15. P00401346MN 310204100806000 73,500,000 Cagayan de Oro Diversion Road, (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 8, Cagayan de Oro City

P00401346MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.363 66,102,500 Central Office / Cagayan de Oro Diversion Road, Concrete Road Region X (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 8, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 154 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401346MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 5,000.000 5,000,000 Central Office / Diversion Road, (Jct. Balubal Sayre meters Region X Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 8, Cagayan de Oro City

P00401346MN-EAO 2,397,500 Central Office / Region X

16. P00401347MN 310204100960000 35,000,000 Cagayan de Oro Coastal Road, (Section 2), Cagayan de Oro City

P00401347MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.900 29,400,000 Cagayan de Oro Cagayan de Oro Coastal Road, Concrete Road City 2nd District (Section 2), Cagayan de Oro City Engineering Office / Cagayan de Oro City 2nd District Engineering Office

P00401347MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 5,000.000 5,000,000 Cagayan de Oro Coastal Road, (Section 2), Cagayan meters City 2nd District de Oro City Engineering Office / Cagayan de Oro City 2nd District Engineering Office

P00401347MN-EAO 600,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

17. P00401513MN 310204100804000 100,000,000 Cagayan de Oro Diversion Road, (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 6, Cagayan de Oro City

P00401513MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.346 5,673,235 Central Office / Cagayan de Oro Diversion Road, Concrete Road Region X (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 6, Cagayan de Oro City

P00401513MN-CW2 Construction of Concrete Bridge - Construction of Square 1,649.431 81,176,765 Cagayan de Oro Diversion Road, Concrete Bridge meters (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 6, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 155 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401513MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 10,000.000 10,000,000 Central Office / Diversion Road, (Jct. Balubal Sayre meters Region X Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 6, Cagayan de Oro City

P00401513MN-EAO 3,150,000 Central Office / Region X

18. P00401514MN 310204100805000 100,000,000 Cagayan de Oro Diversion Road, (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 7, Cagayan de Oro City

P00401514MN-CW1 Construction of Gravel Road - Construction of Lane Km 2.333 33,775,000 Central Office / Cagayan de Oro Diversion Road, Gravel Road Region X (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 7, Cagayan de Oro City

P00401514MN-CW2 Construction of Concrete Bridge - Construction of Square 572.400 57,900,000 Cagayan de Oro Diversion Road, Concrete Bridge meters (Jct. Balubal Sayre Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 7, Cagayan de Oro City

P00401514MN-ROW ROW Acquisition - Cagayan de Oro ROW Acquisition Square 10,000.000 5,000,000 Central Office / Diversion Road, (Jct. Balubal Sayre meters Region X Highway-Pueblo de Oro, CDO-Old Airport Road Diversion Road (Pueblo de Oro/Jct. CDO-Old Airport Road) Phase II, Package 7, Cagayan de Oro City

P00401514MN-EAO 3,325,000 Central Office / Region X

19. P00401515MN 310204100807000 100,000,000 CDO New Eastern Diversion Road ( Jct. South Diversion Road / Mandumol -Nazareth - Camaman-an -Justo Ramonal - Jct / J. R. Borja -LKKS- BCIR/ Lapasan, Cagayan de Oro City

P00401515MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.640 68,925,125 Central Office / CDO New Eastern Diversion Road ( Concrete Road Region X Jct. South Diversion Road / Mandumol -Nazareth - Camaman-an -Justo Ramonal - Jct / J. R. Borja -LKKS- BCIR/ Lapasan, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 156 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401515MN-ROW ROW Acquisition - CDO New ROW Acquisition Square 16,808.824 28,575,000 Central Office / Eastern Diversion Road ( Jct. South meters Region X Diversion Road / Mandumol -Nazareth - Camaman-an -Justo Ramonal - Jct / J. R. Borja -LKKS- BCIR/ Lapasan, Cagayan de Oro City

P00401515MN-EAO 2,499,875 Central Office / Region X

20. P00401540MN 310204100819000 235,000,000 Eastern Interior Bypass Road (Gusa Puerto/ Jct Sayre Highway), Package 5, Cagayan de Oro City

P00401540MN-CW1 Construction of Concrete Road - Construction of Lane Km 11.640 226,775,000 Central Office / Eastern Interior Bypass Road (Gusa Concrete Road Region X Puerto/ Jct Sayre Highway), Package 5, Cagayan de Oro City

P00401540MN-EAO 8,225,000 Central Office / Region X

Network Development - Off-Carriageway Improvement - Secondary Roads 19,075,000

21. P00400452MN 310208100298000 10,000,000 CDO-Port Rd - K1439 + 490 - K1439 + 839, K1440 + 072 - K1440 + 078

P00400452MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 920.000 9,800,000 Cagayan de Oro Shoulder Paving / Construction - at Improvement: meters City 2nd District Specific Locations along CDO-Port Shoulder Paving / Engineering Office Rd (S00606MN) K1439 + 490 - Construction / Cagayan de Oro K1440 + 078 City 2nd District Engineering Office

P00400452MN-EAO 200,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

22. P00400453MN 310208100299000 9,075,000 Corrales Extension St. - Port Road - K1438 + (-269) - K1438 + (-140), K1439 + 000 - K1439 + 558

P00400453MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 1,882.500 8,893,500 Cagayan de Oro Shoulder Paving / Construction - at Improvement: meters City 2nd District Specific Locations along Corrales Shoulder Paving / Engineering Office Extension St. - Port Road Construction / Cagayan de Oro (S01244MN) K1438 + (-269) - City 2nd District K1439 + 558 Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 157 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400453MN-EAO 181,500 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Network Development - Off-Carriageway Improvement - Tertiary Roads 7,835,000

23. P00400454MN 310209100264000 7,835,000 Jct Natl H-Way-Camp Alagar Rd - (S00579MN) Chainage 000 - Chainage 189

P00400454MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 567.000 7,678,300 Cagayan de Oro Shoulder Paving / Construction - Improvement: meters City 2nd District along Jct Natl H-Way-Camp Alagar Shoulder Paving / Engineering Office Rd (S00579MN) Chainage 0 - Construction / Cagayan de Oro Chainage 189 City 2nd District Engineering Office

P00400454MN-EAO 156,700 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Bridge - Retrofitting/ Strengthening of Permanent Bridges 80,000,000

24. P00400818MN 310303100961000 10,000,000 Bigaan Br. 2 (B01471MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400818MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 9,800,000 Cagayan de Oro Bridge - Bigaan Br. 2 (B01471MN) Strengthening of Bridges City 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Cagayan de Oro City 2nd District Engineering Office

P00400818MN-EAO 200,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

25. P00400921MN 310303100792000 70,000,000 Alae Br. 2 (B01288MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400921MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 67,550,000 Central Office / Bridge - Alae Br. 2 (B01288MN) Strengthening of Bridges Cagayan de Oro along Butuan City-Cagayan de Oro Bridge City 2nd District City-Iligan City Rd Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 158 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400921MN-EAO 2,450,000 Central Office / Cagayan de Oro City 2nd District Engineering Office

Bridge - Widening of Permanent Bridges 50,000,000

26. P00400922MN 310305101104000 50,000,000 Bigaan Br.1 (B01470MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400922MN-CW1 Widening of Bridge - Bigaan Br.1 Widening of Square 744.120 49,000,000 Cagayan de Oro (B01470MN) along Butuan Bridge meters City 2nd District City-Cagayan de Oro City-Iligan City Engineering Office Rd / Cagayan de Oro City 2nd District Engineering Office

P00400922MN-EAO 1,000,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office OO2: Protect Lives and Properties Against Major Floods 12 projects 492,707,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 492,707,000

27. P00420390MN 320101104231000 51,850,000 Construction of Flood Control Structure, Upstream of BCIR along Puerto River, Both Sides, Puerto, Cagayan de Oro city

P00420390MN-CW1 Construction of Flood Mitigation Construction of Lineal 563.000 50,035,250 Central Office / Structure - Construction of Flood Flood Mitigation meters Cagayan de Oro Control Structure, Upstream of Structure City 2nd District BCIR along Puerto River, Both Engineering Office Sides, Puerto, Cagayan de Oro city

P00420390MN-EAO 1,814,750 Central Office / Cagayan de Oro City 2nd District Engineering Office

28. P00420468MN 320101105361000 40,000,000 Construction (Completion) of Flood Control Project/Dike along Cagayan de Oro River (Calacala Gap Section 1), Macasandig, Cagayan de Oro City

P00420468MN-CW1 Construction of Flood Mitigation Construction of Lineal 124.364 39,200,000 Cagayan de Oro Structure - Construction Flood Mitigation meters City 2nd District (Completion) of Flood Control Structure Engineering Office Project/Dike along Cagayan de Oro / Cagayan de Oro River (Calacala Gap Section 1), City 2nd District Macasandig, Cagayan de Oro City Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 159 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420468MN-EAO 800,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

29. P00420469MN 320101105362000 40,000,000 Construction (Completion) of Flood Control Project/Dike along Cagayan de Oro River (Calacala Gap Section 2), Macasandig, Cagayan de Oro City

P00420469MN-CW1 Construction of Flood Mitigation Construction of Lineal 124.364 39,200,000 Cagayan de Oro Structure - Construction Flood Mitigation meters City 2nd District (Completion) of Flood Control Structure Engineering Office Project/Dike along Cagayan de Oro / Cagayan de Oro River (Calacala Gap Section 2), City 2nd District Macasandig, Cagayan de Oro City Engineering Office

P00420469MN-EAO 800,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

30. P00420470MN 320101105363000 40,000,000 Construction of Agusan River Dike (Agusan Side) at Agusan River, Brgy. Agusan, Cagayan de Oro City

P00420470MN-CW1 Construction of Flood Mitigation Construction of Lineal 535.273 39,200,000 Cagayan de Oro Structure - Construction of Agusan Flood Mitigation meters City 2nd District River Dike (Agusan Side) at Agusan Structure Engineering Office River, Brgy. Agusan, Cagayan de / Cagayan de Oro Oro City City 2nd District Engineering Office

P00420470MN-EAO 800,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

31. P00420471MN 320101105364000 45,000,000 Construction of Agusan River Dike (Tablon side) at Agusan River, Brgy. Agusan, Cagayan de Oro City

P00420471MN-CW1 Construction of Flood Mitigation Construction of Lineal 204.068 44,100,000 Cagayan de Oro Structure - Construction of Agusan Flood Mitigation meters City 2nd District River Dike (Tablon side) at Agusan Structure Engineering Office River, Brgy. Agusan, Cagayan de / Cagayan de Oro Oro City City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 160 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420471MN-EAO 900,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

32. P00420472MN 320101105365000 41,730,000 Construction of Alae River Dikes, Upstream Section, Brgy. Bugo, Cagayan de Oro City

P00420472MN-CW1 Construction of Flood Mitigation Construction of Lineal 380.616 40,895,400 Cagayan de Oro Structure - Construction of Alae Flood Mitigation meters City 2nd District River Dikes, Upstream Section, Structure Engineering Office Brgy. Bugo, Cagayan de Oro City / Cagayan de Oro City 2nd District Engineering Office

P00420472MN-EAO 834,600 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

33. P00420473MN 320101105366000 41,690,000 Construction of Bigaan River Dikes, Upstream Section, Quarry Area, Galaxy Section, Brgy. Gusa, Cagayan de Oro City

P00420473MN-CW1 Construction of Flood Mitigation Construction of Lineal 300.000 40,856,200 Cagayan de Oro Structure - Construction of Bigaan Flood Mitigation meters City 2nd District River Dikes, Upstream Section, Structure Engineering Office Quarry Area, Galaxy Section, Brgy. / Cagayan de Oro Gusa, Cagayan de Oro City City 2nd District Engineering Office

P00420473MN-EAO 833,800 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

34. P00420474MN 320101105367000 40,000,000 Construction of Cagayan de Oro Drainage System (Camaman-an Section), Cagayan de Oro City

P00420474MN-CW1 Construction of Flood Mitigation Construction of Lineal 504.600 39,200,000 Cagayan de Oro Structure - Construction of Flood Mitigation meters City 2nd District Cagayan de Oro Drainage System Structure Engineering Office (Camaman-an Section), Cagayan de / Cagayan de Oro Oro City City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 161 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420474MN-EAO 800,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

35. P00420475MN 320101105368000 45,507,000 Construction of Cugman River Dike at Cugman River, Cugman, Cagayan de Oro City

P00420475MN-CW1 Construction of Flood Mitigation Construction of Lineal 245.953 44,596,860 Cagayan de Oro Structure - Construction of Cugman Flood Mitigation meters City 2nd District River Dike at Cugman River, Structure Engineering Office Cugman, Cagayan de Oro City / Cagayan de Oro City 2nd District Engineering Office

P00420475MN-EAO 910,140 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

36. P00420476MN 320101105369000 46,930,000 Construction of Flood Control Structure Upstream of BCIR along Dansoli and Gusa Creeks, Both Sides, Gusa, Cagayan de Oro City

P00420476MN-CW1 Construction of Flood Mitigation Construction of Lineal 815.000 45,991,400 Cagayan de Oro Structure - Construction of Flood Flood Mitigation meters City 2nd District Control Structure Upstream of Structure Engineering Office BCIR along Dansoli and Gusa / Cagayan de Oro Creeks, Both Sides, Gusa, Cagayan City 2nd District de Oro City Engineering Office

P00420476MN-EAO 938,600 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

37. P00420477MN 320101105370000 40,000,000 Construction of Revetment, Alae River, Upstream Section, Cagayan de Oro City

P00420477MN-CW1 Construction of Revetment - Construction of Lineal 600.000 39,200,000 Cagayan de Oro Construction of Revetment, Alae Revetment meters City 2nd District River, Upstream Section, Cagayan Engineering Office de Oro City / Cagayan de Oro City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 162 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420477MN-EAO 800,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

38. P00420478MN 320101105371000 20,000,000 Rehabilitation of Damaged Flood Control Dike along Cagayan de Oro River (Upstream of Balulang-Macasandig Bridge), Calacala-Tibasak-Macasandig, Cagayan de Oro City

P00420478MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Lineal 115.000 19,600,000 Cagayan de Oro Flood Control Structure - Major Repair of meters City 2nd District Rehabilitation of Damaged Flood Flood Control Engineering Office Control Dike along Cagayan de Oro Structure / Cagayan de Oro River (Upstream of City 2nd District Balulang-Macasandig Bridge), Engineering Office Calacala-Tibasak-Macasandig, Cagayan de Oro City

P00420478MN-EAO 400,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office Convergence and Special Support Program 1 projects 21,500,000

Construction/ Improvement of Various Infrastructure in support of National Security 21,500,000

39. P00431687MN 300207100141000 21,500,000 Construction of Regional Police Security and Protection Units (RSPUs) and Presidential Protection Division (PPD) Building under the Police Security and Protection Group (PSPG) - PNP-RSPU, Cagayan de Oro City

P00431687MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 20,747,500 Central Office / Construction of Regional Police Other Facilities Facilities Region X Security and Protection Units (RSPUs) and Presidential Protection Division (PPD) Building under the Police Security and Protection Group (PSPG) - PNP-RSPU, Cagayan de Oro City

P00431687MN-EAO 752,500 Central Office / Region X Local Program 32 projects 782,920,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 28,000,000

40. P00442892MN 300105200312000 28,000,000 Construction of Quality Assurance Building of DPWH Cagayan de Oro 2nd DEO, Makabalan, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 163 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442892MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 27,440,000 Cagayan de Oro Building - Construction of Quality Multi Purpose Buildings City 2nd District Assurance Building of DPWH Building Engineering Office Cagayan de Oro 2nd DEO, / Cagayan de Oro Makabalan, Cagayan de Oro City City 2nd District Engineering Office

P00442892MN-EAO 560,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 214,920,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

41. P00442805MN 300103201610000 214,920,000 Completion of Cagayan de Oro Civic/ Convention Center, Cagayan de Oro City

P00442805MN-CW1 Construction of Other Building - Construction of Number of 1.000 207,397,800 Central Office / Completion of Cagayan de Oro Other Building Buildings Region X Civic/ Convention Center, Cagayan de Oro City

P00442805MN-EAO 7,522,200 Central Office / Region X

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 46,000,000 Program

42. P00441016MN 300104217881000 6,000,000 Construction of Multi-Purpose Building, Brgy. Bugo, Cagayan de Oro City, Misamis Oriental

P00441016MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building, Brgy. Bugo, Building Engineering Office Cagayan de Oro City, Misamis / Cagayan de Oro Oriental City 2nd District Engineering Office

P00441016MN-EAO 60,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

43. P00441017MN 300104217888000 3,000,000 Construction of Multi-Purpose Building, Senior Citizen Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 164 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441017MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building, Senior Building Engineering Office Citizen Building, Brgy. Lapasan, / Cagayan de Oro Cagayan de Oro City, Misamis City 2nd District Oriental Engineering Office

P00441017MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

44. P00441018MN 300104211755000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental

P00441018MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Lapasan, Cagayan de Oro City, / Cagayan de Oro Misamis Oriental City 2nd District Engineering Office

P00441018MN-EAO 20,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

45. P00441019MN 300104217882000 3,000,000 Construction of Multi-Purpose Building, Brgy. Consolacion, Cagayan de Oro City, Misamis Oriental

P00441019MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Consolacion, Cagayan de Oro City, / Cagayan de Oro Misamis Oriental City 2nd District Engineering Office

P00441019MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

46. P00441020MN 300104217880000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Tablon, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 165 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441020MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Cagayan de Oro Building - Construction Multi Purpose Buildings City 2nd District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Tablon, Cagayan de / Cagayan de Oro Oro City, Misamis Oriental City 2nd District Engineering Office

47. P00441021MN 300104211750000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Puerto, Cagayan de Oro City, Misamis Oriental

P00441021MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Cagayan de Oro Building - Construction Multi Purpose Buildings City 2nd District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Puerto, Cagayan de / Cagayan de Oro Oro City, Misamis Oriental City 2nd District Engineering Office

48. P00441022MN 300104217883000 10,000,000 Construction of Multi-Purpose Building, Brgy. Nazareth, Cagayan de Oro City, Misamis Oriental

P00441022MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Nazareth, Cagayan de Oro City, / Cagayan de Oro Misamis Oriental City 2nd District Engineering Office

P00441022MN-EAO 100,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

49. P00443941MN 300104217884000 10,000,000 Construction of Provincial Cooperative Building, Capitol Compound, Tiano Luna Sts., Cagayan de Oro City, Misamis Oriental

P00443941MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Provincial Cooperative Building, Building Engineering Office Capitol Compound, Tiano Luna Sts., / Cagayan de Oro Cagayan de Oro City, Misamis City 2nd District Oriental Engineering Office

P00443941MN-EAO 100,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

50. P00443942MN 300104217885000 5,000,000 Repair/rehabilitation/expansion of Brgy. hall, Brgy. Macasandig, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 166 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443942MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Cagayan de Oro Multi Purpose Building - Major Repair of Buildings City 2nd District Repair/rehabilitation/expansion of Multi Purpose Engineering Office Brgy. hall, Brgy. Macasandig, Building / Cagayan de Oro Cagayan de Oro City City 2nd District Engineering Office

P00443942MN-EAO 50,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

51. P00443943MN 300104217886000 3,000,000 Completion of Multi-Purpose Building (evacuation center), Gusa Elementary School, Brgy. Gusa, Cagayan de Oro City

P00443943MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Cagayan de Oro Building - Completion of Multi Purpose Buildings City 2nd District Multi-Purpose Building (evacuation Building Engineering Office center), Gusa Elementary School, / Cagayan de Oro Brgy. Gusa, Cagayan de Oro City City 2nd District Engineering Office

P00443943MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

52. P00443944MN 300104217887000 2,000,000 Construction of Multi-Purpose Building Brgy. 33, Cagayan De Oro City, Misamis Oriental

P00443944MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Cagayan de Oro Building - Construction of Multi Purpose Buildings City 2nd District Multi-Purpose Building Brgy. 33, Building Engineering Office Cagayan De Oro City, Misamis / Cagayan de Oro Oriental City 2nd District Engineering Office

P00443944MN-EAO 20,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 330,000,000 Program

53. P00444662MN 300107200653000 300,000,000 Construction/ Rehabilitation of Cagayan de Oro River Basins, Cala-Cala Section, Brgy. Macasandig, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 167 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444662MN-CW1 Construction of Flood Mitigation Construction of Lineal 0.000 297,000,000 Central Office / Structure - Construction/ Flood Mitigation meters Region X Rehabilitation of Cagayan de Oro Structure River Basins, Cala-Cala Section, Brgy. Macasandig, Cagayan de Oro City

P00444662MN-EAO 3,000,000 Central Office / Region X

54. P00444677MN 300107200946000 30,000,000 Construction of flood control structure along Bigaan (220m), Brgy. Gusa, Cagayan de Oro City

P00444677MN-CW1 Construction of Flood Mitigation Construction of Lineal 210.200 29,700,000 Cagayan de Oro Structure - Construction of flood Flood Mitigation meters City 2nd District control structure along Bigaan Structure Engineering Office (220m), Brgy. Gusa, Cagayan de / Cagayan de Oro Oro City City 2nd District Engineering Office

P00444677MN-EAO 300,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / 15,000,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

55. P00444754MN 300108200260000 15,000,000 Construction of Flood Control at Brgy. Bugo, Cagayan de Oro City

P00444754MN-CW1 Construction of Drainage Structure Construction of Lineal 95.450 14,700,000 Cagayan de Oro - Construction of Flood Control at Drainage meters City 2nd District Brgy. Bugo, Cagayan de Oro City Structure Engineering Office / Cagayan de Oro City 2nd District Engineering Office

P00444754MN-EAO 300,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure 7,000,000 Program

56. P00441023MN 300109200745000 2,000,000 Construction of Drainage Structure, Brgy. Camaman-An, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 168 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441023MN-CW1 Construction of Drainage Structure Construction of Lineal 192.989 1,980,000 Cagayan de Oro - Construction of Drainage Drainage meters City 2nd District Structure, Brgy. Camaman-An, Structure Engineering Office Cagayan de Oro City, Misamis / Cagayan de Oro Oriental City 2nd District Engineering Office

P00441023MN-EAO 20,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

57. P00441024MN 300109200746000 5,000,000 Construction of Drainage Structure, Brgy. Nazareth, Cagayan de Oro City, Misamis Oriental

P00441024MN-CW1 Construction of Drainage Structure Construction of Lineal 332.650 4,950,000 Cagayan de Oro - Construction of Drainage Drainage meters City 2nd District Structure, Brgy. Nazareth, Cagayan Structure Engineering Office de Oro City, Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441024MN-EAO 50,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 55,000,000 Improvement of Various Infrastructure including Local Projects

58. P00443653MN 300116203201000 15,000,000 Construction/Concreting of Roads at Brgy. Balubal, Cagayan de Oro City

P00443653MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.130 14,700,000 Cagayan de Oro Construction/Concreting of Roads Concrete Road City 2nd District at Brgy. Balubal, Cagayan de Oro Engineering Office City / Cagayan de Oro City 2nd District Engineering Office

P00443653MN-EAO 300,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

59. P00443654MN 300116203202000 15,000,000 Construction/Concreting of Roads at Brgy. Camaman-an, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 169 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443654MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.130 14,700,000 Cagayan de Oro Construction/Concreting of Roads Concrete Road City 2nd District at Brgy. Camaman-an, Cagayan de Engineering Office Oro City / Cagayan de Oro City 2nd District Engineering Office

P00443654MN-EAO 300,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

60. P00443655MN 300116203203000 25,000,000 Construction/Concreting of Roads with Drainage at Brgy. Nazareth, Cagayan de Oro City

P00443655MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.345 24,500,000 Cagayan de Oro Construction/Concreting of Roads Concrete Road City 2nd District with Drainage at Brgy. Nazareth, Engineering Office Cagayan de Oro City / Cagayan de Oro City 2nd District Engineering Office

P00443655MN-EAO 500,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 87,000,000

61. P00441008MN 300117205012000 5,000,000 Construction of Road, Brgy. Macasandig, Cagayan de Oro City, Misamis Oriental

P00441008MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.354 4,950,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 2nd District Macasandig, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441008MN-EAO 50,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

62. P00441009MN 300117207359000 3,000,000 Construction of Road, Brgy. Cugman, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 170 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441009MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.212 2,970,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 2nd District Cugman, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441009MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

63. P00441010MN 300117205010000 4,500,000 Construction of Road, Brgy. Bugo, Cagayan de Oro City, Misamis Oriental

P00441010MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.318 4,455,000 Cagayan de Oro Construction of Road, Brgy. Bugo, Concrete Road City 2nd District Cagayan de Oro City, Misamis Engineering Office Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441010MN-EAO 45,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

64. P00441011MN 300117207358000 4,000,000 Construction of Road, Brgy. Camaman-An, Cagayan de Oro City, Misamis Oriental

P00441011MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.283 3,960,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 2nd District Camaman-An, Cagayan de Oro Engineering Office City, Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441011MN-EAO 40,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

65. P00441012MN 300117205011000 3,000,000 Construction of Road, Brgy. Lapasan, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 171 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441012MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.212 2,970,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 2nd District Lapasan, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441012MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

66. P00441013MN 300117207365000 4,500,000 Construction of Road, Brgy. Tablon, Cagayan de Oro City, Misamis Oriental

P00441013MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.318 4,455,000 Cagayan de Oro Construction of Road, Brgy. Tablon, Concrete Road City 2nd District Cagayan de Oro City, Misamis Engineering Office Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441013MN-EAO 45,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

67. P00441014MN 300117207364000 3,000,000 Construction of Road, Brgy. Puerto, Cagayan de Oro City, Misamis Oriental

P00441014MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.212 2,970,000 Cagayan de Oro Construction of Road, Brgy. Puerto, Concrete Road City 2nd District Cagayan de Oro City, Misamis Engineering Office Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441014MN-EAO 30,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

68. P00441015MN 300117207363000 10,000,000 Construction of Road, Brgy. Nazareth, Cagayan de Oro City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 172 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441015MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.707 9,900,000 Cagayan de Oro Construction of Road, Brgy. Concrete Road City 2nd District Nazareth, Cagayan de Oro City, Engineering Office Misamis Oriental / Cagayan de Oro City 2nd District Engineering Office

P00441015MN-EAO 100,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

69. P00444068MN 300117207360000 20,000,000 Construction/Concreting of Roads, Barangay Macasandig, Cagayan de Oro City

P00444068MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.023 19,800,000 Cagayan de Oro Construction/Concreting of Roads, Concrete Road City 2nd District Barangay Macasandig, Cagayan de Engineering Office Oro City / Cagayan de Oro City 2nd District Engineering Office

P00444068MN-EAO 200,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

70. P00444070MN 300117207361000 20,000,000 Construction/Concreting of Roads, Barangay Bugo, Cagayan de Oro City

P00444070MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.023 19,800,000 Cagayan de Oro Construction/Concreting of Roads, Concrete Road City 2nd District Barangay Bugo, Cagayan de Oro Engineering Office City / Cagayan de Oro City 2nd District Engineering Office

P00444070MN-EAO 200,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

71. P00444072MN 300117207362000 10,000,000 Construction/Concreting of Roads, Barangay Tablon, Cagayan de Oro City

MYPS: 03/03/2020 02:36:37 pm Page 173 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444072MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.853 9,900,000 Cagayan de Oro Construction/Concreting of Roads, Concrete Road City 2nd District Barangay Tablon, Cagayan de Oro Engineering Office City / Cagayan de Oro City 2nd District Engineering Office

P00444072MN-EAO 100,000 Cagayan de Oro City 2nd District Engineering Office / Cagayan de Oro City 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 174 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Camiguin District Engineering Office 52 projects 1,094,610,000 52 projects 1,094,610,000 OO1: Ensure Safe and Reliable National Road System 6 projects 308,500,000

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 60,500,000 National Roads - Secondary Roads

1. P00400348MN 310111100153000 60,500,000 Camiguin Circumferential Rd - K0013 + 012 - K0013 + 512, K0022 + 531.70 - K0022 + 633, K0024 + 796 - K0025 + 350, K0025 + 910.30 - K0026 + 160, K0032 + 522.70 - K0033 + 059, K0044 + 599.60 - K0044 + 656.30, K0045 + 967.20 - K0046 + 621.90, K0050 + 800 - K0051 + 000, K0055 + 300 - K0055 + 412

P00400348MN-CW1 Construction of Drainage Structure Construction of Lineal 2,929.700 58,382,500 Central Office / along Road - at Specific Locations Drainage meters Camiguin District along Camiguin Circumferential Rd Structure along Engineering Office (S00001CG) K0013 + 012 - K0055 + Road 412

P00400348MN-EAO 2,117,500 Central Office / Camiguin District Engineering Office

Network Development - Road Widening - Secondary Roads 150,000,000

2. P00400169MN 310202100518000 150,000,000 Camiguin Circumferential Rd - K0002 + 732 - K0002 + 817, K0002 + 827 - K0002 + 927, K0004 + 649 - K0004 + 850, K0004 + 861 - K0004 + 961, K0009 + 597 - K0009 + 697, K0009 + 716 - K0009 + 812, K0011 + 848 - K0012 + 177, K0012 + 218 - K0012 + 310, K0013 + 797 - K0014 + 358, K0014 + 763 - K0015 + 129, K0015 + 741 - K0017 + 070

P00400169MN-CW1 Road Widening - at Specific Road Widening Lane Km 6.648 135,100,000 Central Office / Locations along Camiguin Region X Circumferential Rd (S00001CG) K0002 + 732 - K0017 + 070

P00400169MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 6.626 10,000,000 Central Office / Locations along Camiguin meters Region X Circumferential Rd (S00001CG)

P00400169MN-EAO 4,900,000 Central Office / Region X

Bridge - Widening of Permanent Bridges 98,000,000

3. P00400797MN 310305101107000 21,500,000 Cantaan Br. (B00012CG) along Camiguin Circumferential Rd

P00400797MN-CW1 Widening of Bridge - Cantaan Br. Widening of Square 138.330 21,070,000 Camiguin District (B00012CG) along Camiguin Bridge meters Engineering Office Circumferential Rd / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 175 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400797MN-EAO 430,000 Camiguin District Engineering Office / Camiguin District Engineering Office

4. P00401414MN 310305101105000 38,000,000 Aguran Br. (B00023CG) along Camiguin Circumferential Rd

P00401414MN-CW1 Widening of Bridge - Aguran Br. Widening of Square 289.062 37,240,000 Camiguin District (B00023CG) along Camiguin Bridge meters Engineering Office Circumferential Rd / Camiguin District Engineering Office

P00401414MN-EAO 760,000 Camiguin District Engineering Office / Camiguin District Engineering Office

5. P00401415MN 310305101106000 21,000,000 Alga Br. (B00017CG) along Camiguin Circumferential Rd

P00401415MN-CW1 Widening of Bridge - Alga Br. Widening of Square 181.260 20,580,000 Camiguin District (B00017CG) along Camiguin Bridge meters Engineering Office Circumferential Rd / Camiguin District Engineering Office

P00401415MN-EAO 420,000 Camiguin District Engineering Office / Camiguin District Engineering Office

6. P00401467MN 310305101108000 17,500,000 Puti Br. (B00018CG) along Camiguin Circumferential Rd

P00401467MN-CW1 Widening of Bridge - Puti Br. Widening of Square 152.640 17,150,000 Camiguin District (B00018CG) along Camiguin Bridge meters Engineering Office Circumferential Rd / Camiguin District Engineering Office

P00401467MN-EAO 350,000 Camiguin District Engineering Office / Camiguin District Engineering Office Convergence and Special Support Program 4 projects 180,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 106,680,000

7. P00431461MN 300203100955000 106,680,000 Cross Country Road from Mainit, Catarman to , Camiguin

P00431461MN-CW1 Construction of Road Slope Construction of Lane Km 8,937.000 102,946,200 Central Office / Protection Structure - Cross Road Slope Region X Country Road from Mainit, Protection Catarman to Mambajao, Camiguin Structure

MYPS: 03/03/2020 02:36:37 pm Page 176 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431461MN-EAO 3,733,800 Central Office / Region X

Construction/ Improvement of Access Roads leading to Trades, Industries and 50,000,000 Economic Zones

8. P00431462MN 300204100592000 50,000,000 Naasag-Yumbing-Agoho Road in support of Agri-business Industries (Coconut, Abaca and Bamboo), Mambajao, Camiguin

P00431462MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.764 49,000,000 Camiguin District Naasag-Yumbing-Agoho Road in Concrete Road Engineering Office support of Agri-business Industries / Camiguin District (Coconut, Abaca and Bamboo), Engineering Office Mambajao, Camiguin

P00431462MN-EAO 1,000,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 23,320,000

9. P00431688MN 300207100143000 7,500,000 Construction of Sagay Municipal Police Station Building, Sagay, Camiguin

P00431688MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 7,237,500 Central Office / Construction of Sagay Municipal Other Facilities Facilities Region X Police Station Building, Sagay, Camiguin

P00431688MN-EAO 262,500 Central Office / Region X

10. P00431692MN 300207100147000 15,820,000 Construction Standard Camiguin PPO Headquarters, Camp Aranas, Mambajao, Camiguin Province

P00431692MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 15,266,300 Central Office / Construction Standard Camiguin Other Facilities Facilities Region X PPO Headquarters, Camp Aranas, Mambajao, Camiguin Province

P00431692MN-EAO 553,700 Central Office / Region X Local Program 42 projects 606,110,000

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 6,000,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

11. P00443237MN 300103202727000 6,000,000 Construction of Various Multipurpose Buildings, Camiguin

P00443237MN-CW1 Construction of Multi Purpose Construction of Number of 2.000 5,880,000 Camiguin District Building - Construction of Various Multi Purpose Buildings Engineering Office Multipurpose Buildings, Camiguin Building / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 177 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443237MN-EAO 120,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 73,000,000 Program

12. P00440960MN 300104217892000 15,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Sagay, Camiguin

P00440960MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. Poblacion, Sagay, Engineering Office Camiguin

P00440960MN-EAO 150,000 Camiguin District Engineering Office / Camiguin District Engineering Office

13. P00440961MN 300104217902000 15,000,000 Improvement of Multi-Purpose Building (Municipal Hall with Grounds), Brgy. Poblacion, Mambajao, Camiguin

P00440961MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 14,850,000 Camiguin District Multi Purpose Building - Major Repair of Buildings Engineering Office Improvement of Multi-Purpose Multi Purpose / Camiguin District Building (Municipal Hall with Building Engineering Office Grounds), Brgy. Poblacion, Mambajao, Camiguin

P00440961MN-EAO 150,000 Camiguin District Engineering Office / Camiguin District Engineering Office

14. P00440962MN 300104217895000 5,000,000 Construction of Multi-Purpose Building, Brgy. Liong, Guinsiliban, Camiguin

P00440962MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building, Brgy. Building / Camiguin District Liong, Guinsiliban, Camiguin Engineering Office

P00440962MN-EAO 50,000 Camiguin District Engineering Office / Camiguin District Engineering Office

15. P00440963MN 300104217891000 2,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. Magting, Mambajao, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 178 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440963MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. Magting, Engineering Office Mambajao, Camiguin

P00440963MN-EAO 25,000 Camiguin District Engineering Office / Camiguin District Engineering Office

16. P00440964MN 300104217889000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Benoni, Mahinog, Camiguin

P00440964MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. Benoni, Mahinog, Engineering Office Camiguin

P00440964MN-EAO 20,000 Camiguin District Engineering Office / Camiguin District Engineering Office

17. P00440965MN 300104217890000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Cantaan, Guinsiliban, Camiguin

P00440965MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. Cantaan, Engineering Office Guinsiliban, Camiguin

P00440965MN-EAO 20,000 Camiguin District Engineering Office / Camiguin District Engineering Office

18. P00440966MN 300104217894000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Tangaro, Catarman, Camiguin

P00440966MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. Tangaro, Catarman, Engineering Office Camiguin

P00440966MN-EAO 20,000 Camiguin District Engineering Office / Camiguin District Engineering Office

19. P00440967MN 300104217897000 1,500,000 Construction of Multi-Purpose Building (Covered Court Satage), Brgy. Benhaan, Mambajao, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 179 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440967MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building (Covered Building / Camiguin District Court Satage), Brgy. Benhaan, Engineering Office Mambajao, Camiguin

P00440967MN-EAO 15,000 Camiguin District Engineering Office / Camiguin District Engineering Office

20. P00440968MN 300104217893000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. San Roque, Mahinog, Camiguin

P00440968MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Camiguin District Building - Construction Multi Purpose Buildings Engineering Office (Completion) of Multi-Purpose Building / Camiguin District Building, Brgy. San Roque, Engineering Office Mahinog, Camiguin

21. P00443945MN 300104217898000 2,000,000 Improvement/Rehabilitation of Multi-Purpose Building (Barangay Hall), Brgy. Poblacion, Sagay, Camiguin

P00443945MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,980,000 Camiguin District Multi Purpose Building - Major Repair of Buildings Engineering Office Improvement/Rehabilitation of Multi Purpose / Camiguin District Multi-Purpose Building (Barangay Building Engineering Office Hall), Brgy. Poblacion, Sagay, Camiguin

P00443945MN-EAO 20,000 Camiguin District Engineering Office / Camiguin District Engineering Office

22. P00443946MN 300104217899000 10,000,000 Construction of Multi-Purpose Building (Dialysis Center), Camiguin General Hospital, Brgy. Poblacion, Mambajao, Camiguin

P00443946MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building (Dialysis Building / Camiguin District Center), Camiguin General Engineering Office Hospital, Brgy. Poblacion, Mambajao, Camiguin

P00443946MN-EAO 100,000 Camiguin District Engineering Office / Camiguin District Engineering Office

23. P00443949MN 300104217901000 15,000,000 Construction of Multi-Purpose Building (Dialysis Center Building), Camiguin General Hospital, Mambajao, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 180 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443949MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building (Dialysis Building / Camiguin District Center Building), Camiguin General Engineering Office Hospital, Mambajao, Camiguin

P00443949MN-EAO 150,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 73,000,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

24. P00442759MN 300106200505000 20,000,000 Construction of Sagay River Control, Sagay, Camiguin

P00442759MN-CW1 Construction of Flood Mitigation Construction of Lineal 500.000 19,600,000 Camiguin District Structure - Construction of Sagay Flood Mitigation meters Engineering Office River Control, Sagay, Camiguin Structure / Camiguin District Engineering Office

P00442759MN-EAO 400,000 Camiguin District Engineering Office / Camiguin District Engineering Office

25. P00443083MN 300106200500000 7,000,000 Construction of River Control at Agoho Box Culvert, Mambajao, Camiguin

P00443083MN-CW1 Construction of Flood Mitigation Construction of Lineal 371.810 6,860,000 Camiguin District Structure - Construction of River Flood Mitigation meters Engineering Office Control at Agoho Box Culvert, Structure / Camiguin District Mambajao, Camiguin Engineering Office

P00443083MN-EAO 140,000 Camiguin District Engineering Office / Camiguin District Engineering Office

26. P00443084MN 300106200501000 6,000,000 Construction of River Control at Catibac Box Culvert, Catarman, Camiguin

P00443084MN-CW1 Construction of Flood Mitigation Construction of Lineal 299.240 5,880,000 Camiguin District Structure - Construction of River Flood Mitigation meters Engineering Office Control at Catibac Box Culvert, Structure / Camiguin District Catarman, Camiguin Engineering Office

P00443084MN-EAO 120,000 Camiguin District Engineering Office / Camiguin District Engineering Office

27. P00443085MN 300106200502000 20,000,000 Construction of River Control at Lumad Box Culvert, Mambajao, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 181 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443085MN-CW1 Construction of Flood Mitigation Construction of Lineal 511.000 19,600,000 Camiguin District Structure - Construction of River Flood Mitigation meters Engineering Office Control at Lumad Box Culvert, Structure / Camiguin District Mambajao, Camiguin Engineering Office

P00443085MN-EAO 400,000 Camiguin District Engineering Office / Camiguin District Engineering Office

28. P00443086MN 300106200503000 10,000,000 Construction of River Control at Tangaro Box Culvert, Catarman, Camiguin

P00443086MN-CW1 Construction of Flood Mitigation Construction of Lineal 251.550 9,800,000 Camiguin District Structure - Construction of River Flood Mitigation meters Engineering Office Control at Tangaro Box Culvert, Structure / Camiguin District Catarman, Camiguin Engineering Office

P00443086MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

29. P00443087MN 300106200504000 10,000,000 Construction of River Control at Yumbing Box Culvert, Mambajao, Camiguin

P00443087MN-CW1 Construction of Flood Mitigation Construction of Lineal 220.000 9,800,000 Camiguin District Structure - Construction of River Flood Mitigation meters Engineering Office Control at Yumbing Box Culvert, Structure / Camiguin District Mambajao, Camiguin Engineering Office

P00443087MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / 68,110,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

30. P00443080MN 300108200261000 8,110,000 Construction of Drainage System at Camiguin Sports Complex

P00443080MN-CW1 Construction of Drainage Structure Construction of Lineal 370.300 7,947,800 Camiguin District - Construction of Drainage System Drainage meters Engineering Office at Camiguin Sports Complex Structure / Camiguin District Engineering Office

P00443080MN-EAO 162,200 Camiguin District Engineering Office / Camiguin District Engineering Office

31. P00444561MN 300108200148000 60,000,000 Construction of River Control/Drainage System Along Camiguin Circumferential Road, Maubog Bridge II, Mambajao, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 182 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444561MN-CW1 Construction of Drainage Structure Construction of Lineal 1,300.000 57,900,000 Central Office / - Construction of River Drainage meters Camiguin District Control/Drainage System Along Structure Engineering Office Camiguin Circumferential Road, Maubog Bridge II, Mambajao, Camiguin

