A77 Maybole Bypass Improvement Scheme A77 Maybole Bypass Improvement Scheme

Consultations Draft Road Orders

Consultations were carried out to keep Plans showing the draft Trunk Road and Side Road a wide range of stakeholders with an Orders are available for viewing at the exhibition. interest in the scheme informed, to These are statutory documents that define the line gather information for the Environmental of the proposed road and associated improvements. Statement, and to influence scheme design. The draft Statutory Orders and the Environmental Statement Statutory and non-Statutory consultees included South are also available to view on Transport ’s website. Hard Council, Scottish Environmental Protection copies are available for inspection at the following locations: Agency (SEPA), Scottish Natural Heritage, local landowners, local wildlife groups and members of the Council The Wallace Tower public. 172-176 High Street Environmental issues KA7 1PZ Maybole Library An assessment of the potential environmental • ecology and nature conservation 1 High Street effects of the scheme has been undertaken. • road drainage and water environment Maybole This has been reported in the Environmental • air quality KA19 7AB Statement. • vehicle travellers and community effects A Non-Technical Summary of the Environmental Statement is • cultural heritage Transport Scotland also available. The environmental assessment looks at: • geology and soils Buchanan House • landscape effects • construction noise and vibration 58 Port Dundas Road • land use • operational noise and vibration. G4 0HF What happens next? Confirmation of the draft Orders, and subsequently, Should this be required it would delay the date at which the statutory the Made Orders, will provide Scottish Ministers with orders for the scheme are confirmed. the statutory powers to proceed with construction of If a Public Local Inquiry is held, then everyone who has supported, the scheme, subject to funding availability. objected to, or made other representations about the draft Orders However, if objections are received, and depending on their nature will be informed as to the date and venue. and number, a Public Local Inquiry into the draft Orders may be held Please ensure that you understand the proposals being presented. before an Independent Reporter appointed by the Scottish Ministers. If you wish to support, comment on or object to the draft Orders, or comment on the Environmental Statement, please give us your feedback on the form provided, which can be posted in the feedback box at the exhibition. Alternatively you should write to Transport Scotland at the address Construction below to arrive no later than 31 January 2014. A77 Maybole Bypass The proposed scheme is mainly to be built off line from A77 Maybole Bypass MTRIPS the existing A77 trunk road. Some temporary traffic Transport Scotland management will be required to complete the tie-ins to Buchanan House the existing roads. Improvement Scheme 58 Port Dundas Road Kirklandhill Path will be closed for the duration of the construction of the Glasgow bridge and improved side road. However, this work will be co-ordinated G4 0HF with the tie-in work on the adjacent Gardenrose Path and Road to December 2013 minimise disruption. While some degree of disruption to the public and local community will be necessary to construct the bypass, this will be kept to a minimum. The Further information public will be informed of possible disruption well in advance of the works. Signage will be used to inform users of any temporary traffic management. More information is available at the project website: Once construction of the bypass gets underway, the works are expected www.transportscotland.gov.uk/road/projects/a77-maybole-bypass to take up to 18 months to complete.

