History of LIMCOM History of LIMCOM

Total Page:16

File Type:pdf, Size:1020Kb

History of LIMCOM History of LIMCOM About Tutorial Glossary Documents Images Maps Google Earth Please provide feedback! Click for details You are here: Home>Governance>Water Governance in the Limpopo Basin >History of LIMCOM History of LIMCOM Cooperation between the Limpopo River basin states can be traced back to a number of regional initiatives, agreements and institutions which help to promote a cooperative spirit within the basin. These include: Tripartite Permanent Technical Committee (TPTC) one of the first attempts at a regional water agreement. It was established in 1983 when Mozambique, South Africa and Swaziland formalised it with the goal of making recommendations on the management of the water shortages being experienced in the Limpopo,Incomati and Maputo Rivers at that time (Van der Zaag and Savenije 1999). Limpopo Basin Permanent Technical Committee(LBPTC) between Botswana, Mozambique, South Africa and Zimbabwe was established in 1986 ( SADC 2003a). Joint Permanent Technical Commission (JPTC) between Botswana and South Africa on the Limpopo, Molopo and Nossob Rivers was formalised in 1987 ( SADC 2003a). One of the key outputs of the JPTC was the Joint Upper Limpopo Basin Study (JULBS),which was made to investigate a range of issues including evaluate the most successful and cost effective way of exploiting and regulating the main stream (Amaral and Rubik 2004). Joint Permanent Commission for Co- operation (JPCC) was a joint agreement between Botswana and South Africa was established in 1997 to deal with a variety of issues, including the transfer of water from the Molatedi Dam on the Marico River (SADC 2003a). In 1986, the “Agreement on the Limpopo Basin Permanent Technical Committee” was signed by representatives from Botswana, Mozambique, South Africa and Zimbabwe (UN- HABITAT/ UNEP 2007). This agreement provided the legal framework for the Limpopo Basin Permanent Technical Committee (LBPTC). The mandate of the LBPTC was to advise the parties on transboundary issues related to the management and utilisation of the Limpopo (SADC 2003a). The LBPTC addressed issues, such as (UN- HABITAT/ UNEP 2007): Division of flows Aspects related to droughts Floods and pollution Programmes and activities that jointly benefit all the riparians The organisation became dormant in the mid-1990s, but was reactivated following political changes in South Africa in 1995. The LBPTC helped to ensure that dialogue and negotiation occurred between the riparian countries leading to the establishment of the Limpopo Watercourse Commission (LIMCOM). In 2005, the LBPTC produced a LIMCOM Action Plan in conjunction with the SADC WaterSector Unit (Amaral and Summerhalder 2004). In 2010, the LBPTC conducted a comprehensive Joint Limpopo Basin Study. Phalaborwa Barrage, South Africa. Source: Mac 2008 ( click to enlarge ) Next: LIMCOM Agreement .
Recommended publications
  • Groundwater Recharge Assessment in the Upper Limpopo River Basin: a Case Study in Ramotswa Dolomitic Aquifer
    Groundwater Recharge Assessment in the Upper Limpopo River Basin: A Case Study in Ramotswa Dolomitic Aquifer Submitted to the Faculty of Science, University of the Witwatersrand, Johannesburg, In partial fulfilment of the requirements for the degree of Master of Science in Hydrogeology Submitted by: Simamkele Siyambonga Baqa Student number: 1098513 Supervisors: Dr. Karen Villholth (IWMI) Prof. Tamiru Abiye (Wits) July 2017 in Johannesburg Groundwater Recharge Assessment in the upper Limpopo River Basin: A case study in Ramotswa Dolomitic Aquifer Declaration I Simamkele Siyambonga Baqa declare that Groundwater Recharge Assessment in the upper Limpopo River Basin with a case study in Ramotswa Dolomitic Aquifer is my own investigation and covers no section copied in whole or in part from any source unless it is clearly acknowledged in quotation marks and with detailed, complete and precise referencing. Further, the report has not been submitted before for any degree or examination at any university. …………………………………….. (Signature) ………………… (Date) I Abstract Hydrogeological research was undertaken in the transboundary Ramotswa dolomitic aquifer to provide understanding and quantification of the processes governing recharge mechanism and rates, in order to promote efficient and sustainable groundwater resource utilization and development, as well as to improve the Ramotswa transboundary aquifer management. Hydrochemical and tracer approaches were utilized to evaluate the processes governing the recharge mechanism while the chloride mass balance approach was further applied to assess groundwater recharge rates. Results indicated that all groundwater samples contained detectable amounts of tritium highlighting the renewability of the transboundary Ramotswa aquifer resources. Two distinct water types were characterised: sub-modern waters approximately recharge prior to the 1950s and a mixture of modern and sub-modern waters of recently recharge rainfall indicative of active recharge in the area through intensive rainfall.
