Arun District Council Civic Centre Maltravers Road Littlehampton abcd West Sussex BN17 5LF
Tel: (01903) 737500 Fax: (01903) 730442 DX: 57406 Littlehampton Minicom: 01903 732765
e-mail: [email protected]
Committee Manager : Carrie O’Connor (Ext 37614) 19 th May 2011
CABINET MEETING
A meeting of the Cabinet will be held in Committee Room 1 at the Arun Civic Centre, Maltravers Road, Littlehampton, on Tuesday 31 st May 2011 at 5.00 p.m. and you are requested to attend.
Members : Councillors Mrs Brown (Chairman), Elkins (Vice-Chairman), Bower, R. Brown, Dendle, Dingemans and Wotherspoon (subject to confirmation at Annual Council on 25 th May 2011).
A G E N D A
1. APOLOGIES FOR ABSENCE
2. DECLARATIONS OF INTEREST
Members and Officers are reminded to make any declarations of personal and/or prejudicial interests that they may have in relation to items on this Agenda.
You should declare your interest by stating : a) the item you have the interest in b) whether it is a personal interest and the nature of the interest c) whether it is also a prejudicial interest d) if it is a prejudicial interest, whether you will be exercising your right to speak under Question Time
You then need to re-declare your interest and the nature of the interest at the commencement of the item or when the interest becomes apparent.
3. QUESTION TIME
a) Questions from the public (for a period of up to 15 minutes). b) Questions from Members with prejudicial interests (for a period of up to 15 minutes).
4. MINUTES
To approve as a correct record the Minutes of the meeting held on 7 th March 2011 (previously circulated).
Page 1 of 124
Arun District Council CABINET-31/05/2011
ITEMS FOR DECISION
5 START TIMES
The Cabinet is requested to confirm the start times for meetings for the remainder of 2011/12.
6 THINK FAMILY: EARLY INTERVENTION AND SUPPORT
This report explains proposals to develop a programme of early intervention and family support across West Sussex, including the development of Family Intervention Projects in the Arun, Worthing, Adur and Crawley areas of the County. There is £2M available over three years to develop Family Nursing Partnerships, Family Intervention Projects and a Shared Framework of Services.
7 ARUN WELLBEING PROGRAMME 2011/12
West Sussex Public Health will be funding Arun District Council to deliver a Prevention and Wellbeing Programme in Arun, via the establishment of a Wellbeing Hub. This is an enhancement to the Arun Wellbeing Programme first funded by NHS West Sussex in 2009. Funding is to be provided through a Section 75 agreement, from 2011/12. This report details the revised arrangements for the Arun Wellbeing Programme and requests Cabinet to approve the drawing-down of the allocated funding.
8 NEW HOMES BONUS - PROPOSALS FOR EXPENDITURE IN 2011-2012
The Council has received notification from the Department of Communities and Local Government that it will receive £508,908 under the New Homes Bonus Scheme for 2011-12. This report recommends that a number of proposals should be supported through monies from the New Homes Bonus Scheme.
9 ARUN DEVELOPER AND PARTNER CHARTER PLUS
This report seeks Cabinet support for the adoption of the Arun Developer and Partner Charter Plus.
This new initiative builds on the original objectives of the Bognor Regis Developer and Partner Charter, but will now be augmented with the dual ambitions of creating new training and apprenticeship opportunities, primarily for young people, and improving the environmental sustainability of housing and regeneration projects on Council owned land..
10 PLANNING CONSULTANCY FRAMEWORK AGREEMENT
Arun District Council and a number of other local authorities in East and West Sussex, the identity of which has yet to be confirmed, and potentially the South Downs National Park Authority have a need from time to time to use external planning consultancy services to conduct studies, appraisals and other methods of assessment on areas such as, but not limited to, housing land supply, landscape and urban design appraisals and retail studies within the locality. Arun District Council and the other interested authorities, as outlined above, therefore wish to set
Page 2 of 124
Arun District Council CABINET-31/05/2011 up a procurement framework that they can all use which will test the market for these services with the aim of improving the efficiency and reducing the cost of acquiring those services. It is proposed that Arun District Council be the lead authority for this procurement framework agreement.
11 SOCIAL HOUSING REFORM
This Report identifies key areas of Social Housing Reform being taken forward by the coalition Government and the implications for Arun District Council.
12 REVIEW OF HOUSING ALLOCATIONS SCHEME
This report summarises the responses to the consultation on the draft review of the housing allocations policy and recommends preparation for the implementation of the new policy to start in July 2011 with a launch date of January 2012.
