London to Wales Route Strategy Evidence Report Technical Annex April 2014

Total Page:16

File Type:pdf, Size:1020Kb

London to Wales Route Strategy Evidence Report Technical Annex April 2014 Safe roads, reliable journeys, informed travellers London to Wales Route Strategy Evidence Report Technical Annex April 2014 An executive agency of the Department for Transport Technical annex to London to Wales route-based strategy evidence report Document History Technical annex to London to Wales route-based strategy evidence report Highways Agency This document has been issued and amended as follows: Version Date Description Author Approved by 1 12/12/13 First draft issue to Highways Agency Ian Parsons Andrew Page-Dove 2 13/12/13 Second draft Ian Parsons Andrew Page-Dove 3 16/01/14 Final draft for Publication Agency SW RBS Andrew Page-Dove Team 4 30/01/14 Final draft for stakeholders Agency SW RBS Ian Parsons Team 5 03/04/14 Final for publication Agency SW RBS Colin Gimblett Team i Technical annex to London to Wales route-based strategy evidence report Table of Contents Document History .........................................................................................................i Technical annex to London to Wales route-based strategy evidence report.................i Tables ........................................................................................................................iii Figures.......................................................................................................................iv Part A Supporting evidence.................................................................................5 A1 Introduction .....................................................................................................6 A1.1 Route description...........................................................................................6 A2 Route capability, condition and constraints...............................................12 A2.1 Route performance ......................................................................................12 A2.2 Road Safety.................................................................................................19 A2.3 Asset Condition............................................................................................19 A2.4 Route Operation ..........................................................................................19 A2.5 Technology ..................................................................................................19 A2.6 Vulnerable Road Users................................................................................20 A2.7 Environment.................................................................................................21 A3 Future considerations ..................................................................................27 A3.1 Economic development and surrounding environment ................................27 A3.2 Network improvements and operational changes........................................31 A3.3 Wider transport networks.............................................................................35 A4 Key challenges and opportunities...............................................................38 A4.1 Timescales...................................................................................................38 A4.2 Stakeholder priorities ...................................................................................38 A4.3 Operational challenges and opportunities....................................................38 A4.4 Asset condition challenges and opportunities..............................................38 A4.5 Capacity challenges and opportunities ........................................................38 A4.6 Safety challenges and opportunities ............................................................38 A4.7 Social and environmental challenges and opportunities ..............................38 Part B Stakeholder engagement........................................................................39 B1 Stakeholder Engagement Events .................................................................40 B1.1 Engagement Events Diary ............................................................................40 B1.2 Forward Swindon LEP Event – Invitees and Attendees................................40 B1.3 West of England LEP Event – Invitees and Attendees .................................40 ii Technical annex to London to Wales route-based strategy evidence report B1.4 GFirst LEP Event – Invitees and Attendees..................................................41 B1.5 Buckinghamshire Thames Valley LEP Event – Invitees and Attendees .......42 B1.6 Thames Valley Berkshire LEP Event – Invitees and Attendees....................42 B1.7 Forward Swindon LEP Event – Notes...........................................................44 B1.8 West of England LEP Event – Notes ............................................................54 B1.9 GFirst LEP Event – Notes.............................................................................67 