P00444561MN-EAO 2,100,000 Central Office / Camiguin District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 214,000,000 Improvement of Various Infrastructure including Local Projects

32. P00442757MN 300116203210000 5,000,000 Construction of alternate road and bridge connecting Poblacion to Bonbon, Sagay, Camiguin

P00442757MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.970 4,900,000 Camiguin District Construction of alternate road and Concrete Road Engineering Office bridge connecting Poblacion to / Camiguin District Bonbon, Sagay, Camiguin Engineering Office

P00442757MN-EAO 100,000 Camiguin District Engineering Office / Camiguin District Engineering Office

33. P00443097MN 300116203204000 5,000,000 Concreting of Road, Naasag, Mambajao, Camiguin

P00443097MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.680 4,900,000 Camiguin District Concreting of Road, Naasag, Concrete Road Engineering Office Mambajao, Camiguin / Camiguin District Engineering Office

P00443097MN-EAO 100,000 Camiguin District Engineering Office / Camiguin District Engineering Office

34. P00443098MN 300116203205000 10,000,000 Concreting of Road, Tibaong, Baylao, Mambajao, Camiguin

P00443098MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.450 9,800,000 Camiguin District Concreting of Road, Tibaong, Concrete Road Engineering Office Baylao, Mambajao, Camiguin / Camiguin District Engineering Office

P00443098MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

35. P00443099MN 300116203209000 10,000,000 Concreting of Road, Tupsan Pequeño, Mahinog, Camiguin

MYPS: 03/03/2020 02:36:37 pm Page 183 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443099MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.570 9,800,000 Camiguin District Concreting of Road, Tupsan Concrete Road Engineering Office Pequeño, Mahinog, Camiguin / Camiguin District Engineering Office

P00443099MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

36. P00443243MN 300116202170000 170,000,000 Construction of Camiguin Gymnasium, Mambajao, Camiguin

P00443243MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 164,050,000 Central Office / Building - Construction of Camiguin Multi Purpose Buildings Region X Gymnasium, Mambajao, Camiguin Building

P00443243MN-EAO 5,950,000 Central Office / Region X

37. P00443656MN 300116203206000 10,000,000 Construction of Minsua Road, Brgy. San Isidro, Mahinog, Camiguin

P00443656MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.000 9,800,000 Camiguin District Construction of Minsua Road, Brgy. Concrete Road Engineering Office San Isidro, Mahinog, Camiguin / Camiguin District Engineering Office

P00443656MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

38. P00443657MN 300116203207000 2,000,000 Construction of Road, Brgy. Agoho, Mambajao, Camiguin

P00443657MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 1,960,000 Camiguin District Construction of Road, Brgy. Agoho, Concrete Road Engineering Office Mambajao, Camiguin / Camiguin District Engineering Office

P00443657MN-EAO 40,000 Camiguin District Engineering Office / Camiguin District Engineering Office

39. P00443658MN 300116203208000 2,000,000 Construction of Road, Brgy. Poblacion, Mambajao, Camiguin

P00443658MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 1,960,000 Camiguin District Construction of Road, Brgy. Concrete Road Engineering Office Poblacion, Mambajao, Camiguin / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 184 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443658MN-EAO 40,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 72,000,000

40. P00440969MN 300117207371000 5,000,000 Construction of Road, Brgy. San Miguel, Mahinog, Camiguin

P00440969MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.030 4,950,000 Camiguin District Construction of Road, Brgy. San Concrete Road Engineering Office Miguel, Mahinog, Camiguin / Camiguin District Engineering Office

P00440969MN-EAO 50,000 Camiguin District Engineering Office / Camiguin District Engineering Office

41. P00440970MN 300117207369000 3,000,000 Construction of Road, Brgy. Panghiawan, Catarman, Camiguin

P00440970MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.470 2,970,000 Camiguin District Construction of Road, Brgy. Concrete Road Engineering Office Panghiawan, Catarman, Camiguin / Camiguin District Engineering Office

P00440970MN-EAO 30,000 Camiguin District Engineering Office / Camiguin District Engineering Office

42. P00440971MN 300117207372000 5,000,000 Construction of Road, Brgy. Soro-Soro, Mambajao, Camiguin

P00440971MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.660 4,950,000 Camiguin District Construction of Road, Brgy. Concrete Road Engineering Office Soro-Soro, Mambajao, Camiguin / Camiguin District Engineering Office

P00440971MN-EAO 50,000 Camiguin District Engineering Office / Camiguin District Engineering Office

43. P00440972MN 300117207370000 5,000,000 Construction of Road, Brgy. Poblacion, Mahinog, Camiguin

P00440972MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.440 4,950,000 Camiguin District Construction of Road, Brgy. Concrete Road Engineering Office Poblacion, Mahinog, Camiguin / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 185 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440972MN-EAO 50,000 Camiguin District Engineering Office / Camiguin District Engineering Office

44. P00440973MN 300117207366000 4,000,000 Construction of Road, Brgy. Anito, Mambajao, Camiguin

P00440973MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.480 3,960,000 Camiguin District Construction of Road, Brgy. Anito, Concrete Road Engineering Office Mambajao, Camiguin / Camiguin District Engineering Office

P00440973MN-EAO 40,000 Camiguin District Engineering Office / Camiguin District Engineering Office

45. P00444074MN 300117207367000 20,000,000 Concreting of various Roads, Mambajao, Camiguin

P00444074MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.500 19,800,000 Camiguin District Concreting of various Roads, Concrete Road Engineering Office Mambajao, Camiguin / Camiguin District Engineering Office

P00444074MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

46. P00444077MN 300117207368000 30,000,000 Concreting of various Roads, Catarman and Guinsiliban, Camiguin

P00444077MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.000 29,700,000 Camiguin District Concreting of various Roads, Concrete Road Engineering Office Catarman and Guinsiliban, / Camiguin District Camiguin Engineering Office

P00444077MN-EAO 300,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / 100,000,000 Improvement of Various Infrastructure including Local Projects

47. P00442758MN 300120200307000 20,000,000 Rehabilitation of Water Works Systems, Mambajao, Camiguin

P00442758MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 19,600,000 Camiguin District Systems - Rehabilitation of Water Water Supply Water Engineering Office Works Systems, Mambajao, Systems Supply / Camiguin District Camiguin Systems Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 186 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442758MN-EAO 400,000 Camiguin District Engineering Office / Camiguin District Engineering Office

48. P00443138MN 300120200303000 10,000,000 Rehabilitation of Water Works Systems, Mahinog, Camiguin

P00443138MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 9,800,000 Camiguin District Systems - Rehabilitation of Water Water Supply Water Engineering Office Works Systems, Mahinog, Systems Supply / Camiguin District Camiguin Systems Engineering Office

P00443138MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

49. P00443139MN 300120200304000 10,000,000 Rehabilitation of Water Works Systems, Catarman, Camiguin

P00443139MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 9,800,000 Camiguin District Systems - Rehabilitation of Water Water Supply Water Engineering Office Works Systems, Catarman, Systems Supply / Camiguin District Camiguin Systems Engineering Office

P00443139MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

50. P00443140MN 300120200306000 10,000,000 Rehabilitation of Water Works Systems, Guinsiliban, Camiguin

P00443140MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 9,800,000 Camiguin District Systems - Rehabilitation of Water Water Supply Water Engineering Office Works Systems, Guinsiliban, Systems Supply / Camiguin District Camiguin Systems Engineering Office

P00443140MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

51. P00443141MN 300120200308000 10,000,000 Rehabilitation of Water Works Systems, Sagay, Camiguin

P00443141MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 9,800,000 Camiguin District Systems - Rehabilitation of Water Water Supply Water Engineering Office Works Systems, Sagay, Camiguin Systems Supply / Camiguin District Systems Engineering Office

P00443141MN-EAO 200,000 Camiguin District Engineering Office / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 187 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

52. P00444394MN 300120200305000 40,000,000 Rehabilitation of Various Water Systems, Camiguin

P00444394MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 2.000 39,200,000 Camiguin District Systems - Rehabilitation of Various Water Supply Water Engineering Office Water Systems, Camiguin Systems Supply / Camiguin District Systems Engineering Office

P00444394MN-EAO 800,000 Camiguin District Engineering Office / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 188 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Lanao del Norte 1st District Engineering Office 78 projects 2,146,512,000 (FIRST) 18 projects 524,289,000 OO1: Ensure Safe and Reliable National Road System 12 projects 389,942,000

Asset Preservation - Preventive Maintenance - Primary Roads 156,472,000

1. P00400543MN 310101100379000 13,858,000 Iligan City-Marawi City Rd - K1536 + (-982) - K1536 + (-389)

P00400543MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.186 13,580,840 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 1st District Locations along Iligan City-Marawi Road: Asphalt Engineering Office City Rd (S00929MN) K1536 + (-982) Overlay / Lanao del Norte - K1536 + (-389) 1st District Engineering Office

P00400543MN-EAO 277,160 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

2. P00400544MN 310101100380000 48,960,000 Iligan City-Marawi City Rd - K1541 + 989 - K1543 + 000, K1543 + 773 - K1544 + 230, K1544 + 382 - K1545 + 000

P00400544MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 4.190 47,980,800 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 1st District Locations along Iligan City-Marawi Road: Asphalt Engineering Office City Rd (S00929MN) K1541 + 989 - Overlay / Lanao del Norte K1545 + 000 1st District Engineering Office

P00400544MN-EAO 979,200 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

3. P00400545MN 310101100267000 60,599,000 Iligan City-Marawi City Rd - K1537 + 000 - K1539 + 583

P00400545MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 5.186 58,478,035 Central Office / Asphalt Overlay - along Iligan Maintenance of Lanao del Norte City-Marawi City Rd (S00929MN) Road: Asphalt 1st District K1537 + 000 - K1539 + 583 Overlay Engineering Office

P00400545MN-EAO 2,120,965 Central Office / Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 189 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

4. P00401433MN 310101100381000 33,055,000 Iligan City-Marawi City Rd - K1552 + 539 - K1553 + 955

P00401433MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 2.828 32,393,900 Lanao del Norte Asphalt Overlay - along Iligan Maintenance of 1st District City-Marawi City Rd (S00929MN) Road: Asphalt Engineering Office K1552 + 539 - K1553 + 955 Overlay / Lanao del Norte 1st District Engineering Office

P00401433MN-EAO 661,100 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 78,500,000 Collapse, and Landslide - Primary Roads

5. P00400063MN 310107100128000 78,500,000 Iligan City-Marawi City Rd - K1547 + 370 - K1548 + 090

P00400063MN-CW1 Construction of Road Slope Construction of Square 7,850.000 75,752,500 Central Office / Protection Structure - along Iligan Road Slope meters Lanao del Norte City-Marawi City Rd (S00929MN) Protection 1st District K1547 + 370 - K1548 + 090 Structure Engineering Office

P00400063MN-EAO 2,747,500 Central Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 45,652,000 Collapse, and Landslide - Tertiary Roads

6. P00400064MN 310109100487000 27,500,000 Lanao del Norte Interior Circum. Rd (LDNICR) - K1543 + 980 - K1544 + 180, K1544 + 200 - K1544 + 275, K1546 + 030 - K1546 + 200

P00400064MN-CW1 Construction of Road Slope Construction of Square 2,750.000 26,950,000 Lanao del Norte Protection Structure - at Specific Road Slope meters 1st District Locations along Lanao del Norte Protection Engineering Office Interior Circum. Rd (LDNICR) Structure / Lanao del Norte (S00941MN) K1543 + 980 - K1546 + 1st District 200 Engineering Office

P00400064MN-EAO 550,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

7. P00400069MN 310109100488000 12,152,000 Lanao del Norte Interior Circum. Rd (LDNICR) - K1550 + 290 - K1550 + 650

MYPS: 03/03/2020 02:36:37 pm Page 190 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400069MN-CW1 Construction of Road Slope Construction of Square 1,215.200 11,908,960 Lanao del Norte Protection Structure - along Lanao Road Slope meters 1st District del Norte Interior Circum. Rd Protection Engineering Office (LDNICR) (S00909MN) K1550 + 290 Structure / Lanao del Norte - K1550 + 650 1st District Engineering Office

P00400069MN-EAO 243,040 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

8. P00400070MN 310109100486000 6,000,000 Lanao del Norte Interior Circum. Rd (LDNICR) - K1538 + 778 - K1538 + 880

P00400070MN-CW1 Construction of Road Slope Construction of Square 600.000 5,880,000 Lanao del Norte Protection Structure - along Lanao Road Slope meters 1st District del Norte Interior Circum. Rd Protection Engineering Office (LDNICR) (S00941MN) K1538 + 778 Structure / Lanao del Norte - K1538 + 880 1st District Engineering Office

P00400070MN-EAO 120,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 28,725,000 National Roads - Primary Roads

9. P00400355MN 310110100174000 22,220,000 Iligan City-Marawi City Rd - K1545 + 238 - K1545 + 294, K1546 + 433 - K1547 + 320, K1548 + 010, K1548 + 093 - K1548 + 125, K1548 + 923 - K1548 + 950, K1552 + 850

P00400355MN-CW1 Upgrading of Drainage Structure Upgrading of Lineal 1,029.000 21,775,600 Lanao del Norte along Road - at Specific Locations Drainage meters 1st District along Iligan City-Marawi City Rd Structure along Engineering Office (S00929MN) K1545 + 238 - 0 Road / Lanao del Norte 1st District Engineering Office

P00400355MN-EAO 444,400 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

10. P00401434MN 310110100176000 6,505,000 Malabang-Dobleston-Tukuran Rd - K1989 + 449 - K1989 + 689

MYPS: 03/03/2020 02:36:37 pm Page 191 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401434MN-CW1 Construction of Drainage Structure Construction of Lineal 258.000 6,374,900 Lanao del Norte along Road - at Specific Locations Drainage meters 1st District along Structure along Engineering Office Malabang-Dobleston-Tukuran Rd Road / Lanao del Norte (S00931MN) K1989 + 449 - K1989 + 1st District 689 Engineering Office

P00401434MN-EAO 130,100 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 15,000,000 National Roads - Tertiary Roads

11. P00400356MN 310112100230000 15,000,000 Lanao del Norte Interior Circum. Rd (LDNICR) - K1550 + 860 - K1551 + 768

P00400356MN-CW1 Construction of Drainage Structure Construction of Lineal 908.000 14,700,000 Lanao del Norte along Road - along Lanao del Norte Drainage meters 1st District Interior Circum. Rd (LDNICR) Structure along Engineering Office (S00909MN) K1550 + 860 - K1551 + Road / Lanao del Norte 768 1st District Engineering Office

P00400356MN-EAO 300,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Network Development - Road Widening - Primary Roads 65,593,000

12. P00400322MN 310201100487000 65,593,000 Iligan City-Marawi City Rd - K1546 + 000 - K1547 + 669

P00400322MN-CW1 Road Widening - along Iligan Road Widening Lane Km 3.320 63,297,245 Central Office / City-Marawi City Rd (S00929MN) Lanao del Norte K1546 + 000 - K1547 + 669 1st District Engineering Office

P00400322MN-EAO 2,295,755 Central Office / Lanao del Norte 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 1 projects 78,289,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 78,289,000

13. P00420387MN 320101102711000 78,289,000 Construction of Balo-I Plains Flood Control Project (Package 1), Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 192 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420387MN-CW1 Construction of Flood Mitigation Construction of Lineal 714.068 75,548,885 Central Office / Structure - Construction of Balo-I Flood Mitigation meters Lanao del Norte Plains Flood Control Project Structure 1st District (Package 1), Lanao del Norte Engineering Office

P00420387MN-EAO 2,740,115 Central Office / Lanao del Norte 1st District Engineering Office Convergence and Special Support Program 3 projects 36,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 19,000,000

14. P00431477MN 300203100957000 19,000,000 Access Road leading to Mighty Cave, Tagoloan, Lanao del Norte

P00431477MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.086 18,620,000 Lanao del Norte Access Road leading to Mighty Concrete Road 1st District Cave, Tagoloan, Lanao del Norte Engineering Office / Lanao del Norte 1st District Engineering Office

P00431477MN-EAO 380,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 10,000,000 Economic Zones

15. P00431478MN 300204100594000 10,000,000 Landa Sarip Alawi Road connecting Brgy. Landa to Brgy. Sarip Alawi in support of Abaca Industry, Baloi, Lanao del Norte

P00431478MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 9,800,000 Lanao del Norte Landa Sarip Alawi Road connecting Concrete Road 1st District Brgy. Landa to Brgy. Sarip Alawi in Engineering Office support of Abaca Industry, Baloi, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00431478MN-EAO 200,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 7,000,000

16. P00431683MN 300207100135000 7,000,000 Construction of Baloi Municipal Police Station Building, Baloi, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 193 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431683MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,755,000 Central Office / Construction of Baloi Municipal Other Facilities Facilities Region X Police Station Building, Baloi, Lanao del Norte

P00431683MN-EAO 245,000 Central Office / Region X Local Program 2 projects 20,058,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 15,058,000

17. P00442896MN 300105200313000 15,058,000 Construction of Multi-Purpose Building at DPWH Area Equipment Services Compound Del Carmen, Iligan City

P00442896MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,756,840 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building at DPWH Building Engineering Office Area Equipment Services / Lanao del Norte Compound Del Carmen, Iligan City 1st District Engineering Office

P00442896MN-EAO 301,160 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 5,000,000

18. P00444083MN 300117207375000 5,000,000 Concreting of Local Road in Upper Batal Matungao, Lanao Del Norte

P00444083MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.700 4,950,000 Lanao del Norte Concreting of Local Road in Upper Concrete Road 1st District Batal Matungao, Lanao Del Norte Engineering Office / Lanao del Norte 1st District Engineering Office

P00444083MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office LANAO DEL NORTE (SECOND) 60 projects 1,622,223,000 OO1: Ensure Safe and Reliable National Road System 27 projects 1,366,223,000

Asset Preservation - Preventive Maintenance - Primary Roads 16,849,000

19. P00400547MN 310101100382000 16,849,000 Linamon-Zamboanga Rd - K1602 + 102 - K1602 + 823

MYPS: 03/03/2020 02:36:37 pm Page 194 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400547MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.442 16,512,020 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 1st District Locations along Road: Asphalt Engineering Office Linamon-Zamboanga Rd Overlay / Lanao del Norte (S00968MN) K1602 + 102 - K1602 + 1st District 823 Engineering Office

P00400547MN-EAO 336,980 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 170,363,000 Collapse, and Landslide - Primary Roads

20. P00400065MN 310107100166000 34,600,000 Malabang-Dobleston-Tukuran Rd - K1969 + (-080) - K1969 + 175

P00400065MN-CW1 Construction of Road Slope Construction of Square 3,460.000 33,908,000 Lanao del Norte Protection Structure - along Road Slope meters 1st District Malabang-Dobleston-Tukuran Rd Protection Engineering Office (S00931MN) K1969 + (-080) - Structure / Lanao del Norte K1969 + 175 1st District Engineering Office

P00400065MN-EAO 692,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

21. P00400066MN 310107100130000 52,463,000 Malabang-Dobleston-Tukuran Rd - K1972 + 500 - K1972 + 760, K1972 + 910 - K1973 + 115, K1985 + 275 - K1985 + 345

P00400066MN-CW1 Construction of Road Slope Construction of Square 5,246.300 50,626,795 Central Office / Protection Structure - at Specific Road Slope meters Lanao del Norte Locations along Protection 1st District Malabang-Dobleston-Tukuran Rd Structure Engineering Office (S00931MN) K1972 + 500 - K1985 + 345

P00400066MN-EAO 1,836,205 Central Office / Lanao del Norte 1st District Engineering Office

22. P00400067MN 310107100129000 83,300,000 Linamon-Zamboanga Rd - K1617 + 453 - K1617 + 711, K1621 + 760 - K1622 + 291

MYPS: 03/03/2020 02:36:37 pm Page 195 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400067MN-CW1 Construction of Road Slope Construction of Square 8,330.000 80,384,500 Central Office / Protection Structure - at Specific Road Slope meters Lanao del Norte Locations along Protection 1st District Linamon-Zamboanga Rd Structure Engineering Office (S00968MN) K1617 + 453 - K1622 + 291

P00400067MN-EAO 2,915,500 Central Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 50,000,000 Collapse, and Landslide - Tertiary Roads

23. P00400068MN 310109100485000 50,000,000 Dobleston-Butadon Rd - K2006 + 735 - K2007 + 190, K2007 + 840 - K2008 + 000

P00400068MN-CW1 Construction of Road Slope Construction of Square 5,000.000 49,000,000 Lanao del Norte Protection Structure - at Specific Road Slope meters 1st District Locations along Protection Engineering Office Dobleston-Butadon Rd Structure / Lanao del Norte (S00928MN) K2006 + 735 - K2008 + 1st District 000 Engineering Office

P00400068MN-EAO 1,000,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 18,038,000 National Roads - Primary Roads

24. P00400357MN 310110100175000 13,889,000 Linamon-Zamboanga Rd - K1604 + 410 - K1605 + 872

P00400357MN-CW1 Construction of Drainage Structure Construction of Lineal 1,282.000 13,611,220 Lanao del Norte along Road - along Drainage meters 1st District Linamon-Zamboanga Rd Structure along Engineering Office (S00968MN) K1604 + 410 - K1605 + Road / Lanao del Norte 872 1st District Engineering Office

P00400357MN-EAO 277,780 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

25. P00401453MN 310110100177000 4,149,000 Malabang-Dobleston-Tukuran Rd - K1996 + 775

MYPS: 03/03/2020 02:36:37 pm Page 196 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401453MN-CW1 Construction of Drainage Structure Construction of Lineal 20.000 4,066,020 Lanao del Norte along Road - along Drainage meters 1st District Malabang-Dobleston-Tukuran Rd Structure along Engineering Office (S00931MN) K1996 + 775 - 0 Road / Lanao del Norte 1st District Engineering Office

P00401453MN-EAO 82,980 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 23,439,000 National Roads - Tertiary Roads

26. P00400358MN 310112100229000 23,439,000 Bacolod-Madalum Highway - K1565 + 669.50 - K1566 + 124.20, K1569 + 000 - K1571 + 500

P00400358MN-CW1 Construction of Drainage Structure Construction of Lineal 2,954.700 22,970,220 Lanao del Norte along Road - at Specific Locations Drainage meters 1st District along Bacolod-Madalum Highway Structure along Engineering Office (S00937MN) K1565 + 669.50 - Road / Lanao del Norte K1571 + 500 1st District Engineering Office

P00400358MN-EAO 468,780 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Network Development - Road Widening - Primary Roads 174,470,000

27. P00400179MN 310201100606000 24,470,000 Linamon-Zamboanga Rd - K1595 + 000 - k1595 + 546, K1601 + 839 - K1602 + 102

P00400179MN-CW1 Road Widening - at Specific Road Widening Lane Km 1.567 23,980,600 Lanao del Norte Locations along 1st District Linamon-Zamboanga Rd Engineering Office (S00968MN) K1595 + 000 - K1602 + / Lanao del Norte 102 1st District Engineering Office

P00400179MN-EAO 489,400 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

28. P00400180MN 310201100489000 100,000,000 Malabang-Dobleston-Tukuran Rd - K1969 + (-580) - K1969 + 309, K1969 + 337 - K1970 + 081, K1970 + 099 - K1971 + 274

MYPS: 03/03/2020 02:36:37 pm Page 197 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400180MN-CW1 Road Widening - at Specific Road Widening Lane Km 5.596 96,500,000 Central Office / Locations along Lanao del Norte Malabang-Dobleston-Tukuran Rd 1st District (S00931MN) K1969 + (-580) - Engineering Office K1971 + 274

P00400180MN-EAO 3,500,000 Central Office / Lanao del Norte 1st District Engineering Office

29. P00401435MN 310201100607000 50,000,000 Malabang-Dobleston-Tukuran Rd - K1974 + 000 - K1975 + 300

P00401435MN-CW1 Road Widening - along Road Widening Lane Km 2.662 49,000,000 Lanao del Norte Malabang-Dobleston-Tukuran Rd 1st District (S00931MN) K1974 + 000 - K1975 + Engineering Office 300 / Lanao del Norte 1st District Engineering Office

P00401435MN-EAO 1,000,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Network Development - Construction of Missing Links/ New Roads 275,000,000

30. P00401159MN 310205100441000 125,000,000 LDNICR Salvador - Sapad - Nunungan Road, Package 5, Lanao del Norte

P00401159MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.208 120,625,000 Central Office / LDNICR Salvador - Sapad - Concrete Road Region X Nunungan Road, Package 5, Lanao del Norte

P00401159MN-EAO 4,375,000 Central Office / Region X

31. P00401348MN 310205100167000 150,000,000 Tubod-Ganassi Road, Lanao del Norte

P00401348MN-CW1 Construction of Concrete Bridge - Construction of Square 1,335.600 144,750,000 Central Office / Tubod-Ganassi Road, Lanao del Concrete Bridge meters Region X Norte

P00401348MN-EAO 5,250,000 Central Office / Region X

Network Development - Off-Carriageway Improvement - Tertiary Roads 86,849,000

MYPS: 03/03/2020 02:36:37 pm Page 198 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

32. P00400431MN 310209100266000 39,695,000 Dobleston-Butadon Rd - K1994 + (-360) - K1994 + (-050), K1994 + (-463) - K1994 + (-360), K1994 + (-524) - K1994 + (-475), K1994 + 540 - K1994 + 720, K1994 + 721 - K1994 + 970, K1995 + 030 - K1995 + 090, K1995 + 122 - K1995 + 168, K1995 + 170 - K1995 + 260, K1995 + 275 - K1995 + 390, K1995 + 469 - K1995 + 600, K1995 + 626 - K1995 + 690, K1995 + 800 - K1995 + 830, K1995 + 880 - K1996 + 130, K1996 + 205 - K1996 + 260, K1996 + 285 - K1996 + 305, K1996 + 400 - K1996 + 465, K1996 + 590 - K1997 + 200, K1997 + 247 - K1997 + 410, K1997 + 458 - K1998 + 100, K1998 + 130 - K1998 + 520, K1998 + 539 - K1998 + 800, K1998 + 848 - K1999 + 800

P00400431MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 14,492.000 38,901,100 Lanao del Norte Shoulder Paving / Construction - at Improvement: meters 1st District Specific Locations along Shoulder Paving / Engineering Office Dobleston-Butadon Rd Construction / Lanao del Norte (S00928MN) K1994 + (-524) - 1st District K1999 + 800 Engineering Office

P00400431MN-EAO 793,900 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

33. P00400433MN 310209100267000 17,154,000 Lala-Salvador-Tubod Rd - K1604 + 322 - K1604 + 394, K1606 + 214 - K1608 + 048

P00400433MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 5,718.000 16,810,920 Lanao del Norte Shoulder Paving / Construction - at Improvement: meters 1st District Specific Locations along Shoulder Paving / Engineering Office Lala-Salvador-Tubod Rd Construction / Lanao del Norte (S00930MN) K1604 + 322 - K1608 + 1st District 048 Engineering Office

P00400433MN-EAO 343,080 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

34. P00401452MN 310209100265000 30,000,000 Bacolod-Madalum Highway - K1569 + 000 - K1571 + 500

P00401452MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 10,000.000 29,400,000 Lanao del Norte Shoulder Paving / Construction - Improvement: meters 1st District along Bacolod-Madalum Highway Shoulder Paving / Engineering Office (S00937MN) K1569 + 000 - K1571 + Construction / Lanao del Norte 500 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 199 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401452MN-EAO 600,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Network Development - Paving of Unpaved Roads - Tertiary Roads 327,015,000

35. P00400434MN 310212100124000 100,000,000 Bacolod-Madalum Highway - K1575 + 095 - K1576 + 480, K1576 + 632 - K1577 + 550, K1577 + 869 - K1578 + 152, K1578 + 502 - K1579 + 399

P00400434MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 6.966 96,500,000 Central Office / Specific Locations along Unpaved Roads Lanao del Norte Bacolod-Madalum Highway 1st District (S00937MN) K1575 + 095 - K1579 + Engineering Office 399

P00400434MN-EAO 3,500,000 Central Office / Lanao del Norte 1st District Engineering Office

36. P00401397MN 310212100159000 25,530,000 Bacolod-Madalum Highway - K1581 + (-925) - K1581 + (-404), K1581 + (-070) - K1581 + 095

P00401397MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 1.372 25,019,400 Lanao del Norte Specific Locations along Unpaved Roads 1st District Bacolod-Madalum Highway Engineering Office (S00967MN) K1581 + (-925) - / Lanao del Norte K1581 + 095 1st District Engineering Office

P00401397MN-EAO 510,600 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

37. P00401417MN 310212100127000 61,790,000 Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 6370 - Chainage 8870, Chainage 10870 - Chainage 11698

P00401417MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 3.328 59,627,350 Central Office / Specific Locations along Lanao del Unpaved Roads Lanao del Norte Norte Interior Circum. Rd (LDNICR) 1st District (S00970MN) Chainage 6370 - Engineering Office Chainage 11698

P00401417MN-EAO 2,162,650 Central Office / Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 200 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

38. P00401512MN 310212100125000 86,185,000 Bacolod-Madalum Highway - K1581 + 095 - K1583 + 415

P00401512MN-CW1 Paving of Unpaved Roads - at Paving of Lane Km 4.640 83,168,525 Central Office / Specific Locations along Unpaved Roads Lanao del Norte Bacolod-Madalum Highway 1st District (S00967MN) K1581 + 095 - K1583 + Engineering Office 415

P00401512MN-EAO 3,016,475 Central Office / Lanao del Norte 1st District Engineering Office

39. P00406205MN 310212100126000 53,510,000 Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 1664 - Chainage 3105

P00406205MN-CW1 Paving of Unpaved Roads - along Paving of Lane Km 2.882 51,637,150 Central Office / Lanao del Norte Interior Circum. Rd Unpaved Roads Lanao del Norte (LDNICR) (S00970MN) Chainage 1st District 1664 - Chainage 3105 Engineering Office

P00406205MN-EAO 1,872,850 Central Office / Lanao del Norte 1st District Engineering Office

Bridge - Replacement of Permanent Weak Bridges 126,200,000

40. P00400810MN 310302100248000 48,000,000 Quidalos Br. (B00968MN) along Linamon-Zamboanga Rd

P00400810MN-CW1 Replacement of Bridge - Quidalos Replacement of Square 337.200 47,040,000 Lanao del Norte Br. (B00968MN) along Bridge meters 1st District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 1st District Engineering Office

P00400810MN-EAO 960,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

41. P00400815MN 310302100246000 35,000,000 Dalama Br.(FVR) (B01592MN) along Bacolod-Madalum Highway

P00400815MN-CW1 Replacement of Bridge - Dalama Replacement of Square 314.820 34,300,000 Lanao del Norte Br.(FVR) (B01592MN) along Bridge meters 1st District Bacolod-Madalum Highway Engineering Office / Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 201 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400815MN-EAO 700,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

42. P00401475MN 310302100247000 43,200,000 Gumagamot Br. (B00966MN) along Linamon-Zamboanga Rd

P00401475MN-CW1 Replacement of Bridge - Replacement of Square 601.902 42,336,000 Lanao del Norte Gumagamot Br. (B00966MN) along Bridge meters 1st District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 1st District Engineering Office

P00401475MN-EAO 864,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Bridge - Retrofitting/ Strengthening of Permanent Bridges 30,000,000

43. P00400814MN 310303100962000 30,000,000 Koreo Br. (B01005MN) along Malabang-Dobleston-Tukuran Rd

P00400814MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 29,400,000 Lanao del Norte Bridge - Koreo Br. (B01005MN) Strengthening of Bridges 1st District along Bridge Engineering Office Malabang-Dobleston-Tukuran Rd / Lanao del Norte 1st District Engineering Office

P00400814MN-EAO 600,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Bridge - Widening of Permanent Bridges 68,000,000

44. P00400812MN 310305100841000 60,000,000 Butadon Br. (B00969MN) along Linamon-Zamboanga Rd

P00400812MN-CW1 Widening of Bridge - Butadon Br. Widening of Square 481.770 57,900,000 Central Office / (B00969MN) along Bridge meters Lanao del Norte Linamon-Zamboanga Rd 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 202 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400812MN-EAO 2,100,000 Central Office / Lanao del Norte 1st District Engineering Office

45. P00400813MN 310305101109000 8,000,000 Bauyan Br. (B01803MN) along Malabang-Dobleston-Tukuran Rd

P00400813MN-CW1 Widening of Bridge - Bauyan Br. Widening of Square 339.624 7,840,000 Lanao del Norte (B01803MN) along Bridge meters 1st District Malabang-Dobleston-Tukuran Rd Engineering Office / Lanao del Norte 1st District Engineering Office

P00400813MN-EAO 160,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office Convergence and Special Support Program 5 projects 76,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 36,000,000

46. P00431479MN 300203100956000 36,000,000 Access Road leading to Cathedral Falls, Kapatagan, Lanao del Norte

P00431479MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.880 35,280,000 Lanao del Norte Access Road leading to Cathedral Concrete Road 1st District Falls, Kapatagan, Lanao del Norte Engineering Office / Lanao del Norte 1st District Engineering Office

P00431479MN-EAO 720,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 15,000,000 Economic Zones

47. P00431480MN 300204100593000 15,000,000 Barangay Pinuyak-El Salvador-Darumawang Ilaya Road in support to the Calamansi Processing Plant, Lala, Lanao del Norte

P00431480MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.600 14,700,000 Lanao del Norte Barangay Pinuyak-El Concrete Road 1st District Salvador-Darumawang Ilaya Road Engineering Office in support to the Calamansi / Lanao del Norte Processing Plant, Lala, Lanao del 1st District Norte Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 203 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431480MN-EAO 300,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 25,000,000

48. P00431685MN 300207100138000 11,000,000 Construction of Lala Municipal Police Station Building, Lala, Lanao del Norte

P00431685MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 10,615,000 Central Office / Construction of Lala Municipal Other Facilities Facilities Region X Police Station Building, Lala, Lanao del Norte

P00431685MN-EAO 385,000 Central Office / Region X

49. P00431686MN 300207100139000 7,000,000 Construction of Pantao Ragat Municipal Police Station Building, Pantao Ragat, Lanao del Norte

P00431686MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,755,000 Central Office / Construction of Pantao Ragat Other Facilities Facilities Region X Municipal Police Station Building, Pantao Ragat, Lanao del Norte

P00431686MN-EAO 245,000 Central Office / Region X

50. P00431689MN 300207100144000 7,000,000 Construction of Salvador Municipal Police Station Building, Salvador, Lanao del Norte

P00431689MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,755,000 Central Office / Construction of Salvador Municipal Other Facilities Facilities Region X Police Station Building, Salvador, Lanao del Norte

P00431689MN-EAO 245,000 Central Office / Region X Local Program 28 projects 180,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 118,000,000 Program

51. P00440820MN 300104217911000 5,000,000 Construction of Multi-Purpose Building, Brgy. Kahayagan, Kapatagan, Lanao del Norte

P00440820MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Kahayagan, Kapatagan, Lanao del / Lanao del Norte Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 204 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440820MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

52. P00440821MN 300104217910000 5,000,000 Construction of Multi-Purpose Building, Brgy. Campo Islam, Sultan Naga Dimaporo, Lanao del Norte

P00440821MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Campo Islam, Sultan Naga / Lanao del Norte Dimaporo, Lanao del Norte 1st District Engineering Office

P00440821MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

53. P00440822MN 300104217913000 2,000,000 Construction of Multi-Purpose Building, Brgy. Pili, Sapad, Lanao del Norte

P00440822MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Pili, Building Engineering Office Sapad, Lanao del Norte / Lanao del Norte 1st District Engineering Office

P00440822MN-EAO 20,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

54. P00440823MN 300104217903000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Dangulaan, Sultan Naga Dimaporo, Lanao del Norte

P00440823MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Lanao del Norte Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Dangulaan, Sultan / Lanao del Norte Naga Dimaporo, Lanao del Norte 1st District Engineering Office

55. P00440825MN 300104217905000 1,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Pikinit, Sultan Naga Dimaporo, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 205 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440825MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Lanao del Norte Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Pikinit, Sultan Naga / Lanao del Norte Dimaporo, Lanao del Norte 1st District Engineering Office

56. P00440826MN 300104217912000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lantawan, Sultan Naga Dimaporo, Lanao del Norte

P00440826MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Lantawan, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00440826MN-EAO 20,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

57. P00440827MN 300104217908000 5,000,000 Construction of Multi-Purpose Building, Brgy. Bauyan, Sultan Naga Dimaporo, Lanao del Norte

P00440827MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Bauyan, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00440827MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

58. P00440828MN 300104217916000 3,000,000 Construction of Multi-Purpose Building, Brgy. Ramain, Sultan Naga Dimaporo, Lanao del Norte

P00440828MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Ramain, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 206 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440828MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

59. P00440829MN 300104217909000 3,000,000 Construction of Multi-Purpose Building, Brgy. Calibao, Sultan Naga Dimaporo, Lanao del Norte

P00440829MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Calibao, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00440829MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

60. P00440830MN 300104217917000 3,000,000 Construction of Multi-Purpose Building, Brgy. Topocon, Sultan Naga Dimaporo, Lanao del Norte

P00440830MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Topocon, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00440830MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

61. P00440831MN 300104217919000 1,000,000 Rehabilitation of Multi-Purpose Building, Brgy. Tenazas, Lala, Lanao del Norte

P00440831MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,000,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 1st District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. Tenazas, Lala, Lanao Building / Lanao del Norte del Norte 1st District Engineering Office

62. P00440832MN 300104217915000 5,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Tangcal, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 207 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440832MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Tangcal, Lanao del / Lanao del Norte Norte 1st District Engineering Office

P00440832MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

63. P00440833MN 300104217914000 10,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Magsaysay, Lanao del Norte

P00440833MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Magsaysay, Lanao del / Lanao del Norte Norte 1st District Engineering Office

P00440833MN-EAO 100,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

64. P00440834MN 300104217918000 15,000,000 Construction of Multi-Purpose Building, Brgy. Tambo, Munai, Lanao del Norte

P00440834MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Tambo, Munai, Lanao del Norte / Lanao del Norte 1st District Engineering Office

P00440834MN-EAO 150,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

65. P00443950MN 300104217904000 10,000,000 Construction of Multi-Purpose Building, Brgy. Tambo, Munai, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 208 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443950MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Tambo, Munai, Lanao del Norte / Lanao del Norte 1st District Engineering Office

P00443950MN-EAO 100,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

66. P00443952MN 300104217920000 5,000,000 Rehabilitation of Multi-Purpose Building, Brgy. Poblacion, Sapad, Lanao del Norte

P00443952MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 1st District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. Poblacion, Sapad, Building / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00443952MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

67. P00443954MN 300104217921000 20,000,000 Construction of Multi-Purpose Building (evacuation center) Brgy. Maranding Lala, Lanao del Norte

P00443954MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building (evacuation Building Engineering Office center) Brgy. Maranding Lala, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00443954MN-EAO 200,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

68. P00443955MN 300104217922000 5,000,000 Construction of Multi-Purpose Building at Sultan Barodi National High School, Kapatagan, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 209 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443955MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building at Sultan Building Engineering Office Barodi National High School, / Lanao del Norte Kapatagan, Lanao del Norte 1st District Engineering Office

P00443955MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

69. P00443957MN 300104217923000 10,000,000 Construction of Multi-Purpose Building, Calube Integrated High School, Calube, Sultan Naga Dimaporo, Lanao del Norte

P00443957MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Calube Building Engineering Office Integrated High School, Calube, / Lanao del Norte Sultan Naga Dimaporo, Lanao del 1st District Norte Engineering Office

P00443957MN-EAO 100,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

70. P00443959MN 300104217924000 5,000,000 Construction of Multi-Purpose Building (Covered Court), Brgy. La Libertad, Kapatagan, Lanao del Norte

P00443959MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. La Libertad, / Lanao del Norte Kapatagan, Lanao del Norte 1st District Engineering Office

P00443959MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

71. P00443960MN 300104217925000 2,000,000 Construction of Multi-Purpose Building, Tangcal, Lanao del Sur

MYPS: 03/03/2020 02:36:37 pm Page 210 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443960MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Tangcal, Building Engineering Office Lanao del Sur / Lanao del Norte 1st District Engineering Office

P00443960MN-EAO 20,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 25,000,000 Program

72. P00444678MN 300107200947000 10,000,000 Construction of Flood Control and Drainage Structure, Brgy. Pinuyak, Lala, Lanao Del Norte

P00444678MN-CW1 Construction of Flood Mitigation Construction of Lineal 65.000 9,900,000 Lanao del Norte Structure - Construction of Flood Flood Mitigation meters 1st District Control and Drainage Structure, Structure Engineering Office Brgy. Pinuyak, Lala, Lanao Del / Lanao del Norte Norte 1st District Engineering Office

P00444678MN-EAO 100,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

73. P00444679MN 300107200948000 15,000,000 Construction of Flood Control, Brgy. Pendolunan, Munai, Lanao del Norte

P00444679MN-CW1 Construction of Flood Mitigation Construction of Lineal 256.600 14,850,000 Lanao del Norte Structure - Construction of Flood Flood Mitigation meters 1st District Control, Brgy. Pendolunan, Munai, Structure Engineering Office Lanao del Norte / Lanao del Norte 1st District Engineering Office

P00444679MN-EAO 150,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 8,000,000

74. P00444079MN 300117207373000 5,000,000 Concreting of Unpaved Road leading to Pandanan Cemetery, Brgy. Pandanan, Sultan Naga Dimaporo, Lanao Del Norte

MYPS: 03/03/2020 02:36:37 pm Page 211 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444079MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.450 4,950,000 Lanao del Norte Concreting of Unpaved Road Concrete Road 1st District leading to Pandanan Cemetery, Engineering Office Brgy. Pandanan, Sultan Naga / Lanao del Norte Dimaporo, Lanao Del Norte 1st District Engineering Office