5 6 A77 Maybole Bypass Improvement Scheme

View 2 – looking west towards Culzean Road Introduction Views of the scheme 2 roundabout from houses at McCrae Court Existing View 2 In 2012, Amey was commissioned by Transport Scotland to progress the A77 Maybole Bypass through detailed assessment towards the preparation of scheme Orders and the Environmental Statement. As part of that assessment, a public information exhibition was held in January 2013 to give people viewpoint location 1 Proposed View 2 at year 15 opportunity to comment on the preferred option for the scheme. This leaflet provides summary information a summary of the exhibition panels including the background and benefits of the project, the outcomes of the detailed assessment work that has been undertaken leading to the publication of draft Orders for the scheme and what happens next. View 3 – Existing View 3 3 looking south Need for the scheme The key objectives of the A77 Maybole Bypass scheme are to: towards Maybole • improve the level of service and safety by reducing from Kirklandhill The A77 trunk road forms a strategic link from Glasgow the effects of driver stress and journey times Farm to Stranraer serving Ayrshire and the Northern Ireland • eradicate conflicts between long distance users and ferry ports. It passes through the centre of Maybole along local traffic viewpoint location 2 the High Street, which has restricted carriageway and • stabilise the average peak hour journey time of the pavement widths and limited parking provision. A77 at Maybole Proposed View 3 at year 15 The town is congested partly as a result of the large numbers of cars • improve the conditions within Maybole by removing and heavy goods vehicles using the A77 traveling to and from the port through traffic, particularly heavy goods vehicles facilities at Cairnryan, resulting in poor conditions for pedestrians and road • mitigate the environmental impact of the new users alike. works where possible A further constraint exists to the north of the town, where the A77 • achieve good value for money for both taxpayers passes beneath the Glasgow to Stranraer Railway line through the and transport users. Smithston Railway Bridge which has restricted height clearance.

■■ View 4 – looking north-west towards Laigh a southbound climbing lane from the View 1 – looking north-west towards the 4 north roundabout 1 south roundabout from Broomknowes Grange from Smithston Cottage The scheme • access to land and properties will be maintained or an Existing View 4 Existing View 1 • the bypass consists of 5.2km of alternative route will be viewpoint location 3 new single carriageway to the provided north-west of Maybole • a farm underpass at the • new roundabouts at the tie-ins to southern tie-in the existing A77 at Broomknowes • no demolition of buildings other and Smithston than the derelict Kirklandhill • a new roundabout at B7023 Cottage Culzean Road • construction mainly off line Proposed View 4 at year 15 • three principal structures at the from the existing trunk road Proposed View 1 at year 15 following locations: and affected side roads ■■ Gardenrose Path overbridge • the opening of the new bypass ■■ Kirklandhill Path overbridge ■■ a northbound climbing lane from the is predicted to reduce traffic ■■ B7024 Alloway Road Underbridge south roundabout, though the B7023 on Maybole High Street by • climbing lanes are provided on Culzean Road roundabout approximately 50% with the the steeper sections of alignment, ■■ a southbound climbing lane commencing number of HGVs reducing by viewpoint location 4 comprising: north of Alloway Road approximately 90%.

2 3 4 A77 Maybole Bypass Improvement Scheme

View 2 – looking west towards Culzean Road Introduction Views of the scheme 2 roundabout from houses at McCrae Court Existing View 2 In 2012, Amey was commissioned by Transport Scotland to progress the A77 Maybole Bypass through detailed assessment towards the preparation of scheme Orders and the Environmental Statement. As part of that assessment, a public information exhibition was held in January 2013 to give people viewpoint location 1 Proposed View 2 at year 15 opportunity to comment on the preferred option for the scheme. This leaflet provides summary information a summary of the exhibition panels including the background and benefits of the project, the outcomes of the detailed assessment work that has been undertaken leading to the publication of draft Orders for the scheme and what happens next. View 3 – Existing View 3 3 looking south Need for the scheme The key objectives of the A77 Maybole Bypass scheme are to: towards Maybole • improve the level of service and safety by reducing from Kirklandhill The A77 trunk road forms a strategic link from Glasgow the effects of driver stress and journey times Farm to Stranraer serving Ayrshire and the Northern Ireland • eradicate conflicts between long distance users and ferry ports. It passes through the centre of Maybole along local traffic viewpoint location 2 the High Street, which has restricted carriageway and • stabilise the average peak hour journey time of the pavement widths and limited parking provision. A77 at Maybole Proposed View 3 at year 15 The town is congested partly as a result of the large numbers of cars • improve the conditions within Maybole by removing and heavy goods vehicles using the A77 traveling to and from the port through traffic, particularly heavy goods vehicles facilities at Cairnryan, resulting in poor conditions for pedestrians and road • mitigate the environmental impact of the new users alike. works where possible A further constraint exists to the north of the town, where the A77 • achieve good value for money for both taxpayers passes beneath the Glasgow to Stranraer Railway line through the and transport users. Smithston Railway Bridge which has restricted height clearance.

