12 x 15 BackYard DESIGN/INSTALLATION INFORMATION Back Building PRODUCT INFORMATION

Building Code Disclaimer METAL DEPOTS DOES NOT WARRANT OR REPRESENT ITS BACKYARD SERIES TO MEET ANY PARTICULAR LAWS, ORDINANCES, REGULATIONS, CODES, LOAD, OR ENGINEERING CRITERIA. BACKYARD SERIES BUILDINGS ARE ONLY INTENDED TO BE INSTALLED AND/ OR ERECTED IN GEOGRAPHIC LOCATIONS FOR WHICH TYPICAL BUILDING CODES, LAWS, ORDINANCES, REGULATIONS, LOAD, OR ENGINEERING CRITERIA DO NOT APPLY TO BUILDINGS 400 SQUARE FEET OR LESS. YOU ARE FULLY RESPONSIBLE FOR ENSURING THAT THE BACKYARD SERIES BUILDINGS YOU WISH TO PURCHASE OR INSTALL OR BOTH COMPLIES WITH ALL BUILDING CODES, LAWS, ORDINANCES, REGULATIONS, LOAD, OR ENGINEERING CRITERIA BEFORE PLACING YOUR ORDER. BACKYARD SERIES BUILDINGS ARE NOT DESIGNED OR INTENDED FOR HABITATION AND ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF HABITABILITY, FITNESS, GOOD AND WORKMAN-LIKE CONSTRUCTION AND MERCHANTABILITY ARE EXPRESSLY DISCLAIMED TO THE GREATEST EXTENT PROVIDED BY LAW. ONLY THOSE WARRANTIES EXPRESSLY PROVIDED FOR HEREIN SHALL BE APPLICABLE.

PLEASE INITIAL ______Safety First! NCI Metal Depots strongly recommends strict observance of all safety precautions in the undertaking of any project, whether at or on the job site. Always exercise extreme caution; follow applicable codes and regulations; and use common sense. Consult with a professional if you are in doubt about any procedure. • Always use appropriate safety equipment including, but not limited to, gloves, safety glasses, and steel toe footware. Check your tools and equipment before use to ensure they are in safe, working condition. Some things to consider include: • To reduce the chance of electric shock, make sure all electric cords are plugged into ground fault circuit interrupter (GFCI) plugs. Also, be careful dragging electric cords over or around the steel framing or sheeting. Sharp edges on these components may cut your electric cord. • Be aware that the steel framing components and sheet metal in this kit have sharp edges. Always wear gloves to protect against cuts. • Safety glasses should be worn at all times, especially when drilling or installing the self-drilling fasteners into the sheeting and trim. • Be aware of any low-hanging electric lines, such as the electric feed to a or outbuilding. The steel framing components and sheeting will conduct electricity and could cause electrocution if they come in contact with electric lines. • Be aware of the location of other workers when carrying framing components or sheeting. If you hit someone with the edge of a sheet, it could cause severe injury.

©Copyright Cornerstone Building Brands 2019 All Rights Reserved

DISCLAIMER Descriptions and specifications contained herein were in effect at the time this publication was approved for printing. In a continuing effort to refine and improve products, NCI Metal Depost reserves the right to discontinue products at any time or change specifications and/or designs without incurring obligation. To ensure you have the latest information available, please inquire or visit our website at www. metaldepots.com. Drawings and application details are for illustration purposes only and may not be appropriate for all environmental conditions, building designs or panel profiles. Projects should be designed to conform to applicable building codes, regulations and accepted industry practices. 12x15 BB-2 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building PRODUCT INFORMATION

Before You Start

When deciding where to locate your building, keep in mind you will need a flat, level surface upon which to erect it. You will need an area providing a minimum of approximately three feet clearance, on all sides of the building to allow for adequate to sheet the . Orient the endwall in which the will be installed, in the direction that allows for convenient access.

This building can be erected by two people, although more than two may allow for an easier installation process.

The following tools are needed to erect this building: ●● Electric cords ●● Drill ●● Screwguns (2) with 5/16” nut drivers and #3 Phillips drivers ●● Vise-Grip locking pliers ●● Vise-Grip clamps ●● 4’ level ●● Ratchet with ¾” shallow and deep well sockets ●● ¾” combination wrench ●● Tape measure ●● Right and left cutting sheet metal snips ●● Spud wrench or alignment punch ●● Step ladders (2) ●● Caulk gun ●● Phillips screwdriver

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-3 Back Yard Building PRODUCT INFORMATION