P00444079MN-EAO 50,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

75. P00444762MN 300117207374000 3,000,000 Concreting of Local Roads, Magsaysay, Lanao Del Norte

P00444762MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.400 2,970,000 Lanao del Norte Concreting of Local Roads, Concrete Road 1st District Magsaysay, Lanao Del Norte Engineering Office / Lanao del Norte 1st District Engineering Office

P00444762MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Local Roads and Bridges - Local Bridges - Local Infrastructure Program 2,000,000

76. P00440824MN 300119200398000 2,000,000 Construction of Foot Bridge, Brgy. Pandanan, Sultan Naga Dimaporo, Lanao del Norte

P00440824MN-CW1 Construction of Bridge - Construction of Square 28.000 1,980,000 Lanao del Norte Construction of Foot Bridge, Brgy. Bridge meters 1st District Pandanan, Sultan Naga Dimaporo, Engineering Office Lanao del Norte / Lanao del Norte 1st District Engineering Office

P00440824MN-EAO 20,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 27,000,000

77. P00440835MN 300121200941000 2,000,000 Construction of Water Supply - Level II, Brgy. La Libertad, Kapatagan, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 212 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440835MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Lanao del Norte Systems - Construction of Water Water Supply Water 1st District Supply - Level II, Brgy. La Libertad, Systems Supply Engineering Office Kapatagan, Lanao del Norte Systems / Lanao del Norte 1st District Engineering Office

P00440835MN-EAO 20,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

78. P00443148MN 300121200942000 25,000,000 Construction of Water System (Level II), Brgy. Matampay, Munai, Lanao del Norte

P00443148MN-CW1 Construction of Water Supply Construction of Number of 1.000 24,750,000 Lanao del Norte Systems - Construction of Water Water Supply Water 1st District System (Level II), Brgy. Matampay, Systems Supply Engineering Office Munai, Lanao del Norte Systems / Lanao del Norte 1st District Engineering Office

P00443148MN-EAO 250,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 213 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Lanao del Norte 2nd District Engineering Office 103 projects 2,893,163,000 ILIGAN CITY 49 projects 1,669,163,000 OO1: Ensure Safe and Reliable National Road System 18 projects 1,070,163,000

Asset Preservation - Preventive Maintenance - Primary Roads 41,512,000

1. P00400550MN 310101100383000 32,800,000 Misamis Oriental-Ma Cristina Bdry Rd - K1513 + 804 - K1514 + 101, K1518 + 545 - K1519 + 757

P00400550MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 3.026 32,144,000 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 2nd District Locations along Misamis Road: Asphalt Engineering Office Oriental-Ma Cristina Bdry Rd Overlay / Lanao del Norte (S01378MN) K1513 + 804 - K1519 + 2nd District 757 Engineering Office

P00400550MN-EAO 656,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

2. P00400551MN 310101100384000 8,712,000 Overton-Buru-un Bdry Rd - K1532 + (-573) - K1532 + (-118)

P00400551MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.910 8,537,760 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 2nd District Locations along Overton-Buru-un Road: Asphalt Engineering Office Bdry Rd (S00954MN) K1532 + Overlay / Lanao del Norte (-573) - K1532 + (-118) 2nd District Engineering Office

P00400551MN-EAO 174,240 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Preventive Maintenance - Tertiary Roads 35,527,000

3. P00400549MN 310103100597000 8,024,000 Lanao del Norte Interior Circum. Rd (LDNICR) - K1527 + (-541) - K1527 + (-309)

P00400549MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.732 7,863,520 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 2nd District Locations along Lanao del Norte Road: Asphalt Engineering Office Interior Circum. Rd (LDNICR) Overlay / Lanao del Norte (S00940MN) K1527 + (-541) - 2nd District K1527 + (-309) Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 214 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400549MN-EAO 160,480 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

4. P00400552MN 310103100598000 27,503,000 Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1519 + (-023) - K1519 + 810, K1520 + 457 - K1520 + 698

P00400552MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 2.148 26,952,940 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 2nd District Locations along Sta Road: Asphalt Engineering Office Felomina-Bonbonon-Digkilaan-Rog Overlay / Lanao del Norte ongon Rd (S00946MN) K1519 + 2nd District (-023) - K1520 + 698 Engineering Office

P00400552MN-EAO 550,060 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 8,914,000 Roads - Tertiary Roads

5. P00401436MN 310106100529000 8,914,000 Sta Felomina-Bonbonon-Digkilaan-Rogongon Rd - K1529 + 244 - K1529 + 514

P00401436MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 0.540 5,877,060 Lanao del Norte Pavement - at Specific Locations Concrete 2nd District along Sta Pavement Engineering Office Felomina-Bonbonon-Digkilaan-Rog / Lanao del Norte ongon Rd (S00946MN) K1529 + 244 2nd District - K1529 + 514 Engineering Office

P00401436MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 4,025.700 2,917,000 Lanao del Norte Locations along Sta meters 2nd District Felomina-Bonbonon-Digkilaan-Rog Engineering Office ongon Rd (S00946MN) / Lanao del Norte 2nd District Engineering Office

P00401436MN-EAO 119,940 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 8,167,000 National Roads - Primary Roads

6. P00400361MN 310110100179000 8,167,000 Misamis Oriental-Ma Cristina Bdry Rd - K1513 + 050 - K1513 + 302, K1517 + 527 - K1517 + 767 MYPS: 03/03/2020 02:36:37 pm Page 215 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400361MN-CW1 Construction of Drainage Structure Construction of Lineal 511.000 8,003,660 Lanao del Norte along Road - at Specific Locations Drainage meters 2nd District along Misamis Oriental-Ma Cristina Structure along Engineering Office Bdry Rd (S01378MN) K1513 + 050 - Road / Lanao del Norte K1517 + 767 2nd District Engineering Office

P00400361MN-EAO 163,340 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 53,543,000

7. P00400255MN 310201100611000 28,853,000 Misamis Oriental-Ma Cristina Bdry Rd - K1526 + 488 - K1527 + 263, K1528 + 510 - K1529 + 000

P00400255MN-CW1 Road Widening - at Specific Road Widening Lane Km 1.147 17,880,100 Lanao del Norte Locations along Misamis 2nd District Oriental-Ma Cristina Bdry Rd Engineering Office (S01378MN) K1526 + 488 - K1529 + / Lanao del Norte 000 2nd District Engineering Office

P00400255MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 10,000.000 10,608,000 Lanao del Norte Locations along Misamis meters 2nd District Oriental-Ma Cristina Bdry Rd Engineering Office (S01378MN) / Lanao del Norte 2nd District Engineering Office

P00400255MN-EAO 364,900 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

8. P00400256MN 310201100612000 24,690,000 Overton-Buru-un Bdry Rd - K1534 + 840 - K1535 + 064, K1535 + 073 - K1535 + 877

P00400256MN-CW1 Road Widening - at Specific Road Widening Lane Km 1.150 19,296,200 Lanao del Norte Locations along Overton-Buru-un 2nd District Bdry Rd (S00954MN) K1534 + 840 - Engineering Office K1535 + 877 / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 216 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400256MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 10,000.000 5,000,000 Lanao del Norte Locations along Overton-Buru-un meters 2nd District Bdry Rd (S00954MN) Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400256MN-EAO 393,800 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 661,000,000

9. P00401229MN 310204100506000 81,000,000 Iligan City Circumferencial Road (C3), Phase II, Iligan City

P00401229MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.882 62,725,000 Central Office / Iligan City Circumferencial Road Concrete Road Lanao del Norte (C3), Phase II, Iligan City 2nd District Engineering Office

P00401229MN-ROW ROW Acquisition - Iligan City ROW Acquisition Square 28,600.000 16,000,000 Central Office / Circumferencial Road (C3), Phase II, meters Lanao del Norte Iligan City 2nd District Engineering Office

P00401229MN-EAO 2,275,000 Central Office / Lanao del Norte 2nd District Engineering Office

10. P00401230MN 310204100820000 100,000,000 Iligan City Circumferential Road Extension to Jct. Sta. Felomina-Bonbonono-Digkilaan-Rogongon Road, Iligan City

P00401230MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.000 96,500,000 Central Office / Iligan City Circumferential Road Concrete Road Region X Extension to Jct. Sta. Felomina-Bonbonono-Digkilaan-Ro gongon Road, Iligan City

P00401230MN-EAO 3,500,000 Central Office / Region X

11. P00401233MN 310204100821000 120,000,000 Iligan City Coastal Bypass Road, Package 5, Iligan City

P00401233MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.587 115,800,000 Central Office / Iligan City Coastal Bypass Road, Concrete Road Region X Package 5, Iligan City

P00401233MN-EAO 4,200,000 Central Office / Region X

MYPS: 03/03/2020 02:36:37 pm Page 217 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

12. P00401234MN 310204100822000 120,000,000 Iligan City Coastal Bypass Road, Package 6, Iligan City

P00401234MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.494 115,800,000 Central Office / Iligan City Coastal Bypass Road, Concrete Road Region X Package 6, Iligan City

P00401234MN-EAO 4,200,000 Central Office / Region X

13. P00401554MN 310204100808000 120,000,000 CDOC-Iligan Hinterland Road (Jct. CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 2, Iligan City

P00401554MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.032 115,800,000 Central Office / CDOC-Iligan Hinterland Road (Jct. Concrete Road Region X CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 2, Iligan City

P00401554MN-EAO 4,200,000 Central Office / Region X

14. P00401555MN 310204100809000 120,000,000 CDOC-Iligan Hinterland Road (Jct. CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 3, Iligan City

P00401555MN-CW1 Construction of Gravel Road - Construction of Lane Km 2.364 115,800,000 Central Office / CDOC-Iligan Hinterland Road (Jct. Gravel Road Region X CDO-Kibaritan Road/Dansolihon-Jct. IBR/Rogongon, Iligan City) Alternate Road, Package 3, Iligan City

P00401555MN-EAO 4,200,000 Central Office / Region X

Network Development - Construction of Missing Links/ New Roads 240,000,000

15. P00401231MN 310205100435000 120,000,000 Iligan City - Cagayan de Oro City Alternate Route (Digkilaan - Bulua Section), Package 3, Lanao del Norte

P00401231MN-CW1 Construction of Gravel Road - Iligan Construction of Lane Km 3.960 115,800,000 Central Office / City - Cagayan de Oro City Gravel Road Region X Alternate Route (Digkilaan - Bulua Section), Package 3, Lanao del Norte

P00401231MN-EAO 4,200,000 Central Office / Region X

16. P00401232MN 310205100436000 120,000,000 Iligan City - Cagayan de Oro City Alternate Route (Digkilaan - Bulua Section), Package 4, Lanao del Norte MYPS: 03/03/2020 02:36:37 pm Page 218 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401232MN-CW1 Construction of Gravel Road - Iligan Construction of Lane Km 1.883 115,800,000 Central Office / City - Cagayan de Oro City Gravel Road Region X Alternate Route (Digkilaan - Bulua Section), Package 4, Lanao del Norte

P00401232MN-EAO 4,200,000 Central Office / Region X

Bridge - Retrofitting/ Strengthening of Permanent Bridges 10,000,000

17. P00400923MN 310303100963000 10,000,000 Mandulog Br. 2 (B00881MN) along Misamis Oriental-Ma Cristina Bdry Rd

P00400923MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 9,800,000 Lanao del Norte Bridge - Mandulog Br. 2 Strengthening of Bridges 2nd District (B00881MN) along Misamis Bridge Engineering Office Oriental-Ma Cristina Bdry Rd / Lanao del Norte 2nd District Engineering Office

P00400923MN-EAO 200,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Bridge - Widening of Permanent Bridges 11,500,000

18. P00401553MN 310305101111000 11,500,000 Buru-un Br. (B00935MN) along Overton-Buru-un Bdry Rd

P00401553MN-CW1 Widening of Bridge - Buru-un Br. Widening of Square 82.998 11,270,000 Lanao del Norte (B00935MN) along Bridge meters 2nd District Overton-Buru-un Bdry Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00401553MN-EAO 230,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office OO2: Protect Lives and Properties Against Major Floods 1 projects 50,000,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 50,000,000

19. P00420025MN 320101105372000 50,000,000 Construction of Esplanade along Mandulog River, Brgy. Hinaplaon, Iligan City

MYPS: 03/03/2020 02:36:37 pm Page 219 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420025MN-CW1 Construction of Flood Mitigation Construction of Lineal 456.046 49,000,000 Lanao del Norte Structure - Construction of Flood Mitigation meters 2nd District Esplanade along Mandulog River, Structure Engineering Office Brgy. Hinaplaon, Iligan City / Lanao del Norte 2nd District Engineering Office

P00420025MN-EAO 1,000,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office Convergence and Special Support Program 3 projects 205,500,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 40,500,000

20. P00431573MN 300203101316000 40,500,000 Access Road leading to Dodiongan Falls, Brgy. Bonbonon, Iligan City, Lanao Del Norte

P00431573MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.240 39,690,000 Lanao del Norte Access Road leading to Dodiongan Concrete Road 2nd District Falls, Brgy. Bonbonon, Iligan City, Engineering Office Lanao Del Norte / Lanao del Norte 2nd District Engineering Office

P00431573MN-EAO 810,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 165,000,000 Economic Zones

21. P00431567MN 300204100423000 65,000,000 Barangay Bunawan Road to Barangay Kabacsanan in support to the Coconut Processing Industry, Iligan City, Lanao del Norte

P00431567MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.200 62,725,000 Central Office / Barangay Bunawan Road to Concrete Road Lanao del Norte Barangay Kabacsanan in support to 2nd District the Coconut Processing Industry, Engineering Office Iligan City, Lanao del Norte

P00431567MN-EAO 2,275,000 Central Office / Lanao del Norte 2nd District Engineering Office

22. P00431568MN 300204100426000 100,000,000 Runay Bridge connecting Barangay Lanipao and Iligan-Bukidnon Road in support to the Agri-business and Manufacturing Industries, Iligan City, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 220 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431568MN-CW1 Construction of Concrete Bridge - Construction of Square 897.201 96,500,000 Central Office / Runay Bridge connecting Barangay Concrete Bridge meters Lanao del Norte Lanipao and Iligan-Bukidnon Road 2nd District in support to the Agri-business and Engineering Office Manufacturing Industries, Iligan City, Lanao del Norte

P00431568MN-EAO 3,500,000 Central Office / Lanao del Norte 2nd District Engineering Office Local Program 27 projects 343,500,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 77,500,000 Program

23. P00440980MN 300104217932000 5,000,000 Construction of Multi-Purpose Building, Brgy. Digkilaan, Iligan City, Lanao del Norte

P00440980MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Digkilaan, Iligan City, Lanao del / Lanao del Norte Norte 2nd District Engineering Office

P00440980MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

24. P00440981MN 300104217956000 4,000,000 Rehabilitation of Multi-Purpose Building, Brgy. Santa Filomena, Iligan City, Lanao del Norte

P00440981MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 3,960,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. Santa Filomena, Building / Lanao del Norte Iligan City, Lanao del Norte 2nd District Engineering Office

P00440981MN-EAO 40,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

25. P00440982MN 300104217955000 5,000,000 Rehabilitation of Multi-Purpose Building, Brgy. San Miguel, Iligan City, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 221 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440982MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. San Miguel, Iligan Building / Lanao del Norte City, Lanao del Norte 2nd District Engineering Office

P00440982MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

26. P00440983MN 300104217958000 5,000,000 Rehabilitation/Improvement of Multi-Purpose Building (Ubhai), Brgy. Tubod, Iligan City, Lanao del Norte

P00440983MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation/Improvement of Multi Purpose Engineering Office Multi-Purpose Building (Ubhai), Building / Lanao del Norte Brgy. Tubod, Iligan City, Lanao del 2nd District Norte Engineering Office

P00440983MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

27. P00440984MN 300104217969000 3,000,000 Rehabilitation of Multi-Purpose Building, Villa Verde Elementary School, Brgy. Villa Verde, Iligan City, Lanao del Norte

P00440984MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 2,970,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Villa Verde Elementary Building / Lanao del Norte School, Brgy. Villa Verde, Iligan 2nd District City, Lanao del Norte Engineering Office

P00440984MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

28. P00440985MN 300104217950000 3,000,000 Construction of Multi-Purpose Building, Brgy. Tubod, Iligan City, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 222 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440985MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Tubod, Iligan City, Lanao del Norte / Lanao del Norte 2nd District Engineering Office

P00440985MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

29. P00440986MN 300104217953000 10,000,000 Expansion/Improvement of Multi-Purpose Building (Barangay Hall), Brgy. Acmac, Iligan City, Lanao del Norte

P00440986MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 9,900,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Expansion/Improvement of Multi Purpose Engineering Office Multi-Purpose Building (Barangay Building / Lanao del Norte Hall), Brgy. Acmac, Iligan City, 2nd District Lanao del Norte Engineering Office

P00440986MN-EAO 100,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

30. P00440987MN 300104217954000 10,000,000 Rehabilitation of Multi-Purpose Building, Brgy. Puga-An, Iligan City, Lanao del Norte

P00440987MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 2.000 9,900,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. Puga-An, Iligan City, Building / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440987MN-EAO 100,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

31. P00440988MN 300104217959000 1,500,000 Rehabilitation/Improvement of Multi-Purpose Building including Perimeter Fence at Miguel Obach Memorial School, Brgy. Ubaldo Laya, Iligan City, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 223 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440988MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,485,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation/Improvement of Multi Purpose Engineering Office Multi-Purpose Building including Building / Lanao del Norte Perimeter Fence at Miguel Obach 2nd District Memorial School, Brgy. Ubaldo Engineering Office Laya, Iligan City, Lanao del Norte

P00440988MN-EAO 15,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

32. P00440989MN 300104217957000 2,500,000 Rehabilitation of Multi-Purpose Building, Brgy. Suarez, Iligan City, Lanao del Norte

P00440989MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 2,475,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Brgy. Suarez, Iligan City, Building / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440989MN-EAO 25,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

33. P00443962MN 300104217960000 3,000,000 Rehabilitation of Multi-Purpose Building in Brgy. Acmac, Iligan City

P00443962MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 2,970,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building in Brgy. Acmac, Iligan City Building / Lanao del Norte 2nd District Engineering Office

P00443962MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

34. P00443964MN 300104217961000 10,000,000 Construction/Improvement of Multi-Purpose Building, Brgy. Suarez, Iligan City, Phase I

MYPS: 03/03/2020 02:36:37 pm Page 224 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443964MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Lanao del Norte Building - Multi Purpose Buildings 2nd District Construction/Improvement of Building Engineering Office Multi-Purpose Building, Brgy. / Lanao del Norte Suarez, Iligan City, Phase I 2nd District Engineering Office

P00443964MN-EAO 100,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

35. P00443967MN 300104217963000 5,000,000 Construction/Improvement of Multi-Purpose Building, Brgy. Suarez, Iligan City

P00443967MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Multi Purpose Buildings 2nd District Construction/Improvement of Building Engineering Office Multi-Purpose Building, Brgy. / Lanao del Norte Suarez, Iligan City 2nd District Engineering Office

P00443967MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

36. P00443972MN 300104217966000 3,500,000 Construction of Multi-Purpose Building, Acelo badellessr. Memorial School Brgy. Tipanoy, Iligan City, Lanao del Norte

P00443972MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Acelo Building Engineering Office badellessr. Memorial School Brgy. / Lanao del Norte Tipanoy, Iligan City, Lanao del 2nd District Norte Engineering Office

P00443972MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

37. P00443974MN 300104217967000 2,000,000 Construction of Mess Hall at Slaughter House Compound Merila, Brgy. Ubaldo, Laya, Iligan City, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 225 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443974MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Lanao del Norte Building - Construction of Mess Multi Purpose Buildings 2nd District Hall at Slaughter House Compound Building Engineering Office Merila, Brgy. Ubaldo, Laya, Iligan / Lanao del Norte City, Lanao del Norte 2nd District Engineering Office

P00443974MN-EAO 20,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

38. P00443975MN 300104217968000 5,000,000 Construction/Repair/Rehabilitation of Multi-Purpose Building, Iligan City, Lanao del Norte

P00443975MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Multi Purpose Buildings 2nd District Construction/Repair/Rehabilitation Building Engineering Office of Multi-Purpose Building, Iligan / Lanao del Norte City, Lanao del Norte 2nd District Engineering Office

P00443975MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 45,000,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

39. P00444623MN 300106200506000 45,000,000 Construction of Flood Mitigation Facilities along Mandulog River at Brgy. Mandulog, Iligan City, Package 3

P00444623MN-CW1 Construction of Flood Mitigation Construction of Lineal 201.400 44,100,000 Lanao del Norte Structure - Construction of Flood Flood Mitigation meters 2nd District Mitigation Facilities along Structure Engineering Office Mandulog River at Brgy. Mandulog, / Lanao del Norte Iligan City, Package 3 2nd District Engineering Office

P00444623MN-EAO 900,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 150,000,000 Improvement of Various Infrastructure including Local Projects

MYPS: 03/03/2020 02:36:37 pm Page 226 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

40. P00443422MN 300116202245000 150,000,000 Road Concreting, Iligan-Divilacan (Phase 1), Iligan City

P00443422MN-CW1 Construction of Concrete Road - Construction of Lane Km 10.000 144,750,000 Central Office / Road Concreting, Iligan-Divilacan Concrete Road Region X (Phase 1), Iligan City

P00443422MN-EAO 5,250,000 Central Office / Region X

Local Roads and Bridges - Local Roads - Local Infrastructure Program 66,000,000

41. P00440974MN 300117207378000 3,000,000 Construction of Road, Brgy. Kalilangan, Iligan City, Lanao del Norte

P00440974MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.390 2,970,000 Lanao del Norte Construction of Road, Brgy. Concrete Road 2nd District Kalilangan, Iligan City, Lanao del Engineering Office Norte / Lanao del Norte 2nd District Engineering Office

P00440974MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

42. P00440975MN 300117207377000 5,000,000 Construction of Road, Brgy. Dulag, Iligan City, Lanao del Norte

P00440975MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.760 4,950,000 Lanao del Norte Construction of Road, Brgy. Dulag, Concrete Road 2nd District Iligan City, Lanao del Norte Engineering Office / Lanao del Norte 2nd District Engineering Office

P00440975MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

43. P00440976MN 300117207386000 3,000,000 Construction of Road, Brgy. Rogongon, Iligan City, Lanao del Norte

P00440976MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.330 2,970,000 Lanao del Norte Construction of Road, Brgy. Concrete Road 2nd District Rogongon, Iligan City, Lanao del Engineering Office Norte / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 227 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440976MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

44. P00440977MN 300117207384000 3,000,000 Construction of Road, Brgy. Panoroganan, Iligan City, Lanao del Norte

P00440977MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.296 2,970,000 Lanao del Norte Construction of Road, Brgy. Concrete Road 2nd District Panoroganan, Iligan City, Lanao del Engineering Office Norte / Lanao del Norte 2nd District Engineering Office

P00440977MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

45. P00440978MN 300117207376000 2,000,000 Construction of Road with Drainage, Brgy. Palao, Iligan City, Lanao del Norte

P00440978MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.260 1,980,000 Lanao del Norte Construction of Road with Concrete Road 2nd District Drainage, Brgy. Palao, Iligan City, Engineering Office Lanao del Norte / Lanao del Norte 2nd District Engineering Office

P00440978MN-EAO 20,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

46. P00444085MN 300117207379000 20,000,000 Construction of Road, Barangay Puga-an, Iligan City

P00444085MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.450 19,800,000 Lanao del Norte Construction of Road, Barangay Concrete Road 2nd District Puga-an, Iligan City Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 228 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444085MN-EAO 200,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

47. P00444088MN 300117207380000 15,000,000 Construction of Road, Barangay Pala-o, Iligan City

P00444088MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.110 14,850,000 Lanao del Norte Construction of Road, Barangay Concrete Road 2nd District Pala-o, Iligan City Engineering Office / Lanao del Norte 2nd District Engineering Office

P00444088MN-EAO 150,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

48. P00444090MN 300117207381000 15,000,000 Construction of Road, Barangay Suarez, Iligan City

P00444090MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.743 14,850,000 Lanao del Norte Construction of Road, Barangay Concrete Road 2nd District Suarez, Iligan City Engineering Office / Lanao del Norte 2nd District Engineering Office

P00444090MN-EAO 150,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Local Roads and Bridges - Local Bridges - Local Infrastructure Program 5,000,000

49. P00440979MN 300119200399000 5,000,000 Construction (Completion) of Hanging Bridge, Brgy. Tambacan, Iligan City, Lanao del Norte

P00440979MN-CW1 Construction of Bridge - Construction of Square 70.001 4,950,000 Lanao del Norte Construction (Completion) of Bridge meters 2nd District Hanging Bridge, Brgy. Tambacan, Engineering Office Iligan City, Lanao del Norte / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 229 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440979MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office LANAO DEL NORTE (FIRST) 54 projects 1,224,000,000 OO1: Ensure Safe and Reliable National Road System 24 projects 984,100,000

Asset Preservation - Preventive Maintenance - Primary Roads 72,758,000

50. P00400554MN 310101100268000 72,758,000 Linamon-Zamboanga Rd - K1544 + 754 - K1545 + 606, K1546 + 000 - K1546 + 304, K1547 + 343 - K1547 + 543, K1547 + 584 - K1548 + 124, K1548 + 167 - K1549 + 261, K1573 + 891 - K1574 + 042

P00400554MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.180 70,211,470 Central Office / Asphalt Overlay - at Specific Maintenance of Lanao del Norte Locations along Road: Asphalt 2nd District Linamon-Zamboanga Rd Overlay Engineering Office (S00914MN) K1544 + 754 - K1574 + 042

P00400554MN-EAO 2,546,530 Central Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Preventive Maintenance - Tertiary Roads 50,000,000

51. P00400555MN 310103100599000 50,000,000 Tubod-Ganassi Rd - K1592 + 140 - K1592 + 508, K1595 + 000 - K1596 + 839, K1596 + 860 - K1597 + 705

P00400555MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.078 49,000,000 Lanao del Norte Asphalt Overlay - at Specific Maintenance of 2nd District Locations along Tubod-Ganassi Rd Road: Asphalt Engineering Office (S00924MN) K1592 + 140 - K1597 + Overlay / Lanao del Norte 705 2nd District Engineering Office

P00400555MN-EAO 1,000,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 19,795,000 Roads - Primary Roads

52. P00400650MN 310104100257000 14,120,000 Linamon-Zamboanga Rd - K1589 + 078 - K1589 + 348

MYPS: 03/03/2020 02:36:37 pm Page 230 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400650MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 1.080 13,837,600 Lanao del Norte Pavement - along Concrete 2nd District Linamon-Zamboanga Rd Pavement Engineering Office (S00914MN) K1589 + 078 - K1589 + / Lanao del Norte 348 2nd District Engineering Office

P00400650MN-EAO 282,400 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

53. P00401547MN 310104100256000 5,675,000 Linamon-Zamboanga Rd - K1544 + 130 - K1544 + 273

P00401547MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 0.286 5,561,500 Lanao del Norte Pavement - along Concrete 2nd District Linamon-Zamboanga Rd Pavement Engineering Office (S00914MN) K1544 + 130 - K1544 + / Lanao del Norte 273 2nd District Engineering Office

P00401547MN-EAO 113,500 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 11,666,000 Roads - Tertiary Roads

54. P00400649MN 310106100528000 11,666,000 Bacolod-Madalum Highway - K1556 + (-121) - K1556 + 047

P00400649MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 0.336 6,532,680 Lanao del Norte Pavement - at Specific Locations Concrete 2nd District along Bacolod-Madalum Highway Pavement Engineering Office (S00907MN) K1556 + (-121) - / Lanao del Norte K1556 + 047 2nd District Engineering Office

P00400649MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 2,016.000 5,000,000 Lanao del Norte Locations along Overton-Buru-un meters 2nd District Bdry Rd (S00954MN) Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 231 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400649MN-EAO 133,320 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 28,471,000 National Roads - Primary Roads

55. P00400360MN 310110100178000 28,471,000 Linamon-Zamboanga Rd - K1550 + 338 - K1550 + 438, K1551 + 000 - K1551 + 600, K1553 + 215 - K1553 + 515, K1556 + 009 - K1556 + 309, K1562 + 000 - K1562 + 532, K1562 + 610.20 - K1563 + 500

P00400360MN-CW1 Construction of Drainage Structure Construction of Lineal 2,725.800 27,901,580 Lanao del Norte along Road - at Specific Locations Drainage meters 2nd District along Linamon-Zamboanga Rd Structure along Engineering Office (S00914MN) K1550 + 338 - K1563 + Road / Lanao del Norte 500 2nd District Engineering Office

P00400360MN-EAO 569,420 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 275,330,000

56. P00400257MN 310201100610000 50,000,000 Linamon-Zamboanga Rd - K1574 + 250 - K1575 + 553

P00400257MN-CW1 Road Widening - along Road Widening Lane Km 2.652 49,000,000 Lanao del Norte Linamon-Zamboanga Rd 2nd District (S00914MN) K1574 + 250 - K1575 + Engineering Office 553 / Lanao del Norte 2nd District Engineering Office

P00400257MN-EAO 1,000,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

57. P00400258MN 310201100608000 50,000,000 Linamon-Zamboanga Rd - K1563 + 215 - K1564 + 680

MYPS: 03/03/2020 02:36:37 pm Page 232 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400258MN-CW1 Road Widening - along Road Widening Lane Km 2.936 49,000,000 Lanao del Norte Linamon-Zamboanga Rd 2nd District (S00914MN) K1563 + 215 - K1564 + Engineering Office 680 / Lanao del Norte 2nd District Engineering Office

P00400258MN-EAO 1,000,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

58. P00400259MN 310201100609000 50,000,000 Linamon-Zamboanga Rd - K1566 + 752 - K1567 + 738, K1567 + 750 - K1568 + 346

P00400259MN-CW1 Road Widening - at Specific Road Widening Lane Km 3.164 49,000,000 Lanao del Norte Locations along 2nd District Linamon-Zamboanga Rd Engineering Office (S00914MN) K1566 + 752 - K1568 + / Lanao del Norte 346 2nd District Engineering Office

P00400259MN-EAO 1,000,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

59. P00400853MN 310201100488000 125,330,000 Linamon-Zamboanga Rd - K1546 + 401 - K1547 + 543, K1547 + 584 - K1548 + 124, K1548 + 167 - K1550 + 000

P00400853MN-CW1 Road Widening - at Specific Road Widening Lane Km 7.066 101,643,450 Central Office / Locations along Region X Linamon-Zamboanga Rd (S00914MN) K1546 + 401 - K1550 + 000

P00400853MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 40,000.000 20,000,000 Central Office / Locations along meters Region X Linamon-Zamboanga Rd (S00914MN)

P00400853MN-EAO 3,686,550 Central Office / Region X

Bridge - Retrofitting/ Strengthening of Permanent Bridges 20,000,000

60. P00400867MN 310303101007000 20,000,000 Bolod Br. (B00960MN) along Linamon-Zamboanga Rd

MYPS: 03/03/2020 02:36:37 pm Page 233 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400867MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 19,600,000 Lanao del Norte Bridge - Bolod Br. (B00960MN) Strengthening of Bridges 2nd District along Linamon-Zamboanga Rd Bridge Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400867MN-EAO 400,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Bridge - Widening of Permanent Bridges 506,080,000

61. P00400854MN 310305101113000 29,940,000 Mago-ong Br. (B00941MN) along Linamon-Zamboanga Rd

P00400854MN-CW1 Widening of Bridge - Mago-ong Br. Widening of Square 207.972 29,341,200 Lanao del Norte (B00941MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400854MN-EAO 598,800 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

62. P00400855MN 310305101120000 23,350,000 Tugar Br. (B00943MN) along Linamon-Zamboanga Rd

P00400855MN-CW1 Widening of Bridge - Tugar Br. Widening of Square 121.635 22,883,000 Lanao del Norte (B00943MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400855MN-EAO 467,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

63. P00400856MN 310305101112000 30,650,000 Kawit Br. (B00944MN) along Linamon-Zamboanga Rd

MYPS: 03/03/2020 02:36:37 pm Page 234 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400856MN-CW1 Widening of Bridge - Kawit Br. Widening of Square 214.650 30,037,000 Lanao del Norte (B00944MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400856MN-EAO 613,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

64. P00400857MN 310305101116000 35,710,000 Rupagan Br. (B00945MN) along Linamon-Zamboanga Rd

P00400857MN-CW1 Widening of Bridge - Rupagan Br. Widening of Square 351.072 34,995,800 Lanao del Norte (B00945MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400857MN-EAO 714,200 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

65. P00400858MN 310305100846000 85,000,000 Maigo Br. (B00949MN) along Linamon-Zamboanga Rd

P00400858MN-CW1 Widening of Bridge - Maigo Br. Widening of Square 746.028 82,025,000 Central Office / (B00949MN) along Bridge meters Lanao del Norte Linamon-Zamboanga Rd 2nd District Engineering Office

P00400858MN-EAO 2,975,000 Central Office / Lanao del Norte 2nd District Engineering Office

66. P00400859MN 310305101118000 39,220,000 Segapod Br. (B00950MN) along Linamon-Zamboanga Rd

P00400859MN-CW1 Widening of Bridge - Segapod Br. Widening of Square 369.198 38,435,600 Lanao del Norte (B00950MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 235 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400859MN-EAO 784,400 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

67. P00400860MN 310305100844000 64,930,000 Kulasihan Br. (B00951MN) along Linamon-Zamboanga Rd

P00400860MN-CW1 Widening of Bridge - Kulasihan Br. Widening of Square 540.441 62,657,450 Central Office / (B00951MN) along Bridge meters Lanao del Norte Linamon-Zamboanga Rd 2nd District Engineering Office

P00400860MN-EAO 2,272,550 Central Office / Lanao del Norte 2nd District Engineering Office

68. P00400861MN 310305101114000 23,940,000 Muntay Br. (B00952MN) along Linamon-Zamboanga Rd

P00400861MN-CW1 Widening of Bridge - Muntay Br. Widening of Square 122.303 23,461,200 Lanao del Norte (B00952MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400861MN-EAO 478,800 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

69. P00400862MN 310305101119000 24,180,000 Titunod Br. 1 (B00955MN) along Linamon-Zamboanga Rd

P00400862MN-CW1 Widening of Bridge - Titunod Br. 1 Widening of Square 147.202 23,696,400 Lanao del Norte (B00955MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400862MN-EAO 483,600 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

70. P00400863MN 310305100851000 67,100,000 Titunod Br. 2 (B00956MN) along Linamon-Zamboanga Rd

MYPS: 03/03/2020 02:36:37 pm Page 236 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400863MN-CW1 Widening of Bridge - Titunod Br. 2 Widening of Square 601.974 64,751,500 Central Office / (B00956MN) along Bridge meters Lanao del Norte Linamon-Zamboanga Rd 2nd District Engineering Office

P00400863MN-EAO 2,348,500 Central Office / Lanao del Norte 2nd District Engineering Office

71. P00400864MN 310305101117000 37,600,000 Sagadan Br. (B00961MN) along Linamon-Zamboanga Rd

P00400864MN-CW1 Widening of Bridge - Sagadan Br. Widening of Square 345.539 36,848,000 Lanao del Norte (B00961MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400864MN-EAO 752,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

72. P00400865MN 310305101110000 22,200,000 Baroy Br. (B01681MN) along Linamon-Zamboanga Rd

P00400865MN-CW1 Widening of Bridge - Baroy Br. Widening of Square 78.228 21,756,000 Lanao del Norte (B01681MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

P00400865MN-EAO 444,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

73. P00400866MN 310305101115000 22,260,000 Pangi Br. (B01682MN) along Linamon-Zamboanga Rd

P00400866MN-CW1 Widening of Bridge - Pangi Br. Widening of Square 76.320 21,814,800 Lanao del Norte (B01682MN) along Bridge meters 2nd District Linamon-Zamboanga Rd Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 237 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400866MN-EAO 445,200 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office Convergence and Special Support Program 4 projects 89,900,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 20,000,000

74. P00431571MN 300203100959000 20,000,000 Access Road leading to Mt. Turong-Turong, Tubod, Lanao del Norte

P00431571MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.950 19,600,000 Lanao del Norte Access Road leading to Mt. Concrete Road 2nd District Turong-Turong, Tubod, Lanao del Engineering Office Norte / Lanao del Norte 2nd District Engineering Office

P00431571MN-EAO 400,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 54,080,000 Economic Zones

75. P00431569MN 300204100595000 15,000,000 Segapod to Maliwanag Road connecting National Highway of Segapod in support to Coconut Oil, Rubber and Tablea Processing Industry, Maigo, Lanao del Norte

P00431569MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.020 14,700,000 Lanao del Norte Segapod to Maliwanag Road Concrete Road 2nd District connecting National Highway of Engineering Office Segapod in support to Coconut Oil, / Lanao del Norte Rubber and Tablea Processing 2nd District Industry, Maigo, Lanao del Norte Engineering Office

P00431569MN-EAO 300,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

76. P00431572MN 300204100205000 39,080,000 Malingao Bualan Road from Brgy. Malingao to Brgy. Bualan in support of the Coco Coir Industry, Tubod, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 238 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431572MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.563 38,298,400 Lanao del Norte Malingao Bualan Road from Brgy. Concrete Road 2nd District Malingao to Brgy. Bualan in Engineering Office support of the Coco Coir Industry, / Lanao del Norte Tubod, Lanao del Norte 2nd District Engineering Office

P00431572MN-EAO 781,600 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 15,820,000

77. P00431693MN 300207100148000 15,820,000 Construction Standard Lanao del Norte PPO Headquarters, Camp Major Eduardo M. Gallego, Tubod, Lanao del Norte

P00431693MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 15,266,300 Central Office / Construction Standard Lanao del Other Facilities Facilities Region X Norte PPO Headquarters, Camp Major Eduardo M. Gallego, Tubod, Lanao del Norte

P00431693MN-EAO 553,700 Central Office / Region X Local Program 26 projects 150,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 100,000,000 Program

78. P00440792MN 300104217936000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Lindongan, Baroy, Lanao del Norte

P00440792MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Lindongan, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440792MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

79. P00440793MN 300104217937000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Lower Sagadan, Baroy, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 239 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440793MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Lower Sagadan, / Lanao del Norte Baroy, Lanao del Norte 2nd District Engineering Office

P00440793MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

80. P00440794MN 300104217939000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Manan-ao, Baroy, Lanao del Norte

P00440794MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Manan-ao, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440794MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

81. P00440795MN 300104217934000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Libertad, Baroy, Lanao del Norte

P00440795MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Libertad, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440795MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

82. P00440796MN 300104217947000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Santo Niño Village, Baroy, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 240 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440796MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Santo Niño Village, / Lanao del Norte Baroy, Lanao del Norte 2nd District Engineering Office

P00440796MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

83. P00440797MN 300104217945000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Salong, Baroy, Lanao del Norte

P00440797MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Salong, Baroy, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440797MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

84. P00440798MN 300104217935000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Limwag, Baroy, Lanao del Norte

P00440798MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Limwag, Baroy, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440798MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

85. P00440799MN 300104217943000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Riverside, Baroy, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 241 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440799MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Riverside, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440799MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

86. P00440800MN 300104217938000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Maliwanag, Baroy, Lanao del Norte

P00440800MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Maliwanag, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440800MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

87. P00440801MN 300104217946000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. San Juan, Baroy, Lanao del Norte

P00440801MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. San Juan, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440801MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

88. P00440802MN 300104217951000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Upper Sagadan, Baroy, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 242 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440802MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Upper Sagadan, / Lanao del Norte Baroy, Lanao del Norte 2nd District Engineering Office

P00440802MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

89. P00440803MN 300104217941000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Pendulonan, Baroy, Lanao del Norte

P00440803MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Pendulonan, Baroy, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440803MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

90. P00440807MN 300104217930000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Bato, Baroy, Lanao del Norte

P00440807MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Bato, Baroy, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440807MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

91. P00440808MN 300104217929000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Barakanas, Tubod, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 243 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440808MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Barakanas, Tubod, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440808MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

92. P00440809MN 300104217948000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Taden, Tubod, Lanao del Norte

P00440809MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Taden, Tubod, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440809MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

93. P00440810MN 300104217931000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Camp V, Tubod, Lanao del Norte

P00440810MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Camp V, Tubod, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440810MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

94. P00440811MN 300104217933000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Kakai Renabor, Tubod, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 244 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440811MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Kakai Renabor, / Lanao del Norte Tubod, Lanao del Norte 2nd District Engineering Office

P00440811MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

95. P00440812MN 300104217940000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Palao, Tubod, Lanao del Norte

P00440812MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Palao, Tubod, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440812MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

96. P00440813MN 300104217942000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Pinpin, Tubod, Lanao del Norte

P00440813MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Pinpin, Tubod, Lanao / Lanao del Norte del Norte 2nd District Engineering Office

P00440813MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

97. P00440814MN 300104217949000 3,500,000 Construction of Multi-Purpose Building (Covered Court), Brgy. Taguranao, Tubod, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 245 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440814MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court), Brgy. Taguranao, Tubod, / Lanao del Norte Lanao del Norte 2nd District Engineering Office

P00440814MN-EAO 35,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

98. P00442961MN 300104217928000 20,000,000 Construction of Multi-Purpose Building (PNP Provincial Headquarters), Brgy. Pigcarangan, Tubod, Lanao del Norte

P00442961MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (PNP Building Engineering Office Provincial Headquarters), Brgy. / Lanao del Norte Pigcarangan, Tubod, Lanao del 2nd District Norte Engineering Office

P00442961MN-EAO 200,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

99. P00443966MN 300104217962000 5,000,000 Renovation of the Convergence Hall at Linamon, Lanao Del Norte

P00443966MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 4,950,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 2nd District Renovation of the Convergence Multi Purpose Engineering Office Hall at Linamon, Lanao Del Norte Building / Lanao del Norte 2nd District Engineering Office

