Community Meeting Title
Total Page:16
File Type:pdf, Size:1020Kb
August 19, 2019 100% Design /Construction Kick Off Community Meeting High School Site 113-H-W-4 Please sign in on your mobile device: https://communitymeeting.ocps.net/ High School Site 113-H-W-4 100% Design /Construction Kick off Meeting Agenda August 19, 2019 6:00 PM • Welcome – School Board Member: Pam Gould • Introductions – Jessma Lambert: Facilities Director, Construction Planning • Project Update – Lynn Lefebvre, AIA – Patrick Rauch, AIA – Tom Widener- Wharton- Smith • Questions and Answers • Adjournment 1 Site Location 113-H-W-4 WINDERMERE HS Lake Butler S.R. 429 DR. PHILLIPS HS Lake Hancock ORANGE FICQUETTE RD. COUNTY Lake Tibet NATIONAL GOLF COURSE Huckleberry Lake Lake Mabel Lake Sheen INTERSTATE 4 INTERSTATE Hickorynut Lake SITE 113 NEW HIGH SCHOOL DISNEY WORLD Reedy Lake NEW HS SITE 80 north LAKE COUNTY WINTER GARDEN VINELAND ROAD GARDEN VINELAND WINTER ORANGE COUNTY 2 Site Aerial 113- H-W-4 Tub Lake Hickorynut Lake Lakeshore SEIDEL ROAD H.S. Site 113-H-W-4 (+/-68 Acres) Reedy Lake north 3 Site Plan 113-H-W 4 SEIDEL ROAD FRONT DOOR Retention Wetland Parking (480 Spaces) FRONTAGE ROAD FRONTAGE Parent Drop Staff Parking (200 Spaces) 3-Story HS Campus Future Bus Fueling and Driver Lounge Location Tennis & Basketball Bus Parking Service Courts Parking (170 Fut. Exp. (75 buses Spaces) & 75 cars) Baseball Softball (lighted) (lighted) Stadium Track & Field Practice (lighted) Retention Practice north Student Stations = 2,776 Access Easement for Reedy Creek Improvement District 0’ 200’ Parking = 810 spaces Retention Car Stacking = up to 300 cars Bus Driver parking= 75 spaces On-site Bus Stacking = 40+ buses 4 Project Basis – OCPS Prototype High School 113-H-W-4 OCPS PROTOTYPE HIGH SCHOOLS Windermere High School Oak Ridge High School Evans High School Apopka High School West Orange High School Wekiva High School Ocoee High School Lake Nona High School East River High School Freedom High School Timber Creek High School Olympia High School Oak Ridge High School 5 Project Basis – OCPS Prototype High School 113-H-W-4 UPGRADES INCLUDED PROTOTYPE Windermere High School Educational • 21st Century Collaborative Learning Hubs Technology • Interactive Touchscreen Smart TV’s • WiFi access points throughout Energy Efficiency • LED lighting campus wide (interior, exterior, site and athletic fields) • High efficiency chillers and variable pumping scheme • Low flow plumbing fixtures • Commissioning of MEP systems • ASHRAE 90.1 compliance for lighting and power metering Security • Full security access control and cameras for the school • 2-way emergency radio system • Voice evacuation fire alarm system • Permanent generator and life safety lighting 6 Renderings 113-W-H-4 north 7 Renderings 113-H-W-4 north 8 Renderings 113-H-W-4 north 9 Renderings 113-H-W-4 north 10 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 344,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs MEDIA CENTER • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling CAFETERIA 15 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 340,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs COMPUTER LAB • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling SCIENCE LAB 16 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 340,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs AUDITORIUM • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling GYMNASIUM 17 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room Concessions • GREENHOUSE • Practice Fields • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-850 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) Bus parking (up to 75 buses) STADIUM/TRACK & FIELD 18 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions BASEBALL • Practice Fields • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-810 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) Bus Parking (up to 75 buses) SOFTBALL 19 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions • Practice Fields TENNIS • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-850 Spaces) Parent Drop off / pick up Bus Loop (up to 50 buses) Bus Driver parking = 75 spaces Bus Parking (up to 75 buses) OUTDOOR BASKETBALL 20 Additional Features 113-H-W-4 Safety & Security SECURE ENTRY POINT • Secure Courtyard Design • Single Secure Entry Point • Security System & Cameras • Card Reader Entrance Controls Educational Technology CLASSROOM TECHNOLOGY • 70” Touch Screen “Smart” Monitors • Audio Enhancement • WiFi Connectivity Audio Enhancement System 70” Touchscreen Wireless Access Point 21 Sustainability 113-H-W-4 Sustainable Design Criteria Building • 10% more energy efficient than ASHRAE 90.1 standard • High Efficiency Chillers (15% energy reduction) • Light colored roof to reduce heat gain and improves energy performance • Energy Efficient LED Lighting • Energy Star rated equipment • Water saving toilets, faucets, and fixtures • All classrooms have daylighting • Over 75% of ALL spaces have daylighting • Thermal efficient windows/glazing Site • Native/low water plants – reduce water consumption • Low Impact Design (LID) stormwater design 22 What to Expect 113-H-W-4 Work Hours* Road Closures Monday – Friday 6:00am – 6:00pm Frontage Rd. will be closed except to * Early morning concrete pours will be necessary and will be construction related traffic and for in strict accordance with the Orange County noise ordinance access to the adjacent solar field. Limited single lane closure will be Deliveries required along Seidel Rd. at times throughout the project to complete Monday – Friday 6:00am – 6:00pm work located immediately adjacent to traffic lanes. All construction deliveries to enter the jobsite from Frontage Rd. 23 Site Logistic Plan 113-H-W-4 24 Planned Schedule 113-H-W-4 April November January May August 2019 2019 2020 2021 2021 Design, Permitting, Early Main Campus Construction Move-In and Bidding Site Package 25 Questions & Answers 26.