402 Cromwell Lane, Burton Green, Kenilworth, Warwickshire

Total Page:16

File Type:pdf, Size:1020Kb

402 Cromwell Lane, Burton Green, Kenilworth, Warwickshire 402 Cromwell Lane, Burton Green, Kenilworth, Warwickshire 402 Cromwell Lane, Burton Green, Kenilworth, CV8 1PL A detached five bedroomed property with well SERVICES DATE OF INFORMATION laid out garden and garage, situated in the Mains gas, electricity, water and drainage. These particulars were prepared in November 2014 popular village of Burton Green. EPC rating D. COUNCIL TAX FURTHER INFORMATION Entrance Hall Study WC Lounge/Dining Room Sun Room The property is listed in Band G for Council Tax with For further information, or an appointment to view, please Kitchen Passageway Laundry Room WC 5 Bedrooms one £2,633.27 payable for 2014/15. contact Penny Gibson, Annie Leyland or Chris Hodson on with En Suite Shower Room and One With En Suite 01543 251221. [email protected] Kitchen 2 Bathrooms Garage Gardens and Parking LOCAL AUTHORITY Warwick District Council Admin fees of £390 apply. Riverside House Milverton Hill DESCRIPTION Leamington Spa A detached 5 bedroomed house in a popular residential Warwickshire area, with garage parking and good size garden. CV32 5HZ Burton Green is situated to the south of Coventry and RENTAL TERMS close to Kenilworth. It is mainly residential, with a village The property is available to rent, unfurnished, for a period hall, primary school and inn. More comprehensive of 6/12 months under a Crown Tenancy Agreement. Pets amenities can be found in both Kenilworth and Coventry. only by negotiation, up to a maximum of 2. LAYOUT MONTHLY RENTAL GROUND FLOOR £1,200 per calendar month exclusive of all bills. An Entrance Hall Study WC Lounge/Dining Room Sun Room incoming tenant will be required to pay £150 plus VAT Kitchen Passageway Laundry Room WC Access to Garage administration fee (this also covers the referencing charges) and £175 plus VAT for the inventory/schedule of FIRST FLOOR condition. 5 Bedrooms One with En Suite Shower Room and One DEPOSIT with En Suite Kitchen 2 Bathrooms Two months' rent to be held under the Tenants' Deposit Scheme. OUTSIDE Gardens and Parking ENERGY PERFORMANCE The property was assessed for energy performance in May 2014 and the results can be found elsewhere on this page. Important Notice Smiths Gore for themselves and for the Vendors or Lessors of this property, whose agents they are, give notice that:- (i) These particulars are set out as a general outline only for the guidance of intending Purchasers or Lessees and do not constitute, nor constitute a part of, an offer or contract. (ii) All descriptions, dimensions, references to conditions and necessary permission for use and occupation and other details are given having (for the purposes of the Property Misdescriptions Act 1991) taken all reasonable steps to avoid committing an offence. Nonetheless such statements do not constitute any warranty or representation by the Vendor. Further, such statements are accurate only to the best of the present information and belief of the Vendor. We have not been instructed to carry out a physical survey of the property, a structural survey nor to test any of the services, fixtures, fittings or appliances which pass through, in, on, over, under or attach to the property (whether or not referred to in these particulars). We have not tested any apparatus, equipment, fixtures, fittings or services and so cannot verify that they are in working order or fit for their purpose. (iii) No person in the employment of Smiths Gore has any authority to make or give any representation or warranty whatever in relation to this property, nor is any such representation or warranty given whether by Smiths Gore or the Vendors or the Lessors of this property. (iv) It is the responsibility of any intending Purchaser to satisfy himself as to the basis upon which he makes an offer. The making of any offer for this property will be taken as an admission by the intending Purchaser; (a) That he has relied solely upon his own judgement; and (b) (Tothe extent that he has not personally verified the information in these particulars) he has noted and accepted the qualification and disclaimer set out in (ii) above; and (c) That in entering into any contract pursuant to any such offer, he shall have relied solely upon his own inspection and enquiries and the terms of such contract. (v) Nothing in these particulars or any related discussions forms part of any contract unless expressly incorporated within a subsequent written agreement. (vi) All fixtures and fittings are excluded unless specifically referred to in these particulars. (vii) All measurements are approximate and must not be relied upon. Room measurements are taken to the nearest 0.1 metres. Outbuildings are measured externally (unless otherwise stated) to the nearest 0.5 metres. For convenience, measurements are converted to Imperial, to the nearest 3 inches. Land areas are given as a guide only and must not be relied upon. (viii) If you wish to view EPC ratings on any property displayed on this list, please contact this office. LichfieldStow-on-the-Wold office office t 0154301451 251221 832832 f 01543f 01451 251223 830145 [email protected]@smithsgore.co.uk smithsgore.co.uk .