P00443966MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

100. P00443969MN 300104217964000 2,000,000 Construction of Multi-Purpose Building (Senior Citizens Building), Brgy. Libertad, Kolambugan, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 246 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443969MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Senior Building Engineering Office Citizens Building), Brgy. Libertad, / Lanao del Norte Kolambugan, Lanao del Norte 2nd District Engineering Office

P00443969MN-EAO 20,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

101. P00443970MN 300104217965000 3,000,000 Construction/rehabilitation of Multi-Purpose Building, Brgy. Tugar, Kauswagan, Lanao del Norte

P00443970MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Multi Purpose Buildings 2nd District Construction/rehabilitation of Building Engineering Office Multi-Purpose Building, Brgy. / Lanao del Norte Tugar, Kauswagan, Lanao del Norte 2nd District Engineering Office

P00443970MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 50,000,000

102. P00443117MN 300117207385000 20,000,000 Concreting of Kakai-Ronabor-Torong-Torong Provincial Road at Dimaporo, Pigcarangan, Tubod, Lanao del Norte

P00443117MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.500 19,800,000 Lanao del Norte Concreting of Concrete Road 2nd District Kakai-Ronabor-Torong-Torong Engineering Office Provincial Road at Dimaporo, / Lanao del Norte Pigcarangan, Tubod, Lanao del 2nd District Norte Engineering Office

P00443117MN-EAO 200,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

103. P00444093MN 300117207382000 30,000,000 Construction of Road, Barangay Bara-ason, Kauswagan, Lanao del Norte

MYPS: 03/03/2020 02:36:37 pm Page 247 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444093MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.450 29,700,000 Lanao del Norte Construction of Road, Barangay Concrete Road 2nd District Bara-ason, Kauswagan, Lanao del Engineering Office Norte / Lanao del Norte 2nd District Engineering Office

P00444093MN-EAO 300,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 248 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Occidental 1st District Engineering Office 69 projects 1,399,925,000 (FIRST) 69 projects 1,399,925,000 OO1: Ensure Safe and Reliable National Road System 17 projects 878,425,000

Asset Preservation - Preventive Maintenance - Primary Roads 96,641,000

1. P00400557MN 310101100269000 96,641,000 City-Plaridel-Calamba-Sapang Dalaga Rd - K1744 + 002 - K1744 + 092, K1759 + 000 - K1759 + 359, K1760 + 237 - K1760 + 305, K1761 + 000 - K1761 + 009, K1762 + 000 - K1763 + 000, K1764 + 000 - K1764 + 268, K1765 + 000 - K1765 + 100, K1767 + 539 - K1769 + 000, K1776 + 000 - K1776 + 228, K1785 + 308 - K1785 + 543, K1785 + 800 - K1786 + 000

P00400557MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 15.340 93,258,565 Central Office / Asphalt Overlay - at Specific Maintenance of Misamis Locations along Oroquieta Road: Asphalt Occidental 1st City-Plaridel-Calamba-Sapang Overlay District Dalaga Rd (S01011MN) K1744 + Engineering Office 002 - K1786 + 000

P00400557MN-EAO 3,382,435 Central Office / Misamis Occidental 1st District Engineering Office

Asset Preservation - Preventive Maintenance - Secondary Roads 11,222,000

2. P00400556MN 310102100565000 11,222,000 Oroquieta City-Calamba Mt Rd - K1743 + 084 - K1743 + 570

P00400556MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.944 10,997,560 Misamis Asphalt Overlay - at Specific Maintenance of Occidental 1st Locations along Oroquieta Road: Asphalt District City-Calamba Mt Rd (S01015MN) Overlay Engineering Office K1743 + 084 - K1743 + 570 / Misamis Occidental 1st District Engineering Office

P00400556MN-EAO 224,440 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 13,500,000 Roads - Primary Roads

3. P00401405MN 310104100259000 13,500,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1789 + 000 - K1789 + 500

MYPS: 03/03/2020 02:36:37 pm Page 249 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401405MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 0.882 13,230,000 Misamis Pavement - along Oroquieta Concrete Occidental 1st City-Plaridel-Calamba-Sapang Pavement District Dalaga Rd (S01011MN) K1789 + Engineering Office 000 - K1789 + 500 / Misamis Occidental 1st District Engineering Office

P00401405MN-EAO 270,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 22,439,000 Collapse, and Landslide - Primary Roads

4. P00401437MN 310107100171000 22,439,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1748 + 200 - K1748 + 440

P00401437MN-CW1 Construction of Road Slope Construction of Square 1,920.000 21,990,220 Misamis Protection Structure - along Road Slope meters Occidental 1st Oroquieta Protection District City-Plaridel-Calamba-Sapang Structure Engineering Office Dalaga Rd (S01011MN) K1748 + / Misamis 200 - K1748 + 440 Occidental 1st District Engineering Office

P00401437MN-EAO 448,780 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 71,685,000 National Roads - Primary Roads

5. P00400364MN 310110100180000 32,000,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1773 + 000 - K1775 + 780

MYPS: 03/03/2020 02:36:37 pm Page 250 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400364MN-CW1 Construction of Drainage Structure Construction of Lineal 3,670.000 31,360,000 Misamis along Road - at Specific Locations Drainage meters Occidental 1st along Oroquieta Structure along District City-Plaridel-Calamba-Sapang Road Engineering Office Dalaga Rd (S01011MN) K1773 + / Misamis 000 - K1775 + 780 Occidental 1st District Engineering Office

P00400364MN-EAO 640,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

6. P00400365MN 310110100181000 39,685,000 Ozamis City-Oroquieta City Rd - K1733 + 670 - K1733 + 906, K1734 + 038 - K1734 + 780, K1734 + 941 - K1737 + 107

P00400365MN-CW1 Construction of Drainage Structure Construction of Lineal 6,296.000 38,891,300 Misamis along Road - at Specific Locations Drainage meters Occidental 1st along Ozamis City-Oroquieta City Structure along District Rd (S00963MN) K1733 + 670 - Road Engineering Office K1737 + 107 / Misamis Occidental 1st District Engineering Office

P00400365MN-EAO 793,700 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 46,400,000 National Roads - Secondary Roads

7. P00400366MN 310111100249000 46,400,000 Calamba-Baliangao Rd - K1781 + 299 - K1785 + 086

P00400366MN-CW1 Construction of Drainage Structure Construction of Lineal 4,499.150 45,472,000 Misamis along Road - along Drainage meters Occidental 1st Calamba-Baliangao Rd (S00984MN) Structure along District K1781 + 299 - K1785 + 086 Road Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 251 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400366MN-EAO 928,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Network Development - Road Widening - Primary Roads 149,504,000

8. P00400261MN 310201100490000 100,000,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1787 + 280 - K1788 + 854, K1789 + 000 - K1789 + 415, K1789 + 474 - K1789 + 500, K1790 + 750 - K1791 + 000

P00400261MN-CW1 Road Widening - at Specific Road Widening Lane Km 4.524 96,500,000 Central Office / Locations along Oroquieta Misamis City-Plaridel-Calamba-Sapang Occidental 1st Dalaga Rd (S01011MN) K1787 + District 280 - K1791 + 000 Engineering Office

P00400261MN-EAO 3,500,000 Central Office / Misamis Occidental 1st District Engineering Office

9. P00400262MN 310201100622000 45,737,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1743 + (-1006) - K1743 + 466

P00400262MN-CW1 Road Widening - along Oroquieta Road Widening Lane Km 2.944 44,822,260 Misamis City-Plaridel-Calamba-Sapang Occidental 1st Dalaga Rd (S01011MN) K1743 + District (-1006) - K1743 + 466 Engineering Office / Misamis Occidental 1st District Engineering Office

P00400262MN-EAO 914,740 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

10. P00401406MN 310201100623000 3,767,000 Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd - K1766 + 117 - K1766 + 224, K1766 + 315 - K1766 + 341, K1768 + 232 - K1768 + 269, K1768 + 417 - K1768 + 461

MYPS: 03/03/2020 02:36:37 pm Page 252 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401406MN-CW1 Road Widening - at Specific Road Widening Lane Km 0.214 3,691,660 Misamis Locations along Oroquieta Occidental 1st City-Plaridel-Calamba-Sapang District Dalaga Rd (S01011MN) K1766 + Engineering Office 117 - K1768 + 461 / Misamis Occidental 1st District Engineering Office

P00401406MN-EAO 75,340 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Network Development - Road Widening - Secondary Roads 304,034,000

11. P00400263MN 310202100516000 99,490,000 Calamba-Baliangao Rd - K1782 + 379 - K1785 + 086

P00400263MN-CW1 Road Widening - along Road Widening Lane Km 5.412 96,007,850 Central Office / Calamba-Baliangao Rd (S00984MN) Misamis K1782 + 379 - K1785 + 086 Occidental 1st District Engineering Office

P00400263MN-EAO 3,482,150 Central Office / Misamis Occidental 1st District Engineering Office

12. P00400264MN 310202100517000 63,083,000 Calamba-Baliangao Rd - K1785 + 086 - K1787 + 000

P00400264MN-CW1 Road Widening - along Road Widening Lane Km 3.928 60,875,095 Central Office / Calamba-Baliangao Rd (S00984MN) Misamis K1785 + 086 - K1787 + 000 Occidental 1st District Engineering Office

P00400264MN-EAO 2,207,905 Central Office / Misamis Occidental 1st District Engineering Office

13. P00400309MN 310202100528000 94,761,000 Oroquieta City-Calamba Mt Rd - K1747 + 474 - K1750 + 000

MYPS: 03/03/2020 02:36:37 pm Page 253 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400309MN-CW1 Road Widening - along Oroquieta Road Widening Lane Km 5.270 91,444,365 Central Office / City-Calamba Mt Rd (S01015MN) Misamis K1747 + 474 - K1750 + 000 Occidental 1st District Engineering Office

P00400309MN-EAO 3,316,635 Central Office / Misamis Occidental 1st District Engineering Office

14. P00400310MN 310202100667000 46,700,000 Oroquieta City-Calamba Mt Rd - K1774 + 000 - K1775 + 100

P00400310MN-CW1 Road Widening - along Oroquieta Road Widening Lane Km 2.082 45,766,000 Misamis City-Calamba Mt Rd (S01015MN) Occidental 1st K1774 + 000 - K1775 + 100 District Engineering Office / Misamis Occidental 1st District Engineering Office

P00400310MN-EAO 934,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 110,000,000

15. P00401238MN 310204100525000 110,000,000 Oroquieta City Bypass Road, Misamis Occidental

P00401238MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.520 106,150,000 Central Office / Oroquieta City Bypass Road, Concrete Road Region X Misamis Occidental

P00401238MN-EAO 3,850,000 Central Office / Region X

Bridge - Widening of Permanent Bridges 18,000,000

16. P00400868MN 310305101144000 18,000,000 Tipan Br. (B01101MN) along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd (Phase II)

MYPS: 03/03/2020 02:36:37 pm Page 254 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400868MN-CW1 Widening of Bridge - Tipan Br. Widening of Square 279.045 17,640,000 Misamis (B01101MN) along Oroquieta Bridge meters Occidental 1st City-Plaridel-Calamba-Sapang District Dalaga Rd (Phase II) Engineering Office / Misamis Occidental 1st District Engineering Office

P00400868MN-EAO 360,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Bridge - Construction of New Bridges 35,000,000

17. P00400941MN 310306100175000 35,000,000 Sibula Br. along Oroquieta City-Plaridel-Calamba-Sapang Dalaga Rd

P00400941MN-CW1 Construction of Concrete Bridge - Construction of Square 114.480 34,300,000 Misamis Sibula Br. along Oroquieta Concrete Bridge meters Occidental 1st City-Plaridel-Calamba-Sapang District Dalaga Rd Engineering Office / Misamis Occidental 1st District Engineering Office

P00400941MN-EAO 700,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office Convergence and Special Support Program 9 projects 267,500,000

Construction/ Improvement of Access Roads leading to Seaports 5,000,000

18. P00431579MN 300202100140000 5,000,000 Access Road from National Highway leading to San Vicente Bajo Port, Oroquieta City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 255 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431579MN-CW1 Off-Carriageway Improvement: Off-Carriageway Square 3,000.000 4,900,000 Misamis Shoulder Paving / Construction - Improvement: meters Occidental 1st Access Road from National Shoulder Paving / District Highway leading to San Vicente Construction Engineering Office Bajo Port, Oroquieta City, Misamis / Misamis Occidental Occidental 1st District Engineering Office

P00431579MN-EAO 100,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 255,000,000

19. P00431575MN 300203101322000 42,500,000 Access Road leading to Oro Zipline, Brgy. Dolipos-Bajo-Buntawan, Oroquieta City, Misamis Occidental

P00431575MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.400 41,650,000 Misamis Access Road leading to Oro Zipline, Concrete Road Occidental 1st Brgy. Dolipos-Bajo-Buntawan, District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00431575MN-EAO 850,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

20. P00431576MN 300203101320000 50,000,000 Access Road leading to Libadatama Dam - P, Brgy. Talic, Oroquieta City, Misamis Occidental

P00431576MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.000 49,000,000 Misamis Access Road leading to Libadatama Concrete Road Occidental 1st Dam - P, Brgy. Talic, Oroquieta City, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 256 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431576MN-EAO 1,000,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

21. P00431577MN 300203101317000 50,000,000 Access Road leading to Ambak Ambak Falls, Brgy. Binuangan, Oroquieta City, Misamis Occidental

P00431577MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.000 49,000,000 Misamis Access Road leading to Ambak Concrete Road Occidental 1st Ambak Falls, Brgy. Binuangan, District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00431577MN-EAO 1,000,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

22. P00431578MN 300203101319000 27,447,000 Access Road leading to Guiban Falls, Brgy. Guiban, Concepcion, Misamis Occidental

P00431578MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.196 26,898,060 Misamis Access Road leading to Guiban Concrete Road Occidental 1st Falls, Brgy. Guiban, Concepcion, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00431578MN-EAO 548,940 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

23. P00431679MN 300203101318000 40,000,000 Access Road leading to Baliangao Protected Landscape and Seascape (BPLS), Baliangao, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 257 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431679MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.200 39,200,000 Misamis Access Road leading to Baliangao Concrete Road Occidental 1st Protected Landscape and Seascape District (BPLS), Baliangao, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00431679MN-EAO 800,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

24. P00431681MN 300203101323000 35,000,000 Access Road leading to White Sand Beaches (TAMBAN), Baliangao, Misamis Occidental

P00431681MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.800 34,300,000 Misamis Access Road leading to White Sand Concrete Road Occidental 1st Beaches (TAMBAN), Baliangao, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00431681MN-EAO 700,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

25. P00432320MN 300203101321000 10,053,000 Construction (Completion) of Road leading to Bawbawon Island, Panalsalan, Plaridel, Misamis Occidental

P00432320MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.000 9,851,940 Misamis Construction (Completion) of Road Concrete Road Occidental 1st leading to Bawbawon Island, District Panalsalan, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 258 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00432320MN-EAO 201,060 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 7,500,000

26. P00431690MN 300207100145000 7,500,000 Construction of Sapang Dalaga Municipal Police Station Building, Sapang Dalaga, Misamis Occidental

P00431690MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 7,237,500 Central Office / Construction of Sapang Dalaga Other Facilities Facilities Region X Municipal Police Station Building, Sapang Dalaga, Misamis Occidental

P00431690MN-EAO 262,500 Central Office / Region X Local Program 43 projects 254,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 125,000,000 Program

27. P00440883MN 300104218045000 3,000,000 Construction of Multi-Purpose Building, Brgy. Butuay, Jimenez, Misamis Occidental

P00440883MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Butuay, Jimenez, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440883MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

28. P00440884MN 300104218055000 3,000,000 Construction of Multi-Purpose Building, Brgy. Tabo-o, Jimenez, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 259 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440884MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Tabo-o, Jimenez, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440884MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

29. P00440885MN 300104218043000 3,000,000 Construction of Multi-Purpose Building, Aloran Trade High School, Brgy. Labo, Aloran, Misamis Occidental

P00440885MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Aloran Building District Trade High School, Brgy. Labo, Engineering Office Aloran, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440885MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

30. P00440886MN 300104218042000 3,000,000 Construction of Multi-Purpose Building, Aloran Central School, Brgy. Dalisay, Aloran, Misamis Occidental

P00440886MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Aloran Building District Central School, Brgy. Dalisay, Engineering Office Aloran, Misamis Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 260 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440886MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

31. P00440887MN 300104218056000 3,000,000 Construction of Multi-Purpose Building, Brgy. Talic, Oroquieta City, Misamis Occidental

P00440887MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Talic, Building District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00440887MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

32. P00440888MN 300104218048000 3,000,000 Construction of Multi-Purpose Building, Brgy. Canubay, Oroquieta City, Misamis Occidental

P00440888MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Canubay, Oroquieta City, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440888MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

33. P00440889MN 300104218044000 3,000,000 Construction of Multi-Purpose Building, Brgy. Apil, Oroquieta City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 261 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440889MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Apil, Building District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00440889MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

34. P00440890MN 300104218051000 3,000,000 Construction of Multi-Purpose Building, Brgy. Lower Langcangan, Oroquieta City, Misamis Occidental

P00440890MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Lower Langcangan, Oroquieta City, Engineering Office Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440890MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

35. P00440891MN 300104218049000 3,000,000 Construction of Multi-Purpose Building, Brgy. Eastern Poblacion, Lopez Jaena, Misamis Occidental

P00440891MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Eastern Poblacion, Lopez Jaena, Engineering Office Misamis Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 262 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440891MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

36. P00440893MN 300104218039000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Lao Santa Cruz, Plaridel, Misamis Occidental

P00440893MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction Multi Purpose Buildings Occidental 1st (Completion) of Multi-Purpose Building District Building, Brgy. Lao Santa Cruz, Engineering Office Plaridel, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440893MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

37. P00440894MN 300104218036000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Danao, Plaridel, Misamis Occidental

P00440894MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction Multi Purpose Buildings Occidental 1st (Completion) of Multi-Purpose Building District Building, Brgy. Danao, Plaridel, Engineering Office Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440894MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

38. P00440895MN 300104218046000 3,000,000 Construction of Multi-Purpose Building, Brgy. Calaca-An, Plaridel, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 263 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440895MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Calaca-An, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440895MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

39. P00440896MN 300104218054000 3,000,000 Construction of Multi-Purpose Building, Brgy. Southern Looc, Plaridel, Misamis Occidental

P00440896MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Southern Looc, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440896MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

40. P00440898MN 300104218053000 2,000,000 Construction of Multi-Purpose Building, Brgy. Sinian, Baliangao, Misamis Occidental

P00440898MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Sinian, Baliangao, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 264 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440898MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

41. P00440899MN 300104218050000 2,000,000 Construction of Multi-Purpose Building, Brgy. Landing, Baliangao, Misamis Occidental

P00440899MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Landing, Baliangao, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440899MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

42. P00440900MN 300104218047000 3,000,000 Construction of Multi-Purpose Building, Brgy. Calaran, Calamba, Misamis Occidental

P00440900MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Calaran, Calamba, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440900MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

43. P00440901MN 300104218041000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Solinog, Calamba, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 265 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440901MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction Multi Purpose Buildings Occidental 1st (Completion) of Multi-Purpose Building District Building, Brgy. Solinog, Calamba, Engineering Office Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440901MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

44. P00440903MN 300104218040000 3,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Northern Poblacion, Plaridel, Misamis Occidental

P00440903MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction Multi Purpose Buildings Occidental 1st (Completion) of Multi-Purpose Building District Building, Brgy. Northern Poblacion, Engineering Office Plaridel, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440903MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

45. P00440904MN 300104218052000 5,000,000 Construction of Multi-Purpose Building, Brgy. Northern Poblacion, Baliangao, Misamis Occidental

P00440904MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Brgy. Building District Northern Poblacion, Baliangao, Engineering Office Misamis Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 266 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440904MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

46. P00440905MN 300104218065000 3,000,000 Construction of Multi-Purpose Building, Mindanao State University, Brgy. Puntod, Lopez Jaena, Misamis Occidental

P00440905MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Mindanao Building District State University, Brgy. Puntod, Engineering Office Lopez Jaena, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00440905MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

47. P00444015MN 300104218037000 20,000,000 Construction of Multi-Purpose Building (Canubay Public Market), Brgy. Canubay, Oroquieta City, Misamis Occidental

P00444015MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building (Canubay Building District Public Market), Brgy. Canubay, Engineering Office Oroquieta City, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00444015MN-EAO 200,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 267 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

48. P00444017MN 300104218038000 15,000,000 Construction of Multi-Purpose Building (Coastal Esplanade), Brgy. Poblacion, Plaridel, Misamis Occidental

P00444017MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building (Coastal Building District Esplanade), Brgy. Poblacion, Engineering Office Plaridel, Misamis Occidental / Misamis Occidental 1st District Engineering Office

P00444017MN-EAO 150,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

49. P00444018MN 300104218058000 5,000,000 Construction of Covered Court , Brgy. Western Poblacion, Lopez Jaena, Misamis Occidental

P00444018MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction of Covered Multi Purpose Buildings Occidental 1st Court , Brgy. Western Poblacion, Building District Lopez Jaena, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444018MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

50. P00444020MN 300104218059000 3,000,000 Construction of Covered Court in Brgy. Upper Langcangan, Oroquieta City, Misamis Occidental

P00444020MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Covered Multi Purpose Buildings Occidental 1st Court in Brgy. Upper Langcangan, Building District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 268 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444020MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

51. P00444022MN 300104218060000 5,000,000 Construction/Completion of Municipal Evacuation Hall, Plaridel, Misamis Occidental

P00444022MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction/Completion Multi Purpose Buildings Occidental 1st of Municipal Evacuation Hall, Building District Plaridel, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444022MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

52. P00444023MN 300104218061000 5,000,000 Construction of Multi-Purpose Building, Oroquieta Agro-Industrial School (Misamis Occidental State College), Brgy. Villaflor, Oroquieta City, Misamis Occidental

P00444023MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Oroquieta Building District Agro-Industrial School (Misamis Engineering Office Occidental State College), Brgy. / Misamis Villaflor, Oroquieta City, Misamis Occidental 1st Occidental District Engineering Office

P00444023MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

53. P00444025MN 300104218062000 5,000,000 Construction/rehabilitation of Multi-Purpose Building, Brgy. Poblacion, Plaridel, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 269 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444025MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Multi Purpose Buildings Occidental 1st Construction/rehabilitation of Building District Multi-Purpose Building, Brgy. Engineering Office Poblacion, Plaridel, Misamis / Misamis Occidental Occidental 1st District Engineering Office

P00444025MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

54. P00444027MN 300104218063000 5,000,000 Construction of Multi-Purpose Building (Covered Court/evacuation center) Brgy. San Vicente Alto, Oroquieta City, Misamis Occidental

P00444027MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building (Covered Building District Court/evacuation center) Brgy. San Engineering Office Vicente Alto, Oroquieta City, / Misamis Misamis Occidental Occidental 1st District Engineering Office

P00444027MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

55. P00444028MN 300104218064000 5,000,000 Construction / Completion of Municipal Sports Complex, Plaridel, Misamis Occidental

P00444028MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction / Multi Purpose Buildings Occidental 1st Completion of Municipal Sports Building District Complex, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 270 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444028MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure 2,000,000 Program

56. P00440907MN 300109200747000 2,000,000 Construction of Drainage Structure, Brgy.Northern Poblacion, Plaridel, Misamis Occidental

P00440907MN-CW1 Construction of Drainage Structure Construction of Lineal 192.989 1,980,000 Misamis - Construction of Drainage Drainage meters Occidental 1st Structure, Brgy.Northern Structure District Poblacion, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00440907MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 34,000,000

57. P00440892MN 300117207401000 2,000,000 Construction of Road, Brgy. Katipa, Lopez Jaena, Misamis Occidental

P00440892MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Misamis Construction of Road, Brgy. Katipa, Concrete Road Occidental 1st Lopez Jaena, Misamis Occidental District Engineering Office / Misamis Occidental 1st District Engineering Office

P00440892MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 271 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

58. P00440897MN 300117207409000 2,000,000 Construction of Road, Brgy. Poblacion, Baliangao, Misamis Occidental

P00440897MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Misamis Construction of Road, Brgy. Concrete Road Occidental 1st Poblacion, Baliangao, Misamis District Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00440897MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

59. P00440902MN 300117207402000 2,000,000 Construction of Road, Brgy. Magcamiguing, Calamba, Misamis Occidental

P00440902MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Misamis Construction of Road, Brgy. Concrete Road Occidental 1st Magcamiguing, Calamba, Misamis District Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00440902MN-EAO 20,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

60. P00444121MN 300117207403000 3,000,000 Concreting of Road, Brgy. Mansabay Alto, Lopez Jaena, Misamis Occidental

P00444121MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.488 2,970,000 Misamis Concreting of Road, Brgy. Concrete Road Occidental 1st Mansabay Alto, Lopez Jaena, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 272 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444121MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

61. P00444123MN 300117207404000 5,000,000 Concreting of Brgy. Road, Brgy. Rizal, Lopez Jaena, Misamis Occidental

P00444123MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.816 4,950,000 Misamis Concreting of Brgy. Road, Brgy. Concrete Road Occidental 1st Rizal, Lopez Jaena, Misamis District Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444123MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

62. P00444125MN 300117207405000 5,000,000 Improvement/Concreting of J. Clarin Street, Brgy. Poblacion, Oroquieta City, Misamis Occidental

P00444125MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.782 4,950,000 Misamis Improvement/Concreting of J. Concrete Road Occidental 1st Clarin Street, Brgy. Poblacion, District Oroquieta City, Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444125MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

63. P00444127MN 300117207406000 5,000,000 Rehabilitation / Concreting of Local Road of Brgy. San Pedro, Aloran, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 273 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444127MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.300 4,950,000 Misamis Rehabilitation / Concreting of Local Concrete Road Occidental 1st Road of Brgy. San Pedro, Aloran, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444127MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

64. P00444130MN 300117207407000 5,000,000 Construction of Access Road leading to the seaport, Plaridel, Misamis Occidental

P00444130MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.310 4,950,000 Misamis Construction of Access Road Concrete Road Occidental 1st leading to the seaport, Plaridel, District Misamis Occidental Engineering Office / Misamis Occidental 1st District Engineering Office

P00444130MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

65. P00444132MN 300117207408000 5,000,000 Concreting of secondary national highway from Municipal boundary Sapang Dalaga to Brgy. Poblacion, Concepcion, Misamis Occidental

P00444132MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.490 4,950,000 Misamis Concreting of secondary national Concrete Road Occidental 1st highway from Municipal boundary District Sapang Dalaga to Brgy. Poblacion, Engineering Office Concepcion, Misamis Occidental / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 274 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444132MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Local Roads and Bridges - Local Bridges - Local Infrastructure Program 15,000,000

66. P00444358MN 300119200400000 15,000,000 Construction of Footbridge to Bawbawon Island, Brgy. Panalsalan, Plaridel, Misamis Occidental

P00444358MN-CW1 Construction of Bridge - Construction of Square 500.000 14,850,000 Misamis Construction of Footbridge to Bridge meters Occidental 1st Bawbawon Island, Brgy. District Panalsalan, Plaridel, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00444358MN-EAO 150,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / 73,000,000 Improvement of Various Infrastructure including Local Projects

67. P00442863MN 300120200311000 48,000,000 Construction of Level III Water Supply System, Sapang Dalaga, Misamis Occidental

P00442863MN-CW1 Construction of Water Supply Construction of Number of 1.000 47,040,000 Misamis Systems - Construction of Level III Water Supply Water Occidental 1st Water Supply System, Sapang Systems Supply District Dalaga, Misamis Occidental Systems Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 275 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442863MN-EAO 960,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

68. P00442864MN 300120200310000 25,000,000 Construction of Level III Water Supply System, Panaon, Misamis Occidental

P00442864MN-CW1 Construction of Water Supply Construction of Number of 1.000 24,500,000 Misamis Systems - Construction of Level III Water Supply Water Occidental 1st Water Supply System, Panaon, Systems Supply District Misamis Occidental Systems Engineering Office / Misamis Occidental 1st District Engineering Office

P00442864MN-EAO 500,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 5,000,000

69. P00440906MN 300121200949000 5,000,000 Construction of Water Supply - Level II, Baliangao, Misamis Occidental

P00440906MN-CW1 Construction of Water Supply Construction of Number of 1.000 4,950,000 Misamis Systems - Construction of Water Water Supply Water Occidental 1st Supply - Level II, Baliangao, Systems Supply District Misamis Occidental Systems Engineering Office / Misamis Occidental 1st District Engineering Office

P00440906MN-EAO 50,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 276 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Occidental 2nd District Engineering Office 116 projects 3,354,071,000 MISAMIS OCCIDENTAL (SECOND) 116 projects 3,354,071,000 OO1: Ensure Safe and Reliable National Road System 29 projects 1,739,109,000

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 80,360,000 Roads - Primary Roads

1. P00400652MN 310104100195000 80,360,000 Ozamis-Pagadian Rd - K1663 + 722 - K1664 + 747, K1692 + 000 - K1692 + 129, K1692 + 141 - K1692 + 635, K1697 + 450 - K1697 + 843, K1699 + 143 - K1699 + 783

P00400652MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 6.630 77,547,400 Central Office / Pavement - at Specific Locations Concrete Misamis along Ozamis-Pagadian Rd Pavement Occidental 2nd (S00957MN) K1663 + 722 - K1699 + District 783 Engineering Office

P00400652MN-EAO 2,812,600 Central Office / Misamis Occidental 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 28,638,000 Roads - Tertiary Roads

2. P00400651MN 310106100531000 28,638,000 Bonifacio-Don Victoriano Rd - K1667 + (-589) - K1667 + 000, K1667 + 870 - K1668 + 037

P00400651MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 1.512 28,065,240 Misamis Pavement - at Specific Locations Concrete Occidental 2nd along Bonifacio-Don Victoriano Rd Pavement District (S00959MN) K1667 + (-589) - Engineering Office K1668 + 037 / Misamis Occidental 2nd District Engineering Office

P00400651MN-EAO 572,760 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 26,111,000 National Roads - Primary Roads

3. P00400367MN 310110100182000 14,591,000 Ozamis-Oroquieta Rd - K1703 + 000 - K1703 + 660, K1705 + 000 - K1705 + 524

MYPS: 03/03/2020 02:36:37 pm Page 277 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400367MN-CW1 Construction of Drainage Structure Construction of Lineal 1,184.000 14,299,180 Misamis along Road - at Specific Locations Drainage meters Occidental 2nd along Ozamis-Oroquieta Rd Structure along District (S01006MN) K1703 + 000 - K1705 + Road Engineering Office 524 / Misamis Occidental 2nd District Engineering Office

P00400367MN-EAO 291,820 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

4. P00400368MN 310110100183000 11,520,000 Ozamis-Pagadian Rd - K1670 + 332 - K1671 + 444

P00400368MN-CW1 Construction of Drainage Structure Construction of Lineal 1,111.000 11,289,600 Misamis along Road - along Drainage meters Occidental 2nd Ozamis-Pagadian Rd (S00957MN) Structure along District K1670 + 332 - K1671 + 444 Road Engineering Office / Misamis Occidental 2nd District Engineering Office

P00400368MN-EAO 230,400 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 280,500,000

5. P00400247MN 310201100491000 80,500,000 Ozamis-Pagadian Rd - K1662 + 460 - K1664 + 696

P00400247MN-CW1 Road Widening - along Road Widening Lane Km 4.472 77,682,500 Central Office / Ozamis-Pagadian Rd (S00957MN) Misamis K1662 + 460 - K1664 + 696 Occidental 2nd District Engineering Office

P00400247MN-EAO 2,817,500 Central Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 278 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

6. P00400323MN 310201100624000 50,000,000 Ozamis-Oroquieta Rd - K1712 + 187 - K1713 + 885

P00400323MN-CW1 Road Widening - along Road Widening Lane Km 3.394 49,000,000 Misamis Ozamis-Oroquieta Rd (S01006MN) Occidental 2nd K1712 + 187 - K1713 + 885 District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00400323MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

7. P00400324MN 310201100625000 50,000,000 Ozamis-Oroquieta Rd - K1713 + 885 - K1715 + 364

P00400324MN-CW1 Road Widening - along Road Widening Lane Km 2.972 49,000,000 Misamis Ozamis-Oroquieta Rd (S01006MN) Occidental 2nd K1713 + 885 - K1715 + 364 District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00400324MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

8. P00400325MN 310201100492000 100,000,000 Ozamis-Pagadian Rd - K1677+843 - K1680+818

P00400325MN-CW1 Road Widening - along Road Widening Lane Km 5.948 96,500,000 Central Office / Ozamis-Pagadian Rd (S00957MN) Misamis K1677+843 - K1680+818 Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 279 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400325MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 980,000,000

9. P00401214MN 310204100968000 50,000,000 Mt Malindang Eco Tourism Bypass Highway, (Paiton-Owayan-Matugnao Section), Misamis Occidental

P00401214MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.940 49,000,000 Misamis Mt Malindang Eco Tourism Bypass Concrete Road Occidental 2nd Highway, District (Paiton-Owayan-Matugnao Engineering Office Section), Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00401214MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

10. P00401215MN 310204100969000 50,000,000 Mt Malindang Eco Tourism Bypass Highway, (Tituron-Villaba-Salimpuno-Kimat Section), Misamis Occidental

P00401215MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.940 49,000,000 Misamis Mt Malindang Eco Tourism Bypass Concrete Road Occidental 2nd Highway, District (Tituron-Villaba-Salimpuno-Kimat Engineering Office Section), Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00401215MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

11. P00401216MN 310204100970000 50,000,000 Ozamis City-Clarin Interior By-Pass Link (OCCIBAL), (Bacolod-Labo-Airport Section), Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 280 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401216MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.772 41,160,000 Misamis Ozamis City-Clarin Interior By-Pass Concrete Road Occidental 2nd Link (OCCIBAL), District (Bacolod-Labo-Airport Section), Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00401216MN-ROW ROW Acquisition - Ozamis ROW Acquisition Square 16,407.500 8,000,000 Misamis City-Clarin Interior By-Pass Link meters Occidental 2nd (OCCIBAL), (Bacolod-Labo-Airport District Section), Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00401216MN-EAO 840,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

12. P00401217MN 310204100833000 100,000,000 Ozamis City-Clarin Interior By-Pass Link (OCCIBAL), City, Misamis Occidental

P00401217MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.300 67,550,000 Central Office / Ozamis City-Clarin Interior By-Pass Concrete Road Misamis Link (OCCIBAL), Ozamiz City, Occidental 2nd Misamis Occidental District Engineering Office

P00401217MN-ROW ROW Acquisition - Ozamis ROW Acquisition Square 4,900.000 30,000,000 Central Office / City-Clarin Interior By-Pass Link meters Misamis (OCCIBAL), Ozamiz City, Misamis Occidental 2nd Occidental District Engineering Office

P00401217MN-EAO 2,450,000 Central Office / Misamis Occidental 2nd District Engineering Office

13. P00401218MN 310204100836000 100,000,000 Panguil Bay Access Road, (Bonifacio Coastal Section), Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 281 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401218MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.174 96,500,000 Central Office / Panguil Bay Access Road, Concrete Road Misamis (Bonifacio Coastal Section), Occidental 2nd Misamis Occidental District Engineering Office

P00401218MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

14. P00401219MN 310204100972000 30,000,000 - Bonifacio Bypass Road, (Tiaman-Lumapas Section), Misamis Occidental

P00401219MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.420 29,400,000 Misamis Tangub - Bonifacio Bypass Road, Concrete Road Occidental 2nd (Tiaman-Lumapas Section), District Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00401219MN-EAO 600,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

15. P00401220MN 310204100853000 100,000,000 Tangub - Bonifacio Bypass Road, (Bonifacio Section), Misamis Occidental

P00401220MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.620 96,500,000 Central Office / Tangub - Bonifacio Bypass Road, Concrete Road Misamis (Bonifacio Section), Misamis Occidental 2nd Occidental District Engineering Office

P00401220MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

16. P00401221MN 310204100855000 75,000,000 Tangub - Bonifacio Bypass Road, (Pisaan - Buenavista Section), Misamis Occidental

P00401221MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.000 72,375,000 Central Office / Tangub - Bonifacio Bypass Road, Concrete Road Misamis (Pisaan - Buenavista Section), Occidental 2nd Misamis Occidental District Engineering Office MYPS: 03/03/2020 02:36:37 pm Page 282 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401221MN-EAO 2,625,000 Central Office / Misamis Occidental 2nd District Engineering Office

17. P00401222MN 310204100973000 50,000,000 Tangub - Bonifacio Bypass Road, (San Vicente-Tugas-Sumirap Section), Misamis Occidental

P00401222MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.460 49,000,000 Misamis Tangub - Bonifacio Bypass Road, Concrete Road Occidental 2nd (San Vicente-Tugas-Sumirap District Section), Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00401222MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

18. P00401223MN 310204100854000 75,000,000 Tangub - Bonifacio Bypass Road, (Kanao-Kanao-Anonnang Section), Misamis Occidental

P00401223MN-CW1 Construction of Concrete Road - Construction of Lane Km 4.900 72,375,000 Central Office / Tangub - Bonifacio Bypass Road, Concrete Road Misamis (Kanao-Kanao-Anonnang Section), Occidental 2nd Misamis Occidental District Engineering Office

P00401223MN-EAO 2,625,000 Central Office / Misamis Occidental 2nd District Engineering Office

19. P00401224MN 310204100835000 100,000,000 Ozamis Coastal Bypass Road, Package A, Misamis Occidental

P00401224MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.514 86,850,000 Central Office / Ozamis Coastal Bypass Road, Concrete Road Misamis Package A, Misamis Occidental Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 283 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401224MN-ROW ROW Acquisition - Ozamis Coastal ROW Acquisition Square 1,952.030 10,000,000 Central Office / Bypass Road, Package A, Misamis meters Misamis Occidental Occidental 2nd District Engineering Office

P00401224MN-EAO 3,150,000 Central Office / Misamis Occidental 2nd District Engineering Office

20. P00401225MN 310204100974000 50,000,000 Tudela Bypass Road (Tigdok - Tongo Section), Misamis Occidental

P00401225MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.396 49,000,000 Misamis Tudela Bypass Road (Tigdok - Concrete Road Occidental 2nd Tongo Section), Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00401225MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

21. P00401226MN 310204100834000 100,000,000 Ozamis Coastal Bypass Road Extension, Malaubang-Tinago Section, Package A, Misamis Occidental

P00401226MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.458 77,200,000 Central Office / Ozamis Coastal Bypass Road Concrete Road Misamis Extension, Malaubang-Tinago Occidental 2nd Section, Package A, Misamis District Occidental Engineering Office

P00401226MN-ROW ROW Acquisition - Ozamis Coastal ROW Acquisition Square 16,722.000 20,000,000 Central Office / Bypass Road Extension, meters Misamis Malaubang-Tinago Section, Occidental 2nd Package A, Misamis Occidental District Engineering Office

P00401226MN-EAO 2,800,000 Central Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 284 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

22. P00401521MN 310204100971000 50,000,000 Ozamis Coastal Bypass Road Extension, Malaubang - Tinago Section, Package B, Misamis Occidental

P00401521MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.780 49,000,000 Misamis Ozamis Coastal Bypass Road Concrete Road Occidental 2nd Extension, Malaubang - Tinago District Section, Package B, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00401521MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Network Development - Construction of Missing Links/ New Roads 300,000,000

23. P00401350MN 310205100430000 100,000,000 Bonifacio-Don Victoriano Road, Package 1, Misamis Occidental

P00401350MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.667 96,500,000 Central Office / Bonifacio-Don Victoriano Road, Concrete Road Misamis Package 1, Misamis Occidental Occidental 2nd District Engineering Office

P00401350MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

24. P00401351MN 310205100431000 100,000,000 Bonifacio-Don Victoriano Road, Package 2, Misamis Occidental

P00401351MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.667 96,500,000 Central Office / Bonifacio-Don Victoriano Road, Concrete Road Misamis Package 2, Misamis Occidental Occidental 2nd District Engineering Office

P00401351MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

25. P00401352MN 310205100429000 100,000,000 Bonifacio-Don Victoriano Road, Napangan-Mansawan Section, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 285 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401352MN-CW1 Construction of Gravel Road - Construction of Lane Km 4.052 48,250,000 Central Office / Bonifacio-Don Victoriano Road, Gravel Road Misamis Napangan-Mansawan Section, Occidental 2nd Misamis Occidental District Engineering Office

P00401352MN-CW2 Construction of Concrete Road - Construction of Lane Km 3.840 46,320,000 Bonifacio-Don Victoriano Road, Concrete Road Napangan-Mansawan Section, Misamis Occidental

P00401352MN-ROW ROW Acquisition - Bonifacio-Don ROW Acquisition Square 4,251.000 2,000,000 Central Office / Victoriano Road, meters Misamis Napangan-Mansawan Section, Occidental 2nd Misamis Occidental District Engineering Office

P00401352MN-EAO 3,430,000 Central Office / Misamis Occidental 2nd District Engineering Office

Network Development - Off-Carriageway Improvement - Primary Roads 6,000,000

26. P00400451MN 310207100112000 6,000,000 Ozamis-Pagadian Rd - K1685 + 682

P00400451MN-CW1 Off-Carriageway Improvement: Off-Carriageway Number of 1.000 5,880,000 Misamis Flaring of Intersections / Improvement: Intersectio Occidental 2nd Improvement of Intersections - Flaring of ns District along Ozamis-Pagadian Rd Intersections / Engineering Office (S00957MN) K1685 + 682 - 0 Improvement of / Misamis Intersections Occidental 2nd District Engineering Office