B1.10 Buckinghamshire Thames Valley LEP Event – Notes ..................................81 B1.11 Thames Valley Berkshire LEP Event – Notes...............................................90 Tables Table A2.1 Sections of the route falling within the national top 250 (top 10%) busiest in England ..............................................................................................12 Table A2.2 Sections of the route in the national top 250 (top 10%) least reliable journey-time 2012/13 ..........................................................................................12 Table A2.3 Links with freight proportions over 20% ........................................13 Table A2.4 M4 – Derivation of Flow range (vehicles per day, in both directions) 14 Table A2.5 A404 – Derivation of Flow range (vehicles per day, in both directions) 14 Table A2.6 M32 – Derivation of Flow range (vehicles per day, in both directions) 15 Table A2.7 M48 – Derivation of Flow range (vehicles per day, in both directions) 15 Table A2.8 M49 – Derivation of Flow range (vehicles per day, in both directions) 15 Table A2.9 A308(M) – Derivation of Flow range (vehicles per day, in both directions) 15 Table A2.10 M4 – Derivation of Average Freight Proportion ...........................16 Table A2.11 A404 – Derivation of Average Freight Proportion........................17 Table A2.12 M32 – Derivation of Average Freight Proportion .........................17 Table A2.13 M48 – Derivation of Average Freight Proportion .........................18 Table A2.14 M49 – Derivation of Average Freight Proportion .........................18 Table A2.15 A308(M) – Derivation of Average Freight Proportion ..................18 Table A2.16 Collisions / Casualties – Temporal Analysis................................19 Table A2.17 Technology Provision along the Strategic Road Network Section 20 iii Technical annex to London to Wales route-based strategy evidence report Table A2.17 Technology Provision along the Strategic Road Network section20 Figures Figure A1.1 Scheme Publication Extract – Scheme Overview 8 Figure A1.2 Scheme Publication Extract – Scheme Coverage 9 Figure A1.3 Scheme Publication Extract – Scheme Detail 10 Figure A2.1 Bristol AQMA coverage 21 Figure A2.2 Reading AQMA coverage 22 Figure A2.3 Wokingham AQMA coverage 23 Figure A2.4 Royal Borough of Windsor and Maidenhead – Bray/M4 AQMA coverage 24 Figure A2.5 South Bucks District Council AQMA coverage 25 Figure A2.6 Slough Borough Council – Slough AQMA No.1 coverage 26 Figure A2.7 Bristol City Region City Deal – Executive Summary Extract 28 Figure A2.8 Bristol City Region City Deal – Vision and Strategy for Growth Extract 29 Figure A2.9 Bristol City Region City Deal – Diagram Extract 30 iv London to Wales route-based strategy evidence report Part A Supporting evidence 5 London to Wales route-based strategy evidence report A1 Introduction A1.1 Route description M4 Junction 19-20 and M5 Junction 15-17 Smart Motorway Section 1.3 of the main report provides a description of the route and within that description; reference is made to the upgrade of the route to smart motorway between M4 junctions 19 and 20. Further information is provided here in relation to this scheme. The Agency is working to improve the M4 between junctions 19 and 20, and the M5 between junctions 15 and 17, by making it a smart motorway (previously known as managed motorways). Smart motorways help relieve congestion by using technology to vary speed limits. They also allow the hard shoulder to be used as a running lane at peak times to create additional capacity. They deliver these benefits at a significantly lower cost than conventional motorway widening and with less impact on the environment during construction. See pages 8 and 9 for more about smart motorways. Following the October 2010 Spending Review, it was announced in April 2011 that this scheme would be prepared to start construction in early 2012. Works were then officially started on 25 January 2012 by Roads Minister Mike Penning. It was planned to open the scheme to traffic in the fourth quarter (between January and March) of financial year 2013/14. The M4/M5 smart motorway scheme is taking place on the link between the main motorways between London, the West and the Midlands and South-West. It serves the City of Bristol. This work is needed as the route suffers from heavy congestion and unpredictable journey times. The estimated outturn cost of £89 million was approved by the Secretary of State in October 2011 prior to the start of construction. The current forecasted cost for this scheme is £86 million
Recommended publications
  • Major Resurfacing