    [Show full text]
  • River Health Programme in the North West Province
    RIVER HEALTH PROGRAMME IN THE NORTH WEST PROVINCE What is the River Health Programme? ‚ It is a national programme co-ordinated by DWAF, DEAT, WRC designed to monitor the condition of rivers in South Africa using standardised bio- monitoring techniques. What is biomonitoring? ‚ Use of living organisms as biological indicators of ecosystem or environmental “health”. ‚ Animals and plants provide a long-term integrated reflection of water quality and quantity, habitat quality and other environmental conditions What is being monitored in the River Health Programme? Indices of Ecosystem health ‚ Fish (Fish Community Integrity Index) ‚ Aquatic Invertebrates (South African Scoring System SASS4) ‚ Aquatic Habitats (Integrated Habitat Assessment System IHAS) ‚ Plants (Riparian Vegetation Index RVI) ‚ Water flow (Hydrological Index) ‚ Water quality (Dissolved Oxygen, pH, Conductivity, Temperature) ‚ River channel condition (Geomorphological Index) Advantages of biomonitoring ‚ Detects changes in water quality e.g pollution from mining, industry and agriculture ‚ Detects effects of changes in water flow e.g dams, bridges and forestry ‚ Standardized method of comparison of water quality ‚ Easy to use practical means of assessing water quality ‚ Relatively cheap and quick ‚ Can detect water quality changes which may be missed by chemical sampling ‚ Non-destructive - animals returned live to water. Disadvantages to biomonitoring ‚ A fair amount of training is required ‚ Can be open to subjective interpretation ‚ Does not provide an exact figures of water quality parameters ‚ Cannot pinpoint the exact cause of water quality problems ‚ Has no legal standing North West Rivers identified for River Health Programme ‚ Groot Marico River ‚ Hex River near Rustenburg ‚ Elands River near Rustenburg ‚ Crocodile River downstream of Hartebeespoort Dam ‚ Mooi River near Potchefstroom ‚ Schoonspruit near Ventersdorp to Orkney ‚ Harts River from Lichtenburg to Spitzkop Dam ‚ the section of the Vaal River forming the boundary between the Free State and the North West.
    [Show full text]
  • RESILIENCE in the LIMPOPO BASIN (RESILIM) PROGRAM Final Report
    RESILIENCE IN THE LIMPOPO BASIN (RESILIM) PROGRAM Final Report October 1, 2017 This publication was produced for review by the United States Agency for International Development. It was prepared by Chemonics International Inc. The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States government. RESILIENCE IN THE LIMPOPO BASIN (RESILIM) PROGRAM Final Report October 1, 2107 Contract No. AID-674-C-12-00006 Cover photo: Across the Limpopo River Basin, the livelihoods of people such as this fisherman in Mozambique depend on effective transboundary management of natural resources, including water and biodiversity, as well as future climate impacts. Credit: Climate Investment Funds Action, 2014. CONTENTS Acronyms .............................................................................................................................................. i Executive Summary............................................................................................................................ ii 1. Project Context .............................................................................................................................. 1 Climate and Weather ................................................................................................................................... 1 Water Demand .............................................................................................................................................
    [Show full text]
  • Bakwena Contributes to Significant Storm Water Upgrades in Zeerust
    Bakwena contributes to significant storm water upgrades in Zeerust During heavy rains in January 2011, the Klein Marico River flooded and washed away part of the bridge linking Ikageleng Township and Zeerust in the North West Province. This highlighted an issue that the town has struggled with for some time. During heavy downpours, the main road of Zeerust in the Ramotshere Moiloa Local Municipality has been subject to frequent flooding due to aging and inadequate storm water drainage. Bakwena Platinum Corridor Concessionaire, operator of the N1N4 toll route, is contributing to the upgrade of the storm water drainage system in the main street of this Northwest town and the connection of the storm water system to the river. SANRAL which is responsible for the R49 route is also contributing to upgrade the stormwater system. Construction on the R15-million storm water upgrades started in March 2015 and will be complete in February 2017. It involves augmenting the storm water system, the reconstruction of kerb inlet structures and resurfacing the main road. V&V Consulting Engineers designed the upgrades, which also include the provision of a secondary system on the R49 that links into a bulk drainage system ensuring effective disposal of water emanating from higher lying areas. Says Jacques van Niekerk of G4 Civils, the construction company appointed by Bakwena to complete the works, “The replacement of the storm water reticulation is particularly challenging since the original plans are out of date. We found that the existing infrastructure was not installed according to good engineering practice and some of the storm water systems were not connected to the larger system.