Parts List

Item No. Description Color Quantity Length Use 1 4¹⁄ 2 2 hannel alvanied 12 op and bottom side walls 2 4" x 2¹⁄ ee alvanied 122 op and bottom end walls ₈ 3 4" x 2¹⁄ ee alvanied 3 122 eiling joists ₂ 4" x 2¹⁄ ee alvanied 2 12 oor jambs ₂ Angle alvanied 12 orners ₂ idge urlin 2. alvanied 1 12 idge purlin 2 lip 2 alvanied oor jamb attachment ¹⁄ 1 in ead olts wuts lain oltup framing 9 anel lvm. lus 1210 oof ₂ 10 anel all olor 1 0 alls 11 12 hite 1 1210 oof 12 utside orner rim 10 rim olor 0 orners 13 Eave rim 19 rim olor 2 1 op of side walls 1 ae rim, apered 33 rim olor 2 1210 ae 1 amb rim 20 rim olor 2 3 oor trim at sides 1 ead rim 1 rim olor 1 oor trim at top 1 ase rim 3 rim olor 2 12 ase trim at end walls 1 ase rim 39 rim olor 2 1 12 ase trim at side walls 19 ¹⁄ " x ³⁄ ape Sealer ra 2 olls 00 oof side laps and rae trim 20 rethane aul 0 hite 1 ube ₂ ₃₂ 21 anel S losure 10 30 nder panels at eave 22 astener 12A ancae SS lain 0 oor frame to framing 23 astener 3 ong ife SS lain 100 oof panels to framing 2 astener 1 SS rim olor 0 orner trim 2 astener 1 SS all olor 20 all panels to framing 2 astener ong ife ap e lain 0 oof panel laps 2 astener A ap e all olor 0 all panel laps 2 astener A ap e rim olor Eave and rae trim 29 Screw aps 9 lac 13 overs screw points on inside 30 0 oor wocset 930 1 3 1¹⁄ hannel Section 3109 alvanied 1 11 nstalls to bottom of joists

inal lr₂ i BB Item No. Description Color Quantity Length Use 3 4" x 2¹⁄ ee alvanied 122 loor joists ¹⁄ 1 in ead olts wuts lain 30 oltup to joist ₂ 31 astener 212 S.. eamer lain 100 lwood floor attachment ₂ 32 4' x 8' x ³⁄ lwood loor Y BY ₄ inal in i 33 Auger lac uilding anchor 3 able alvanied 3 able lamp alvanied

12x15 BB-4 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building PRODUCT INFORMATION

Optional Parts List inal al nin Item No. Description Color Quantity Length Use anel oof olor 2 1210 oof apered ae rim 33 rim olor 1 1210 ae Eave rim 19 rim olor 2 9 art 2 12 ee 12 a. alvanied 3 123 3 See rawing art 2 12 ee 12 a. alvanied 1 123 3 See rawing art 1 2 hannel 1 ga. alvanied 2 90 See rawings idge urlin lassic at 2. alvanied 1 90 See rawing astener 3 olor 100 astener A olor 0 S losure 9 12 332 ape Seal 0 1 oll A30 olt wnut 12 1 12 313 lated inhead olt with ut 32 lated 1 s tubing 2 cut into two pcs. lated 1 20 120 long

inal a nin Item No. Description Color Quantity Length Use 9 anel oof olor oof Etension 109 anel oof olor oof 10 Etension Eave rim 19 rim olor 2 1 9 ae rim S1 See rawing rim olor 2 Etension 109 ae rim S1 See rawing rim olor 2 10 Etension art 2 12 ee 12 a. alvanied 1 13 3 See rawing art 2 1 2 hannel 12 a. 2 12 alvanied 2 See rawing Etension art 3 1 2 hannel 12 a. 102 12 alvanied 2 See rawing 10 Etension ar a alvanied 3 13 3 See rawing 2 Strapping alvalume lus 1 102 12 astener 3 olor 22 astener A olor S losure 9 10 12 332 ape Seal 0 2 olls A30 olt wnut 12 1 12 313 lated 9 inhead olt with ut 32 lated 1 s tubing 2 cut into two pcs. lated 1 20 120 long

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-5 Back Yard Building PRODUCT INFORMATION

Parts Diagram

12x15 BB-6 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building PRODUCT INFORMATION

Product Check List

Item No. Description Color Illustration

1 4¹⁄₈” x 2” x 2” Channel MK: CH1* Galvanized

2 4” x 2¹⁄₂” Cee MK: C1* Galvanized

3 4” x 2¹⁄₂” Cee MK: C2 Galvanized

4 4” x 2¹⁄₂” Cee MK: C3 Galvanized

5 4” x 4” Angle MK: A1 Galvanized

6 Ridge Purlin (P2.5) MK:R1 * Galvanized

7 MC-2 Clip (HW-256) Galvanized

8 Z\x” x 1” Fin Head Bolts w/Nuts Plain

9 “PBU” Panel Glvm. Plus

10 “PBU” Panel Color

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-7 Back Yard Building PRODUCT INFORMATION

Product Check List (Cont’d.)

