’ First Five Level Facts

• Dallas High Five is located at I-635 and U.S. 75. • Work on Dallas High Five will begin in January of 2002. • Dallas High Five construction is expected to last 5 years. • Dallas High Five will allow for 8 lanes of travel on U.S. 75. • Dallas High Five will have 10 lanes of travel and 4 Dedicated Barrier-Separated HOV Lanes on I-635. • Dallas High Five offers the unique quality of connecting access roads underneath We call it the Dallas High Five the large connector ramps. Top 5 Reasons for the New I-635 and • Dallas High Five design is compatible with future I-635 improvements. U.S. 75 Dallas High Five Interchange • Dallas High Five design includes a Reversible HOV Direct Connection Ramp 1 • Improved mobility and safety from eastbound I-635 to northbound U.S. 75. 2 • Improved air quality • Dallas High Five will carry well over 1/2 million vehicles per day. 3 • Improved local access • Dallas High Five will reduce overall emissions by allowing more continuous travel •4 Increased capacity at higher speeds. •5 Flexibility to meet future traffic needs • Dallas High Five will include improved hike and bike trails.

Spring Valley Road Proposed Map Legend (Jan. 2007)

Northbound Central Expressway U.S. 75 Midpark Ro Southbound Central Expressway U.S. 75 ad Eastbound LBJ Freeway I-635 Westbound LBJ Freeway I-635 Reversible HOV Lane 2-Way HOV Lanes N Frontage roads / connecting streets U.S. 75

TI Boulevard Coit Road Coit

Bike trail et tre I-635 Valley View Lane t S lnu Restland Road Wa

Bike trail Merit Drive

e riv D Bann er Churchill Hillcrest Road Hillcrest W ay I Boulevard

Churchill Way Extension T

k

e

e

r Estimated completion

e C

k by 2005 v

k

i

e

c r

e

o r

D

R C l

e d

a DART LBJ North Central Station t

i oad o

r h t o Estimated completion

n w W n

e Summer 2002 o t

t C o Coit R ch e k C n u r ra B n a d loy e P F v A le il v n e e r G Forest Lane

DART Forest Lane Station Estimated completion Summer 2002

For additional information contact: Dallas

Taking LBJ/Central to New Heights 4777 East Highway 80 • Mesquite, Texas 75150 www.DallasHighFive.org 214-320-6100 • Fax 214-320-6117 Dallas

Taking LBJ/Central to New Heights www.DallasHighFive.org

High Five Interchange Model

North Central Expressway Main Lanes: 8 lanes of travel on U.S. 75, Levels on the Interchange: 10 lanes of travel and 4 Dedicated Barrier- Level one: Separated HOV lanes on I-635. • Existing: Eastbound I-635 • Future: Northbound and Southbound U.S. 75 Frontage Roads: Typically 3 lanes with curbs Level two: on all frontage roads continuous east-west • Existing: Northbound and Southbound U.S. 75 • Future: “Box” and north-south through the interchange. Level three: • Existing: Westbound I-635 High Occupancy Vehicle (HOV) Lanes: • Future: Eastbound and Westbound I-635 Dedicated Barrier-Separated HOV Lanes on Level four: I-635, with Reversible HOV Direct Connection • Existing: None Ramp to/from I-635 west and U.S. 75 north. • Future: Direct Connection Ramps Level five: Coit Road: Will be reconstructed to have • Existing: None LBJ Freeway • Future: Direct Connection Ramps and 3 lanes plus 2 left-turn lanes in both direc- Reversible HOV Lane tions. The new bridge will also include “Texas U-turns.” NOTE: The highest ramp will be 90 feet higher than the depressed lanes on U.S. 75 than the depressed lanes on U.S. 75 “Texas U-turns”: Will also be added at Midpark Road, TI Access Bridge, Park Central Drive, Hillcrest Road and Greenville Avenue. N Cottonwood Creek: A new bike path cross- ing will be constructed along Cottonwood Creek to connect to the existing bike trail network.

Interchange Model: To view the scale model of the Interchange, call TxDOT’s main office at 214-320-6100 to verify location.

Model elements for roadways are scaled twice as tall to be more visible.

Work will be completed in three construction phases

Phase I Phase II • TI Boulevard reconstruction • I-635 Main Lanes and HOV Lanes • Hillcrest Road and Park Central Drive U-turns • Frontage Road “Box” along U.S. 75 • Coit Road Bridge • HOV T-Connection Ramps at TI Boulevard • U.S. 75 and I-635 Frontage Roads • Direct Connection Ramps between freeways Phase III • Midpark Road and TI Access Bridges • U.S. 75 Main Lanes • HOV Wishbone Ramps on U.S. 75 • Frontage Road “Box” along I-635 • Greenville Avenue U-turn • Reversible HOV Direct Connection Ramp

July 2001