    [Show full text]
  • Glimpopo Fact Sheet
    Fact Sheet 1 The Limpopo River flows over a total distance of The Limpopo basin covers almost 14 percent of the total 1,750 kilometres. It starts at the confluence of the Marico area of its four riparian states – Botswana, South Africa, and Crocodile rivers in South Africa and flows northwest Zimbabwe and Mozambique. And of the basin’s total area, of Pretoria. It is joined by the Notwane river flowing from 44 percent is occupied by South Africa, 21 percent by Botswana, and then forms the border between Botswana Mozambique, almost 20 percent by Botswana and 16 per- and South Africa, and flows in a north easterly direction. cent by Zimbabwe. At the confluence of the Shashe river, which flows in from Zimbabwe and Botswana, the Limpopo turns almost due Drainage Network The Limpopo river has a rela- east and forms the border between Zimbabwe and South tively dense network of more than 20 tributary streams and Africa before entering Mozambique at Pafuri. For the next rivers, though most of these tributaries have either season- 561 km the river flows entirely within Mozambique and al or episodic flows. In historical times, the Limpopo river enters the Indian Ocean about 60 km downstream of the was a strong-flowing perennial river but is now regarded town of Xai-Xai. as a weak perennial river where flows frequently cease. During drought periods, no surface water is present over The Basin The Limpopo river basin is almost circular large stretches of the middle and lower reaches of the in shape with a mean altitude of 840 m above sea level.
    [Show full text]
  • An Assessment of the Reproductive Biology of the Marico Barb Barbus Motebensis (Steindachner 1894) from the Upper Groot Marico Catchment
    COPYRIGHT AND CITATION CONSIDERATIONS FOR THIS THESIS/ DISSERTATION o Attribution — You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use. o NonCommercial — You may not use the material for commercial purposes. o ShareAlike — If you remix, transform, or build upon the material, you must distribute your contributions under the same license as the original. How to cite this thesis Surname, Initial(s). (2012) Title of the thesis or dissertation. PhD. (Chemistry)/ M.Sc. (Physics)/ M.A. (Philosophy)/M.Com. (Finance) etc. [Unpublished]: University of Johannesburg. Retrieved from: https://ujdigispace.uj.ac.za (Accessed: Date). An assessment of the reproductive biology of the Marico barb Barbus motebensis (Steindachner 1894) from the upper Groot Marico catchment MINOR DISSERTATION By DALE HERMAN KINDLER submitted in the partial fulfilment of the requirements for the degree MAGISTER SCIENTIAE in AQUATIC HEALTH in the FACULTY OF SCIENCE at the UNIVERSITY OF JOHANNESBURG Supervisor: Prof. G.M. Wagenaar (UJ) Co-supervisor: Dr. O.L.F. Weyl (SAIAB) 2015 Table of Content Table of Figures ......................................................................................................................... iii List of Tables .............................................................................................................................. v Acknowledgments....................................................................................................................
    [Show full text]
  • Molatedi-Dam-Presentation-Final.Pdf
    TRANSBOUNDARY RELATIONSHIP BETWEEN BOTSWANA AND SOUTH AFRICA OVER MOLATEDI DAM Location Brief Facts on the Molatedi Dam • Catchment Area - 8787 km2 • Surface Area - 3600 ha (full supply level) • Impounds - Marico river • Total Capacity - 203 000 000 cubic meters • Height - 29 m • Earth Fill dam History 1. The Dam was built as part of a collaborative effort between; • Department of Water Affairs of the then Bophuthatswana • Department of water Affairs of the Republic of South Africa • Water Utilities Corporation of Botswana History The Dam was built as an effort to optimally utilise the water resources of the Marico River which borders RSA and Botswana The river flows in an easterly direction for approximately 253 km before joining the Crocodile River to form Limpopo River Applicable Legal Framework 1. Three parties entered into an agreement for the construction, operation, maintenance and supply of water – TSWASA Agreement 1998 2. Agreement revised in 2014 as a result of; • Incorporation of Bophuthatswana into RSA • Revised SADC Protocol on Shared Water courses (August 2000) • Establishment of Joint Permanent Technical Committee between RSA and Botswana Revised Protocol on Shared Watercourses in SADC which makes provision for the coordinated management, protection and utilisation of shared water resources within the region 2008 Agreement between RSA and Botswana on Water Supply Across the Border facilitating authorised water supply across the two counties (incl local authorities and individuals) Limpopo River Basin Agreement establishing LIMCOM Challenges Associated With The Dam 1. Institutional Reforms 2. Climate Change leading to changes in yields and consequently allocations Challenges Associated With The Dam Current allocations done after a study on the hydrology, with Botswana not really being involved in the study leading to protracted negotiations on the allocations.