Recommended publications
  • The Response of the Burton Green Parish Council to the Coventry Local Modelling Report, December 2016
    THE RESPONSE OF THE BURTON GREEN PARISH COUNCIL TO THE COVENTRY LOCAL MODELLING REPORT, DECEMBER 2016. INTRODUCTION This parish council considers that the projections of population and employment growth since the base year of 2013 up to 2034 may be unreliable. More importantly, we believe that the Planners have failed to recognise the impact of neighbouring housing developments on our transport infrastructure and in so doing have reached a conclusion: “the Cromwell Lane development does not have a significant impact on the total network delay or average speed” which is unsustainable. GROWTH IN HOUSING AND JOBS It is possible, if the Modelling Report is to be believed, that the population will grow by 18% and another 25,000 houses will be built in the period between 2013 and 2034 but it is also possible that these forecasts could prove wide of the mark. Projecting the future, in an uncertain world, is a precarious occupation whatever models are used, especially when it comes to predicting jobs. It seems that the consultants from Parsons Brinckerhoff, a multinational engineering and design firm, anticipate 28,200 new jobs in this period. For example, 15,000 jobs with the Friargate Regeneration Scheme, 4,250 at Eastern Green,1191 in the town centre and 5,000at Whitley/Whitley East and so on. Hopefully these assumptions are sound but they may be over optimistic. Certainly the positivity of this report conflicts sharply with the report by the respected Institute of Public Policy Research, “Britain in the 2020s.”According to the authors, the world of work will be revolutionised, with millions of jobs in retail and manufacturing disappearing as a result of automation and the internet.
    [Show full text]
  • Cromwell Tower Burton Green Kenilworth
    Cromwell Tower Burton Green Kenilworth LifestyleA host of originalbenefit features pull out statementincluding the can central go to spiraltwo orstaircase three .lines. 6XXX5 4 X FirstKenilworth paragraph, 3 miles, editorial Balsall Commonstyle, short, 3 miles,considered Coventry headline 7 miles benefits(trains to Londonof living Eustonhere. One from or 55two mins), sentences Warwick that 7.5 convey miles, Solihullwhat you9.5 miles,would Birminghamsay in person. International Airport 11 miles (all distances and times are approximate) Second paragraph, additional details of note about the property. Wording to add value and support image selection. Tem volum is solor si aliquation rempore puditiunto qui utatis adit, animporepro experit et dolupta ssuntio mos apieturere ommosti squiati busdaecus cus dolorporum volutem SubSituation Head Cromwell Tower is situated in the village of Burton Green, which has a village hall and primary school. Further day to day facilities are available in nearby Kenilworth and Balsall Common. The property is well placed for the commuter with easy access to the motorway and rail networks as well as Birmingham InternationalSub Head Airport. Tile Hill Railway Station is only 0.9 miles away with trains directly to Birmingham and Coventry. Kenilworth railway station (newly reopened in 2018) links to the mainline stations at Leamington Spa and Coventry. The area is well served by a range of primary and secondary state schools, a grammar school in Stratford and private schools including Crackley Hall in Kenilworth, King Henry VIII and Bablake in Coventry, Warwick School for Boys and King's High School for Girls in Warwick, Kingsley School for Girls and Arnold Lodge School in Leamington Spa.