ITEMS FOR INFORMATION
13 BETTER TOGETHER - SHARED SERVICES UPDATE
This report updates Cabinet on progress with the Better Together Programme.
14 ARUN WELLBEING AND HEALTH PARTNERSHIP - 8TH FEBRUARY 2011
To receive and note the Minutes of the meeting of the Arun Wellbeing and Health Partnershp held on 8th February 2011.
15 SAFER ARUN PARTNERSHIP - 28TH FEBRUARY 2011
To receive and note the Minutes of the meeting of the Safer Arun Partnership held on 28th February 2011.
16 EXEMPT INFORMATION
That under Section 100A(4) of the Local Government Act 1972, the public and accredited representatives of newspapers be excluded from the meeting for the following items of business on the grounds that they involve the likely disclosure of exempt information as defined in Part 1 of Schedule 12A of the Act by virtue of the paragraph specified against the items.
17 PARTNERSHIP ARRANGEMENT WITH HYDE HOUSING ASSOCIATION TO DELIVER PRIVATE SECTOR LEASING (EXEMPT - PARAGRAPH 3 - INFORMATION RELATING TO BUSINESS AFFAIRS)
This report provides details of a proposal to provide private sector leased properties to assist in the prevention of homelessness through a partnership arrangement with Hyde Housing Association. It seeks authority to enter into an agreement with Hyde to develop the scheme in Arun. Establishing the scheme will require contingency budget provision of £5000 to be made as a from the Homeless Prevention Fund to underwrite rent losses on the basis contained within this report.
Page 3 of 124
Arun District Council CABINET-31/05/2011 18 AWARD OF CONTACT FOR REACTIVE REPAIRS AND MAINTENANCE OF COUNCIL HOUSING PROPERTIES AND CORPORATE BUILDINGS (EXEMPT - PARAGRAPH 3 - INFORMATION RELATING TO BUSINESS AFFAIRS)
To consider the attached report.
19 REVIEW OF THE COMMUNITY ALRAM SERVICE (ARUN LIFELINE) (EXEMPT - PARAGRAPH 3 - INFORMATION RELATING TO BUSINESS AFFAIRS)
To consider the attached report.
20 EXTENSION OF CORPORATE CLEANING CONTRACT
To consider the attached report.
21 LEISURE CONTRACT - REQUEST TO EXTEND (RENEW) EXISTING LEASE (EXEMPT - PARAGRAPH 3 - INFORMATION RELATING TO BUSINESS AFFAIRS)
To consider the attached report.
That under Section 100A(4) of the Local Government Act 1972, the public and accredited representatives of newspapers be excluded from the meeting for the following item of business on the grounds that it involves the likely disclosure of exempt information as defined in Part 1 of Schedule 12A of the Act by virtue of the paragraph specified against the item.
Note : *Indicates report is attached for all Members of the Council only and the press (excluding exempt items). Copies of reports can be obtained on request from the Committee Manager).
Note : Members are reminded that if they have any detailed questions would they please inform the Chairman and/or relevant Director in advance of the meeting.
Cabinet Cabinet 31st May 2011
Page 4 of 124
Arun District Council CABINET-31/05/2011 ITEM 6
AGENDA ITEM NO.
ARUN DISTRICT COUNCIL
REPORT TO AND DECISION OF CABINET ON 31st May 2011
PART A : REPORT SUBJECT: Think Family: Early Intervention and Support
REPORT AUTHOR: Ian Sumnall, Chief Executive DATE: May 2011 EXTN: 37609
EXECUTIVE SUMMARY: This report explains proposals to develop a programme of early intervention and family support across West Sussex, including the development of Family Intervention Projects in the Arun, Worthing, Adur and Crawley areas of the County. There is £2M available over three years to develop Family Nursing Partnerships, Family Intervention Projects and a Shared Framework of Services.
RECOMMENDATIONS It is recommended that Cabinet welcomes the development of the Think Family programme in West Sussex and agrees to our participation because of the benefits to vulnerable residents of the Arun District.
