Contract BC1 Railway Bosphorus Tube Crossing and Stations (Marmaray)

Optional legal copy goes here OR www.business.com Bosphorus Strait

Black Sea

B o s p •European Side h Asian Side o r u s

Marmara Sea

Business 2 Project Location

2nd Bridge

1st Bridge

Railway Bosphorus Tube Crossing, Tunnels and Stations

Business 3 Longitudinal Section

Business 4 Particular Design Conditions

¾ Design Basis Earthquake : Mw = 7.5 ¾ Countermeasure to Liquefaction ¾ Huge Water Pressure : Max. 60m ¾ Rapid Current Upper Layer (N to S) : Max. 5 knots (2.5m/sec) Bottom Layer (S to N) : 1 ~ 1.5 knots ¾ Fire Resistance : 100 Mw Fire Train with Petrol Fire

Business 5 IMMERSE Construction Vehicle Structure Escape Gauge Squeeze Way Way

Business 6 IMMERSE TUNNEL Construction

Business 7 Bird View Strait Crossing

Business 8 Immersion Procedure

European Side

Placing Barge

Tunnel Element

Access shaft

Asian Side TBM Tunnel Boring Machine Business 9 Tunnel Cross and Longitudinal Section

Armor Protection Tunnel Armor Protection Anchor Release Band アジア側 ヨーロッパ側

General Backfill

Selected Locking Fill Foundation

(m) Immerse Tube (1387m) 0 -10 Sea Bed -20 -30 Armor Protection E11 -40 E8 E9 E10 E5 E6 E7 -50 E1 E2 E3 E4 -60 Seismic Joint Seismic Joint

Business 10 Typical Cross Section of Immersed Tunnel Element

1000 6350 600 6350 1000

Vehicle Structure Escape Gauge Squeeze Way Way

Business 11 Comparison Major Tube in the World

70 60 60 50 41 37 37 36 40 33 32 32 31 31 30 30 20 10 Depth of Tube Bottom (m) of Tube Depth 0 Channel Roads Channel Fort McHenry Tama Tunnel Tunnel Tama Bosphorus BART Hampton roads Interstate Baytown Parana Thimble Shoal 2nd Hampton Baltimore

Business 12 Tuzla Dry Dock TUBE Fabrication

Business 13 Immersion Procedure

Before Immersion (Anchoring Completion)

Marmara Sea Side Black Sea Side

Business 14 Slurry Type TBM TUNNEL Construction

Business 15 TBM Excavation Route

European Side Asian Side

Kazlicesme Bosphorus Strait

Yedikule Airilikcesme Yenikapi Uskudar

2170m 3343m 4620m TBM TBM Immerse TBM EPB Slurry Tunnel Slurry

Business 16 TBM(Slurry Type) φ=7,640mm、L=11,000mm

Business 17 Tunnel Inside (Asian Side – Sept.07)

Business 18 Tunnel Inside (Asian Side – Uskudar Station Breakthrough – July 09)

Business 19 NATM TUNNEL Construction

Business 20 NATM Works Location

Track CROSS OVER

SIRKECI Deep Station

Track CROSS OVER

USKUDAR Station

Emergency CROSS PASSAGE Drain Pit (44 Places 200m Interval)

Business 21 Uskudar Cross Over Tunnel Model

Business 22 Uskudar Cross Over Tunnel Excavation

Business 23 Lining Concrete

Business 24 Bird View around Sirkeci Station

North Entrance

East Ventilation Shaft

West Ventilation Shaft

South Entrance

Business 25 Sirkeci Station NATM Works

Business 26 Bird View of Uskudar Station Area

Immersed Tunnel

Uskudar Sta.

Business 27 Station Excavation

Business 28 U/W Concerns

ƒ Project of almost prototypical nature – deepest ever submerged

ƒ “atypical” connection sea-land tunnels

ƒ Strong bi-directional current in the Bosphorus straight

ƒ Heavy ship traffic with “reckless” ship owners at times

ƒ Due to deep tunnels high water pressure and hence water tightness issues

ƒ An overseas contractor moving in unknown cultural environment

ƒ Land tunneling under densely built up (historic) areas

Business 29