Item No. Description Color Illustration

11 “U” LTP Panel (HW-1441) White

12 Outside Corner Trim (FL-10) Trim Color

13 Eave Trim (FL-19) Trim Color

14 Rake Trim, Tapered (FL-533) Trim Color

15 “U” Jamb Trim (FL-20) Trim Color

16 “U” Head Trim (FL-514D) Trim Color

17 Base Trim (FL-538) Trim Color

18 Base Trim (FL-539) Trim Color

19 ¹⁄₂” x C⁄c₂” Tape Sealer Gray

20 Urethane Caulk White

12x15 BB-8 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building PRODUCT INFORMATION

Product Check List (Cont’d.)

Item No. Description Color Illustration

21 “PBU” Panel Inside Closure White

22 Fastener #12A Pancake SDS Plain

23 Fastener #3 Long Life SDS Plain

24 Fastener #17C SDS Trim Color

25 Fastener #17C SDS Wall Color

26 Fastener #4 Long Life Lap Tek Plain

27 Fastener #4A Lap Tek Wall Color

28 Fastener #4A Lap Tek Trim Color

29 Screw Caps Black

30 6068 Door w/Lockset (HW-9305) N/A

36 1¹⁄₂” Channel Section (HW-3110) Galvanized

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-9 Back Yard Building PRODUCT INFORMATION

Product Check List (Cont’d.) Optional Floor Kit (BUBFLK02) Item No. Description Color Illustration

21 4” x 2¹⁄₂” Cee MK: C2 White

22 Z\x” x 1” Fin Head Bolts w/Nuts Plain

23 Fastener #212 S.D. Reamer Plain

24 4’ x 8’ x C⁄v” CDX Plywood N/A

* NOT INCLUDED N OPTIONAL FLOOR KIT (PLYWOOD NOT SUPPLIED BY METAL DEPOTS)

Optional Tie Down Kit (HW-7549) Item No. Description Color Illustration

33 Auger Galvanized

34 Cable Galvanized

35 Cable Clamp Galvanized

12x15 BB-10 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Product Check List (Cont’d.) Optional Gable Extension Item No. Description Color Illustration

“PBU” Panel Wall Color

Rake Trim, Tapered (FL-532) Trim Color

Eave Trim (FL-19) Trim Color

4” x 2¹⁄₂” Cee MK: C8 Galvanized

4” x 2¹⁄₂” Cee MK: C9 Galvanized

4¹⁄,” x 2 Channel MK: CH4 Galvanized

Ridge Purlin (P2.5) MK:R1 * Galvanized

Fastener #3 Long Life SDS Plain

Fastener #4A Lap Tek Wall Color

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-11 Back Yard Building BUILDING INSTALLATION

Product Check List (Cont’d.) Optional Gable Extension Item No. Description Color Illustration

PBU I/S Closure HW-459

¹⁄₂” x C⁄c₂” Tape Sealer HW-507 Gray

A307 Bolt w/nut Z\x” x 1Z\x” Plated HW-3513

Z\x” x 1” Fin Head Bolts w/Nuts Plain HW-313

CQ 4x4 sq tubing 24’ Plated

12x15 BB-12 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Product Check List (Cont’d.) Optional Eave Extension Item No. Description Color Illustration

“PBU” Panel Wall Color

“PBU” Panel Wall Color

Rake Trim (SF-1) Trim Color

Eave Trim (FL-19) Trim Color

4” x 2¹⁄₂” Cee MK: C6 Galvanized

4¹⁄,” x 2¹⁄,” Channel MK: CH2 Galvanized

4¹⁄,” x 2¹⁄,” Channel MK: CH3 Galvanized

4” x 2¹⁄₂” Cee MK: C4 Galvanized

2” Strapping Galvanized

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-13 Back Yard Building BUILDING INSTALLATION

Product Check List (Cont’d.) Optional Gable Extension Item No. Description Color Illustration

Fastener #3 Long Life SDS Plain

Fastener #4A Lap Tek Wall Color

PBU I/S Closure HW-459

¹⁄₂” x C⁄c₂” Tape Sealer Gray

A307 Bolt w/nut Z\x” x 1Z\x” Plated HW-3513

Z\x” x 1” Fin Head Bolts w/Nuts Plain HW-362

CQ 4x4 sq tubing 24’ Plated

12x15 BB-14 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 1 Base Framing Installation Once you have chosen your location in which to erect the building, level the soil as well as possible. Additional soil can be brought in to help with this process.

Determine the direction you want the door to face. The door will install in an end wall (one of the 12’-2” long walls). Lay out two open-faced channel sections labeled CH1 (Item 1), parallel to each other, with the open side facing each other, 12’-2” apart. At each end, lay out a C1 cee (Item 2), with the open side facing the CH1 members. At each corner, lay out an A1 angle (Item 5). All parts are symmetrical, so each end of these parts is the same. Using four fin head bolts (Item 8) at each corner, attach the A1 angles to the C1 and CH1 members. Be sure to put the bolt head to the outside and the nut to the inside of the frame. Tighten the bolts with a ratchet and ¾” socket and/or a ¾” combination wrench.