    [Show full text]
  • Madikwe Hills Private Game Reserve I North-West Province
    MADIKWE HILLS PRIVATE GAME RESERVE I NORTH-WEST PROVINCE www.madikwehills.com AUGUST 2013 Moscow London Frankfurt Paris Milan Rome Doha Dubai BOTSWANA DERDEPOORT GATE ZAMBIA Singapore AFRICA Seychelles TAU VICTORIA GATE FALLS ZIMBABWE Johannesburg Gaberone Marico River MADIKWE HILLS BOTSWANA Kruger MADIKWE National WONDERBOOM Park GATE GAME Timbavati GR TUNINGI GABORONE Sabi Sands GR MOZAMBIQUE RESERVE Madikwe GR Pilanesburg GR Hazyview Sun City PRETORIA White River ABJATERSKOP Johannesburg PILANESBERG GATE MOLATEDI GATE GAME RESERVE Dwarsberg/ Mabeskraal NORTH WEST Molatedi Dam ZEERUST SOUTH AFRICA August 2012 ATLANTIC OCEAN INDIAN SOUTH AFRICA OCEAN George CAPE TOWN Knysna Port Elizabeth BOMA GYM KITCHEN TSALA 1 MAIN DINING RECEPTION & ROOM MAIN OFFICE & BAR CURIO & RANGER OFFICE 2 8 WATERHOLE 5 7 6 3 4 9 10 11 12 LITTLE MADIKWE Traversing over 75 000 hectares, Madikwe Hills Private Game Lodge is situated on a hill, in the heart of the malaria-free Madikwe Game Reserve. Ingeniously set amongst boulders and age-old Tamboti trees, the lodge offers visitors the utmost in luxury and hospitality, where you will find yourself enchanted by a world of intrigue and majestic beauty. LOCATION • Madikwe Game Reserve – North West Province. • 4½ hours from Johannesburg/Pretoria. ACCOMMODATION MAIN CAMP • 10 Secluded glass fronted suites (±150m2) • Uninterrupted views of the African bush • Private deck with plunge pool • Air-conditioning • Fans • Fireplaces • Fully stocked mini-bar • Indoor and outdoor showers • Mosquito nets • Private lounge ACCOMMODATION LITTLE MADIKWE (Family Friendly Camp) Little Madikwe comprises of a 2 Bedroomed Suite (±390m2). An additional 2 Luxury Suites (±150m2) can be reserved to form a completely private camp accommodating up to 8 guests.
    [Show full text]
  • Operating Rules for Dams with High Evaporation Losses
    Operating Rules for Dams with High Evaporation Losses H. S. Swart1, P.G. van Rooyen2, B. Mwaka3, C. Ntuli4 1WRP Consulting Engineers (Pty) Ltd, H.S. Swart 2WRP Consulting Engineers (Pty) Ltd, P.G. van Rooyen 3 Department of Water Affairs and Forestry, Directorate of Water Resource Planning Systems, B. Mwaka 4 Department of Water Affairs and Forestry, Directorate of Water Resource Planning Systems, C. Ntuli Abstract The purpose of this assessment was to determine general and drought curtailment rules for the major dams situated within the Great Marico River System. The climate of the Marico catchment is semi-arid with the result that flow in the Marico River is highly variable and intermittent. The Water Resources Yield Model (WRYM) was used for the historic as well as the long- term and short-term stochastic yield analyses that were undertaken for each of the major dams. The short-term yield characteristics of the identified sub-systems together with the required assurance of supply of the different user groups in the system were subsequently incorporated in the more advanced Water Resources Planning Model (WRPM). Well established principles of system operation were applied and the WRPM was used to develop simplified curtailment curves for each sub- system. Alternative operating rules were assessed and the impact of the extremely high evaporation losses from reservoirs on the supply from the water resources was found to be significant. Consequently it was established that the average supply to water users could be increased by implementing less severe restrictions, i.e. when the water resources are operated at lower storage levels, the evaporation losses are reduced and the average supply to the users is increased.