1. BACKGROUND: Think Family: Early Intervention and Support is a programme of preventative support, focused and targeted intervention to families most at risk, and a system wide shared framework of services. It is a three-year programme with around £2M available to develop Family Intervention Projects, Family Nursing Partnerships and a Shared Framework of Services. Family Intervention Projects (FIP) The Family Intervention Project (FIP) will provide intensive parenting and family support for families with multiple problems, for example potential family breakup, long term parental illness, financial crisis, housing problems, child protection concerns or antisocial behaviour. The intention is to target 144 families in the Adur, Worthing, Arun and Crawley areas of the County, and within Arun the programme should target at least 50 families over a three year period. The targeted families will be chosen through local knowledge and will have agreed to cooperate with this programme. They will be allocated a key worker (one of three employed within Arun) who will act as an intermediary with the various agencies and give one to one intensive support to the family. District councils will be invited to top-up to provide additional resources and/or workers if required, and will be expected to realign their delivery to support discretionary housing
Page 5 of 124
Arun District Council CABINET-31/05/2011 ITEM 6
payments, benefits, leisure etc. A two year pilot FIP has been running in Adur and Worthing since spring 2010. One case study gives the example of a mother with five children on child protection plans; after several months intensive work with the family the children have improved health and activity levels, housing debt is being paid off, there have been no complaints to the antisocial behaviour team or police, older children have been on work placements or at college and the younger ones doing well at school, the mother has taken up volunteering, and all the children have been taken off the child protection plans. It is proposed by the county council that the coordination of the expanded project be delegated to Adur/Worthing councils who will further delegate delivery to Arun and Crawley councils. It is anticipated that the staffing resource for Arun will be three key workers – one of whom will be at a senior level, and target families will be identified by September 2011. Family Nursing Partnerships (FNP) The Family Nursing Partnerships (FNP) scheme is an evidence-based, intensive preventive programme to be targeted at 100 vulnerable first time teenage mothers across the county (not just in the areas designated for FIPs). It is a three year programme and will enable support for children from conception and up to 2.5 years of age, by improving ante-natal health, child health and development and parental economic self-sufficiency. There are still questions in relation to both the FIPs and FNPs in relation to who will manage the key workers, and how the individuals and families will be identified. There may also be a need for Arun District Council to adapt some of its existing policies to meet the consequences of the programmes, for example discretionary housing payment. Once these issues are clarified and the full timetable is in place a further report will be prepared for Cabinet. Shared Framework of Services (countywide) To enable agencies in West Sussex to work better together to support families in providing the best start for their children’s lives, a shared framework of services is being developed. Whilst some families will be supported by the FIP and FNP projects others will be supported by universal, targeted and specialist services delivered by the voluntary, community and statutory sectors. Services commissioned to meet each type of need will join-up with each other so that there is a clear pathway of support for families in West Sussex. It is intended that this programme will enable better communication with families and between services using a common understandin g and way of talking about need; a focus on working together to support families sooner and reducing the numbers of those who go on to need help from specialist services; improve the experience of families who ask for help, reducing the times they are passed back and forward between services and improved planning and access to appropriate services for children and families at the right time with evidence of better outcomes or end results for families. Elements of this shared framework include the following: • The West Sussex Continuum of Need (see appendix 1) will provide a common way for all who support families and children to understand, and talk together about different levels of need. Each service will understand their own
Page 6 of 124
Arun District Council CABINET-31/05/2011 ITEM 6
contribution to children and families across this continuum • Clear pathways of support for some of our most vulnerable groups of children and families will be marked out from prevention and early intervention through to specialist levels of support to improve access and our understanding of who does what when for these key groups. • There will be a strong focus on how children and families are passed between services at different levels of support especially those at the cusp of needing help from specialist support services • Local integrated support teams will work to strengthen the targeting and integrated support of families and children at district council level and support effective use of the Common Assessment Framework, Team Around the Child and the Lead Professional role. • Workforce training and development will be aimed at equipping all who work with families with the principles and skills needed to work effectively together to improve the outcomes for families and children’s lives.
2. PROPOSAL(S): It is proposed that Cabinet welcomes the development of the Think Family programme in West Sussex and agrees to our participation because of the benefits to vulnerable residents of the Arun District. 3. OPTIONS:
(i) to agree the proposal in section 2 ( recommended option) (ii) not to agree the proposal in section 2 4. CONSULTATION:
Has consultation been undertaken with: YES NO Relevant Town/Parish Council X Relevant District Ward Councillors X Other groups/persons (please specify) X 5. ARE THERE ANY IMPLICATIONS IN RELATION YES NO TO THE FOLLOWING COUNCIL POLICIES: (Explain in more detail at 6 below) Financial X Legal X Human Rights/Equality Impact Assessment X
Community Safety including Section 17 of Crime & Disorder Act X Sustainability X Asset Management/Property/Land X
Page 7 of 124
Arun District Council CABINET-31/05/2011 ITEM 6
Technology X Other (please explain) X 6. IMPLICATIONS: Financial: There is expectation that if benefits accrue that organisations would be expected to give a commitment to help keep the Family Intervention Project going beyond year 3. Equality Impact Assessment: The programme is led by the county council and as such the responsibility for carrying out EIA is with them. Community Safety: There are clear opportunities for the promotion of better community safety. Sustainability: The FNP and FIP are currently short-term projects. There is no guarantee that further funding will be made available once the current schemes have finished, though there may be expectation on the Council and other benefiting agencies to commit further resources.
