Shri Narendra Modi Hon’ble Prime Minister NEW RAILWAYS New Jharkhan A progressive journey since 2014 Parliamentary Constituency PREFACE

Indian Railways is the lifeline of the Nation and a catalyst for ’s progress and economic development. It plays a significant role in the socio-economic development of every region of the country including the state of . With a view to improve railway infrastructure and to extend the railway network in Jharkhand, Railway Division was formed in the year 2003. The Government of Jharkhand always extends necessary support and cooperation to towards development of the state and improvement of services for the people.

Godda

Shivpur

Sanki

Tatisilwai

Map not to scale

In a mission mode, railways have achieved many visible milestones in Jharkhand in the last seven years in different fields i.e. construction of new lines, doubling, development of stations etc. On the freight side, loading has reached a new milestone where the potentiality of the state enriched with minerals played the lead role. The changing face of transport sector in Jharkhand and the expectations of its people are being fulfilled with topmost priority. In the wake of COVID-19 pandemic, Indian Railways is playing a significant role by taking various measures to combat the situation. With a view to contain the spread of Novel Coronavirus, Indian Railways is producing PPE Kits, Reusable Face Masks, Hand Sanitizer etc. In addition, coaches have been converted to COVID Care Centres. Some of the recent achievements of railways and ongoing projects parliamentary constituency-wise in the state of Jharkhand are being highlighted in this Pamphlet. It may be noted that the budget allocated to various projects is not apportioned state wise but ref lects the cost of the project. INPUTS BY RAILWAY IN GIRIDIH CONSTITUENCY GIRIDIH PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS : Giridih, Baghmara, , Dumri, & B. WORKS COMPLETED IN LAST SEVEN YEARS: B.1 Infrastructural Developments: u Extension of pit from 10 to 16 coach length at NSCB at a cost of Rs.2.20 crores u Provision of 50,000 gallons RCC over head tank deep tube weel for platform, station water supply at Gomoh at a cost of Rs. 0.55 crores u Provision of dedicated water tank with deep tubewell for carriage watering at Gomoh at a cost of Rs.1.06 crores u Electrification of Dughda siding at at a cost of Rs.10.86 crores u Provision of washable appron on Up Main Line at Gomoh Station at a cost of Rs.1 . 3 8 crores u Provision of washable appron for platform No.2 at Gomoh at a cost of Rs.1.85 u A d d itional new Foot Over Bridge from north side circulating area to platform No.1 and 2 at NSCB Gomoh at a cost of Rs.2.02 crores u Raising of platform No.1,2 & 3 as high level at Chandrapura at a cost of Rs.1.05 crores u Doubling from Chandrapura to Rajabera at a cost of Rs. 64.44 crore. u New line from to Kawar 53 Km. commissioned on 08.08.15 (of Koderma to Giridih new line) u Total Electrification : 4.757 TKM u Important Electrification Commissioned : (a) shunting neck towards west end (b) Mahuda washery line and L/No- 6,7,8 GC, (c) Khanudih Extension of L. No.-6 (d) Munidih washery post loading line NO. 1&2-0.395 TKM (e) Mahuda L/No - 4 & 5-0.459 TKM (f) Khanudih Shunting neck towards Gomoh end---0.913 TKM u Limited Height Subways constructed : 7 (BG-34, BG-36, BG-12, BG-17, BG-14, BG-15, BG-35) u 2nd line commissioned from Chandrapura to Rajabera (4 Km) u 2nd line commissioned from Chandrapura to Bhandaridah (6.64 Km) u 2nd line commissioned from Jarangdih to Thermal (5.72 Km) u 2nd line commissioned from Gomia to Dumri Bihar (6.85 Km) u Commissioning of One Road Over Bridge between Matari - Gomoh in place of(1). LC no. 9/Spl/T in GC (2). 9/B Gomoh-Telo & (3) A12/B Gomoh-Khanodih u 105 kWp Roof top solar plants have been provided at Gomoh. u Electrification of 168.73 TKM Commissioned in Giridih including Rema Giridih-Maheshmunda (Excl.) of 59.051 TKM. u CCTV has been installed at Gomoh, and Chandrapura for under Nirbhaya Fund u 2 nos. of Goods Sheds have been commissioned. u 2 nos. of Stations have been commissioned.