    [Show full text]
  • Stoneleigh, Kenilworth and Burton Green HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 18 | Stoneleigh, Kenilworth and Burton Green HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 18 I Stoneleigh, Kenilworth and Burton Green High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/18 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Stoneleigh, Kenilworth and Burton Green/No 18 I Contents Contents Draft Volume 2: Community Forum Area Report – Stoneleigh, Kenilworth and Burton Green/No 18 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2 7 1.2 Purpose
    [Show full text]
  • Kenilworth Community Forum Cycling Issues in the Kenilworth & Burton
    Kenilworth Community Forum Cycling Issues in the Kenilworth & Burton Green Areas December 2012 Kenilworth Community Forum: Cycling Issues Report CONTENTS Section Page Contents 1 Foreword by Cllr. John Whitehouse 2 1. Executive Summary 3 2. The Built Environment 4 2.1 General Matters 4 2.2 Specific Locations 5 3. Abbey Fields 9 4. The Greenway 11 4.1 Using Shared Space 11 4.2 Parked Cars 11 4.3 Connecting the Greenway to the Town Centre 12 4.4 Access Gates for Cyclists 12 5. Education 13 5.1 Cycling Training for Adults 13 5.2 Encouraging Young People to Cycle 13 5.3 Health Benefits of Cycling 14 5.4 Safety of Cyclists on Roads 14 5.5 Good Practice in Future Planning 15 6. Shared Space 16 6.1 Cycling on Pavements 16 6.2 Use of Alleyways etc 17 7. Consolidate List of Recommendations 18 6.1 Higher Priority 18 6.2 Lower Priority 19 Appendix: Other matters discussed but not pursued 21 Contributors: 23 December 2012 Page 1 Kenilworth Community Forum: Cycling Issues Report FOREWORD BY CLLR. JOHN WHITEHOUSE I was asked to set up and chair this Group by the Kenilworth Community Forum at its meeting in March 2012, following suggestions at a previous priority-setting session of the Forum. It was felt that the problems experienced by those seeking to cycle around Kenilworth and its area, and in some cases the problems caused by those cyclists, required more detailed identification and debate than was possible within the Forum meetings themselves. The majority of people who took part in the group are residents of Kenilworth or Burton Green.
    [Show full text]
  • Warwick District Noise Monitoring Report (June 2021)
    August 2021 Construction noise and vibration Monthly Report – June 2021 Warwick District Council OFFICIAL Page i Non-Technical Summary 1 Abbreviations and Descriptions 2 Introduction 3 1.2 Measurement Locations 4 Summary of Results 6 2.1 Summary of Measured Noise and Vibration Levels 6 2.2 Exceedances of the LOAEL and SOAEL 9 2.3 Exceedances of Trigger Level 12 2.4 Complaints 12 Appendix A Site Locations 13 Appendix B Monitoring Locations 18 Appendix C Data 22 List of tables Table 1: Table of Abbreviations 2 Table 2: Monitoring Locations 5 Table 3: Summary of Measured dB LAeq Data over the Monitoring Period 7 Table 4: Summary of Measured PPV Data over the Monitoring Period 9 Table 5: Summary of Exceedances of LOAEL and SOAEL 10 Table 6: Summary of Exceedances of Trigger Levels 12 Table 7: Summary of Complaints 12 OFFICIAL Page ii Non-Technical Summary This Noise and Vibration Monitoring Report fulfils HS2 Limited’s commitment detailed in the Environmental Minimum Requirements (EMRs), Annex 1, Code of Construction Practice, to present the results of noise and vibration monitoring carried out within Warwick District Council (WDC) area during the month of June 2021. Within this period monitoring was undertaken at the following worksites: • Noise and vibration monitoring were undertaken at the Burton Green Tunnel worksite (ref.: BGT), where work activities included demolition work at 404 Cromwell Lane, surfacing of the Burton Green compound car park, fencing of the utilities pipe through the South portal area, and excavation works. • Noise monitoring was undertaken at Bockenden Cutting (ref.: BC), where work activities included topsoil stripping, temporary drainage works, and site clearance.
    [Show full text]
  • Kenilworth to Hampton-In-Arden
    LOCAL AREA High Speed Rail Consultation In Your Area 12: Kenilworth to Hampton-in-Arden Find out here about: ●● what is proposed between Kenilworth and Hampton-in-Arden; ●● what this means for people living between Kenilworth and Hampton-in- Arden; and ●● what would happen during construction. What is proposed between What this means for people Kenilworth and Hampton-in- living between Kenilworth and Arden? Hampton-in-Arden The proposed route would pass the north-east The proposed green tunnel at Burton of Kenilworth largely in cutting, passing Green underneath the Coventry to Kenilworth railway. The 300 metre long green tunnel would pass Following the alignment of a disused railway in under Cromwell Lane in Burton Green. Green cutting, it would then pass through Burton tunnels differ from bored tunnels. The former Green, hidden within a 300 metre long green are built from the surface downwards, whereas tunnel. It would continue along this disused rail bored tunnels are built from below the ground. corridor towards Berkswell and to the north- east of Balsall Common. East of Berkswell Station it would cross over the Birmingham to Coventry railway and past Berkswell House. The proposed route would then pass alongside the A452 road in a cutting, running north of Balsall and Bradnock’s Marsh. The A452 would be raised east of Hampton-in-Arden to lift the road over the high speed line. A typical green tunnel High Speed Rail Consultation In Your Area 12: Kenilworth to Hampton-in-Arden We would expect the green tunnel to take 1 to For most of its length, the track level of the 2 years to build.