    12 The Advertiser, March 25, 2021 ROYAL BOROUGH OF Conservation Area and Development Public Notices WINDSOR & MAIDENHEAD (ɈLJ[PUN[OL:L[[PUNVMH3PZ[LK)\PSKPUN Town and Country Planning Departure from the Development Act 1990 (as amended) Plan and Development Affecting The Council has received the following a Public Rights of Way and planning applications. Major Development) 21/00582/FULL. First floor side 21/00763/FULL. Two storey side/rear extension with Juliet balconies to extension with rear Juliet balcony, front and rear elevation, x1 new Juliet ÄYZ[ÅVVYZPKLL_[LUZPVUYLWSHJLTLU[ balcony to existing front elevation, alterations to fenestration to include Major resurfacing x1 new window to existing rear elevation, 5VYVVÅPNO[ZYLUKLYZPKLLSL]H[PVU YLTV]HSVML_PZ[PUNKVVYHUKPUÄSS[V and raised terrace with side steps side elevation, garage conversion following demolition of existing rear to habitable accommodation, two storey extension - Sheelin Cottage, new pitched roof to existing garage, 4 Straight Road, Old Windsor, Windsor. All areas: From road closures to planning applications and more, HS[LYH[PVUZ [V L_[LYUHS ÄUPZOLZ HUK +L]LSVWTLU[(ɈLJ[PUN[OL:L[[PUN alteration to fenestration - Sungei Lalu, of Listed Building) Frogmill, Hurley, Maidenhead. 21/00784/FULL. Replacement pitched (Development Affecting a Public YVVM^P[OZVSHYWHULSZMYVU[LSLJ[YPJ Each week, the Advertiser publishes public notices Rights of Way) roller door, rear door and alterations containing important information affecting the 21/00793/FULL. x1 front dormer to fenestration to the existing and x1 rear dormer - part retrospective detached garage - The Cottage, community you live in. These statutory notices - The Thatched House, Bisham Road, /PNO :[YLL[ +H[JOL[ :SV\NO Bisham, Marlow.
    [Show full text]
  • M4 Junction 18A Link Study – Combined Modelled and Appraisal Report
    M4 Junction 18a Link Study – Combined Modelled and Appraisal Report Prepared for South Gloucestershire Council and Highways England March 2018 Draft 1 The Square Temple Quay Bristol BS1 6DG Draft Document history M4 Junction 18a Link Study Combined Modelling and Appraisal Report This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 001 01.03.18 Working Draft JB HS HS Draft Contents Section Page Introduction ................................................................................................................................ 1‐1 1.1 Purpose of this Report ............................................................................................... 1‐1 1.2 Scheme Objectives ..................................................................................................... 1‐1 1.3 Scheme Description ................................................................................................... 1‐1 1.4 Previous Studies ......................................................................................................... 1‐3 Local Transport Situation ............................................................................................................ 2‐3 2.1 Existing Local Transport System ................................................................................ 2‐3 2.2 Key Travel Demands .................................................................................................. 2‐5 2.3 Transport Problems and Factors ...............................................................................
    [Show full text]
  • London to Wales Route Strategy March 2017 Contents 1
    London to Wales Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 10 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 14 Maintaining the strategic road network 15 4. Current investment plans and growth potential 17 Economic context 17 Innovation 17 Investment plans 17 5. Future challenges and opportunities 21 6. Next steps 27 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham
    [Show full text]
  • Prime Unique Connected
    PRIME UNIQUE CONNECTED DESIGN AND BUILD OPPORTUNITIES UP TO 1,300,000 SQ FT MOUNTPARK BRISTOL XL SEVERN ROAD / CENTRAL AVENUE, BRISTOL, BS10 7ZE MOUNTPARK.COM/BRISTOLXL CHEPSTOW M48 SEVERN BRIDGE THORNBURY Mountpark BristolXL is a new industrial / logistics development situated at the gateway to the south J1 west, Avonmouth in Bristol. M48 A4O3 J23 The scheme has three fundamental benefits: M4 SEC OND SEV ERN A38 CRO M4 J21 SSING J22 M5 NEW J15 / J2O JUNCTION PRIME SEVERN ESTUARY JO1 The site is situated in a prime distribution M4 location, adjacent to the established Central A4O3 M5 A38 Park area of Avonmouth, 10 miles to the M49 A432 north west of Bristol City Centre. A4O3 AVONMOUTH DOCKS FILTON J19 RIVER AVON J18 A4O18 M4 UNIQUE ROYAL A41744 HRS SHEFFIELD PORTBURY J18a DOCKS M32 M1 A38 M6 The proposed scheme can accommodate A4162 NOTTINGHAM a single unit of over 1,000,000 sq ft, which A4 is unique for the area. 3 HRS M42 A4176 A432 A4174 BIRMINGHAM M5 2 HRS M5 M1 A369 M4O CONNECTED A42O A42O BRISTOL 1 HR OXFORD The scheme is strategically located for local and O.5 HRS national distribution via the M49, M4 and M5 A37O M4 M4 LONDON motorways. Accessibility will be further improved in CARDIFF BRISTOL SWINDON 2019 with the opening of a new junction on the M49 A38 A4174 A431 A4174 M3 motorway which is within 1 mile of the site. M4 A37 SOUTHAMPTON PORTSMOUTH A37O BRISTOL AIRPORT CONNECTED ABUNDANT Strategically located, offering Bristol is the economic hub of the south west both connectivity and accessibility, region with excellent labour availability, education resources, and connectivity.
