August 19, 2019
100% Design /Construction Kick Off Community Meeting
High School Site 113-H-W-4
Please sign in on your mobile device: https://communitymeeting.ocps.net/ High School Site 113-H-W-4 100% Design /Construction Kick off Meeting Agenda August 19, 2019 6:00 PM • Welcome – School Board Member: Pam Gould • Introductions – Jessma Lambert: Facilities Director, Construction Planning • Project Update – Lynn Lefebvre, AIA – Patrick Rauch, AIA – Tom Widener- Wharton- Smith • Questions and Answers • Adjournment
1 Site Location 113-H-W-4
WINDERMERE HS Lake Butler
S.R. 429 DR. PHILLIPS HS
Lake Hancock
ORANGE FICQUETTE RD. COUNTY Lake Tibet NATIONAL GOLF COURSE
Huckleberry Lake Lake Mabel Lake Sheen INTERSTATE 4 INTERSTATE
Hickorynut Lake SITE 113 NEW HIGH SCHOOL DISNEY WORLD
Reedy Lake
NEW HS SITE 80 north LAKE COUNTY WINTER GARDEN VINELAND ROAD GARDEN VINELAND WINTER ORANGECOUNTY
2 Site Aerial 113- H-W-4
Tub Lake Hickorynut Lake
Lakeshore
SEIDEL ROAD
H.S. Site 113-H-W-4 (+/-68 Acres) Reedy Lake
north
3 Site Plan 113-H-W 4
SEIDEL ROAD FRONT DOOR Retention
Wetland
Parking (480 Spaces) FRONTAGE ROAD FRONTAGE Parent Drop Staff Parking (200 Spaces) 3-Story HS Campus Future Bus Fueling and Driver Lounge Location Tennis & Basketball Bus Parking Service Courts Parking (170 Fut. Exp. (75 buses Spaces) & 75 cars) Baseball Softball (lighted) (lighted)
Stadium Track & Field Practice (lighted) Retention
Practice north Student Stations = 2,776 Access Easement for Reedy Creek Improvement District 0’ 200’ Parking = 810 spaces Retention Car Stacking = up to 300 cars Bus Driver parking= 75 spaces On-site Bus Stacking = 40+ buses 4 Project Basis – OCPS Prototype High School 113-H-W-4 OCPS PROTOTYPE HIGH SCHOOLS Windermere High School Oak Ridge High School Evans High School Apopka High School West Orange High School Wekiva High School Ocoee High School Lake Nona High School East River High School Freedom High School Timber Creek High School Olympia High School
Oak Ridge High School
5 Project Basis – OCPS Prototype High School 113-H-W-4 UPGRADES INCLUDED PROTOTYPE Windermere High School Educational • 21st Century Collaborative Learning Hubs
Technology • Interactive Touchscreen Smart TV’s • WiFi access points throughout
Energy Efficiency • LED lighting campus wide (interior, exterior, site and athletic fields) • High efficiency chillers and variable pumping scheme • Low flow plumbing fixtures • Commissioning of MEP systems • ASHRAE 90.1 compliance for lighting and power metering
Security • Full security access control and cameras for the school • 2-way emergency radio system • Voice evacuation fire alarm system • Permanent generator and life safety lighting 6 Renderings 113-W-H-4
north
7 Renderings 113-H-W-4
north
8 Renderings 113-H-W-4
north
9 Renderings 113-H-W-4
north
10 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 344,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs MEDIA CENTER • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling CAFETERIA
15 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 340,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs COMPUTER LAB • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling SCIENCE LAB
16 Building Program 113-H-W-4 Student Capacity: 2,776 Buildings: 340,000 Square Feet Campus Program Administration Media Center Cafeteria Classroom Buildings • Classrooms • Science Labs AUDITORIUM • Computer Labs • CTE Labs Auditorium & Music Spaces • Band • Vocal • Orchestra • Piano Lab Gymnasium • Locker Rooms • Weight Room • Gymnastics/Dance • Wrestling GYMNASIUM
17 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room Concessions • GREENHOUSE • Practice Fields • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-850 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) Bus parking (up to 75 buses) STADIUM/TRACK & FIELD
18 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions BASEBALL • Practice Fields • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-810 Spaces) Parent Drop off / pick up Bus Loop (up to 60 buses) Bus Parking (up to 75 buses) SOFTBALL
19 Site Program 113-H-W-4 Site: +/-68 Acres Site Amenities Greenhouse and Shade house Athletics • Field House at Stadium/Track •Locker Rooms •Weight Room •Concessions • Practice Fields TENNIS • Baseball Field • Softball Field • Baseball & Softball Concessions • Tennis Courts • Outdoor Basketball Courts Cars and Buses Student and Faculty parking (+/-850 Spaces) Parent Drop off / pick up Bus Loop (up to 50 buses) Bus Driver parking = 75 spaces Bus Parking (up to 75 buses) OUTDOOR BASKETBALL
20 Additional Features 113-H-W-4 Safety & Security SECURE ENTRY POINT • Secure Courtyard Design • Single Secure Entry Point • Security System & Cameras • Card Reader Entrance Controls
Educational Technology CLASSROOM TECHNOLOGY • 70” Touch Screen “Smart” Monitors • Audio Enhancement • WiFi Connectivity
Audio Enhancement System 70” Touchscreen
Wireless Access Point
21 Sustainability 113-H-W-4 Sustainable Design Criteria Building • 10% more energy efficient than ASHRAE 90.1 standard • High Efficiency Chillers (15% energy reduction) • Light colored roof to reduce heat gain and improves energy performance • Energy Efficient LED Lighting • Energy Star rated equipment • Water saving toilets, faucets, and fixtures • All classrooms have daylighting • Over 75% of ALL spaces have daylighting • Thermal efficient windows/glazing
Site • Native/low water plants – reduce water consumption • Low Impact Design (LID) stormwater design
22 What to Expect 113-H-W-4 Work Hours* Road Closures Monday – Friday 6:00am – 6:00pm Frontage Rd. will be closed except to * Early morning concrete pours will be necessary and will be construction related traffic and for in strict accordance with the Orange County noise ordinance access to the adjacent solar field.
Limited single lane closure will be Deliveries required along Seidel Rd. at times throughout the project to complete Monday – Friday 6:00am – 6:00pm work located immediately adjacent to traffic lanes. All construction deliveries to enter the jobsite from Frontage Rd.
23 Site Logistic Plan 113-H-W-4
24 Planned Schedule 113-H-W-4
April November January May August 2019 2019 2020 2021 2021
Design, Permitting, Early Main Campus Construction Move-In and Bidding Site Package
25 Questions & Answers
26