B. 2 Passenger Amenities u Provision of CCTV cameras for surveillance and monitoring for loading and unloading in the sidings of KKC Main and KKC Link between Mohuda-Khanoodih stations in Gomoh Section at a cost of Rs.0.019 crores u Provision of full electrification of Upshunting neck towards Khanudih end of Mohuda station u Extension of platform at Mohuda station at a cost of Rs.0.45 crores u Raising of platform at Mohuda station at a cost of Rs.0.30 crores u Platform surface provided at Mohuda station at a cost of Rs.0.15 crores u Token less block working system between -Bhowra-Mahalboni- Bhaga- Layabad-Malkhera-Jamuniatand-Chandrapura stations at a cost of Rs.3.16 crores u Raising of platform -2 at Mahuda, Tata Halt u Extension of platform -5 Stations : Mahuda-2, Tata Sijua Halt -1, Layabad-1, -1, Kharkhari-1) u Platform Surface Improvement-3 stations : Mahuda, Malkera, Tata Sijua Halt u Foot Over Bridge - 2 Nos.: Mahuda, Khanudih u Divyangjan Toilet- 4 Stns. : Layabad, Malkera, Mahuda, Khanudih) u Station Facade- 1 No. : Mahuda u Soft Upgradation -1 : Mahuda u Mahuda station connected with DVC 33KV Power supply. u Foot Over Bridge at NSC Bose Gomoh from North side to platform no.1&2. u Foot Over Bridge at Bermo, Kanwar, Danea, Dumri Bihar and Jarangdih station, u Pay & Use toilet ( In circulating area near PF no.5) at Parasnath & at Chandrapura. u Divyang toilet at NSC Bose Gomoh PF no.1&2 and PF no.1 u Extension of PF no.1&2 at NSC Bose Gomoh u Extension of PF at Telo, Bermo, Keshwari. u Raising of PF No.2&3 at Chandrapura, raising of PF No.1&2 at Tetulmari, raising of PF no.2 at Gomia, raising PF at Sonardih, Chaube, Dumri Bihar and Gomia. u Lean-to-shed at Danea-18 nos., Dumri Bihar-10 nos.and Gomia-4 nos. u 2 bay Platform shed at Platform no.1 at Chandrapura. u 3 one bay Platform shed at Platform No.1&2, 3 one bay Platform shed at Platform No.3&4 and one 1 bay Platform shed at Platform No.5&6 at Gomoh u Platform shed at Dumri Bihar, Danea and Gomia. u Improvement of circulating area at Chandrapura. u Improvement of station to the standered of Adarsh station u Provision of full length coach watering facility at PF line No.1 and 4/5 at Gomoh u 96 nos. and 80 nos. of Mobile charging points with tray provided at Gomoh and Parasnath respectively. u Wi-Fi facility has been provided at 16 stations (Tetulmari, Nimighat, Gomoh, Parasnath, Telo, Chandrapura, Phulwaritarn, Bokaro, Phusro, Bhandaridah, Jarangdih, Gomia, Bermo, Dumbri . Bihar, Danea and Jogeswar Bihar)

C. ON GOING WORKS: u Anara-Purulia, Purulia-Chandil and Bhaga-Mohuda complete track renewal at a cost of Rs.16.22 crores u Renewal of switch expansion joint 60K G 100 Nos.at a cost of Rs.4.80crores u Through sleeper renewal primary- 27 .879track kilometer at a cost of Rs.26.18 crores u Development of high level passenger amenities at Bhojudih station and provision of Foot Over Bridge at Anara station at a cost of Rs.5.79 crores u Replacement of existing Old Foot Over Bridge at Chandil, Mohuda and some other stations at a total cost of Rs.8.22 crores u Provision of Foot Over Bridge at Sanka and Khanudih, Booking Office - cum - Waiting Hall, Circulating Area at Khanudih and some other places at a total cost of Rs.19.31 crores. u Extension of platforms at 30 different stations at a cost of Rs. 4.75 crores u Provision of facilities for Divyang at various stations at a cost of Rs.0.35 crores u Doubling from Jarangdih to Danea at cost of Rs. 331.96 crore. u Doubling from Danea to Ranchi Road at cost of Rs.323.88 crores. u Provision of Chequered tiles, Roofing sheet & other allied works at approach of Mohuda Foot Over Bridge u Provision of Foot Over Bridge (3.60 mtr wide) at Matari station. u Gomoh- Extension of Foot Over Bridge from PF No.1&2 to PF No.- 5&6 with landing to Platform No.- 3,4 & Platform No. 5,6 at Gomoh u Parasnath :- Provision of 2nd Foot Over Bridge of 6.00M wide at Parasnath station. u Phulwartanr- Provision of 3.0 M wide Foot Over Bridge & extension of Platform No. 1&2 upto 350 metre at Phulwartanr u Gomoh- Improvement of both side circulating area, provision of wt. hall with booking counter & extn. of FOB from Platform No.5&6 to south side circulating area. u Phulwartanr:- Improvement of circulating area at South side of Phulwartanr station u Provision of Lifts 2 Nos. at Gomo stations. u Modification in Low Tension over-head transmission line by replacing ACSR conductors with aerial bunched cables (1 km) at Gomoh. u Augmentation of lighting at Goods Sheds, having round the clock working at Gomoh. u Provision of Lifts 2 Nos. at Parasnath stations. u Augmentation of lighting at Goods Sheds, having round the clock working at Katrasgarh, Dugdha and Bermo.

SOME IMPORTANT PHOTOS