    [Show full text]
  • An Assessment of the Health Status and Edibility of Fish from Three Impoundments in the North West Province, South Africa
    AN ASSESSMENT OF THE HEALTH STATUS AND EDIBILITY OF FISH FROM THREE IMPOUNDMENTS IN THE NORTH WEST PROVINCE, SOUTH AFRICA BY BYRON M. BESTER DISSERTATION SUBMITTED IN FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF MAGISTER SCIENTIÆ IN AQUATIC HEALTH IN THE FACULTY OF SCIENCE AT THE UNIVERSITY OF JOHANNESBURG SUPERVISOR: PROF. G. M. WAGENAAR CO-SUPERVISOR: DR J. C. VAN DYK DECEMBER 2013 NOTE: The financial assistance of the National Research Foundation (NRF), University of Johannesburg (UJ) and Cancer Association of South Africa (CANSA) is hereby acknowledged. Opinions expressed and conclusions arrived at, are those of the author and are not necessarily attributed to the abovementioned institutions. M. Sc. – 2013 TABLE OF CONTENTS TABLE OF CONTENTS ...................................................................................................................... II ACKNOWLEDGEMENTS ................................................................................................................. VII LIST OF ABBREVIATIONS .............................................................................................................. VIII GLOSSARY OF TERMS .................................................................................................................... XI LIST OF TABLES .......................................................................................................................... XIII LIST OF FIGURES .......................................................................................................................
    [Show full text]
  • Integrated Transboundary River Basin Management for the Sustainable Development of the Limpopo River Basin
    11/17/2019 Global Environment Facility (GEF) Operations Project Identication Form (PIF) entry – Full Sized Project – GEF - 7 Integrated Transboundary River Basin Management for the Sustainable Development of the Limpopo River Basin Part I: Project Information GEF ID 10182 Project Type FSP Type of Trust Fund GET CBIT/NGI CBIT NGI Project Title Integrated Transboundary River Basin Management for the Sustainable Development of the Limpopo River Basin Countries Regional, Botswana, Mozambique, South Africa, Zimbabwe Agency(ies) UNDP Other Executing Partner(s) Executing Partner Type Global Water Partnership – Southern Africa (GWP-SA Others https://gefportal.worldbank.org 1/68 11/17/2019 Global Environment Facility (GEF) Operations GEF Focal Area International Waters Taxonomy International Waters, Focal Areas, Communications, Stakeholders, Gender results areas, Gender Equality, Capacity, Knowledge and Research, Freshwater, River Basin, Inuencing models, Strengthen institutional capacity and decision-making, Demonstrate innovative approache, Convene multi-stakeholder alliances, Private Sector, Large corporations, Civil Society, Academia, Non-Governmental Organization, Local Communities, Awareness Raising, Behavior change, Education, Public Campaigns, Beneciaries, Gender Mainstreaming, Gender-sensitive indicators, Sex-disaggregated indicators, Capacity Development, Access and control over natural resources, Participation and leadership, Access to benets and services, Knowledge Generation and Exchange, Knowledge Generation, Knowledge Exchange, Learning
    [Show full text]
  • JOINT LIMPOPO RIVER BASIN STUDY SCOPING PHASE Final
    REPÚBLICA DE MOÇAMBIQUE MINISTÉRIO DAS OBRAS PUBLICAS E HABITAÇÃO DIRECÇÃO NACIONAL DE ÁGUAS REPÚBLICA DE M I OÇAM UE B Q On behalf of the LIMPOPO BASIN PERMANENT TECHNICAL COMMITTEE - LBPTC JOINT LIMPOPO RIVER BASIN STUDY SCOPING PHASE Final Report Main Report January 2010 Botswana Mozambique South Africa Zimbabwe FINANCED BY Commissioned by: In delegated cooperation with: PREPARED BY BIGCON CONSORTIUM MAIN REPORT TABLE OF CONTENTS Page LIST OF ABBREVIATIONS ......................................................................................................... i LIST OF FIGURES .......................................................................................................................ii LIST OF TABLES.........................................................................................................................iii ACKNOWLEDGEMENTS ........................................................................................................... iv 0 EXECUTIVE SUMMARY...................................................................................................... v 1 INTRODUCTION................................................................................................................... 1 2 THE LIMPOPO RIVER BASIN............................................................................................ 2 2.1 Geography and catchment division ...........................................................................................2 2.2 Topography and climate.............................................................................................................5
    [Show full text]