7. REASON FOR THE DECISION: To improve quality of life in a targeted, evidence-based and sustainable way for some of the most needy families in the Arun District.
8. BACKGROUND PAPERS:
Page 8 of 124
Arun District Council CABINET-31/05/2011 APPENDIX 1 to ITEM 6 Level of need / Assessment
Level 1 Level 2 Level 3 Level 4 No identified Low risk to Vulnerable - complex Common Assessment Common Specialist High additional needs (CAF) Considered at vulnerable Assessment Assessment this Point alongside (CAF) should be Required Common Universal support For all children. Children with an identified Identified needs are increasingly Children at risk of experiencing Targeted initiated Provided by eg. additional need that can be met by complex/ Unmet need is at risk of harm. intervention •Education a referral to a single agency. escalating. More than two agencies Acute needs that Require statutory •GP, Health Visitor Response services are Universal &/ are involved with the child/ family intensive support •Housing or Targeted. requiring a Co-ordinated/ targeted Threshold for Social care and other •Police EG. School Action;SALT,Portage, Integrated response. specialist Service met Response by •Vol & comm sector Connexions, Children & Family cen- Agency. eg Social Care Police, YJS •Local children’s centre tre. Local community project. CAF should be used but where CAMHS Health there is an escalating issue of unmet need or a question of potential risk the threshold with ‘Child in Need’ may be crossed requiring social care assessment.
Normal safeguarding procedures Should be followed in each case.
Lead professional optional Lead professional agreed
Universal Targeted services Co-ordinated Specialist services targeted services services
In house assessment Single agency assessment used. CAF Assessment initiated to Statutory assessment if required. Coordinate multi agency plan in recording & delivery partnership with family. within own agency. Statutory responsibility To fulfil lead role E.g. Social worker, YOS Information sharing between practioners
Page 9 of 124 Think family
Arun District Council CABINET-31/05/2011 ITEM 7
AGENDA ITEM NO.
ARUN DISTRICT COUNCIL
REPORT TO AND DECISION OF CABINET ON 31st May 2011
PART A : REPORT SUBJECT: Arun Wellbeing Programme 2011/12
REPORT AUTHOR: Hazel Flack, Partnership Manager DATE: May 2011 EXTN: 37609
EXECUTIVE SUMMARY: West Sussex Public Health will be funding Arun District Council to deliver a Prevention and Wellbeing Programme in Arun , via the establishment of a Wellbeing Hub. This is an enhancement to the Arun Wellbeing Programme first funded by NHS West Sussex in 2009. Funding is to be provided through a Section 75 agreement, from 2011/12. This report details the revised arrangements for the Arun Wellbeing Programme and requests Cabinet to approve the drawing-down of the allocated funding.
RECOMMENDATIONS It is recommended that Cabinet: (i) welcomes the development of the Arun Wellbeing Programme and Hub funded by the West Sussex Public Health; and (ii) approves the total spend of the Arun Wellbeing programme for 2011/12 funded via a section 75 agreement to the sum of £418,300 (exact sum to be confirmed).