    [Show full text]
  • Community Engagement Plan Burton Green Kenilworth and Coventry
    LAP–BG–001 March 2018 Community Engagement Plan Burton Green Kenilworth and Coventry HS2 Ltd’s approach to community engagement and what it means for your area 1 Respecting our communities Welcome to the Community Engagement Plan HS2 is the largest infrastructure project in Europe, 345 miles of new high We are the largest construction project within Europe and, by association, speed railway connecting 8 out of 10 of the UK’s largest cities. we are facing the largest community engagement challenge currently in the UK. How we and our contractors behave is as important to the This means, unfortunately, that we cannot avoid affecting local residents railway’s success as delivering the project on time and ensuring value and businesses, and so we have to be an exemplar project in our approach for money for the tax payer. to engagement with communities. Our aspiration is to be a good neighbour every single day, by respecting For me this means HS2 and our suppliers being actively involved with the people and communities we impact and being sensitive to their needs, the community to build mutually beneficial, long term relationships. earning our social licence to operate. By doing so we will better understand local concerns and how we can work together to minimise disruption to peoples’ lives, and where We want to be clear about how you can get involved in the project and we make mistakes, learning from these will help us to constantly how we will keep you informed of progress or opportunities such as jobs, improve our engagement approach.
    [Show full text]
  • Nueve, Red Lane, Burton Green, Kenilworth, Warwickshire
    Nueve, Red Lane, Burton Green, Kenilworth, Warwickshire Nueve, Red Lane, Burton Green, Kenilworth, CV8 1PB A very well presented detached 5 bedroom SERVICES DEPOSIT house standing in large gardens of just under ¾ Mains water, gas and electricity. Private drainage. Two months' rent to be held under the Tenants' Deposit acre, well situated for easy access to Scheme. Kenilworth, Coventry, the A46 and M40. EPC COUNCIL TAX ENERGY PERFORMANCE rating D. The property is listed in Band G. The charge for 2014-15 The property was assessed for energy performance in is £2,282.17. November 2010 and the results can be found elsewhere Accommodation Entrance Hall Cloakroom Drawing on this page. LOCAL AUTHORITY Room Sitting Room Kitchen/Dining Room Conservatory Warwick District Council Office Rear Hall Utility Room Boot Room Master DATE OF INFORMATION Riverside House Bedroom with En Suite Shower Room 4 Further These particulars were prepared in November 2014. Milverton Hill Bedrooms Bathroom Detached Double Garage and Leamington Spa Parking Front and Rear Gardens Outbuildings Warwickshire FURTHER INFORMATION CV32 5HZ For further information or an appointment to view, £390 admin fee applies. please contact Annie Leyland, Chris Hodson or Penny RENTAL TERMS Gibson on 01543 251221. DESCRIPTION The property is available to rent unfurnished for a period Nueve comprises a spacious fully modernised detached of 6/12 months under a Crown Tenancy Agreement. family house with gas fired central heating and double Non-smokers only please and pets by arrangement (up to glazing. The house is located within easy driving a maximum of 2). distance of Kenilworth, the A46 and M40.
    [Show full text]
  • Sites for Gypsies and Travellers Contents
    Warwick District Council June 2013 Sites for Gypsies and Travellers Contents 1. Introduction 3 2. Background 3 3. Who are Gypsies and Travellers? 5 4. What are the Issues? 6 5. Policy Background 7 6. Evidence Base 8 7. Local Plan Requirements 8 8. Identification of Potential Sites 10 9. Sites for consideration and comment 11 Areas of Search 12 - 13 10. Table of Sites 14 11. Potential for Land Purchase 15 Maps of Individual Sites 16 - 35 2 1. Introduction 1.1 The Council is required by the National Planning Policy Framework (NPPF) and the Housing Act 2004 to meet the accommodation needs of the population within their area. This includes the needs of the Gypsy and Traveller community and that of Travelling Show People. 1.2 To meet this need Warwick District Council is committed to allocating sustainable and affordable sites to meet the permanent residential needs of this District’s Gypsy and Traveller Community and Travelling Show People through the Local Plan process. 2. Background 2.1 No specific accommodation needs for these groups had been identified in this district prior to the publication of the “Gypsy and Travellers Accommodation Assessment for the South Housing Market Area of the West Midlands” in 2008. This identified a requirement for 11 permanent and 15 transit pitches for the Gypsy and Traveller community. Whilst the assessment also included Travelling Show People, it did not identify a specific need within the district for this group. 3 2.2 Officers began work on identifying a site initially for transit use on land within its ownership, as it was considered that this would be the easiest to deliver in the short term.