P00400451MN-EAO 120,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Bridge - Retrofitting/ Strengthening of Permanent Bridges 6,000,000

27. P00400846MN 310303100966000 4,000,000 Sinonoc Br. (B01145MN) along Ozamis-Oroquieta Rd

MYPS: 03/03/2020 02:36:37 pm Page 286 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400846MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 3,920,000 Misamis Bridge - Sinonoc Br. (B01145MN) Strengthening of Bridges Occidental 2nd along Ozamis-Oroquieta Rd Bridge District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00400846MN-EAO 80,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

28. P00400847MN 310303100965000 2,000,000 Moraji Br. 2 (B01825MN) along Bonifacio-Don Victoriano Rd

P00400847MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 1,960,000 Misamis Bridge - Moraji Br. 2 (B01825MN) Strengthening of Bridges Occidental 2nd along Bonifacio-Don Victoriano Rd Bridge District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00400847MN-EAO 40,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Bridge - Widening of Permanent Bridges 31,500,000

29. P00400848MN 310305101145000 31,500,000 Dimalooc Br. (B00354MN) along Ozamis-Pagadian Rd

P00400848MN-CW1 Widening of Bridge - Dimalooc Br. Widening of Square 228.960 30,870,000 Misamis (B00354MN) along Bridge meters Occidental 2nd Ozamis-Pagadian Rd District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 287 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400848MN-EAO 630,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office OO2: Protect Lives and Properties Against Major Floods 5 projects 288,192,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 288,192,000

30. P00420490MN 320101105384000 50,000,000 Construction of Ozamis City Drainage System, Package 2, Misamis, Occidental

P00420490MN-CW1 Construction of Flood Mitigation Construction of Lineal 456.046 49,000,000 Misamis Structure - Construction of Ozamis Flood Mitigation meters Occidental 2nd City Drainage System, Package 2, Structure District Misamis, Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00420490MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

31. P00420491MN 320101105385000 50,000,000 Construction of Slope Protection (Upstream and Downstream) of Tudela Bridge along Ozamis-Oroquieta Road, Tudela, Misamis Occidental

P00420491MN-CW1 Construction of Slope Protection Construction of Square 4,192.433 49,000,000 Misamis Structure - Construction of Slope Slope Protection meters Occidental 2nd Protection (Upstream and Structure District Downstream) of Tudela Bridge Engineering Office along Ozamis-Oroquieta Road, / Misamis Tudela, Misamis Occidental Occidental 2nd District Engineering Office

P00420491MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 288 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

32. P00420492MN 320101105386000 38,192,000 Construction of Slope Protection, Upstream and Downstream of Bagumbang Bridge along Ozamis-Pagadian Road, Misamis Occidental

P00420492MN-CW1 Construction of Slope Protection Construction of Square 3,202.348 37,428,160 Misamis Structure - Construction of Slope Slope Protection meters Occidental 2nd Protection, Upstream and Structure District Downstream of Bagumbang Bridge Engineering Office along Ozamis-Pagadian Road, / Misamis Misamis Occidental Occidental 2nd District Engineering Office

P00420492MN-EAO 763,840 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

33. P00420493MN 320101105390000 50,000,000 Construction of Ozamis City Drainage System, Package 3, Misamis, Occidental

P00420493MN-CW1 Construction of Flood Mitigation Construction of Lineal 456.046 49,000,000 Misamis Structure - Construction of Ozamis Flood Mitigation meters Occidental 2nd City Drainage System, Package 3, Structure District Misamis, Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00420493MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

34. P00420703MN 320101105389000 100,000,000 Construction of Ozamis City Drainage System, Package 1, Misamis, Occidental

P00420703MN-CW1 Construction of Flood Mitigation Construction of Lineal 4,932.000 98,000,000 Misamis Structure - Construction of Ozamis Flood Mitigation meters Occidental 2nd City Drainage System, Package 1, Structure District Misamis, Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 289 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420703MN-EAO 2,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office Convergence and Special Support Program 5 projects 264,000,000

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations 225,000,000

35. P00431560MN 300203101325000 50,000,000 Gandawan-Lake Duminagat Road leading to Lake Duminagat, Brgys. Nueva Vista-Gandawan & Lake Duminagat, Don Victoriano, Misamis Occidental

P00431560MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.300 49,000,000 Misamis Gandawan-Lake Duminagat Road Concrete Road Occidental 2nd leading to Lake Duminagat, Brgys. District Nueva Vista-Gandawan & Lake Engineering Office Duminagat, Don Victoriano, / Misamis Misamis Occidental Occidental 2nd District Engineering Office

P00431560MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

36. P00431561MN 300203101109000 100,000,000 Access Road leading to Mt. Malindang Eco-Tourism Park with Park Development, Misamis Occidental

P00431561MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.667 96,500,000 Central Office / Access Road leading to Mt. Concrete Road Misamis Malindang Eco-Tourism Park with Occidental 2nd Park Development, Misamis District Occidental Engineering Office

P00431561MN-EAO 3,500,000 Central Office / Misamis Occidental 2nd District Engineering Office

37. P00431777MN 300203101324000 25,000,000 Access Road leading to Mt. Malindang Eco-Tourism Park with Park Development (Package B), Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 290 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431777MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.000 24,500,000 Misamis Access Road leading to Mt. Concrete Road Occidental 2nd Malindang Eco-Tourism Park with District Park Development (Package B), Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00431777MN-EAO 500,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

38. P00432321MN 300203101326000 50,000,000 Access Road leading to Piduan Falls, Don Victoriano, Misamis Occidental

P00432321MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.920 49,000,000 Misamis Access Road leading to Piduan Concrete Road Occidental 2nd Falls, Don Victoriano, Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00432321MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Construction/ Improvement of Access Roads leading to Trades, Industries and 39,000,000 Economic Zones

39. P00431562MN 300204100598000 39,000,000 Road leading to Industrial Area, Sta. Maria, Minsubong and lsidro D. Tan, in support of IT-BPM, Tangub City, Misamis Occidental

P00431562MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.000 38,220,000 Misamis Road leading to Industrial Area, Concrete Road Occidental 2nd Sta. Maria, Minsubong and lsidro District D. Tan, in support of IT-BPM, Engineering Office Tangub City, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 291 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00431562MN-EAO 780,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office Local Program 77 projects 1,062,770,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 20,500,000

40. P00442909MN 300105200314000 20,500,000 Construction (Completion) of Two-Storey Building (Standard Design) of Misamis Occidental 2nd DEO, Sta. Maria, Tangub City

P00442909MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 20,090,000 Misamis Building - Construction Multi Purpose Buildings Occidental 2nd (Completion) of Two-Storey Building District Building (Standard Design) of Engineering Office Misamis Occidental 2nd DEO, Sta. / Misamis Maria, Tangub City Occidental 2nd District Engineering Office

P00442909MN-EAO 410,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 431,500,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

41. P00442772MN 300103201611000 80,000,000 Construction and Improvement of Multi-Purpose Building, Tangub City Cluster, Misamis Occidental

P00442772MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 77,200,000 Central Office / Building - Construction and Multi Purpose Buildings Misamis Improvement of Multi-Purpose Building Occidental 2nd Building, Tangub City Cluster, District Misamis Occidental Engineering Office

P00442772MN-EAO 2,800,000 Central Office / Misamis Occidental 2nd District Engineering Office

42. P00442775MN 300103202773000 3,000,000 Construction of Multi-Purpose Building, Triunfu, Ozamiz City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 292 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442775MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,940,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Triunfu, Building District Ozamiz City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442775MN-EAO 60,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

43. P00442776MN 300103202761000 5,000,000 Construction of Multi-Purpose Building, Don Victoriano Cluster, Misamis Occidental

P00442776MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,900,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Don Building District Victoriano Cluster, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00442776MN-EAO 100,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

44. P00442778MN 300103202759000 20,000,000 Construction of Multi-Purpose Building including Site Development, Clarin Cluster, Misamis Occidental

P00442778MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,600,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building including Building District Site Development, Clarin Cluster, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 293 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442778MN-EAO 400,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

45. P00442779MN 300103202768000 20,000,000 Construction of Multi-Purpose Building, Cluster 2nd District, Misamis Occidental

P00442779MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,600,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Cluster Building District 2nd District, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442779MN-EAO 400,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

46. P00442780MN 300103202774000 20,000,000 Construction of Multi-Purpose Building, Tudela Cluster, Misamis Occidental

P00442780MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,600,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Tudela Building District Cluster, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442780MN-EAO 400,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

47. P00442918MN 300103201612000 200,000,000 Construction of Convention Center, Ozamis City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 294 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442918MN-CW1 Construction of Other Building - Construction of Number of 1.000 193,000,000 Central Office / Construction of Convention Center, Other Building Buildings Region X Ozamis City, Misamis Occidental

P00442918MN-EAO 7,000,000 Central Office / Region X

48. P00442920MN 300103202753000 1,000,000 Construction (Completion) of Multi-Purpose Building, Balon, Tudela, Misamis Occidental

P00442920MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Building - Construction Multi Purpose Buildings Occidental 2nd (Completion) of Multi-Purpose Building District Building, Balon, Tudela, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

49. P00442921MN 300103202754000 1,000,000 Construction (Completion) of Multi-Purpose Building, San Isidro Alto, Sinacaban, Misamis Occidental

P00442921MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Building - Construction Multi Purpose Buildings Occidental 2nd (Completion) of Multi-Purpose Building District Building, San Isidro Alto, Engineering Office Sinacaban, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

50. P00442922MN 300103202755000 2,700,000 Construction of Multi-Purpose Building, Bolinsong, Bonifacio, Misamis Occidental

P00442922MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Bolinsong, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442922MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

51. P00442923MN 300103202756000 2,700,000 Construction of Multi-Purpose Building, Buracan, Bonifacio, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 295 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442923MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Buracan, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442923MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

52. P00442924MN 300103202757000 2,700,000 Construction of Multi-Purpose Building, Calolot, Bonifacio, Misamis Occidental

P00442924MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Calolot, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442924MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

53. P00442925MN 300103202758000 5,000,000 Construction of Multi-Purpose Building, Catadman, Ozamiz City, Misamis Occidental

P00442925MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,900,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Catadman, Building District Ozamiz City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 296 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442925MN-EAO 100,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

54. P00442926MN 300103202760000 2,700,000 Construction of Multi-Purpose Building, Dimalco, Bonifacio, Misamis Occidental

P00442926MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Dimalco, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442926MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

55. P00442927MN 300103202762000 2,700,000 Construction of Multi-Purpose Building, Dullan, Bonifacio, Misamis Occidental

P00442927MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Dullan, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442927MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

56. P00442928MN 300103202763000 2,500,000 Construction of Multi-Purpose Building, Embargo, Ozamiz City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 297 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442928MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Embargo, Building District Ozamiz City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442928MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

57. P00442929MN 300103202764000 2,500,000 Construction of Multi-Purpose Building, Gotokan Diot, Ozamiz, Misamis Occidental

P00442929MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Gotokan Building District Diot, Ozamiz, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442929MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

58. P00442930MN 300103202765000 2,700,000 Construction of Multi-Purpose Building, Linconan, Bonifacio, Misamis Occidental

P00442930MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Linconan, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 298 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442930MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

59. P00442931MN 300103202766000 2,700,000 Construction of Multi-Purpose Building, Lower Usugan, Bonifacio, Misamis Occidental

P00442931MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Lower Building District Usugan, Bonifacio, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00442931MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

60. P00442932MN 300103202767000 2,700,000 Construction of Multi-Purpose Building, Montol, Bonifacio, Misamis Occidental

P00442932MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Montol, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442932MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

61. P00442933MN 300103202769000 3,000,000 Construction of Multi-Purpose Building, Penacio, Clarin, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 299 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442933MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,940,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Penacio, Building District Clarin, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442933MN-EAO 60,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

62. P00442934MN 300103202770000 2,500,000 Construction of Multi-Purpose Building, Poblacion, Clarin, Misamis Occidental

P00442934MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Poblacion, Building District Clarin, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442934MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

63. P00442935MN 300103202771000 2,700,000 Construction of Multi-Purpose Building, Remedios, Bonifacio, Misamis Occidental

P00442935MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Remedios, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 300 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442935MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

64. P00442936MN 300103202772000 2,500,000 Construction of Multi-Purpose Building, Sangay Diot, Ozamiz City, Misamis Occidental

P00442936MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Sangay Building District Diot, Ozamiz City, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00442936MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

65. P00442937MN 300103202776000 2,700,000 Construction of Multi-Purpose Building, Tusik, Bonifacio, Misamis Occidental

P00442937MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,646,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Tusik, Building District Bonifacio, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442937MN-EAO 54,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

66. P00443283MN 300103202775000 36,500,000 Construction of Multi-Purpose Building, Cluster, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 301 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443283MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 35,770,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Cluster, Building District Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443283MN-EAO 730,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 135,000,000 Program

67. P00440908MN 300104218093000 30,000,000 Construction of Multi-Purpose Buildings, Misamis Occidental

P00440908MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 29,700,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Buildings, Misamis Building District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00440908MN-EAO 300,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

68. P00441054MN 300104218066000 2,700,000 Construction and Improvement of Multi-Purpose Building, Bongabong, Tudela, Misamis Occidental

P00441054MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Bongabong, Tudela, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 302 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441054MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

69. P00444030MN 300104218067000 30,000,000 Construction/Improvement of Multi-Purpose Building, Cluster, Misamis Occidental

P00444030MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 29,700,000 Misamis Building - Multi Purpose Buildings Occidental 2nd Construction/Improvement of Building District Multi-Purpose Building, Cluster, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444030MN-EAO 300,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

70. P00444035MN 300104218070000 2,700,000 Construction and Improvement of Multi-Purpose Building, Canibungan Proper, Tudela, Misamis Occidental

P00444035MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Canibungan Proper, Engineering Office Tudela, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444035MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

71. P00444037MN 300104218071000 2,700,000 Construction and Improvement of Multi-Purpose Building, Casilak, Tudela, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 303 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444037MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Casilak, Tudela, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00444037MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

72. P00444039MN 300104218072000 2,600,000 Construction and Improvement of Multi-Purpose Building, Duangican, Tudela, Misamis Occidental

P00444039MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,574,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Duangican, Tudela, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444039MN-EAO 26,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

73. P00444040MN 300104218073000 1,000,000 Completion of Multi-Purpose Building, Gumbil, Tudela, Misamis Occidental

P00444040MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Building - Completion of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Gumbil, Building District Tudela, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

74. P00444042MN 300104218074000 2,600,000 Construction and Improvement of Multi-Purpose Building, Locsoon, Tudela, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 304 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444042MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,574,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Locsoon, Tudela, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00444042MN-EAO 26,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

75. P00444044MN 300104218075000 2,600,000 Construction and Improvement of Multi-Purpose Building, Maribojoc, Tudela, Misamis Occidental

P00444044MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,574,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Maribojoc, Tudela, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444044MN-EAO 26,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

76. P00444046MN 300104218076000 2,600,000 Construction and Improvement of Multi-Purpose Building, Upper Centro, Tudela, Misamis Occidental

P00444046MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,574,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Upper Centro, Tudela, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 305 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444046MN-EAO 26,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

77. P00444047MN 300104218077000 2,600,000 Construction and Improvement of Multi-Purpose Building, Yahong, Tudela, Misamis Occidental

P00444047MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,574,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Yahong, Tudela, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00444047MN-EAO 26,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

78. P00444049MN 300104218078000 2,700,000 Construction and Improvement of Multi-Purpose Building, Dinas, Sinacaban, Misamis Occidental

P00444049MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Dinas, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444049MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 306 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

79. P00444051MN 300104218079000 2,700,000 Construction and Improvement of Multi-Purpose Building, Libertad Alto, Sinacaban, Misamis Occidental

P00444051MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Libertad Alto, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444051MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

80. P00444052MN 300104218080000 2,700,000 Construction and Improvement of Multi-Purpose Building, Libertad Bajo, Sinacaban, Misamis Occidental

P00444052MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Libertad Bajo, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444052MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

81. P00444054MN 300104218081000 2,700,000 Construction and Improvement of Multi-Purpose Building, San Isidro Bajo, Sinacaban, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 307 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444054MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, San Isidro Bajo, Engineering Office Sinacaban, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444054MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

82. P00444056MN 300104218082000 2,700,000 Construction and Improvement of Multi-Purpose Building, San Vicente, Sinacaban, Misamis Occidental

P00444056MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, San Vicente, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444056MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

83. P00444057MN 300104218083000 2,700,000 Construction and Improvement of Multi-Purpose Building, Señor, Sinacaban, Misamis Occidental

P00444057MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Señor, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 308 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444057MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

84. P00444059MN 300104218084000 2,700,000 Construction and Improvement of Multi-Purpose Building, Tipan, Sinacaban, Misamis Occidental

P00444059MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,673,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Tipan, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444059MN-EAO 27,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

85. P00444061MN 300104218085000 5,000,000 Construction and Improvement of Multi-Purpose Building including Sports Facilities, Villa Consuelo, Ozamiz, Misamis Occidental

P00444061MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building including Sports Facilities, Engineering Office Villa Consuelo, Ozamiz, Misamis / Misamis Occidental Occidental 2nd District Engineering Office

P00444061MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 309 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

86. P00444062MN 300104218086000 4,000,000 Construction and Improvement of Multi-Purpose Building, Liposong, Ozamiz, Misamis Occidental

P00444062MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,960,000 Misamis Building - Construction and Multi Purpose Buildings Occidental 2nd Improvement of Multi-Purpose Building District Building, Liposong, Ozamiz, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444062MN-EAO 40,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

87. P00444064MN 300104218088000 5,000,000 Construction of Multi-Purpose Building, Tangub City, Misamis Occidental

P00444064MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Tangub Building District City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00444064MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

88. P00444066MN 300104218089000 5,000,000 Construction / Rehabilitation Multi-Purpose Building Brgy. Villa Consuelo, Ozamiz City

P00444066MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Building - Construction / Multi Purpose Buildings Occidental 2nd Rehabilitation Multi-Purpose Building District Building Brgy. Villa Consuelo, Engineering Office Ozamiz City / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 310 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444066MN-EAO 50,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

89. P00444067MN 300104218090000 10,000,000 Completion/Improvement of Multi-Purpose Building (Tudela Gymnasium), Tudela, Misamis Occidental

P00444067MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Misamis Building - Multi Purpose Buildings Occidental 2nd Completion/Improvement of Building District Multi-Purpose Building (Tudela Engineering Office Gymnasium), Tudela, Misamis / Misamis Occidental Occidental 2nd District Engineering Office

P00444067MN-EAO 100,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

90. P00444069MN 300104218091000 3,000,000 Construction and/or Repair/Rehabilitation of Multi-Purpose Building, Brgy. Villa Consuelo, Ozamis City, Misamis Occidental

P00444069MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction and/or Multi Purpose Buildings Occidental 2nd Repair/Rehabilitation of Building District Multi-Purpose Building, Brgy. Villa Engineering Office Consuelo, Ozamis City, Misamis / Misamis Occidental Occidental 2nd District Engineering Office

P00444069MN-EAO 30,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

91. P00444071MN 300104218092000 2,000,000 Construction of Multi-Purpose Building Brgy. Lorenzo Tan, Tangub City, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 311 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444071MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building Brgy. Building District Lorenzo Tan, Tangub City, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00444071MN-EAO 20,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 36,270,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

92. P00444624MN 300106200507000 36,270,000 Construction/Improvement of Sinonoc Seawall, Sinacaban, Misamis Occidental

P00444624MN-CW1 Construction of Flood Mitigation Construction of Lineal 661.000 35,544,600 Misamis Structure - Flood Mitigation meters Occidental 2nd Construction/Improvement of Structure District Sinonoc Seawall, Sinacaban, Engineering Office Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444624MN-EAO 725,400 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 280,000,000 Improvement of Various Infrastructure including Local Projects

93. P00442766MN 300116203212000 15,000,000 Concreting of Mialen Barangay Road, Clarin, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 312 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442766MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.980 14,700,000 Misamis Concreting of Mialen Barangay Concrete Road Occidental 2nd Road, Clarin, Misamis Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442766MN-EAO 300,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

94. P00442785MN 300116203211000 20,000,000 Concreting of Guinalaban - Paiton Road, Tangub City

P00442785MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.080 19,600,000 Misamis Concreting of Guinalaban - Paiton Concrete Road Occidental 2nd Road, Tangub City District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442785MN-EAO 400,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

95. P00442786MN 300116203213000 15,000,000 Concreting of Road Lilo-an-Lower Usugan, Bonifacio, Misamis Occidental

P00442786MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.442 14,700,000 Misamis Concreting of Road Lilo-an-Lower Concrete Road Occidental 2nd Usugan, Bonifacio, Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 313 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442786MN-EAO 300,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

96. P00442787MN 300116203219000 10,000,000 Concreting of Tinaclaan Balulao Canicapan Road, Clarin, Misamis Occidental

P00442787MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.280 9,800,000 Misamis Concreting of Tinaclaan Balulao Concrete Road Occidental 2nd Canicapan Road, Clarin, Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442787MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

97. P00442788MN 300116203220000 45,000,000 Construction of road Leading to Convention Center, Ozamiz City, Misamis Occidental

P00442788MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.922 44,100,000 Misamis Construction of road Leading to Concrete Road Occidental 2nd Convention Center, Ozamiz City, District Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442788MN-EAO 900,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

98. P00442789MN 300116203224000 30,000,000 Construction/Improvement of Upper Centro-Balon-Sinuza Road, Tudela, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 314 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442789MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.860 29,400,000 Misamis Construction/Improvement of Concrete Road Occidental 2nd Upper Centro-Balon-Sinuza Road, District Tudela, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442789MN-EAO 600,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

99. P00442790MN 300116203216000 10,000,000 Concreting of Road Liposong-Gotocan Diot-Sangay Diot, Ozamiz City, Misamis Occidental

P00442790MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.268 9,800,000 Misamis Concreting of Road Concrete Road Occidental 2nd Liposong-Gotocan Diot-Sangay District Diot, Ozamiz City, Misamis Engineering Office Occidental / Misamis Occidental 2nd District Engineering Office

P00442790MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

100. P00443100MN 300116203217000 10,000,000 Concreting of Road, Labo-Embargo-Gotokan Daku Road, Ozamis City

P00443100MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.380 9,800,000 Misamis Concreting of Road, Concrete Road Occidental 2nd Labo-Embargo-Gotokan Daku District Road, Ozamis City Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 315 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443100MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

101. P00443101MN 300116203218000 10,000,000 Concreting of Segatic Diot Road, Clarin, Misamis Occidental

P00443101MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.440 9,800,000 Misamis Concreting of Segatic Diot Road, Concrete Road Occidental 2nd Clarin, Misamis Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443101MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

102. P00443659MN 300116203214000 20,000,000 Concreting of Road, Tangub City, Misamis Occidental

P00443659MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.000 19,600,000 Misamis Concreting of Road, Tangub City, Concrete Road Occidental 2nd Misamis Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443659MN-EAO 400,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

103. P00443660MN 300116203215000 50,000,000 Construction of Acces road to Ozamis Airport, Ozamis City

MYPS: 03/03/2020 02:36:37 pm Page 316 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443660MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.380 49,000,000 Misamis Construction of Acces road to Concrete Road Occidental 2nd Ozamis Airport, Ozamis City District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443660MN-EAO 1,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

104. P00443661MN 300116203221000 10,000,000 Improvement of Canibungan Daku-Canibungan Putol Road, Clarin, Misamis Occidental

P00443661MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.250 9,800,000 Misamis Improvement of Canibungan Concrete Road Occidental 2nd Daku-Canibungan Putol Road, District Clarin, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443661MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

105. P00443662MN 300116203222000 25,000,000 Improvement/Concreting of Polao-Kauswagan Road, Tangub City, Misamis Occidental

P00443662MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.000 24,500,000 Misamis Improvement/Concreting of Concrete Road Occidental 2nd Polao-Kauswagan Road, Tangub District City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 317 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443662MN-EAO 500,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

106. P00443663MN 300116203223000 10,000,000 Improvement of Pantaon-Dalapang Road, Ozamiz City, Misamis Occidental

P00443663MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.250 9,800,000 Misamis Improvement of Pantaon-Dalapang Concrete Road Occidental 2nd Road, Ozamiz City, Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00443663MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 70,000,000

107. P00440909MN 300117207410000 20,000,000 Construction of Roads, Misamis Occidental

P00440909MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.829 19,800,000 Misamis Construction of Roads, Misamis Concrete Road Occidental 2nd Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00440909MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

108. P00444134MN 300117207411000 20,000,000 Concreting/Improvement of Villa Consuelo Road, Osamis, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 318 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444134MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.400 19,800,000 Misamis Concreting/Improvement of Villa Concrete Road Occidental 2nd Consuelo Road, Osamis, Misamis District Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00444134MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

109. P00444136MN 300117207412000 20,000,000 Concreting of Calabayan - Pantaon Road, Osamis, Misamis Occidental

P00444136MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.400 19,800,000 Misamis Concreting of Calabayan - Pantaon Concrete Road Occidental 2nd Road, Osamis, Misamis Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

P00444136MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

110. P00444139MN 300117207413000 10,000,000 Concreting of Tangub City Streets, Misamis Occidental

P00444139MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.250 9,900,000 Misamis Concreting of Tangub City Streets, Concrete Road Occidental 2nd Misamis Occidental District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 319 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444139MN-EAO 100,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / 10,000,000 Improvement of Various Infrastructure including Local Projects

111. P00442797MN 300118200291000 10,000,000 Construction of Footbridge connecting to the Public Market, Tangub City

P00442797MN-CW1 Construction of Bridge - Construction of Square 72.036 9,800,000 Misamis Construction of Footbridge Bridge meters Occidental 2nd connecting to the Public Market, District Tangub City Engineering Office / Misamis Occidental 2nd District Engineering Office

P00442797MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / 59,500,000 Improvement of Various Infrastructure including Local Projects

112. P00442769MN 300120200177000 10,000,000 Construction of Water System, Tangub City, Misamis Occidental

P00442769MN-CW1 Construction of Water Supply Construction of Number of 1.000 9,800,000 Misamis Systems - Construction of Water Water Supply Water Occidental 2nd System, Tangub City, Misamis Systems Supply District Occidental Systems Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 320 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442769MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

113. P00442770MN 300120200312000 10,000,000 Construction/Rehabilitation/Improvement of Water Supply System, Ozamiz City, Misamis Occidental

P00442770MN-CW1 Construction of Water Supply Construction of Number of 1.000 9,800,000 Misamis Systems - Water Supply Water Occidental 2nd Construction/Rehabilitation/Impro Systems Supply District vement of Water Supply System, Systems Engineering Office Ozamiz City, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00442770MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

114. P00444395MN 300120200313000 30,000,000 Construction (Completion) of Water System, Tangub City, Misamis Occidental

P00444395MN-CW1 Construction of Water Supply Construction of Number of 1.000 29,400,000 Misamis Systems - Construction Water Supply Water Occidental 2nd (Completion) of Water System, Systems Supply District Tangub City, Misamis Occidental Systems Engineering Office / Misamis Occidental 2nd District Engineering Office

P00444395MN-EAO 600,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

115. P00444396MN 300120200314000 9,500,000 Construction/Rehabilitation/Improvement of Water Supply System, Clarin, Misamis Occidental

MYPS: 03/03/2020 02:36:37 pm Page 321 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444396MN-CW1 Construction of Water Supply Construction of Number of 1.000 9,310,000 Misamis Systems - Water Supply Water Occidental 2nd Construction/Rehabilitation/Impro Systems Supply District vement of Water Supply System, Systems Engineering Office Clarin, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00444396MN-EAO 190,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 20,000,000

116. P00444583MN 300121200950000 20,000,000 Construction/Improvement of Water System, Misamis Occidental Cluster

P00444583MN-CW1 Construction of Water Supply Construction of Number of 1.000 19,800,000 Misamis Systems - Water Supply Water Occidental 2nd Construction/Improvement of Systems Supply District Water System, Misamis Occidental Systems Engineering Office Cluster / Misamis Occidental 2nd District Engineering Office

P00444583MN-EAO 200,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 322 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Oriental 1st District Engineering Office 107 projects 3,487,500,000 MISAMIS ORIENTAL (FIRST) 107 projects 3,487,500,000 OO1: Ensure Safe and Reliable National Road System 50 projects 2,688,196,000

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 60,000,000 Roads - Primary Roads

1. P00400653MN 310104100194000 60,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1358 + 175 - K1359 + 115, K1379 + 079 - K1379 + 300, K1380 + 900 - K1381 + 355, K1381 + 890 - K1382 + 547, K1392 + 484 - K1392 + 726, K1394 + 221 - K1395 + 000, K1395 + 942 - K1395 + 977

P00400653MN-CW1 Reconstruction to Concrete Reconstruction to Lane Km 6.649 57,900,000 Central Office / Pavement - at Specific Locations Concrete Misamis Oriental along Butuan City-Cagayan de Oro Pavement 1st District City-Iligan City Rd (S00485MN) Engineering Office K1358 + 175 - K1395 + 977

P00400653MN-EAO 2,100,000 Central Office / Misamis Oriental 1st District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 92,252,000 Collapse, and Landslide - Primary Roads

2. P00400101MN 310107100167000 12,252,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1282 + (-028) - K1282 + 037.25

P00400101MN-CW1 Construction of Road Slope Construction of Square 1,247.310 12,006,960 Misamis Oriental Protection Structure - along Road Slope meters 1st District Butuan City-Cagayan de Oro Protection Engineering Office City-Iligan City Rd (S00473MN) Structure / Misamis Oriental K1282 + (-028) - K1282 + 037.25 1st District Engineering Office

P00400101MN-EAO 245,040 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

3. P00400102MN 310107100168000 40,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1396 + 000 - K1396 + 750

P00400102MN-CW1 Construction of Road Slope Construction of Square 2,024.250 39,200,000 Misamis Oriental Protection Structure - along Road Slope meters 1st District Butuan City-Cagayan de Oro Protection Engineering Office City-Iligan City Rd (S00485MN) Structure / Misamis Oriental K1396 + 000 - K1396 + 750 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 323 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400102MN-EAO 800,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

4. P00400103MN 310107100169000 40,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1396 + 750 - K1397 + 500

P00400103MN-CW1 Construction of Road Slope Construction of Square 3,765.000 39,200,000 Misamis Oriental Protection Structure - along Road Slope meters 1st District Butuan City-Cagayan de Oro Protection Engineering Office City-Iligan City Rd (S00485MN) Structure / Misamis Oriental K1396 + 750 - K1397 + 500 1st District Engineering Office

P00400103MN-EAO 800,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Network Development - Road Widening - Primary Roads 263,608,000

5. P00400326MN 310201100614000 50,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1296 + 100 - K1297 + 400

P00400326MN-CW1 Road Widening - along Butuan Road Widening Lane Km 2.598 49,000,000 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00473MN) K1296 + 100 - Engineering Office K1297 + 400 / Misamis Oriental 1st District Engineering Office

P00400326MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

6. P00400327MN 310201100613000 50,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1294 + 756 - K1296 + 100

P00400327MN-CW1 Road Widening - along Butuan Road Widening Lane Km 2.696 49,000,000 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00473MN) K1294 + 756 - Engineering Office K1296 + 100 / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 324 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400327MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

7. P00400328MN 310201100617000 50,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1299 + 700 - K1301 + 300

P00400328MN-CW1 Road Widening - along Butuan Road Widening Lane Km 3.208 49,000,000 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00473MN) K1299 + 700 - Engineering Office K1301 + 300 / Misamis Oriental 1st District Engineering Office

P00400328MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

8. P00400329MN 310201100616000 50,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1298 + 000 - K1299 + 700

P00400329MN-CW1 Road Widening - along Butuan Road Widening Lane Km 3.398 49,000,000 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00473MN) K1298 + 000 - Engineering Office K1299 + 700 / Misamis Oriental 1st District Engineering Office

P00400329MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

9. P00400330MN 310201100618000 38,608,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1313 + 000 - K1314 + 296

P00400330MN-CW1 Road Widening - along Butuan Road Widening Lane Km 1.812 37,835,840 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00564MN) K1313 + 000 - Engineering Office K1314 + 296 / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 325 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400330MN-EAO 772,160 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

10. P00400331MN 310201100615000 25,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1297 + 400 - K1298 + 000

P00400331MN-CW1 Road Widening - along Butuan Road Widening Lane Km 1.210 24,500,000 Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd (S00473MN) K1297 + 400 - Engineering Office K1298 + 000 / Misamis Oriental 1st District Engineering Office

P00400331MN-EAO 500,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 747,000,000

11. P00401236MN 310204100965000 100,000,000 Magsaysay-Butuan City Coastal Bypass/Alternate Road, (Damayuhan - Villa Felipa Section) Phase I, Misamis Oriental

P00401236MN-CW1 Construction of Concrete Bridge - Construction of Square 5,227.920 96,500,000 Central Office / Magsaysay-Butuan City Coastal Concrete Bridge meters Region X Bypass/Alternate Road, (Damayuhan - Villa Felipa Section) Phase I, Misamis Oriental

P00401236MN-EAO 3,500,000 Central Office / Region X

12. P00401251MN 310204100815000 157,000,000 Claveria-Balingoan By-pass Road, (Mapua-Dahilig Section), Misamis Oriental

P00401251MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.900 135,100,000 Central Office / Claveria-Balingoan By-pass Road, Concrete Road Region X (Mapua-Dahilig Section), Misamis Oriental

P00401251MN-ROW ROW Acquisition - ROW Acquisition Square 34,000.000 17,000,000 Central Office / Claveria-Balingoan By-pass Road, meters Region X (Mapua-Dahilig Section), Misamis Oriental

P00401251MN-EAO 4,900,000 Central Office / Region X

13. P00401252MN 310204100813000 150,000,000 Claveria-Balingoan By-pass Road, (Kabangasan-Mapua Section), Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 326 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401252MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.400 135,100,000 Central Office / Claveria-Balingoan By-pass Road, Concrete Road Region X (Kabangasan-Mapua Section), Misamis Oriental

P00401252MN-ROW ROW Acquisition - ROW Acquisition Square 20,000.000 10,000,000 Central Office / Claveria-Balingoan By-pass Road, meters Region X (Kabangasan-Mapua Section), Misamis Oriental

P00401252MN-EAO 4,900,000 Central Office / Region X

14. P00401253MN 310204100814000 120,000,000 Claveria-Balingoan By-pass Road, (Mapua Section), Misamis Oriental

P00401253MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.967 106,150,000 Central Office / Claveria-Balingoan By-pass Road, Concrete Road Region X (Mapua Section), Misamis Oriental

P00401253MN-ROW ROW Acquisition - ROW Acquisition Square 20,000.000 10,000,000 Central Office / Claveria-Balingoan By-pass Road, meters Region X (Mapua Section), Misamis Oriental

P00401253MN-EAO 3,850,000 Central Office / Region X

15. P00401522MN 310204100962000 20,500,000 Gingoog Bypass Road, Misamis Oriental (Phase III)

P00401522MN-CW1 Construction of Concrete Road - at Construction of Lane Km 0.520 10,290,000 Misamis Oriental Specific Locations along Butuan Concrete Road 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (S00473MN) Chainage 0 - / Misamis Oriental Chainage 0 1st District Engineering Office

P00401522MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 13,089.000 10,000,000 Misamis Oriental Locations along Butuan meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (S00473MN) / Misamis Oriental 1st District Engineering Office

P00401522MN-EAO 210,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

16. P00401523MN 310204100964000 49,750,000 Gingoog Bypass Road (Phase 4), Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 327 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401523MN-CW1 Construction of Concrete Bridge - Construction of Square 667.800 38,955,000 Misamis Oriental Gingoog Bypass Road (Phase 4), Concrete Bridge meters 1st District Misamis Oriental Engineering Office / Misamis Oriental 1st District Engineering Office

P00401523MN-ROW ROW Acquisition - Gingoog Bypass ROW Acquisition Square 13,081.000 10,000,000 Misamis Oriental Road (Phase 4), Misamis Oriental meters 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

P00401523MN-EAO 795,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

17. P00406203MN 310204100963000 49,750,000 Gingoog Bypass Road (Phase 5), Misamis Oriental

P00406203MN-CW1 Construction of Concrete Bridge - Construction of Square 667.800 38,955,000 Misamis Oriental Gingoog Bypass Road (Phase 5), Concrete Bridge meters 1st District Misamis Oriental Engineering Office / Misamis Oriental 1st District Engineering Office

P00406203MN-ROW ROW Acquisition - Gingoog Bypass ROW Acquisition Square 13,081.000 10,000,000 Misamis Oriental Road (Phase 5), Misamis Oriental meters 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

P00406203MN-EAO 795,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

18. P00406204MN 310204100966000 100,000,000 Magsaysay-Butuan City Coastal Bypass/Alternate Road, (Damayuhan - Villa Felipa Section) Phase 2, Misamis Oriental

P00406204MN-CW1 Construction of Concrete Bridge - Construction of Square 5,227.920 96,500,000 Central Office / Magsaysay-Butuan City Coastal Concrete Bridge meters Region X Bypass/Alternate Road, (Damayuhan - Villa Felipa Section) Phase 2, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 328 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00406204MN-EAO 3,500,000 Central Office / Region X

Network Development - Construction of Missing Links/ New Roads 859,197,000

19. P00401237MN 310205100438000 150,000,000 Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Package 13, Misamis Oriental

P00401237MN-CW1 Construction of Concrete Road - Construction of Lane Km 10.000 144,750,000 Central Office / Impasug-ong Bdry. Bukidnon Concrete Road Region X (Siloo)-Misamis Oriental (Eureka), Package 13, Misamis Oriental

P00401237MN-EAO 5,250,000 Central Office / Region X

20. P00401353MN 310205100439000 177,299,000 Impasug-ong Bdry. Bukidnon (Siloo)-Misamis Oriental (Eureka), Package 14, Misamis Oriental

P00401353MN-CW1 Construction of Concrete Road - Construction of Lane Km 6.803 171,093,535 Central Office / Impasug-ong Bdry. Bukidnon Concrete Road Region X (Siloo)-Misamis Oriental (Eureka), Package 14, Misamis Oriental

P00401353MN-EAO 6,205,465 Central Office / Region X

21. P00401354MN 310205100443000 265,949,000 Malaybalay-Gingoog Road (Minalwang-Kalhaan Section), Package 12, Misamis Oriental

P00401354MN-CW1 Construction of Concrete Road - Construction of Lane Km 10.388 256,640,785 Central Office / Malaybalay-Gingoog Road Concrete Road Region X (Minalwang-Kalhaan Section), Package 12, Misamis Oriental

P00401354MN-EAO 9,308,215 Central Office / Region X

22. P00401355MN 310205100444000 265,949,000 Malaybalay-Gingoog Road (Minalwang-Kalhaan Section), Package 13, Misamis Oriental

P00401355MN-CW1 Construction of Concrete Road - Construction of Lane Km 11.422 256,640,785 Central Office / Malaybalay-Gingoog Road Concrete Road Region X (Minalwang-Kalhaan Section), Package 13, Misamis Oriental

P00401355MN-EAO 9,308,215 Central Office / Region X

Bridge - Replacement of Permanent Weak Bridges 52,794,000

23. P00400869MN 310302100192000 52,794,000 Kibaluyot Br. (B01345MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400869MN-CW1 Replacement of Bridge - Kibaluyot Replacement of Square 295.740 50,946,210 Central Office / Br. (B01345MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd Engineering Office MYPS: 03/03/2020 02:36:37 pm Page 329 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400869MN-EAO 1,847,790 Central Office / Misamis Oriental 1st District Engineering Office

Bridge - Widening of Permanent Bridges 613,345,000

24. P00400870MN 310305100843000 51,680,000 Dangoan Br. 2 (B01291MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400870MN-CW1 Widening of Bridge - Dangoan Br. 2 Widening of Square 493.027 49,871,200 Central Office / (B01291MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd Engineering Office

P00400870MN-EAO 1,808,800 Central Office / Misamis Oriental 1st District Engineering Office

25. P00400871MN 310305101122000 10,780,000 Bolisong Br. (B01300MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400871MN-CW1 Widening of Bridge - Bolisong Br. Widening of Square 590.049 10,564,400 Misamis Oriental (B01300MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400871MN-EAO 215,600 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

26. P00400872MN 310305100842000 63,700,000 Catuan Br. (B01349MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400872MN-CW1 Widening of Bridge - Catuan Br. Widening of Square 607.698 61,470,500 Central Office / (B01349MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd Engineering Office

P00400872MN-EAO 2,229,500 Central Office / Misamis Oriental 1st District Engineering Office

27. P00400873MN 310305101127000 10,840,000 Kibungsod Br. (B01151MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

MYPS: 03/03/2020 02:36:37 pm Page 330 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400873MN-CW1 Widening of Bridge - Kibungsod Br. Widening of Square 896.760 10,623,200 Misamis Oriental (B01151MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400873MN-EAO 216,800 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

28. P00400874MN 310305100845000 68,000,000 Lunao Br. (B01350MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400874MN-CW1 Widening of Bridge - Lunao Br. Widening of Square 648.720 65,620,000 Central Office / (B01350MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd Engineering Office

P00400874MN-EAO 2,380,000 Central Office / Misamis Oriental 1st District Engineering Office

29. P00400875MN 310305101130000 31,300,000 Malubog Br. (B01344MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400875MN-CW1 Widening of Bridge - Malubog Br. Widening of Square 730.859 30,674,000 Misamis Oriental (B01344MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400875MN-EAO 626,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

30. P00400876MN 310305101131000 15,500,000 Mangiskis Br. (B01347MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400876MN-CW1 Widening of Bridge - Mangiskis Br. Widening of Square 282.002 15,190,000 Misamis Oriental (B01347MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 331 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400876MN-EAO 310,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