Before proceeding with further installation, level the framework, on all four sides, with a four foot level.

Check to ensure that the floor area is square by measuring diagonal corners. If both measurements are the same, the floor is square. If they are not, push on either corner of the longest diagonal until both diagonal measurements are the same.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-15 Back Yard Building PRODUCT INFORMATION

Step 2 Floor Kit and Tie Down Kit Installation If you do not have the optional floor kit or tie down kit, skip this step and go to Step 3. Floor Kit Framing Installation Install the seven C2 (Item 3) cees into the CH1 open face channels (Item 1) and bolt together with fin head bolts (Item 8). Be sure to put the bolt head to the outside and the nut to the inside of the frame. The C2 cees are symmetrical, so it does not matter which way they are oriented. Tighten the bolts with a ratchet and ¾” socket and/or a ¾” combination wrench. Tie Down Kit Installation If you purchased the optional tie down kit, install the tie down augers into the ground at each inside corner of the building. Drill two ¼” holes, 2” apart, through the top return leg of the C1 cee as close as possible to the auger (Item 33). Loop the steel cable through the eye of the auger and through the holes in the C1 cee and fasten with two cable clamps (Item 35). Plywood Floor Installation (Plywood not supplied by Metal Depots) Check to ensure that the floor area is still square by measuring diagonal corners once again. Cut three sheets of plywood (Item 32) to the length of 7’-5¹⁄₂”. Install the three sheets of cut plywood, beginning at the end wall in which the door is to be installed. Lay the first sheet so that the 7’-5¹⁄₂” length of the plywood is oriented along the side wall (15’-2” length) of the building, 1¹⁄₂” inside of the steel line at end wall. This will allow clearance for the door frame later in the installation sequence. The side of the plywood should be 1” inside of the side wall (15’-2” length) steel line. Orient the next two cut sheets of plywood along the end wall. Fasten the plywood to the steel framing members with self-drilling reamer fasteners (Item 31) at 2’-0” centers along the edges and along the interior floor joists. Cut the remaining three sheets of plywood to the length of 7’-7”. Install the remaining plywood by aligning and butting up to previously installed plywood.

CAUTION Metal Depots strongly recommends that you secure the building to the ground to help prevent strong winds from moving or overturning the building. If you did not purchase a tie-down kit, secure the building to the ground in some manner.

12x15 BB-16 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building PRODUCT INFORMATION

Step 3 Roof Framing Installation

Using fin head bolts (Item 8), four at each corner, attach the remaining C1 (Item 2) and CH1 (Item 1) members to the top of the A1 angles (Item 5).

NOTE It will be easier if you attach the CH1 members to the A1 angles first, then attach the C1 members.

Starting at each end of the CH1, skip the first set of prepunched holes, then install a C2 cee (Item 3) into the CH1 channel. It does not matter which direction the C2 cees are oriented. Place your third C2 cee in the center prepunched holes.

Be sure to put the bolt heads to the outside and the nut to the inside of the frame. Tighten the bolts with a ratchet and ¾” socket and/or a ¾” combination wrench.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-17 Back Yard Building BUILDING INSTALLATION

Step 3 (cont’d.) Roof Framing Installation

Check to ensure that the roof area is square by measuring diagonal corners. If both measurements are the same, the roof is square. If they are not, push on either corner of the longest diagonal until both diagonal measurements are the same.

Find and mark the center of both end walls. Align the center of the ridge purlin (Item 6) with these marks and attach it to the C1 and C2 cees with two wall fasteners (Item 25) at each cee, ten fasteners total. Directly below the ridge purlin, install the 1¹⁄₂” channel section (Item 36) to the bottom of the ceiling joist (Item 3) with one fastener (Item 25) at each ceiling joist.

12x15 BB-18 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 4 Door Installation

Using a four foot level, check the end wall that is to receive the door to ensure that it is plumb. Check for plumb at both corners of this end wall. Install the door (Item 30) into the center of the end wall. The door frame will fit between the top and bottom C1 cees with the lip of the door frame flush with the outside face of the channels. Plumb the door with the four foot level and temporarily “C” clamp it to the C1 cee at the top of the door frame.

Install a pancake head (Item 22) fastener through the lip of the door frame and into the C1 cee, at each corner of the door frame, top and bottom.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-19 Back Yard Building BUILDING INSTALLATION

Step 5 Base Trim Installation

Before installation, remove the strippable film from all four pieces of base trim. The ends of the base trim have been mitered to fit together at the corners.

The base trim for the side walls (Item 18) will be installed first. The side wall base trim has tabs that must be bent to a 90-degree angle before installation. Install both pieces of side wall base trim to the floor with pancake head fasteners (Item 22) at three foot on center and to the side of the CH1 channel with the trim color hex head fasteners (Item 24) at three foot on center.

