Bharat Coking Coal Limited
Total Page:16
File Type:pdf, Size:1020Kb
STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government. BHARAT COKING COAL LIMITED FORM-1 (As per EIA Notification, 2006) for PROPOSED BHOJUDIH NLW COAL WASHERY (3-Products) (2.0 MTPA) Bharat Coking Coal Limited (April, 2013) Prepared by Regional Institute – II Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Koylanagar, Dhanbad – 826005 FORM-I (I) Basic Information S.No. Item Details 1 Name of the Project Bhojudih NLW Coal Washery (2.0 MTPA) 2 S. No. of the schedule 2(a) 3 Proposed capacity/area/length/tonnage Capacity-2.0 MTPA, to be handled/command area/lease Command area-15 ha, BCCL Lease area area/number of wells to be drilled 4 New/Expansion/Modernization New (Adjoining Existing Washery) 5 Existing capacity/Area etc. Not Applicable 6 Category of Projects i.e., „A‟ or „B‟ A 7 Does it attract the general condition? If Yes, Jharkhand-W.B. inter-state boundary yes, please specify. is 2.0 Km -N from the proposed Bhojudih Coal Washery. 8 Does it attract the specific condition? If No yes, please specify. 9 Location Latitudes 230 37‟ 3” N Longitudes 860‟ 28‟ 56 E Plot/Survey/Khasra No. Plot No.- 1 [1/1000] , Khata No.-478 Village Santhaldih Tehsil Santhaldih District Purulia State West Bangal 10 Nearest railway station/airport along Railway station- Santhaldih 03 km approx with distance in kms. Airport –Kolkata 300 km 11 Nearest Town, city, District Nearest town- Raghunathpur- 30 Km Appx. Headquarters along with distance in Purulia- 50 Km Approx. kms. Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 1 S.No. Item Details 12 Village Panchayats, Zilla Parishad, Chelyama Gram Panchayat Municipal Corporation, Local body Vill. & Post- Chelyama, Dist.- Purulia (complete postal addresses with W.B.-723146 telephone nos. to be given) Phone No.-03251-262214 13 Name of the applicant Sri R. P. Yadav 14 Registered Address Bhojudih Coal Washery, PO- Santhaldih 15 Address for correspondence: Name Sri R. P. Yadav Designation (Owner/Partner/CEO) Project Officer ,Bhojudih Coal Washery Address P.O.- Santhaldih Pin Code 723145 E-mail Not Available Telephone No. +91-9470597835 Fax No. 0326-2230201 16 Details of Alternative Sites examined, if No, The Land for the proposed washery site any. Location of these sites should be is under possession of BCCL. shown on a topo sheet. 17 Interlinked Projects None 18 Whether separate application of Not required interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to NIL be given. (a) The Forest (Conservation) Act, 1980? Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 2 S.No. Item Details (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order/Policy relevant/relating to the NIL site? 23 Forest land involved (hectares) NIL 24 Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court NIL (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 3 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data Permanent or temporary Temporary change in the land use due to change in land use, land construction of the washery. cover or topography 15 Ha of total land is under BCCL lease 1.1 including increase in Yes hold. intensity of land use (with respect to local land use plan) Clearance of existing land, Land: Total land required is in possession vegetation and buildings? with BCCL. 1.2 Yes Vegetation : There is no vegetation In the proposed area Habitation : Nil Creation of new land Proposed washery construction and 1.3 uses? Yes infrastructure development will change the present land use. Pre-construction Bore holes will be drilled for indicative soil investigations e.g. bore investigation. 1.4 Yes houses, soil testing? Detailed soil investigation will be done at the time of detailed design. 1.5 Construction works? Yes Construction of raw coal receiving Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 4 Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data arrangement, washery building, clean coal dispatch arrangement, service buildings, roads and culverts is proposed. 1.6 Demolition works? No Not Applicable Temporary sites used for Temporary site for construction activity will construction works or be maintained by BOM operator within the 1.7 housing of construction Yes washery site. The housing needs will be workers? arranged by BOM operator in the vicinity of the site. Above ground buildings, Construction of semi-underground raw structures or earthworks coal receiving arrangement with including linear structures, underground conveyor tunnel, washery 1.8 Yes cut and fill or excavations building, clean coal dispatch arrangement, service buildings, roads and culverts is proposed. Underground works Only minor in nature, like underground 1.9 including mining or Yes conveyor tunnel as envisaged in the tunneling? report. Reclamation including dismantling of 1.10 Reclamation works? Yes unused infrastructure at the end of washery life. 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not applicable. Production and Wet processing of coal beneficiation with 1.13 Yes manufacturing processes? closed water circuit system. Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 5 Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data The proposed washery will receive (-) 200 mm crushed raw coal @ 2.0 MTPA by rail from North/South Tisra OCP of BCCL. The washed coal is proposed to be Facilities for storage of transported by conveyor belt to adjoining 1.14 Yes goods or materials? Railway Siding and Wagon loading of washed coal is proposed through fast loading system (3600 TPH) consisting of hopper & surge bunker. The washery is expected to generate about 0.392 Mt of rejects per annum. The rejects will be dispatched to the consumers through railway. The wet processing of coal in the proposed Facilities for treatment or washery is based on closed water circuit 1.15 disposal of solid waste or Yes system. The water fed into the system will liquid effluents? be collected after use and re-circulated and no effluent will be allowed to escape into the natural drainage system. No domestic effluent is expected to be generated as no residential colony is proposed to be constructed in core zone. Facilities for long term The residential and welfare facilities for 1.16 housing of operational Yes BCCL personnel will be shared with the workers? project facilities of existing Bhojudih Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 6 Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data washery. However, for the manpower of BOM operator, separate arrangement will be made by operator. Existing road will be utilized after suitable widening and strengthening. In house New road, rail or sea roads will be constructed for internal 1.17 traffic during construction Yes traffic. Existing Railway siding will be or operation? suitably augmented/modified to cater receipt of raw coal and dispatch of product i.e. washed coal, middling & reject. New road, rail, air As above. waterborne or other No alteration of existing routes is transport infrastructure proposed. 1.18 No including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or Not applicable. 1.19 infrastructure leading to No changes in traffic movements? The substation of the existing washery is New or diverted about 2.5 km from the proposed washery. 1.20 transmission lines or Yes The power shall be drawn from sub- pipelines? station of the existing washery either through cable or overhead transmission Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 7 Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data line (OHTL). New pipe line from Damodar river to proposed project site. Impoundment, damming, culverting, realignment or Not applicable. 1.21 other changes to the No hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable. The water requirement of approx. 0.30 MGD is proposed to be made from Abstraction or transfers of No adjacent Damodar river. The requirement 1.23 water form ground or includes loss of moistures with products, surface waters? dust suppression and evaporation losses etc. Changes in water bodies or the land surface 1.24 No Not applicable. affecting drainage or run- off? Transport of personnel or Transport of material for construction, materials for construction, operation will be done through 1.25 Yes operation or tippers/trucks by road. Personnel will use decommissioning? their individual transport facility. Form-1_Proposed Bhojudih Coal Washery (2.0 MTPA) _BCCL Page 8 Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data The closure activities form an integral part of mine and washery plan.