31. P00400877MN 310305101134000 33,000,000 Minlagas Br. (B01352MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400877MN-CW1 Widening of Bridge - Minlagas Br. Widening of Square 314.820 32,340,000 Misamis Oriental (B01352MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd / Misamis Oriental 1st District Engineering Office

P00400877MN-EAO 660,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

32. P00400878MN 310305101135000 15,000,000 Pangasihan Br. (B01341MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400878MN-CW1 Widening of Bridge - Pangasihan Widening of Square 286.200 14,700,000 Misamis Oriental Br. (B01341MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400878MN-EAO 300,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

33. P00400879MN 310305100850000 61,120,000 Talisayan Br. (B01297MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400879MN-CW1 Widening of Bridge - Talisayan Br. Widening of Square 583.085 58,980,800 Central Office / (B01297MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 1st District Rd Engineering Office

P00400879MN-EAO 2,139,200 Central Office / Misamis Oriental 1st District Engineering Office

34. P00400924MN 310305101121000 3,500,000 Binuangan Br. (B01305MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

MYPS: 03/03/2020 02:36:37 pm Page 332 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400924MN-CW1 Widening of Bridge - Binuangan Br. Widening of Square 243.270 3,430,000 Misamis Oriental (B01305MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400924MN-EAO 70,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

35. P00400925MN 310305101124000 26,000,000 Dangoan Br. 1 (B01290MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400925MN-CW1 Widening of Bridge - Dangoan Br. 1 Widening of Square 496.080 25,480,000 Misamis Oriental (B01290MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400925MN-EAO 520,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

36. P00400926MN 310305101125000 31,335,000 Gahub Br. (B01346MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400926MN-CW1 Widening of Bridge - Gahub Br. Widening of Square 597.872 30,708,300 Misamis Oriental (B01346MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400926MN-EAO 626,700 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

37. P00400927MN 310305101132000 2,500,000 Mantangale Br. (B01298MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

MYPS: 03/03/2020 02:36:37 pm Page 333 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400927MN-CW1 Widening of Bridge - Mantangale Widening of Square 194.616 2,450,000 Misamis Oriental Br. (B01298MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400927MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

38. P00400928MN 310305101133000 2,500,000 May-Ang Br. (B01310MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400928MN-CW1 Widening of Bridge - May-Ang Br. Widening of Square 241.839 2,450,000 Misamis Oriental (B01310MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400928MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

39. P00400929MN 310305101138000 5,000,000 Salay River Br. (B01309MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400929MN-CW1 Widening of Bridge - Salay River Br. Widening of Square 243.556 4,900,000 Misamis Oriental (B01309MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400929MN-EAO 100,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

40. P00400930MN 310305100849000 103,000,000 Sta. Ines Br. 1 (B01294MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400930MN-CW1 Widening of Bridge - Sta. Ines Br. 1 Widening of Square 982.620 99,395,000 Central Office / (B01294MN) along Butuan Bridge meters Region X City-Cagayan de Oro City-Iligan City Rd

MYPS: 03/03/2020 02:36:37 pm Page 334 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400930MN-EAO 3,605,000 Central Office / Region X

41. P00400931MN 310305101141000 17,090,000 Talisay Br. (B01152MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400931MN-CW1 Widening of Bridge - Talisay Br. Widening of Square 248.040 16,748,200 Misamis Oriental (B01152MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400931MN-EAO 341,800 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

42. P00400932MN 310305101142000 8,700,000 Tup-on Br. (B01293MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400932MN-CW1 Widening of Bridge - Tup-on Br. Widening of Square 288.680 8,526,000 Misamis Oriental (B01293MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400932MN-EAO 174,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

43. P00400933MN 310305101137000 2,000,000 Salay Br. 2 (B01308MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400933MN-CW1 Widening of Bridge - Salay Br. 2 Widening of Square 290.970 1,960,000 Misamis Oriental (B01308MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400933MN-EAO 40,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

44. P00400934MN 310305101129000 6,000,000 Maanas Br. (B01289MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

MYPS: 03/03/2020 02:36:37 pm Page 335 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400934MN-CW1 Widening of Bridge - Maanas Br. Widening of Square 326.840 5,880,000 Misamis Oriental (B01289MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400934MN-EAO 120,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

45. P00400935MN 310305101123000 9,000,000 Calipapaan Br. (B01302MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400935MN-CW1 Widening of Bridge - Calipapaan Br. Widening of Square 248.040 8,820,000 Misamis Oriental (B01302MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400935MN-EAO 180,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

46. P00400936MN 310305101136000 10,500,000 Portulin Br. (B01292MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400936MN-CW1 Widening of Bridge - Portulin Br. Widening of Square 243.270 10,290,000 Misamis Oriental (B01292MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400936MN-EAO 210,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

47. P00400937MN 310305101139000 8,700,000 Silad Br. 2 (B01303MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

MYPS: 03/03/2020 02:36:37 pm Page 336 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400937MN-CW1 Widening of Bridge - Silad Br. 2 Widening of Square 245.178 8,526,000 Misamis Oriental (B01303MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400937MN-EAO 174,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

48. P00400938MN 310305101140000 12,100,000 Tagbocboc Br. (B01296MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase II)

P00400938MN-CW1 Widening of Bridge - Tagbocboc Br. Widening of Square 196.524 11,858,000 Misamis Oriental (B01296MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase II) / Misamis Oriental 1st District Engineering Office

P00400938MN-EAO 242,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

49. P00400939MN 310305101126000 2,500,000 Inobulan Br. (B01306MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400939MN-CW1 Widening of Bridge - Inobulan Br. Widening of Square 290.493 2,450,000 Misamis Oriental (B01306MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400939MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

50. P00400940MN 310305101128000 2,000,000 Lapinig Br. (B01299MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

MYPS: 03/03/2020 02:36:37 pm Page 337 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400940MN-CW1 Widening of Bridge - Lapinig Br. Widening of Square 195.284 1,960,000 Misamis Oriental (B01299MN) along Butuan Bridge meters 1st District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 1st District Engineering Office

P00400940MN-EAO 40,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office OO2: Protect Lives and Properties Against Major Floods 13 projects 464,821,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 324,821,000

51. P00420479MN 320101105373000 40,000,000 Construction of Flood Control along Gahub River Downstream, Gingoog City, Misamis Oriental

P00420479MN-CW1 Construction of Flood Mitigation Construction of Lineal 265.880 39,200,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Gahub River Structure Engineering Office Downstream, Gingoog City, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00420479MN-EAO 800,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

52. P00420480MN 320101105374000 46,285,000 Construction of Flood Control along Gingoog River Downstream, Gingoog City, Misamis Oriental

P00420480MN-CW1 Construction of Flood Mitigation Construction of Lineal 442.162 45,359,300 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Gingoog River Structure Engineering Office Downstream, Gingoog City, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00420480MN-EAO 925,700 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 338 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

53. P00420481MN 320101105375000 30,000,000 Construction of Flood Control Project along Dangoan River, Brgy. Bulua, Medina, Misamis Oriental

P00420481MN-CW1 Construction of Flood Mitigation Construction of Lineal 400.700 29,400,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control Project along Dangoan Structure Engineering Office River, Brgy. Bulua, Medina, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00420481MN-EAO 600,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

54. P00420482MN 320101105376000 30,000,000 Construction of Flood Control Project along Dangoan River, Brgy. Bulua, Medina, Misamis Oriental (Phase 2)

P00420482MN-CW1 Construction of Flood Mitigation Construction of Lineal 332.400 29,400,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control Project along Dangoan Structure Engineering Office River, Brgy. Bulua, Medina, / Misamis Oriental Misamis Oriental (Phase 2) 1st District Engineering Office

P00420482MN-EAO 600,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

55. P00420483MN 320101105377000 50,000,000 Construction of Revetment along Gingoog River (Brgys. Santiago, Daan Lungsod), (Phase 2), Gingoog City, Misamis Oriental

P00420483MN-CW1 Construction of Revetment - Construction of Lineal 363.400 49,000,000 Misamis Oriental Construction of Revetment along Revetment meters 1st District Gingoog River (Brgys. Santiago, Engineering Office Daan Lungsod), (Phase 2), Gingoog / Misamis Oriental City, Misamis Oriental 1st District Engineering Office

P00420483MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 339 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

56. P00420484MN 320101105378000 50,000,000 Construction of Revetment along Gingoog River (Brgys. Santiago, Daan Lungsod), Gingoog City, Misamis Oriental

P00420484MN-CW1 Construction of Revetment - Construction of Lineal 186.900 49,000,000 Misamis Oriental Construction of Revetment along Revetment meters 1st District Gingoog River (Brgys. Santiago, Engineering Office Daan Lungsod), Gingoog City, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00420484MN-EAO 1,000,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

57. P00420485MN 320101105379000 35,000,000 Construction of Revetment at Gahub River Upstream, Left Side, Gingoog City, Misamis Oriental

P00420485MN-CW1 Construction of Revetment - Construction of Lineal 238.900 34,300,000 Misamis Oriental Construction of Revetment at Revetment meters 1st District Gahub River Upstream, Left Side, Engineering Office Gingoog City, Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00420485MN-EAO 700,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

58. P00420486MN 320101105380000 33,536,000 Construction of Revetment at Gahub River Upstream, Left Side, (Phase 2), Gingoog City, Misamis Oriental

P00420486MN-CW1 Construction of Revetment - Construction of Lineal 245.000 32,865,280 Misamis Oriental Construction of Revetment at Revetment meters 1st District Gahub River Upstream, Left Side, Engineering Office (Phase 2), Gingoog City, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00420486MN-EAO 670,720 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

59. P00420487MN 320101105381000 10,000,000 Construction of Sea Wall at Brgy. Duka, Medina, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 340 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420487MN-CW1 Construction of Flood Mitigation Construction of Lineal 98.100 9,800,000 Misamis Oriental Structure - Construction of Sea Flood Mitigation meters 1st District Wall at Brgy. Duka, Medina, Structure Engineering Office Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00420487MN-EAO 200,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 140,000,000 and Principal Rivers

60. P00420649MN 320102101367000 35,000,000 Construction of Flood Control along Balatukan River, Brgy. Mandangoa, (Phase 2), Balingasag, Misamis Oriental

P00420649MN-CW1 Construction of Flood Mitigation Construction of Lineal 201.400 34,300,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Balatukan River, Structure Engineering Office Brgy. Mandangoa, (Phase 2), / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00420649MN-EAO 700,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

61. P00420650MN 320102101368000 35,000,000 Construction of Flood Control along Balatukan River, Brgy. Mandangoa, Balingasag, Misamis Oriental

P00420650MN-CW1 Construction of Flood Mitigation Construction of Lineal 263.700 34,300,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Balatukan River, Structure Engineering Office Brgy. Mandangoa, Balingasag, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00420650MN-EAO 700,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

62. P00420651MN 320102101369000 35,000,000 Construction of Flood Control along Balatukan River, Downstream, Balingasag, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 341 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420651MN-CW1 Construction of Flood Mitigation Construction of Lineal 272.400 34,300,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Balatukan River, Structure Engineering Office Downstream, Balingasag, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00420651MN-EAO 700,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

63. P00420652MN 320102101370000 35,000,000 Construction of Flood Control along Balatukan River, Downstream, Balingasag, Misamis Oriental (Phase 2)

P00420652MN-CW1 Construction of Flood Mitigation Construction of Lineal 280.400 34,300,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Balatukan River, Structure Engineering Office Downstream, Balingasag, Misamis / Misamis Oriental Oriental (Phase 2) 1st District Engineering Office

P00420652MN-EAO 700,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office Convergence and Special Support Program 1 projects 15,956,000

Construction/ Improvement of Access Roads leading to Trades, Industries and 15,956,000 Economic Zones

64. P00431580MN 300204100596000 15,956,000 Barangay Silad Road connecting Barangay Mangga in support of the Coco industry - Copra drying and Oil Mill Facilities, Sugbongcogon, Misamis Oriental

P00431580MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.720 15,636,880 Misamis Oriental Barangay Silad Road connecting Concrete Road 1st District Barangay Mangga in support of the Engineering Office Coco industry - Copra drying and / Misamis Oriental Oil Mill Facilities, Sugbongcogon, 1st District Misamis Oriental Engineering Office

P00431580MN-EAO 319,120 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office Local Program 43 projects 318,527,000

MYPS: 03/03/2020 02:36:37 pm Page 342 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 74,500,000 Program

65. P00440910MN 300104217976000 1,000,000 Construction (Completion) of Multi-Purpose Building, Waterfall Elementary School, Brgy. Waterfall, Balingasag, Misamis Oriental

P00440910MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Waterfall Elementary / Misamis Oriental School, Brgy. Waterfall, Balingasag, 1st District Misamis Oriental Engineering Office

66. P00440911MN 300104217972000 1,500,000 Construction (Completion) of Multi-Purpose Building, Brgy. San Isidro, Balingasag, Misamis Oriental

P00440911MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. San Isidro, / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00440911MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

67. P00440912MN 300104217981000 2,500,000 Construction of Multi-Purpose Building, Brgy. Quezon, Balingasag, Misamis Oriental

P00440912MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Quezon, Balingasag, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00440912MN-EAO 25,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

68. P00440913MN 300104217970000 1,500,000 Construction (Completion) of Multi-Purpose Building, Balingasag Central School, Brgy. Poblacion, Balingasag, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 343 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440913MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Balingasag Central School, / Misamis Oriental Brgy. Poblacion, Balingasag, 1st District Misamis Oriental Engineering Office

P00440913MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

69. P00440917MN 300104217979000 5,000,000 Construction of Multi-Purpose Building, Brgy. Matampa, Salay, Misamis Oriental

P00440917MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Matampa, Salay, Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00440917MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

70. P00440918MN 300104217971000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Mosangot, Binuangan, Misamis Oriental

P00440918MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Mosangot, / Misamis Oriental Binuangan, Misamis Oriental 1st District Engineering Office

P00440918MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

71. P00440919MN 300104217973000 2,000,000 Construction (Completion) of Multi-Purpose Building, Brgy. Valdeconcha, Binuangan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 344 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440919MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Brgy. Valdeconcha, / Misamis Oriental Binuangan, Misamis Oriental 1st District Engineering Office

P00440919MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

72. P00440920MN 300104217980000 5,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Sugbongcogon, Misamis Oriental

P00440920MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Sugbongcogon, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00440920MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

73. P00440922MN 300104217992000 3,000,000 Construction of Multi-Purpose Building, Brgy. Tambagan, Medina, Misamis Oriental

P00440922MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Tambagan, Medina, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00440922MN-EAO 30,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

74. P00440925MN 300104217974000 1,000,000 Construction (Completion) of Multi-Purpose Building, Consuelo National High School, Brgy. Consuelo, Magsaysay, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 345 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440925MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Consuelo National High / Misamis Oriental School, Brgy. Consuelo, Magsaysay, 1st District Misamis Oriental Engineering Office

75. P00440926MN 300104217975000 1,000,000 Construction (Completion) of Multi-Purpose Building, Kibungsod Central School, Brgy. Kibungsod, Magsaysay, Misamis Oriental

P00440926MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Misamis Oriental Building - Construction Multi Purpose Buildings 1st District (Completion) of Multi-Purpose Building Engineering Office Building, Kibungsod Central School, / Misamis Oriental Brgy. Kibungsod, Magsaysay, 1st District Misamis Oriental Engineering Office

76. P00440928MN 300104217978000 2,000,000 Construction of Multi-Purpose Building, Brgy. Damayuhan, Magsaysay, Misamis Oriental

P00440928MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Damayuhan, Magsaysay, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00440928MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

77. P00440929MN 300104217977000 14,500,000 Construction of Multi-Purpose Building, Brgy. 26, Gingoog City, Misamis Oriental

P00440929MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,355,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. 26, Building Engineering Office Gingoog City, Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00440929MN-EAO 145,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

78. P00443977MN 300104217982000 10,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Sugbongcogon Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 346 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443977MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Sugbongcogon Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00443977MN-EAO 100,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

79. P00443979MN 300104217983000 3,000,000 Construction of Multi-Purpose Hall/Evacuation Center at Brgy. Dampil, Lagonglong, Misamis Oriental

P00443979MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Hall/Evacuation Building Engineering Office Center at Brgy. Dampil, / Misamis Oriental Lagonglong, Misamis Oriental 1st District Engineering Office

P00443979MN-EAO 30,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

80. P00443981MN 300104217984000 1,500,000 Construction of Multi-Purpose Building(Child Development Center), Brgy. Nabataan, Binuangan, Misamis Oriental

P00443981MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building(Child Building Engineering Office Development Center), Brgy. / Misamis Oriental Nabataan, Binuangan, Misamis 1st District Oriental Engineering Office

P00443981MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

81. P00443982MN 300104217985000 1,500,000 Construction of Multi-Purpose Building(Child Development Center), Sitio Mabini, Brgy. Tinigbasan, Binuangan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 347 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443982MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building(Child Building Engineering Office Development Center), Sitio Mabini, / Misamis Oriental Brgy. Tinigbasan, Binuangan, 1st District Misamis Oriental Engineering Office

P00443982MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

82. P00443984MN 300104217986000 1,500,000 Construction of Multi-Purpose Building (Child Development Center),Brgy. Dampias, Binuangan, Misamis Oriental

P00443984MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,485,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building (Child Building Engineering Office Development Center),Brgy. / Misamis Oriental Dampias, Binuangan, Misamis 1st District Oriental Engineering Office

P00443984MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

83. P00443986MN 300104217987000 3,500,000 Construction of Covered Court, San Luis National High School, Brgy. San Luis, Gingoog City, Misamis Oriental

P00443986MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Misamis Oriental Building - Construction of Covered Multi Purpose Buildings 1st District Court, San Luis National High Building Engineering Office School, Brgy. San Luis, Gingoog / Misamis Oriental City, Misamis Oriental 1st District Engineering Office

P00443986MN-EAO 35,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

84. P00443987MN 300104217988000 2,500,000 Completion of Multi-Purpose Building (New Executive Building), Brgy. Lapinig, Balingoan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 348 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443987MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Completion of Multi Purpose Buildings 1st District Multi-Purpose Building (New Building Engineering Office Executive Building), Brgy. Lapinig, / Misamis Oriental Balingoan, Misamis Oriental 1st District Engineering Office

P00443987MN-EAO 25,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

85. P00443988MN 300104217989000 5,000,000 Completion of Multi-Purpose Building, Portulin National High School, Medina, Misamis Oriental

P00443988MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Completion of Multi Purpose Buildings 1st District Multi-Purpose Building, Portulin Building Engineering Office National High School, Medina, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00443988MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

86. P00443990MN 300104217990000 2,000,000 Repair and Rehabilitation of Multi-Purpose Building (Covered Court) Brgy. Panabol, Kinoguitan, Misamis Oriental

P00443990MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,980,000 Misamis Oriental Multi Purpose Building - Repair and Major Repair of Buildings 1st District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building (Covered Court) Brgy. Building / Misamis Oriental Panabol, Kinoguitan, Misamis 1st District Oriental Engineering Office

P00443990MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

87. P00443992MN 300104217991000 2,000,000 Construction of Multi-Purpose Building (Evacuation Center) Brgy. Cabubuhan, Magsaysay, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 349 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443992MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building (Evacuation Building Engineering Office Center) Brgy. Cabubuhan, / Misamis Oriental Magsaysay, Misamis Oriental 1st District Engineering Office

P00443992MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 15,000,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

88. P00444625MN 300106200508000 15,000,000 Construction of Flood Control Structure, Downstream of Dangoan Bridge 2, Medina, Misamis Oriental

P00444625MN-CW1 Construction of Flood Mitigation Construction of Lineal 173.400 14,700,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control Structure, Downstream of Structure Engineering Office Dangoan Bridge 2, Medina, / Misamis Oriental Misamis Oriental 1st District Engineering Office

P00444625MN-EAO 300,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 75,000,000 Program

89. P00444680MN 300107200949000 5,000,000 Construction of Flood Control and Drainage, Brgy. South Poblacion, Medina, Misamis Oriental

P00444680MN-CW1 Construction of Flood Mitigation Construction of Lineal 59.600 4,950,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control and Drainage, Brgy. South Structure Engineering Office Poblacion, Medina, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00444680MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 350 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

90. P00444681MN 300107200950000 20,000,000 Construction of Flood Control Downstream of Waterfall Bridge 2, Brgy. Waterfall, Balingasag, Misamis Oriental

P00444681MN-CW1 Construction of Flood Mitigation Construction of Lineal 122.300 19,800,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control Downstream of Waterfall Structure Engineering Office Bridge 2, Brgy. Waterfall, / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00444681MN-EAO 200,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

91. P00444682MN 300107200951000 15,000,000 Construction of Flood Control Upstream of Waterfall Bridge 2, Brgy. Waterfall, Balingasag, Misamis Oriental

P00444682MN-CW1 Construction of Flood Mitigation Construction of Lineal 100.700 14,850,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control Upstream of Waterfall Structure Engineering Office Bridge 2, Brgy. Waterfall, / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00444682MN-EAO 150,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

92. P00444683MN 300107200952000 15,000,000 Construction of Flood Control along Balatukan River (Upstream), Brgy. Mandangoa, Balingasag, Misamis Oriental

P00444683MN-CW1 Construction of Flood Mitigation Construction of Lineal 100.650 14,850,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 1st District Control along Balatukan River Structure Engineering Office (Upstream), Brgy. Mandangoa, / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00444683MN-EAO 150,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 351 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

93. P00444684MN 300107200953000 20,000,000 Construction of revetment at Brgy. Napaliran, Balingasag (upstream), Right Side along Balatukan River, Balingasag, Misamis Oriental

P00444684MN-CW1 Construction of Revetment - Construction of Lineal 111.440 19,800,000 Misamis Oriental Construction of revetment at Brgy. Revetment meters 1st District Napaliran, Balingasag (upstream), Engineering Office Right Side along Balatukan River, / Misamis Oriental Balingasag, Misamis Oriental 1st District Engineering Office

P00444684MN-EAO 200,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / 60,000,000 Improvement of Various Infrastructure including Local Projects

94. P00444723MN 300111200309000 30,000,000 Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. - K1314 + 680 - K1315 + 000, K1316 + 000 - K1316 + 412, K1316 +000 - K1316 + 412, K1316 + 542 - K1317 + 490, Misamis Oriental

P00444723MN-CW1 Road Widening - Road Widening Road Widening Lane Km 2.148 29,400,000 Misamis Oriental along Butuan City-Cagayan De Oro 1st District City - Iligan City Rd. - K1314 + 680 - Engineering Office K1315 + 000, K1316 + 000 - K1316 / Misamis Oriental + 412, K1316 +000 - K1316 + 412, 1st District K1316 + 542 - K1317 + 490, Engineering Office Misamis Oriental

P00444723MN-EAO 600,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

95. P00444724MN 300111200310000 30,000,000 Road Widening along Butuan City-Cagayan De Oro City - Iligan City Rd. - K1340 + 000 - K1314 + 190, Misamis Oriental

P00444724MN-CW1 Road Widening - Road Widening Road Widening Lane Km 1.640 29,400,000 Misamis Oriental along Butuan City-Cagayan De Oro 1st District City - Iligan City Rd. - K1340 + 000 - Engineering Office K1314 + 190, Misamis Oriental / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 352 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444724MN-EAO 600,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 55,000,000

96. P00440914MN 300117207387000 5,000,000 Construction of Road, Brgy. Banglay, Lagonglong, Misamis Oriental

P00440914MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.664 4,950,000 Misamis Oriental Construction of Road, Brgy. Concrete Road 1st District Banglay, Lagonglong, Misamis Engineering Office Oriental / Misamis Oriental 1st District Engineering Office

P00440914MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

97. P00440921MN 300117207392000 10,000,000 Construction of Road, Brgy. Kauswagan, Balingoan, Misamis Oriental

P00440921MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.320 9,900,000 Misamis Oriental Construction of Road, Brgy. Concrete Road 1st District Kauswagan, Balingoan, Misamis Engineering Office Oriental / Misamis Oriental 1st District Engineering Office

P00440921MN-EAO 100,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

98. P00440924MN 300117207388000 5,000,000 Construction of Road, Brgy. Bugdang, Talisayan, Misamis Oriental

P00440924MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.448 4,950,000 Misamis Oriental Construction of Road, Brgy. Concrete Road 1st District Bugdang, Talisayan, Misamis Engineering Office Oriental / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 353 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440924MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

99. P00444097MN 300117207389000 5,000,000 Concreting of Local Road at Mananum Daan to San Isidro-Labas Pagsama, Medina, Misamis Oriental

P00444097MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.554 4,950,000 Misamis Oriental Concreting of Local Road at Concrete Road 1st District Mananum Daan to San Isidro-Labas Engineering Office Pagsama, Medina, Misamis / Misamis Oriental Oriental 1st District Engineering Office

P00444097MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

100. P00444100MN 300117207390000 5,000,000 Concreting of Local Road at Purok 2 to Purok 3, Brgy. San Jose, Medina, Misamis Oriental

P00444100MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.640 4,950,000 Misamis Oriental Concreting of Local Road at Purok Concrete Road 1st District 2 to Purok 3, Brgy. San Jose, Engineering Office Medina, Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00444100MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

101. P00444102MN 300117207391000 5,000,000 Concreting of Local Road at Brgy. Artadi, Magsaysay, Misamis Oriental

P00444102MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.541 4,950,000 Misamis Oriental Concreting of Local Road at Brgy. Concrete Road 1st District Artadi, Magsaysay, Misamis Engineering Office Oriental / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 354 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444102MN-EAO 50,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

102. P00444107MN 300117207395000 20,000,000 Concreting of Local Road, Brgy. Salubsob to Brgy. Calubo, Kinoguitan, Misamis Oriental

P00444107MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.433 19,800,000 Misamis Oriental Concreting of Local Road, Brgy. Concrete Road 1st District Salubsob to Brgy. Calubo, Engineering Office Kinoguitan, Misamis Oriental / Misamis Oriental 1st District Engineering Office

P00444107MN-EAO 200,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Water Management Facilities - Water Supply - Construction / Repair / Rehabilitation / 31,027,000 Improvement of Various Infrastructure including Local Projects

103. P00442862MN 300120200309000 31,027,000 Construction of Level III Water Supply System, Magsaysay, Misamis Oriental

P00442862MN-CW1 Construction of Water Supply Construction of Number of 1.000 30,406,460 Misamis Oriental Systems - Construction of Level III Water Supply Water 1st District Water Supply System, Magsaysay, Systems Supply Engineering Office Misamis Oriental Systems / Misamis Oriental 1st District Engineering Office

P00442862MN-EAO 620,540 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 8,000,000

104. P00440915MN 300121200945000 1,500,000 Rehabilitation of Water Supply - Level II, Brgy. Alipuaton, Salay, Misamis Oriental

P00440915MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,485,000 Misamis Oriental Systems - Rehabilitation of Water Water Supply Water 1st District Supply - Level II, Brgy. Alipuaton, Systems Supply Engineering Office Salay, Misamis Oriental Systems / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 355 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440915MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

105. P00440916MN 300121200946000 1,500,000 Rehabilitation of Water Supply - Level II, Brgy. Saray, Salay, Misamis Oriental

P00440916MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 1,485,000 Misamis Oriental Systems - Rehabilitation of Water Water Supply Water 1st District Supply - Level II, Brgy. Saray, Salay, Systems Supply Engineering Office Misamis Oriental Systems / Misamis Oriental 1st District Engineering Office

P00440916MN-EAO 15,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

106. P00440923MN 300121200944000 3,000,000 Construction of Water Supply - Level II, Brgy. San Roque, Medina, Misamis Oriental

P00440923MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,970,000 Misamis Oriental Systems - Construction of Water Water Supply Water 1st District Supply - Level II, Brgy. San Roque, Systems Supply Engineering Office Medina, Misamis Oriental Systems / Misamis Oriental 1st District Engineering Office

P00440923MN-EAO 30,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

107. P00440927MN 300121200943000 2,000,000 Construction of Water Supply - Level II, Brgy. Artadi, Magsaysay, Misamis Oriental

P00440927MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Misamis Oriental Systems - Construction of Water Water Supply Water 1st District Supply - Level II, Brgy. Artadi, Systems Supply Engineering Office Magsaysay, Misamis Oriental Systems / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 356 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440927MN-EAO 20,000 Misamis Oriental 1st District Engineering Office / Misamis Oriental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 357 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Oriental 2nd District Engineering Office 117 projects 2,712,129,000 MISAMIS ORIENTAL (SECOND) 117 projects 2,712,129,000 OO1: Ensure Safe and Reliable National Road System 31 projects 1,473,405,000

Asset Preservation - Preventive Maintenance - Primary Roads 357,952,000

1. P00400558MN 310101100385000 23,029,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1400 + 435 - K1401 + 534

P00400558MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 2.200 22,568,420 Misamis Oriental Asphalt Overlay - along Butuan Maintenance of 2nd District City-Cagayan de Oro City-Iligan City Road: Asphalt Engineering Office Rd (S00507MN) K1400 + 435 - Overlay / Misamis Oriental K1401 + 534 2nd District Engineering Office

P00400558MN-EAO 460,580 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

2. P00400560MN 310101100266000 84,923,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1500 + 903 - K1501 + 905, K1502 + 126 - K1502 + 883, K1508 + 100 - K1508 + 492, K1508 + 686 - K1509 + 270, K1510 + 000 - K1510 + 671, K1510 + 771 - K1511 + 000

P00400560MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 7.268 81,950,695 Central Office / Asphalt Overlay - at Specific Maintenance of Misamis Oriental Locations along Butuan Road: Asphalt 2nd District City-Cagayan de Oro City-Iligan City Overlay Engineering Office Rd (S00519MN) K1500 + 903 - K1511 + 000

P00400560MN-EAO 2,972,305 Central Office / Misamis Oriental 2nd District Engineering Office

3. P00401439MN 310101100264000 100,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1408 + 783 - K1408 + 909, K1410 + 690 - K1411 + 000, K1411 + 940 - K1412 + 771, K1413 + 621 - K1415 + 518

P00401439MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.442 96,500,000 Central Office / Asphalt Overlay - at Specific Maintenance of Misamis Oriental Locations along Butuan Road: Asphalt 2nd District City-Cagayan de Oro City-Iligan City Overlay Engineering Office Rd (S00507MN) K1408 + 783 - K1415 + 518

P00401439MN-EAO 3,500,000 Central Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 358 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

4. P00401541MN 310101100265000 150,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1451 + 381 - K1451 + 428, K1451 + 782 - K1451 + 989, K1452 + 679 - K1452 + 994, K1462 + 387 - K1463 + 281, K1466 + 126

P00401541MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 7.676 106,150,000 Central Office / Asphalt Overlay - at Specific Maintenance of Region X Locations along Butuan Road: Asphalt City-Cagayan de Oro City-Iligan City Overlay Rd (S00519MN) K1451 + 381 - 0

P00401541MN-CW2 Off-Carriageway Improvement: Off-Carriageway Number of 1.000 28,950,000 Flaring of Intersections / Improvement: Intersectio Improvement of Intersections - at Flaring of ns Specific Locations along Butuan Intersections / City-Cagayan de Oro City-Iligan City Improvement of Rd (S00519MN) K1451 + 381 - 0 Intersections

P00401541MN-ROW ROW Acquisition - at Specific ROW Acquisition Square 3,000.000 10,000,000 Central Office / Locations along Butuan meters Region X City-Cagayan de Oro City-Iligan City Rd (S00519MN)

P00401541MN-EAO 4,900,000 Central Office / Region X

Asset Preservation - Preventive Maintenance - Tertiary Roads 5,736,000

5. P00400561MN 310103100600000 1,000,000 Loguilo-Alubijid By-Pass Rd - K1461 + (-092) - K1461 + (-038)

P00400561MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.108 980,000 Misamis Oriental Asphalt Overlay - along Maintenance of 2nd District Loguilo-Alubijid By-Pass Rd Road: Asphalt Engineering Office (S00526MN) K1461 + (-092) - Overlay / Misamis Oriental K1461 + (-038) 2nd District Engineering Office

P00400561MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

6. P00401384MN 310103100601000 4,736,000 Manticao By-Pass Rd - K1501 + 000 - K1501 + 262

P00401384MN-CW1 Preventive Maintenance of Road: Preventive Lane Km 0.524 4,641,280 Misamis Oriental Asphalt Overlay - along Manticao Maintenance of 2nd District By-Pass Rd (S00561MN) K1501 + Road: Asphalt Engineering Office 000 - K1501 + 262 Overlay / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 359 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401384MN-EAO 94,720 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 32,076,000 Roads - Primary Roads

7. P00400655MN 310104100258000 32,076,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1464 + 827 - K1465 + 243

P00400655MN-CW1 Rehabilitation of Paved Road - at Rehabilitation of Lane Km 1.724 31,434,480 Misamis Oriental Specific Locations along Butuan Paved Road 2nd District City-Cagayan de Oro City-Iligan City Engineering Office Rd (S00519MN) K1464 + 827 - / Misamis Oriental K1465 + 243 2nd District Engineering Office

P00400655MN-EAO 641,520 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved 28,467,000 Roads - Tertiary Roads

8. P00401385MN 310106100530000 28,467,000 Manticao By-Pass Rd - K1500 + 215 - K1501 + 000

P00401385MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 1.620 27,897,660 Misamis Oriental along Manticao By-Pass Rd Paved Road 2nd District (S00561MN) K1500 + 215 - K1501 + Engineering Office 000 / Misamis Oriental 2nd District Engineering Office

P00401385MN-EAO 569,340 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 1,000,000 Collapse, and Landslide - Primary Roads

9. P00401420MN 310107100170000 1,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1461 + 100 - K1461 + 112, K1461 + 150 - K1461 + 160, K1461 + 500 - K1461 + 506, K1470 + 650 - K1470 + 662, K1470 + 700 - K1470 + 705

MYPS: 03/03/2020 02:36:37 pm Page 360 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401420MN-CW1 Construction of Road Slope Construction of Square 116.000 980,000 Misamis Oriental Protection Structure - at Specific Road Slope meters 2nd District Locations along Butuan Protection Engineering Office City-Cagayan de Oro City-Iligan City Structure / Misamis Oriental Rd (S00519MN) K1461 + 100 - 2nd District K1470 + 705 Engineering Office

P00401420MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 41,000,000 Collapse, and Landslide - Secondary Roads

10. P00400099MN 310108100450000 41,000,000 Gingoog-Claveria-Villanueva Rd - K1344 + 015 - K1344 + 195, K1356 + 385 - K1356 + 690, K1359 + 570 - K1359 + 670, K1363 + 525 - K1363 + 655, K1364 + 240 - K1364 + 340

P00400099MN-CW1 Construction of Road Slope Construction of Square 5,050.000 40,180,000 Misamis Oriental Protection Structure - at Specific Road Slope meters 2nd District Locations along Protection Engineering Office Gingoog-Claveria-Villanueva Rd Structure / Misamis Oriental (S01338MN) K1344 + 015 - K1364 + 2nd District 340 Engineering Office

P00400099MN-EAO 820,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Network Development - Road Widening - Primary Roads 349,193,000

11. P00400248MN 310201100486000 80,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1503 + 798 - K1506 + 200

P00400248MN-CW1 Road Widening - along Butuan Road Widening Lane Km 4.820 77,200,000 Central Office / City-Cagayan de Oro City-Iligan City Misamis Oriental Rd (S00519MN) K1503 + 798 - 2nd District K1506 + 200 Engineering Office

P00400248MN-EAO 2,800,000 Central Office / Misamis Oriental 2nd District Engineering Office

12. P00400249MN 310201100621000 28,917,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1510 + 098 - K1511 + 110

MYPS: 03/03/2020 02:36:37 pm Page 361 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00400249MN-CW1 Road Widening - along Butuan Road Widening Lane Km 1.998 28,338,660 Misamis Oriental City-Cagayan de Oro City-Iligan City 2nd District Rd (S00519MN) K1510 + 098 - Engineering Office K1511 + 110 / Misamis Oriental 2nd District Engineering Office

P00400249MN-EAO 578,340 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

13. P00400250MN 310201100484000 90,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1455 + 585 - K1458 + 253

P00400250MN-CW1 Road Widening - along Butuan Road Widening Lane Km 5.356 86,850,000 Central Office / City-Cagayan de Oro City-Iligan City Misamis Oriental Rd (S00519MN) K1455 + 585 - 2nd District K1458 + 253 Engineering Office

P00400250MN-EAO 3,150,000 Central Office / Misamis Oriental 2nd District Engineering Office

14. P00400251MN 310201100619000 40,283,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1458 + 253 - K1459 + 447

P00400251MN-CW1 Road Widening - along Butuan Road Widening Lane Km 2.398 39,477,340 Misamis Oriental City-Cagayan de Oro City-Iligan City 2nd District Rd (S00519MN) K1458 + 253 - Engineering Office K1459 + 447 / Misamis Oriental 2nd District Engineering Office

P00400251MN-EAO 805,660 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

15. P00400253MN 310201100485000 80,000,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1488 + 385 - K1491 + 248

P00400253MN-CW1 Road Widening - along Butuan Road Widening Lane Km 5.740 77,200,000 Central Office / City-Cagayan de Oro City-Iligan City Misamis Oriental Rd (S00519MN) K1488 + 385 - 2nd District K1491 + 248 Engineering Office

P00400253MN-EAO 2,800,000 Central Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 362 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

16. P00401329MN 310201100620000 29,993,000 Butuan City-Cagayan de Oro City-Iligan City Rd - K1464 + 444 - K1465 + 243

P00401329MN-CW1 Road Widening - along Butuan Road Widening Lane Km 1.628 29,393,140 Misamis Oriental City-Cagayan de Oro City-Iligan City 2nd District Rd (S00519MN) K1464 + 444 - Engineering Office K1465 + 243 / Misamis Oriental 2nd District Engineering Office

P00401329MN-EAO 599,860 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Network Development - Road Widening - Secondary Roads 58,371,000

17. P00401438MN 310202100522000 58,371,000 Gingoog-Claveria-Villanueva Rd - K1351 + 765 - K1352 + 1000

P00401438MN-CW1 Road Widening - along Road Widening Lane Km 4.514 56,328,015 Central Office / Gingoog-Claveria-Villanueva Rd Misamis Oriental (S01338MN) K1351 + 765 - K1352 2nd District + 1000 Engineering Office

P00401438MN-EAO 2,042,985 Central Office / Misamis Oriental 2nd District Engineering Office

Network Development - Construction of By-Pass and Diversion Roads 480,000,000

18. P00401171MN 310204100967000 50,000,000 Opol Diversion Road (Opol-Canitoan), Misamis Oriental

P00401171MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.592 49,000,000 Misamis Oriental Opol Diversion Road Concrete Road 2nd District (Opol-Canitoan), Misamis Oriental Engineering Office / Misamis Oriental 2nd District Engineering Office

P00401171MN-EAO 1,000,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

19. P00401227MN 310204100838000 150,000,000 Puerto-Claveria By-Pass Road, Package 6, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 363 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401227MN-CW1 Construction of Concrete Road - Construction of Lane Km 8.560 125,450,000 Central Office / Puerto-Claveria By-Pass Road, Concrete Road Region X Package 6, Misamis Oriental

P00401227MN-ROW ROW Acquisition - Puerto-Claveria ROW Acquisition Square 40,000.000 20,000,000 Central Office / By-Pass Road, Package 6, Misamis meters Region X Oriental

P00401227MN-EAO 4,550,000 Central Office / Region X

20. P00401249MN 310204100816000 150,000,000 Claveria-Balingoan By-pass Road, Package 5, Misamis Oriental

P00401249MN-CW1 Construction of Concrete Road - Construction of Lane Km 8.800 144,750,000 Central Office / Claveria-Balingoan By-pass Road, Concrete Road Region X Package 5, Misamis Oriental

P00401249MN-EAO 5,250,000 Central Office / Region X

21. P00401250MN 310204100837000 130,000,000 Puerto-Claveria By-Pass Road, Package 5, Misamis Oriental

P00401250MN-CW1 Construction of Concrete Bridge - Construction of Square 2,671.200 125,450,000 Central Office / Puerto-Claveria By-Pass Road, Concrete Bridge meters Region X Package 5, Misamis Oriental

P00401250MN-EAO 4,550,000 Central Office / Region X

Bridge - Retrofitting/ Strengthening of Permanent Bridges 8,521,000

22. P00401458MN 310303100964000 8,521,000 Tagoloan Br. (B01116MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00401458MN-CW1 Retrofitting / Strengthening of Retrofitting / Number of 1.000 8,350,580 Misamis Oriental Bridge - Tagoloan Br. (B01116MN) Strengthening of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401458MN-EAO 170,420 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Bridge - Rehabilitation/ Major Repair of Permanent Bridges 7,089,000

23. P00401454MN 310304100686000 1,000,000 Pugaan Br. (B01115MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

MYPS: 03/03/2020 02:36:37 pm Page 364 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401454MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Pugaan Br. (B01115MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401454MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

24. P00401455MN 310304100641000 1,000,000 Pangayawan Br. (B01327MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00401455MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Pangayawan Br. Major Repair of Bridges 2nd District (B01327MN) along Butuan Bridge Engineering Office City-Cagayan de Oro City-Iligan City / Misamis Oriental Rd 2nd District Engineering Office

P00401455MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

25. P00401456MN 310304100643000 1,000,000 Taytayan Br. (B01328MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00401456MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Taytayan Br. (B01328MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401456MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

26. P00401457MN 310304100642000 1,000,000 Tabo-o Br. (B01329MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

MYPS: 03/03/2020 02:36:37 pm Page 365 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401457MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Tabo-o Br. (B01329MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401457MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

27. P00401530MN 310304100638000 1,000,000 Gimaylan Br. (B01330MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00401530MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Gimaylan Br. (B01330MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401530MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