Repeat the above procedures to install the end wall base trim (Item 17). The end wall with the door will require you to cut the base trim at both sides of the door. You can cut the trim 1” long on both sides of the door and notch the trim to allow you to plug the opening in the end of the base trim.

12x15 BB-20 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 6 Door Jamb Support/Trim Installation

On each side of the door frame, install a C3 cee (Item 4). The C3 cee will attach to both the top and bottom C1 cees (Item 2) with angle clips (Item 7). Use the wall panel fasteners (Item 25) to attach the clips to the channels. Use the floor fasteners (Item 31) to attach the clips to the floor. If a floor kit was not ordered, use pancake fasteners (Item 22) to attach the clips to the bottom CH1 channel.

The door is now ready to be trimmed. Remove the strippable film from both pieces of jamb trim (Item 15) and from the head trim (Item 16).

Set the head trim (Item 16) on top of the door frame, center it, and mark the left and right edges of the door frame on the bottom of the trim. Turn the trim over and cut a tab in the bottom of the trim to within ¼” of the marks at each end. Bend these tabs down and set the trim back at the top of the door frame.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-21 Back Yard Building BUILDING INSTALLATION

Step 6 (Cont’d.) Door Jamb Support/Trim Installation

“C” clamp the head trim to each end of the C1 cee at the top of the door frame and install three wall panel fasteners (Item 25) through the head trim and into the C1 cee.

Set a piece of jamb trim (Item 15) on the base trim at one side of the door frame. Mark the top of the jamb trim even with the bottom of the head trim that was just installed. Cut the jamb trim at this mark and “C” clamp the jamb trim to the C3 cee. Attach the jamb trim to the C3 cee with four wall panel fasteners. Repeat this process with the jamb trim for the opposite jamb of the door.

Using the snips, cut each end of the head trim even with the outside edge of the jamb trim to provide a finished appearance.

12x15 BB-22 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 7 Wall Panel Installation

Separate the wall panels into four bundles, one for each wall. The wall with the door will have two special width panels (Item 10A). The opposite end wall will have four panels and the two side walls will have five panels each. Set each bundle on boards to keep them off the ground.

NOTE The panels have different rib configu- rations at each side rib. One side has a partial rib which laps to the outside and is the side that will be marked for predrilling. The other side has a full rib, referred to as a “Purlin Bearing Leg”. This leg laps to the inside and will provide support during lap fas- tener installation.

To ensure that the wall fasteners are aligned, it is best to pre-drill the panels while they are in bundles. Make sure all four bundles of wall panels are flush at the bottom end. “C” clamp each bundle of panels together to prevent them from moving. At the bottom end of each bundle, mark the fastener location in the center of each flat between the panel ribs. The mark should be 1” from the bottom of the panels.

The wall with the door will not require any side lap fasteners and needs no pre- drilling at the panel side laps. The other three walls will require side laps and will need to be pre-drilled at the side lap. Make the first mark at 3” from the bottom, in the center of the rib. Mark every two feet thereafter.

Using a 1/8” drill bit, pre-drill each bundle at the marked locations. Always attach a second “C” clamp to within a few inches of each mark before you drill the hole. This will help prevent breaking drill bits and keep the holes in the proper location throughout the bundle.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-23 Back Yard Building BUILDING INSTALLATION

Step 7 (Cont’d) Wall Panel Installation

Before installing the wall panels, check to make sure the wall is plumb.

The first panel on each wall will start with the edge of the partial side rib aligned with the steel line. The last panel on each wall should finish with the purlin bearing leg no more than 3/4” past the steel line.

Install panels to the wall with six fasteners (Item 25) at the base, in the predrilled holes and six fasteners at the top in every flat, beginning with the flat immediately adjacent to the predrilled side lap. The top fasteners should be approximately 1” below the panel top. These fasteners will be covered by trim later, so alignment is not necessary.

At each corner, install additional wall fasteners 1’ on center along the length of the panels on each side of the corner. These fasteners will attach the wall panel to the A1 angle (Item 5).

Install wall color lap teks (Item 27) into the pre-drilled holes in the side of the wall panels.

12x15 BB-24 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 8 Roof Installation

Remove the strippable film from the eave trim (Item 13) and install to the top of the wall panels with the trim color lap fasteners (Item 28). Install these fasteners through the eave trim and into every other panel rib (one foot on center).

Locate the foam inside closures (Item 21) and lay out five by each side wall. These closures will be installed under the roof panels as they are installed.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-25 Back Yard Building BUILDING INSTALLATION

Step 8 (Cont’d) Roof Installation

With the four metal roof panels in a bundle and the ends flush, mark the side lap fastener locations on the panel side lap that is a partial rib. The first mark will be 4” from the panel end and then 20” on center thereafter, with a final mark 4” from the other end of the panels. Use “C” clamps to hold the panels together and drill a 1/8” hole in the center of the panel side rib at the marked locations.