    [Show full text]
  • Matthew Rees Planning Officer London Borough of Hounslow Civic Centre Lampton Road Hounslow TW3 4DN. 13 July 2018 Dear Mr Rees
    Matthew Rees Planning Officer London Borough of Hounslow Civic Centre Lampton Road Hounslow TW3 4DN. 13 July 2018 Dear Mr Rees, System Reference: P/2018/1927 Planning Reference: 00504/AE/P21: SEGRO Park Heathrow, Ariel Way, Hounslow TW4 6JW Comments of Friends of the River Crane Environment (“FORCE”) I submit the following comments on the above planning application, on behalf of the Friends of the River Crane Environment (“FORCE”). Our comments are structured as: • Introduction to FORCE • Comments on specific aspects of the proposals • Considerations concerning Section 106. 1 Introduction to FORCE FORCE is an environmental and community based charity, founded in 2003 and with over 500 members, most of whom are local within the London Boroughs of Richmond upon Thames and Hounslow. Our Objects are “to promote for the benefit of the public, and to advance the education of the public, in the conservation, protection and improvement of the physical and natural environment” of the River Crane and the Duke of Northumberland’s River. More information on our organisation can be found at www.force.org.uk SEGRO Park Heathrow (‘the Site’ hereafter) is a very important location for FORCE, as it: • abuts directly onto the River Crane for some 300 metres between the A30 and the A312, via the Causeway Water Meadows • links via the River Crane upstream with the 58-hectare Cranford Park, which is in the process of major restoration funded by the Heritage Lottery Fund and Big Lottery • links directly via the River Crane downstream with Donkey Wood and Brazil Mill Wood, which are the focus of local initiatives to improve their environmental and community value for residents • is adjacent to Heathrow Airport, for which improvements to local air quality, connectivity and green spaces are issues of significant resident concern in both ongoing operations and potential expansion • is already designated partly Metropolitan Green Belt and partly as a Locally Significant Industrial Site.
    [Show full text]
  • TO LET Offices—1,860 Sq Ft (172.86 Sq M)
    TO LET Offices—1,860 sq ft (172.86 sq m) Self-contained Detached Building Parking New Lease available Former Custom House, Sharpness Docks, Sharpness, Gloucestershire 01452 380064 LOCATION Sharpness Docks are situated adjacent to the river Severn in Gloucestershire and at the end of the Gloucester to Sharpness Ship Canal. The Docks remain very much a working port and receive ships from around the world. Accordingly the area remains popular with commercial property occupiers. The Docks are situated at the far end of the B4066 linking directly to the A38 Bristol Road. Junction 13 and 14 of the M5 Motorway are approximately a 10 minute drive time. DESCRIPTION A detached single storey building of facing brickwork to the elevations under a flat roof. Internally the main office area has been subdivided to form 3 separate working/office areas, however this could be opened out to a more open plan format. Ladies & Gents W.C.’S, a kitchen and shower room are installed. The building benefits from a Quayside location and externally there are lawned areas and demised car parking. The property has a floor area of approximately 1,860 sq ft (172.86 sq m) measured on a gross internal floor area basis. 01452 380064 KEY INFORMATION Services Service Charge Mains water, drainage, gas and electricity are connected to A charge is made to cover the upkeep and maintenance of the property. the common parts of the estate. Heating is via a gas fired boiler and traditional ‘wet’ Quoting Terms radiator system. The property is available by way of a new full repairing and insuring lease for a negotiable term of years.