1. BACKGROUND: Arun District Council has hosted a Wellbeing Programme funded by, and on behalf of. NHS West Sussex since May 2009. This programme was originally funded for three years at £200,000 per year. The funding enabled the establishment of a team and the commissioning and delivery of around 30 projects, via statutory and voluntary partners, which met the priorities of the Arun Wellbeing and Health Partnership (informed by the Arun Sustainable Community Strategy). The Arun Wellbeing and Health Partnership reports directly to the Arun Local Strategic Partnership as well as to Arun District Council’s Cabinet. Changes in national policy through the NHS White Paper and the Public Health White Paper, resulting in the decision to abolish PCTs from 2013, transfer the Public Health function to the upper tier local authority and commissioning arrangements to GP consortia, have prompted a review of the Wellbeing Programmes in West Sussex. • West Sussex Public Health (the Public Health department within NHS West Sussex currently undergoing transition to West Sussex County Council) has devised a county-wide Prevention and Wellbeing Programme for adults of all ages, based at District and Borough Council level. This programme provides for
Page 10 of 124
Arun District Council CABINET-31/05/2011 ITEM 7
a hub function in each District and Borough Council area, which will serve as the source of advice and information and coordination of the programme, and include local services that can be accessed by the population who need them to meet their health and wellbeing needs. The objectives of the Programmes are: • To support behaviour change to reduce the consequences of locally agreed priority behaviours such as unhealthy eating, alcohol misuse, smoking and low levels of physical activity. • To act as a hub of information for members of the public wishing to change behaviours to improve their health. • To be a referral point for GPs and other health and social care professionals with patients / clients requiring support to change unhealthy behaviours. Each local authority in West Sussex will have its own Wellbeing Hub which will be central to the delivery of the Prevention and Wellbeing Programme. The Wellbeing Hubs will have an in-depth knowledge of local health and wellbeing opportunities. The Hubs are a universal service, to be accessible for all, but they will also be targeted to those experiencing greatest inequalities. Functions of the Wellbeing Hubs The Wellbeing Hub will provide the following functions: • To serve as the source of advice, information and coordination of local services that can be accessed by the population who need them to meet their health and wellbeing needs. • To enable partner organisations to act in a more integrated and innovative way to empower people and communities to make healthier choices in their lives. • To develop and maintain an accessible “one stop” source of information on wellbeing in each district or borough. • To provide “face to face”, telephone and online contact with the public and maintain an up to date database of local wellbeing services for adults of all ages with particular emphasis on those services that support behaviour change in people with increased risk of developing cardiovascular disease and cancer. • To establish core service deliverables, for example: standard hours of access and signposting functions to the related health and wellbeing services (e.g. smoking cessation services, motivational interviewing). • Support for families with multiple problems • Suitably skilled and trained staff. • Communication and marketing of the wellbeing programme. • To enable adults, particularly those who are vulnerable, to be more linked with appropriate local services. • To increase the awareness of the importance of wellbeing to residents and professionals across the locality. • To establish a method of ensuring that voices of the most vulnerable within
Page 11 of 124
Arun District Council CABINET-31/05/2011 ITEM 7
communities are heard on matters of wellbeing. • To monitor contact, in terms of needs and demographics, in order to inform future service delivery. • Using motivational interviewing and brief interventions to identify behaviours that need changing, such as smoking cessation, weight management and physical activity • Liaising with other council departments such as benefits and housing to identify target high risk/hard to reach families for signposting to access relevant services • Supporting isolated individuals to take part in more social activities • Linking to providers of NHS health checks
A total of £2,205,000 has been identified by NHS West Sussex during 2011/12 to run seven Wellbeing Hubs and to provide prevention and lifestyle services. In allocating the funding to each area factors that have been taken into account are population size, access and prevalence of risk factors. Each of the Hubs is receiving initial funding of £100,000 to establish the core service, and under the formula the additional allocation to Arun District Council for 2011/12 is anticipated to be £318,300, making a total for 2011/12 of £418,300. NHS West Sussex has committed to a two year programme ending March 2013 but is not indicating the amount of funding available for 2012/13 at this stage, though informally there are indications that it will be the same as for 2011/12. This should be clarified once the Section 75 agreement has been finalised. There is as yet no guarantee of continuation of the programme following the full incorporation of Public Health into the County Council from 1 st April 2013, and the current programme arrangements will include an exit strategy should the County Council decide not to continue with the programme. An action plan is currently being drawn up to deliver the programme in Arun, and this will also be reported to the Arun Wellbeing and Health Partnership and to the Local Strategic Partnership. 2. PROPOSAL(S): It is proposed that Arun’s Cabinet: (i) welcomes the development of the Arun Wellbeing Programme and Hub funded by the West Sussex Public Health; and (ii) approves the total spend of the Arun Wellbeing programme for 2011/12, funded via a section 75 agreement, to the sum of £418,300 (exact sum to be confirmed). 3. OPTIONS:
(i) to agree the proposals in section 2 ( recommended option) (ii) not to agree the proposals in section 2 4. CONSULTATION:
Has consultation been undertaken with: YES NO
Page 12 of 124
Arun District Council CABINET-31/05/2011 ITEM 7
Relevant Town/Parish Council X Relevant District Ward Councillors X Other groups/persons (please specify) Shortly to consult with the Arun Wellbeing and Health Partnership 5. ARE THERE ANY IMPLICATIONS IN RELATION YES NO TO THE FOLLOWING COUNCIL POLICIES: (Explain in more detail at 6 below) Financial X Legal Human Rights/Equality Impact Assessment X
Community Safety including Section 17 of Crime & Disorder Act Sustainability X Asset Management/Property/Land X Technology X Other (please explain) 6. IMPLICATIONS: Financial: The programme will be reviewed after six months and Public Health may choose to recoup funds not spent within that time, to reallocate the following year. Equality Impact Assessment: Attached as appendix 1 Sustainability: Due to Public Health being absorbed within the County Council from 1st April 2013 there is no commitment to funding beyond that date Asset Management/Property: Consideration is being given to leasing or retaining premises in order to provide a physical hub function on each side of the Arun River Technology: If a decision is made to focus activities at separate premises there will be a need for broadband provision and/or computer access at these premises. 7. REASON FOR THE DECISION: To improve the wellbeing of the residents of the Arun District To satisfy the terms of the Section 75 agreement
8. BACKGROUND PAPERS: Prevention, Wellbeing and Implementation Programme - specification Joint Strategic Needs Assessment Equality Impact Assessment
Page 13 of 124
Arun District Council CABINET-31/05/2011 ITEM 8
AGENDA ITEM NO.