Starting at the back end wall, lay the first roof panel across the framing with the purlin bearing leg toward the inside of the building. The roof panel should the eave trim by approximately 2-3/4”. Make sure the overhang is the same dimension on both sides. Be sure the inside closures (Item 21) are under, and properly nested with, the roof panel on both sides.

Attach the roof panel at both ends with long life fasteners (Item 23) in every flat between the panel ribs for a total of six fasteners per side. Install three fasteners into the ridge purlin in every other flat beginning with the flat closest to the predrilled panel side lap. CAUTION Install roof panels from a step ladder on either side of the building. Panels will not support the point load of a man standing at mid span as they are fastened. Always exercise extreme care when walking on panels after fastening to prevent buckling of panel ribs. Apply tape sealant (Item 19) along the top of the purlin bearing side lap of the roof panel just installed. Install second panel in the same manner as first panel. The third panel to be installed will be the light transmitting panel (Item 11). Install this panel just as the previous roof panels were installed except, leave the last fastener out of the panel at both ends. Since the fiberglass light transmitting panel has to be on top of the metal roof panels on both sides, leaving these fasteners out will make it easier to slide the next metal roof panel under this light transmitting panel.

12x15 BB-26 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 8 (Cont’d) Roof Installation

Before installing the next roof panel, apply tape sealant along both side laps. The side rib of the metal panel must fit under the side rib of the light transmitting panel. Fasten this panel to the framing as previously outlined. You can now install the fasteners, that were previously left out of the light transmitting panel.

Install the last metal roof panel using the same methods as previously outlined.

Install the lap fasteners (Item 26) into the predrilled holes in the roof panels.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-27 Back Yard Building BUILDING INSTALLATION

Step 9 Trim Installation

Remove the strippable film from the four pieces of corner trim (Item 12). At the bottom end of the corner trim, mark the fastener flange at 3” and every two foot thereafter. Do this on both sides of the trim. Attach the corner trim with the trim color structural fasteners (Item 24) at each mark. Install all four corners in this manner.

Install tape sealant (Item 19) to the roof panel side ribs at each end wall.

Remove the strippable film from the rake trim (Item 14). This trim must be handled carefully to prevent damaging it. Install the rake trim at each wall and attach to the roof side rib with trim color lap fasteners (Item 28) at two foot on center. Attach the rake trim to the end wall with trim color lap fasteners at two foot on center.

Use the urethane caulk (Item 20) to seal the slit in the apex of the rake trim and any other places as needed.

12x15 BB-28 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building BUILDING INSTALLATION

Step 10 Screw Cap Installation

On the inside of the building, install the screw caps (Item 29) over the drill points of all exposed fasteners. The screw caps are intended to help prevent injury from contact with the drill point.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-29 Back Yard Building GABLE INSTALLATION

Step 1 Post Installation

Once you have chosen your location to erect the addition, level the soil as well as possible. Additional soil can be brought in to help with the process. 12’ Use a string line, layout were the 4” x 4” post

x 15’ will be located. Depending on the length of the gable extension will determine which dimension will be used. Each post will be inset by 2” on each side to account for the CH4 or BackY CH5 part. The 5’-9 1/2” or 8’-9 1/2” is based on the outside of the wall panel. ard Building Once the post locations have been deter- mined, place 18” of the 4 x 4 posts into the ground and concrete in place. Make sure that the posts are plum and square before the con- crete sets. Gable Extension 4” x 8’-9 1/2”

11’-11 3/4”

12x15 BB-30 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 2 Roof Framing Installation

If you are adding the extension to an existing building, remove the tapered rake on the end wall that you are adding the extension. Locate piece marked C5. Then “C” clamp the part to the building. Make sure that the pre-punched holes in the Cee are pointing down. Once, the part is in place, mark the hole locations. Remove the part and drill 5/8” diameter holes through the wall panel and existing roof member. Now, place the part back on the wall section and use the ½” x 1 ½” bolts that were supplied.

Part C5

4” x 4” Column

12’ x 15’ BackYard Building

11 ’-1 1 3/4” 8’-9 1/2”

Bury Column 18” Deep

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-31 Back Yard Building GABLE INSTALLATION

Step 3 Gable Member

Use a string line, mark the location for the new Gable End member. The top of the new Cee member will be the same height as the member on the existing building. Layout piece mark C7. Once you know the dimension for the top of the column height, cut off the remaining 4” x 4” column. Now, install Part C7 by using four #12 fasteners per column for a total of 8 screws.

Part C5

4” x 4” Column

Part C7 Run String Line to 12’ x 15’ BackYard Building Determine Cut Line

11 ’-1 1 3/4” 8’-9 1/2”

12x15 BB-32 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 4 Rake Member

Using fin head bolts, two at each corner, attach CH4 member to C5 and C7. It does not matter which direction the CH4 channels are oriented..