    [Show full text]
  • The Daws Hill Neighbourhood Plan
    The Daws Hill Neighbourhood Plan Supporting documentation Annex May, 2015 | Daws Hill Neighbourhood Forum | www.dhnf.org | 11 May 2015 | Table of Contents Appendix D: Supporting and Consultation Evidence ............................................................................. 3 Ref No D/001 - Recognition of the planning process: ............................................................................................... 3 Ref No D/002 - Current WDC/BCC Strategy: ................................................................................................................. 6 Ref No D/003 - Statutory Requirements: ........................................................................................................................ 6 Ref No D/004 – WDC PS10 Development Brief for Handy Cross Sports Centre site: .................................. 7 Appendix E: Supporting Documents .................................................................................................... 10 Ref E/001 - Daws Hill Neighbourhood Forum TOR ................................................................................................. 10 Ref E/002 - Position Statement 1: RAF Daws Hill Site. .......................................................................................... 12 Ref E/003 - Position Statement 2: Infrastructure ................................................................................................... 15 Ref E/004 – Road Infrastructure Analysis ..................................................................................................................
    [Show full text]
  • Vaughan Road Car Park, West Harrow, HA1 3XD
    Dandi Nine Ltd September 2020 Planning Statement Vaughan Road Car Park, West Harrow, HA1 3XD savills.co.uk Executive Summary The application seeks to deliver a local landmark building of exemplary architectural quality, providing affordable luxury aparthotel accommodation and an enhanced public offering within the London Borough of Harrow (LBH). The application scheme comprises the re-development of the disused car park site and the erection of a part 5-storey and part 12-storey building, comprising a 129-room aparthotel (Class C1). The scheme includes a 5th floor publicly accessible restaurant and external amenity space and features ground floor commercial space (which includes a cafe/juice bar, bakery, florist kiosk, concierge service including complimentary tea/coffee/ summer bar). The proposal features associated public realm and highways works to activate the frontage of the aparthotel, which in turn brings a natural surveillance and a vibrancy to the area. The proposal also features hard and soft landscaping; refuse storage; car parking and cycle parking; and associated works. The site is immediately adjacent to Harrow town centre and benefits from a 6a PTAL rating. The proposal features cycle parking provision, three car parking spaces at the rear of the site (two blue badge spaces and one servicing space), but is otherwise a car- free development for future guests and visitors. The application seeks to deliver a design-led solution to an opportunity site, which is highly sustainable and contextual. The principle of development is considered to be acceptable and appropriate within its gateway town centre location, which is evidenced in the supporting Hotel Need Assessment and Sequential Test (produced by Savills).
    [Show full text]
  • Lower Almondsbury.Pdf
    Planning Statement Lower Almondsbury Green Ltd 0244 Contents Page 1.0 Introduction ...................................................................................... 2 2.0 Site Description and Location ............................................................. 3 3.0 Policy ............................................................................................... 4 4.0 Analysis ............................................................................................ 5 5.0 Conclusions .................................................................................... 11 Planning Statement Lower Almondsbury Green Ltd 0244 1.0 Introduction 1.1. The purpose of this document is to set out the planning policy case for the release of land at Lower Almondsbury from the Green Belt for housing development to assist the Council in meeting its specified housing needs. The Statement is structured as follows: • Section 2 Site Description and Location • Section 3 Policy • Section 4 Analysis • Section 5 Conclusion 1.2. In addition to the above, the Statement is supported by a number of supporting technical documents, which when combined with this document provide a robust evidence base for the site. This allows a decision to be made to allocate the site for housing development. These reports are as follows: • LDA Design Documents • Development Capacity Report • Ecological Appraisal • Heritage Appraisal • Landscape and Visual Appraisal • Corun Associates Documents • Transport Assessment 2 Planning Statement Lower Almondsbury Green Ltd 0244 2.0 Site Description and Location Site Description 2.1. The site is approximately 7.5 ha. It contains 5 fields of agricultural land used for grazing. A Conservation Area runs across the north of the site and a stream crosses through the site. Hedgerows, fences and stone walls contain the fields. The site is predominantly surrounded by a number of residential dwellings and their associated curtilage. Location 2.2. The site is found immediately outside of the development boundary of Almondsbury in South Gloucestershire.