ARUN DISTRICT COUNCIL
REPORT TO AND DECISION OF CABINET ON 31 st May 2011
PART A : REPORT SUBJECT: New Homes Bonus – Proposals for expenditure in 2011-12
REPORT AUTHOR : Karl Roberts DATE: 18 th April 2011 EXTN: 37760
EXECUTIVE SUMMARY: The Council has received notification from the Department of Communities and Local Government that it will receive £508,908 under the New Homes Bonus Scheme for 2011-12. This report recommends that a numb er of proposals should be supported through monies from the New Homes Bonus Scheme.
RECOMMENDATIONS : It is recommended that : 1. The proposed allocation of New Homes Bonus monies for 2011-12 be allocated to the following projects; i. The sum of £17,000 is allocated to each Joint Area Advisory Committee for use in supporting locally identified needs by the JAAC’s . ii. The sum of up to £35,000 is allocated to employing a person either directly or indirectly on a 12 month contract as a ‘Neighbourhood Planner’ to facilitate with parish councils the development of Neighbourhood Plans in Arun. iii. The sum of up to £40,000 is allocated to undertaking a Leisure Strategy. iv. The sum of up to £25,000 is allocated along with other previously identified resources to provide additional support to the part time Empty Homes Officer by 12 months. v. The sum of £ 303,000 be made available for the facilitating the delivery of street scene enhancements to the Littlehampton Tidal Defence Scheme and/or to facilitate the use of Oldlands Farm as a Business Park. vi. The remainder (£54, 908 plus any underspend from ii to v) to be held in a reserve for future allocation.
1. BACKGROUND: The CLG describes the aim of the New Homes Bonus (“NHB”) thus : “The aim of the New Homes Bonus is to create a powerful, simple, transparent and permanent incentive which rewards local authorities that deliver sustainable housing development.” Recent years have seen a steady decline in national ho use building which culminated in 2009 with only 118,000 completions: the lowest peacetime annual total since 1924. The ‘top-down’ approach of managing housing provision favoured by the last government has been replaced by the Coalition government’s philosophy of locally- driven growth within a framework of powerful incentives.