Part CH4

Part C5

Part C7

12’ x 15’ BackYard Building

11 ’-1 1 3/4” 8’-9 1/2”

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-33 Back Yard Building GABLE INSTALLATION

Step 5 Intermitted Member

Locate the additional Cee members labeled C7 and install using fin head bolts into pre- punched holes located in parts CH4. Then install R1 over part C7 and C5. Use two #12 fasteners per connection.

“C” clamp the eave trim to both eave Cee members and install two screws through the trim to hold in place.

Part FL-19

Part CH4

Part C7

Part C7

Part R1

Part C7

12’ x 15’ BackYard Building

11 ’-1 1 3/4”

8’-9 1/2”

12x15 BB-34 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 6 Roof Panel Installation

To ensure that the roof panels are aligned, it is best to pre-drill the panels while they are in bundles. Make sure the bundles of roof panels are flush at the bottom end. “C” clamp the bundle together to prevent them from moving. Mark the fastener location in the center of each flat between the panel ribs.

Using a 1/8” drill bit, pre-drill each bundle at the marked locations. Always attach a second “C” clamp to within a few inches of each mark before you drill the hole. This will help prevent breaking drill bits and

Starting where the rake trim was removed lay the first roof panel across the framing with the purlin bearing leg toward the outside of the building. The new roof panel should overhang the eave trim by approximately 2-3/4”. Be sure the inside closures are under and properly Part C7 nested with, the roof panel.

Attach the roof panel at both ends with long life fasteners in every flat between the panel Part R1 ribs for a total of six fasteners per end. Install Part C7 three fasteners into the intermediate supports in every other flat beginning with the flat to the pre-drilled panel side lap.

Part C7 Apply tape sealant along the top of the purlin bearing side lap of the roof panel just installed. Install the remaining panels in the manner as Part CH4 first panel.

12’ x 15’ BackYard Building Install the lap fasteners into the predrilled holes in the roof panels. 11’-1 1 3/4” Install tape sealant to the roof panel side ribs 8’-9 1/2” at each end wall.

Remove the strippable film from the rake trim. This trim must be handled carefully to prevent damaging it. Install the rake trim wall and attach to the roof side rib with trim color lap fasteners at two foot on center. Attach the rake trim to the end wall with trim color lap fasteners at two foot on center.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-35 Back Yard Building GABLE INSTALLATION

Step 6 (Cont’d) Roof Panel Installation

Attach the roof panel at both ends with long life fasteners (Item 23) in every flat between the panel ribs for a total of six fasteners per side. Install three fasteners into the ridge purlin in every other flat beginning with the flat closest to the predrilled panel side lap.

CAUTION Install roof panels from a step ladder on either side of the building. Panels will not support the point load of a man standing at mid span as they are fastened. Always exercise extreme care when walking on panels after fastening to prevent buckling of panel ribs.

Apply tape sealant (Item 19) along the top of the purlin bearing side lap of the roof panel just installed.

12’ x 15’ BackYard Building

11 ’- 11 3/4” 8’-9 1/2”

12x15 BB-36 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 7 Rake Trim

Install tape sealant (Item 19) to the roof panel side ribs at each end wall.

Remove the strippable film from the rake trim (Item 14). This trim must be handled carefully to prevent damaging it. Install the rake trim at each wall and attach to the roof side rib with trim color lap fasteners (Item 28) at two foot on center. Attach the rake trim to the end wall with trim color lap fasteners at two foot on center.

Use the urethane caulk (Item 20) to seal the slit in the apex of the rake trim and any other places as needed.

12’ x 15’ BackYard Building 11 ’- 11 3/4”

8’-9 1/2”

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-37 Back Yard Building GABLE INSTALLATION

Step 1 Post Installationr

Once you have chosen your location to erect the addition, level the soil as well as possible. Additional soil can be brought in to help with 11’-11 3/4” the process.

Use a string line, layout were the 4” x 4” post will be located. Depending on the length of the eave extension will determine which dimension will be used. Each post will be inset by 2” on each side to account for the CH2 or CH3 part. The 8’-0” or 10’-0” is based on the outside of the wall panel. 4” x 4” Column Once the post locations have been determined, place 18” of the 4 x 4 posts into the ground and concrete in place. Make sure that the posts are plum and square before the Eave Extension concrete sets. 8’-0” or 10’-0”

12’ x 15’ BackYard Building

12x15 BB-38 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 2 Roof Framing Installation

If you are adding the extension to an existing building, remove the eave fasteners on the side that you are adding the extension. Locate piece marked C6. Then “C” clamp the part to the building. Make sure that the pre-punched holes in the Cee are pointing down. Once, the part is in place, mark the hole locations. Remove the part and drill 5/8” diameter holes through the wall panel and existing roof member. Now, place the part back on the wall section and use the ½” x 1 ½” bolts that were supplied.