    [Show full text]
  • London- West Midlands ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area Report CFA18 | Stoneleigh, Kenilworth and Burton Green
    LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA18 | Stoneleigh, Kenilworth and Burton Green | CFA18 | Stoneleigh, Kenilworth and Burton Green Green and Burton Stoneleigh, Kenilworth November 2013 VOL VOL VOL ES 3.2.1.18 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA18 | Stoneleigh, Kenilworth and Burton Green November 2013 ES 3.2.1.18 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report
    [Show full text]
  • BURROW HILL PARK BURTON GREEN CALA HOMES BUILT for YOUR NEXT CHAPTER Stock Photography Local Area Photography BURROW HILL PARK YOUR COUNTRY ESCAPE AWAITS
    CALA HO ME S BURROW HILL PARK BURTON GREEN CALA HOMES BUILT FOR YOUR NEXT CHAPTER Stock photography Local area photography BURROW HILL PARK YOUR COUNTRY ESCAPE AWAITS Surrounded by open farmland, leafy paths and idyllic country views, Burrow Hill Park is an exclusive new collection of 54 private 2, 3, 4 and 5 bedroom semi-detached and detached homes, situated in the desirable village of Burton Green. Offering everything you need for contemporary comfort and low-maintenance ease, our beautifully designed homes enjoy light and spacious interiors, together with a high specification throughout. Bordering Kenilworth, as well as in easy reach of Coventry and Solihull, this tranquil setting is Computer generated image of The Oatvale perfectly placed for an aspirational and relaxed family lifestyle, with plenty of amenities, attractions and schools nearby. Stock photography Photography from a previous CALA development Photography from a previous CALA development Photography from a previous CALA development BUYING NEW IS BETTER WITH CALA CALA PEACE OF MIND A 10-year NHBC Buildmark Warranty, 24-hour response service for emergency calls and after-sales service for two years following all purchases. MOVE CHAIN-FREE Our 100% Part Exchange* service frees you from being in a chain. For more information and to use our part exchange calculator to see what you could save, visit cala.co.uk/part-exchange MORE CHOICE With a selection of kitchens and bathrooms, you can choose the cabinets, tiles and floorings to suit you. Choices are subject to build stage. A VIBRANT NEW COMMUNITY Many residents of new developments find that they quickly become part of an inclusive community of like-minded people.
    [Show full text]
  • Warwickshire Winter 2020 3-Month Construction Look Ahead
    Warwickshire Winter 2020 3-month construction look ahead Warwickshire Winter 2020 This forward look covers HS2 associated work in Warwickshire. The document is a forward look of construction activities planned in the next three months. The dates and information included in the forward look are subject to change as programme develops. These will be updated in the next edition of the forward look. The maps included are for illustrative purposes only. If you have any queries about the information in this forward look, the HS2 Helpdesk is available all day, every day on 08081 434 434 or by emailing [email protected] In addition to the work shown on the following maps, general preparations including the removal of some existing vegetation is ongoing across all areas. Bat hibernation and otter/reptile surveys will also be undertaken in areas along the route from December 2020 to February 2021. Page 2 Map 1 1 2 3 4 5 6 7 9 8 10 Three-month look ahead Location of Proposed Description of works works duration Location 1 Ongoing until Finishing the temporary diversion of the Kenilworth winter 2020-21 Greenway between locations 1 and 2, and completing a temporary Greenway crossing point over Waste Lane in Berkswell. Location 2 Ongoing until • Finishing the temporary diversion of the winter 2020-21 Kenilworth Greenway • Completing temporary Greenway crossing points over Hob Lane and Red Lane • Temporary closure and diversion of Red Lane • Temporary traffic lights and lane closures on Cromwell and Hob Lanes. Location 3 Early 2021 Setting up of compound at Burton Green.
    [Show full text]