Page 14 of 124
Arun District Council CABINET-31/05/2011 ITEM 8
The New Homes Bonus is part of a range of incentives set out in the government’s Local Growth White Paper. This report gives a summary of how the allocation of New Homes Bonus (“NHB”) for Arun in 2011-12 should be allocated. Key features of the Scheme to note include:- • NHB will provide incentivised funding which recognises and rewards a council for increasing its housing supply, through a formula related to the national average council tax, making a payment for each new home built and each long term empty property brought back into use, with an additional amount to be paid for each new affordable home created. • The bonus is to be paid annually for each of the 6 years after that home is built /brought back into use. £200 million has been set aside for 2011/12, and £250m for each of the following three years. The real problem with the scheme, however, is that after the first year it is not fully-funded, with any shortfall coming from Formula Grant. By year six and beyond, around 80% of the money will ne ed to come from the existing settlement. This means that the cash allocations in the CSR will be reduced from 2012-13 in order to pay for the New Homes Bonus. The NHB will be paid as unringfenced grant. As a consequence of this it would appear sensible to consider the NHB on an annual basis once the Council can be clear whether it is a net beneficiary or a net loser. • The level of payment will be based on the average national band D council tax, with all other bands adjusted to a band D equivalent. • Provisi on of additional publicly owned Gypsy & Traveller caravan sites will also be rewarded. • In two tier areas the bonus is split 80:20 in favour of lower tier councils. • Councils are encouraged to consider pooling some NHB to support Local Enterprise Partnerships. This paper does not propose any such support for 2011-12. 2. PROPOSALS: The Council has been awarded the sum of £508,908 representing a net increase of 511 dwellings. Of these 74 were classified as empty homes which have been brought back into use. Due to the method of data collection the additional reward for the delivery of Affordable Homes will be paid from 2012-13. For the reasons set out above it would be unwise to make commitments against future years NHB without being clear on how much Revenue Support Grant will be clawed back in future years to fund the scheme nationally. Consequently, this report deals solely with the allocation of NHB for 2011-12. The Government has strongly urged Councils to passport some of the grant directly to local communities. For Arun this would logically take the form of passing some of the grant to Parish & Town Councils. It is considered that a reasonable sum would be 10% of that available to Arun to spend. However, as this is the first year of the scheme the sum available would be approximately £50,000. Rather than allocate this to each parish either on a pro-rata basis or equal share basis where it would individually have little impact it is suggested that the sum of £17,000 be allocated to each of the Joint Area Committee’s (£51,000 in total) to be used on projects where it supports locally identified and prioritised needs as determined and recommended by the JAAC’s.
In addition to the above it is recommended that a post of ‘Neighbourhood Planner’ should be funded for one year to support any Parish & Town Council in Arun that wishes to progress a Neighbourhood Plan (including those offered the above grant). Page 15 of 124
Arun District Council CABINET-31/05/2011 ITEM 8
This is because many Parish & Town Councils don’t currently have the relevant skills or capacity to undertake such a task. This post could be managed by the Planning service at Arun or alternatively via a voluntary organisation such as Action in Rural Sussex. Moving away from neighbourhood planning there are a number of other initiatives that the NHB could be used to support. Firstly, the Council needs to urgently update its Leisure Strategy to provide a vision for leisure provision over the next 25 years and identify what investment will be required to fulfil that vision. This work will need to be comm issioned externally due to the lack of capacity internally and therefore a working budget of up to £50,000 is suggested although it is hoped the final sum should be less. A second initiative is to continue to support the Council’s excellent work on bringin g empty homes back into use. Indeed the Council is rewarded through the final NHB allocations for any empty homes brought back into use. Equally, the Council could be penalised if the number of empty homes increases. The contract of the Council’s Empty Homes Officer comes to an end on the 31 st March 2012 and any extension will require approving by Vacancy management group. There is money available to continue with this work but on a part time basis and an additional £25K is required for to allow a graduate trainee to be employed for 12 months to assist the EH Officer. The EH Officer works 3 days on empty homes and 2 days for Arun Housing Services on strategy issues but has been seconded to Asset Management issues for over 6 months. The additional resource would allow outstanding essential work on empty homes to be moved forward. This leaves the bulk of the 2011-12 allocation (at least 303k) too be used for delivery key major regeneration infrastructure in Arun. In the ‘State of the District’ debate in November 2010 it was resolved to support key infrastructure projects in Arun. The most immediate priorities are contributing to the enhancement of the core scheme design for the East Bank Tidal Defence Regeneration project for Littlehampton led by the Environment Agency and/or to facilitate the use of Oldlands Farm as a Business Park at Bognor Regis. It is therefore recommended that this sum be held in reserve to support either or both these two projects dependant upon their respective delivery timescales and the availability of partnership contributions from other stakeholders etc. Finally, it should be noted that some of the NHB should be passported to the South Downs National Park Authority for new units created within the park boundaries. The actual numbers involved are likely to be very small. Whilst the National Park did not officially take on its powers until the 1 st April 2011 it would be in the spirit of the grant to passport on the relevant proportion to the SDNPA. However, the data that is used to calculate the grant is based on Council tax records for October 2009 to October 2010. Unfortunately, it is not yet possible to identify from these records the cumulative change in the Arun part of the SDNP. Consequently to undertake the necessary calcul ations it will be necessary to use the Annual Monitoring Report prepared by Planning. However, this data is compiled on a financial year basis. Consequently, the data is currently only available to April 2010. Therefore it is suggested that any payment to the SDNPA for 2011-12 be delayed until April 2012 and taken out of next year’s allocation. 3. OPTIONS: 3.1) Agree the proposed allocations 3.2) Instruct officers to prepare an alternative set of allocations . 4. CONSULTATION: Page 16 of 124
Arun District Council CABINET-31/05/2011 ITEM 8
Has consultation been undertaken with: YES NO Relevant Town/Parish Council x Relevant District Ward Councillors x Other groups/persons (please specify) 5. ARE THERE ANY IMPLICATIONS IN RELATION TO YES NO THE FOLLOWING COUNCIL POLICIES: (Explain in more detail at 6 below) Financial x Legal x Human Rights/Equality Impact Assessment Recommendations x (i), (ii), (iii) and (v) do not require an EIA. Items (iv) and (vi) will need to be subject to an EIA as the likely content and detail is established.