Part C6

Run String Line to Determine Cut Line

12’ x 15’ BackYard Building 4” x 4” Column 11 3/4” 8’-0” or 10’-0” 14’-

Bury Column 18” Deep

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-39 Back Yard Building GABLE INSTALLATION

Step 3 Eave Member

Use a string line, mark the location for the new Eave member. Use the slope of the existing roof and extend it to the 4” x 4” . Layout piece mark C4. The new eave extension will have the same roof slope of the existing building. Once you know the dimension for the top of the column height, cut off the remaining 4” x 4” column. Now, install Part C4 by using four #12 fasteners per column for a total of 8 screws.

Part C6

Part C4

12’ x 15’ BackYard Building 4” x 4” Column 1 3/4” 8’-0” or 10’-0 14’-1

Bury Column 18” Deep

12x15 BB-40 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 4 Rake Member

Using fin head bolts, two at each corner, attach CH2 or CH3 member to C3 and C5. It does not matter which direction the CH2 or CH3 channels are oriented.

PART C5

PART CH2 OR CH3

PART C3

12’ x 15’ BackYard Building 4” x 4” Column ’-11 3/4” 8’-0” or 10’-0 11

Bury Column 18” Deep

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-41 Back Yard Building GABLE INSTALLATION

Step 5 Intermitted Member

Locate the additional Cee members labeled C3 and install using fin head bolts into pre- punched holes located in parts CH2 or CH3.

“C” clamp the eave trim to the low eave Cee member and install two screws through the trim to hold in place.

PART C3 PART CH2 OR CH3

PART C3

2” Strap

12’ x 15’ BackYard Building 4” x 4” Column ’-11 3/4” 8’-0” or 10’-0” 11

Bury Column 18” Deep

12x15 BB-42 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building GABLE INSTALLATION

Step 6 Roof Panel Installation

To ensure that the roof panels are aligned, it is best to pre-drill the panels while they are in bundles. Make sure the bundle of roof panels are flush at the bottom end. “C” clamp the bundle together to prevent them from moving. Mark the fastener location in the center of each flat between the panel ribs.

Using a 1/8” drill bit, pre-drill each bundle at the marked locations. Always attach a second “C” clamp to within a few inches of each mark before you drill the hole. This will help prevent breaking drill bits and keep holes in the proper location throughout the bundle.

The low eave fasteners on the existing building should have been removed. Once the fasteners are removed, start at the back end wall and install the eave extension roof panels by inserting the roof panel under the existing roof panel. The new roof panel should overhang the eave trim by approximately 2-3/4”. Be sure the inside closures are under and properly nested with, the roof panel.

Attach the roof panel at both ends with long life fasteners in every flat between the panel ribs for a total of six fasteners per end. Install three fasteners into the intermediate supports in every other flat beginning with the flat closet to the pre-drilled panel side lap.

Apply tape sealant along the top of the purlin bearing side lap of the roof panel just installed. Install the remaining panels in the manner as first panel. 12’ x 15’ BackYard Building Install the lap fasteners into the predrilled 1 3/4” holes in the roof panels. 8’-0” or 10’-0” 14’-1 Install tape sealant to the roof panel side ribs at each end wall.

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-43 Back Yard Building GABLE INSTALLATION

Step 6 (Cont’d) Roof Panel Installation

Remove the strippable film from the rake trim. This trim must be handled carefully to prevent damaging it. Install the rake trim at each wall and attach to the roof side rib with trim color lap fasteners at two foot on center. Attach the rake trim to the end wall with trim color lap fasteners at two foot on center.

CAUTION Install roof panels from a step ladder on either side of the building. Panels will not support the point load of a man standing at mid span as they are fastened. Always exercise extreme care when walking on panels after fastening to prevent buckling of panel ribs.

2” Strap

12’ x 15’ BackYard Building

1 3/4” 8’-0” or 10’-0” 14’-1

12x15 BB-44 Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. Back Yard Building NOTES

Subject to change without notice See www.metaldepots.com for current information. Effective August 13, 2019. 12x15 BB-45 Call us, visit us on the web or stop by the store nearest you to learn more about our product offerings. We look forward to servicing your roof, your home and you.

800.531.2731 | www.metaldepots.com

STAY IN TOUCH facebook.com/metaldepots

Descriptions and specifications contained herein were in effect at the time this publication was approved for printing. In a continuing effort to refine and improve products. Metal Depots reserves the right to discontinue products at any time or change specifications and /or designs without incurring obligation. To ensure you have the latest information available, please inquire or visit our website at www.metaldepots.com Application details are for illustration purposes only and may not be appropriate for all environmental conditions, building designs or panel profiles. Projects should be designed to conform to applicable building codes, regelations and accepted industry practices. If there is a conflict between this manual and project erection drawings, the erection drawings will take precedence.

August 13, 2019 / Rev 00.00