    [Show full text]
  • M4 Smart Motorway Faqs
    Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway.
    [Show full text]
  • Questions to the Mayor
    Written Answers to questions not answered at Mayor’s Question Time on 14 October 2009 South London Line Question No: 2651 / 2009 Jenny Jones Will you express your support for the retention of the South London rail service from Victoria to London Bridge via Denmark Hill, and oppose any reduction in this service that is carried out for financial reasons rather than capacity reasons? Oral response given Missing Updates Question No: 2932 / 2009 John Biggs Are there any unusual, novel, or contentious issues that have arisen since the last Mayor’s Question Time meeting, which you have failed to include in either your last written report or your oral update today? Oral response given Limousines and chauffeurs for the Met’s senior officers Question No: 2939 / 2009 Dee Doocey Following your comments at last months MQT, where you said that cars that ferry around Ministers, civil servants, and other people on the ‘taxpayer’s payroll’ should be got rid of, will you be taking action to abolish limousines and chauffeurs for senior MPS officers? Oral response given London Plan Question No: 3106 / 2009 Steve O’Connell What does the Mayor consider to be the most important aspects of the latest draft of the London Plan and how do they reflect his priorities for London? Oral response given 1 Young People Question No: 2745 / 2009 Joanne McCartney What recent initiatives have you delivered for young people in London? Oral response given Congestion Charge Question No: 3072 / 2009 Victoria Borwick Further to your answers to questions 3014/2008 and 1053/2009 on helping the retail economy the Mayor said he would re-look at bringing forward the post-Christmas Congestion Charge-free days to before Christmas.
    [Show full text]
  • M5 Junction 10 Improvements Scheme
    M5 Junction 10 Improvements Scheme Technical Appraisal Report Volume 1 - Report M5 Junction 10 Improvement Scheme Volume 1 - Report - Technical Appraisal Report Notice This document and its contents have been prepared and are intended solely for the Client’s information and use in relation to M5 Junction 10 Improvement Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Purpose Revision Status Originated Checked Reviewed Authorised Date description C03 A1 Final Issue CJ CCR TT TT 15/09/20 C02 A1 Final Issue CJ CCR TT TT 10/08/20 C01 A1 Second issue CG CCR HC HC 18/06/20 First Draft for P01 S3 GCC Internal SW MT CCR --- 03/12/19 Review Client signoff Client Gloucestershire County Council Project M5 Junction 10 Improvement Job number 5188483 Client signature / date Security Classification - High Page 2 of 186 GCCM5J10-ATK-GEN-XX-RP-ZM-000001 | C03 | M5 Junction 10 Improvement Scheme Volume 1 - Report - Technical Appraisal Report Contents Chapter Page Executive Summary 8 1. Introduction 12 1.1. Scheme Background 12 1.2. Location of the scheme 12 1.3. Purpose of this Report 14 2. Planning Brief 15 2.1. Introduction 15 2.2. Scheme Objectives 15 3. Existing Conditions 17 3.1. Description of the Locality 17 3.2. Existing Highway Network 17 3.3. Current Issues at M5 Junction 10 18 3.4. Existing Structures 19 3.5. Existing Road Pavement 31 3.6. Existing Traffic Conditions 37 3.7.
    [Show full text]