Community Safety including Section 17 of Crime & Disorder Act x Sustainability x Asset Management/Property/Land x Technology x Other (please explain) x Human Resources 6. IMPLICATIONS: 6.1) Financial : Under the CLG proposals the NHB will be a major source of ongoing funding for the Council.
7. REASON FOR THE DECISION: 7.1) To allocate the New Homes Bonus allocation for 2011-12 based on what are considered to be immediate needs.
8. BACKGROUND PAPERS: Department of Communities & Local Government: Equality Impact Assessment on the Consultation Document. Arun District Council’s Empty Homes Strategy.
Page 17 of 124
Arun District Council CABINET-31/05/2011 ITEM 8
Page 18 of 124
Arun District Council CABINET-31/05/2011 ITEM 9
AGENDA ITEM NO.
ARUN DISTRICT COUNCIL
REPORT TO AND DECISION OF CABINET ON 31 MAY 2011
REPORT SUBJECT : Arun Developer and Partner Charter Plus
REPORT AUTHOR: Andy Elder DATE: 3 May 2011 EXTN: 37714
EXECUTIVE SUMMARY :
This report seeks Cabinet support for the adoption of the Arun Developer and Partner Charter Plus.
This new initiative builds on the original objectives of the Bognor Regis Developer and Partner Charter, but will now be augmented with the dual ambitions of creating new training and apprenticeship opportunities, primarily for young people, and improving the environmental sustainability of housing and regeneration projects on Council owned land.
RECOMMENDATIONS
It is RECOMMENDED that the Cabinet approve the new Arun Developer and Partner Charter Plus.
1. BACKGROUND: 1.1 On 9 June 2009 Arun District Council announced the launch of the Bognor Regis Developer and Partner Charter at the Butlins Shoreline Conference Centre. The Charter was adopted as an ‘in spirit’ agreement between developers, education, skills and training providers and local businesses to explore and support opportunities arising from the exciting and extensive developments in Bognor Regis.
1.2 It was introduced to derive additional benefits and ‘multiple dividends’ from the physical regeneration of Bognor Regis. The benefits from the Charter so far have been achieved through the commitment of individual developers, and existing businesses and regeneration partners in the Town, prior to the significant benefits which will emanate from the schemes themselves once the various projects are completed.
1.3 The original Bognor Regis Developer and Partner Charter was set around five main objectives;
• Raising average weekly wages in the area, which are currently lower than the County and Regional average; • Raising educational attainment and skill levels, which are currently lower than the County and Regional average; • Improving the competitiveness and sustainability of the diverse range of small businesses in the area which make up over 80% of our business community; • Exciting residents, visitors and potential investors with the intentions, plans, progress and outcomes of developments; • Promoting good if not best practice in safe, secure and considerate working practices. Page 19 of 124
Arun District Council CABINET-31/05/2011 ITEM 9
1.4 The creation of the Bognor Regis Developer & Partner Charter is one of the Council’s priorities (2009 - 2013) “working with major developers and educational and skills partners to see physical regeneration projects bringing about social regeneration”, this priority has been achieved and since its launch over 30 organisations have signed the Developer and Partner Charter signalling their commitment to the regeneration of Bognor Regis.
1.5 However, following the introduction of the Council’s new housing strategy, Raise the Roof, with its focus on economic growth, it is now felt to be an opportune and appropriate time to build on the principles of the existing Bognor Regis Developer and Partner Charter and extend the initiative, with some significant additional elements, to the rest of the Arun district creating a new Arun Developer and Partner Charter Plus (the ‘Charter Plus’).
1.6 Charter Plus is designed to help stimulate and generate economic growth and reduce carbon emissions from new residential housing developments in the Arun district. Charter Plus will be promoted by all Service Managers in the Council, but the primary responsibility for implementing and monitoring it will be with the Planning and Housing Strategy team.
1.7 Charter Plus specifically supports the following wider priorities of the Council;