■■ View 4 – looking north-west towards Laigh a southbound climbing lane from the View 1 – looking north-west towards the 4 north roundabout 1 south roundabout from Broomknowes Grange from Smithston Cottage The scheme • access to land and properties will be maintained or an Existing View 4 Existing View 1 • the bypass consists of 5.2km of alternative route will be viewpoint location 3 new single carriageway to the provided north-west of Maybole • a farm underpass at the • new roundabouts at the tie-ins to southern tie-in the existing A77 at Broomknowes • no demolition of buildings other and Smithston than the derelict Kirklandhill • a new roundabout at B7023 Cottage Culzean Road • construction mainly off line Proposed View 4 at year 15 • three principal structures at the from the existing trunk road Proposed View 1 at year 15 following locations: and affected side roads ■■ Gardenrose Path overbridge • the opening of the new bypass ■■ Kirklandhill Path overbridge ■■ a northbound climbing lane from the is predicted to reduce traffic ■■ B7024 Alloway Road Underbridge south roundabout, though the B7023 on Maybole High Street by • climbing lanes are provided on Culzean Road roundabout approximately 50% with the the steeper sections of alignment, ■■ a southbound climbing lane commencing number of HGVs reducing by viewpoint location 4 comprising: north of Alloway Road approximately 90%.

2 3 4 A77 Maybole Bypass Improvement Scheme A77 Maybole Bypass Improvement Scheme

Consultations Draft Road Orders

Consultations were carried out to keep Plans showing the draft Trunk Road and Side Road a wide range of stakeholders with an Orders are available for viewing at the exhibition. interest in the scheme informed, to These are statutory documents that define the line gather information for the Environmental of the proposed road and associated improvements. Statement, and to influence scheme design. The draft Statutory Orders and the Environmental Statement Statutory and non-Statutory consultees included South are also available to view on Transport Scotland’s website. Hard Ayrshire Council, Scottish Environmental Protection copies are available for inspection at the following locations: Agency (SEPA), Scottish Natural Heritage, local landowners, local wildlife groups and members of the South Ayrshire Council The Wallace Tower public. 172-176 High Street Ayr Environmental issues KA7 1PZ Maybole Library An assessment of the potential environmental • ecology and nature conservation 1 High Street effects of the scheme has been undertaken. • road drainage and water environment Maybole This has been reported in the Environmental • air quality KA19 7AB Statement. • vehicle travellers and community effects A Non-Technical Summary of the Environmental Statement is • cultural heritage Transport Scotland also available. The environmental assessment looks at: • geology and soils Buchanan House • landscape effects • construction noise and vibration 58 Port Dundas Road • land use • operational noise and vibration. Glasgow G4 0HF What happens next? Confirmation of the draft Orders, and subsequently, Should this be required it would delay the date at which the statutory the Made Orders, will provide Scottish Ministers with orders for the scheme are confirmed. the statutory powers to proceed with construction of If a Public Local Inquiry is held, then everyone who has supported, the scheme, subject to funding availability. objected to, or made other representations about the draft Orders However, if objections are received, and depending on their nature will be informed as to the date and venue. and number, a Public Local Inquiry into the draft Orders may be held Please ensure that you understand the proposals being presented. before an Independent Reporter appointed by the Scottish Ministers. If you wish to support, comment on or object to the draft Orders, or comment on the Environmental Statement, please give us your feedback on the form provided, which can be posted in the feedback box at the exhibition. Alternatively you should write to Transport Scotland at the address Construction below to arrive no later than 31 January 2014. A77 Maybole Bypass The proposed scheme is mainly to be built off line from A77 Maybole Bypass MTRIPS the existing A77 trunk road. Some temporary traffic Transport Scotland management will be required to complete the tie-ins to Buchanan House the existing roads. Improvement Scheme 58 Port Dundas Road Kirklandhill Path will be closed for the duration of the construction of the Glasgow bridge and improved side road. However, this work will be co-ordinated G4 0HF with the tie-in work on the adjacent Gardenrose Path and Alloway Road to December 2013 minimise disruption. While some degree of disruption to the public and local community will be necessary to construct the bypass, this will be kept to a minimum. The Further information public will be informed of possible disruption well in advance of the works. Signage will be used to inform users of any temporary traffic management. More information is available at the project website: Once construction of the bypass gets underway, the works are expected www.transportscotland.gov.uk/road/projects/a77-maybole-bypass to take up to 18 months to complete.