28. P00401531MN 310304100640000 1,000,000 Naawan Br. (B01334MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00401531MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 980,000 Misamis Oriental Bridge - Naawan Br. (B01334MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401531MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

29. P00401532MN 310304100639000 1,089,000 Lugait Br. (B01338MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

MYPS: 03/03/2020 02:36:37 pm Page 366 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00401532MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 1,067,220 Misamis Oriental Bridge - Lugait Br. (B01338MN) Major Repair of Bridges 2nd District along Butuan City-Cagayan de Oro Bridge Engineering Office City-Iligan City Rd / Misamis Oriental 2nd District Engineering Office

P00401532MN-EAO 21,780 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Bridge - Widening of Permanent Bridges 104,000,000

30. P00400851MN 310305100848000 100,000,000 Solana Br. (B01320MN) along Butuan City-Cagayan de Oro City-Iligan City Rd

P00400851MN-CW1 Widening of Bridge - Solana Br. Widening of Square 791.820 96,500,000 Central Office / (B01320MN) along Butuan Bridge meters Misamis Oriental City-Cagayan de Oro City-Iligan City 2nd District Rd Engineering Office

P00400851MN-EAO 3,500,000 Central Office / Misamis Oriental 2nd District Engineering Office

31. P00400852MN 310305101143000 4,000,000 Villanueva Br. (B01113MN) along Butuan City-Cagayan de Oro City-Iligan City Rd (Phase III)

P00400852MN-CW1 Widening of Bridge - Villanueva Br. Widening of Square 69.150 3,920,000 Misamis Oriental (B01113MN) along Butuan Bridge meters 2nd District City-Cagayan de Oro City-Iligan City Engineering Office Rd (Phase III) / Misamis Oriental 2nd District Engineering Office

P00400852MN-EAO 80,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office OO2: Protect Lives and Properties Against Major Floods 4 projects 230,000,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 230,000,000

32. P00420388MN 320101104229000 70,000,000 Construction of Flood Control at Poblacion, Lugait, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 367 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420388MN-CW1 Construction of Flood Mitigation Construction of Lineal 495.000 67,550,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Misamis Oriental Control at Poblacion, Lugait, Structure 2nd District Misamis Oriental Engineering Office

P00420388MN-EAO 2,450,000 Central Office / Misamis Oriental 2nd District Engineering Office

33. P00420391MN 320101104232000 60,000,000 Construction of Flood Control Structures along BCIR, Upstream of Villanueva Bridge, Villanueva, Misamis Oriental

P00420391MN-CW1 Construction of Flood Mitigation Construction of Lineal 376.000 57,900,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Misamis Oriental Control Structures along BCIR, Structure 2nd District Upstream of Villanueva Bridge, Engineering Office Villanueva, Misamis Oriental

P00420391MN-EAO 2,100,000 Central Office / Misamis Oriental 2nd District Engineering Office

34. P00420488MN 320101105382000 50,000,000 Construction of Flood Control (Upstream & Downstream) along Amoros Bridge, Misamis Oriental

P00420488MN-CW1 Construction of Flood Mitigation Construction of Lineal 264.000 49,000,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 2nd District Control (Upstream & Downstream) Structure Engineering Office along Amoros Bridge, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00420488MN-EAO 1,000,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

35. P00420489MN 320101105383000 50,000,000 Construction of Flood Control Structures at (Natumolan Section), Misamis Oriental

P00420489MN-CW1 Construction of Flood Mitigation Construction of Lineal 127.000 49,000,000 Misamis Oriental Structure - Construction of Flood Flood Mitigation meters 2nd District Control Structures at Tagoloan Structure Engineering Office River (Natumolan Section), / Misamis Oriental Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 368 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00420489MN-EAO 1,000,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office Convergence and Special Support Program 5 projects 540,000,000

Construction/ Improvement of Access Roads leading to Airports 450,000,000

36. P00431667MN 300201100060000 300,000,000 CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Misamis Oriental, Package V

P00431667MN-CW1 Construction of Concrete Road - Construction of Lane Km 21.214 289,500,000 Central Office / CDO-Opol-El Concrete Road Region X Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Misamis Oriental, Package V

P00431667MN-EAO 10,500,000 Central Office / Region X

37. P00431772MN 300201100061000 150,000,000 CDO-Opol-El Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Misamis Oriental, Package VI

P00431772MN-CW1 Construction of Concrete Road - Construction of Lane Km 10.607 144,750,000 Central Office / CDO-Opol-El Concrete Road Region X Salvador-Alubijid-Laguindingan Airport (Pueblo de Oro/CDO Airport to Jct. BCIR Laguindingan) Mountain Diversion Road, Misamis Oriental, Package VI

P00431772MN-EAO 5,250,000 Central Office / Region X

Construction/ Improvement of Access Roads leading to Trades, Industries and 71,000,000 Economic Zones

38. P00431564MN 300204100357000 62,438,000 Road in Dinugon connecting PHIVIDEC Industrial Site, Sta. Ana, Tagoloan, Misamis Oriental

P00431564MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.450 60,252,670 Central Office / Road in Dinugon connecting Concrete Road Misamis Oriental PHIVIDEC Industrial Site, Sta. Ana, 2nd District Tagoloan, Misamis Oriental Engineering Office

P00431564MN-EAO 2,185,330 Central Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 369 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

39. P00431565MN 300204100597000 8,562,000 Access Road PR-2 (Barbero Road) and Service Road (SR) 6 connecting PHIVIDEC Industrial Site, Tagoloan, Misamis Oriental

P00431565MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.600 8,390,760 Misamis Oriental Access Road PR-2 (Barbero Road) Concrete Road 2nd District and Service Road (SR) 6 connecting Engineering Office PHIVIDEC Industrial Site, Tagoloan, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00431565MN-EAO 171,240 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Construction/ Improvement of Various Infrastructure in support of National Security 19,000,000

40. P00431684MN 300207100136000 19,000,000 Construction of El Salvador City Police Station Building, El Salvador City, Misamis Oriental

P00431684MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 18,335,000 Central Office / Construction of El Salvador City Other Facilities Facilities Region X Police Station Building, El Salvador City, Misamis Oriental

P00431684MN-EAO 665,000 Central Office / Region X Local Program 77 projects 468,724,000

Buildings and Other Structures - Multipurpose / Facilities - National Building Program 54,724,000

41. P00442893MN 300105200253000 54,724,000 Construction of Two-Storey Building of DPWH Misamis Oriental 2nd DEO including other facilities, Balase, El Salvador City

P00442893MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 52,808,660 Central Office / Building - Construction of Multi Purpose Buildings Misamis Oriental Two-Storey Building of DPWH Building 2nd District Misamis Oriental 2nd DEO Engineering Office including other facilities, Balase, El Salvador City

P00442893MN-EAO 1,915,340 Central Office / Misamis Oriental 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 70,000,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

42. P00442919MN 300103202728000 20,000,000 Construction (Completion) of Multipurpose Building, Opol, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 370 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442919MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,600,000 Misamis Oriental Building - Construction Multi Purpose Buildings 2nd District (Completion) of Multipurpose Building Engineering Office Building, Opol, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00442919MN-EAO 400,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

43. P00443238MN 300103202729000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Kilangit, Gitagum, Misamis Oriental

P00443238MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Kilangit, Gitagum, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443238MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

44. P00443239MN 300103202730000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Lanise, Claveria, Misamis Oriental

P00443239MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Lanise, Claveria, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443239MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

45. P00443240MN 300103202731000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Loguilo, Alubijid, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 371 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443240MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Loguilo, Alubijid, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443240MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

46. P00443241MN 300103202732000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Lourdes, Alubijid, Misamis Oriental

P00443241MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Lourdes, Alubijid, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443241MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

47. P00443242MN 300103202733000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Minalwang, Claveria, Misamis Oriental

P00443242MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Minalwang, / Misamis Oriental Claveria, Misamis Oriental 2nd District Engineering Office

P00443242MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

48. P00443244MN 300103202734000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Panampawan, Claveria, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 372 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443244MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Panampawan, / Misamis Oriental Claveria, Misamis Oriental 2nd District Engineering Office

P00443244MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

49. P00443245MN 300103202735000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Rizal, Claveria, Misamis Oriental

P00443245MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Rizal, Claveria, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443245MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

50. P00443248MN 300103202736000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay Sampatulog, Alubijid, Misamis Oriental

P00443248MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay Sampatulog, / Misamis Oriental Alubijid, Misamis Oriental 2nd District Engineering Office

P00443248MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

51. P00443251MN 300103202737000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Barangay San Isidro, Jasaan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 373 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443251MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Barangay San Isidro, Jasaan, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443251MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

52. P00443252MN 300103202738000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Aromahan, Laguindingan, Misamis Oriental

P00443252MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Aromahan, / Misamis Oriental Laguindingan, Misamis Oriental 2nd District Engineering Office

P00443252MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

53. P00443255MN 300103202739000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Gasi, Laguindingan, Misamis Oriental

P00443255MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Gasi, Laguindingan, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443255MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

54. P00443257MN 300103202740000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Kimalok, Libertad, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 374 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443257MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Kimalok, Libertad, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443257MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

55. P00443259MN 300103202741000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Lubluban, Libertad, Misamis Oriental

P00443259MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Lubluban, Libertad, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443259MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

56. P00443261MN 300103202742000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Mauswagon, Laguindingan, Misamis Oriental

P00443261MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Mauswagon, / Misamis Oriental Laguindingan, Misamis Oriental 2nd District Engineering Office

P00443261MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

57. P00443263MN 300103202743000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Patag, Manticao, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 375 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443263MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Patag, Manticao, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443263MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

58. P00443265MN 300103202744000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Poblacion, Laguindingan, Misamis Oriental

P00443265MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Poblacion, / Misamis Oriental Laguindingan, Misamis Oriental 2nd District Engineering Office

P00443265MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

59. P00443267MN 300103202745000 2,000,000 Construction of Multi-Purpose Building - Barangay Hall, Brgy. Quezon, Gitagum, Misamis Oriental

P00443267MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Barangay Building Engineering Office Hall, Brgy. Quezon, Gitagum, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443267MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

60. P00443268MN 300103202746000 2,000,000 Construction of Multi-Purpose Building - Covered Court, Barangay Himaya, El Salvador City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 376 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443268MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Barangay Himaya, El / Misamis Oriental Salvador City, Misamis Oriental 2nd District Engineering Office

P00443268MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

61. P00443270MN 300103202747000 2,500,000 Construction of Multi-Purpose Building - Covered Court, Barangay Lanao, Alubijid, Misamis Oriental

P00443270MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Barangay Lanao, Alubijid, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443270MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

62. P00443272MN 300103202748000 2,500,000 Construction of Multi-Purpose Building - Covered Court, Barangay Mat-l (Inside Claveria National High School), Claveria, Misamis Oriental

P00443272MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Barangay Mat-l (Inside / Misamis Oriental Claveria National High School), 2nd District Claveria, Misamis Oriental Engineering Office

P00443272MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

63. P00443275MN 300103202749000 2,000,000 Construction of Multi-Purpose Building - Covered Court, Barangay Patrocenio, Claveria, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 377 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443275MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Barangay Patrocenio, / Misamis Oriental Claveria, Misamis Oriental 2nd District Engineering Office

P00443275MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

64. P00443277MN 300103202750000 2,500,000 Construction of Multi-Purpose Building - Covered Court, Brgy. Aplaya, Jasaan, Misamis Oriental

P00443277MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Brgy. Aplaya, Jasaan, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443277MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

65. P00443279MN 300103202751000 2,000,000 Construction of Multi-Purpose Building - Covered Court, Mizpa Hillside Institute, Brgy. D.G. Pelaez, Gitagum, Misamis Oriental

P00443279MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, Mizpa Hillside Institute, / Misamis Oriental Brgy. D.G. Pelaez, Gitagum, 2nd District Misamis Oriental Engineering Office

P00443279MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

66. P00443281MN 300103202752000 2,500,000 Construction of Multi-Purpose Building - Covered Court, San Antonio Elementary School, Brgy. San Antonio, Jasaan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 378 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443281MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,450,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building - Covered Building Engineering Office Court, San Antonio Elementary / Misamis Oriental School, Brgy. San Antonio, Jasaan, 2nd District Misamis Oriental Engineering Office

P00443281MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 133,000,000 Program

67. P00440930MN 300104218003000 2,500,000 Construction of Multi-Purpose Building, Brgy. Lanao, Alubijid, Misamis Oriental

P00440930MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Lanao, Alubijid, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440930MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

68. P00440931MN 300104218006000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lourdes, Alubijid, Misamis Oriental

P00440931MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Lourdes, Alubijid, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440931MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

69. P00440932MN 300104218005000 2,000,000 Construction of Multi-Purpose Building, Brgy. Loguilo, Alubijid, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 379 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440932MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Loguilo, Alubijid, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440932MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

70. P00440933MN 300104218023000 2,000,000 Construction of Multi-Purpose Building, Brgy. Sampatulog, Alubijid, Misamis Oriental

P00440933MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Sampatulog, Alubijid, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440933MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

71. P00440934MN 300104218007000 2,000,000 Construction of Multi-Purpose Building, Brgy. San Isidro, Jasaan, Misamis Oriental

P00440934MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. San Building Engineering Office Isidro, Jasaan, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440934MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

72. P00440935MN 300104218004000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lanise, Claveria, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 380 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440935MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Lanise, Claveria, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440935MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

73. P00440936MN 300104218010000 2,500,000 Construction of Multi-Purpose Building, Brgy. Mat-I, Claveria, Misamis Oriental

P00440936MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Mat-I, Claveria, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440936MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

74. P00440937MN 300104218012000 2,000,000 Construction of Multi-Purpose Building, Brgy. Minalwang, Claveria, Misamis Oriental

P00440937MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Minalwang, Claveria, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440937MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

75. P00440938MN 300104218014000 2,000,000 Construction of Multi-Purpose Building, Brgy. Panampawan, Claveria, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 381 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440938MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Panampawan, Claveria, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440938MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

76. P00440939MN 300104218016000 2,500,000 Construction of Multi-Purpose Building, Brgy. Patrocenio, Claveria, Misamis Oriental

P00440939MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Patrocenio, Claveria, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440939MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

77. P00440940MN 300104218022000 2,000,000 Construction of Multi-Purpose Building, Brgy. Rizal, Claveria, Misamis Oriental

P00440940MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Rizal, Building Engineering Office Claveria, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440940MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

78. P00440941MN 300104218000000 2,500,000 Construction of Multi-Purpose Building, Brgy. Himaya, El Salvador City, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 382 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440941MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Himaya, El Salvador City, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440941MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

79. P00440942MN 300104218001000 2,000,000 Construction of Multi-Purpose Building, Brgy. Kilangit, Gitagum, Misamis Oriental

P00440942MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Kilangit, Gitagum, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440942MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

80. P00440943MN 300104218021000 2,000,000 Construction of Multi-Purpose Building, Brgy. Quezon, Gitagum, Misamis Oriental

P00440943MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Quezon, Gitagum, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440943MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

81. P00440944MN 300104217999000 2,500,000 Construction of Multi-Purpose Building, Brgy. Gregorio Pelaez, Gitagum, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 383 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440944MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Gregorio Pelaez, Gitagum, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440944MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

82. P00440945MN 300104217996000 2,500,000 Construction of Multi-Purpose Building, Brgy. Aplaya, Jasaan, Misamis Oriental

P00440945MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Aplaya, Jasaan, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440945MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

83. P00440946MN 300104218035000 2,500,000 Construction of Multi-Purpose Building (Covered Court) at San Antonio Elementary School, Brgy. San Antonio, Jasaan, Misamis Oriental

P00440946MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Covered Building Engineering Office Court) at San Antonio Elementary / Misamis Oriental School, Brgy. San Antonio, Jasaan, 2nd District Misamis Oriental Engineering Office

P00440946MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

84. P00440947MN 300104217997000 2,000,000 Construction of Multi-Purpose Building, Brgy. Aromahon, Laguindingan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 384 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440947MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Aromahon, Laguindingan, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440947MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

85. P00440948MN 300104217998000 2,000,000 Construction of Multi-Purpose Building, Brgy. Gasi, Laguindingan, Misamis Oriental

P00440948MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Gasi, Building Engineering Office Laguindingan, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440948MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

86. P00440949MN 300104218011000 2,000,000 Construction of Multi-Purpose Building, Brgy. Mauswagon, Laguindingan, Misamis Oriental

P00440949MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Mauswagon, Laguindingan, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00440949MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

87. P00440950MN 300104218020000 2,000,000 Improvement of Multi-Purpose Building, Brgy. Poblacion, Laguindingan, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 385 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440950MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Improvement of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Laguindingan, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440950MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

88. P00440951MN 300104218002000 2,000,000 Construction of Multi-Purpose Building, Brgy. Kimalok, Libertad, Misamis Oriental

P00440951MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Kimalok, Libertad, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440951MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

89. P00440952MN 300104218008000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lubluban, Libertad, Misamis Oriental

P00440952MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Lubluban, Libertad, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440952MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

90. P00440953MN 300104218015000 2,000,000 Construction of Multi-Purpose Building (Barangay Hall), Brgy. Patag, Manticao, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 386 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440953MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building (Barangay Building Engineering Office Hall), Brgy. Patag, Manticao, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00440953MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

91. P00440954MN 300104218009000 2,500,000 Construction of Multi-Purpose Building, Brgy. Malanang, Opol, Misamis Oriental

P00440954MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Malanang, Opol, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440954MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

92. P00440955MN 300104218013000 2,500,000 Construction of Multi-Purpose Building, Brgy. Nangcaon, Opol, Misamis Oriental

P00440955MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Nangcaon, Opol, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00440955MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

93. P00440956MN 300104218017000 2,500,000 Construction of Multi-Purpose Building, Brgy. Poblacion 2, Villanueva, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 387 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440956MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion 2, Villanueva, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440956MN-EAO 25,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

94. P00440957MN 300104217993000 2,000,000 Construction of Multi-Purpose Building, Barangay Hall, Brgy. Poblacion 2, Villanueva, Misamis Oriental

P00440957MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Barangay Building Engineering Office Hall, Brgy. Poblacion 2, Villanueva, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00440957MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

95. P00440958MN 300104218018000 2,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion 3, Villanueva, Misamis Oriental

P00440958MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion 3, Villanueva, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00440958MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

96. P00443993MN 300104217994000 20,000,000 Completion of Multi-Purpose Building (Municipal Hall), Barangay Looc, Villanueva, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 388 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443993MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Misamis Oriental Building - Completion of Multi Purpose Buildings 2nd District Multi-Purpose Building (Municipal Building Engineering Office Hall), Barangay Looc, Villanueva, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443993MN-EAO 200,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

97. P00443995MN 300104217995000 15,000,000 Rehabilitation of Multi-Purpose Building (Municipal Gym), Barangay Poblacion 1, Villanueva, Misamis Oriental

P00443995MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 14,850,000 Misamis Oriental Multi Purpose Building - Major Repair of Buildings 2nd District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building (Municipal Gym), Building / Misamis Oriental Barangay Poblacion 1, Villanueva, 2nd District Misamis Oriental Engineering Office

P00443995MN-EAO 150,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

98. P00443997MN 300104218024000 2,000,000 Construction of Multi-Purpose Building, Brgy. Kalabaylabay, El Salvador City, Misamis Oriental

P00443997MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Kalabaylabay, El Salvador City, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00443997MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

99. P00443999MN 300104218025000 2,000,000 Construction of Multi-Purpose Building, Brgy. Santa Cruz, Claveria, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 389 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443999MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Santa Building Engineering Office Cruz, Claveria, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00443999MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

100. P00444001MN 300104218027000 5,000,000 Construction of Tagoloan Public Market, Tagoloan Misamis Oriental

P00444001MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Construction of Tagoloan Multi Purpose Buildings 2nd District Public Market, Tagoloan Misamis Building Engineering Office Oriental / Misamis Oriental 2nd District Engineering Office

P00444001MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

101. P00444003MN 300104218028000 5,000,000 Construction of Multi-Purpose Building, Bukidnon State University-External Studies Center, Alubijid, Misamis Oriental

P00444003MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Bukidnon Building Engineering Office State University-External Studies / Misamis Oriental Center, Alubijid, Misamis Oriental 2nd District Engineering Office

P00444003MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

102. P00444005MN 300104218029000 5,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Manticao, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 390 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444005MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Manticao, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00444005MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

103. P00444006MN 300104218030000 5,000,000 Construction/rehabilitation of Multi-Purpose Building, Brgy. Pangayawan, Gitagum, Misamis Oriental

P00444006MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Misamis Oriental Building - Multi Purpose Buildings 2nd District Construction/rehabilitation of Building Engineering Office Multi-Purpose Building, Brgy. / Misamis Oriental Pangayawan, Gitagum, Misamis 2nd District Oriental Engineering Office

P00444006MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

104. P00444008MN 300104218031000 3,000,000 Construction and/or Repair/Rehabilitation of Multi-Purpose Building, Opol Community College, Opol, Misamis Oriental

P00444008MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Oriental Building - Construction and/or Multi Purpose Buildings 2nd District Repair/Rehabilitation of Building Engineering Office Multi-Purpose Building, Opol / Misamis Oriental Community College, Opol, Misamis 2nd District Oriental Engineering Office

P00444008MN-EAO 30,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

105. P00444010MN 300104218032000 4,000,000 Construction and/or Repair/Rehabilitation of Multi-Purpose Building, Opol, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 391 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444010MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,960,000 Misamis Oriental Building - Construction and/or Multi Purpose Buildings 2nd District Repair/Rehabilitation of Building Engineering Office Multi-Purpose Building, Opol, / Misamis Oriental Misamis Oriental 2nd District Engineering Office

P00444010MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

106. P00444011MN 300104218033000 2,000,000 Construction of Multi-Purpose Building Brgy. Cogon, Gitagum, Misamis Oriental

P00444011MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building Brgy. Building Engineering Office Cogon, Gitagum, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00444011MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

107. P00444013MN 300104218034000 2,000,000 Construction of Multi-Purpose Building Initao, Misamis Oriental

P00444013MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building Initao, Building Engineering Office Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00444013MN-EAO 20,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 100,000,000 Improvement of Various Infrastructure including Local Projects

108. P00443092MN 300116202297000 100,000,000 Construction of Seaside Boulevard, Poblacion Section, Villanueva, Misamis Oriental

MYPS: 03/03/2020 02:36:37 pm Page 392 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443092MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.000 96,500,000 Central Office / Construction of Seaside Boulevard, Concrete Road Misamis Oriental Poblacion Section, Villanueva, 2nd District Misamis Oriental Engineering Office

P00443092MN-EAO 3,500,000 Central Office / Misamis Oriental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 78,000,000

109. P00440959MN 300117207393000 3,000,000 Construction of Road, Brgy. Barra, Opol, Misamis Oriental

P00440959MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.473 2,970,000 Misamis Oriental Construction of Road, Brgy. Barra, Concrete Road 2nd District Opol, Misamis Oriental Engineering Office / Misamis Oriental 2nd District Engineering Office

P00440959MN-EAO 30,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

110. P00444104MN 300117207394000 10,000,000 Concreting of Brgy. Roads, Brgy. Poblacion, Opol, Misamis Oriental

P00444104MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.628 9,900,000 Misamis Oriental Concreting of Brgy. Roads, Brgy. Concrete Road 2nd District Poblacion, Opol, Misamis Oriental Engineering Office / Misamis Oriental 2nd District Engineering Office

P00444104MN-EAO 100,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

111. P00444109MN 300117207396000 15,000,000 Construction of Road with Site Development along Villanueva Flood Control, Brgy. Looc, Villanueva, Misamis Oriental

P00444109MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.364 14,850,000 Misamis Oriental Construction of Road with Site Concrete Road 2nd District Development along Villanueva Engineering Office Flood Control, Brgy. Looc, / Misamis Oriental Villanueva, Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 393 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444109MN-EAO 150,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

112. P00444112MN 300117207397000 5,000,000 Concreting of Junction-Provincial Road to Airport Access Road, Laguindingan, Misamis Oriental

P00444112MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.693 4,950,000 Misamis Oriental Concreting of Junction-Provincial Concrete Road 2nd District Road to Airport Access Road, Engineering Office Laguindingan, Misamis Oriental / Misamis Oriental 2nd District Engineering Office

P00444112MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

113. P00444114MN 300117207398000 5,000,000 Improvement of Local Road at Tungkalan-Seriwagan Kimagas, Brgy. Sungay, Alubijid, Misamis Oriental

P00444114MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.598 4,950,000 Misamis Oriental Improvement of Local Road at Concrete Road 2nd District Tungkalan-Seriwagan Kimagas, Engineering Office Brgy. Sungay, Alubijid, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00444114MN-EAO 50,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

114. P00444117MN 300117207399000 10,000,000 Completion of Boardwalk, Brgy. Poblacion, Opol, Misamis Oriental

P00444117MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 9,900,000 Misamis Oriental Completion of Boardwalk, Brgy. Other Facilities Facilities 2nd District Poblacion, Opol, Misamis Oriental Engineering Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 394 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444117MN-EAO 100,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

115. P00444119MN 300117207400000 30,000,000 Construction of the Misamis Oriental West Diversion Road (Butuan- CDO - Iligan Road), Opol to Lugait

P00444119MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.666 29,700,000 Central Office / Construction of the Misamis Concrete Road Region X Oriental West Diversion Road (Butuan- CDO - Iligan Road), Opol to Lugait

P00444119MN-EAO 300,000 Central Office / Region X

Water Management Facilities - Water Supply - Local Infrastructure Program 33,000,000

116. P00444581MN 300121200947000 3,000,000 Construction of Waterworks System, Brgy. Matangad, Gitagum, Misamis Oriental

P00444581MN-CW1 Construction of Water Supply Construction of Number of 1.000 2,970,000 Misamis Oriental Systems - Construction of Water Supply Water 2nd District Waterworks System, Brgy. Systems Supply Engineering Office Matangad, Gitagum, Misamis Systems / Misamis Oriental Oriental 2nd District Engineering Office

P00444581MN-EAO 30,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

117. P00444582MN 300121200948000 30,000,000 Construction of Water System Projects, Villanueva, Misamis Oriental

P00444582MN-CW1 Construction of Water Supply Construction of Number of 1.000 29,700,000 Misamis Oriental Systems - Construction of Water Water Supply Water 2nd District System Projects, Villanueva, Systems Supply Engineering Office Misamis Oriental Systems / Misamis Oriental 2nd District Engineering Office

P00444582MN-EAO 300,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 395 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

REGIONWIDE 49 projects 1,105,000,000 Bukidnon 1st District Engineering Office 9 projects 407,500,000 Local Program 9 projects 407,500,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 7,500,000 Program

1. P00441091MN 300104217722000 2,500,000 Construction (Completion) of Multipurpose Building, Brgy. Kahaponan, Valencia City, Bukidnon

P00441091MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multipurpose Building Engineering Office Building, Brgy. Kahaponan, / Bukidnon 1st Valencia City, Bukidnon District Engineering Office

P00441091MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

2. P00441092MN 300104217725000 2,500,000 Construction (Completion) of Multipurpose Building, Brgy. Poblacion, Valencia City, Bukidnon

P00441092MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction Multi Purpose Buildings District (Completion) of Multipurpose Building Engineering Office Building, Brgy. Poblacion, Valencia / Bukidnon 1st City, Bukidnon District Engineering Office

P00441092MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

3. P00441106MN 300104217734000 2,500,000 Construction of Multi-purpose Building, Brgy. Halapitan, San Fernando, Bukidnon

P00441106MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 1st Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Halapitan, San Fernando, Bukidnon / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 396 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441106MN-EAO 25,000 Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 400,000,000 Program

4. P00444663MN 300107200665000 70,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Kulaman Br.), Malaybalay City, Bukidnon

P00444663MN-CW1 Construction of Flood Mitigation Construction of Lineal 676.800 69,300,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road Engineering Office (Kulaman Br.), Malaybalay City, Bukidnon

P00444663MN-EAO 700,000 Central Office / Bukidnon 1st District Engineering Office

5. P00444664MN 300107200666000 65,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Malusikob Br.) Malaybalay City, Bukidnon

P00444664MN-CW1 Construction of Flood Mitigation Construction of Lineal 500.000 64,350,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road Engineering Office (Malusikob Br.) Malaybalay City, Bukidnon

P00444664MN-EAO 650,000 Central Office / Bukidnon 1st District Engineering Office

6. P00444665MN 300107200667000 65,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Mangawag Br.) Malaybalay City, Bukidnon

P00444665MN-CW1 Construction of Flood Mitigation Construction of Lineal 500.000 64,350,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road Engineering Office (Mangawag Br.) Malaybalay City, Bukidnon

P00444665MN-EAO 650,000 Central Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 397 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

7. P00444666MN 300107200670000 65,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Manikaan Br.) Malaybalay City, Bukidnon

P00444666MN-CW1 Construction of Flood Mitigation Construction of Lineal 500.000 64,350,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road Engineering Office (Manikaan Br.) Malaybalay City, Bukidnon

P00444666MN-EAO 650,000 Central Office / Bukidnon 1st District Engineering Office

8. P00444667MN 300107200671000 65,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Busdi Br.) Malaybalay City, Bukidnon

P00444667MN-CW1 Construction of Flood Mitigation Construction of Lineal 593.000 64,350,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road (Busdi Engineering Office Br.) Malaybalay City, Bukidnon

P00444667MN-EAO 650,000 Central Office / Bukidnon 1st District Engineering Office

9. P00444668MN 300107200672000 70,000,000 Construction of Flood Control Structure along Malaybalay-Gingoog Road (Bulonay Br.) Malaybalay City, Bukidnon

P00444668MN-CW1 Construction of Flood Mitigation Construction of Lineal 860.000 69,300,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Bukidnon 1st Control Structure along Structure District Malaybalay-Gingoog Road Engineering Office (Bulonay Br.) Malaybalay City, Bukidnon

P00444668MN-EAO 700,000 Central Office / Bukidnon 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 398 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Bukidnon 2nd District Engineering Office 13 projects 126,500,000 Local Program 13 projects 126,500,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 24,500,000 Program

1. P00441080MN 300104217769000 3,000,000 Construction of Multi-Purpose Building, Brgy. Anahawon, Maramag, Bukidnon

P00441080MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Anahawon, Maramag, Bukidnon / Bukidnon 2nd District Engineering Office

P00441080MN-EAO 30,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

2. P00441098MN 300104217776000 2,000,000 Construction of Multi-purpose Building, Brgy. Kawilihan, Don Carlos, Bukidnon

P00441098MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Kawilihan, Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

P00441098MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

3. P00441099MN 300104217783000 2,000,000 Construction of Multi-purpose Building, Brgy. Old Nongnongan, Don Carlos, Bukidnon

P00441099MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Old Building Engineering Office Nongnongan, Don Carlos, / Bukidnon 2nd Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 399 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441099MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

4. P00441100MN 300104217781000 2,000,000 Construction of Multi-purpose Building, Brgy. Mauswagon, Don Carlos, Bukidnon

P00441100MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Mauswagon, Don Carlos, Bukidnon / Bukidnon 2nd District Engineering Office

P00441100MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

5. P00441101MN 300104217774000 2,000,000 Construction of Multi-purpose Building, Brgy. Cabalantian, Kitaotao, Bukidnon

P00441101MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Cabalantian, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

P00441101MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

6. P00441102MN 300104217775000 2,000,000 Construction of Multi-purpose Building, Brgy. Kalumihan, Kitaotao, Bukidnon

P00441102MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Kalumihan, Kitaotao, Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 400 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441102MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

7. P00441103MN 300104217765000 2,000,000 Construction (Completion) of Multipurpose Building, Brgy. San Lorenzo, Kitaotao, Bukidnon

P00441103MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction Multi Purpose Buildings District (Completion) of Multipurpose Building Engineering Office Building, Brgy. San Lorenzo, / Bukidnon 2nd Kitaotao, Bukidnon District Engineering Office

P00441103MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

8. P00441105MN 300104217768000 2,000,000 Construction of Multi-purpose Building (Phase 2), Brgy. Puntian, Quezon, Bukidnon

P00441105MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building (Phase 2), Building Engineering Office Brgy. Puntian, Quezon, Bukidnon / Bukidnon 2nd District Engineering Office

P00441105MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

9. P00441107MN 300104217770000 2,500,000 Construction of Multi-purpose Building, Brgy. Bagongsilang, Maramag, Bukidnon

P00441107MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,475,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Bagongsilang, Maramag, Bukidnon / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 401 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441107MN-EAO 25,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

10. P00441137MN 300104217789000 5,000,000 Construction of Multi-Purpose Building, Kitaotao, Bukidnon

P00441137MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Bukidnon 2nd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Kitaotao, Building Engineering Office Bukidnon / Bukidnon 2nd District Engineering Office

P00441137MN-EAO 50,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 102,000,000

11. P00441104MN 300117207338000 2,000,000 Construction of Road, Brgy. West Dalurong, Kitaotao, Bukidnon

P00441104MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.141 1,980,000 Bukidnon 2nd Construction of Road, Brgy. West Concrete Road District Dalurong, Kitaotao, Bukidnon Engineering Office / Bukidnon 2nd District Engineering Office

P00441104MN-EAO 20,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

12. P00444038MN 300117207331000 50,000,000 Concreting of Talahiron - Magsaysay - Metebagao - Kitubo Road, Sitio Kikipot, Brgy. Talahiron to Sitio Pagan, Brgy. Magsaysay Section, Kibawe, Bukidnon

P00444038MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.073 49,500,000 Bukidnon 2nd Concreting of Talahiron - Concrete Road District Magsaysay - Metebagao - Kitubo Engineering Office Road, Sitio Kikipot, Brgy. Talahiron / Bukidnon 2nd to Sitio Pagan, Brgy. Magsaysay District Section, Kibawe, Bukidnon Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 402 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444038MN-EAO 500,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

13. P00444043MN 300117207333000 50,000,000 Concreting of Talahiron - Magsaysay - Metebagao - Kitubo Road, Sitio Pagan to Sitio Pamungulon, Brgy. Magsaysay Section, Kibawe, Bukidnon

P00444043MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.500 49,500,000 Bukidnon 2nd Concreting of Talahiron - Concrete Road District Magsaysay - Metebagao - Kitubo Engineering Office Road, Sitio Pagan to Sitio / Bukidnon 2nd Pamungulon, Brgy. Magsaysay District Section, Kibawe, Bukidnon Engineering Office

P00444043MN-EAO 500,000 Bukidnon 2nd District Engineering Office / Bukidnon 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 403 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Bukidnon 3rd District Engineering Office 3 projects 7,000,000 Local Program 3 projects 7,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 7,000,000 Program

1. P00441081MN 300104217858000 3,000,000 Construction of Multi-Purpose Building, Brgy. Tangkulan, Manolo Fortich, Bukidnon

P00441081MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-Purpose Building, Brgy. Building Engineering Office Tangkulan, Manolo Fortich, / Bukidnon 3rd Bukidnon District Engineering Office

P00441081MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

2. P00441096MN 300104217853000 3,000,000 Construction of Multi-purpose Building, Brgy. Kalingking, Malitbog, Bukidnon

P00441096MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Kalingking, Malitbog, Bukidnon / Bukidnon 3rd District Engineering Office

P00441096MN-EAO 30,000 Bukidnon 3rd District Engineering Office / Bukidnon 3rd District Engineering Office

3. P00441097MN 300104217854000 1,000,000 Construction of Multi-purpose Building, Brgy. Kisolon, Kisolon CES, Sumilao Bukidnon

P00441097MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,000,000 Bukidnon 3rd Building - Construction of Multi Purpose Buildings District Multi-purpose Building, Brgy. Building Engineering Office Kisolon, Kisolon CES, Sumilao / Bukidnon 3rd Bukidnon District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 404 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Camiguin District Engineering Office 3 projects 40,000,000 Local Program 3 projects 40,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 15,000,000 Program

1. P00441141MN 300104217896000 10,000,000 Construction of Multi-Purpose Building, Poblacion, Mambajao, Camiguin

P00441141MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building, Poblacion, Building / Camiguin District Mambajao, Camiguin Engineering Office

P00441141MN-EAO 100,000 Camiguin District Engineering Office / Camiguin District Engineering Office

2. P00443947MN 300104217900000 5,000,000 Construction of Multi-Purpose Building, Poblacion, Mambajao, Camiguin

P00443947MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Camiguin District Building - Construction of Multi Purpose Buildings Engineering Office Multi-Purpose Building, Poblacion, Building / Camiguin District Mambajao, Camiguin Engineering Office

P00443947MN-EAO 50,000 Camiguin District Engineering Office / Camiguin District Engineering Office

Water Management Facilities - Water Supply - Local Infrastructure Program 25,000,000

3. P00441140MN 300121200940000 25,000,000 Rehabilitation of Various Water Systems - Municipal Wide, Mambajao, Camiguin

P00441140MN-CW1 Rehabilitation of Water Supply Rehabilitation of Number of 1.000 24,750,000 Camiguin District Systems - Rehabilitation of Various Water Supply Water Engineering Office Water Systems - Municipal Wide, Systems Supply / Camiguin District Mambajao, Camiguin Systems Engineering Office

P00441140MN-EAO 250,000 Camiguin District Engineering Office / Camiguin District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 405 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Lanao del Norte 1st District Engineering Office 4 projects 12,000,000 Local Program 4 projects 12,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 12,000,000 Program

1. P00441073MN 300104217926000 3,000,000 Rehabilitation of Multi-Purpose Building, Poblacion, Kapatagan, Lanao del Norte

P00441073MN-CW1 Rehabilitation / Major Repair of Rehabilitation / Number of 1.000 2,970,000 Lanao del Norte Multi Purpose Building - Major Repair of Buildings 1st District Rehabilitation of Multi-Purpose Multi Purpose Engineering Office Building, Poblacion, Kapatagan, Building / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00441073MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

2. P00441113MN 300104217907000 3,000,000 Construction of Multi-Purpose Building, Barangay Poblacion, Sultan Naga Dimaporo, Lanao del Norte

P00441113MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Barangay Building Engineering Office Poblacion, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

P00441113MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

3. P00441114MN 300104217906000 3,000,000 Construction of Multi-Purpose Building, Barangay Pikalawag, Sultan Naga Dimaporo, Lanao del Norte

P00441114MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Barangay Building Engineering Office Pikalawag, Sultan Naga Dimaporo, / Lanao del Norte Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 406 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441114MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

4. P00443841MN 300104217700000 3,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Salvador, Lanao del Norte

P00443841MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 1st District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Salvador, Lanao del / Lanao del Norte Norte 1st District Engineering Office

P00443841MN-EAO 30,000 Lanao del Norte 1st District Engineering Office / Lanao del Norte 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 407 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Lanao del Norte 2nd District Engineering Office 4 projects 29,000,000 Local Program 4 projects 29,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 14,000,000 Program

1. P00441044MN 300104217927000 6,000,000 Construction (Completion) of Multi-Purpose Building, Barangay Bagong Silang, Iligan City, Lanao del Norte

P00441044MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 5,940,000 Lanao del Norte Building - Construction Multi Purpose Buildings 2nd District (Completion) of Multi-Purpose Building Engineering Office Building, Barangay Bagong Silang, / Lanao del Norte Iligan City, Lanao del Norte 2nd District Engineering Office

P00441044MN-EAO 60,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

2. P00441083MN 300104217944000 3,000,000 Construction of Multi-Purpose Building, Brgy. Sagadan, Tubod, Lanao del Norte

P00441083MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Sagadan, Tubod, Lanao del Norte / Lanao del Norte 2nd District Engineering Office

P00441083MN-EAO 30,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

3. P00441136MN 300104217952000 5,000,000 Construction of Multi-Purpose Building, Tubod, Lanao del Norte

P00441136MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Lanao del Norte Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Tubod, Building Engineering Office Lanao del Norte / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 408 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00441136MN-EAO 50,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 15,000,000

4. P00444095MN 300117207383000 15,000,000 Road Concreting, Brgy. Bualan, Tubod, Lanao del Norte

P00444095MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.350 14,850,000 Lanao del Norte Road Concreting, Brgy. Bualan, Concrete Road 2nd District Tubod, Lanao del Norte Engineering Office / Lanao del Norte 2nd District Engineering Office

P00444095MN-EAO 150,000 Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 409 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Occidental 1st District Engineering Office 1 project 3,000,000 Local Program 1 project 3,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 3,000,000 Program

1. P00441076MN 300104218057000 3,000,000 Construction of Multi-Purpose Building, Magcamiguing, Calamba, Misamis Occidental

P00441076MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 1st Multi-Purpose Building, Building District Magcamiguing, Calamba, Misamis Engineering Office Occidental / Misamis Occidental 1st District Engineering Office

P00441076MN-EAO 30,000 Misamis Occidental 1st District Engineering Office / Misamis Occidental 1st District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 410 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Occidental 2nd District Engineering Office 9 projects 413,000,000 OO2: Protect Lives and Properties Against Major Floods 2 projects 200,000,000

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems 200,000,000

1. P00420355MN 320101105387000 100,000,000 Construction of Usugan River Flood Control Project (Downstream), Package A, Bonifacio, Misamis Occidental

P00420355MN-CW1 Construction of Flood Mitigation Construction of Lineal 428.000 98,000,000 Misamis Structure - Construction of Usugan Flood Mitigation meters Occidental 2nd River Flood Control Project Structure District (Downstream), Package A, Engineering Office Bonifacio, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00420355MN-EAO 2,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

2. P00420356MN 320101105388000 100,000,000 Construction of Usugan River Flood Control Project (Downstream), Package B, Bonifacio, Misamis Occidental

P00420356MN-CW1 Construction of Flood Mitigation Construction of Lineal 722.000 98,000,000 Misamis Structure - Construction of Usugan Flood Mitigation meters Occidental 2nd River Flood Control Project Structure District (Downstream), Package B, Engineering Office Bonifacio, Misamis Occidental / Misamis Occidental 2nd District Engineering Office