5 6 A77 Maybole Bypass Improvement Scheme A77 Maybole Bypass Improvement Scheme

Consultations Draft Road Orders

Consultations were carried out to keep Plans showing the draft Trunk Road and Side Road a wide range of stakeholders with an Orders are available for viewing at the exhibition. interest in the scheme informed, to These are statutory documents that define the line gather information for the Environmental of the proposed road and associated improvements. Statement, and to influence scheme design. The draft Statutory Orders and the Environmental Statement Statutory and non-Statutory consultees included South are also available to view on Transport Scotland’s website. Hard Ayrshire Council, Scottish Environmental Protection copies are available for inspection at the following locations: Agency (SEPA), Scottish Natural Heritage, local landowners, local wildlife groups and members of the South Ayrshire Council The Wallace Tower public. 172-176 High Street Ayr Environmental issues KA7 1PZ Maybole Library An assessment of the potential environmental • ecology and nature conservation 1 High Street effects of the scheme has been undertaken. • road drainage and water environment Maybole This has been reported in the Environmental • air quality KA19 7AB Statement. • vehicle travellers and community effects A Non-Technical Summary of the Environmental Statement is • cultural heritage Transport Scotland also available. The environmental assessment looks at: • geology and soils Buchanan House • landscape effects • construction noise and vibration 58 Port Dundas Road • land use • operational noise and vibration. Glasgow G4 0HF What happens next? Confirmation of the draft Orders, and subsequently, Should this be required it would delay the date at which the statutory the Made Orders, will provide Scottish Ministers with orders for the scheme are confirmed. the statutory powers to proceed with construction of If a Public Local Inquiry is held, then everyone who has supported, the scheme, subject to funding availability. objected to, or made other representations about the draft Orders However, if objections are received, and depending on their nature will be informed as to the date and venue. and number, a Public Local Inquiry into the draft Orders may be held Please ensure that you understand the proposals being presented. before an Independent Reporter appointed by the Scottish Ministers. If you wish to support, comment on or object to the draft Orders, or comment on the Environmental Statement, please give us your feedback on the form provided, which can be posted in the feedback box at the exhibition. Alternatively you should write to Transport Scotland at the address Construction below to arrive no later than 31 January 2014. A77 Maybole Bypass The proposed scheme is mainly to be built off line from A77 Maybole Bypass MTRIPS the existing A77 trunk road. Some temporary traffic Transport Scotland management will be required to complete the tie-ins to Buchanan House the existing roads. Improvement Scheme 58 Port Dundas Road Kirklandhill Path will be closed for the duration of the construction of the Glasgow bridge and improved side road. However, this work will be co-ordinated G4 0HF with the tie-in work on the adjacent Gardenrose Path and Alloway Road to December 2013 minimise disruption. While some degree of disruption to the public and local community will be necessary to construct the bypass, this will be kept to a minimum. The Further information public will be informed of possible disruption well in advance of the works. Signage will be used to inform users of any temporary traffic management. More information is available at the project website: Once construction of the bypass gets underway, the works are expected www.transportscotland.gov.uk/road/projects/a77-maybole-bypass to take up to 18 months to complete.

5 6