P00420356MN-EAO 2,000,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office Local Program 7 projects 213,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 58,000,000 Program

MYPS: 03/03/2020 02:36:37 pm Page 411 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

3. P00441077MN 300104218087000 3,000,000 Construction of Multi-Purpose Building, Circumferential Road, Bitoon-Aguada, Ozamiz City

P00441077MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Building - Construction of Multi Purpose Buildings Occidental 2nd Multi-Purpose Building, Building District Circumferential Road, Engineering Office Bitoon-Aguada, Ozamiz City / Misamis Occidental 2nd District Engineering Office

P00441077MN-EAO 30,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

4. P00444032MN 300104218068000 33,000,000 Construction/Completion of 10 units Multi-Purpose Building, Tangub City, Misamis Occidental

P00444032MN-CW1 Construction of Multi Purpose Construction of Number of 10.000 32,670,000 Misamis Building - Construction/Completion Multi Purpose Buildings Occidental 2nd of 10 units Multi-Purpose Building, Building District Tangub City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

P00444032MN-EAO 330,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

5. P00444034MN 300104218069000 22,000,000 Construction/Completion of 15 units Multi-Purpose Building, Tangub City, Misamis Occidental

P00444034MN-CW1 Construction of Multi Purpose Construction of Number of 15.000 21,780,000 Misamis Building - Construction/Completion Multi Purpose Buildings Occidental 2nd of 15 units Multi-Purpose Building, Building District Tangub City, Misamis Occidental Engineering Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 412 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00444034MN-EAO 220,000 Misamis Occidental 2nd District Engineering Office / Misamis Occidental 2nd District Engineering Office

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 15,000,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

6. P00444622MN 300106200281000 15,000,000 Construction/Improvement of Seawall, Misamis Occidental Cluster

P00444622MN-CW1 Construction of Flood Mitigation Construction of Lineal 330.500 14,475,000 Central Office / Structure - Flood Mitigation meters Misamis Construction/Improvement of Structure Occidental 2nd Seawall, Misamis Occidental District Cluster Engineering Office

P00444622MN-EAO 525,000 Central Office / Misamis Occidental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / 140,000,000 Improvement of Various Infrastructure including Local Projects

7. P00443214MN 300116202148000 50,000,000 Concreting of Barangay Roads in Misamis Occidental

P00443214MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.125 48,250,000 Central Office / Concreting of Barangay Roads in Concrete Road Misamis Misamis Occidental Occidental 2nd District Engineering Office

P00443214MN-EAO 1,750,000 Central Office / Misamis Occidental 2nd District Engineering Office

8. P00443348MN 300116202216000 60,000,000 Construction/Improvement of Barangay Roads, Misamis Occidental Cluster

P00443348MN-CW1 Construction of Concrete Road - Construction of Lane Km 3.750 57,900,000 Central Office / Construction/Improvement of Concrete Road Misamis Barangay Roads, Misamis Occidental 2nd Occidental Cluster District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 413 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443348MN-EAO 2,100,000 Central Office / Misamis Occidental 2nd District Engineering Office

9. P00444757MN 300116202213000 30,000,000 Construction/Concreting of Barangay Roads, Misamis Occidental Cluster, Misamis Occidental

P00444757MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.875 28,950,000 Central Office / Construction/Concreting of Concrete Road Misamis Barangay Roads, Misamis Occidental 2nd Occidental Cluster, Misamis District Occidental Engineering Office

P00444757MN-EAO 1,050,000 Central Office / Misamis Occidental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 414 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Misamis Oriental 2nd District Engineering Office 3 projects 67,000,000 Local Program 3 projects 67,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 7,000,000 Program

1. P00441078MN 300104218019000 3,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Laguindingan, Misamis Oriental

P00441078MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Laguindingan, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00441078MN-EAO 30,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

2. P00444000MN 300104218026000 4,000,000 Construction of Multi-Purpose Building, Brgy. Poblacion, Laguindingan, Misamis Oriental

P00444000MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,960,000 Misamis Oriental Building - Construction of Multi Purpose Buildings 2nd District Multi-Purpose Building, Brgy. Building Engineering Office Poblacion, Laguindingan, Misamis / Misamis Oriental Oriental 2nd District Engineering Office

P00444000MN-EAO 40,000 Misamis Oriental 2nd District Engineering Office / Misamis Oriental 2nd District Engineering Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 60,000,000

3. P00443756MN 300117205329000 60,000,000 Construction of Lapad, Laguindingan to Lourdes, Alubijid Barangay Road, Misamis Oriental

P00443756MN-CW1 Construction of Concrete Road - Construction of Lane Km 5.160 59,400,000 Central Office / Construction of Lapad, Concrete Road Misamis Oriental Laguindingan to Lourdes, Alubijid 2nd District Barangay Road, Misamis Oriental Engineering Office

P00443756MN-EAO 600,000 Central Office / Misamis Oriental 2nd District Engineering Office

MYPS: 03/03/2020 02:36:37 pm Page 415 of 415 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Autonomous Region in Muslim Mindanao 1 projects 100,000,000 Lanao del Sur 1st District Engineering Office 1 project 100,000,000 LANAO DEL SUR (FIRST) 1 project 100,000,000 OO2: Protect Lives and Properties Against Major Floods 1 project 100,000,000

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins 100,000,000 and Principal Rivers

1. P00420611MN 320102101056000 100,000,000 Construction of Flood Control Mitigation along Bubong River, Bubong, Lanao del Sur

P00420611MN-CW1 Construction of Flood Mitigation Construction of Lineal 725.000 96,500,000 Central Office / Structure - Construction of Flood Flood Mitigation meters Region X Control Mitigation along Bubong Structure River, Bubong, Lanao del Sur

P00420611MN-EAO 3,500,000 Central Office / Region X

MYPS: 03/03/2020 02:40:09 pm Page 1 of 1 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Autonomous Region in Muslim Mindanao 1 projects 6,400,000 Lanao del Sur 1st District Engineering Office 1 project 6,400,000 LANAO DEL SUR (FIRST) 1 project 6,400,000 Convergence and Special Support Program 1 project 6,400,000

Construction/ Improvement of Various Infrastructure in support of National Security 6,400,000

1. P00431770MN 300207100140000 6,400,000 Construction of Piagapo Municipal Police Station Building, Piagapo, Lanao Del Sur

P00431770MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,176,000 Central Office / Construction of Piagapo Municipal Other Facilities Facilities Region X Police Station Building, Piagapo, Lanao Del Sur

P00431770MN-EAO 224,000 Central Office / Region X

MYPS: 03/03/2020 02:38:25 pm Page 1 of 1 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Autonomous Region in Muslim Mindanao 51 projects 632,000,000 Lanao del Sur 1st District Engineering Office 51 projects 632,000,000 LANAO DEL SUR (FIRST) 51 projects 632,000,000 Local Program 51 projects 632,000,000

Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / 50,000,000 Rehabilitation / Improvement of Various Infrastructure including Local Projects

1. P00443223MN 300103202714000 10,000,000 Construction of Multi-purpose Building (Gymnasium), Brgy. Poblacion, Saguiaran, Lanao Del Sur

P00443223MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,750,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-purpose Building Building (Gymnasium), Brgy. Poblacion, Saguiaran, Lanao Del Sur

P00443223MN-EAO 250,000 Region X / Region X

2. P00443225MN 300103202715000 10,000,000 Construction of Multi-Purpose Building (Municipal Hall) (Phase ll), Brgy. Maribo, Lumba-Bayabao, Lanao Del Sur

P00443225MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,750,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building (Municipal Building Hall) (Phase ll), Brgy. Maribo, Lumba-Bayabao, Lanao Del Sur

P00443225MN-EAO 250,000 Region X / Region X

3. P00443226MN 300103202716000 5,000,000 Construction of Multi-purpose Building (Open Gym), Brgy. Bubong Madanding, Marantao, Lanao Del Sur

P00443226MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,875,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-purpose Building (Open Building Gym), Brgy. Bubong Madanding, Marantao, Lanao Del Sur

P00443226MN-EAO 125,000 Region X / Region X

4. P00443227MN 300103202717000 5,000,000 Construction of Multi-purpose Building (Open Gym), Brgy. Malimono, Marawi City, Lanao Del Sur

P00443227MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,875,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-purpose Building (Open Building Gym), Brgy. Malimono, Marawi City, Lanao Del Sur

MYPS: 03/03/2020 02:42:47 pm Page 1 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443227MN-EAO 125,000 Region X / Region X

5. P00443228MN 300103202718000 5,000,000 Construction of Multi-Purpose Facility (Grandstand Bleacher), Brgy. Francport, Bumbaran, Lanao Del Sur

P00443228MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 4,875,000 Region X / Region Construction of Multi-Purpose Other Facilities Facilities X Facility (Grandstand Bleacher), Brgy. Francport, Bumbaran, Lanao Del Sur

P00443228MN-EAO 125,000 Region X / Region X

6. P00443229MN 300103202719000 5,000,000 Construction of Public Market, Brgy. Patani, Marawi City, Lanao Del Sur

P00443229MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,875,000 Region X / Region Building - Construction of Public Multi Purpose Buildings X Market, Brgy. Patani, Marawi City, Building Lanao Del Sur

P00443229MN-EAO 125,000 Region X / Region X

7. P00443230MN 300103202720000 10,000,000 Construction Public Market, Brgy. Eastern Wao, Wao, Lanao Del Sur

P00443230MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,750,000 Region X / Region Building - Construction Public Multi Purpose Buildings X Market, Brgy. Eastern Wao, Wao, Building Lanao Del Sur

P00443230MN-EAO 250,000 Region X / Region X

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 182,000,000 Program

8. P00440836MN 300104217685000 10,000,000 Construction of Multi-Purpose Building, Brgy. Maribo, Lumba-Bayabao, Lanao del Sur

P00440836MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Maribo, Lumba-Bayabao, Lanao del Sur

P00440836MN-EAO 100,000 Region X / Region X

9. P00440837MN 300104217666000 10,000,000 Construction of Multi-Purpose Building, Brgy. Bansayan, Poona-Bayabao, Lanao del Sur

MYPS: 03/03/2020 02:42:47 pm Page 2 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440837MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Bansayan, Poona-Bayabao, Lanao del Sur

P00440837MN-EAO 100,000 Region X / Region X

10. P00440838MN 300104217679000 5,000,000 Construction of Multi-Purpose Building, Brgy. Kianibong, Tagoloan, Lanao del Sur

P00440838MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Kianibong, Tagoloan, Lanao del Sur

P00440838MN-EAO 50,000 Region X / Region X

11. P00440839MN 300104217692000 5,000,000 Construction of Multi-Purpose Building, Brgy. Ranao-Baning, Amai Manabilang, Lanao del Sur

P00440839MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Ranao-Baning, Amai Manabilang, Lanao del Sur

P00440839MN-EAO 50,000 Region X / Region X

12. P00440840MN 300104217691000 3,000,000 Construction of Multi-Purpose Building, Brgy. Pilintangan, Wao, Lanao del Sur

P00440840MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Pilintangan, Wao, Lanao del Sur

P00440840MN-EAO 30,000 Region X / Region X

13. P00440841MN 300104217665000 3,000,000 Construction of Multi-Purpose Building, Brgy. Banga, Marawi City, Lanao del Sur

P00440841MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Banga, Marawi City, Lanao del Sur

P00440841MN-EAO 30,000 Region X / Region X

14. P00440842MN 300104217672000 3,000,000 Construction of Multi-Purpose Building, Brgy. Cabasaran, Marawi City, Lanao del Sur

MYPS: 03/03/2020 02:42:47 pm Page 3 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440842MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Cabasaran, Marawi City, Lanao del Sur

P00440842MN-EAO 30,000 Region X / Region X

15. P00440843MN 300104217668000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bito Buadi Itowa, Marawi City, Lanao del Sur

P00440843MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Bito Building Buadi Itowa, Marawi City, Lanao del Sur

P00440843MN-EAO 20,000 Region X / Region X

16. P00440844MN 300104217676000 2,000,000 Construction (Completion) of Multi-Purpose Building, Eastern Wao, Lanao del Sur

P00440844MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction Multi Purpose Buildings X (Completion) of Multi-Purpose Building Building, Eastern Wao, Lanao del Sur

P00440844MN-EAO 20,000 Region X / Region X

17. P00440845MN 300104217694000 2,000,000 Construction of Multi-Purpose Building, Brgy. Rorogagus East, Marawi City, Lanao del Sur

P00440845MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Rorogagus East, Marawi City, Lanao del Sur

P00440845MN-EAO 20,000 Region X / Region X

18. P00440846MN 300104217695000 3,000,000 Construction of Multi-Purpose Building, Brgy. Rorogagus Proper, Marawi City, Lanao del Sur

P00440846MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Rorogagus Proper, Marawi City, Lanao del Sur

P00440846MN-EAO 30,000 Region X / Region X

MYPS: 03/03/2020 02:42:47 pm Page 4 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

19. P00440847MN 300104217674000 2,000,000 Construction of Multi-Purpose Building, Brgy. Dulay Proper, Marawi City, Lanao del Sur

P00440847MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Dulay Building Proper, Marawi City, Lanao del Sur

P00440847MN-EAO 20,000 Region X / Region X

20. P00440848MN 300104217675000 2,000,000 Construction of Multi-Purpose Building, Brgy. Dulay West, Marawi City, Lanao del Sur

P00440848MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Dulay Building West, Marawi City, Lanao del Sur

P00440848MN-EAO 20,000 Region X / Region X

21. P00440849MN 300104217671000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bubonga Pagalamatan, Marawi City, Lanao del Sur

P00440849MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Bubonga Pagalamatan, Marawi City, Lanao del Sur

P00440849MN-EAO 20,000 Region X / Region X

22. P00440850MN 300104217715000 2,000,000 Construction of Multi-Purpose Building, Brgy. Wawalayan Calocan, Marawi City, Lanao del Sur

P00440850MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Wawalayan Calocan, Marawi City, Lanao del Sur

P00440850MN-EAO 20,000 Region X / Region X

23. P00440851MN 300104217669000 2,000,000 Construction of Multi-Purpose Building, Brgy. Boriongan, Taraka, Lanao del Sur

P00440851MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Boriongan, Taraka, Lanao del Sur

P00440851MN-EAO 20,000 Region X / Region X

MYPS: 03/03/2020 02:42:47 pm Page 5 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

24. P00440852MN 300104217688000 2,000,000 Construction of Multi-Purpose Building, Brgy. Pagalamatan, Taraka, Lanao del Sur

P00440852MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Pagalamatan, Taraka, Lanao del Sur

P00440852MN-EAO 20,000 Region X / Region X

25. P00440853MN 300104217664000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bandera Buisan, Taraka, Lanao del Sur

P00440853MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Bandera Buisan, Taraka, Lanao del Sur

P00440853MN-EAO 20,000 Region X / Region X

26. P00440854MN 300104217684000 2,000,000 Construction of Multi-Purpose Building, Brgy. Malungun, Taraka, Lanao del Sur

P00440854MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Malungun, Taraka, Lanao del Sur

P00440854MN-EAO 20,000 Region X / Region X

27. P00440855MN 300104217677000 2,000,000 Construction of Multi-Purpose Building, Brgy. Gapao Balindong, Taraka, Lanao del Sur

P00440855MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Gapao Balindong, Taraka, Lanao del Sur

P00440855MN-EAO 20,000 Region X / Region X

28. P00440856MN 300104217683000 2,000,000 Construction of Multi-Purpose Building, Brgy. Lumasa, Taraka, Lanao del Sur

P00440856MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Lumasa, Taraka, Lanao del Sur

P00440856MN-EAO 20,000 Region X / Region X

MYPS: 03/03/2020 02:42:47 pm Page 6 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

29. P00440857MN 300104217670000 2,000,000 Construction of Multi-Purpose Building, Brgy. Borowa, Taraka, Lanao del Sur

P00440857MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Borowa, Taraka, Lanao del Sur

P00440857MN-EAO 20,000 Region X / Region X

30. P00441032MN 300104217661000 5,000,000 Construction of Multi-Purpose Building, Barangay Bubong, Saguiaran, Lanao del Sur

P00441032MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Barangay Building Bubong, Saguiaran, Lanao del Sur

P00441032MN-EAO 50,000 Region X / Region X

31. P00441043MN 300104217662000 3,000,000 Construction of Multi-Purpose Building, Barangay Gadongan, Marawi City, Lanao del Sur

P00441043MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Barangay Building Gadongan, Marawi City, Lanao del Sur

P00441043MN-EAO 30,000 Region X / Region X

32. P00443836MN 300104217655000 20,000,000 Construction/Completion of Multi-Purpose Building (Gymnasium), Brgy. Madanding, Bubong, Lanao del Sur

P00443836MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Region X / Region Building - Construction/Completion Multi Purpose Buildings X of Multi-Purpose Building Building (Gymnasium), Brgy. Madanding, Bubong, Lanao del Sur

P00443836MN-EAO 200,000 Region X / Region X

33. P00443837MN 300104217656000 16,000,000 Construction/Rehabilitation of Multi-Purpose Building (Pugaan Sports Complex including Facilities), Brgy. Pugaan, Ditsaan-Ramain, Lanao del Sur

P00443837MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 15,840,000 Region X / Region Building - Multi Purpose Buildings X Construction/Rehabilitation of Building Multi-Purpose Building (Pugaan Sports Complex including Facilities), Brgy. Pugaan, Ditsaan-Ramain, Lanao del Sur MYPS: 03/03/2020 02:42:47 pm Page 7 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443837MN-EAO 160,000 Region X / Region X

34. P00443838MN 300104217657000 14,000,000 Construction of Multi-Purpose Building (Legislative Building including Facilities), Brgy. Bagoa-Ingud, Ditsaan-Ramain, Lanao del Sur

P00443838MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 13,860,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building (Legislative Building Building including Facilities), Brgy. Bagoa-Ingud, Ditsaan-Ramain, Lanao del Sur

P00443838MN-EAO 140,000 Region X / Region X

35. P00443848MN 300104217707000 5,000,000 Construction of Multi-Purpose Building/Center, Adiong Memorial Polytechnic State College

P00443848MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building/Center, Building Adiong Memorial Polytechnic State College

P00443848MN-EAO 50,000 Region X / Region X

36. P00443850MN 300104217709000 20,000,000 Construction/Rehabilitation of Provincial Infirmary Center, Marawi City, Lanao del Sur

P00443850MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Region X / Region Building - Multi Purpose Buildings X Construction/Rehabilitation of Building Provincial Infirmary Center, Marawi City, Lanao del Sur

P00443850MN-EAO 200,000 Region X / Region X

37. P00443851MN 300104217710000 3,500,000 Construction of Multi-Purpose Building, Katogonan, Buadiposo Bundong, Lanao del Sur

P00443851MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Building Katogonan, Buadiposo Bundong, Lanao del Sur

P00443851MN-EAO 35,000 Region X / Region X

38. P00443852MN 300104217711000 3,500,000 Construction of Multi-Purpose Building at Brgy. Eastern, Wao, Lanao del Sur

MYPS: 03/03/2020 02:42:47 pm Page 8 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443852MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 3,465,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building at Brgy. Building Eastern, Wao, Lanao del Sur

P00443852MN-EAO 35,000 Region X / Region X

39. P00443853MN 300104217712000 5,000,000 Construction of Multi-Purpose Building, Brgy. Gadongan, Ditsaan-Ramain, Patani, Marawi City, Lanao Del Sur

P00443853MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Gadongan, Ditsaan-Ramain, Patani, Marawi City, Lanao Del Sur

P00443853MN-EAO 50,000 Region X / Region X

40. P00443854MN 300104217713000 7,000,000 Construction of Multi-Purpose Building, Brgy. Rantian, Ramain, Lanao del Sur

P00443854MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 6,930,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Rantian, Ramain, Lanao del Sur

P00443854MN-EAO 70,000 Region X / Region X

41. P00443855MN 300104217714000 10,000,000 Construction/Rehabilitation of Multi-Purpose Building, Municipal Hall Compound, Brgy. Apa Mimbalay, Masiu, Lanao del Sur

P00443855MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 9,900,000 Region X / Region Building - Multi Purpose Buildings X Construction/Rehabilitation of Building Multi-Purpose Building, Municipal Hall Compound, Brgy. Apa Mimbalay, Masiu, Lanao del Sur

P00443855MN-EAO 100,000 Region X / Region X

Flood Control and Drainage - Flood Control Structures / Facilities - Construction / 50,000,000 Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

42. P00442725MN 300106200499000 20,000,000 Construction of Open Canal, Sugod Section, Marawi City, Lanao del Sur

P00442725MN-CW1 Construction of Flood Mitigation Construction of Lineal 150.000 19,500,000 Region X / Region Structure - Construction of Open Flood Mitigation meters X Canal, Sugod Section, Marawi City, Structure Lanao del Sur

MYPS: 03/03/2020 02:42:47 pm Page 9 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00442725MN-EAO 500,000 Region X / Region X

43. P00442727MN 300106200498000 30,000,000 Construction of Flood Control, Gata River, Poona-Bayabao, Lanao del Sur

P00442727MN-CW1 Construction of Flood Mitigation Construction of Lineal 220.000 29,250,000 Region X / Region Structure - Construction of Flood Flood Mitigation meters X Control, Gata River, Structure Poona-Bayabao, Lanao del Sur

P00442727MN-EAO 750,000 Region X / Region X

National Roads and Bridges - National Bridges - Construction / Repair / Rehabilitation 120,000,000 / Improvement of Various Infrastructure including Local Projects

44. P00442721MN 300113200033000 20,000,000 Construction of Kilikili 2 Bridge, Wao, Lanao del Sur

P00442721MN-CW1 Construction of Bridge - Construction of Square 100.170 19,500,000 Region X / Region Construction of Kilikili 2 Bridge, Bridge meters X Wao, Lanao del Sur

P00442721MN-EAO 500,000 Region X / Region X

45. P00442722MN 300113200030000 50,000,000 Construction of Balatin Bridge, Wao, Lanao del Sur

P00442722MN-CW1 Construction of Bridge - Construction of Square 407.840 48,750,000 Region X / Region Construction of Balatin Bridge, Bridge meters X Wao, Lanao del Sur

P00442722MN-EAO 1,250,000 Region X / Region X

46. P00442724MN 300113200031000 30,000,000 Construction of Bu-ot 1 Bridge, Wao, Lanao del Sur

P00442724MN-CW1 Construction of Bridge - Construction of Square 143.100 29,250,000 Region X / Region Construction of Bu-ot 1 Bridge, Bridge meters X Wao, Lanao del Sur

P00442724MN-EAO 750,000 Region X / Region X

47. P00442728MN 300113200034000 20,000,000 Construction of Tuba Bridge, Wao, Lanao del Sur

P00442728MN-CW1 Construction of Bridge - Construction of Square 142.500 19,500,000 Region X / Region Construction of Tuba Bridge, Wao, Bridge meters X Lanao del Sur

P00442728MN-EAO 500,000 Region X / Region X

National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / 230,000,000 Improvement of Various Infrastructure including Local Projects

MYPS: 03/03/2020 02:42:47 pm Page 10 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

48. P00442719MN 300111200197000 90,000,000 Rehabilitation of Marawi-Malabang National Road, Brgy. Nataron - Brgy. Cawayan Section, Marantao, Lanao del Sur

P00442719MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 6.000 86,850,000 Central Office / Rehabilitation of Paved Road Region X Marawi-Malabang National Road, Brgy. Nataron - Brgy. Cawayan Section, Marantao, Lanao del Sur

P00442719MN-EAO 3,150,000 Central Office / Region X

49. P00442720MN 300111200195000 90,000,000 Rehabilitation of Bumbaran-Talakag National Road, Brgy. Mansilano-Brgy. Upper Fort Section, Bumbaran, Lanao del Sur

P00442720MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 6.490 86,850,000 Central Office / Rehabilitation of Paved Road Region X Bumbaran-Talakag National Road, Brgy. Mansilano-Brgy. Upper Fort Section, Bumbaran, Lanao del Sur

P00442720MN-EAO 3,150,000 Central Office / Region X

50. P00442723MN 300111200308000 30,000,000 Widening of Wao National Road, Kilikili Section, Wao, Lanao del Sur

P00442723MN-CW1 Road Widening - Widening of Wao Road Widening Lane Km 2.340 29,250,000 Region X / Region National Road, Kilikili Section, X Wao, Lanao del Sur

P00442723MN-EAO 750,000 Region X / Region X

51. P00442726MN 300111200301000 20,000,000 Concreting of Ilian Road Phase II, Marantao, Lanao del Sur

P00442726MN-CW1 Construction of Concrete Road - Construction of Lane Km 1.900 19,500,000 Region X / Region Concreting of Ilian Road Phase II, Concrete Road X Marantao, Lanao del Sur

P00442726MN-EAO 500,000 Region X / Region X

MYPS: 03/03/2020 02:42:47 pm Page 11 of 11 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Autonomous Region in Muslim Mindanao 1 projects 6,400,000 Lanao del Sur 2nd District Engineering Office 1 project 6,400,000 LANAO DEL SUR (SECOND) 1 project 6,400,000 Convergence and Special Support Program 1 project 6,400,000

Construction/ Improvement of Various Infrastructure in support of National Security 6,400,000

1. P00431682MN 300207100134000 6,400,000 Construction of Balabagan Municipal Police Station Building, Balabagan, Lanao Del Sur

P00431682MN-CW1 Construction of Other Facilities - Construction of Number of 1.000 6,176,000 Central Office / Construction of Balabagan Other Facilities Facilities Region X Municipal Police Station Building, Balabagan, Lanao Del Sur

P00431682MN-EAO 224,000 Central Office / Region X

MYPS: 03/03/2020 02:46:36 pm Page 1 of 1 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Autonomous Region in Muslim Mindanao 45 projects 635,000,000 Lanao del Sur 2nd District Engineering Office 45 projects 635,000,000 LANAO DEL SUR (SECOND) 45 projects 635,000,000 Local Program 45 projects 635,000,000

Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure 108,000,000 Program

1. P00440858MN 300104217654000 2,000,000 Construction of Multi-Purpose Building A, Brgy. Bara-As, Picong, Lanao del Sur

P00440858MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building A, Brgy. Building Bara-As, Picong, Lanao del Sur

P00440858MN-EAO 20,000 Region X / Region X

2. P00440859MN 300104217660000 15,000,000 Construction of Multi-Purpose Building B, Brgy. Bara-As, Picong, Lanao del Sur

P00440859MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building B, Brgy. Building Bara-As, Picong, Lanao del Sur

P00440859MN-EAO 150,000 Region X / Region X

3. P00440860MN 300104217697000 2,000,000 Construction of Multi-Purpose Building, Brgy. Torogan, Picong, Lanao del Sur

P00440860MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Torogan, Picong, Lanao del Sur

P00440860MN-EAO 20,000 Region X / Region X

4. P00440861MN 300104217663000 2,000,000 Construction of Multi-Purpose Building, Brgy. Anas, Picong, Lanao del Sur

P00440861MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Anas, Building Picong, Lanao del Sur

P00440861MN-EAO 20,000 Region X / Region X

5. P00440862MN 300104217687000 2,000,000 Construction of Multi-Purpose Building, Brgy. Mimbalawag, Picong, Lanao del Sur

MYPS: 03/03/2020 02:48:24 pm Page 1 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440862MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Mimbalawag, Picong, Lanao del Sur

P00440862MN-EAO 20,000 Region X / Region X

6. P00440863MN 300104217699000 2,000,000 Construction of Multi-Purpose Building, Brgy. Ubanoban, Picong, Lanao del Sur

P00440863MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Ubanoban, Picong, Lanao del Sur

P00440863MN-EAO 20,000 Region X / Region X

7. P00440864MN 300104217686000 2,000,000 Construction of Multi-Purpose Building, Brgy. Micalubo, Picong, Lanao del Sur

P00440864MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Micalubo, Picong, Lanao del Sur

P00440864MN-EAO 20,000 Region X / Region X

8. P00440869MN 300104217682000 5,000,000 Construction of Multi-Purpose Building, Brgy. Linuk, Madalum, Lanao del Sur

P00440869MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Linuk, Madalum, Lanao del Sur

P00440869MN-EAO 50,000 Region X / Region X

9. P00440870MN 300104217673000 2,000,000 Construction of Multi-Purpose Building, Brgy. Cadayonan, Madalum, Lanao del Sur

P00440870MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Cadayonan, Madalum, Lanao del Sur

P00440870MN-EAO 20,000 Region X / Region X

10. P00440871MN 300104217693000 2,000,000 Construction of Multi-Purpose Building, Brgy. Riray, Madalum, Lanao del Sur

MYPS: 03/03/2020 02:48:24 pm Page 2 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440871MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Riray, Building Madalum, Lanao del Sur

P00440871MN-EAO 20,000 Region X / Region X

11. P00440872MN 300104217696000 2,000,000 Construction of Multi-Purpose Building, Brgy. Tamporong, Madalum, Lanao del Sur

P00440872MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Tamporong, Madalum, Lanao del Sur

P00440872MN-EAO 20,000 Region X / Region X

12. P00440873MN 300104217667000 2,000,000 Construction of Multi-Purpose Building, Brgy. Bato, Madalum, Lanao del Sur

P00440873MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Bato, Building Madalum, Lanao del Sur

P00440873MN-EAO 20,000 Region X / Region X

13. P00440874MN 300104217680000 2,000,000 Construction of Multi-Purpose Building, Brgy. Kormatan, Madalum, Lanao del Sur

P00440874MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Kormatan, Madalum, Lanao del Sur

P00440874MN-EAO 20,000 Region X / Region X

14. P00440875MN 300104217689000 3,000,000 Construction of Multi-Purpose Building, Brgy. Pagayonan, Madamba, Lanao del Sur

P00440875MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Pagayonan, Madamba, Lanao del Sur

P00440875MN-EAO 30,000 Region X / Region X

15. P00440876MN 300104211500000 2,000,000 Construction of Multi-Purpose Building, Brgy. Linuk, Madamba, Lanao del Sur

MYPS: 03/03/2020 02:48:24 pm Page 3 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440876MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Linuk, Madamba, Lanao del Sur

P00440876MN-EAO 20,000 Region X / Region X

16. P00440877MN 300104217698000 2,000,000 Construction of Multi-Purpose Building, Brgy. Tulay, Madamba, Lanao del Sur

P00440877MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Tulay, Madamba, Lanao del Sur

P00440877MN-EAO 20,000 Region X / Region X

17. P00440878MN 300104217681000 2,000,000 Construction of Multi-Purpose Building, Brgy. Liangan, Madamba, Lanao del Sur

P00440878MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Liangan, Madamba, Lanao del Sur

P00440878MN-EAO 20,000 Region X / Region X

18. P00440879MN 300104217690000 2,000,000 Construction of Multi-Purpose Building, Brgy. Palao, Madamba, Lanao del Sur

P00440879MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Palao, Madamba, Lanao del Sur

P00440879MN-EAO 20,000 Region X / Region X

19. P00440882MN 300104217678000 5,000,000 Construction of Multi-Purpose Building, Brgy. Ingud, Tugaya, Lanao del Sur

P00440882MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 4,950,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Ingud, Tugaya, Lanao del Sur

P00440882MN-EAO 50,000 Region X / Region X

20. P00443839MN 300104217658000 20,000,000 Construction of Multi-Purpose Building, Brgy. Bara-as, Picong, Lanao del Sur

MYPS: 03/03/2020 02:48:24 pm Page 4 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00443839MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 19,800,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Bara-as, Picong, Lanao del Sur

P00443839MN-EAO 200,000 Region X / Region X

21. P00443840MN 300104217659000 15,000,000 Construction of Multi-Purpose Building, Brgy. Uyaan Proper, Madamba, Lanao del Sur

P00443840MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 14,850,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building, Brgy. Building Uyaan Proper, Madamba, Lanao del Sur

P00443840MN-EAO 150,000 Region X / Region X

22. P00443842MN 300104217701000 2,000,000 Construction of Multi-Purpose Building (Municipal Hall) Balabagan, Lanao Del Sur

P00443842MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building (Municipal Building Hall) Balabagan, Lanao Del Sur

P00443842MN-EAO 20,000 Region X / Region X

23. P00443843MN 300104217702000 2,000,000 Construction / Improvement of Multi-Purpose Building (Municipal Hall) Madalum, Lanao Del Sur

P00443843MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction / Multi Purpose Buildings X Improvement of Multi-Purpose Building Building (Municipal Hall) Madalum, Lanao Del Sur

P00443843MN-EAO 20,000 Region X / Region X

24. P00443844MN 300104217703000 2,000,000 Construction / Improvement of Multi-Purpose Building (Municipal Hall) Malabang, Lanao Del Sur

P00443844MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction / Multi Purpose Buildings X Improvement of Multi-Purpose Building Building (Municipal Hall) Malabang, Lanao Del Sur

P00443844MN-EAO 20,000 Region X / Region X

MYPS: 03/03/2020 02:48:24 pm Page 5 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

25. P00443845MN 300104217704000 2,000,000 Construction of Multi-Purpose Building Lumbaca-Unayan, Lanao Del Sur

P00443845MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building Building Lumbaca-Unayan, Lanao Del Sur

P00443845MN-EAO 20,000 Region X / Region X

26. P00443846MN 300104217705000 2,000,000 Construction of Multi-Purpose Building (Public Market) Butig, Lanao Del Sur

P00443846MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building (Public Building Market) Butig, Lanao Del Sur

P00443846MN-EAO 20,000 Region X / Region X

27. P00443847MN 300104217706000 2,000,000 Construction of Multi-Purpose Building Phase 1 Kapatagan, Lanao Del Sur

P00443847MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 1,980,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Building Phase 1 Building Kapatagan, Lanao Del Sur

P00443847MN-EAO 20,000 Region X / Region X

28. P00443849MN 300104217708000 3,000,000 Construction of Multi-Purpose Center, Brgy. Silid, Bayang, Lanao del Sur

P00443849MN-CW1 Construction of Multi Purpose Construction of Number of 1.000 2,970,000 Region X / Region Building - Construction of Multi Purpose Buildings X Multi-Purpose Center, Brgy. Silid, Building Bayang, Lanao del Sur

P00443849MN-EAO 30,000 Region X / Region X

Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure 2,000,000 Program

29. P00440866MN 300107200940000 2,000,000 Construction of Flood Control Structure, Brgy. Balangas, Picong, Lanao del Sur

P00440866MN-CW1 Construction of Flood Mitigation Construction of Lineal 42.000 1,980,000 Region X / Region Structure - Construction of Flood Flood Mitigation meters X Control Structure, Brgy. Balangas, Structure Picong, Lanao del Sur

P00440866MN-EAO 20,000 Region X / Region X

MYPS: 03/03/2020 02:48:24 pm Page 6 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

Local Roads and Bridges - Local Roads - Local Infrastructure Program 19,000,000

30. P00440865MN 300117207320000 2,000,000 Construction of Road, Brgy. Punong, Picong, Lanao del Sur

P00440865MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.300 1,980,000 Region X / Region Construction of Road, Brgy. Concrete Road X Punong, Picong, Lanao del Sur

P00440865MN-EAO 20,000 Region X / Region X

31. P00440881MN 300117207322000 2,000,000 Construction of Road, Brgy. Uyaan Proper, Madamba, Lanao del Sur

P00440881MN-CW1 Construction of Concrete Road - Construction of Lane Km 0.270 1,980,000 Region X / Region Construction of Road, Brgy. Uyaan Concrete Road X Proper, Madamba, Lanao del Sur

P00440881MN-EAO 20,000 Region X / Region X

32. P00443115MN 300117207321000 15,000,000 Concreting of Road, Brgy. Sabanding, Madalum, Lanao del Sur

P00443115MN-CW1 Construction of Concrete Road - Construction of Lane Km 2.390 14,850,000 Region X / Region Concreting of Road, Brgy. Concrete Road X Sabanding, Madalum, Lanao del Sur

P00443115MN-EAO 150,000 Region X / Region X

National Roads and Bridges - National Bridges - Construction / Repair / Rehabilitation 65,000,000 / Improvement of Various Infrastructure including Local Projects

33. P00442735MN 300113200035000 35,000,000 Constructionof Miondas Bridge, Malabang, Lanao del Sur

P00442735MN-CW1 Construction of Bridge - Construction of Square 120.000 34,125,000 Region X / Region Constructionof Miondas Bridge, Bridge meters X Malabang, Lanao del Sur

P00442735MN-EAO 875,000 Region X / Region X

34. P00442736MN 300113200032000 30,000,000 Construction of Carasaan Bridge, Picong, Lanao del Sur

P00442736MN-CW1 Construction of Bridge - Construction of Square 104.940 29,250,000 Region X / Region Construction of Carasaan Bridge, Bridge meters X Picong, Lanao del Sur

P00442736MN-EAO 750,000 Region X / Region X

National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / 435,000,000 Improvement of Various Infrastructure including Local Projects

MYPS: 03/03/2020 02:48:24 pm Page 7 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

35. P00442730MN 300111200304000 50,000,000 Rehabilitation of Marawi-Malabang Road including drainage, Bacolod Kalawi section, Lanao del Sur

P00442730MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 3.490 48,750,000 Region X / Region Rehabilitation of Paved Road X Marawi-Malabang Road including drainage, Bacolod Kalawi section, Lanao del Sur

P00442730MN-EAO 1,250,000 Region X / Region X

36. P00442731MN 300111200305000 50,000,000 Rehabilitation of Marawi-Malabang Road including drainage, Malabang section, Lanao del Sur

P00442731MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 5.430 48,750,000 Region X / Region Rehabilitation of Paved Road X Marawi-Malabang Road including drainage, Malabang section, Lanao del Sur

P00442731MN-EAO 1,250,000 Region X / Region X

37. P00442732MN 300111200302000 50,000,000 Rehabilitation of Cotabato-Malabang-Lanao del Norte Road, Kapatagan Section, Lanao del Sur

P00442732MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 3.530 48,750,000 Region X / Region Rehabilitation of Paved Road X Cotabato-Malabang-Lanao del Norte Road, Kapatagan Section, Lanao del Sur

P00442732MN-EAO 1,250,000 Region X / Region X

38. P00442733MN 300111200307000 50,000,000 Rehabilitation of Masiu-Ganassi Road, Binidayan-Ganassi Section, Lanao del Sur

P00442733MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 3.590 48,750,000 Region X / Region Rehabilitation of Masiu-Ganassi Paved Road X Road, Binidayan-Ganassi Section, Lanao del Sur

P00442733MN-EAO 1,250,000 Region X / Region X

39. P00442734MN 300111200306000 50,000,000 Rehabilitation of Masiu-Ganassi Road, Bayang Section, Lanao del Sur

P00442734MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 3.600 48,750,000 Region X / Region Rehabilitation of Masiu-Ganassi Paved Road X Road, Bayang Section, Lanao del Sur

P00442734MN-EAO 1,250,000 Region X / Region X MYPS: 03/03/2020 02:48:24 pm Page 8 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

40. P00442753MN 300111200198000 75,000,000 Rehabilitation of Marawi-Malabang Road including Drainage, Ganassi -Pualas Section, Lanao del Sur

P00442753MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 5.250 72,375,000 Central Office / Rehabilitation of Paved Road Region X Marawi-Malabang Road including Drainage, Ganassi -Pualas Section, Lanao del Sur

P00442753MN-EAO 2,625,000 Central Office / Region X

41. P00442754MN 300111200196000 60,000,000 Rehabilitation of Cotabato-Malabang-Lanao del Norte Road, Balabagan Section, Lanao del Sur

P00442754MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 4.960 57,900,000 Central Office / Rehabilitation of Paved Road Region X Cotabato-Malabang-Lanao del Norte Road, Balabagan Section, Lanao del Sur

P00442754MN-EAO 2,100,000 Central Office / Region X

42. P00442756MN 300111200303000 50,000,000 Rehabilitation of Ganassi-Tubod Road, Brgy. Uyaan Section, Madamba, Lanao del Sur

P00442756MN-CW1 Rehabilitation of Paved Road - Rehabilitation of Lane Km 3.530 48,750,000 Region X / Region Rehabilitation of Ganassi-Tubod Paved Road X Road, Brgy. Uyaan Section, Madamba, Lanao del Sur

P00442756MN-EAO 1,250,000 Region X / Region X

Water Management Facilities - Water Supply - Local Infrastructure Program 6,000,000

43. P00440867MN 300121200883000 2,000,000 Construction of Water Supply - Level II, Brgy. Tual, Picong, Lanao del Sur

P00440867MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Region X / Region Systems - Construction of Water Water Supply Water X Supply - Level II, Brgy. Tual, Picong, Systems Supply Lanao del Sur Systems

P00440867MN-EAO 20,000 Region X / Region X

44. P00440868MN 300121200882000 2,000,000 Construction of Water Supply - Level II, Brgy. Maganding, Picong, Lanao del Sur

P00440868MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Region X / Region Systems - Construction of Water Water Supply Water X Supply - Level II, Brgy. Maganding, Systems Supply Picong, Lanao del Sur Systems

MYPS: 03/03/2020 02:48:24 pm Page 9 of 10 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act

UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office

P00440868MN-EAO 20,000 Region X / Region X

45. P00440880MN 300121200884000 2,000,000 Construction of Water Supply - Level II, Brgy. Tubaran, Madamba, Lanao del Sur

P00440880MN-CW1 Construction of Water Supply Construction of Number of 1.000 1,980,000 Region X / Region Systems - Construction of Water Water Supply Water X Supply - Level II, Brgy. Tubaran, Systems Supply Madamba, Lanao del Sur Systems

P00440880MN-EAO 20,000 Region X / Region X

MYPS: 03/03/2020 02:48:24 pm Page 10 of 10 IO Report